Loading...
2022-25 New Beacon - Re-bid Services MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date Upon Execution Task Order No. 2022 ..25 � Client Project No. 406-636174 PFC#1 Engineer Project No. FtJ l J25 . This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida("Client") and JACOBS PROJECT MANAGEMENT CO. ("Consultant"), dated February 16, 2022 ("Agreement"). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized—EYW New Beacon—Re-bid Services Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 3 page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price of$o-„ C 532.00 N/A Other(Describe): nNEY Schedule A PP000UW �O Services may commence on Execution Services will cease by_ 65 days asSISTA urn ATTORNEY" o.t, 12/5/22 Recommended by: Approved by: Director of Airports ate: 12.1.2022 .N. .. ,�,.. County Admire tfor Date: 12.5.2022 CONSULTANT: JACOBS PROJECT MANAGEMENT CO Jacqueline By Witness Ross Daw 2=1Lz r .� .� a Title Director File: MSTR APS—Monroe County Page 1 of 1 Exhibit A— (2022 - 25) Scope of Services Monroe County Airports EYW New Beacon— Re-bid Services SCOPE OF WORK Jacobs will provide bidding support services for the installation of new airport beacon at Key West International Airport(EYW). This is a re-bid of this project as the previous bid packages were rejected. EXISTING CONDITIONS, EYW New Beacon The existing beacon at Key West International airport is reaching the end of its' serviceable life and is ready for replacement. The replacement of the beacon for the design and construction was approved in a PFC application. Under previously awarded purchase order,the survey and geotechnical investigation services and contract documents were completed. This scope of services will include only the bidding support services for a new airport beacon. DESCRIPTION OF WORK +: This project comprised of the following bid elements. 1. Installation of new high mast pole and airport beacon. 2. Demolition of existing beacon and high mast pole. General Scope, One construction package will be developed for this project. For this construction package, Jacobs will provide the following services: 1. Management of the project. 2. Preparation of the bid documents and incorporation of Monroe County's front-end contract documents. 3. Preparation of the construction cost estimate, and construction schedule. 4. Bidding and award assistance. Assumptions/Design Parameters 1. Jacobs will produce a final contract set of plans, specifications, construction schedule, and construction cost estimate for bidding purposes. 2. DEP and ACOE permits are not required based on the current scope of the project. 3. It is assumed that a SFWMD permit will not be required for this project. 4. This scope of work aloes not:include construction administration,resident project representative nor quality assurance testing. These services along with a construction management plan will be provided under a separate purchase order. 5. This scope of work will not require an AGIS project. Page 1 of 3 6. This scope of services and pricing is provided based upon and shall be performed under base agreement "Master Agreement for Professional Services 12/15". The Master Agreement for Professional Services is between Monroe County Florida and Jacobs Project Management Co. with an execution date of January 27,2017(together the base agreement Master Agreement for Professional Services 12/15 and any amendments thereto are defined as the "Agreement"). Notwithstanding anything to the contrary contained or referenced in this Scope of Services,the terms and conditions of the Agreement shall govern all staff augmentation under this Scope of Services. 7. Jacobs will reasonably rely upon the accuracy, and completeness of the information/data provided by the Client or other third parties. 8. In providing opinions of cost, financial analyses, economic feasibility projections,for the project, Jacobs has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions;time or quality of performance by operating personnel or third parties; and other economic and operational factors that may materially affect the ultimate project cost or schedule. Therefore, Jacobs makes no warranty that Client's actual project costs, financial aspects, economic feasibility,will not vary from Jacobs' opinions, analyses,projections,or estimates. 9. In soils, foundation,groundwater, and other subsurface investigations,the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations,changed or unanticipated underground conditions may occur that could affect total project cost and/or execution. These conditions and cost/execution effects are not the responsibility of Jacobs. 10. Jacobs shall at no time take title,risk of loss or ownership of the hazardous materials or wastes. Client recognizes that Jacobs assumes no risk and/or liability for hazardous materials encountered while performing any services associated with such hazardous waste. Article C—Bid Phase Services Upon completion of the construction documents and at the request of the Airport,Jacobs will prepare the project documents for bidding. Jacobs will perform bidding support services,the following terms will apply: A. The County appoints Jacobs as its Agent, and Jacobs accepts such appointment to perform bid/procurement services on the County's behalf in connection with the project. B. Such services shall be performed under the County's direction and in accordance to such forms, terms and conditions, or modifications or revisions to same as the County may in its sole discretion at any time instruct Jacobs to use. All services shall be carried out in accordance with the procedures mutually agreed upon by the County and Jacobs. C. Jacobs shall not have authority to accept or bind the County in any way to changes, modifications, revisions, alterations, amendments, or supplemental, additional, or different terms and conditions (hereinafter Page 2 of 3 referred to as "deviations") which may be submitted or requested by a vendor or contractor. Jacobs shall immediately submit any deviations from the County's standard terms and conditions to the County for review by the County's Purchasing Manager or their representative and such deviations shall not be accepted by Jacobs unless Jacobs receives express written approval thereof from the County's Project and/or Purchasing Manager or their representative. D. All documents issued by Jacobs hereunder shall be signed by Jacobs for the County if so directed. The ownership and title of all items purchased hereunder shall pass directly from the selling party to the County, and Jacobs shall at no time be a party to such transaction other than as agent of the County. The County shall have the unilateral right to have the commitment authority of Jacobs, its employee or this limited agency authorization in its entirety revoked and cancelled at any time, with or without cause. The County shall be obligated directly to the selling party for all payments for materials, equipment, supplies and services procured hereunder. E. The County shall hold Jacobs and its employees harmless from any claims, suits or liabilities arising out of any breach or other failure of performance by any contractor,vendor or supplier under any contract or purchase order issued by Jacobs hereunder. The following task will be performed as part of the bid phase services: 1. Coordinate with the County Purchasing Department and the Airport to advertise for bids. 2. Coordinate with the County to provide electronic copies of the bid documents to prospective bidders 3. Prepare for and attend a project pre-bid conference 4. Prepare responses to address requests for information from prospective bidders 5. Prepare and coordinate the issuing of two(2)addenda with the County purchasing department. 6. Revise bid documents as necessary for the addendum 7. Review bids for responsiveness 8. Prepare a bid tabulation 9. Make a recommendation for award based on review of the bid information submitted. 10. Generate conformed construction documents and prepare and send out construction contract. Services for Article C will be provided under a lump sum basis. PROJECT SCHEDULE: The tentative project schedule from the Notice to Proceed date will be as follows: Article C—Bid Phase Services 60 days Page 3 of 3 ,.11 Jacobs JOB HOUR AND FEE ESTIMATE Monroe County Airport: Key West International Airport Project: EYW New Beacon-Re-bid Services FEE SUMMARY SASIC SERVICES Hours Fee DBE AMOUNT Article C-Bidding Services 118 $ 20,832 - TOTAL LT NIP S01 FEE 1.18 S 20,832 S CBEPcrcentagge 0.00%