Item E5 to • f PW & Eng Report at BOCC Meeting 1 . Cudj oe Update (Kevin W) (Attachment A) 2. Paving in Cudj oe Region (Kevin W) a. Private Roads — recommend they be repaired Question is extent (pending County Attorney opinion) b. Additional paving (other lane recommend approval — other based upon condition priority — see chart Attachment B) Adds $6.7 million (Attachment B) 3. Upcoming proposed changes in Cudjoe Scope of Work (Attachment C) 4. Paving Evaluation / Rehabilitation (Judy C) a. Status b. Schedule 9/16/2013 Attachment A Cudjoe Status September 2013 (Snapshot at September 13, 2013) Finances FKAA Advances to date $24.0 million (since7/2012) Expenditures to date -Fully processed against advances $10.1 million -"in process" w/in County $ 1.6 million -"in process"/expected in August at FKAA $13.7 million (since7/2012) FKAA advances on hand $10.3 million (review expected cash flow for 4th Qtr / 2013) Construction (from FKAA) WWTP Foundation work completed on major BNR (Bio Nutrient Reactor) structure. Yard piping and electrical duct banks being installed. Inner Islands Work continuing on Spanish Main, ready to start in Cudjoe Estates, and Cudjoe Gardens. Gravity and LPS areas. Outer Islands Construction work on Lower Sugarloaf Key and Ramrod; LPS areas. Gravity resources mobilized and dewater injection wells being drilled on Lower Sugarloaf Key. Design work for Big Pine is 60% complete. 9/16/2013 Aftachm.ent B Cujoe Sewer Project Paving Costs (all entries in$mIlHons) Island---""'--'-A-lready included in Add full width paving in Add full width paving in Add full width paving in basic project project.areas where areas within the project areas outside of the streets vAil betrenched area where streets will not poroject areas on the be trenched rest of the island ................................................................................................... ........................... .............. ........................-------- ............... Upper Sugarloaf $OA6 $0.30 $0.48 M05 ................--. . .............................................. ........................................................................................... Cudjoe $1.15 $0.18 $1.22 $0.37 Summeda-nd- $0.90- $0.15- $0.36 $0.37 Change Order Fee $0.06 $0.21. Moa ............................. ........... ...................................... subtotal Inner(by area) $2.21 $0.69 $2.27 $0.87 cumulative.,Ira $0.69 $2.96 $3.83 additional paving - ---------------------------------------------- $0.82 Lower Sugarloaf $1.24 -$1.02 ........................................... ............................................................................................................................. Ramrod $0.90 $0.29 $0.38 $0.03 ........................ ............................................ UttleTorch $0.r84 $0AS $0.36 $0.02 ........................................................................ ................. ............. ....... ................. Big Pine $4.56 $161 $1.42 $0.29 ._._....-._......a_ ................. ...... DB fee �0,60 $0A5 SOAS S0.09 ....................... ......................................................... subtotal Outer(by area) $8.15 $6.01 $2A2 $1.26 cumulative outer $6.01 $8.43 $9.69 additional paving Total Paving included in Project Grand Total of $6.70 $1.1.39 $1152 added paving (each column 39 includes all prior columns) Recommendation Should be considered If 1.1 It I complietes a contiguous wee or 2)Pavement study Mes this as a high pokmft .....................-1......................................................................................................... 9/16/2013 Attachment C Upcoming Items (FKAA Board review 25 SEP / BOCC Approvals in October) 1 . Addition of full width paving ($6.7 million) (inner & outer island areas) 2. Addition of remote monitoring for grinder pumps ($655k) and emergency generator receptacle ($319k) (outer islands) 3. Credit from elimination of Niles Channel extra casing in directional drill (-$250k) & expedited design schedule (-$13k) (outer islands) 4. Sales Tax saving on direct equipment purchase by FKAA (-$4 k) (outer islands) 5. Addition of Little Palm Island to service area (cost neutral — assessments offset added costs) (outer islands) 6. Additional connections for properties developed after bid documents ($210k) (outer islands) Net proposed increase in project cost (excluding added paving) is $, , k 9/16/2013