Item D45 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: June 21, 2006 Division: Engineering Bulk Item: Yes No Department: Facilities Development Staff Contact Person:_Jerry Barnett AGENDA ITEM WORDING: Approval to terminate the Construction Manager at Risk contract with The Tower Group, Inc. to serve as Advisor during Design and General Contractor for construction of the Murray E. Nelson Government and Cultural Center in Key Largo, and approval to advertise Request for Bids for the construction phase of the project. ITEM BACKGROUND: In accordance to the Request for Proposals article 1.8 Part B, and the Agreement between the parties dated March 15, 2006, article 14.3 (2), the County may terminate the Agreement and not award the construction phase of the project to the CM at Risk if the Owner and the CM at Risk do not agree upon a Guaranteed Maximum Price (GMP). The Tower Group, Inc. submitted a GMP which was over what the budget allows. Value Engineering and Scope Reductions were proposed, however costs still exceeded budget limitations. See attached analysis. PREVIOUS RELEVANT BOCC ACTION: On October 19, 2005, the BOCC approved to award a Construction Manager at Risk contract to The Tower Group, Inc. to serve as Advisor during Design and General Contractor for construction of the new Murray E. Nelson Government and Cultural Center. On March 15,2006, the BOCC approved to rescind the contract of October 19,2005, and approved to award a revised contract. CONTRACVAGREEMENTCHANGES: N/A STAFF RECOMMENDATIONS: Approval as stated above. TOTAL COST: N/A BUDGETED: Yes NI A No COST TO COUNTY: N/A SOURCE OF FUNDS: N/A REVENUE PRODUCING: Yes No X AMOUNT PER MONTH Year DIVISION DIRECTOR Risk Management APPROVED BY: County Atty _ DOCUMENTATION: Included Not Required_ DISPOSITION: AGENDA ITEM Revised 2/05 Murray E. Nelson Government and Cultural Center Guaranteed Maximum Price (GMP) Analysis Construction Budget (Identified in Contract) Construction Budget (Actually available for GMP) $6,500,000.00 8,300,000.00 The Tower Group's GMP (Includes CM at Risk Administration Fee, Construction Fee, and Pre-Construction Fee) The Tower Group's Value Engineering Reduction (Includes Adjusted Construction Fee after Value Engineering) The Tower Group'S Revised GMP 12,485,591.92 (1.507209.60)* $J.Q,9.1&3 82. 3 2 * Value Engineering/Scope Reductions (Proposed): Description Savin~s Replace Tensioned Canonies with Parasol Structures $57,200 Reduce Concrete Sidewalks from 6" to 4" 2,000 12"XI2" Precast Pavers in lieu of 16"XI6" Pavers (No savings if shell stone) 19,800 If Credenzas at the Conference Rooms are Not Part of the Built-in CabinetrY 6,500 Administration Sunoort Desks (Rm 202) are not included as Built-in Cabinetry 6,000 Replace Rigid Nailable Roof Insulation with Kraft Faced R-19 Batt Insulation, Add PlyWood Above Deck 6,000 Use 7/8" metal furring channels at 16" OC at the bottom side of the Trusses for the Gypsum Ceilings at the 2,000 Stairwells in lieu of the Drop Ceiling with Metal Framing and PlyWood Sheathing. Eliminate the Spandral Panels F -16 and F -17 and Use Steel Beams/Columns and Metal Framing and Drywall at the 8,200 Second Floor. Take the Dimming Svstem Eauipment out of the Contract 150,000 Value Engineer Light Fixture Package with an Eaual to or Similar Fixture Package 128,000 Reduction or Elimination of Fire Pump Based on Current Flow Text Requirements 21,500 Eliminate Structural Steel Joists and DeckIL WC Underneath Trusses Above the Code InsP. Offices 5,200 Standard Picket Railing at the Stairwells in Lieu of the Mesh Railings 1,200 Eliminate the First Floor Offices 122, 123, 124 89,713 Eliminate the Tower at the Front Entrance 47,518 Eliminate Second Floor Offices Rm 214,222,223 82,277 Eliminate the Roof Dormers 36,313 Have a Remote Office Suite on 2nd Floor to Shell 11,481 Change Grasspave area to Grass on Shellrock Base with Removable Bollards 38,593 Steel Scissor Trusses 4' OC with a Gyp. Board Ceiling Assemblv in Lieu of the Heavy Timber 28,100 Replace Generator with 60KW Generator 235,000 Cut Roof Overhangs from 6'0"c reduction in standing seam roofmg and truss cost 14,100 Eliminate the entire back of house area behind the stage (RRIns 105, 106, 107, 108), Replace with an open air porch 84,330 with pavers and a standing seam roof Reduction of Augercast PileslPile Caps Required on the Proiect (Pile Cans Only, Still More Savings) 55,600 Take out Removable Stage and Retractable Walls 74,000 Sales Tax Savin!!s7Monroe County purchase materials) 250,000 Total Value Engineering $1,460,625 Savings on adjusted construction fee after Value Enineering 46,585 Total $1 5Q721O Page 1 of 1 Koppel-Dave From: Koppel-Dave Sent: Tuesday, June 20, 2006 5:13 PM To: Willi-Tom Cc: Cyr-Connie; Barnett-Jerry; Hutton-Suzanne; Riger-Ann Subject: Agenda Item D 45-Change In wording requested by County Attorney's Office Tom, can we revise the agenda wording to the fOIlOwingtApproval to reject the Guaranteed Maximum Price of $12.4M prior to value engineering and $10.9M after value engineering from The Tower Group, Inc. and to terminate the Construction Manager at Risk contract with The Tower Group, Inc. to serve as Advisor during Design and General Contractor for construction of the Murray E. Nelson Government and Cultural Center in Key Largo, and approval to advertise Request for Bids for the construction phase of the project" (The item currently states, "Approval to terminate the Construction Manager at Risk contract with The Tower Group, Inc. to serve as Advisor during Design and General Contractor for construction of the Murray E. Nelson Government and Cultural Center in Key Largo, and approval to advertise Request for Bids for the construction phase of the project") David S. Koppel, P.E. County Engineer Monroe County 1100 Simonton Street, #2-216 Key West, Florida 33040 Telephone: (305) 292-4426 Fax: (305) 295-4321 t k~ruJ;.py ~. KQPPel-D",ve@mJ)nrQec~unty,fl.99V -----Original Message----- From: Barnett-Jerry Sent: Tuesday, June 20, 2006 3:57 PM To: Koppel-Dave SUbject: M.E.N.B, Dave, Legal is suggesting that we ask the BOCC to reject TTG's GMP first and then terminate, if they reject. I have the papers showing their proposed GMP before value engineering and after. Legal suggested that we may wish to remove the item from bulk. Dixie has been asking lots of questions and we have provided her with the information. The agenda item does not address the rejection of the GMP as presented to us at our meeting on 05-24- 06. At that meeting we could not reach agreement on getting the project in budget. There was a consensus at the meeting that without a significant change in the scope of the project TTG could not build it for the budget we have and that we would have to seek other means to try to get the project built with our budget. Jerry A. Barnett Director of Facilities Development 305292-4416 Phone 305 295-4321 Fax JJAS- 6/20/2006