Loading...
Item L09 L.9 Coty f � ,�� BOARD OF COUNTY CONIMSSIONERS �� Mayor David Rice,District 4 The Florida Keys � Mayor Pro Tem Craig Cates,District I y Michelle Coldiron,District 2 James K.Scholl,District 3 Ij Holly Merrill Raschein,District 5 County Commission Meeting November 15, 2022 Agenda Item Number: L.9 Agenda Item Summary #11336 BULK ITEM: Yes DEPARTMENT: Airports TIME APPROXIMATE: STAFF CONTACT: Richard Strickland(305) 809-5200 N/A AGENDA ITEM WORDING: Report of Airport change orders reviewed by the County Administrator/Assistant County Administrator. ITEM BACKGROUND: There were two (2) change orders considered and approved by the County Administrator/Assistant Administrator during the month of October, 2022. PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No. 27-1998 was adopted in order to provide that the County Administrator may approve separate, non-cumulative change orders for construction projects and professional service contracts in amounts not to exceed $50,0000 (as amended by Ordinance No. 024-2015) or 5% of the original contract price, whichever is greater. The BOCC requested a monthly report of all change orders considered by the County Administrator. CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATION: N/A DOCUMENTATION: Airport Monthly Change Order Report FINANCIAL IMPACT: Effective Date: Expiration Date: Total Dollar Value of Contract: n/a Total Cost to County: 0 Packet Pg. 3133 L.9 Current Year Portion: Budgeted: Source of Funds: CPI: Indirect Costs: Estimated Ongoing Costs Not Included in above dollar amounts: Revenue Producing: No If yes, amount: Grant: County Match: Insurance Required: No Additional Details: REVIEWED BY: Beth Leto Completed 10/27/2022 8:48 AM Richard Strickland Completed 10/27/2022 11:03 AM Pedro Mercado Completed 10/27/2022 11:08 AM Purchasing Completed 10/27/2022 2:32 PM Budget and Finance Completed 10/27/2022 3:15 PM Brian Bradley Completed 10/27/2022 3:40 PM Lindsey Ballard Completed 10/31/2022 2:42 PM Board of County Commissioners Pending 11/15/2022 9:00 AM Packet Pg. 3134 (podea japio a ueg0 @od!!¥. G MAM podea japio a ueg0 Alq4uoW 4jodjiV :4u9wq3ej4V q 2 � � _ $ j ) : IL � IL\ ) ) 0 _ \ \ \ { m / o �go } � \ \\ \ \ \ / \ ! lo) 3\ ! o !226 2 \ \ 7 ® go ` ; [ R \ \ o H \\ \\ o _ a2a k2 \ \ o o {I ƒ \ ) , - ) - { o \ \\\ w }u § °o \) a -\ {\/ \ )\ }) o \ { \ jzj { o < - : i ( ! \ \ ) \ \ \ E ° § ; - ® ( ) 3 ] \ \ o o k < \ L.9.a MONROE COUNrI Y/DEPARnUNT OF AIRPORTS CONTRACT CHANGE ORDER PROJECT TITLE: Marathon International Airport CHANGE ORDER NO: 13 Terminal Re-Roof Project INITIATION DATE: September 15,2022 TO CONTRACTOR: Marino Construction Group CONTRACT DATE: March 17, 2021CL as The Contract is changed as follows: as The original (Contract Sum) (Guaranteed Maximum:Price).......................................... $ 1,888,375.00 as Net change by previously authorized Change Orders..,., ................................ $ 0.00 The(Contract Sump(Guaranteed Maximum Price) prior to this Change order was.. ..........$ 1,888,375.00 The(Contract Sum) (Guaranteed Maximum Price)will be(increase (decreased) tf (unchanged) by this Change Order-...1 o The new(Contract Sum)_(Guaranteed Maximum Price) including this Change Order is....... $ 1,888,375.00 : The Contract Time will be(increased) (decreased),(unchanged)by... ............. 60 days The date of Substantial Completion as of the date of this Change Order is....................November 14,2022 Detailed description of change order and justification: This change order Is for Final Completion Time Extenslon!is requested in order to compile final closeout documents and attain all final inspections. CL o as This Change Order is 0.01°0 of the original contract price. Not v@ id until signed by Owner.Architect if a licable and Contractor as ARCHITECT: r �crr 9/===== Date CONTRACTOR: 0 DIRECTOR OF AIRPORTS 9.20.21 2" � .... � � , Date ....... MONROE COUNTY: fit./Count Administrator 1 ODate 022 S5 y U NFtOE COUNTY ATFOnNElt" A lO 'E FORM PE J',. A S11 A LINTY ATTORNEY Date 9/22/22 Packet Pg. 3136 L.9.a Change Order Attachment per Monroe County Code Section 2-58(b) Change Order was not included in the original contract specifications. Yes( X) No( ) If Yes, explanation: This change order is for Final Completion Time Extension#5 requested in order to compile final closeout documents and attain all final inspections. • Change Order was included in the original specifications. Yes ( ) No ( X ) if Yes, explanation of increase in price: U 0 • Change Order exceeds$50,000 or 5%of contract price(whichever is greater).Yes( No(X) CL If Yes, explanation as to why it is not subject for a calling for bids: 0 CL • Project architect approves the change order. Yes(X ) No ( ) If no,explanation of why: • Change Order is correcting an error or omission in design document. Yes ( ) No ( X ) Should a claim under the applicable professional liability policy be made? Yes( ) No ( X ) U Explain: 0 0 CL 4i c� Packet Pg. 3137 L.9.a MONROE COUNTY/DEPARTMENT OF AIRPORTS CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO: 5 FBO ACCESS ROAD, KWIA INITIATION DATE:_October 5, 2022 0 TO CONTRACTOR: CHARLEY TOPPINO& SONS, INC CONTRACT DATE: APRIL 21, 2021 CL as as The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price)......... ... ................... .... $ 3,163,649.67 aCD s Net change by previously authorized Change Orders................. ...... $ 342,647.81 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was ....... ....$ 3,506,297.48 The (Contract Sum) (Guaranteed Maximum Price)will be (increased) (decreased) tf (unchanged) by this Change Order,.., .$ 133,585.24 0 The new(Qo CL rrtr Lt. ram) (Guaranteed Maximum Price) including this Change Order is._.,. $ 3,639,882.72 The Contract Time will be increased (decreased) (unchanged) by........................... 77 days The date of Substantial Completion as of the date of this Change Order is. ....... 11/24/2022 Detailed description of change order and justification: This change order includes (1)Airport Sign Letter Change, (2) Sanitary Manhole Adjustment, (3 Curb Repair, (4) Light pole Relocation, (5) Fire Well Monitoring/Abandonment, (6)Addition of a gas CL and fire line for future connection to Concourse A that is within the Access Road limits. (7) NCL Pre- existing storm drain removal and (8) AT&T allowance overrun, (9) Dumpster Pad Credit. E This change Order is 4.22% of the original contract price. as Not valid until signed by Owner Architect if applicable),and Contractor ARCHITECT: ...., .. 10/10/2022 ate 0 CONTRACTOR_ ..... �� �� Date " ,� DIRECTOR OF AIRPORTS ,, 10.14.2022 Date E MONROE COUNTY: �"� �w�� C 10.19.2022 U Asst./CountyAdministrator Date ' ahNO COUNTY ATTOn FORM EY PECM O J. C56 ASSISTA to AITORNEY Date 10/17/22 Packet Pg. 3138 L.9.a Change Order Attachment per Monroe County Code Section 2-58(b) Change Order was not included in the original contract specifications. Yes ( ) No (X) If Yes, explanation : Additional site work for new above ground fuel tank within the limits of existing project Change Order was included in the original specifications. Yes ( ) No (X ) CL If Yes, explanation of increase in price: U Change Order exceeds$50,000 or 5%of contract price(whichever is greater).Yes() No(X) 0 CL If Yes, explanation as to why it is not subject for a calling forbids: Project architect approves the change order. Yes(X) No ( CL If no,explanation of why: Change Order is correcting an error or omission in design document. Yes ( ) No (X ) Should a claim under the applicable professional liability policy be made? Yes ( ) No (X) U Explain: 21 0 0 CL c� Packet Pg. 3139 L.9.a CHANGE 0 11 R I D ER N .5 SUMMARY OF ITN ITEM INCREASE DECREASE ] 1. Airport Sign Change $ 6,151.35 2.Adjusting Sanitary Manhole $ 1,200,00 3. Curb Repair $ 850.00 4. Lightpole Relocation $ 1,428.00 5. Fire Well and Monitoring Abandonment $ 7,000.00 6. Gas and Fire Line $ 201,180.00 CL 7, NCL Pre-existing Storm Drain Removal $ 6,442.00 8. AMTAllowarice Overrun (SCIV No. 64) $ 1,769,13 9. Dumpster Pad Credit $ (92,435,24) $ 226,020.48 a� OTAL CHIANGE ORDER NO.S 33,585.24 u 0 CL 0 CL u 21 0 0 CL c� Packet Pg. 3140 L.9.a Price Quotation Attention: McFarland Johnson DATE. 9/7/22 2409 North Roosevelt Blvd Suite 4 Key West,Florida 33040 ITEMIZED QUANTITIES Location: 3491 S Roosevelt Blvd,Key West FL 33040 Scope: Change Order for Larger Lettering on Airport Signs Item Description Quantity Units Cost per Unit Line Item Cost Notes CL 1 Airport Sign Design Change 1.0 LS $ 5,349.00 $ 5,349.00 Additional 3/8"high letters for main gate and 7'letters for the support s'n Dismantle and modify a/mady fabricated forms Shpp charqes p W 0 CL a Subtotal $ 5,349.00 2 Overhead&Profit 15% 1.0 LS $802.35 $802.35 3 Performance/Payment Bonds$20.00/Thousand 1.0 LS 4 Mobilization/Demobilization 1.0 LS 0 General Conditions 1.0 LS CL Total: $ 6,151.35 Notes: Exclusions: Prepared by: Estimator lCharley Toppino&Sons,Inc. Sheet 1 of 1 Date: 9/7/22 Signature: Date: , 0 CL ass E Packet Pg. 3141 L.9.a P'EDRO � �� � 31.1.Q� �(305) „ 3V �Vu 872 0 Key, (3 5) 72 4516 ............................................................................................................. REQUEST FOR CHANGE ORDER 06/20/2022 0 CL Attn.: Carli Bernard Charley Toppino and Sons, Inc. as CID Project: Key West International Airport Access Road tf RE: Request for Change Order for larger lettering and modifying already made forms CL Ms. Bernard, The purpose of this letter is to request a Change Order for the additional cost associated with purchasing larger font letters per the attached drawings included in the email received 07/27/2022. This revised drawings CL increased the letter for the main airport and the support signs. It also modified the recessed area on where the °b letters will be installed. Since we already had the forms fabricated at our shop, these forms will now need to be modified. Furthermore,we did not know if additional mock-ups will be needed so, we have included an alternate price in case it is needed. CI Therefore, see below additional cost for these changes: A) Additional 9 3/8" high letters for main gate and 7" letters for the support sign......$ 2,562.00 B) Shipping the letters...............................................................................................................$ 807.00 0 C) Dismantle and modify already fabricated forms............................................................$ 1,980.00 tf CL Total additional cost......................................................................................................$5,349.00 < Alternate for additional mock-ups if needed add: E Form, pour, strip and paint mock-ups............................................................................$ 2,450.33 0 Contact me if you have any questions. Respectfully Submitted, Pedro Falcon Contractors, Inc. Christian Brisson As President Packet Pg. 3142 L.9.a Price Quotation Attention: McFarland Johnson DATE. 8/30/22 2409 North Roosevelt Blvd Suite 4 Key West,Florida 33040 ITEMIZED QUANTITIES Location: 3491 S Roosevelt Blvd,Key West FL 33040 Scope: Adjusting Sanitary Manhole Item Description Quantity Units Cost per Unit Line Item Cost Notes CL 1 Adjusting Sanitary Manhole 1.0 LS $ 1,120.00 $ 1,120.00 l Pmject Foremen 2 Skilled Laborers Generator&Chipping Gun p W 0 CL a Subtotal $ 1,120.00 2 Performance/Payment Bonds$20.00/Thousand 1.0 LS 3 General Conditions 1.0 LS 0 CL Total: $ 1,120.00 Notes: Pro sal valid for 30 days Exclusions: Bonding,asbestos abatement,lead paint removal,environmental testing,surveying, contaminated soils mrno.L Prepared by: Estimator Charley Toppino&Sons,Inc. 21 Sheet 1 of! Date: 8/30122 0 Signature: Date: 0 CL ass E Packet Pg. 3143 L.9.a Price Quotation Attention: McFarland Johnson DATE. 8/30/22 2409 North Roosevelt Blvd Suite 4 Key West,Florida 33040 ITEMIZED QUANTITIES Location: 3491 S Roosevelt Blvd,Key West FL 33040 Scope: Curb Repair-Seaplane Item Description Quantity Units Cost per Unit Line Item Cost Notes CL 1 Curb Repair 1.0 LS $ 850.00 $ 850.00 l Pro'ect Foremen Op—tor 2 Skilled Laborers 1 Rubber Tim Excavator L- Ready Mix Concrete p W 0 CL a Subtotal $ 850.00 2 Performance/Payment Bonds$20.00/Thousand 1.0 LS 1� 3 General Conditions 1.0 LS 0 CL Total: $ 850.00 Notes: Pro sal valid for 30 days Bonding,asbestos abatement,lead paint removal,environmental testing,surveying, Exclusions: contaminated soils rerroval. Prepared by: U Estimator 21 Charley Toppino&Sons,Inc. Sheet t oft Date: 8/30122 0 Signature: Date: 0 CL ass E Packet Pg. 3144 L.9.a Price Quotation Attention: McFarland Johnson DATE. 8/30/22 2409 North Roosevelt Blvd Suite 4 Key West,Florida 33040 ITEMIZED QUANTITIES Location: 3491 S Roosevelt Blvd,Key West FL 33040 Scope: Lightpole Relocation Item Description Quantity Units Cost per Unit Line Item Cost Notes CL 1 Li ht ole Relocation 1.0 LS $ 1,426.00 $ 1,426.00 l Pre'ect Foremen Op-tor l Skilled Laborers 1 Rubber Tim Excavator Bobcat 0.✓ p W 0 CL a Subtotal $ 1,426.00 2 Performance/Payment Bonds$20.00/Thousand 1.0 LS 1� 3 General Conditions 1.0 LS 0 CL Total: $ 1,426.00 Notes: Pro sal valid for 30 days Bonding,asbestos abatement,lead paint removal,environmental testing,surveying, Exclusions: contaminated soils rerroval. Prepared by: U Estimator 21 Charley Toppino&Sons,Inc. Sheet 1 of 1 Date: 8/30122 0 Signature: Date: 0 CL ass E Packet Pg. 3145 L.9.a Price Quotation Attention: McFarland Johnson DATE. 9/7/22 2409 North Roosevelt Blvd Suite 4 Key West,Florida 33040 ITEMIZED QUANTITIES Location: 3491 S Roosevelt Blvd,Key West FL 33040 Scope: Well Abandonment Item Description Quantity Units Cost per Unit Line Item Cost Notes CL 1 Fire Well and Monitoring Well Abandonment 2.0 EA $ 3,500.00 $ 7,000.00 #57 Rock Ready Mix Concrete Grout p W 0 CL a Subtotal $ 7,000.00 2 Performance/Payment Bonds$20.00/Thousand 1.0 LS 3 General Conditions 1.0 LS 0 CL Total: $ 7,000.00 Notes: Pro sal valid for30 da s Exclusions: Bonding,asbestos abatement,lead paint removal,environmental testing,surveying, contaminated soils rerroval. Prepared by: Estimator Charley Toppino&Sons,Inc. 21 Sheet t oft Date: 9/7/22 0 Signature: Date: 0 CL ass E Packet Pg. 3146 L.9.a Price Quotation Attention: McFarland Johnson DATE. 9/15/22 2409 North Roosevelt Blvd Suite 4 Key West,Florida 33040 ITEMIZED QUANTITIES Location: 3491 S Roosevelt Blvd,Key West FL 33040 Scope: Dumpster Pad Credit Item Description Quantity Units Cost per Unit Line Item Cost Notes CL Dum ster Pad Credit 100-1 Mobilization 1.0 LS $ 3983.00 $ 3983.00 102-1 MOT 1.0 LS N/A N/A 104-2 Sediment Barrier 0.0 LF $ 2.50 $ - 104-5 Concrete Washout Structure 1.0 EA $ 1 750.00 $ 1 750.00 110-1 Clearing and Grubbing 0.011 AC $ 121 000.00 $ 1 331.00 110-6 Removal of Existing Asphalt&Parking Sin 1.0 LS $ 250000 $ 250000 120-1 Re ualr Excavation 67.5 CY $ 21.00 $ 1 417.50 160-1 Type B Stabilization 303.5 SY 1$ 12.71 $ 385749 230-1 Limerock Material 33.4 CY $ 62.50 $ 208750 334-1 Supericave Asphaltic Con Traffic B 5.0 Tons $ 219.00 $ 1 095.00 350-1 Reinforced Cement Concrete Pavement 8" 2200. SY $ 196.00 $ 43120.00 pp qq 550-1 Fencing,T be B 10'with Barbed Wire 175.0 LF $ 96.00 $ 1680000 �d 550-2 Fence Gate Type B Single 3'O enin 2.0 EA $ 1 220.00 $ 244000 550-3 Fence Gate Type B Double 12'O enin 4.0 EA $ 270000 $ 1080000 570-2 Performance Turf Sod 39.0 SY 6.25 243.75 850-1 1"Conduit in Trench with Feeders 76.0 LF $ 10.00 $ 760.00 CL 850-1 Reinstall Dum ster Panel(*Already Installed-No credit 1.0 Ea 250.00 250.00 a Subtotal $ 92,435.24 0 Performance/Payment Bonds$20.00/Thousand 1.0 LS CL General Conditions 1.0 LS Total: $ (92,435.24) Notes: Credit for work not performed Exclusions: p W Prepared by: MEstimator Charley Toppino&Sons,Inc. Sheet 1 of 1 0 Date: 9/15/22 Signature: Date: 0 CL ass E Packet Pg. 3147 L.9.a Price Quotation Attention: McFarland Johnson DATE. 9/14/22 2409 North Roosevelt Blvd Suite 4 Key West,Florida 33040 ITEMIZED QUANTITIES Location: 3491 S Roosevelt Blvd,Key West FL 33040 Scope: Installation of new 8"Fire and 4"PVC for Gas Line Item Description Quantity Units Cost per Unit Line Item Cost Notes CL 1 Installation of New 8"Fire and V PVC for Gas Line 1.0 LS $ 201,180.00 $ 201,180.00 8"C900 DR14 PVC GJ Blue Pie&A urt—nces 8"Gate Valve 4"S40 PVC Milling&Ashad Pavement 2"SP9.5(Approx.5,450 SF #57 Rock Flowfill 500 PSI Testin Dewatering Pumps p W 0 CL a Subtotal $ 201,180.00 2 Performance/Payment Bonds$20.00/Thousand 1.0 LS 3 General Conditions 1.0 LS 0 CL Total: $ 201,180.00 Notes: Pro sal valid for 30 days Exclusions: Bonding,asbestos abatement,lead paint removal,environmental testing,surveying, contaminated soils removal. Prepared by: Estimator U Charley Toppino&Sons,Inc. Sheet 1 of 1 Date: 9/14/22 Signature: Date: 0 0 CL ass E Packet Pg. 3148