2023-AUC-28 03/13/2023 County of Monroe
Planning&Environmental Resources Department ,� ,xa �,, Board of County Commissioners:
Marathon Government Center 's Mayor Craig Cates,District I
2798 Overseas Highway,Suite 400 ��h Mayor Pro Tem Holly Merrill
Raschein,District 5
Marathon,FL 33050 y , d � .; Michelle Lincoln,District 2
Voice: (305)289-2500 Y 6 "{ ;` � James K. Scholl,District 3
FAX: (305)289-2536 �� ,� �'' ' David Rice,District 4
We strive to be caring,professional,and fair
Task Order #2023-AUC-28
For the Removal of Marine Debris
Date: March 13, 2023
American Underwater Contractors, Inc. is hereby authorized to proceed with the removal and
disposal of the 20' corrugated pipe in the canal at the residence of 6 Bunting Drive, Key Largo.
The County agrees to pay the proposed cost of$3,800.00 upon completion of the work and receipt
of an invoice, complete disposal receipt, and photographs.
The completion of the work shall be in accordance with the following schedule:
X Routine Removal- vessel should be disposed of by March 20, 2023
X Environmental Emergency
X Hazard to Navigation
X Imminent Threat to Public Safety
General Requirements: Cownictor ski lal [,)rovucl : ::ofi fic lfiot: to u�lc u::vcstug It alg oll1cer �i.0 �c is
24 48 Wurs [,)raior to tic stin of rcaciov i �icfivu ics Any anchors/mooring devices, or other
appurtenances associated with the vessel, shall also be removed. The awarded contractor shall
dispose of vessels and marine debris at any of three Monroe County Solid Waste transfer stations
or other certified waste management facility. County transfer stations require engines to be
separated from the vessel. The vessel can contain no fuel or fuel tanks. All fluids should be drained
from the engine, which will be visually inspected by the transfer station for acceptance. Engines,
batteries, fuel, and fuel tanks (or other hazardous materials) shall be properly disposed of(transfer
stations have separate facilities/containers for engines, fuel, etc.). Any recyclable materials may
be taken to a recycling center or licensed scrap yard. If asbestos is present, further coordination
with DEP and the Marine Resources office will be required prior to removal. Please note that any
vessels or debris that requires `processing' (e.g. crushing/compacting that is not contained) may
require coordination with DEP. Work shall comply with all County, State and Federal regulations.
The Contractor shall contact the Marine Resources Office immediately if circumstances arise in
which the work cannot be completed according to the above indicated schedule, in which case
other arrangements may be necessary. It is understood that weather may delay removal efforts;
however, the Contractor's work load or logistical issues will not be considered 'good reason' for
delays. All documents required for payment (including invoices, photographs showing
removal/disposal and complete disposal/recycling tickets) shall be submitted electronically to the
Marine Resources Office. The photographs shall document the condition of the vessel prior to
removal, the removal process, and the final disposition of the vessel.
Additional Instructions: n/a
y.
00,
� .. ��..... 03.13.2023
'Roman Gastesi, County Administrator