GMP 1st Amendment 08/17/2022 oi� �I ui uumuuu II
A 0NmMUN 1 IIINpllll
i
UII d III..)A
FL KEYS MARATHON AIRPORT NAUB - EOC
7280 Overseas Hwy
Marathon, FL 33050
Ajax Job: 202011
VI �
r�
�a
GUARANTEED MAXIMUM PRICE PROPOSAL
August 5, 2022
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
TABLE OF CONTENTS
I. Executive Summary
II. List of Documents
III. Description of Work
A. Clarifications, Qualifications and Assumptions
IV. GMP Cost Summary
A. GMP Cost Narrative
B. GMP Cost Report—Base Bid GMP (CM Summary Report)
C. GMP Cost Report—Base Bid GMP (CM Detail Report)
D. Allowance Schedule
V. Site Utilization Plan
A. Site Utilization Plan Narrative
B. Site Utilization Plan
VI. Project Schedule
A. Project Schedule Narrative
B. Project Schedule
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
EXECUTIVE SUMMARY
Ajax Building Company, LLC is pleased to present this Guaranteed Maximum Price(GMP) Proposal for the FL Keys
Marathon Airport NAUB EOC for consideration by Monroe County. This GMP Proposal will recap the status of the
project through the end of the GMP Phase and will provide cost reports, schedule and other project information to be
utilized by the project team as the project moves forward. This GMP Proposal, upon acceptance by Monroe County,
is intended to be incorporated into the CM Contract for construction phase activities.
Project Description
The project consists of a 25,799 SF elevated concrete structure with double roof system designed to FEMA 361
standards on the southwest corner of the Marathon Airport and all related sitework. The facility houses the Monroe
County Emergency Operations Center, Sheriff's Call Center&Dispatch and Fire Administration. These spaces are
served by redundant utility systems for potable water,wastewater and emergency power. State of the art audio-
visual technology and access control systems are being implemented including video walls and biometric screening..
Guaranteed Maximum Price(GMP)
Ajax Building Company, LLC is confident that the GMP costs included herein are representative of the proposed
scope of work depicted in the GMP Documents. The work included in the GMP Proposal is based upon the List of
Documents included in Section II of this proposal as amended by the Clarifications, Qualifications, and Assumptions
and the Allowance Schedule, contained in Sections III and IV of this proposal.
The Base Bid GMP Proposal for the FL Keys Marathon Airport NAUB EOC totals$31,856,275. The Base Bid GMP
Proposal includes the 25,799 SF EOC and all related sitework.
Project Schedule
The project schedule included within this proposal is based on the information represented in the GMP Documents.
The project schedule reflects an overall duration of eighteen (18)months for the construction phase of the project.
The following contractual dates are incorporated into the CM Contract via this GMP Proposal.
• Substantial Completion February 2, 2024
• Final Completion March 15, 2024
The following additional Milestone Dates are anticipated within the project schedule in order to achieve the
contractual dates listed above.
• Mobilization/Start of Construction October 6, 2022
• Top-Out of Building Structure April 3, 2023
• Building Dry-In May 9, 2023
• Permanent Power September 6, 2023
• Owner Occupancy February 26, 2024
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
In order for construction activities to commence on October 6, 2022 as scheduled, the following contractual activities
will need to be completed as indicated.
• GMP Negotiations Complete August 10, 2022
• CM Contract Amendment Executed August 17,2022
• All Required Permits Issued September 23, 2022
• Grant Submission to FDEM &FDOT October 28, 2021
• FEMA, FDEM, & FDOT Approval July 1, 2022
• Notice to Proceed Issued August 18, 2022
In order to expedite the project start-up activities, the Design Team, the Construction Manager and the Owner will be
required to closely coordinate and expedite submittal review/approval, respond to information requests, respond to
conflicts/unforeseen conditions, etc.
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
LIST OF DOCUMENTS
The work included in this GMP Proposal is based upon the List of Documents immediately following this narrative
subject to amendments by the Clarifications, Qualifications and Assumptions and the Allowance Schedule, contained
in Sections III and IV of this proposal.
The List of Documents includes the:
• Contract Drawings
• Project Specifications
• Addenda Issued by the Architect/Engineer
• Pre-Bid Requests for Information (Pre-Bid RFI's)
• Bid Packages and Bid Package Addenda
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
CONTRACT DRAWINGS
Entitled 100% Permit Documents dated 8/11/2021
Sheet Description Date Revised Revised
Cover Sheet 8/11/21 8/25/21 10/1/21
Life Safety
G-100 Project Criteria 8/11/21 10/1/21
G-101 Life Safety Plan 8/11/21 8/25/21 10/1/21
G-102 Design Information 9/21/21 9/21/21
G-201 Wall Type Details 8/11/21
G-202 Wall Type Details 8/11/21
G-203 UL Details 8/11/21
G-204 UL Details 8/11/21
G-205 UL Details 8/11/21
G-206 UL Details 8/11/21
G-207 UL Details 8/11/21
G-208 UL Details 8/11/21
Civil
01 Cover Sheet 8/09/21 11/03/21
02 Construction Notes 8/09/21 9/27/21*
03 Legends and Project Information 8/09/21 9/27/21*
04 Aerial w/Project Overlay 8/09/21 9/27/21*
05 Site Plan 8/09/21 9/27/21*
06 Paving Grading &Drainage Plan 8/09/21 9/27/21*
07 Typical Sections& Details 8/09/21 9/27/21*
08 Details 8/09/21 9/27/21*
09 Utility Plan 8/09/21 9/27/21* 11/03/21
10 Utility Details 8/09/21 9/27/21* 11/03/21
11 Lift Station Details 8/09/21 9/27/21* 11/03/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Sheet Description Date Revised Revised
12 Temporary Erosion Control Plan 8/09/21 9/27/21* 11/03/21
13 Temporary Erosion Control Details 8/09/21 9/27/21*
*09/27/21 was issued as part of the ADG Addendum 02 dated
09/21/21
Landscape
LP-0 Cover Sheet 8/11/21
LP-1 Landscape Plant List, Notes &Details 8/11/21 10/1/21
LP-2 Landscape Plan 8/11/21 10/1/21
IR-01 Irrigation Plan 8/11/21 9/21/21 10/1/21
IR-02 Irrigation Plan 8/11/21
IR-03 Irrigation Calculations 8/11/21
IR-04 Irrigations Details 8/11/21
IR-05 Irrigations Details 8/11/21
IR-06 Irrigation Specifications 8/11/21
Structural
S-000 Cover Sheet& Drawing List 8/11/21
S-001 General Notes 8/11/21 9/21/21
S-002 General Notes 8/11/21 10/1/21
S-003 Threshold Inspection Plan 8/11/21
S-004 Threshold Inspection Plan 8/11/21
S-005 Cladding Wind Pressure Diagram 8/11/21 9/21/21
S-006 Gravity Loading Plans 8/11/21 8/25/21
S-007 Lap Splice Schedules 8/11/21
S-101 Foundation Plan 8/11/21 8/25/21 9/21/21
S-102 First Floor Framing Plan 8/11/21 8/25/21 9/21/21
S-103 Roof Framing Plan 8/11/21 9/21/21
S-200 Typical Footing Details and Schedule 8/11/21
S-210 Typical Slab on Grade Details 8/11/21
S-211 Typical Slab on Grade Details 8/11/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Sheet Description Date Revised Revised
S-300 Concrete Shear Wall Schedule and Notes 8/11/21
S-301 Concrete Shear Wall Elevations 1 8/11/21 10/1/21
S-302 Concrete Shear Wall Elevations 11 8/11/21 10/1/21
S-303 Concrete Shear Wall Elevations 111 8/11/21 9/21/21 10/1/21
S-305 Concrete Shear Wall Pans 8/11/21 9/21/21
S-310 Typical Concrete Shear Wall Details 8/11/21
S-311 Typical Concrete Shear Wall Details 8/11/21
S-312 Concrete Shear Wall Link Beam Details 8/11/21
S-400 Concrete Beam Schedule 8/11/21
S-401 Concrete Beam Schedule 8/11/21
S-402 Typical Concrete Beam Detailing 8/11/21 8/25/21 9/21/21
S-403 Typical Soffit Beam Detailing 8/11/21
S-404 Typical Joist and Soffit Beam Details 8/11/21
S-405 Typical Joist and Soffit Beam Details 8/11/21
S-420 Concrete Column Schedule and Details 8/11/21
S-440 Concrete Details 8/11/21 9/21/21
S-441 Concrete Details 8/11/21 9/21/21
S-442 Concrete Details 8/11/21 8/25/21 9/21/21
S-500 Canopy Details 8/11/21
S-501 Misc. Steel 8/11/21 9/21/21
S-600 Typical Masonry Details 8/11/21
S-601 Typical Masonry Details 8/11/21
S-602 Typical Masonry Details 8/11/21
Architectural
A-001 Architectural Site Plan 8/11/21 8/25/21 9/21/21
A-011 Site Details 8/11/21 9/21/21 9/21/21
A-012 Site Details 8/11/21 9/21/21
9/21/21
A-013 Site.Details 8/11/21 9/21/21 9/21/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Sheet Description Date Revised Revised
A-014 Site Details 8/11/21 8/25/21
9/21/21
A-015 Site Details 8/11/21 8/25/21
A-016 Site Feature—Vehicle Access Gate 8/11/21 8/25/21
A-017 Site Details—Canopies 8/11/21 9/21/21
A-021 CEP/Generator Enclosure Plans &Section 8/11/21 9/21/21
A-022 CEP/Generator Enclosure Plans &Sections 8/11/21 9/21/21
A-025 CEP/Generator Enclosure Details 8/11/21
A-030 Dumpster Enclosure Enlarged Plan &Details 8/11/21 9/21/21
A-101 Floor Plan—Ground Level 8/11/21 9/21/21 10/1/21
A-101 B Dimensioned Plan—Ground Level 8/11/21
A-102 Floor Plan—First Level 8/11/21 9/21/21
A-102B Dimensioned Plan—First Level 8/11/21 8/25/21 9/21/21
A-111 Reflected Ceiling Plan—Ground Level 8/11/21
A-112 Reflected Ceiling Plan—First Level 8/11/21 8/25/21 10/1/21
A-115 Ceiling Details 8/11/21 8/25/21
A-116 Ceiling Details 8/11/21 8/25/21
A-121 Roof Plan 8/11/21 9/21/21 10/1/21
A-131 Restroom Accessory Requirements 8/11/21 8/25/21
A-132 Enlarged Restroom Plans 8/11/21
A-133 Enlarged Plans 8/11/21
A-141 Plan Details&Sections 8/11/21
A-142 Plan Details&Sections 8/11/21 8/25/21
A-143 Plan Details&Sections 8/11/21 9/21/21
A-151 Furniture and Equipment Plan 8/11/21
A-152 Furniture and Equipment Schedules 8/11/21 8/25/21
A-153 Operable Partitions Plan & Details 8/11/21
A-201 Exterior Elevations 8/11/21 8/25/21 9/21/21
A-202 Exterior Elevations 8/11/21 9/21/21
A-211 Enlarged Exterior Elevations&Signage 8/11/21 9/21/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Sheet Description Date Revised Revised
A-212 Enlarged Exterior Elevations Details 8/11/21
A-301 Building Sections 8/11/21 9/21/21
A-311 Wall Sections 8/11/21 9/21/21
A-312 Wall Sections 8/11/21 9/21/21
A-313 Wall Sections 8/11/21 9/21/21
A-314 Wall Sections 8/11/21 9/21/21
A-321 Roof&Vertical Details 8/11/21 9/21/21
A-322 Roof&Vertical Details 8/11/21 9/21/21 10/1/21
A-331 Sunshade Elevations 8/11/21
A-332 Sunshade Enlarged Plan &Sections 8/11/21 8/25/21 9/21/21
A-401 Vertical Circulation-Stairs 8/11/21 9/21/21
A-402 Vertical Circulation-Stairs 8/11/21 9/21/21
A-403 Vertical Circulation—Stairs 8/11/21 9/21/21
A-404 Vertical Circulation—Roof Access 8/11/21 9/21/21
A-405 Vertical Circulation—Elevators& Detail 8/11/21 9/21/21
A-406 Vertical Circulation-Elevators 8/11/21 9/21/21
A-421 Vertical Circulation Details 8/11/21 8/25/21 9/21/21
A-501 Window Schedule & Elevs. 8/11/21 9/21/21
A-502 Metal Screen Elevations 8/11/21 9/21/21
A-511 Exterior Window Details 8/11/21
A-512 Int. Window Schd., Elev. & Dtls. 8/11/21
A-521 Specialty Window Details 8/11/21 9/21/21 10/1/21
A-601 Exterior and Interior Door Schedule 8/11/21 8/25/21 9/21/21
A-602 Exterior and Interior Door Schedule 8/11/21 8/25/21 9/21/21
A-611 Door Details 8/11/21
Interiors
ID-001 Interior General Notes and Details 8/11/21 8/25/21
ID-101 Ground Level Interior Finish Plan 8/11/21 8/25/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Sheet Description Date Revised Revised
ID-102 First Interior Finish Plan 8/11/21 8/25/21 9/21/21
ID-201 Interior Elevations 8/11/21
ID-202 Interior Elevations 8/11/21 8/25/21
ID-203 Interior Elevations 8/11/21 8/25/21
ID-204 Interior Elevations 8/11/21 8/25/21
ID-301 Millwork and Interior Details 8/11/21
ID-302 Millwork and Interior Details 8/11/21
ID-401 Interior Finish Legend 8/11/21 8/25/21
ID-501 Interior Signage 8/11/21
ID-502 Interior Signage 8/11/21
ID-503 Interior Signage 8/11/21
ID-504 Interior Signage 8/11/21
Mechanical
M-000 Mechanical Legend, General Notes &Sheet Index 7/14/21*
M-112 Reflected Ceiling Plan—First Floor Level-HVAC 7/14/21* 10/1/21 11/05/21
M-300 Mechanical Schedules 7/14/21* 8/25/21 11/05/21
M-301 Mechanical Schedules 7/14/21*
M-400 Mechanical Details 7/14/21*
M-401 Mechanical Details 7/14/21*
M-402 Mechanical Details 7/14/21*
M-403 Mechanical Details 7/14/21* 11/05/21
M-404 Mechanical Details 7/14/21*
M-500 HVAC Controls 7/14/21*
M-501 HVAC Controls 7/14/21*
*Dated 7/14/21 but part of the 08/11/21 Permit set
Electrical
E-000 Electrical Symbol Legend, Sheet Index 7/14/21*
E-001 Electrical General Notes 7/14/21*
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Sheet Description Date Revised Revised
E-100 Site Plan—Electrical 7/14/21* 9/21/21
E-101 Floor Plan—Ground Level—Power 7/14/21* 9/21/21 10/1/21
E-102 Floor Plan—First Level—Power 7/14/21* 8/25/21 9/21/21
E-121 Roof Plan—Electrical 7/14/21*
E-200 Site Plan-Lighting 7/14/21* 10/1/21 10/27/21
E-200P Site Plan—Photometry Study 7/14/21* 10/1/21 10/27/21
E-211 Reflected Ceiling Plan-Ground Level-Lighting 7/14/21* 8/25/21
E-211LC Reflected Ceiling Plan-Ground Level-Lighting Controls 7/14/21*
E-212 Reflected Ceiling Plan-First Level-Lighting 7/14/21* 8/25/21
E-212LC Reflected Ceiling Plan-First Level-Lighting Controls 7/14/21*
E-301 Floor Plan-Ground Level-Fire Alarm 7/14/21*
E-302 Floor Plan-First Level -Fire Alarm 7/14/21* 9/21/21
E-401 Enlarged Room Plans 7/14/21* 9/21/21 10/1/21
E-402 Enlarged Room Plans 7/14/21* 9/21/21
E-501 Conceptual One-Line Diagram 7/14/21* 9/21/21 10/1/21
E-502 Diagrammatic Fire Alarm System Riser 7/14/21*
E-601 Lighting Schedules 7/14/21* 10/1/21 10/27/21
E-701 Panel Schedules 7/14/21* 8/25/21 9/21/21
E-702 Panel Schedules 7/14/21*
E-703 Panel Schedules 7/14/21* 8/25/21 9/21/21
E-704 Panel Schedules 7/14/21* 8/25/21 9/21/21
E-801 Details 7/14/21*
E-802 Details 7/14/21*
*Dated 7/14/21 but part of the 08/11/21 Permit set
Plumbing
P-000 Plumbing Symbols, Legend, Notes and Index 7/14/21*
P-001 Schedules 7/14/21* 10/1/21
P-002 Site Plan—Plumbing 7/14/21* 10/1/21
P-100 Ground Level—Underground Gravity 7/14/21* 10/1/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Sheet Description Date Revised Revised
P-101 Floor Plan—Ground Level—Gravity 7/14/21* 10/1/21
P-102 Floor Plan—Ground Level—Pressure 7/14/21*
P-103 Floor Plan—First Floor Level—Gravity 7/14/21* 10/1/21
P-104 Floor Plan—First Floor Level-Pressure 7/14/21* 10/1/21
P-121 Roof Plan—Plumbing 7/14/21* 10/1/21
P-200 Plumbing Enlarged 7/14/21* 10/1/21
P-201 Plumbing Enlarged 7/14/21* 10/1/21
P-202 Plumbing Enlarged 7/14/21* 10/1/21
P-203 Plumbing Enlarged 7/14/21*
P-300 Plumbing Isometric 7/14/21* 10/1/21
P-301 Plumbing Isometric 7/14/21*
P-302 Plumbing Isometric 7/14/21* 10/1/21
P-400 Plumbing Details 7/14/21*
P-401 Plumbing Details 7/14/21* 10/1/21
P-402 Plumbing Details 7/14/21*
P-403 Grease Interceptor Details 7/14/21*
P-404 Plumbing Details 7/14/21*
*Dated 7/14/21 but part of the 08/11/21 Permit set
Fire Protection
FP-000 Fire Protection Symbols, Legend, Notes,and Index 7/14/21*
FP-001 Fire Protection Site Plan 7/14/21*
FP-111 Reflected Ceiling Plan—Ground Level—Fire Protection 7/14/21* 8/25/21
FP-112 Reflected Ceiling Plan—First Floor Level—Fire Protection 7/14/21* 8/25/21
FP-400 Fire Protection Details 7/14/21*
FP-401 Fire Protection Details 7/14/21* 8/25/21
*Dated 7/14/21 but part of the 08/11/21 Permit set
Technology
T-000 Technology Legend, Notes, &Sheet Index 8/11/21 9/21/21
T-100 Technology Site Plan 8/11/21 10/1/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Sheet Description Date Revised Revised
T-101 Ground Floor Level—Voice/Data 8/11/21
T-102 First Floor Level—Voice/Data 8/11/21 10/1/21
T-103 Roof Level—Comm.And Security 8/11/21 10/1/21
T-111 Ground Floor Level—Audio/Video&Security 8/11/21 10/1/21
T-112 First Floor Level—Audio/Video&Security 8/11/21 10/1/21
T-200 Technology Site Plan -Grounding 8/11/21 9/21/21
T-202 First Floor Level-Grounding 8/11/21 9/21/21
T-203 Roof Level-Grounding 8/11/21 10/1/21
T-301 Technology Enlarged Plans 8/11/21
T-302 Technology Enlarged Plans 8/11/21 8/25/21
T-303 Technology Enlarged Plans 8/11/21 10/1/21
T-304 Technology Enlarged Plans 8/11/21 8/25/21 10/1/21
T-305 Technology Enlarged Plans 8/11/21
T-306 Technology Enlarged Plans 8/11/21
T-307 Technology Enlarged Plans 8/11/21
T-401 Technology Riser Diagrams 8/11/21
T-402 Technology Riser Diagrams 8/11/21
T-403 AV Diagrams 8/11/21 8/25/21 10/1/21
T-404 AV Diagrams 8/11/21
T-405 AV Diagrams 8/11/21
T-406 Security Diagrams 8/11/21
T-407 Security Diagrams 8/11/21
T-501 Technology Schedules 8/11/21 8/25/21
T-502 Technology Rack Elevations 8/11/21 8/25/21
T-601 Technology Details 8/11/21
T-602 Technology Details 8/11/21
T-603 Technology Details 8/11/21
T-604 Technology Details 8/11/21
T-605 Technology Details 8/11/21 10/1/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Sheet Description Date Revised Revised
T-606 Technology Details 8/11/21
T-607 Technology Details 8/11/21
T-608 Technology Details 8/11/21
T-609 Technology Details 8/11/21
T-610 Technology Details 8/11/21
(END OF DRAWINGS)
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
PROJECT SPECIFICATIONS
Entitled 100% Permit Documents dated 8/11/2021
Section Description #Pages Date Revised
Table of Contents Volume 1
Cover Page 1 8/11/21
Project Directory 3 8/11/21
Table of Contents 4 8/11/21 10/1/21
Division 00—Procurement and Contracting Requirements
00 60 00 Project Documents 157 8/11/21
Report of Geotechnical Exploration Monroe County 8/11/21
Emergency Operations Center(EOC)(14 pages)
Report of Geotechnical Exploration Monroe County 8/11/21
Emergency Operations Center(EOC) (16 pages)
Monroe County Grants (124 pages)
Division 01 —General Requirements
01 1000 Summary of Work 5 8/11/21
01 25 00 Substitution Procedures 7 8/11/21
01 33 00 Submittal Procedures 12 8/25/21
01 40 00 Quality Assurance Plan 11 9/21/21
01 45 00 Structural Testing and Inspections 18 8/11/21
01 60 00 Product Requirements 6 8/11/21
Division 02—Existing Conditions
Not Used
Division 03-Concrete
03 1000 Concrete Formwork 15 8/11/21
03 1210 Form liners for Architectural Concrete 5 8/25/21
03 20 00 Concrete Reinforcement 17 8/11/21
03 30 00 Cast-In-Place Concrete 54 8/11/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Section Description #Pages Date Revised
03 31 00 Cast-In-Place Concrete Add Mixtures 10 8/11/21
03 42 00 Composite Precast Concrete(PSI System) 8 8/11/21
03 48 00 Concrete Wall Caps 6 8/11/21
Division 04-Masonry
04 22 00 Concrete Masonry Units 25 8/11/21
Division 05-Metals
05 1200 Structural Steel 24 8/11/21
05 50 00 Metal Fabrications 9 8/11/21
Division 06—Wood, Plastics,And Composites
06 1000 Rough Carpentry 4 8/11/21
06 41 00 Architectural Wood Casework 5 8/11/21
Division 07—Therman and Moisture Protection
07 1700 Bentonite Waterproofing 14 8/11/21 8/25/21
07 21 00 Thermal Insulation 3 8/11/21
07 42 93 Preformed Aluminum Soffit Panels 6 8/11/21
07 46 46 Cementitious Fiberboard 5 8/11/21 8/25/21
07 54 16 Fully Adhered Kee Single Ply Roofing Systems 18 8/11/21 8/25/21
07 62 00 Sheet Metal Flashing and Trim 12 8/11/21 8/25/21
07 71 00 Roof Specialties 11 8/11/21
07 84 13 Penetration Firestopping 7 8/11/21
07 92 00 Joint Sealants 5 8/11/21 8/25/21
Division 08—Openings
08 11 13 Hollow Metal Doors and Frames 11 8/11/21
08 1213 Missile Impact Hollow Metal Frames 8 8/11/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Section Description #Pages Date Revised
08 14 16 Flush Wood Doors 6 8/11/21
0831 13 Access Doors and Panels 5 8/11/21
08 33 00 Rolling Counter Doors 5 8/11/21
08 34 00 Bullet Resistant Doors and Frames 4 8/11/21
0841 13 Aluminum-Framed Entrances, Storefronts and Curtain Walls 11 8/11/21
08 71 00 Door Hardware 45 8/11/21 9/21/21
08 80 00 Glazing 8 8/11/21 8/25/21
0891 19 Fixed Louvers 5 8/11/21 8/25/21
08 95 43 Flood Vents 6 9/21/21 10/1/21
Division 09—Finishes
0921 16 Gypsum Board Assemblies 12 8/11/21 8/25/21
09 24 00 Portland Cement Plastering 7 8/11/21
09 30 00 Tiling 11 8/11/21
09 51 00 Acoustical Ceilings 5 8/11/21
09 65 00 Resilient Flooring 7 8/11/21
09 66 23 Resinous Matrix Terrazzo Flooring 6 8/11/21
09 68 13 Tile Carpeting 4 8/11/21
09 69 00 Access Flooring 11 8/11/21 8/25/21
09 84 30 Sound Absorbing Wall and Ceiling Units 4 8/11/21
09 90 00 Painting &Coating 18 8/11/21
09 91 23 Interior Painting 8 8/11/21
Division 10—Specialties
10 1100 Visual Display Units 3 8/11/21
10 1400 Signage 4 8/11/21
1021 Phenolic Toilet Compartments 4 8/11/21
13.17
10 22 26 Operable Partitions 6 8/11/21 8/25/21
10 26 00 Wall and Door Protection 5 8/11/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Section Description #Pages Date Revised
10 28 00 Toilet, Bath and Laundry Accessories 6 8/11/21
10 44 00 Fire Protection Specialties 3 8/11/21
10 51 00 Metal Lockers 5 8/11/21 8/25/21
1071 13 Exterior Sun Control Devices 5 8/11/21
10 75 16 Ground-Set Flagpoles 4 8/11/21 8/25/21
Division 11 —Equipment
11 30 13 Residential Appliances 5 8/11/21
Division 12—Furnishings
12 24 00 Window Shades 5 8/11/21
12 36 00 Countertops 5 8/11/21
12 93 00 Site Furnishings 3 8/11/21
12 93 13 Bike Racks 3 8/11/21
Division 13—Special Construction
13 48 13 Vinyl Sound Barriers 4 8/11/21
Division 14—Conveying Equipment
14 24 00 Machine Roomless Hydraulic Passenger Elevators 18 8/11/21 8/25/21
Division 20—Mechanical Systems
Not Used
Division 21 —Fire Protection
21 05 17 Sleeves and Sleeve Seals for Fire-Suppression Piping 5 8/11/21
21 05 18 Escutcheons for Fire-Suppression Piping 2 8/11/21
21 05 53 Identification for Fire-Suppression Piping and Equipment 5 8/11/21
21 1313 Wet-Pipe Sprinkler Systems 18 8/11/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Section Description #Pages Date Revised
Division 22-Plumbing
22 05 17 Sleeves and Sleeve Seals for Plumbing Piping 3 8/11/21
22 05 18 Escutcheons for Plumbing Piping 2 8/11/21
22 05 23 General-Duty Valves for Plumbing Piping 8 8/11/21
22 05 29 Hangers and Supports for Plumbing Piping and Equipment 7 8/11/21
22 05 53 Identification for Plumbing Piping and Equipment 5 8/11/21
22 07 19 Plumbing Piping Insulation 18 8/11/21
22 11 16 Domestic Water Piping 11 8/11/21
22 11 19 Domestic Water Piping Specialties 13 8/11/21
22 1316 Sanitary Waste and Vent Piping 11 8/11/21
22 1319 Sanitary Waste Piping Specialties 7 8/11/21
22 1323 Sanitary Waste Interceptors 4 8/11/21
22 1413 Facility Storm Drainage Piping 16 8/11/21
22 1423 Storm Drainage Piping Specialties 4 8/11/21
2242 Commercial Water Closets 3 8/11/21
13.13
2242 Commercial Lavatories 5 8/11/21
16.13
2242 Commercial Sinks 5 8/11/21
16.16
22 42 23 Commercial Showers 4 8/11/21
Table of Contents Volume 2 3 8/11/21
Division 23—Heating Ventilating and Air Conditioning
23 00 10 Basic Mechanical Requirements 25 8/11/21
23 05 00 Common Work Results for HVAC 13 8/11/21
2305 13 Common Motor Requirements for HVAC Equipment 4 8/11/21
23 05 17 Sleeves and Sleeve Seals for HVAC Piping 6 8/11/21
23 05 18 Escutcheons for HVAC Piping 3 8/11/21
2305 19 Meters and Gages for HVAC Piping 7 8/11/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Section Description #Pages Date Revised
23 05 29 Hangers and Supports for HVAC Piping and Equipment 13 8/11/21
23 05 53 Identification for HVAC Piping and Equipment 7 8/11/21
23 05 93 Test and Balance for HVAC 23 8/11/21
23 07 13 Duct Insulation 18 8/11/21
23 07 19 HVAC Piping Insulation 21 8/11/21
23 09 00 Instrumentation and Control for HVAC 19 8/11/21
23 11 13 Facility Fuel-Oil Piping 21 8/11/21
23 23 00 Refrigerant Piping 12 8/11/21
2331 13 Metal Ducts 17 8/11/21
23 33 00 Air Duct Accessories 12 8/11/21
23 34 16 Centrifugal HVAC Fans 8 8/11/21
23 34 23 HVAC Power Ventilators 10 8/11/21
23 36 00 Air Terminal Units 13 8/11/21
23 73 13 Modular Indoor Central Station Air Handling Units 14 8/11/21
23 81 26 Split-System Air Conditioners 9 8/11/21
Division 26-Electrical
26 00 10 Basic Electrical Requirements 21 8/11/21
26 05 19 Low-Voltage Electrical Power Conductors and Cables 8 8/11/21
26 05 26 Grounding and Bonding for Electrical Systems 12 8/11/21
26 05 29 Hangers and Supports for Electrical Systems 7 8/11/21
26 05 33 Raceways and Boxes for Electrical Systems 16 8/11/21
26 05 39 Underfloor Raceway Assemblies 13 8/11/21
26 05 43 Underground Ducts and Raceways for Electrical Systems 10 8/11/21 8/25/21
26 05 53 Identification for Electrical Systems 10 8/11/21
26 05 73 Overcurrent Protective Device Coordination Study 6 8/11/21
2605 Arc-Flash Hazard Analysis 9 8/11/21
73.19
26 24 13 Switchboards 12 8/11/21
26 24 16 Panelboards 13 8/11/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Section Description #Pages Date Revised
26 27 26 Wiring Devices 13 8/11/21
2628 13 Fuses 4 8/11/21
26 28 16 Enclosed Switches and Circuit Breakers 12 8/11/21
26 29 13 Enclosed Controllers 12 8/11/21
26 29 23 Variable Frequency Motor Controllers 18 8/11/21
2632 Diesel Emergency Engine Generators 22 8/11/21
13.13
26 33 53 Static Uninterruptible Power Supply 17 8/11/21
26 36 00 Transfer Switches 13 8/11/21
2641 13 Lightning Protection for Structures 5 8/11/21
26 43 13 Transient-Voltage Suppression for Low-Voltage Electrical g 8/11/21
Power Circuits
Division 27-Technology
27 00 10 Technology General Provisions 22 8/11/21
27 05 26 Grounding and Bonding for Telecommunications Systems 10 8/11/21
27 05 28 Raceways for Technology 24 8/11/21
27 1000 Structured Cabling System 38 8/11/21
27 41 00 Audio Visual Systems 21 8/11/21
P741 3R as 8 Pl
Division 28—Electronic Safety and Security
28 05 37 Security Voice Communications—Distributed Antenna Sys. 8 8/11/21
28 1000 Electronic Security Systems 37 8/11/21
28 20 00 CCTV Video Surveillance System 29 8/11/21
28 46 21 Fire Alarm System 32 8/11/21
Division 31 —Earthwork
316100 Footings 8 8/11/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Section Description #Pages Date Revised
Division 32—Exterior Improvements
32 31 00 Heavy Duty Swing Gate System 5 8/11/21
3231 13 Fencing 4 8/11/21
Division 33—Utilities
Not Used
(END OF SPECIFICATIONS)
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
ADDENDA ISSUED BY THE ARCHITECT/ENGINEER
Addenda# Description #Pages Date Revised
01 ADG Addendum#1 —Pre-Construction RFIs 255 8/25/21
02 ADG Addendum#2—Permit&Peer Review Comments 179 9/21/21
03 ADG Addendum#3—Permit&Peer Review Comments 166 10/01/21
04 ADG Addendum#4 7 10/27/21
06 ADG Addendum#6 5 11/03/21
07 ADG Addendum#7 3 11/05/21
08 ADG Addendum#8—Architectural Permit Review Comments 0 11/03/21
(END OF ADDENDA)
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
PRE-BID REQUESTS FOR INFORMATION (PRE-BID RFI's)
PB RFI No. Description Issued Resp Revised
001 FEMA Door Rating 8/17/21 8/20/21
002 Mobile Shelving &Locker Design 8/17/21 8/20/21
003 Specified Lectern Finish 8/18/21 8/20/21
004 Cast in Place Stairs vs Metal Pan Stairs 8/18/21 8/20/21
005 Kitchen Exhaust Support Framing 8/18/21 9/2/21
006 Kitchen Exhaust Hood 8/18/21 9/2/21
007 Kitchen Exhaust Hood 8/18/21 9/2/21
008 Motorized Roller Shades 8/18/21 8/25/21
009 Roller Shades Locations 8/18/21 8/25/21
010 Fire Protection 8/18/21 8/25/21
011 Elevators 8/18/21 8/20/21
012 Plumbing LEED Requirement 8/18/21 8/20/21
013 Roofing LEED Requirement 8/18/21 8/20/21
014 Door Hardware-Warehousing 8/18/21 8/20/21
015 Ballistic Level Requirements 8/18/21 8/20/21
016 Furniture &Specialty Equipment Schedule 8/18/21 8/20/21
017 Plumbing Fixtures 8/18/21 8/24/21
018 Electrical-Power to Lavatories 8/18/21 8/30/21
019 Bradley LVQ Lavatory Requirements 8/18/21 8/20/21
020 Plumbing Fixtures 8/18/21 8/24/21
021 Door 218 Glass Type Clarification 8/18/21 8/25/21
022 Stairwell Doors Fire Rating 8/18/21 8/20/21
023 Epoxy Floor in Stair Landings 8/19/21 8/25/21
024 Terrazzo Flooring & Base 8/19/21 8/25/21
025 Flooring Finishes 8/19/21 8/25/21
026 Acoustical Wall Panels 8/19/21 8/25/21
027 Knife Edge trim 8/19/21 8/25/21
028 Drywall soffit and cove details 8/19/21 8/25/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
PB RFI No. Description Issued Resp Revised
029 Electrical-Light Fixture Selection 8/19/21 8/31/21
030 Electrical Linear Light Fixture Selection 8/19/21 8/27/21
031 Door Schedule Clarifications-Bullet Resistant Doors & 8/19/21 8/24/21
Frames
032 Acoustical Wall Panels 8/19/21 8/25/21
033 Specification Section 096900 8/19/21 8/20/21
034 Specification Section 096900 Access Floors 8/19/21 8/20/21
035 Site Fencing 8/19/21 8/25/21
036 Xypex Cast In place Concrete Additives 8/19/21 8/25/21
037 Flagpole Wind Speed Design 8/19/21 8/20/21
038 Specification Section 102226 Operable Partitions 8/19/21 8/24/21
039 Corner Guard CG-1 8/19/21 8/25/21
040 Roller Shades 8/19/21 8/25/21
041 Vehicle Gate Motor Pad 8/19/21 8/26/21
042 Life Safety Plan Wall Types 8/19/21 8/24/21
043 Water Tank Curb Details 8/19/21 8/24/21
044 Porcelain Wall Tile Restrooms 204&205 8/19/21 8/25/21
045 Spacesaver Record Storage Fully Loaded Weight 8/19/21 8/26/21
046 Freestyle Personal Storage Lockers 8/19/21 8/24/21
047 Stormwater Holding Tank Layout 8/19/21 9/3/21
048 Fire Rated Glazing Clarification 8/19/21 8/24/21
049 Hardie Board Cladding Thickness 8/19/21 8/24/21
050 Hose Bid at Sanitary Lift Station 8/19/21 8/24/21
051 Exterior Building Joint Sealant 8/19/21 8/24/21
052 Louver Basis of Design 8/19/21 8/25/21
053 Restroom Partition Height 8/20/21 8/25/21
054 Access Flooring Identification on Floor Plans 8/20/21 8/24/21
055 Locker Elevations& Details 8/20/21 8/25/21
056 Hose Bibb Material Clarification 8/20/21 8/24/21
057 Light Pole and Tree Conflict 8/20/21 9/3/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
PB RFI No. Description Issued Resp Revised
058 Conduit Chase from Plinth to First Floor Level 8/20/21 8/25/21
059 Underground Duct Bank Backfill Material 8/20/21 9/2/21
060 Form Liner 8/20/21 8/24/21
061 Technology Fiber Requirements 8/20/21 8/25/21
062 Security Cabinet Fiber Requirements 8/20/21 8/25/21
063 Drawing T304 8/20/21 8/25/21
064 T 304 &T305 8/20/21 8/25/21
065 Spec Section 27 41 00-2 8/20/21 8/25/21
066 T102 8/20/21 8/25/21
067 T404 Technology 8/20/21 8/25/21
068 T302 Technology 8/20/21 8/25/21
069 T403 Technology 8/20/21 8/25/21
070 Maxcell Innerduct Requirements 8/20/21 8/25/21
071 Spec Section 28 05 37 Security Voice Communication- 8/20/21 8/25/21
Distributed Antenna System
072 'Future Use' Conduit Rack Clarification 8/20/21 8/25/21
073 BDA System 8/20/21 9/3/21
074 BDA System 8/20/21 9/3/21
075 Underground Primary Conduit 8/20/21 8/25/21
076 E-101 & E-501 8/20/21 8/25/21
077 SS-4& ID-F Fixtures 8/20/21 8/30/21
078 Light Fixtures 8/20/21 8/30/21
079 Electrical A-116 Detail#3 8/20/21 8/25/21
080 ICC RM 219& Dispatch RM 235 8/20/21 8/25/21
081 Door Schedules 8/20/21 8/25/21
082 ID-203 Wall Panel AWP1.12 8/20/21 8/25/21
083 PTW-2 Wall Tile 8/23/21 8/25/21
084 Ceiling Finishes 8/24/21 8/25/21
085 Interior Drawings: Legible Plans Needed 8/25/21 8/27/21
086 FEC on Drawings 8/25/21 8/25/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
PB RFI No. Description Issued Resp Revised
087 Fire Protection-Clean Agent Locations 8/25/21 8/31/21
088 Rain Water Harvest System 8/25/21 9/3/21
089 Site Fencing Clarifications 8/25/21 8/25/21
090 Form Liner RFI 60 8/27/21 9/1/21
091 Structural Notes-Rebar 8/27/21 8/31/21
092 Laundry Trench 8/30/21 9/7/21
093 Room Finish Schedule 8/31/21 9/1/21
094 HVAC Instrumentation &Control System 8/31/21 9/3/21
095 Fire Alarm System 8/31/21 9/8/21
096 RF Specification Section 27-41-38 RF Systems Infrastructure 9/3/21 7/15/22
097 Form liner Follow up to RFI 90 9/3/21 9/14/21
098 Resinous Flooring EF-2 9/8/21 7/21/22
100 Hardie Board Locations 9/15/21 7/15/22
101 STC Door Ratings 9/16/21 7/8/22
102 Doors 253A and 253B Hardware sets 9/16/21 7/8/22
104 Door 213 Hardware set 9/16/21 7/8/22
105 081213 Missile Impact Hollow Metal 3.4.3 9/16/21 7/21/22
106 VT Industries Plastic Laminate 9/16/21 7/11/22
107 Bathroom Accessory Details 9/16/21
108 Load Bank Option 2 9/16/21 8/4/22
109 Exterior Signage by others clarification 9/21/21 7/21/22
110 A-001 perimeter fencing location clarification 7/26/22 8/2/22
(END OF PRE-BID RFI'S)
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
BID PACKAGES AND BID PACKAGE ADDENDA
BP No. Description Date
BP 01.02 Materials Testing 8/11/21
BP 01.13 Surveying 8/11/21
BP 01.15 Final Cleaning 8/11/21
BP 03.01 Concrete& Masonry 8/11/21
BP 05.01 Structural &Misc. Steel 8/11/21
BP 07.06 Membrane Roofing 8/11/21
BP 08.01 Doors, Frames& Hardware 8/11/21
BP 08.03 Glass &Glazing 8/11/21
BP 08.04 Rolling Counter Doors 8/11/21
BP 09.01 Framing, Drywall &Stucco 8/11/21
BP 09.02 Hard Tile 8/11/21
BP 09.03 Acoustical Ceilings &Walls 8/11/21
BP 09.05 Flooring 8/11/21
BP 09.06 Epoxy Terrazzo Floors 8/11/21
BP 09.08 Access Flooring 8/11/21
BP 09.09 Painting 8/11/21
BP 10.01 Visual Display Units 8/11/21
BP 10.04 Signage 8/11/21
BP 10.07 Operable Partitions 8/11/21
BP 10.10 Building Specialties 8/11/21
BP 10.13 Lockers 8/11/21
BP 11.05 Food Service Equipment 8/11/21
BP 12.01 Window Treatments 8/11/21
BP 12.02 Casework 8/11/21
BP 14.01 Elevators 8/11/21
BP 21.01 Fire Suppression 8/11/21
BP 22.01 Plumbing 8/11/21
BP 23.01 HVAC 8/11/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
BP No. Description Date
BP 26.01 Electrical 8/11/21
BP 31.01 Sitework&utilities 8/11/21
BP 32.04 Fencing &Gates 8/11/21
BP 32.05 Landscaping & Irrigation 8/11/21
BP Description Date
Addenda
01.02-1 Materials Testing-Addendum 01.02-1 8/18/21
01.13-1 Surveying-Addendum 01.13-1 8/18/21
01.15-1 Final Cleaning-Addendum 01.15-1 8/18/21
03.01-1 Concrete& Masonry-Addendum 03.01-1 8/18/21
05.01-1 Structural &Misc. Steel-Addendum 05.01-1 8/18/21
07.06-1 Membrane Roofing-Addendum 07.06-1 8/18/21
08.01-1 Doors, Frames& Hardware-Addendum 08.01-1 8/18/21
08.03-1 Glass &Glazing-Addendum 08.03-1 8/18/21
08.04-1 Rolling Counter Doors-Addendum 08.04-1 8/18/21
09.01-1 Framing, Drywall &Stucco-Addendum 09.01-1 8/18/21
09.02-1 Hard Tile-Addendum 09.02-1 8/18/21
09.03-1 Acoustical Ceilings&Walls-Addendum 09.03-1 8/18/21
09.05-1 Flooring-Addendum 09.05-1 8/18/21
09.06-1 Epoxy Terrazzo Floors-Addendum 09.06-1 8/18/21
09.08-1 Access Flooring-Addendum 09.08-1 8/18/21
09.09-1 Painting-Addendum 09.09-1 8/18/21
10.01-1 Visual Display Units-Addendum 10.01-1 8/18/21
10.04-1 Signage-Addendum 10.04-1 8/18/21
10.07-1 Operable Partitions-Addendum 10.07-1 8/18/21
10.10-1 Building Specialties-Addendum 10.10-1 8/18/21
10.13-1 Lockers-Addendum 10.13-1 8/18/21
11.05-1 Food Service Equipment-Addendum 11.05-1 8/18/21
12.01-1 Window Treatments-Addendum 12.01-1 8/18/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
BP No. Description Date
12.02-1 Casework-Addendum 12.02-1 8/18/21
14.01-1 Elevators-Addendum 14.01-1 8/18/21
21.01-1 Fire Suppression-Addendum 21.01-1 8/18/21
22.01-1 Plumbing-Addendum 22.01-1 8/18/21
23.01-1 HVAC-Addendum 23.01-1 8/18/21
26.01-1 Electrical-Addendum 26.01-1 8/18/21
31.01-1 Sitework& Utilities-Addendum 31.01-1 8/18/21
32.04-1 Fencing &Gates-Addendum 32.04-1 8/18/21
32.05-1 Landscaping & Irrigation-Addendum 32.05-1 8/18/21
01.02-2 Materials Testing-Addendum 01.02-2 8/26/21
01.13-2 Surveying-Addendum 01.13-2 8/26/21
01.15-2 Final Cleaning-Addendum 01.15-2 8/26/21
03.01-2 Concrete& Masonry-Addendum 03.01-2 8/26/21
05.01-2 Structural &Misc. Steel-Addendum 05.01-2 8/26/21
07.06-2 Membrane Roofing-Addendum 07.06-2 8/26/21
08.01-2 Doors, Frames& Hardware-Addendum 08.01-2 8/26/21
08.03-2 Glass &Glazing-Addendum 08.03-2 8/26/21
08.04-2 Rolling Counter Doors-Addendum 08.04-2 8/26/21
09.01-2 Framing, Drywall &Stucco-Addendum 09.01-2 8/26/21
09.02-2 Hard Tile-Addendum 09.02-2 8/26/21
09.03-2 Acoustical Ceilings &Walls-Addendum 09.03-2 8/26/21
09.05-2 Flooring-Addendum 09.05-2 8/26/21
09.06-2 Epoxy Terrazzo Floors-Addendum 09.06-2 8/26/21
09.08-2 Access Flooring-Addendum 09.08-2 8/26/21
09.09-2 Painting-Addendum 09.09-2 8/26/21
10.01-2 Visual Display Units-Addendum 10.01-2 8/26/21
10.04-2 Signage-Addendum 10.04-2 8/26/21
10.07-2 Operable Partitions-Addendum 10.07-2 8/26/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
BP No. Description Date
10.10-2 Building Specialties-Addendum 10.10-2 8/26/21
10.13-2 Lockers-Addendum 10.13-2 8/26/21
11.05-2 Food Service Equipment-Addendum 11.05-2 8/26/21
12.01-2 Window Treatments-Addendum 12.01-2 8/26/21
12.02-2 Casework-Addendum 12.02-2 8/26/21
14.01-2 Elevators-Addendum 14.01-2 8/26/21
21.01-2 Fire Suppression-Addendum 21.01-2 8/26/21
22.01-2 Plumbing-Addendum 22.01-2 8/26/21
23.01-2 HVAC-Addendum 23.01-2 8/26/21
26.01-2 Electrical-Addendum 26.01-2 8/26/21
31.01-2 Sitework& Utilities-Addendum 31.01-2 8/26/21
32.04-2 Fencing &Gates-Addendum 32.04-2 8/26/21
32.05-2 Landscaping & Irrigation-Addendum 32.05-2 8/26/21
01.02-3 Materials Testing-Addendum 01.02-3 8/27/21
01.13-3 Surveying-Addendum 01.13-3 8/27/21
01.15-3 Final Cleaning-Addendum 01.15-3 8/27/21
03.01-3 Concrete& Masonry-Addendum 03.01-3 8/27/21
05.01-3 Structural &Misc. Steel-Addendum 05.01-3 8/27/21
07.06-3 Membrane Roofing-Addendum 07.06-3 8/27/21
08.01-3 Doors, Frames &Hardware-Addendum 08.01-3 8/27/21
08.03-3 Glass &Glazing-Addendum 08.03-3 8/27/21
08.04-3 Rolling Counter Doors-Addendum 08.04-3 8/27/21
09.01-3 Framing, Drywall &Stucco-Addendum 09.01-3 8/27/21
09.02-3 Hard Tile-Addendum 09.02-3 8/27/21
09.03-3 Acoustical Ceilings&Walls-Addendum 09.03-3 8/27/21
09.05-3 Flooring-Addendum 09.05-3 8/27/21
09.06-3 Epoxy Terrazzo Floors-Addendum 09.06-3 8/27/21
09.08-3 Access Flooring-Addendum 09.08-3 8/27/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
BP No. Description Date
09.09-3 Painting-Addendum 09.09-3 8/27/21
10.01-3 Visual Display Units-Addendum 10.01-3 8/27/21
10.04-3 Signage-Addendum 10.04-3 8/27/21
10.07-3 Operable Partitions-Addendum 10.07-3 8/27/21
10.10-3 Building Specialties-Addendum 10.10-3 8/27/21
10.13-3 Lockers-Addendum 10.13-3 8/27/21
11.05-3 Food Service Equipment-Addendum 11.05-3 8/27/21
12.01-3 Window Treatments-Addendum 12.01-3 8/27/21
12.02-3 Casework-Addendum 12.02-3 8/27/21
14.01-3 Elevators-Addendum 14.01-3 8/27/21
21.01-3 Fire Suppression-Addendum 21.01-3 8/27/21
22.01-3 Plumbing-Addendum 22.01-3 8/27/21
23.01-3 HVAC-Addendum 23.01-3 8/27/21
26.01-3 Electrical-Addendum 26.01-3 8/27/21
31.01-3 Sitework& Utilities-Addendum 31.01-3 8/27/21
32.04-3 Fencing &Gates-Addendum 32.04-3 8/27/21
32.05-3 Landscaping & Irrigation-Addendum 32.05-3 8/27/21
07.06-4 Membrane Roofing-Addendum 07.06-4 9/7/21
01.02-5 Materials Testing-Addendum 01.02-5 9/7/21
01.13-5 Surveying-Addendum 01.13-5 9/7/21
01.15-5 Final Cleaning-Addendum 01.15-5 9/7/21
03.01-5 Concrete& Masonry-Addendum 03.01-5 9/7/21
05.01-5 Structural&Misc. Steel-Addendum 05.01-5 9/7/21
07.06-5 Membrane Roofing-Addendum 07.06-5 9/7/21
08.01-5 Doors, Frames& Hardware-Addendum 08.01-5 9/7/21
08.03-5 Glass&Glazing-Addendum 08.03-5 9/7/21
08.04-5 Rolling Counter Doors-Addendum 08.04-5 9/7/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
BP No. Description Date
09.01-5 Framing, Drywall &Stucco-Addendum 09.01-5 9/7/21
09.02-5 Hard Tile-Addendum 09.02-5 9/7/21
09.03-5 Acoustical Ceilings &Walls-Addendum 09.03-5 9/7/21
09.05-5 Flooring-Addendum 09.05-5 9/7/21
09.06-5 Epoxy Terrazzo Floors-Addendum 09.06-5 9/7/21
09.08-5 Access Flooring-Addendum 09.08-5 9/7/21
09.09-5 Painting-Addendum 09.09-5 9/7/21
10.01-5 Visual Display Units-Addendum 10.01-5 9/7/21
10.04-5 Signage-Addendum 10.04-5 9/7/21
10.07-5 Operable Partitions-Addendum 10.07-5 9/7/21
10.10-5 Building Specialties-Addendum 10.10-5 9/7/21
10.13-5 Lockers-Addendum 10.13-5 9/7/21
11.05-5 Food Service Equipment-Addendum 11.05-5 9/7/21
12.01-5 Window Treatments-Addendum 12.01-5 9/7/21
12.02-5 Casework-Addendum 12.02-5 9/7/21
14.01-5 Elevators-Addendum 14.01-5 9/7/21
21.01-5 Fire Suppression-Addendum 21.01-5 9/7/21
22.01-5 Plumbing-Addendum 22.01-5 9/7/21
23.01-5 HVAC-Addendum 23.01-5 9/7/21
26.01-5 Electrical-Addendum 26.01-5 9/7/21
31.01-5 Sitework& Utilities-Addendum 31.01-5 9/7/21
32.04-5 Fencing &Gates-Addendum 32.04-5 9/7/21
32.05-5 Landscaping & Irrigation-Addendum 32.05-5 9/7/21
10.01-6 Visual Display Units-Addendum 10.01-6 9/8/21
22.01-6 Plumbing-Addendum 22.01-6 9/8/21
01.02-7 Materials Testing-Addendum 01.02-7 9/28/21
01.13-7 Surveying-Addendum 01.13-7 9/28/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
BP No. Description Date
01.15-7 Final Cleaning-Addendum 01.15-7 9/28/21
03.01-7 Concrete & Masonry-Addendum 03.01-7 9/28/21
05.01-7 Structural &Misc. Steel-Addendum 05.01-7 9/28/21
07.06-7 Membrane Roofing-Addendum 07.06-7 9/28/21
08.01-7 Doors, Frames& Hardware-Addendum 08.01-7 9/28/21
08.03-7 Glass &Glazing-Addendum 08.03-7 9/28/21
08.04-7 Rolling Counter Doors-Addendum 08.04-7 9/28/21
09.01-7 Framing, Drywall &Stucco-Addendum 09.01-7 9/28/21
09.02-7 Hard Tile-Addendum 09.02-7 9/28/21
09.03-7 Acoustical Ceilings&Walls-Addendum 09.03-7 9/28/21
09.05-7 Flooring-Addendum 09.05-7 9/28/21
09.06-7 Epoxy Terrazzo Floors-Addendum 09.06-7 9/28/21
09.08-7 Access Flooring-Addendum 09.08-7 9/28/21
09.09-7 Painting-Addendum 09.09-7 9/28/21
10.01-7 Visual Display Units-Addendum 10.01-7 9/28/21
10.04-7 Signage-Addendum 10.04-7 9/28/21
10.07-7 Operable Partitions-Addendum 10.07-7 9/28/21
10.10-7 Building Specialties-Addendum 10.10-7 9/28/21
10.13-7 Lockers-Addendum 10.13-7 9/28/21
11.05-7 Food Service Equipment-Addendum 11.05-7 9/28/21
12.01-7 Window Treatments-Addendum 12.01-7 9/28/21
12.02-7 Casework-Addendum 12.02-7 9/28/21
14.01-7 Elevators-Addendum 14.01-7 9/28/21
21.01-7 Fire Suppression-Addendum 21.01-7 9/28/21
22.01-7 Plumbing-Addendum 22.01-7 9/28/21
23.01-7 HVAC-Addendum 23.01-7 9/28/21
26.01-7 Electrical-Addendum 26.01-7 9/28/21
31.01-7 Sitework& Utilities-Addendum 31.01-7 9/28/21
32.04-7 Fencing &Gates-Addendum 32.04-7 9/28/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
BP No. Description Date
32.05-7 Landscaping & Irrigation-Addendum 32.05-7 9/28/21
01.02-8 Materials Testing-Addendum 01.02-8 10/4/21
01.13-8 Surveying-Addendum 01.13-8 10/4/21
01.15-8 Final Cleaning-Addendum 01.15-8 10/4/21
03.01-8 Concrete &Masonry-Addendum 03.01-8 10/4/21
05.01-8 Structural &Misc. Steel-Addendum 05.01-8 10/4/21
07.06-8 Membrane Roofing-Addendum 07.06-8 10/4/21
08.01-8 Doors, Frames &Hardware-Addendum 08.01-8 10/4/21
08.03-8 Glass &Glazing-Addendum 08.03-8 10/4/21
08.04-8 Rolling Counter Doors-Addendum 08.04-8 10/4/21
09.01-8 Framing, Drywall &Stucco-Addendum 09.01-8 10/4/21
09.02-8 Hard Tile-Addendum 09.02-8 10/4/21
09.03-8 Acoustical Ceilings&Walls-Addendum 09.03-8 10/4/21
09.05-8 Flooring-Addendum 09.05-8 10/4/21
09.06-8 Epoxy Terrazzo Floors-Addendum 09.06-8 10/4/21
09.08-8 Access Flooring-Addendum 09.08-8 10/4/21
09.09-8 Painting-Addendum 09.09-8 10/4/21
10.01-8 Visual Display Units-Addendum 10.01-8 10/4/21
10.04-8 Signage-Addendum 10.04-8 10/4/21
10.07-8 Operable Partitions-Addendum 10.07-8 10/4/21
10.10-8 Building Specialties-Addendum 10.10-8 10/4/21
10.13-8 Lockers-Addendum 10.13-8 10/4/21
11.05-8 Food Service Equipment-Addendum 11.05-8 10/4/21
12.01-8 Window Treatments-Addendum 12.01-8 10/4/21
12.02-8 Casework-Addendum 12.02-8 10/4/21
14.01-8 Elevators-Addendum 14.01-8 10/4/21
21.01-8 Fire Suppression-Addendum 21.01-8 10/4/21
22.01-8 Plumbing-Addendum 22.01-8 10/4/21
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
BP No. Description Date
23.01-8 HVAC—Addendum 23.01-8 10/4/21
26.01-8 Electrical—Addendum 26.01-8 10/4/21
31.01-8 Sitework& Utilities—Addendum 31.01-8 10/4/21
32.04-8 Fencing &Gates—Addendum 32.04-8 10/4/21
32.05-8 Landscaping & Irrigation—Addendum 32.05-8 10/4/21
(END OF BID PACKAGES AND BID PACKAGE ADDENDA)
END OF DOCUMENT LIST
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
CLARIFICATIONS, QUALIFICATIONS AND ASSUMPTIONS
Basis of the GMP Proposal
• This GMP Proposal has been prepared based on the following documents:
The Contract Drawings entitled 100% Permit Documents dated August 11, 2021 as prepared by Architects
Design Group. Refer to Document List included in Section II of this proposal.
The Project Specifications entitled 100% Permit Documents dated August 11,2021 as prepared by
Architects Design Group. Refer to Document List included in Section II of this proposal.
The Architect Addendum prepared by Architects Design Group and their consultants, to the extent that the
addendum was made available and issued to bidders by Ajax Building Company, LLC as part of a bid
package addenda prior to and since the bid date:
■ Addendum No. 1 dated August 25, 2021.
■ Addendum No.2 dated September 21, 2021 issued to the bidders post bid date and reconciled with the
bid date proposals.
■ Addendum No. 3 dated October 1, 2021 issued to the bidders post bid date and reconciled with the bid
date proposals.
■ Addendum No. 4 dated October 27, 2021 issued to the bidders post bid date and reconciled with the
bid date proposals.
■ Addendum No. 6 dated November 3, 2021 issued to the bidders post bid date and reconciled with the
bid date proposals.
■ Addendum No. 7 dated November 5, 2021 issued to the bidders post bid date and reconciled with the
bid date proposals.
■ Addendum No. 8 dated November 3, 2021 issued to the bidders post bid date and reconciled with the
bid date proposals.
Requests for Information (RFIs) No. 001 —110 to the extent that the information was made available and
issued to bidders by Ajax Building Company, LLC as part of a bid package addendum prior to their bid date,
with answers and/or clarifications provided by the Owner, the Architect and their consultants, or the
Construction Manager.
The Construction Manager's GMP Cost Report dated August 5, 2022.
The Construction Manager's Project Schedule dated August 5, 2022.
The Bid Packages and Bid Package Addenda issued to bidders by the Construction Manager.
• It is understood that various allowances are included in this GMP Proposal as indicated in Section IV-D of this
proposal. It is further understood that the Construction Manager's Contract will require adjustments by change
order(either additive or deductive)for reconciling the difference between each allowance and the actual costs
and/or savings realized on each allowance.
• The Cost of Work for the Contract includes all labor, material, shipping, travel, taxes, and equipment required to
construct the facility, as well as all temporary items and services that are necessary to support the construction
activities.
• These qualifications, clarifications and assumptions are intended to supplement the GMP Cost Report and the
GMP Documents, and are intended to inform the Owner and the Design Team of the Construction Manager's
interpretation of the scope items which are included or excluded, and which may not be clearly shown or defined
by specification, plan, elevation, detail, section, schedule, or schematic.
Scope of the GMP Proposal
• The scope of this GMP Proposal consists of the following:
The Construction Manager's general conditions and general requirements for a period of eighteen (18)
months.
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Base Bid GMP—Includes the following scope of work:
■ The project consists of a 25,799 SF elevated concrete structure with double roof system designed to
FEMA 361 standards on the southwest corner of the Marathon Airport and all related sitework. The
facility houses the Monroe County Emergency Operations Center, Sheriff's Call Center&Dispatch and
Fire Administration. These spaces are served by redundant utility systems for potable water,
wastewater and emergency power. State of the art audio-visual technology and access control
systems are being implemented including video walls and biometric screening.
Division 01 —General Requirements
• Clarifications, qualifications and assumptions related to Division 01:
This GMP Proposal includes the Construction Manager's general conditions and general requirements for a
period of eighteen (18)months.
We have included the necessary jobsite supervision, layout, safety supplies, equipment, temporaryjobsite
office facility, postage, office equipment, project internet, and jobsite communications.
We have included a jobsite office facility for the Owner,Architect, Engineer, or their representatives.
Aerial photographs have been included.
An allowance of$25,000 is included for Materials Testing per Bid Package 01.02.
An allowance of$592,000 is included for building permits.
Environmental permits are not included.
Tap fees, connection charges, system charges, impact fees, meter fees, or other regulatory
requirements/fees are not included as all utilities are being tied into existing utility services.
Costs related to a threshold inspector are not included.
Temporary utility services(water, sewer and electric)are included. It is assumed that all temporary utilities
required for the project will be tied into permanent utilities and that these permanent utilities are readily
accessible, of adequate size to handle any additional load as required by temporary utilities and that
temporary on-site facilities can be located as necessary to prevent the need for any substantial overhead
and/or underground temporary utilities.
The consumption costs associated with temporary water,sewer and electric utilities will be paid for by the
Construction Manager through the date of Substantial Completion at which time these utilities shall be
transferred into the Owner's name and become the responsibility of the Owner.
We have included costs for Scheduling Software, Updates, Maintenance, and Support within the GMP. The
charge for this service shall be$2,850 and shall be billed as a lump sum amount upon approval of the GMP
and issuance of the Notice to Proceed.
We have included costs for MIS Services related to the project. This includes software updates associated
with Ajax Building Company, LLC standard software provided for cost management, computer operating
systems, PDF software,word processing applications, and spreadsheet applications. This includes
troubleshooting, virus management/remediation, malware/adware management/remediation, updates, and
maintenance of these systems. This does not include services related to scheduling, document control, and
Project Management Controls,which are provided via other applications noted below. This does not include
service provider costs for internet/telephone, initial setup,wiring, or connections. The charge for this service
shall be$4,750 and shall be billed as a lump sum amount upon approval of the GMP and issuance of the
Notice to Proceed.
We have included costs for Document Management and Project Management Controls Services. These
services will be provided via a cloud-based platform that will allow direct access to all Construction
personnel, including Owners,Architects, and Subcontractors. Services will include the ability to
access/manage the information via mobile devices via the internet. Services included will be Plans and
Specs Maintenance and distribution, RFI Control, Submittal Control, Punch List Management, Daily
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Reports, along with other related functions inherent in the platform. The charge for this service shall be
$32,000 and shall be billed as a lump sum amount upon approval of the GMP and issuance of the Notice to
Proceed.
We have included costs to host project-related video conferencing and file sharing within the GMP. These
services will be provided via cloud-based platforms.
Temporary gravel, limerock, crushed concrete or asphalt millings is included for the stabilization of the
construction entrances.
Temporary jobsite fencing and gates are included as 6-0" high chain link fencing.
Silt fencing is included for areas where construction runoff and/or erosion may occur.
We have included re-seeding areas disturbed by construction activities with Bahia seed as necessary to
return those areas to their pre-construction condition. It should be understood that there will be a"growing
in" period following the seeding operations.
One(1)each standard 4' x 8' project sign is included.
An allowance of$4,300 is included for the reproduction and distribution of Contract Documents for the
purpose of construction.
An allowance of$25,000 for Site Survey is included per Bid Package 01.13.
The final project cleaning is included.
Jobsite cleanup, rubbish removal and rubbish disposal are included.
An as-built survey is included for the final documentation of the location and elevation of the proposed new
construction.
An allowance of$500,000 is included for future material escalation and expediting as a result of the current
supply chain impacts resultant from COVID and labor shortages.
Performance and Payment Bonds are included.
Labor burden multiplier is included as a fixed rate of 45%. This multiplier is to account for all added
expenses related to direct labor that are not included as part of OH&P.
We have included this project's portion of our Umbrella/General Liability Insurance Policy within the GMP.
The charge for this coverage shall be$328,094 and shall be billed as a lump sum amount upon approval of
the GMP and issuance of the Notice to Proceed.
Costs for procuring Builder's Risk Insurance are included for$196,219.
■ The standard deductible for this policy is$25,000.
■ The windstorm deductible for this policy is$250,000 minimum and 5%VARTOL.
■ The flood deductible for this policy is$250,000 minimum and 5%VARTOL.
■ The earthquake deductible for this policy is$25,000.
■ Should a Builder's Risk claim occur,any deductibles or uncovered costs will be treated as a change in
scope to be funded via a change order to the Construction Manager's Contract.
■ "Loss of Use" coverage is not included in the policy. If a Builder's Risk claim occurs,Ajax Building
Company, LLC excludes costs associated with"Loss of Use".
The Builder's Risk and General Liability Policies do not cover existing construction or existing building
components, therefore the Owner shall provide for a waiver of subrogation in Ajax Building Company, LLC's
favor.
We have included Warranty Management for the project within the GMP. The charge for this service to be
provided during the warranty period shall be$16,834 and shall be billed as a lump sum amount upon
approval of the GMP and issuance of the Notice to Proceed.
A Construction Manager's Contingency is included. This contingency is to be utilized by Ajax Building
Company, LLC in executing the work described in this GMP Proposal. Acceptable uses of this contingency
include, but are not limited to, the following:
■ Buy-out of work not included in previously awarded bid packages.
■ Repair of damages caused by an unknown source or contractor(not including Builder's Risk claims).
■ To improve and/or accelerate the progress of the work.
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
■ To improve the conditions of the work.
■ For modification of the work resulting from an unknown ambiguity(not an error or omission)in the
contract documents.
■ To increase and/or supplement staff as necessary to effectively manage the project.
■ To adjust the reimbursable general conditions in excess of the budget.
Architectural and/or Engineering Fees are not included.
The Construction Manager's Construction Phase Fee is included at the rate of 4.8%of the GMP which shall
be converted to a lump sum of$1,528,981 upon acceptance of the GMP.
Ajax Building Company, LLC may utilize a subcontractor default insurance program for some subcontractors
as an alternative to Subcontractor Bonds. When utilized, the cost for the subcontractor default insurance
coverage will be the same cost as the subcontractor's bond cost.
Should the Owner elect to utilize the Direct Purchase Order process to save sales tax, the tax for actual
purchases will be credited to the Owner. At the end of the Project, any refund for materials not purchased
or surplus materials returned to suppliers plus the applicable sales tax amount shall be credited with an
additive Change Order to the Agreement with the Construction Manager and Subcontractor's Agreement.
Surplus materials shall be the property of the Subcontractor and no refund or materials shall be due to the
Owner.
Some work of the GMP Proposal and the Project Schedule may include materials or products from China or
other areas impacted by the Coronavirus, COVID-19 virus, or future concern. The GMP and Project
Schedule do not account for and specifically exclude any disruptions or delays to the procurement or supply
of such materials caused by the current Coronavirus or COVID-19 outbreak. Additionally, the GMP and
Project Schedule do not account for and specifically exclude any impacts that may be caused to the
performance of the work resulting from labor shortages, shutdowns,work restrictions, travel restrictions,
production inefficiencies, governmental regulations/guidance, or other causes resulting from the current
Coronavirus or COVID-19 outbreak. Any impacts to material pricing, deliveries or schedule that are realized
will need to be addressed through remaining project Allowances. If there are no internal project funds,then
an Owner Change Order to increase the Contract will be required. The Substantial Completion date will be
equitably adjusted for any critical path activity affected from the above.
Division 02—Existing Conditions
• Clarifications, qualifications and assumptions related to Division 02:
Abatement and Remediation Work
■ We specifically exclude any asbestos abatement, lead paint abatement or removal, PCB abatement or
removal, and related surveys, air monitoring, clearances, testing services,etc.
Demolition/Selective Demolition
■ Demolition work and selective demolition work, as required for the renovations and new construction, is
included in this proposal.
■ The water and runoff generated from construction operations will be contained on the project site. It is
assumed that the water and/or runoff generated from demolition operations will not require collection,
treatment or disposal.
■ It is assumed that abandoned utilities will be disconnected and capped (not removed or filled).
■ We specifically exclude the relocation and/or reinstallation of any existing or temporary buildings,
structures, etc.
■ The salvage of any materials, equipment,furniture,etc. is specifically excluded. It is assumed that all
salvage operations by the Owner will have already been completed prior to the mobilization of the
Construction Manager.
Division 03—Concrete
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
• Clarifications, qualifications and assumptions related to Division 03:
Concrete Work is included per BP 03.01 Concrete & Masonry.
■ Standard subsoil termite treatment is included at the slab sub-grade. No special or extended
warranties are included.
■ Concrete sidewalks are included strictly as indicated on the Architectural Site and Civil drawings. No
additional value is included for additional sidewalk connectors, etc.
Division 04—Masonry
• Clarifications, qualifications and assumptions related to Division 04:
Masonry Work is included per BP 03.01 Concrete &Masonry.
■ All cmu masonry is included as standard cmu. Fire rated, ground face,fluted, acoustical, colored or
other special cmu are not included.
General Masonry Items
■ Mortar additives or coloring are not included.
■ Exposed masonry joints are included as concave joints both horizontally and vertically.
Division 05—Metals
• Clarifications, qualifications and assumptions related to Division 05:
Metal Work is included per BP 05.01 Structural &Miscellaneous Steel.
■ Metal railings are included strictly as indicated on the drawings. No additional handrails are included
based on FBC/ADA requirements for maximum spacing between handrails. It is assumed that handrail
quantities were designed to meet all applicable requirements.
Division 06—Wood, Plastics and Composites
• Clarifications, qualifications and assumptions related to Division 06:
Wood, Plastics and Composites Work is included per BP 12.02 Casework.
Division 07—Thermal and Moisture Protection
• Clarifications, qualifications and assumptions related to Division 07:
Thermal and Moisture Protection Work is included per BP 07.06 Membrane Roofing.
Roofing system is included as FiberTite membrane.
Bentonite waterproofing is included at the elevator pit walls only.All other retaining walls/foundations
include Xypex waterproofing admixture in the concrete.
■ Bentonite waterproofing is include from the top of the MAT foundations up the walls of the elevator pit.
Waterproofing is not included underneath the MAT foundations.
Joint Sealers is included per Bid Package 09.09—Painting.
Division 08—Openings
• Clarifications, qualifications and assumptions related to Division 08:
Doors, Frames& Hardware are included per BP 08.01 Doors, Frames& Hardware.
■ All hollow metal frames are included as standard hollow metal. No mastic painting,asphalt painting, or
back priming is included for hollow metal frames.
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
■ No zinc-rich priming is included.
■ Opening 249 was specified with a STC rating of 60, that rating is not available in the specified product.
We have included a door with a rating of STC 55
■ The specified door for Opening 249 is 3'Y2" thick and included as designed. This opening may not
comply with ADA requirements.
■ Door Hardware changes are included based on the official RFI responses to-date.
Glass and Glazing Work is included per BP 08.03 Glass &Glazing.
Rolling Door Work is included per BP 08.04 Rolling Counter Doors.
Division 09—Finishes
• Clarifications, qualifications and assumptions related to Division 09:
Metal Framing, Drywall &Stucco Work is included per BP 09.01 Framing, Drywall &Stucco.
Tile Work is included per BP 09.02 Hard Tile.
Epoxy Terrazzo Work is included per BP 09.06 Epoxy Terrazzo Floors.
Ceilings Work is included per BP 09.03 Acoustical Ceilings&Walls.
Flooring Work is included per BP 09.05 Flooring.
Access Flooring Work is included per BP 09.08 Access Flooring.
Paints and Waterproofing Work is included per BP 09.09 Painting.
■ Texcote XL70 system is included for the underside of the 1st floor and at all hardiboard locations per
RFI 100 response, instead of Texcote CoolWall system.
■ No painting is included for concealed areas or areas otherwise not exposed to view.
Division 10—Specialties
• Clarifications, qualifications and assumptions related to Division 10:
Miscellaneous Building Specialties Work is included per BP 10.10 Building Specialties.
■ Specialties quantities are included per RFI 107 attachment. This RFI remains open at this time.
Visual Display Surfaces Work is included per BP 10.01 Visual Display Surfaces.
Signage and Plaques Work is included per BP 10.04 Signage.
Lockers are included per BP 10.13 Lockers.
Operable Partitions Work is included per BP 10.07 Operable Partitions.
— Operable Partitions are included as manufactured by Moderco Series 800.
Division 11 —Equipment
• Clarifications, qualifications and assumptions related to Division 11:
■ Appliances are included per BP 11.05 Food Service Equipment.
Division 12—Furnishings
• Clarifications, qualifications and assumptions related to Division 12:
Window Treatments Work is included per BP 12.01 Window Treatment.
Division 14—Conveying Systems
• Clarifications, qualifications and assumptions related to Division 14:
Elevators Work is included per BP 14.01 Elevators.
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Division 21 —Fire Suppression
• Clarifications, qualifications and assumptions related to Division 21:
Fire Protection Systems Work is included per BP 21.01 Fire Protection.
■ The Architect/Engineer of Record shall provide all required fire protection system engineering
documents for the project, including all engineering, calculations, analysis, and other data required to
set forth the overall design requirements and provide sufficient direction to the construction manager for
the layout and construction of the fire protection system(s)and shall be signed and sealed by the
Engineer of Record and meet all requirements of the authority having jurisdiction. The construction
manager's fire protection subcontractor shall provide all required fire protection system layout
documents for the project, including layout, sizing, hydraulic calculations and other construction data
that shall provide the requirements for the fabrication and installation of the fire protection system(s)
and shall prepare and submit for review/approval, shop drawings and product data for the fire protection
system(s)based upon the design documents provided by the Architect/Engineer of Record. Shop
drawings and product data shall not require any additional engineering input, and shall not be required
to be signed/sealed by a delegated engineer.
Division 22—Plumbing
• Clarifications, qualifications and assumptions related to Division 22:
Plumbing Work is included per BP 22.01 Plumbing
Fuel Piping is included in BP 26.01 Electrical
Division 23—HVAC
• Clarifications, qualifications and assumptions related to Division 23:
HVAC and Test& Balance Work is included per BP 23.01 HVAC.
Division 26—Electrical
• Clarifications, qualifications and assumptions related to Division 26:
Electrical Work is included per BP 26.01 Electrical
Basic Materials and Methods
■ Secondary electrical service from the primary transformer to the building(s)and electrical service
distribution thereafter in included. The Construction Manager assumes that the Owner's local utility
company will install the primary electrical service from the utility company's infrastructure to the on-site
transformer, including furnishing and installing the primary transformer and related housekeeping pad.
■ Jacking, boring, or directional drilling is not included for new or relocated utilities.
■ We exclude Load Bank Option 1 and Option 2 per RFI 108 response.
Division 27—Communications
• Clarifications, qualifications and assumptions related to Division 27:
Data/Communications Systems Work is included per BP 26.01 Electrical
TV, CCTV and MATV Systems Work is included per BP 26.01 Electrical
Sound and Video Systems Work is included per BP 26.01 Electrical
Television and Multimedia Equipment Work is included per BP 26.01 Electrical
Distributed Antenna Systems(DAS)and testing for same in their entirely is included per BP 26.01 Electrical.
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Division 28—Electronic Safety and Security
• Clarifications, qualifications and assumptions related to Division 28:
Security,Alarm and Detection Systems Work is included per BP 26.01 Electrical
Fire Alarm Systems Work is included per BP 26.01 Electrical
General Electronic Safety and Security Items is included per BP 26.01 Electrical
Division 31 —Earthwork
• Clarifications, qualifications and assumptions related to Division 31:
Site Work/Earthwork is included per BP 31.01 Sitework&Utilities
■ It is assumed that the existing soils are of an acceptable material and that compaction can be achieved
under normal means and methods, and that over-excavation and/or replacement of unsuitable soils will
not be required in the performance of the work.
■ Based on Geotechnical Report, dewatering is not expected to be needed for the installation of the new
work. As such,dewatering has not been figured and not included.
Division 32—Exterior Improvements
• Clarifications, qualifications and assumptions related to Division 32:
Paving Work is included per BP 31.01 Sitework& Utilities
■ We have not included any milling and/or resurfacing of existing roadways, parking lots or drives. It is
anticipated that various roadways, paving, parking lots,etc.surrounding the project site will require
resurfacing and/or repair at the completion of the project. We recommend that a more detailed
evaluation be performed by the project team during the later stages of the project so that a definitive
scope of work can be prepared and priced accordingly.
Fencing and Gates Work is included per BP 32.04 Fencing &Gates
Landscaping and Irrigation Work is included per BP 32.05 Landscaping & Irrigation
Division 33—Utilities
• Clarifications, qualifications and assumptions related to Division 33:
Site Utilities Work is included per BP 31.01 Sitework& Utilities
General Notes
• General clarifications, qualifications and assumptions related to the GMP Proposal:
CAD"As-Builts" are included.
0&M training, manuals or video-training is not included for Owner furnished equipment or items provided by
the Owner's vendors.
This GMP Proposal is based on the premise and understanding that Ajax Building Company, LLC will have
full control to reallocate any funds and/or budgets within the GMP (excluding allowances)as determined
necessary in the execution of the CM Contract.
Various unforeseen conditions and discrepancies may arise during the construction phase. It is assumed
that the Design Team and Owner will assign a staff member(s)that will be readily available to respond and
provide timely assistance in resolving all issues that may arise.
END OF CLARIFICATIONS, QUALIFICATIONS AND ASSUMPTIONS TO THE GMP PROPOSAL
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
COST REPORT NARRATIVE
Ajax Building Company, LLC is confident that the GMP Cost Report included herein is representative of the proposed
scope of work depicted in the GMP Documents. The work included in the GMP Proposal is based upon the List of
Documents included in Section II of this proposal as amended by the Clarifications, Qualifications and Assumptions
and the Allowance Schedule, contained in Sections III and IV of this proposal.
The Base Bid GMP Proposal for the FL Keys Marathon Airport NAUB EOC totals$31,856,275. The Base Bid GMP
Proposal includes the 25,799 SF facility and all related sitework.
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
GMP Cost Report:
BASE BID GMP
CM Summary Report
cestMana�►ement/lecap
Sort Sequences: Estimate File: :202011_GMP_CM06.est
1. Sec Estimator:
2. Divisions Primary Project Qty:O
3. Not Used Secondary Project Qty: 0 FLF
4. Not Used Estimate UM: Imperk
Report includes Taxes&Insurance.
8:47:37AM 8/5/2022
Description Unit$ Total$
NOTICE : This Document is considered proprietary information and shaH not be distributed beyond the
intended recipient without the express written consent of Ajax Building Company,LLC !!
Total Division 01 GENERAL $2,569,302
REQUIREMENTS
Total Division 03 CONCRETE $5,545,615
Total Division 05 METALS $370,713
Total Division 07 THERMAL &MOISTURE $1,293,764
PROTECTION
Total Division 08 DOORS& WINDOWS $1,530,109
Total Division 09 FINISHES $2,924,811
Total Division 10 SPECIALTIES $427,102
Total Division 11 EQUIPMENT $114,300
Total Division 12 FURNISHINGS $195,768
Total Division 14 CONVEYING SYSTEMS $234,617
Total Division 21 FIRE SUPRESSION $262,707
SYSTEMS
Total Division 22 PLUMBING $933,933
Total Division 23 HVAC WORK $1,265,300
Total Division 26 ELECTRICAL WORK $7,069,048
Total Division 31 SITEWORK $2,325,287
Total Division 32 SITE IMPROVEMENTS $481,214
Total Division 36 BONDS&INSURANCE $719,258
Total Division 37 WARRANTY $16,834
ALLOCATION
Total Division 50 ESCALATION COSTS $500,000
Total Division 80 CONTINGENCY $955,613
Total Division 90 BUILDING PERMITS $592,000
Total Division 95 CONTRACTORS $1,528,981
OVERHEAD& FEE
Total Sec BB BASE BID $31,856,275
Page 1
Sort Sequences: Estimate File: :202011_GMP_CM06.est
1. Sec Estimator:
2. Divisions Primary Project Qty:O
3. Not Used Secondary Project Qty: 0 FLF
4. Not Used Estimate UM: Imperk
Report includes Taxes&Insurance.
8:47:37AM 8/5/2022
Description Unit$ Total$
NOTICE : This Document is considered proprietary information and shaH not be distributed beyond the
intended recipient without the express written consent of Ajax Building Company,LLC !!
ESTIMATE TOTALS $31,856,275
Page 2
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
GMP Cost Report:
BASE BID GMP
CM Detail Report
tostmansi►emsotDetai/
AaX
Sort Sequences: Estimate File: :202011 GMP CM06.est
1. Sec -
2. Major Item Code Estimator:
3. Minor Item Code Primary Project Qty:O SF
4. Not Used Secondary Project Qty: 0 FLRS
Estimate UM: Imperial
Report includes Taxes&Insurance.
8:46:45AM 8/5/2022
Description Quantity Unit$ Total$
N is Document is considered pro rie ry information and shall not be distributed beyondthe
intended recipient without the express written consent of Ajax Building Company,LLC !!!
Sec B'B BASE BID
Major Item Code 01300.000 GENERAL CONDITIONS
Minor Item Code 01300.000 ADMINISTRATIVE
REQUIREMENTS
Project Executive 80.00 WEEK 217.50 17,400
Operations Manager 80.00 WEEK 1,033.85 82,708
Operations Manager Vehicle Allowance 19.00 MO 220.00 4,180
Full Time Project Manager 80.00 WEEK 4,135.40 330,832
Full Time Project Manager Vehicle Allowance 19.00 MO 800.00 15,200
Asst. Project Manager 80.00 WEEK 2,723.10 217,848
Asst. Project Manager Vehicle Allowance 19.00 MO 350.00 6,650
General Superintendent 71.00 WEEK 1,033.85 73,403
General Superintendent Vehicle Allowance 17.00 MO 220.00 3,740
Full Time Project Superintendent 71.00 WEEK 4,307.95 305,864
Asst. Superintendent#1 71.00 WEEK 3,159.55 224,328
Carpenter 40.00 WEEK 1,450.00 58,000
Project Accountant 80.00 WEEK 217.50 17,400
Project Administrator 80.00 WEEK 1,551.50 124,120
Home Office Secretary 80.00 WEEK 348.00 27,840
Total Minor Item Code 01300.000 $1,509,514
ADMINISTRATIVE REQUIREMENTS
Total Major Item Code 01300.000 GENERAL $1,509,514
CONDITIONS
Major Item Code 01300.300 GENERAL REQUIREMENTS
Minor Item Code 01310.000 TRAVEL, PER DIEM, &
RELOCATION
Airplane Tickets 19.00 EACH 650.00 12,350
Rental Car 19.00 DAYS 150.00 2,850
Meals 38.00 DAYS 35.00 1,330
Per Diem Expenses 72.00 MO 720.00 51,840
Motel/Hotel Rooms 38.00 DAYS 500.00 19,000
Living Expenses 17.00 MO 22,000.00 374,000
Travel Expenses 1.00 LS 2,500.00 2,500
Moving Expenses 1.00 LS 10,000.00 10,000
Meters/Tolls/Fees 38.00 MO 15.00 570
Total Minorltem Code01310.000 $474,440
TRAVEL,PER DIEM, &RELOCATION
Minor Item Code 01320.000 CONSTRUCTION PROGRESS
DOCUMENTATION
Video Taping 2.00 EACH 250.00 500
Aerial Photographs-3 @ 8 x 10's 19.00 MO 350.00 6,650
Page 1
Sort Sequences: Estimate File: :202011 GMP CM06.est
1. Sec -
2. Major Item Code Estimator:
3. Minor Item Code Primary Project Qty:O SF
4. Not Used Secondary Project Qty: 0 FLRS
Estimate UM: Imperial
Report includes Taxes&Insurance.
8:46:45AM 8/5/2022
Description Quantity Unit$ Total$
N is Document is considered pro rie ry information and shall not be distributed beyondthe
intended recipient without the express written consent of Ajax Building Company,LLC !!!
Construction Schedule 19.00 MO 150.00 2,850
Total Minor Item Code01320.000 $10,000
CONSTRUCTION PROGRESS
DOCUMENTATION
Minor Item Code 01350.000 SPECIAL PROCEDURES
Project Document Management Software 1.00 LS 32,000.00 32,000
Data Processing 19.00 MO 250.00 4,750
Total Minor Item Code01350.000 $36,750
SPECIAL PROCEDURES
Minor Item Code 01410.000 REGULATORY REQUIREMENTS
Environmental Permits 1.00 NIC
Water System Service Charges 1.00 NIC
Water Systems Tap Charges 1.00 NIC
Sewer System Service Charges 1.00 NIC
Sewer System Tap Charges 1.00 NIC
Transportation Impact Fees 1.00 NIC
Impact/Connection Fees 1.00 NIC
Meter/Tap Fees 1.00 NIC
Total Minor I tem Code 01410.000
REGULATORY REQUIREMENTS
Minor Item Code 01420.000 SAFETY
Safety Supplies 17.00 MO 129.00 2,193
Safety Jobsite Signs 20.00 EACH 53.75 1,075
Safety Training&Videos 1.00 LS 250.00 250
Temporary Fire Protection(1 ea/6,000 So 5.00 EA 43.00 215
Safety Director/Inspector 68.00 MO 234.90 15,973
First Aid Supplies 1.00 LS 376.25 376
Water, Ice,&Cups 17.00 MO 134.38 2,284
Total Minor Item Code 01420.000 SAFETY $22,367
Minor Item Code 01450.000 QUALITY CONTROL
Laboratory Testing Allowance 1.00 ALLW 25,000.00 25,000
Total Minor Item Code01450.000 $25,000
QUALITY CONTROL
Minor Item Code 01500.000 TEMPORARY FACILITIES
Project Office Trailer 19.00 MO 1,612.50 30,638
Office Trailer Set-up 1.00 EACH 10,750.00 10,750
Office Trailer Removal 1.00 EACH 9,675.00 9,675
Project Tool House 18.00 MO 241.88 4,354
County PM Trailer& Equipment 19.00 MO 1,075.00 20,425
County PM Trailer Set-up 1.00 EACH 7,525.00 7,525
County PM Trailer Removal 1.00 EACH 6,450.00 6,450
Project Office Supplies 19.00 MO 295.63 5,617
Jobsite Postage 19.00 MO 430.00 8,170
Jobsite Office Equipment 19.00 MO 800.00 15,200
Jobsite Office Furniture 19.00 MO 500.00 9,500
Jobsite Water Cooler 19.00 MO 107.50 2,043
Total Minorltem Code01590.000 $130,346
TEMPORARY FACILITIES
Minor Item Code 01510.000 TEMPORARY UTILITIES
Chemical Toilets 17.00 MO 2,257.50 38,378
Page 2
Sort Sequences: Estimate File: :202011 GMP CM06.est
1. Sec -
2. Major Item Code Estimator:
3. Minor Item Code Primary Project Qty:O SF
4. Not Used Secondary Project Qty: 0 FLRS
Estimate UM: Imperial
Report includes Taxes&Insurance.
8:46:45AM 8/5/2022
Description Quantity Unit$ Total$
N is Document is considered pro rie ry information and shall not be distributed beyondthe
intended recipient without the express written consent of Ajax Building Company,LLC !!!
Handwashing Station 17.00 MO 322.50 5,483
Electric Usage Charge 19.00 MO 870.00 16,530
Temporary Electric Connection 1.00 LS 3,000.00 3,000
Water Usage Charge 17.00 MO 435.00 7,395
Temporary Water Connection 1.00 LS 1,200.00 1,200
Early Cut-On Permanent Power 25,800.00 SQFT 0.86 22,188
Total Minorltem Code01510.000 $94,173
TEMPORARY UTILITIES
Minor Item Code 01530.000 PROJECT COMMUNICATIONS
Internet Service Charges 19.00 MO 322.50 6,128
ISP Construction Fee 1.00 LS 564.38 564
Jobsite Communications 19.00 MO 806.25 15,319
Total Minorltem Code01530.000 $22,011
PROJECT COMMUNICATIONS
Minor Item Code 01540.000 CONSTRUCTION TOOLS&
EQUIPMENT
Small Tools& Equipment 50.00 MO 268.75 13,438
Superintendent Pick-up Truck 34.00 MO 700.00 23,800
Fuel for Superintendent Pick-up Truck 34.00 MO 537.50 18,275
Total Minorltem Code01540.000 $55,513
CONSTRUCTION TOOLS& EQUIPMENT
Minor Item Code 01580.000 PROJECT IDENTIFICATION
Project Sign 2.00 EACH 1,250.00 2,500
Total Minorltem Code01580.000 $2,500
PROJECT IDENTIFICATION
Minor Item Code 01720.000 CONSTRUCTION PREPARATION
Purchase Drawings/Reproduction Cost Allowance 1.00 ALLW 4,300.00 4,300
Surveys 1.00 LS 25,000.00 25,000
Total Minorltem Code01720.000 $29,300
CONSTRUCTION PREPARATION
Minor Item Code 01740.000 PROJECT CLEANING
Final Jobsite Clean-up 2.00 LS 10,320.00 20,640
Construction Clean-up 1,500.00 MNHR 50.75 76,125
Rubbish Removal 17.00 MO 107.50 1,828
Dump Charges 2,500.00 CUYD 19.62 49,047
Total Minorltem Code01740.000 $147,639
PROJECT CLEANING
Minor Item Code 01770.000 CLOSEOUT PROCEDURES
As-Built Drawings(CADD) 1.00 LS 8,250.00 8,250
Total Minorltem Code01770.000 $8,250
CLOSEOUT PROCEDURES
Minor Item Code 01820.000 DEMONSTRATION&TRAINING
Video Tape Training 1.00 LS 1,500.00 1,500
Total Minorltem Code01820.000 $1,500
DEMONSTRATION& TRAINING
Total Major Item Code 01300.300 GENERAL $1,059,788
REQUIREMENTS
Major Item Code 03000.000 CONCRETE WORK
Minor Item Code 03300.000 CAST-IN-PLACE CONCRETE
BP03.01 Concrete&Masonry 1.00 LS 5,545,615.00 5,545,615
Page 3
Sort Sequences: Estimate File: :202011 GMP CM06.est
1. Sec —
2. Major Item Code Estimator:
3. Minor Item Code Primary Project Qty:O SF
4. Not Used Secondary Project Qty: 0 FLRS
Estimate UM: Imperial
Report includes Taxes&Insurance.
8:46:45AM 8/5/2022
Description Quantity Unit$ Total$
N is Document is considered pro rie ry information and shall not be distributed beyondthe
intended recipient without the express written consent of Ajax Building Company,LLC !!!
Total Minor Item Code03300.000 $5,545,615
CAST-IN-PLACE CONCRETE
Total Major Item Code 03000.000 CONCRETE $5,545,615
WORK
Major Item Code 05000.000 STRUCTURAL STEEL,JOISTS, &
DECK
Minor Item Code 05120.000 STRUCTURAL STEEL
BP05.01 Structural&Miscellaneous Steel 1.00 LS 370,713.00 370,713
Total Minor Item Code05120.000 $370,713
STRUCTURAL STEEL
Total Major Item Code 05000.000 $370,713
STRUCTURAL STEEL,JOISTS,&DECK
Major Item Code 07300.000 SHINGLES, TILES, &ROOF
COVERINGS
Minor Item Code 07330.000 ROOF COVERINGS
BP07.06 Membrane Roofing 1.00 LS 1,293,763.50 1,293,764
Total Minor Item Code 07330.000 ROOF $1,293,764
COVERINGS
Total Major Item Code 07300.000 SHINGLES, $1,293,764
TILES, &ROOF COVERINGS
Major Item Code 08000.000 BASIC DOOR&WINDOW
MATERIALS&METHODS
Minor Item Code 08000.000 DOORS, FRAMES, &HARDWARE
BP08.01 Doors, Frames& Hardware 1.00 LS 390,058.97 390,059
Total Minor Item Code 08000.000 DOORS, $390,059
FRAMES, &HARDWARE
Total Major Item Code 08000.000 BASIC $390,059
DOOR& WINDOW MATERIALS&METHODS
Major Item Code 08300.000 SPECIALTY DOORS
Minor Item Code 08330.000 COILING DOORS&GRILLES
BP 08.04 Rolling Counter Door 1.00 LS 15,500.00 15,500
Total Minor Item Code 08330.000 COILING $15,500
DOORS &GRILLES
Total Major Item Code 08300.000 SPECIALTY $15,500
DOORS
Major Item Code 08400.000 ENTRANCES&STOREFRONTS
Minor Item Code 08400.000 ENTRANCES&STOREFRONTS
BP08.03 Glass&Glazing 1.00 LS 1,124,550.00 1,124,550
Total Minor Item Code 08400.000 $1,124,550
ENTRANCES&STOREFRONTS
Total Major Item Code 08400.000 $1,124,550
ENTRANCES&STOREFRONTS
Major Item Code 09100.000 GYP BOARD, PLASTER, &STUCCO
SYSTEMS
Minor Item Code 09250.000 GYPSUM BOARD
BP09.01 Framing, Drywall&Stucco 1.00 LS 1,832,063.00 1,832,063
Total Minor Item Code09250.000 $1,832,063
GYPSUM BOARD
Total Major Item Code 09100.000 GYP $1,832,063
BOARD,PLASTER, &STUCCO SYSTEMS
Page 4
Sort Sequences: Estimate File: :202011 GMP CM06.est
1. Sec —
2. Major Item Code Estimator:
3. Minor Item Code Primary Project Qty:O SF
4. Not Used Secondary Project Qty: 0 FLRS
Estimate UM: Imperial
Report includes Taxes&Insurance.
8:46:45AM 8/5/2022
Description Quantity Unit$ Total$
N is Document is considered pro rie ry information and shall not be distributed beyondthe
intended recipient without the express written consent of Ajax Building Company,LLC !!!
Major Item Code 09300.000 TILE
Minor Item Code 09300.000 TILE
BP09.02 Hard Tile 1.00 LS 250,677.54 250,678
Total Minor Item Code 09300.000 TILE $250,678
Total Major Item Code 09300.000 TILE $250,678
Major Item Code 09500.000 CEILINGS
Minor Item Code 09500.000 CEILINGS
BP09.05 Acoustical Ceilings&Wall Panels 1.00 LS 229,440.12 229,440
Total Minor Item Code 09500.000 $229,440
CEILINGS
Total Major Item Code 09500.000 CEILINGS $229,440
Major Item Code 09600.000 FINISHED FLOORING
Minor Item Code 09600.000 FLOORS
BP09.06 Flooring 1.00 LS 27,952.00 27,952
Total Minor Item Code 09600.000 FLOORS $27,952
Minor Item Code 09670.000 FLUID APPLIED FLOORING
BP09.06 Epoxy Terrazzo Floor 1.00 LS 132,260.12 132,260
Total Minor Item Code 09670.000 FLUID $132,260
APPLIED FLOORING
Total Major Item Code 09600.000 FINISHED $160,212
FLOORING
Major Item Code 09900.000 PAINTS&COATINGS
Minor Item Code 09900.000 PAINTS&COATINGS
BP09.09 Paints&Coatings 1.00 LS 452,417.94 452,418
Total Minor Item Code 09900.000 PAINTS $452,418
&COATINGS
Total Major Item Code 09900.000 PAINTS& $452,418
COATINGS
Major Item Code 10000.000 MISCELLANEOUS BUILDING
SPECIALTIES
Minor Item Code 10000.000 MISCELLANEOUS SPECIALTIES
BP 09.08 Access Flooring 1.00 LS 63,414.00 63,414
BP10.01 Visual Display Boards 1.00 LS 38,644.05 38,644
BP10.04 Signage 1.00 LS 75,943.32 75,943
BP10.07 Operable Partitions 1.00 LS 33,000.00 33,000
BP10.10 Building Specialties 1.00 LS 101,769.15 101,769
BP10.13 Lockers 1.00 LS 114,331.66 114,332
Total Minor Item Code 10000.000 $427,102
MISCELLANEOUS SPECIALTIES
Total Major Item Code 10000.000 $427,102
MISCELLANEOUS BUILDING SPECIALTIES
Major Item Code 11000.000 BUILDING EQUIPMENT
Minor Item Code 11000.000 MISCELLANEOUS EQUIPMENT
BP11.05 Food Service Equipment 1.00 LS 114,300.00 114,300
Total Miorltem Code 11000.000 $114,300
MISCELLANEOUS EQUIPMENT
Total Major Item Code 11000.000 BUILDING $114,300
EQUIPMENT
Major Item Code 12000.000 BUILDING FURNISHINGS
Page 5
Sort Sequences: Estimate File: :202011 GMP CM06.est
1. Sec —
2. Major Item Code Estimator:
3. Minor Item Code Primary Project Qty:O SF
4. Not Used Secondary Project Qty: 0 FLRS
Estimate UM: Imperial
Report includes Taxes&Insurance.
8:46:45AM 8/5/2022
Description Quantity Unit$ Total$
N is Document is considered pro rie ry information and shall not be distributed beyondthe
intended recipient without the express written consent of Ajax Building Company,LLC !!!
Minor Item Code 12000.000 MISCELLANEOUS FURNISHINGS
BP12.01 Window Treatments 1.00 LS 21,173.50 21,174
BP12.02 Casework 1.00 LS 174,594.49 174,594
Total Minor Item Code 12000.000 $195,768
MISCELLANEOUS FURNISHINGS
Total Major Item Code 12000.000 BUILDING $195,768
FURNISHINGS
Major Item Code 14000.000 CONVEYING SYSTEMS
Minor Item Code 14000.000 CONVEYING SYSTEMS
BP14.01 Elevators 1.00 LS 234,616.94 234,617
Total Minor Item Code 14000.000 $234,617
CONVEYING SYSTEMS
Total Major Item Code 14000.000 $234,617
CONVEYING SYSTEMS
Major Item Code 21000.000 FIRE SUPPRESSION SYSTEMS
Minor Item Code 21005.000 COMMON WORK RESULTS-FIRE
SUPPRESSION
BP21.01 Fire Suppression 1.00 LS 262,707.00 262,707
Total Minor Item Code21005.000 $262,707
COMMON WORK RESULTS-FIRE
SUPPRESSION
Total Major Item Code 21000.000 FIRE $262,707
SUPPRESSION SYSTEMS
Major Item Code 22000.000 PLUMBING WORK
Minor Item Code 22010.000 COMMON WORK RESULTS FOR
PLUMBING
BP22.01 Plumbing 1.00 LS 933,933.32 933,933
Total Miorltem Code22010.000 $933,933
COMMON WORK RESULTS FOR
PLUMBING
Total Major Item Code 22000.000 PLUMBING $933,933
WORK
Major Item Code 23000.000 HEATING,VENTILATION, &AIR
CONDITIONING
Minor Item Code 23005.000 COMMON WORK RESULTS FOR
HVAC
BP23.01 HVAC 1.00 LS 1,265,300.00 1,265,300
Total Minor Item Code23005.000 $1,265,300
COMMON WORK RESULTS FOR HVAC
Total Major Item Code 23000.000 HEATING, $1,265,300
VENTILATION, &AIR CONDITIONING
Major Item Code 26000.000 ELECTRICAL WORK
Minor Item Code 26050.000 COMMON WORK RESULTS FOR
ELECTRICAL
BP26.01 Electrical& Low Voltage 1.00 LS 7,069,047.70 7,069,048
Total Minor Item Code26050.000 $7,069,048
COMMON WORK RESULTS FOR
ELECTRICAL
Total Major Item Code 26000.000 $7,069,048
ELECTRICAL WORK
Page 6
Sort Sequences: Estimate File: :202011 GMP CM06.est
1. Sec —
2. Major Item Code Estimator:
3. Minor Item Code Primary Project Qty:O SF
4. Not Used Secondary Project Qty: 0 FLRS
Estimate UM: Imperial
Report includes Taxes&Insurance.
8:46:45AM 8/5/2022
Description Quantity Unit$ Total$
N is Document is considered pro rie ry information and shall not be distributed beyondthe
intended recipient without the express written consent of Ajax Building Company,LLC !!!
Major Item Code 31000.000 SITEWORK
Minor Item Code 31000.000 SITEWORK
BP31.01 Sitework& Utilities 1.00 LS 2,325,286.86 2,325,287
Total Minor Item Code 31000.000 $2,325,287
SITEWORK
Total Major Item Code 31000.000 SITEWORK $2,325,287
Major Item Code 32000.000 SITE IMPROVEMENTS
Minor Item Code 31650.000 SITE IMPROVEMENTS
BP32.01 Fencing&Gates 1.00 LS 256,882.00 256,882
Total Minor Item Code 31650.000 SITE $256,882
IMPROVEMENTS
Minor Item Code 32900.000 LANDSCAPING
BP32.02 Landscaping& Irrigation 1.00 LS 224,332.01 224,332
Total Minor Item Code32900.000 $224,332
LANDSCAPING
Total Major Item Code 32000.000 SITE $481,214
IMPROVEMENTS
Major Item Code 36000.000 BONDS&INSURANCE
Minor Item Code 36000.000 BONDS&INSURANCE
Performance& Payment Bond 1.00 LS 194,945.00 194,945
General Liability 1.00 LS 328,094.00 328,094
Builder's Risk Insurance 1.00 LS 196,219.00 196,219
Total Minor Item Code 36000.000 BONDS $719,258
&INSURANCE
Total Major Item Code 36000.000 BONDS& $719,258
INSURANCE
Major Item Code 37000.000 WARRANTIES
Minor Item Code 37000.000 WARRANTY
Warranty Allocation 1.00 LS 16,834.00 16,834
Total Minor Item Code 37000.000 $16,834
WARRANTY
Total Major Item Code 37000.000 $16,834
WARRANTIES
Major Item Code 50000.000 ESCALATION COSTS
Minor Item Code 50000.000 ESCALATION COSTS
Material Escalation Allowance 1.00 ALLW 500,000.00 500,000
Total Minor Item Code 50000.000 $500,000
ESCALATION COSTS
Total Major Item Code 50000.000 $500,000
ESCALATION COSTS
Major Item Code 80000.000 CONTINGENCY/ESCALATION
Minor Item Code 80000.000 CONTINGENCY&ESCALATION
Contingency 1.00 LS 955,613.00 955,613
Total Minor Item Code 80000.000 $955,613
CONTINGENCY&ESCALATION
Total Major Item Code 80000.000 $955,613
CONTINGENCY/ESCALATION
Major Item Code 90000.000 PERMITS
Minor Item Code 90000.000 FEES
Page 7
Sort Sequences: Estimate File: :202011 GMP CM06.est
1. Sec —
2. Major Item Code Estimator:
3. Minor Item Code Primary Project Qty:O SF
4. Not Used Secondary Project Qty: 0 FLRS
Estimate UM: Imperial
Report includes Taxes&Insurance.
8:46:45AM 8/5/2022
Description Quantity Unit$ Total$
N is Document is considered pro rie ry information and shall not be distributed beyondthe
intended recipient without the express written consent of Ajax Building Company,LLC !!!
Building Permits 1.00 LS 592,000.00 592,000
Total Minor Item Code 90000.000 FEES $592,000
Total Major Item Code 90000.000 PERMITS $592,000
Major Item Code 95000.000 OVERHEAD& FEES
Minor Item Code 90000.000 FEES
Construction Manager's Fee 1.00 LS 1,528,981.00 1,528,981
Total Minor Item Code 90000.000 FEES $1,528,981
Total Major Item Code 95000.000 OVERHEAD $1,528,981
&FEES
Total Sec BB BASEBID $31,856,275
Page 8
Sort Sequences: Estimate File: :202011 GMP CM06.est
1. Sec —
2. Major Item Code Estimator:
3. Minor Item Code Primary Project Qty:O SF
4. Not Used Secondary Project Qty: 0 FLRS
Estimate UM: Imperial
Report includes Taxes&Insurance.
8:46:45AM 8/5/2022
Description Quantity Unit$ Total$
N is Document is considered pro rie ry information and shall not be distributed beyondthe
intended recipient without the express written consent of Ajax Building Company,LLC !!!
ESTIMATE TOTALS $31,856,275
Page 9
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
ALLOWANCE SCHEDULE
The following allowances are included in the GMP Proposal where a clear scope has not been defined by the GMP
Documents or where the items require further research. These allowances are for the cost of work only and do not
include costs for insurance, bonds, contingency,fee,etc.
It is understood that the Construction Manager's Contract will require adjustments by change order(either additive or
deductive)for reconciling the difference between each of the below listed allowances and the actual costs and/or
savings realized for each allowance.
Item No. Description Allowance Amount
Division 01 —General Requirements
Materials Testing Allowance $25,000
Site Survey Allowance $25,000
Drawing Reproduction Allowance $4,300
Division 50—Escalation
Material Escalation $500,000
Division 90—Permits
Building Permit Allowance $592,000
END OF ALLOWANCE SCHEDULE
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
SITE UTILIZATION PLAN NARRATIVE
Refer to the attached Site Utilization Plan dated February 4, 2021 as prepared by Ajax Building Company, LLC and
included in Section V-B of this proposal for the illustration of the below listed items.
Temporary Fencing
■ Material: Six foot(6') high galvanized chain link fencing will be utilized for the temporary construction fencing.
■ Locations: Temporary fencing will be installed at the locations indicated on the Site Utilization Plan.
■ Visual Barriers: Full-height windscreening will be installed as a visual barrier on all chain link fencing and gates.
This visual barrier will be maintained for the duration of the project.
Construction Entrances and Temporary Gates
■ Primary Construction Entrance: The primary construction entrance is located off of Airport Road at the
northwest corner of the project site. A 24'wide vehicle gate will be located at this entrance.
■ Secondary Construction Entrances: Secondary entrances to the project site will be located off of Airport Road at
the southwest corner of the project site. A 24'wide vehicle gates will be located at these entrances. This
entrance will serve as secondary and emergency access to the project site.
■ All construction entrances intended for vehicular traffic will be stabilized with gravel, limerock, crushed concrete,
asphalt millings, or other stabilization materials as determined appropriate by Ajax Building Company, LLC.
Although it is anticipated that a large portion of the stabilization materials will be inherently absorbed by the
project site,Ajax Building Company, LLC will endeavor to remove and dispose of these stabilization materials to
a practical limit prior to the installation of site finishes.
■ Note: The locations for all gates are indicated on the Site Utilization Plan.
Site Security
■ Gate Security: All temporary gates,vehicle and pedestrian,will be chained and locked during non-work hours
throughout the duration of the project.
Debris Removal
■ Roll-off containers will be supplied and maintained by Waste Management for removing construction debris from
the project site.
■ All roll-off container pulls will be scheduled by Ajax Building Company, LLC's Project Superintendent.
Tree Protection/Erosion Control/Barricades
■ Tree protection: All tree protection required by the Contract Documents will be installed prior to the
commencement of site work.
■ Erosion Control: All silt fencing, hay bales and other erosion control measures required by the Contract
Documents will be installed prior to the commencement of site work.
■ Tree and Root Pruning: All tree and root pruning required will be performed in accordance with the Contract
Documents.
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
Crane,Vehicle and Equipment Paths
■ Crane, vehicle and equipment paths required for equipment and/or vehicle travel, bearing, access, etc.within the
project site will be stabilized with gravel, limerock, crushed concrete, asphalt millings, or other stabilization
materials as determined appropriate by Ajax Building Company, LLC.
■ Although it is anticipated that a large portion of the stabilization materials will be inherently absorbed by the
project site,Ajax Building Company, LLC will endeavor to remove and dispose of these stabilization materials to
a practical limit prior to the installation of site finishes.
On-Site Material Storage
■ Storage Containers: Various materials, equipment and fabricated items will be stored in Connex-type trailers,
tractor trailers and storage boxes within the fenced area of the project site. All storage containers will be locked
during non-work hours.
■ Open Material Storage: Various materials, equipment and fabricated items that do not lend themselves to be
stored in containers will be stored and/or staged on the project site. Such items will be stored on dunnage and
protected from the elements as necessary to ensure that that quality and condition of the items is not
jeopardized.
Temporary Facilities
■ Jobsite Office Trailers: The locations forjobsite office trailers are indicated on the Site Utilization Plan. The
locations indicated have been proposed in an effort to minimize interference with construction activities and to
allow for minimal disturbance of the completed construction when the office trailers are removed at the
completion of the project. All jobsite office trailers will be well-maintained units.
■ Schedule: The project schedule indicates that the mobilization of jobsite office trailers will commence in March
2022 with the start of mobilization activities.
■ Temporary Power:
o Temporary electrical service for the jobsite office trailers will be obtained from Florida Keys Electric Co-
Op. The temporary electrical service is being provided by Ajax Building Company, LLC and will be
installed by the Electrical Subcontractor.
o Temporary electrical service for the construction site will be obtained from Florida Keys Electric Co-Op.
The temporary electrical service is being provided by Ajax Building Company, LLC and will be installed
by the Electrical Subcontractor.
■ Temporary Water:
o Temporary water service for the jobsite office trailers will be obtained from the City of Marathon. The
temporary water service is being provided by Ajax Building Company, LLC and will be installed by the
Sitework Subcontractor.
o Temporary water service for the construction site will be obtained from the City of Marathon. The
temporary water service is being provided by Ajax Building Company, LLC and will be installed by the
Sitework Subcontractor.
■ Temporary Sanitary Sewer:
o The temporary sanitary sewer service for the jobsite office trailers will be obtained by 1)tying into an
existing sanitary sewer service,or 2)supplying a sanitary holding tank.
o The temporary sanitary sewer service for the construction site will be obtained by 1)tying into an
existing sanitary sewer service, or 2)supplying portable toilet facilities(port-o-lets).
o In such cases that a holding tank or portable toilet facilities(port-o-lets)are required, those facilities will
be serviced two(2)times per week or as otherwise necessary when they are in use.
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
■ Temporary Telephone and Internet Services:
o Temporary internet service for the jobsite office trailers will be obtained from Comcast. The temporary
internet service is being provided by Ajax Building Company, LLC and will be installed by the Electrical
Subcontractor.
Construction Traffic, Parking and Deliveries
■ Ajax Building Company, LLC Office Staff: Ajax office staff will utilize the north entrance gate and drive off of
Airport Road for access, parking and project management activities. Parking for Ajax office staff will be in the
location(s)indicated on the Site Utilization Plan.
■ Construction Employees and Personnel: Construction employees and personnel will utilize the north entrance
gate and drive off of Airport Road for access and parking. Parking for construction employees and personnel will
be in the location(s)indicated on the Site Utilization Plan.
■ Construction Deliveries: General construction related deliveries will utilize the north entrance gate and drive off
of Airport Road for access to the project site.
Maintenance of Site
■ Ajax Building Company, LLC will maintain all temporary fencing,visual windscreen barriers, tree protection,
erosion control measures, construction storage areas,and construction parking areas to ensure safety and an
acceptable appearance. It is assumed that the Owner will continue to maintain all other areas outside the
construction site or not occupied by Ajax Building Company, LLC.
■ Street sweeping will be performed as necessary.
■ The site will be monitored for trash, debris, and general housekeeping. Cleanup and housekeeping will be
performed on a regular basis as necessary to ensure safety and an acceptable appearance.
Emergency Contact Information
■ Emergency Contacts: The following is a list of emergency contact numbers for Ajax Building Company, LLC
personnel assigned to the project.
Contact Person Job Title Contact Number
Michael Wilson Operations Manager 813-792-3920/813-545-2583
Marshall Quarles Project Manager 813-510-1206/321-507-2113
r///i/ ihtlllly ll%�
vi r /w11 /g//4 �r/�
, / r
�' f '/%)Ri1F
4i�. MIA INIIIIIIIININNINNIImIIItmll NIN001"IN 111111111:111111IIIIm11*11111111111#
i I ! e
r
�i
Owne0ii
�r,/ ID
�rl " aa '60 `�aa�w:ww
d•"
....
w•w°
im-"
I
/
wa
m"
a
ki
awwa
av"a
adm
,w
17171
` u1nj [pi
i� dUl71 ISlvl
r a a
ggall /
I
� I 1�� °u uuu uuuu
111
IIY 9 I.
I I
' 1 ,
/////// rr///'
r�
� / ririii t
Site Utilization Plan - February 4, 2021
4m Monroe County - FL Keys Marathon Airport NAUB EOC
AJAX BUILDING COMPANY,LLC PROJECT NO.202011
FL KEYS MARATHON AIRPORT NAUB - EOC
GMP PROPOSAL August 5, 2022
SCHEDULE NARRATIVE
Refer to the attached Master Project Schedule dated August 5, 2022 as prepared by Ajax Building Company, LLC
and included in Section VI-B of this proposal for the illustration of the below listed items. The project schedule has
been updated to include progress achieved through August 5, 2022 .
The project schedule included within this proposal is based on the information represented in the GMP Documents.
The project schedule reflects an overall duration of eighteen (18)months for the construction phase of the project.
The following contractual dates are incorporated into the CM Contract via this GMP Proposal.
• Substantial Completion February 2, 2024
• Final Completion March 15, 2024
The following additional Milestone Dates are anticipated within the project schedule in order to achieve the
contractual dates listed above.
• Mobilization/Start of Construction October 6, 2022
• Top-Out of Building Structure April 3, 2023
• Building Dry-In May 9, 2023
• Permanent Power September 6, 2023
• Owner Occupancy February 26, 2024
In order for construction activities to commence on October 6, 2022 as scheduled, the following contractual activities
will need to be completed as indicated.
• GMP Negotiations Complete August 10, 2022
• CM Contract Amendment Executed August 17,2022
• All Required Permits Issued September 23, 2022
• Grant Submission to FDEM &FDOT October 28, 2021
• FEMA, FDEM, & FDOT Approval July 1, 2022
• Notice to Proceed Issued August 18, 2022
Should any of the above listed dates not be met and therefore delay the commencement and/or progress of
construction, the contractual substantial and final completion dates noted above will require extension on a day for
day basis.
In order to expedite the project start-up activities, the Design Team, the Construction Manager and the Owner will be
required to closely coordinate and expedite submittal review/approval, respond to information requests, respond to
conflicts/unforeseen conditions, etc.
The schedule is based upon the assumption that any design revisions required to address future design review
comments and/or permitting review comments will be issued to the Construction Manager within one (1)week of
receipt of such comments with a directive to proceed. It is further assumed that such revisions(if any)will be minor
in nature and will not result in a material change in the overall scope and/or direction of the project.
Ajax Building Company, LLC will continue to work closely with the Project Team throughout the Preconstruction and
Construction Phases of the project to ensure that all critical dates are maintained.
Q
LL
Y
o
o
- - - - - -- - - - - - - - - - - - - - -
Go
0 A 0
Y t
N n W m
_- - _____-___
O
N
L
F m
U O
N N N N N N N N N N T N N N N N N N N N N N N N N N O O O O O
0 0 Ti � 0 Ti
o LL LL ¢ - - - - - - a (� z o o c� c� c� c� o 0 o z o o z U
LL o 6 o 4 c6 N d d d c6 � 0 c6 � 0 No 4 6 d d o6 d c6 0 0 0 6 c6 c6 � o6 d o c L N o (6 d 00
m m O O N
p p o 0 0 ¢ ¢ ¢ f2i Ri Ri Ri Ri Ri pp pp pp pp pp pp ~ W
N ® N NUU NUU NUU N N N N N N N N N N N N N N N N N N N N N N N
6I • 6- N N N � N N � N N Q N N N N � N N N 6I 6I Q � 6I 6I Q Q Q Q U U U U U U
Q o 0 o OO LL LL �p ¢ �j Q a zN Q Q pp�� o o N0 m0 0p 0
M O O N N O d) d) d) p I� N N E bV A P O M M �2 N O N N N N Qc
O O N O 0 N N O O O N M O N O O O N O N O O M N m O N N O O � I� N N M O O N N O C
e a L
VJ ll/^�Oa
W
a
Y
¢ J
U
m_ L.L
o
• g wo
o ° $ w m
u) E ° o w E
ca
t .o cj `o -o �n o w,
a. 3 o o
E E m 61 o ° .O
° a'� o o o o m
Z 0 u 3 o L O a U s s ¢
s a a o Z o z n o
® (~j m .� n s o a°i .� m 2 o is LL E a J a s 0 R
7 a oo> Fg � S o E E 0 3 ° .E $ a O '6 m g o LL m o
.6I LL' o $ UI (3 d W o 0 U co W - O '6 .O 2 0 4 N N U 0 o y0 0 , '' w
t W U W O U U Z $ a n o ° o .S
W a ° o o a°i o 0 0 0 `o o o o o o m � a°i ° Q m G- (n O G- C7 iL [9 2 1 N 2 z o
® z u) n n o cn o o o 8 m o u) 8 8 8 8 (D _ Ir Q-
N 0 a
a. •
a
Q
z
N
w
a
= = - - -' - - - -- -' - s
� w
a my
m
a E-- E O o
Q M
•________________ •_______-____________-___ - - - - *_- W . ai
- - - - -
m
cl
O W
W LL U 0
m t LL
LL N O O > LL
�---0--Lu
0
° 0
Q---'s'-.k �
.- E w
LL C 6I O N
.O a CO)o ° o__________________________________•_______-____________-___-_______________________________________________________________________________ ----i-------- S Z--a__�a__-�`___O-_ __
z---. --N - O O N
o
z N 'Q
°
o (V O � O N pO s a N 0
rz
� � '� a° t
0 w g w
N T >
r. E c9i o n U N Z U
6I Q
T:_______________�___ ____ _________
tr
Y"p
Q FNC
N-_u�-_-7- W--LL 0LL-- --LL♦-_m____♦ ♦_- O
_ _ _ __ - N
o a_< < < <
QN N N N N N N N N
Z O Z Z Z 0 0
s m � � � ¢ ¢ ¢ ¢ ¢ o o z o
d) d o d N R N o N d d o 6 No 4 ci o 4 N ci 4 •® d L cL o 0 0 � d o o �A d d d O U
m - - - - 0 0 0 N N N O
¢ ¢
a a N N N a N a ~ w
p p O O O O O O N N T N N N N N N N N N N N N N N N N N Q
o pop z z z o 0 o NLL pap � � pp' a cNN� c� c� �o�OO o fo�pp o o s o z m m
N
o
M N O N O N M O g N O N N N g N O Qc
o ND N N a
N M N O O O o o O O O No O O N O N N N o O O Co N I� O No M O O C
L
oa N l^
W
N Y
N N p J
E LL' 5 a -O
O O O F N
U a n J a g °
w x ¢ Z o w a ¢
.° E o o a m ww W g v L,
3 0 o a o '� E a ° > LL LL E
Ir °� o -° s o .N a o 2 ° o o E , O Ir 0 w
o - m °� w .o '.9 a �° E w u°i U o U o '� ° t o m .w LL
E o iw a �. Z o o z_ a O w z Z
aEi F ° o 0 � U ° .� U .61 m > .N a>i ¢ o 5 m E E o o
v o� o > o o w a .o m O m .N o U o >. m 2
m :� aEi a o o m o Y U m a a o yaj Q U °� F m C7 o� i°a o ¢ ¢ p o
$ s o m Uffi °� �° 0 m m a 3 3 E Z F = a °� ° ° aNi aNi a ._�
o a o '- a m °- -o m o� o a ` W '° O o m m o ,Uo ° °
o CO N U � f w
U E LL s E o m a o c� o U o U c� o
0 p _ Q r U m o m a p a>i s a O U a W ° xs Z o ° Z U d d ¢
o a N m '- °� fl- °-Ir
o m E m E U U o g u a a a U U - m
0 o w` d m w � m � LL ° m a w o ° � � � � o � 0 0 0 U � o s w w � w o 0 0 0 0 0 0 � E U
° (n LL U N O a O a a a U co co LL Q U LL LL LL LL 7 LL LL LL U LL LL co co
m o
E a
Q
Q
- -- - - - - - - - - - - - - -
v
W I I o
_ ---'10--------___
W
c Z m w
O —
Z
`7___________________�
U
o
� 0
r r r r
LL
N N
Q
� O _
N
N__ ___ __ __ __ __ __ __ __ __ __ __ __ __ __ __ N
75
Q - ~ L - -- N — 4 N � �
_ 4 U ` ' -
-2 2
_ s
_ N
- U) _ _ _
E u)
N
Y3 U--� - - -- --�-- �s m xS �,'r�---�--. -_.� LL in LL o
------ ¢ -- -- -- -- n W -0 U '°--- U s N s U-- ------m _)- E
♦ n _ a u m U)
------------
°- 0 c---- ° - .. U m E - .� F F - �--- --- ---�-
` .� ', 1 8- � � s y s s ¢ W yr > ¢ a a ¢
----------- u U .. U '�0 LL .s '0-- -- --_--.-'w U m E E E E--E--�---�--
U s U E U :° s U �s 0 s s s s s s s o--
a 3 a £� o ° zo cD W U E E w E E E • i -Q-Q ¢ -Q Q Q Q Q -Q
z >� O___ ___ ` s s N ¢ ¢ �__s__s___ s_Q 05
m--�--- -- Q---- E Q---N
o N ---------------------- -- -- --- m m--- • �---�---
¢ __ ___ E-
r-- N- E- E- f- � � � �
� U U U nnII Q
0
Fl
¢ ¢ ¢ ¢ s ¢ ¢ O LL 2 2 0 0 0 O �' O �' O �' O O z z z z z z z z z z ® O Z (�
N O r "L N M ® N m N � 6 o6 N o6 N o6 o6 N o6 r r d) d) d) d) d) d) d) d) d) d e d
0 N O
.... O �N N N � � N. � N N..� N N...N O 0....0 O O O O O O O m �.
O
LJJ
1 6I 6I 6I 6I Q � �` 6I 6I Q Q Q Q Q Q Q Q Q Q
A A A A Q Q Q Q i i i i i i i i i i Q Q
Q Q Q QO LL N� QO QO 0 0 0 0 0 0 0 0 0 0 N�N
N OP cO � N O O N O N N O O O O O O O O O O O O O O ® N Qc
o N O 0 O O e N N O m O O O O a O O O O O O O O O O O O O W O O O O O O O O O O O O O C N N N N L
LU
Y
J
LL
w
v E
o N s ° s s �
a ® E s (n E s (n s s s s s •
m
a s o ® � E U U N a E u .r �- N N s75
o n s s a s O n E 8 E •
a ° oic
, • `�° 61 4 u m m o Y y o' W s o - xs W u, s o6
rz
a 3 a > E fi s cD w Co) o n i o a
Q 0I = O N N j 0 LL N N N N N N N N N N N N N N N N N N N N N N N N N N rn E
¢ ¢ C7 E W s s s s s s s s s s s s s s s s s s s s s s s s s s
g U U U '' E a a a o U O E E E E E E E E E E E E E E E E E E E E E E E E E E c7 - -
O Q N N N N N N N N N N N N N N N N N N N N N N N N N N
W U U U U t . . . . . . . . . . . . . . . . . . . . . . . . . . E u
m m m U r Q Q • U (n Ir U Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Ir
E
a
�I
E
o <
orza c
o �
-
o E
75
E
i- �
Q w E a
nrz
--- -- --�--- --r---------
w w
v � � a �
o
s N
--------------------
- - m
----------------------- --m---N s -------'', - - a o - w m <
_ o
--------N --� -- o ---�--
6 3 �
-- --------N-------- ----£- - £--�--- --_ .- - --ram----sue-m--- -- -- o m---@---
U E U Q N
-- o- 5r-------- -----
EL -Q
N ` U'i E s E--moo---� o - o_ --� LL - -- Q - a o ---a`��-` - - "_ U _
_ _ 30 �n - - ---y -- ---
o ---E------ s n o ° U U ° 0-- - -----
---E---� -- --LL--�--Y--W-- --- --- -- - F FcUi--- -- ---N - -- -- ---°� --',a-- -- --y--- -- ---U-- --- --- --- -- V LL o
3 _ 3 ° ~ m U
3 ` — __�______
._ N N U N
U `O----------�-- y --Q--�__ __ __ ____ - _ __-____ Q- - __ __ ___ 3-- __ __-2___
C p3
p � t 3-'�N Q 11 0 x LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' U N ���LL (n
o O N- - A'S__ __• --_ _____ - __
--U - �- - - -- -- -- --- -- --- -- -------
-------'------------------------
z :< � � � � 00 � � � 0
Q � � �
o
Q
z
o
0
N N N N N N N N> N> N> N> N> NUU N> N> NUU NUU NUU NUU NUU NUU NUU NUU NUU NUU N N>> M N N N N N N N N N N N N N N Q
0 0 0 0 0 0 0 U U U U U N U U N N N N N N N N N N e O Z O O Q LL 0 LL 2 LL LL 0 Z U
O O O O O O O z z z z z O z z 0 0 0 0 0 0 0 0 0 0 O Z
c6 d� d� d� L c6 c6 , 0 0 _ 0 N ci c6 N O O
LL N N N N N N O O O O N N O 0 0 0 0 0 0 0 0 0 N 6 N O N N O O N O O O N
2 LJJ
N N N N N N NN NN NN NN NN NN NN NN NN N N N N N N N N N N NN NN NN NN NN NN NN NN NN N N N N N N N N
O O O O O O O O Z Z Z Z Z Z Z Z Z Z • O O O O O O O O O z z z z z z z 0
N O O O O O O O O O O N N N N O O O N Q
V O W O O 0 0 0 � 0 O O 0 O O O O O O O O 0 O O 0 0 0 00 0 N O O 00 00 O O O O O O O O O G
mm
(V (V (V
�a lA
LJJ
Y
J
LL
E
E
E
° ° o E .. o •
s .` g ° a ° E
s ° s cZ0Z c0 s s s s s a +• a .. E o W +•
U) ° m (n 5 ° 2 B (n U) U) s (n E E E N E E wEi E E E
n _ -_ _
Q .Q s �' s x s s Q Q m cn s o ° 2 a E u a g E o E o E
w U) Un E y E cn y s �' o- 05 W N s � `° 8 a o a U a a E a m
u ffi s s P ipi W ° ° N �$6 F [� (n (n $ s U°1 aU�i U a o a a �- m 1t�j ° c
NO 8 6I N 8 N U > ° N t�6 " `N U U p N N 45 3 U O 6 U N oI oI oI y o W `p 2i_ _
QW C) QLL' QLL QJ QLL (wo Q Q0 QLL Q0 Qx Q5 Ei (Qo QJ Q0 Qx Q> QQ Qa Q� Q� QLL QQ 4 9 .� O = j U �n m
w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w'f w o o k o� o > > i3j.� °° a'� t�6
LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' LL' d W U LL' LL J LL' (n LL x O UI 0 w U) J
Q
N
a �
O
� 0
� 4 �
0 '0 0 Q
Q
Y
z O Ir 05
o
� � w__�
�6 UI �O N -
3 O O-_t--�---__- ________________________ W' S w
ID
o
8
ol
.. o 1 o- -- --o -- ----------------------------------------`-------,o-- -------- ---g-, .N �, U U a
o O 8 a ?: g5
o- o',�--..-- --� a aEi --�----`, ------------ - ---� -- o -U--� m o-------- - -U)------�-�-
a_ m_
lw
:co
D Y N F UI W O N _
Ir
LL- g o E w o o
o- - `-
'05
-
LL -- --" �' - - ------ --¢ w o U N d to m 0 m `m of
m N u5
a s o 0 o m y------------------ o
oS- [ 7�- 0-05
� U � LL
U a
o o
V U N
N �___�___ J IIIIVVIIIIII
s'
8 O LL LL fl � U) r r r
W o n
_
--c
� 0r
rz
o
0 0 W E LL�
- �
.,
0
o
Q
z
0
N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N M M
¢ ¢ Li O O z z z p m m m asi asi `m `m `m Q Q Q Q Q m m m 3 3 3 3 3
N `6 N N 0 `6 N N 0 0 0 cNb o d' N `6 `�' N N 0 ci d 0 N `� 0 `� 0 0 d N o 0 0 `� 0 0 N' O N o p
� N N O m � N O � N N O � �
N N N N N N N N N N N m NN N N N N N N N N N th N N N N N N N N N N N N N N N N N N N
0 0 0 0 0 0 0 0 0 0 0 NLL �Op • �Op pO �Op �Op pz� pzO p0�
8 8 8 8 8 8 8 8 8 8 O O O N N N O M O N N O N N O ; g �2 �2 N O O O O O N O M Qc
o O O O O O O O O O O O O M O V O N N N N N O N O O O N O N N N N O O N O O N C
mm
� � � � N � N � N N O N O N N N N L
�a lA
LU
Y
J
LL
N
o
2-
LL LL
U Y
N 8 N E
_8 8Ir
E E E E wE E. E u a a w � m I 0 D o
� .0LL LL Ea _E EE o -0W j o ° 0 0'ffio5
mo
E w w m O z
o e 05
o oo U
ta . y� r
° n o o t ° i
e
o m U U � `m E o N o o o N o o E 8 w i'' E ¢ E
to o x > ¢ a 2m a u ¢ o z 20 U) ¢ _ i to C) U) a C C) � i a C) w Ir 0- to m o w 0- LL o w
U
i
Q
m o
E
a
o s LL E a
a Ul
(n
m
_______ `-------------------- N
- ¢ U >
x - U - 0 0 9-------- m------- o xS
-- o- ------�',�,---------- U-- --- ---�---
° -----------------_________________O_5❑6_-_-_-_-_-_-_-_-_-_-_-_-Yo____LL❑___________________-___N-�_-____-_—__-__�__________�___� ------.---.----L
U U f
N❑
o
o
_ 9 T
-- __ ___ __ __ __ __ U O_j_ LL
NU) > N
` LL° _ - m oF— an o
o _
___ - Q -
NU
_
V.5.
O `'no S ° UF Z> 2
rz N o E o ~
❑ - a c
a O - t0 $' -g --- ❑ ❑
z --W--y--� o O m O > °-- j N Y--
❑ o or 0 = °
= N - - -_ ------ :E--a--- ---E?--- -� ----m------- '--------------
0 - - - - -
a
w
• 0
U)
'r F F r r r
r
Q
0
N N N N N N N N N N N N N N N N N N N N N N> N>> N N> N> N> N> N> N> N> N> N>> N N>> N N>> N N>> N N>> N N Q
61 0 0 0 0 0 0 0 0 0 U O O O O O O O O O O s O s O s O s O s s z
¢ ¢ 6 ¢ 6 ¢ O O O � O d O O O p O Z Z O Z Z Z z Z Z Z Z Z O Z O Z p Z O Z 0 0 0 (�
O O O M O N O O N O O O N N N N 0 m 0 0 0 0 N d d� 0 N 0 I� r 0 r 04 O
� � � O M O O O O N N � N N O N O N � N O N O O
2 LLJ
m m m m m m m m m m m m m m m m m m m m m m m m m m M M M M M M M M M M M M M M M
`Nl
M M M O O�O O�O O�O O O O O �O�pp �O�pp �O�pp N ZN Z p zp� p zp� Z Z Z Z Z Z Z Z m Zm Z Z LA_
O O N N V I. r O O O � � � N N N 0 0 0 0 V (O (O N N N N N N Qc g g N M O O N N N N N
o O O O N N O N N O O O O O O N N O O O N N N O O N O O N N O N N O N N O N N M O M N N C
LU
Y
o J
t LL
!0
8 0- tj
LL 05 O
Y o E v
W' Q N N E f�
is
U) °
Y o m U -o ° Sw
o a
a0i ° ° >, o O 0
E w E s m w L `g a o 05
U N J 6I Uhl m Q$' N N 8 .� N
ii U � Y is to -o $ a°• >° F a0i E s—WzoLL N o u a F ° g ° w 9
a � LL g o U 61 LL g uoi n F o - m U o U N`o m O Q m
= LL _ xS a a o J Z m o o is o '� id .
a o Co W o a m ,fig .s O Y xs >. 's ._ s 0 0� m 0 ._ o� w m a ¢ 0 n U c
�° fl- - = m i0 0 m 'Gj °� LL m m `m w .w LL Y J o ° U o F o F F U
a .4 a ~ 0 m `O_ W .E .4 U U N .� m o L U w N a' > a F .❑ > °� _ ❑ - ._
°� Q� w °� 07 m E ar 0 a` a� ¢ ' c°i p W 5 c°i �n y 3 0 0 W ' 3 ' O o E
U) a u�S n = uS a u�S z° - u�S = i � w = Y 2 °n i C) a 9 I° t° L LL - J - n ¢ - LL w - a - a
Q
a
;m
- o F
W
o5 E Y 8
° � Q o ID -
Z O
° O O ° ° U
� 0---------o--N- ----�-- ---------------O 9--
a _ ---- _ s w N w --
w --------o --- ---------o - O-------�_' O .o g ffi w E
8 .. --------0�- w- a--------m--o- -------ii o €----Q---E---�--- -:ur--'�---o---o---U-
� w m (n v o
- o - - � -
-- _ - ° m
- ----o-- --Q--''-- .�--�--� --- --- U �--- o w
------ m _ -� 3-�'', -- -- a aFFs--�S---c---LL-
E - ------- -W----
- - Ti- - m-
m a a` ,
E 8-j-� t 05 o U a LL ° U) a J m n o <
Q o �- '',❑
-- .----�--- J---- -----_--®-
- w
� 0_ V
rn
OI N � OI
� Y L
N n W
N
O N
N N N N N N N N N N
C N N N N N N N N N N N N N N N N N
N C 4 4 U C C C C 4 4 4 N 4 N (6 (6
Z 0 0 0 0 0 0 0 0 LL LL 0 LL LL LL LL Z U
s d c6 �A (5 c6 c6 ci ci N m N d O O o `�' of 0
� M � 0 � N � � N � 0 0 � N O O
O
m 2 LJJ
N> N> N> NUU NUU NUU NUU NUU NUU NUU NUU N N NUU NUU NUU N N N N N N N N N
O O O N N N N N N N N N N N N N N N N /<
Z Z OZp 0 0 0 0 0 0 0 0 �p 0 0 p0p�� p� NLLN LL LL LL �p LL LL
o M N N O N N O N M N O...N N N N O O N N N O O N O N O C
U)
LU
Y
J
LL
N
w OW 05
Z M °5
o s o o w E
E
0
o E w > n
LL (n J O
W.
- U
T O 6
UUJJ ° U '.0 . 05 0O U �p LL L fl'
w
_ m o
o o o o a F ° > .ia xf m U w �
U`o � N .s' 0 U �p m m �_ a�i LL in F 5 o �'-
-a w W E E LL E
Ul 6I S Ul Ul -6C6
�n N w�
J W LL O Q EO T O N W 4 Q K
C C C
E J cn U J m cn a O U O LL
U
i