Loading...
Item H7 H.7 County f � .�� ",�, 1 BOARD OF COUNTY COMMISSIONERS Mayor Craig Cates,District 1 Mayor Pro Tem Holly Merrill Raschein,District 5 The Florida Keys Michelle Lincoln,District 2 James K.Scholl,District 3 David Rice,District 4 County Commission Meeting December 7, 2022 Agenda Item Number: H.7 Agenda Item Summary #11483 BULK ITEM: No DEPARTMENT: Airports TIME APPROXIMATE: STAFF CONTACT: Richard Strickland(305) 809-5200 N/A AGENDA ITEM WORDING: Approval of Guaranteed Maximum Price (GMP) Amendment 3 and Change Order 4001 to the Prime Construction Activities Agreement with NV2A Gulf Keystar, a Joint Venture, LLC, in the amount of $4,156,365.00 for the Key West International Airport Concourse A and Terminal Improvements program, to be funded by FDOT Grant G2090, FAA Grants, BIL, Grants, and/or the 2022 Airport Bond Proceeds. ITEM BACKGROUND: Guaranteed Maximum Price (GMP) Amendment 3 and Change Order 4001 reincorporates value engineered items that were removed from GMP 2 for cost saving measures in the amount of$4,035,306.00 plus 3% owner's allowance of$121,059.00 for the following scopes of work: Emergency Power Generators and paralleling EMS Switch Gear; Full Glass Passenger Boarding Bridges; Exterior Vestibules 102 and 103 at bag claim curbside doors; Baggage Area Bar; Lost Baggage Storage Area; and Rental Car counters and offices PREVIOUS RELEVANT BOCC ACTION: On October 21, 2020, the BOCC granted approval to advertise the competitive solicitation for the Construction Manager at Risk Services for Key West International Airport Concourse A and Terminal Improvements program. On May 19, 2021, the BOCC rejected all proposals and granted approval to re-advertise the competitive solicitation with a reduced period of advertisement from 45 days to 30 days. On September 15, 2021, the BOCC approved the CMAR pre-construction agreement with NV2A Gulf Keystar and on October 20, 2021, the BOCC approved the 1st amendment to the CMAR pre- construction (design) agreement and Task Order No. 1. Subsequently Task Order No. 2 was approved on January 21, 2022; Task Order No. 3 on March 16, 2022; Task Order No. 4 on May 18, 2022, and Task Order 5 on July 20, 2022. Packet Pg. 1221 H.7 On August 17, 2022, the BOCC approved the CMAR Prime Construction Activities Agreement and GMP Amendment 1 to the Construction Activities Agreement for the early works package, and on September 21, 2022, the BOCC approved GMP Amendment 2. CONTRACT/AGREEMENT CHANGES: New CMAR GMP Amendment 3 and Change Order 4001 STAFF RECOMMENDATION: Approval. DOCUMENTATION: NV2A CMAR GMP Amendment 3 & CO 4001 FINANCIAL IMPACT: Effective Date: Upon Notice to Proceed Expiration Date: Upon completion and acceptance by owner Total Dollar Value of Contract: $4,156,365.00 Total Cost to County: -0- Current Year Portion: Budgeted: Yes Source of Funds: FDOT Grant G2090, FAA Grants, BIL Grants, and/or the 2022 Airport Bond Proceeds. CPI: Indirect Costs: Estimated Ongoing Costs Not Included in above dollar amounts: Revenue Producing: If yes, amount: Grant: County Match: Insurance Required: Yes Additional Details: REVIEWED BY: Beth Leto Completed 11/18/2022 3:46 PM Richard Strickland Completed 1 1/1 8/2022 4:04 PM Pedro Mercado Completed 1 1/1 8/2022 4:05 PM Purchasing Completed 1 1/1 8/2022 4:09 PM Budget and Finance Completed 11/21/2022 9:52 AM Brian Bradley Completed 11/21/2022 10:06 AM Lindsey Ballard Completed 11/21/2022 12:15 PM Board of County Commissioners Pending 12/07/2022 9:00 AM Packet Pg. 1222 H.7.a Key West International Airport Concourse A and Terminal Improvements Program Guaranteed Maximum Price Amendment PROJECT: CONTRACT INFORMATION: GMP AMENDMENT: Key West International Agreement Between Owner and GMP Amendment: 03 Airport Concourse A and Construction Manager at Risk Dated: 31 October 2022 Terminal Improvements (Construction Activities) Program Dated: 17t'August, 2022 OWNER: CONSTRUCTION MANAGER: Monroe County Board of NV2A Gulf Keystar, a Joint Venture,LLC County Commissioners 5450 MacDonald Ave. 43 500 Whitehead Street Key West, FL 33040 Key West, Florida 33040 CL ARTICLE 1.0 GUARANTEED MAXIMUM PRICE 1.1 Pursuant to Articles 2 and 4 of the Agreement,the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price. As agreed by the Owner and Construction Manager,the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed. The Contract Sum as defined in the Agreement consists of the following: (1) Cost of the Work for the portion of the Work covered by the GMP Amendment, (11) General Conditions Costs, (111) Bonding and insurance costs, (iv) Construction Manager's Fee, (v) Allowances, (vi) Construction Manager's contingency. t3 1.2 The Contract Sum is guaranteed by the Construction Manager not to exceed the amount listed 06 below. Original Contract Sum 0.06 Previously authorized Change Orders/GMP Amendments 97,426,465.00 Contract Sum prior to this Amendment 97,426,465.00 This GMP Amendment 4,035,306.00 Revised Contract Sum 101,461,771.00 U c� Previously Authorized Owner Controlled Allowance 2,922,794.00 Z 4i Owner Controlled Allowance for this Amendment 121,059.00 E Revised Owner Controlled Allowance 3,043,853.00 Total Authorized Funding(Contract Sum +Owner Allowance) 104,505,624.00 1.3 Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories, including allowances; the Construction Manager's contingency; alternates; the Construction Manager's Fee; and other items that comprise the Guaranteed Maximum Price as defined in of the Agreement. (Provide itemized statement below or reference an attachment.) 2022.10.31 KWIA GMP Amendment 03.docx Page 1/4 Packet Pg. 1223 H.7.a Key West International Airport Concourse A and Terminal Improvements Program Guaranteed Maximum Price Amendment See attached PCCO 4001 ARTICLE 2.0 SCHEDULE 2.1 The date of commencement of the Work shall be: (Check one of the following boxes.) ❑� The date of issuance of Owner Notice to Proceed(NTP). E E ❑ Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) If a date of commencement of the Work is not selected,then the date of commencement shall be the date of execution of this Amendment. t3 2.2 Unless otherwise provided,the Contract Time is the period of time,including authorized adjustments,allotted in the Contract Documents for Substantial Completion of the Work. The Contract Time shall be measured from the date of commencement of the Work. 2.3 Subject to adjustments of the Contract Time as provided in the Contract Documents,the Construction Manager shall achieve Substantial Completion of the entire Work: (Check one of the following boxes and complete the necessary information.) t3 ❑ Not later than calendar days from the date of commencement of the Work. 0 By the following date: See Construction Schedule in Section 7 of GMP Amendment 02 ARTICLE 3.0 INFORMATION UPON WHICH GMP AMENDMENT IS BASED The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the U Contract Documents and the following: 3.1 Assumptions and clarifications, if any,upon which the GMP Amendment is based: (Either list here, or refer to an exhibit attached to this Amendment.) E c� See attached Scope Qualifications and Clarifications 3.2 The following Drawings: (Either list the Drawings here, or refer to an exhibit attached to this Amendment.) See Drawing Log in Section 9 of GMP Amendment 02 3.3 The following Specifications: (Either list the Specifications here, or refer to an exhibit attached to this Amendment.) 2022.10.31 KWIA GMP Amendment 03.docx Page 2/4 Packet Pg. 1224 H.7.a Key West International Airport Concourse A and Terminal Improvements Program Guaranteed Maximum Price Amendment See Technical Specification Log in Section 10 of GMP Amendment 02 3.4 The following Supplementary and other Conditions of the Contract: (Either list here, or refer to an exhibit attached to this Amendment.) None E See next page for signatures t3 t3 06 E E CL t3 c� E c� 2022.10.31 KWIA GMP Amendment 03.docx Page 3/4 Packet Pg. 1225 H.7.a Key West International Airport Concourse A and Terminal Improvements Program Guaranteed Maximum Price Amendment SIGNATURES This Agreement is entered into as of the day and year first written above and is executed in at least two (2) original copies of which one (1) is to be delivered to the Construction Manager. (SEAL) Ff BOARD OF COUNTY COMMISSIONERS E Attest: Kevin Madok, Clerk OF MONROE COUNTY, FLORIDA By. By. Deputy Clerk Mayor Date: CONSTRUCTIO NAGER AT RISK U P°EQ o 1. By. w ASSI It ATTORNEY Print Nam_. Gilberto Neves twat 11/18/22 Title: A Gulf Keystar JV Representative Date: 31 October 2022 U 06 CL E c� 2022.10.31 KWIA GMP Amendment 03.docx Page 4/4 Packet Pg. 1226 H.7.a PCCO #001 NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami, Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West, Florida 33040 Prime Contract Change Order #001 : Added VE Items TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West, Florida 33040 Miami, Florida 33156 DATE CREATED: 10/28/2022 CREATED BY Rebecca Vieira(NV2A/Gulf Keystar JV) CONTRACT STATUS: Pending-In Review REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY: E DUE DATE: REVIEW DATE: CIL INVOICED DATE: PAID DATE: SCHEDULEIMPACT: EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: U CONTRACT FOR: 20-2039-01:KWIA Concourse A&Terminal TOTAL AMOUNT: $4,035,306.00 Improvement Program DESCRIPTION: This Prime Contract Change Order will authorize the following scopes of work that were originally excluded from GMP 2 during value engineering negotiations meeting held on July 11th and July 21 st,2022,to be incorporated to the Prime Contract. Concourse A Added Scope: U 06 • Emergency Power Generator and Paralleling EMS Switch Gear M • Full Glass Passenger Boarding Bridges—convert half-glass passenger boarding bridges to original design. E Terminal Improvements Added Scope. • Return the pink areas shown on the attached drawing A111 previously removed during negotiations held on July 11th,2022. • Vestibule 102 • Vestibule 103 • Baggage Area Concession Bar • Lost Baggage Storage Area • Rental Car Counters U cN Reference: > McFarland Johnson's drawings A111 (SK-17-11-22) E ATTACHMENTS: c5 CO#001 Added VF ite >.pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# I Title Schedule Impact Amount 001 GM 2 Added Items $4,035,306.00 Total: $4,035,306.00 ,611L'J-D NV2A/Gulf Keystar JV Page 1 of 2 Printed On: 10/ Packet Pg. 1227 H.7.a ■■■■����IIII -" P C C O #0 01 CHANGE ORDER LINE ITEMS: PCO#001:GMP 2 Added Items # Budget Code Description Qty Units Unit Cost Subtotal 1 14-.32.10.15.S Passenger Boarding Passenger Boarding Bridges-Full Glass 1.0 Is $500,000.00 $500,000.00 Bridges.Subcontractor 2 26-.00.10.10.S Electrical.Subcontractor Back-up Generators 1.0 Is $1,200,000.00 $1,200,000.00 99-.99.99.01.S Lost Baggage Storage 3 Area(temporary place Baggage Claim/Rental Areas 1.0 Is $1,425,264.00 $1,425,264.00 holder).Subcontractor 4 99-.99.99.67.0 Master Permit Master Permit Allowance 1.0 $62,505.00 $62,505.00 Allowance.Other M 5 00-.31.13.10.0 NV2A-Project General Conditions 1.0 Is $265,647.00 $265,647.00 Supervision.Other 90-.21.00.16.0 Construction 6 Contingency.Other Construction Contingency 1.0 $139,263.00 $139,263.00 7 90-.21.00.20.0 Escalation Escalation Allowance 1.0 $202,526.00 $202,526.00 Allowance.Other 8 90-.13.10.01.0 Payment& Performance payment&Performance Bond 1.0 $40,353.00 $40,353.00 Bond.Other 9 90-.13.10.02.Olnsurances.Other Insurances 1.0 $48,424.00 $48,424.00 10 Allowance.Other Builder's Risk Builder's Risk Allowance 1.0 $32,282.00 $32,282.00 Allowance.Other 11 99-.99.99.66.0 Procore OH&P.Other CM Fees 1.0 Is $119,042.00 $119,042.00 V-- Grand Total:1 $4,036,306.00 UJ The original(Contract Sum) $97,426,465.00 Net change by previously authorized Change Orders $0.00 The contract sum prior to this Change Order was $97,426,465.00 0 The contract sum would be changed by this Change Order in the amount of $4,035,306.00 oa The new contract sum including this Change Order will be $101,461,771.00 The contract time will not be changed by this Change Order. E E (SEAL) U Attest: KEVIN MADOK,Clerk r NRO{E7VE UNTY!ATVT FtNEw�" < ArPtI ASSc6-A �IJNTY ATTORNEY By Deputy CLerk Date 11/18/22 Board of County Commissioners Christopher Kopec(McFarland Johnson, of Monroe County,Florida NV2A/Gulf Keystar JV Inc.) 49 Court Street, Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton, New York 13901 Key West, Florida 33040 Miami, Florida 33156 SIGNATURE DATE Mayor/Chairman DATE SIGNATURE DATE NV2A/Gulf Keystar JV Page 2 of 2 Printed On: 10/2 Packet Pg. 1228 NM K Key West International Airport Concourse A &Terminal Improvements Program 90%CDs CO#001 -Emergency Generators/Full Glass PBBs/Full Finished Baggage Claim Room CONCOURSEA •' TOTAL • • SYSTEM DESCRIPTION 02 EXISTING CONDITIONS I DEMOLITION $ 228,306 $ 228,31 03 CONCRETE $ 04 MASONRY $ 05 METALS $ 93,114 $ 93,1: tS 06 WOOD&PLASTIC $ 111,355 $ 111,3! 07 THERMAL AND MOISTURE $ 10 08 OPENINGS $ 186,390 $ 186,3! 09 FINISHES $ 202,587 $ 202,51 10 SPECIALTIES $ 38,454 $ 38,4! 11 EQUIPMENT $ 12 FURNISHINGS $ CL 14 CONVEYING SYSTEMS(Includes Div 13 PBBs) $ 500,000 $ 500,01 21 FIRE SUPPRESION $ 19,192 $ 19,1! 22 PLUMBING $ 59,343 $ 59,3, 23 MECHANCAL $ 188,313 $ 188,3: 26 ELECTRICAL $ 1,200,000 $ 87,901 $ 1,287,91 27 COMMUNICATIONS $ 28 ELECTRONIC SAFETY&SECURITY $ 31 EARTHWORK I SWPPP I PILING I DEWATERING $ 32 EXTERIOR IMPROVEMENTS $ 33 UTILITIES $ 34 TRANSPORTATION $ GENERAL REQUIREMENTS $ 134,895 $ 134,8! MOT I MOVEMENT OF PASSENGERS $ 75,414 $ 75,4: f) TEMPORARY TSA CHECKPOINT ALLOWANCE $ 06 AIRLINE SUPPORT OFFICE AREA ALLOWANCE $ TOTAL DIRECT COST 1,700,000 1,425,264 3,125,21 Markups I Fees I Contingency MASTER PERMIT ALLOWANCE 2.00% $ 34,000 $ 28,505 $ 62,51 GENERAL CONDITIONS 8.50% $ 144,500 $ 121,147 $ 265,6, SUBCONTRACTOR BOND included CONSTRUCTION CONTINGENCY 4.46% $ 68,000 $ 71,263 $ 139,21 DESIGN CONTINGENCY N/A N/A CL ESCALATION(ALLOWANCE) 6.48% $ 60,000 $ 142,526 $ 202,5: PAYMENT&PERFORMANCE BOND 1.00% $ 21,334 $ 19,019 $ 40,3! INSURANCE(EXCLUDING BUILDER'S RISK) 1.20% $ 25,601 $ 22,822 $ 48,4: BUILDER'S RISK INSURANCE(ALLOWANCE) 0.80% $ 17,068 $ 15,215 $ 32,21 CM FEE 2.95% $ 62,936 $ 56,105 $ 119,0, TOTAL CONSTRUCTION COST 2,133,440 1,901,867 4,035,3 1CN OWNER'S ALLOWANCE ACCOUNT 3% $ 64,003 $ 57,056 1 $ 121,0! TOTAL $ 2,197,443 $ 1,958,923 1 $ 4,156,31 E Notes: Concourse A scope includes: • Emergengy power generator&Paralleling EMS switch gear added back at$1.2M. • Passenger Boarding Bridges- added back$500K to convert to original design. Terminal Improvements and Existing Baggage Claim/Holdroom Renovations, as shown in the 90%CDs,including the following elements per sketches E 1 and SK-2: -Baggage Gaim Concession Bar -Lost Bag Storage Office(BSO)Area •New Rental Car Counters Packet Pg. 1229 N'''V -S Vestibules#101 1 102 1 103 Lost Bag Counters(LBC)#105 1 Lost Bag Storage(LBS)#106 Lobby 104 Car Rental Counters#152&Car Rental Offices 130 thru 134 Division Description 01 General Requirements $ 134,895.A 011000 General Requirements 6,550.00 SF $ 20.59 $ 134,895., 01 MOT Movement of Passengers _ $ 75,413.5 01 20 00 MOT Movement of Passengers 6,550.00 SF $ 11.51 $ 75,413.! 02 Existing Conditions $ 228,305.5 02 41 00 Demolition 6,550.00 SF $ 34.86 $ 228,305.! 03 Concrete $ 033000 Concrete it 05 Metals $ 93,113.5 05 50 00 Miscellaneous Metals 6,550.00 SF $ 14.22 $ 93,113.! 06 Wood&Plastics $ 111,355.-, Da 06 40 00 Lost Baggage Millwork 1.00 LS $ 56,359.20 $ 56,359.: 06 40 00 Rental Car Millwork 1.00 LS $ 54,996.00 $ 54,996.( 08 Doors&Windows $ 186,389.5 CL 08 11 00 Metal Doors&Frames 7.00 EA $ 3,300.00 $ 23,100.( 08 40 00 Automatic Glass Doors&Storefront 1.00 LS $ 163,289.98 $ 163,289.! 09 Finishes $ 202,587.( 09 20 00 Plaster&Gypsum Board(Excludes Column Wraps part of VE) 1.00 LS $ 28,882.00 $ 28,882.( 096000 Flooring 1.00 LS $ 65,059.05 $ 65,059.( U 09 50 00 Ceilings 1.00 LS $ 98,962.00 $ 98,962.( 09 90 00 Painting 1.00 LS $ 9,684.00 $ 9684.( 10 Specialties $ 38:454.( 10 44 00 Fire Extinguishers I Cabinets 2.00 EA $ 450.00 $ 900.( ., 10 22 13 Wire Mesh Partitions-Lost Baggage Storage Cages 1.00 LS $ 22,300.00 $ 22,300.( 101400 Signage 1.00 LS $ 15,254.00 $ 15,254.( 12 Furniture $ Furniture by Owner not includ( U 21 Fire Suppression $ 19,191.! 210000 Fire Protection 6,550.00 SF $ 2.93 $ 19,191.1 y j 22 Plumbing $ 59,343.( 220000 Plumbing 6,550.00 SF $ 9.06 $ 59,343.( 23 HVAC $ 188,312.! 23 00 00 HVAC 6,550.00 SF $ 28.75 $ 188,312.- C0 26 Electrical $ 87,901.( 260000 Electrical 6,550.00 SF $ 13.42 $ 87,901.( Division Description •• ••• i U 14 Passeger Boarding Bridges $ 500,000.( 14 90 00 Passeger Boarding Bridges-Full Glass 1.00 LS $ 500,000.00 $ 500,000.( > 26 Electrical $ 1,200,000.( 26 00 00 Electrical Emergency Generators 1.00 LS $ 1,200,000.00 $ 1,200,000.( E U Packet Pg. 1230 7--T------,- 7T (C4u8wPu8wVdW9MVWD - LAAA3) �OO#O3VC4u8wPu8wV'dWOUVWDVZAN :4u8w43e44V ................... 311, 1% mam Ae)4'pNa 9JOAaSOOH S 16PE I& 1,INBVJIUVd3O AlNnoo ROUNUM tC IL $141"1 z ............................................................ ...... —71 J4 IL 'V 0 ORION,, 0 0 ............. Lit ED 41 0 V 10 5, 0 el 0 z P m F ct _ma .pin w.0 jll��//yi �����(I��j�. i m CIA CIA IU) I . .. ......... From:John Ma era<jrnafera @rnjinc,corn> Sent:Wednesday,October 12,2022 2:40 PM To: Luis Arditi Antonio Pinto<a ' ] ._[� r1to �r-C A Cc:Strickland-Richard<-Siruckllauid-rRu�.,,h srd�)l'WnonroeCOLunty FL,(3ov>;Leto-Beth<Leto-. Christopher Kopec Matt Dubbe Subject:Co nco uirse A Value Engineered Items to Be Addled Back Luis/Antonio, Per our meeting last Friday 10/7/22,the Airport would like to add back the following value engineered items that were removed from G M P 2 during negotiations: • Backup generators • Half glass PBBs changed back to full glass • Baggage claim bar • Bag storage office(BSO) • New rental car counters • Exterior vestibules at the bag claim curbside doors Please prepare a draft change order and GMP amendment for review a:nd processing.If you have any questions or would like to discuss,please let us know. Thank you, John L McFarland Johnson John Mafera Vice President I lRegional Director ofAvlatID11 3 0 5­7 Mi-4 9 7 1 321-431-7029 Visit our.w.e. b site to see how Mi employee owners am innovating to improve our word ..................... N ZWEr,Onoup Packet Pg. 1232 H.7.a Key West International Airport Concourse A and Terminal Improvements Program E Guaranteed Maximum Price Amendment 3 (GMP Amendment 3) based on 90% Construction Documents (90% CD) dated 05/02/2022 by McFarland Johnson U U 06 E E CL Prepared by U NV2A-Gulf-Keystar JV E October 31, 2022 Page1/2 NV �M GULF BUILDING T,AI L'j- Packet Pg. 1233 H.7.a Scope Qualifications and Clarifications E GMP 03 incorporates items previously procured during RFP 02 procurement process that were not incorporated into GMP E 02,due to valued engineering process agreed during negotiations meetings held between CMAR, McFarland Johnson,and CL Key West Airport on 07/08/2022, 07/11/2022, 07/21/2022. Concourse A U ➢ Division 14: o This GMP includes(7)Glassed Walled Passenger Boarding Bridges(PBB)in accordance with the McFarland Johnson 90%Contract Documents dated 05/02/2022 in lieu of the valued engineered Passenger Boarding _ Bridges option included in GMP 02. ➢ Division 26: o This GMP includes the Cummins Emergency Power and Generation and Paralleling EMS Switch Gear U originally deferred from GMP 02. 06 Terminal Improvements ➢ This GMP returns to the contract previously excluded scope as shown on the highlighted areas in pink per sketches SK-01 Rev 1 dated 10.31.2022 as follows: o Baggage Claim Bar o Bag Storage Office (BSO)Area CL o New Rental Car Counters U ➢ The following cabinetry locations are included in this GMP: o Lost Baggage Counters (6)- Room 105 ; o Rental Car Counters (5) E c� ➢ Hollow metal doors, frames, and finish hardware in accordance with the contract documents as shown in SK-01 Rev.1 dated 10/31/2022, highlighted areas in pink. ➢ Automatic doors-Marks 100, 102B and 103B o ASSA ABLOY Automatic Doors-Manufacturers standard operating hardware ➢ Protection film on lost baggage storage. Paget/2 NVGULF BUILDING �M KF—YST*R 61IL'j-D Packet Pg. 1234 NV2AGRO-01 H.7.a ACOR©`° CERTIFICATE OF LIABILITY INSURANCE FDATEM/DD/YYYY)(M /22/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THI: CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIE7 BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZES REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement of this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT AG FL Insurance Team NAME: American Global LLC PHONE FAX 900 S Pine Island Road (A/C,No,Ext): (A/C,No): AIL Suite 210 ADDRESS:certsFL@americanglobal.com Plantation,FL 33324 INSURERS AFFORDING COVERAGE NAIC# INSURERA:Valley Forge Insurance Company 20508 j INSURED INSURER B:Continental Casualty Company 20443 NV2A Gulf Keystar JV LLC INSURERC:The Continental Insurance Company 35289 9100 S.Dadeland Blvd Suite 600 INSURERD:Berkley Assurance Company 39462 Miami,FL 33156 INSURER E: E INSURER F COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: CIL THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOI INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THI: CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF POLICY EXP LTR INSD WVD MMIDD/YYYY MMIDD/YYYY LIMITS U A X COMMERCIAL GENERAL LIABILITY 2,000,1 EACH OCCURRENCE $ CLAIMS-MADE X OCCUR 6072326798 8/17/2022 8/17/2023 DAMAGE TO RENTED 100,1 X PREMISES Ea occurrence $ MED EXP(Any oneperson) $ 15,1 PERSONAL&ADV INJURY $ 2,000,1 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 4,000,1 "" POLICY� JECT � LOC PRODUCTS-COMP/OP AGG $ 4,000,1 OTHER: EBL AGGREGATE $ 2,000, B AUTOMOBILE LIABILITY COMBINEDSINGLELIMIT 1,000,1 U Ea accident $ 06 X ANY AUTO X 6072326753 8/17/2022 8/17/2023 BODILY INJURY Perperson) $ OWNED SCHEDULED + AUTOS ONLY AUTOS BODILY INJURY Per accident $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY Per accident) ccident $ $ 9= C X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 10,000,1 EXCESS LIAB CLAIMS-MADE 6072326770 8/17/2022 8/17/2023 AGGREGATE $ DED X RETENTION$ 10,000 Aggregate $ 10,000,1 CL A WORKERS COMPENSATIONPER AND EMPLOYERS'LIABILITY X STATUTE OERH Y/N WC672326767 8/17/2022 8/17/2023 1,000,1 ANY PROPRIETOR/PARTNER/EXECUTIVE N/A E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,1 If yes,describe under 1,000,1 L) DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ D Professional Liab. PCAB-5018898-0822 8/17/2022 8/17/2023 $5M Agg;Per Claim/EE 5,000,1 CN DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Project: Key West International Airport Concourse A&Terminal Improvements Monroe County Board of County Commissioners is included as Additional Insured in accordance with the policy provisions of the General Liability and Aut Liability Policies. j' ~ By ., 8 . 23 . 22DA CERTIFICATE HOLDER CANCELLATION WAMM - SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORI Monroe County Board of County Commissioners THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IP ty ty ACCORDANCE WITH THE POLICY PROVISIONS. Gato Building, Room 2-213 1100 Simonton Street Key West,FL 33040 AUTHORIZED REPRESENTATIVE ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION The ACORD name and logo are registered marks of ACORD Packet Pg. 1235 -� NV2AGU L-02 H.7.a ACOR©`° CERTIFICATE OF LIABILITY INSURANCE FDATE(MM/DD/YYYY) (►•-- 10/11/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THI: CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIE7 BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZES REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement of this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT AG FL Insurance Team NAME: American Global LLC PHONE FAX (A/C,No,Ext): (A/C,No): ADDRESS:certsFL@americanglobal.com INSURERS AFFORDING COVERAGE NAIC# INSURERA:Homeslte Insurance Company 17221j INSURED INSURER B:Texas Insurance Company 16543 NV2A Gulf Keystar JV INSURERC:Navigators Specialty Insurance Co. 36056 9100 South Dadeland Blvd Ste 600 INSURERD:Gotham Insurance Company 25569 Miami,FL 33156-7815 INSURER E: E INSURER F COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: CIL THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOI INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THI: CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF POLICY EXP LTR INSD WVD MMIDD/YYYY MMIDD/YYYY LIMITS U A X COMMERCIAL GENERAL LIABILITY 2,000,1 EACH OCCURRENCE $ CLAIMS-MADE X OCCUR PCP-157993595-00 10/10/2022 1/10/2026 DAMAGE TO RENTED X PREMISES Ea occurrence $ MED EXP(Any oneperson) $ PERSONAL&ADV INJURY $ 2,000,1 GEN'L AGGREGATE LIMIT APPLIES PER: ' GENERAL AGGREGATE $ 2,000,1 "" �� POLICY JECT- El LOC ",I * 2,000,1 PRODUCTS-COMP/OP AGG $ OTHER: ,., , " $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT 06 Ea accident $ ANY AUTO DA i „_ BODILY INJURY Per person) $ OWNED SCHEDULEDy + AUTOS ONLY AUTOS WAM- "  ". BODILY INJURY Per accident $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY Per accident) ccident $ $ B UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 5,000,1 X EXCESS LIAB CLAIMS-MADE X T122EIWN-02045-01 10/10/2022 1/10/2026 AGGREGATE $ 5,000,1 DED RETENTION$ g CIL WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE ❑ E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? N/A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ If yes,describe under U DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ C Excess Liability X LA22FXSZOC8XJIC 10/10/2022 1/10/2026 Per Occ/Aggregate 5,000,1 < D Excess Liability X EX202200002787 10/10/2022 1/10/2026 Per Occ/Aggregate 7,500,1 3! DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Project: Key West International Airport Concourse A&Terminal Improvements Excess Liability-$15M($7.5M QS)x$12M Vantage Risk Specialty Insurance Company(NAIC#: 16275) c5 Policy Number: P03XC0000025710 Effective Dates: 10/10/2022-01/10/2026 Each Occurrence/Aggregate:$7,500,000 SEE ATTACHED ACORD 101 CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORI Monroe County Board of County Commissioners THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IP ty ty ACCORDANCE WITH THE POLICY PROVISIONS. Gato Building, Room 2-213 1100 Simonton Street Key West,FL 33040 AUTHORIZED REPRESENTATIVE ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION The ACORD name and logo are registered marks of ACORD Packet Pg. 1236 AGENCY CUSTOMER ID: NV2AGUL-02 H.7.a LOC#: A�©� ADDITIONAL REMARKS SCHEDULE Page 1 of AGENCY NAMED INSURED American Global LLC NV2A Gulf Keystar JV 9100 South Dadeland Blvd Ste 600 POLICY NUMBER Miami,FL 33156-7815 SEE PAGE 1 CARRIER NAIC CODE ,SEE PAGE 1 SEE P 1 EFFECTIVE DATE:SEE PAGE 1 ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: ACORD 25 FORM TITLE: Certificate of Liability Insurance Description of Operations/Locations/Vehicles: Excess Liability-$25M($12.5M QS)x$27M Crum& Forster Specialty Insurance Company(NAIC#: 44520) Policy Number: SEO-120792 E Effective Dates: 10/10/2022-01/10/2026 Each Occurrence/Aggregate: $12,500,000 Excess Liability-$25M($12.5M QS)x$27M Arch Specialty Insurance Company(NAIC#:21199) Policy Number: UXP1049851-00 Effective Dates: 10/10/2022-01/10/2026 U Each Occurrence/Aggregate: $12,500,000 1- Monroe County Board of County Commissioners is included as Additional Insured in accordance with the policy provisions of the General Liability and Excess Liability Policies. W U E U c� E c� ACORD 101 (2008/01) ©2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Packet Pg. 1237