Item C05BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: October 17, 2007 Division: Engineering Bulk Item: Yes X No Department: Facilities Development Staff Contact Person/Phone #: Jerry Barnett X4416 AGENDA ITEM WORDING: Receipt of monthly report on Change Orders reviewed by the County Administrator's Office. ITEM BACKGROUND: There were two change orders considered and approved by the County Administrator for the period beginning September 1, 2007 and ending September 30 2007, for a total of $43, 876.10. PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No. 026-1998 was adopted in order to provide that the County Administrator may approve separate, non -cumulative change orders for construction projects and professional service contracts in amounts not to exceed $25,000.00 or 5% of the original contract price, whichever is greater. The BOCC requested a monthly report of all change orders considered by the County Administrator. CONTRACT/AGREEMENT CHANGES: NIA STAFF RECOMMENDATIONS: N/A TOTAL COST: N/A COST TO COUNTY: N/A BUDGETED: Yes N/A No SOURCE OF FUNDS: N/A REVENUE PRODUCING: Yes No AMOUNT PER MONTH Year APPROVED BY: County Atty _ OMB/Purchasing Risk Management DOCUMENTATION: Included X Not Required DISPOSITION: AGENDA ITEM # Revised 11/06 CHANGE ORDERS CONSIDERED BY THE COUNTY ADMINISTRATOR'S OFFICE FOR THE PERIOD 9/01/07 — 9/30/07 PROJECT CO* AMOUNT - DESCRIPTION DATE CONSIDERED CAUSE Medical Examiner's Facility 2 $43,876.10 Reimbursement of Builders Risk Insurance *09/07/07 Months of delays occurred at no fault of the Contractor, and Builders Risk insurance was required for contract execution. Medical Examiner's Facility 4 $0.00 No Cost Time extension of 104 days, from November 8, 2007 to February 20, 2008. *09/11/07 Time required to obtain building structural design revisions and permits. Total $43,876.10 * Approved MONROE COUNTY FACILITIES DEVELOPMENT M E M O R A N D U M TO: David Koppel County Engineer FROM: Ann Riger, Contracts Administrat r Facilities Development DATE: October 2, 2007 RE: Agenda Item - Change Order Report AGENDA ITEM WORDING: Receipt of the monthly report on Change Orders reviewed by the County Administrator's Office. ITEM BACKGROUND: There were two change orders considered and approved by the County Administrator totaling $48, 876.10. They are as follows: 1. Medical Examiner's Facility - Change Order No. 2 for an increase of $43, 876.10 to reimburse the contractor costs for obtaining Builders Risk Insurance. Builders Risk insurance was required at execution of the contract, and due to permitting & surveying delays, and the unforeseen hauling of muck, the construction was delayed many months. 2. Medical Examiner's Facility - Change Order No. 4 for a no cost time extension of 104 days, from November 8, 2007 to February 20, 2008 due to the time required to obtain building structural design revisions and permits for same to reduce the expected costs. PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No. 026-1998 was adopted in order to provide that the County Administrator may approve separate, non- cumulative change orders for construction projects and professional service contracts in amounts not to exceed $25, 000. 00 or 5% of the original contract price, whichever is greater. The BOCC requested a monthly report of all change orders considered by the County Administrator. CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATIONS: N/A Thank you. If you have any questions please call me at ext. 4439. AR MONROE COUNTY / ENGINEERING /FACILITIES DEVELOPMENT CONTRACT CHANGE ORDER PROJECT TITLE: Medical Examiner's Facility MM 56 U.S. 1 Crawl Key Marathon, FL 33050 TO CONTRACTOR: Fonticiella Construction Corp. 11400 W. Flagler Street Ste 206 Miami, FL 33174 The Contract is changed as follows: CHANGE ORDER NO: 2 INITIATION DATE: November 29, 2006 CONTRACT DATE: May 19, 2004 The original (Contract Sum) (Guaranteed Maximum Price) ........................................ $ 2,963,000.00 Net change by previously authorized Change Orders ................................................ $ 1,026,429.00 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was ......... $ 3,989,429.00 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order ................. $ 43,876.10 The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is ... $ 4,033,305.10 The Contract Time will be (increased) (decreased) (unchanged) by .................. ( ) N/A The date of Substantial Completion as of the date of this Change Order is .................. November 8, 2007 Detailed description of change order and justification: The Contractor was asked to purchase Builders Risk insurance necessary for execution of his contract. Builders Risk Insurance and a Citizens Wind Policy, were purchased effective from January 9. 2006 to January 9 2007 Permittlno and surveying Issues caused months of delay in commencement of construction at no fault of the Contractor and additional delays occurred from the removal and haulino of muck The Contractor is asking for reimbursement of the cost for renewal of the insurance policies due to the delays, i rns L.nange Vrger Is 7.4579 of the original Contract amount ARCHITECT: CONTRACTOR: DIRECTOR, FACILITIES DEVELOPMENT: COUNTY ENGINEER: COUNTY ADMINISTRATOR T / Date FUIrstructian Lorp. - Date 3--Z$-D J Bar Date v 13avrd S. Koppel, P.E. Date Thomas Willi/D b Frederick Date Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The Contractor was instructed to obtain Builders Risk Insurance prior to commencement of work at the Medical Facility site. By no fault of the Contractor, the project was delayed several months. Contractor is requesting reimbursement of the renewal of the insurance policies. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: 0 Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No ED Should a claim under the applicable professional liability policy be made? Yes ❑ No ED Explain: elf Lcr LrJr�r YJl: Lb .ib511b41b5 t-UNIIUILLLA UUN51 C:U R0 LIT I^JG ' � --- iRl' ❑ - I� p 41 C4)NSYRUCTION C,bRPORATIO N F A C S I M I L E To: Mr. Kevin Wilson Monroe County Florida Phone: 305-292-4429 Fax: 305-29S-4321 PAGE 01/15 �,4C,'l4fpy�FcG'� F� �IZC1 From: Nerminia M. Fonticiella Date: 01 /22/2007 Pages: 1 S W/Ce vp 4 Re: Medical Examiner's Insurance renewal Change Order 1 back documents CC: Comments: Mr. Wilson, Attached are the documents pertaining to the Builder's Risk and Wind Insurance Change Order previously sent to your office for the above mentioned project: 1.- Citizens Property Insuranc� -WIND ONLY - ORIGINAL Policy No. 1096870 1 /69/06 to 1 /09/07 Amount S29,140.00 Paid Check * 6890 S13,4k3.00 Paid Check * 874S S15.717.00 S29,140.00 - 2.- AAIC - BUILDER'S RISK - ORIGINAL i Policy No. 87A21Mi 000332-00 1 /09/06 to 1 /09/07 Amount S 27.281.25 i Paid Check #1 7085 S27,2dl .25 I 3.- Citizens Property Insurance - WIND ONLY - RENEWAL Policy No. 1096870 1 /69/07 to 1 /09/08 Amount S27,763.00 Paid Check *9308 S 23,577.00 Paid check *9467 S 4,186.00 S 27,163.00 �� d; �1? : a r i0 - Ganeral Contractor • Design -Build • Construction Management 11400 West Hagler Street, Suite 206, Mlemi, Florida 13174 - Tel 305.207 960s . Fax 305.226.4165 - www.fonticlella.com 011111 Lbb1 bl: Lb d0b22b4lbb F-UNI1(�1tLLA C;UN51 GU NAUE 02/lb 4.- AAIC - BUILDER'S RISK - RENEWAL 1 Policy No. 87A21M1000332-00 1 /09/07 to 3/09/07 Amount S9,212.20 Paid Check #9468 59,212.20 AAIC (American Alternative Insurance Corp.) will not renew the Builder's Risk policy for 2008. This company is not writing policies In the Florida Keys anymore and gave Fonticiclla Const Corp. 60 days extension as per Fla Statutes when an Insurance company is leaving the market. Our insurance agent is already looking for other quotes for Builder's Risk, for the periods 3109107 to 3/09/08, but there are no companies in the market as of right now that will insure extra wind. The total as of today for the renewal of policies due to delays starting this job is: WINO RENEWAL S 27,763.00 B/R RENEWAL (2 months) _ 9.212.20 S 36,975.00 Overhead dr profit (5%) 1,848.75 Bond Fee (2.590 --"f TOTAL S 39.794.34 �g, �a Q- �i 57 If you have any questions, please call me at 305-207-9605 ext 204. Thank you C Ca��� rJ1� 17')9D,vo 3% i�� - ?,!:�%� 90/'7,Ye, 0 General Contractor • Deslan-Sulld - Construction Management 1 1400 West Flagle► Street, Suite 206, Miami, Florida 33174 - Tel 30S.2071605 . Fax 30S.226.4165 • www.forMciellaxom T.R. JONES & COMPANY Insurance and Financial Services Post Office Box 1505 1780 N. Krome Ave. Homestead, FL 33030 Phone: (305) 247-5121 Fax: (305) 248-8543 CLIENT Fonticiella Construction Corporation DATE 3/12/2007 POLICY # BR66675978 INVOICED TO: Fonticiella Construction Corporation 11400 W. Flagler Street #206 Miami FL 33174 PLEASE MAKE CHECK PAYABLE TO: T. R. Jones & Company AND MAIL TO: T. R. JONES & COMPANY, P O Box 1505, Homestead FL 33090-1505 EFFECTIVE TRANSACTION DESCRIPTION AMOUNT 3/9/2007 Rewrite Builders Risk coverage for $17,292.00 Monroe County Medical Examiners Office 3/9/2007-3/9/2008 T. R. JONES & COMPANY 1780 N. Krome Avenue Homestead, Florida 33030 $17,292.00 (305) 247-5121 Phone (305) 24841543 Fax nl J LG' LGrJ r nl : Ltd ZUDZZ04100 r UIN 111.1CLLH 1-ullJ I flu rHUG rJOJ 13 . �........., .u....,.v.,u u�,..A..^ 6 A. % ....,, ,, k,,.44. + , RV v l 4%0614 •,A Pub, . P►NL u•Lvnju•u:,v au. u- rur , ba svr., iv rvr wt A PART THSRSOF, COMPLETE THE NUMBERED CITIZENS PItaP!?ttTY INSVRAN RPORATION POLICY. CITIZENS PROPERTYRANCE CORPORATION, WI Y POLICY 6 C e Comm Parkway, Jackaoovdta, Hlorida 3221 orpmat NSWem larvae AM ADDnsas `r`.k,L. jg CHANGE NO. lTHtS IS AN AMENDED FONTICIELLA CONSTRUCTION CORPORATION • 11400 W FLAGLER ST STB 206 GENERAL BUSINESS MIAMI, FL 33174 THIS CHANGE IS EFFBCTIVE 1/09/2006 Md= TMW 1 09 2006 70 1 09 2% AT 12:01 A.M. 19M C=Z Ms POLICY ND. 1096870 ITIIIS IS YOUR POLICY DECLARATION PAGE kMl1ULL ' r 6 $ 0 s c + THIS STATEMENT OF COVERAGE GIVES THE STATUS OF YOUR POLICY AFTER THE RECENT CHANGES) AN ADDITIONAL PREMIUM OF $ _ 2031S MULTED FROM THIS CHANGES) ( 16437 PREMIUM + 3878 SURCHARGE) 1 1,000,000 0 87,000 T-85 23,577 ONE STORY MASONRY MEDICAL rX MINER'S FACILITY BUILDINC3(1.000 P) UNDER CONSTRUCTION LOC: 565 33RD STREET GULF MARATHON, MONROE FL 33050-2301 S 23,577.00 5 Ylorlda Hurricane cat rmnd ,pp s Market Sq Cud, 613.00 -Rains/cat Financing 9.14 CIT-➢ill 20 BUILDERS' RISK CIT CP2 CIT-WO6 tg&wm/ .. Pay*., MONROE COUNTY BOARD OF COUNT COMMISSIONERS 1100 SIMONTON STREET KEY WEST, FL 33040 nt Paroz: T R JONES & COMPANY 0028 INSURED P 0 BOX 1S05 HOMESTEAD, FL 33030 Date= '-WOl 17/02) 002R'A Tfam 2 wx.rry Tsr-t.fOAT7nY - r.-- ........ nnv ..,....r. Gll LL, GC1YJ I 131; Ltj JGOLLb4lbO r UN I lUltLLA 1UN51 I U t HUt I( I / � , I r Vd4ftn CIT010 MID-MMM 11j03/05 11,423.00 MEDICAL 8XAMIM I S WXND ssaussaes 13,423.00 Axior 3.�,423.00 0.00 �I,esaasams esma� 13,423.00 0.00 b4! 15 M1 • �.r R i� I Qwr�^'�::a► a= . Paid 0.00 13,423.00 Ics:s cstm(m"U== 0,00 13,423.00 '<13 f1}� �•rr• / ~ IR .} rt ���° ��l} • J,; r s r to ,. lL,S�'{., i tw` l�. r � _ Cr � s• �� j,'l ii r•i �, r r ( :1 i. ,i , - "�'!. °.: •.t �� !`'ri 't ,i T 'gl I( r `.�'•t ��5�` r m o rA7 TO THE /� t!I� I C ` { ir, f .it ..((�t0.!�i'�i* !''t't � itf�ti (. at y{( •( ' A r006B 90w ; �4Cf 660 i � 3'9 2�: 06061 ?ti 16 ?�'0 5 .e.�ar wl.c ua � �.�. twa�..w.•iu�r.ar a� anrlr�c � nauo►arrr. IMas�r'r,�a�e Ms nwr�a wn+ r�ca � wic a wu. aw�oeiw war a.awMa o� nuel�rw i'j��j 1:61 r t• � tf,�ll (�. rilt GGtGGGt Gl: GG t-UN1 iUitLLA UUN51 UU 1''Aut b511' FONTICIELLA CONSTRUCTION CORP °`•. ION 8745 CITIZENS INSURANCE CORP. 7077 Bonnevel Road, Suite 500, Jacksonville, FL 32216 Check: 8745 Date: 9/7/2006 Vendor: CIT009 Poor lakpi P.Q. Num. Invoice Bala Retention Dis=n Amt Paid 9114/06 9114106 15,717.00 15,717.00 0.00 0.00 15,717.00 Medical Exam. Policy#1096870 15,717.00 15,717.00 0.00 , 0.00 15,717.00 FOR Qi 94" CALI.AWftC" COLMUnR.FOAW AT (30ilit04W.OR MW30SIMWA TMI>i GFI<CK li VOIQ WITilOUt 4 CO MRpiR AND • UIO PLU&A I iii ♦ ►WQ IMLW- M6tTlRM11Ut ON THE pAcx • HOLD AT &g0-LB TO ViQW FONTICIELLA CONSTRUCTION CORPORATION txx OAhTF 8745 7630 NW 26TH STREt?T 11400 W FLAMER STREET, STE 206 MIAML FL 33122 MIAMI, FL 33174 i3.1130AW t 8745 DATE AMUNT PAY 9/7/2006 '^"••'""" 15, 717.00 TO THE THE SUM OF FIFTEEN THOUSAND SEVEN HUNDRED SEVENTEEN DOLLARS ORDER OF CITIZENS INSURANCE CORP. 7077 Bonneval Road, Suite 500, Jacksonville, FL 32216 "0008?45o' 1:0660143921: . ., . dgNATUAE MWA rOMAIM A K UHT A F"WARMR141 CMFrfi V-OPWAW 0606 t 74 36 700 5 -49NCC OF PINX U S VLT&N- NUMYrRS UNDER S GUATURE INDWES CHECK 16 FR.UOULIW,, PATEDR NUMP6 S ARE ►MITS W 14 HEAT SENSITNC PW 6 MLL 04APPCAk WH6N ULOWtN0 IN. FONTICIELLA CONSTRUCTION CORPORATION 8745 TIZENS INSURANCE CORP. Check: 8745 ,77 Bonneval Road, Suite 500, Date: 9/7/2006 ckaonville, FL 32216 Vendor: CIT009 vim P.O, Num• 111Yoics.B>atance Retention Discount Amt. Paid 4/06 9/14/06 15,717.00 15.717.00 0.00 0.00 15,717.00 Medical Exam. Policy#1096870 15, 717.00 15, 717.00 0.00 0.00 15, 717.00 !OR REOMM CAu AAs1tem coMPUrER FORM AT (SX)SOS-3b6 OR PAX (3W)WW41 FOMILC41 Ul/ Lz: ztjuI el: zn dUnZ,Lb41bb FUNI 1C1tLLA CONST CO PAGE 06/15 / 583 Coliege ROW EW AAIC Pdncdm,NJ 08543-5241 Ise (800) 305.4954 Named Insured and Mailing Address >E031TIamk COKMt7CTION CORPORATION 11400 WZST PLAOLRR STREET MIAMI, FL. 33174 Business Description CORPORATION POLICY PERIOD Policy Number. 87A2IM1000332-00 Prior Nuunber. MW POLICY Agency Coder 10007 Britt/Faulk Insurance Agency, Inc Producer 100 Glen 8a91e8 Court Carrollton, Qa. 30117 Pboae: 770-834-0015 Type of Business: 370 Audit Period: Front 01/09/2006 TO 01/09/2007 12:01 AM. Standard Time at the Address of the Named Insured shown above COMMON POLICY DECLARATIONS In return for the payment of the pnxnium, and subject to all the terms of this poky, we agree with you to provide the insurance as stated In the policy. This policy consists of the fallowing coverage parts for which a premium Is shown. This premium may be subject to adjustnenL COVERAGE PART(S) IK-7050(04/04) Builders's Risk - Bahaduled aobsits Fora - Broad FORMS and ENDORSEMENTS applicable to all Coverage Parts Premium 27250.00 Policy Premium 27230.00 Taxes, Fees and Surnhar+pes 0.00 Total Prarrium / Deposit Premium 273SO. 00 ACO-1100 (09/05) CL-0605 (02/03) CL-0610 (12/02) Ant-2001 (09/05) XM-7030 (04/04) AIN- 2003 (09/OS) Alit-2004 (09/03) CL-0100 (03/29) I19-1271 Bd 1.0 TY-2019 (04/04) CL-0260 (01/01) THESE DECLARATIONS TOGETHER WITH THE POLICY AND ANY APPLICABLE FORMS AND ENDORSEMENTS ISSUED TO FORM A PART THEREOF, COMPLETE THE ABOVE POLICY. Counterslgnod at: Carrollton, Ga. By: Data: 12/14/200S The Company has caused this policy to be signed by its President and Secretary. ou4� 4- AALP%- vo: WVx"iie Presidesecretary CY ACO 1100 0905 Copyright, American ARemaUve Mrsursnce Corporation, 2006 Page 1 of 1 rill L.G/ LUG f 101: LU-'JUOLLb41bb T.B. JOW8 im'. IMMIce 2-a_ milk. Tr1jrjA go Ant [gD-87LrAl+i 11/03/05 27, 381.25 M=ICAL MXAMn= I S B/R sramansoae 27,281.25 I-UNIIUiLLLA UUNSI GU PAGE 07/15 ti 1111 �;f s �; rr y` l � � " I ._r ri•, � � -. � - r-' , r,'� }/wV 2�jjjLjA= AAt1&jjtRj ,281.25 0.00 0.00 •27,281.25 . :'•r•'}'1 J��, . -, , r• f '(r ,t� 'ir �fY �•:,.i•r,t �� r e .�.r �f.r r •,. r a, ^Itt �! L;t�'r' tr,r CJ ;jy :rr77ar''F J 1 Val ` +r a 1 ;+ r MK • ��i ii r�r l::+`I r Zs, I`. t°;�{ Pii rfii?.t;fitt P :�t¢I �_• �` IiMiIM�" 1 i • : '1, � .� �'� ,:;�: E1 .� ,�ft,�� (jar ' "( r r r, r' J:' '1 I , '•j; , �� J M 4 t �- � rp3: n •r 1' P• + � a f t� ! ♦. R r ? i +r �1A .. E PAY car _OV. t cis :. �, .l iC� r rl. - •�:'.l ' r .'i1 ,�'.. i11q � ',� ( � .�`1 !'Ptt + ,J'• ;. apr �•_ ol ' i� •� +) :,1, � ir; + rrii- .� � (! ., jJ�3,t,i � ty0irr}�s,. � � r i t;�. , �.Jli C ti� i s J ,ilx,j,�!`rf a •; ' •...1 .t � �,t�( i :1�' .•rf �. ? ��(1�� -it: i1.. + � r a •I�rO�:. 180070ase Ko660LLMI: 0606i?416?ros WOMM Cr FW"Mn>rr NtaMeua LUM e10KOME OANWN C Mnc M FRAUODUM PMEN. OUMM N! I PWM NM NW SMMIMe NK a V&L oM VMM %MIRY r ow0+a oR ��rM /a CJli GLi 4rJr1( riI. Lt'J 3G7LLb4lbO hUNI1l.�1tLLA UUN51 UU HAUL 08/15 A PART TKEREOP, COMPLETE THE BELOW NWHERED CITIZENS PROPER"tY LYSI;RANLE COIL RAT ION POLICY. CnUENS PROPERRT SURANCE CORPORATION, W NLY POLICY 32s 73 . � 11iIS 2!' A 'ON TICIELLA CONSTRUCTION CORPORATION GENERAL BUSINESS 1400 14 FLAGLSR ST STS 206 !IAMI, FL 33174 ' TM 11/09 20071 09 2008 Ar 12:01 A.M. (tXT) cl=Zzas POL" No. 1096870 DATI THIS IS YOUR POLICY DECLARATION PAGE - TMs is not a Riff PAC$ 2 3 t S 3 3 1,000,000 .0 B7,000 T-65 23,577 ONS STORY MASONRY MEDICAL EXAMINE:R'9 FACILITY BUILDING tMRR CONSTRUCTION IOC: 56S 331ZD STRENT GULF MARATHON, MONROE FL 33050-2301 I ZOOS FHCF Emer Aumot 23,577.00 t 236.00 Reins/cAt Financing 3 PO NOT PAT :t to Fos* Wa) , 4100 RETAINED) CIT-Wll 20 BtTILDERS' RISK CIT-Wll 19 CIT CP2 CIT-W06 gee/Lose Payee: MONROE COUNTY BOARD OF COUNT COMMISSIONERS 1100 SIMONTON STRUT KEY NEST, FL 33040 Payor: T R JONBS i COMPANY 002E INSME,D P 0 BOX 150S HOMESTEAD, FL 33030 (305) 247-5121 10"0 12/2B/2006 )3 (7/02) AM p4 T�s w Z M TN "s,� •�xsTrw rns. — — nnv a tmill 4 Q A T A 011 z[, [rin i t91 : Gb :16OZZb41 bn t-UN 1 1lU1LLLA CUUN51 UU HA(*- by/ 15 ' :. 6676 Corpertec Ct�11a`J+� �tyd,C}�TJda•g3i116.0173 .�` li/09/2006 AGGENT� Pofl Number: 1096e70' RqSU�r FWT3:CISI,LA CONSTRUCTION CORPORATION T R JONSS & COMPANY 0028 ��•• 11400 N FLAGLER ST STS 206 P 0 Box 1505 HOMESTEAD, FL 33030 * . MIa11=Ir11V �tt Ir33'1%� - {(�1,•'��a) .'I.iiw!.� \1 -,lit t I. tic, . . vj1 t.It• �•�'r.l ;i, .1 .a. :1 +;IJICr i!1'lilJ.. •. 1•1 +l, � : •.e!(F:H .- .1 �j• • . t'•, .. a .. �r'1'Tl • �: ` r:: LA9/Z T,.,rl, a, R..%1; '•, i ",,.: :u. _ , t , r fr . 1 Yew DNh1d kk! 17, 000 $1, c0c, 000 $23, 517 ONS STORY MHONRY MEDXCAL-W(AM1XZJt 8 PACrLITV BUILDING A twDzn CONsTRUCTICM Si5 33RD STREIT CiLF, KARATHM . • r . • . 1. .. • CSdmem o�tR dw far 7rau lv pry Your VZDW iBLFA NR2 XAVY INC ULUSBD 0% of 1� teltiaw�Peemwm �y t� dw from your preria" ggaoliryc•' 9U. way . •f PAY TIM AMOUNT" due mows. The mmmnin; 20% win be ssl'act oth" d6dwtibls apaunts as (for deductible 0pdoa ghowln) doe within 30 day. Amm in this nqiee. $27, 763 ilasl07-3e Pradom - 23,577 RainCa a Flsand" 3, 33 7 FbrWa Harrksw Cat Fksi 236 Taz4LUc pt SwThwrP • 41z ■ r`■rnr■r■r�r��■r,rl Sab*f to Own He (e): CIT-W11 a0 WILDS"' 11" CIT CP2 CIT-x06 WORTANT:, TRIM POLICY HXPIM AT 13t01: A.M. EST 011 1/09/2007. PREMIUM MUST 3E RECSIV= ETWILL NOTE ND Y TM NO � $ RZ T$y POUCCOMTDM V N IIaTBRRUPTiON .------------------------------------ RIIT M TM PORTION WITH PAYl1M Full Pn dumDue: $27,763 1/09/07-08 We use followvq information to cootdinaEa claims adjusmienis MWmnm Amount Dw: S22,211 Pkm verity Flood Cartier mad Flood Palley Number !Nail Cbe& Payable To: CrMLWS or FLOOD i@IIVER " FORM s I1�18D - A: CI17ZZM PROPERTY INSURANCE CORPORATION '` . Z• d ,.PO B& 17869, JsdctosvtbN Fh 32243-7W Plea" Prfut Homeemers/Ftre Carrier and Polcy Number INSURED:- c_POlQTICIELLA CONSTRUCTION CORPORATION PAYOR: C1dws PoUcy Nomben 1016870 POMTICISLLA CONSTRUCTIOX CORPORATIO 11400 N FLAGLER ST STE 206 MIMI, FL 33174 CIT-Y04 10 0S 109687011010601090700277630000000 Paga 1 00283 >,000,oaa Ull4ti Znnt 101: Lb dVnZZb41bb hUNI IUILLLA WN51 CU PAGE 10l15 Cf7" , `'' ffifta.CORPORA .,.. a69acarlo l J.a�bs nr<ag Fkride: 3221 DATEs 11i09/2006 . �Y �.��" .pppmber 1096870 utstl : 7. C..:,d' AGM (375) 247-5121. JONEFONTICIELLA CONSTRUCTION CORPORATION T R Box 1 0 COMPANY 3� 11400 m FLAGLER ST STE 206 P 0 D, MIAMI, FL 33174 HOMESTibADFL 33030 CITEU 5 RENEWAL PREMIUM DUE:_:....._1l�9 0'1 _ _ 1 YarDeft" Is: 87,000 $1, 000, 000� $23, 577 ONE STORY MASONRY MSDICAL EXAMINER'S FACILITY BUT ruff" UNDER CONSTRUCTION S65 33RD STRM GULF, MARATHON v° c C,itlZeu 01fCrs thepp� for you lo pay You DZMCTIBL99 WAY er FMZD 80 � 'twm 1 duo fra your pr YOu may ** PAY ?ffiB AMOUNT "s wilt be sel le amounts as (fotdeducdble opdm down) doe t+vh�io 30 dayL sho notice . $27, 763 LO V4e Plemkon 23,577 Rei arAt FleeaneioS 3 , 537 Fb ida flunicene Cal Fand 236 T8ar-Z=V0Pt SWCh"V - 413 Satejeet to Forcer No (s): CIT-Ili 20 BUILDSRB' RIBS CIT CP2 CIT-N06 v a... Vl. tV JV JGL VYl0:.1 FONTICIELLA CONSTRUCT -tom Co p ruiNl v-ir— _L.H wjNz,1 -,u rl-5t�t llrl5 • Property Inc. Corp. , 9308 :::.. .. Check:. 9308 Date: 12/19/2006 Vendor: CIT010 in Prior 10968109 111/09m Medical Examiner's Facility 2 W WNW 8t � 23,577.00 O.OD 0.00 23,577.00 23,577.00 23,577.00 p 00 2 =_ 0.00 23,577.00 FOAMCIEILA CONSTRUCTION C _ MCMti Flp�lp ,� �/pl j 4b vrj jr ORPORATIOIV 114W W PLAaLLER SMET, VrE Zoe 7eeo s 9308 Wa�otir,FL ,74 , :Y :: s.aaNw�;t;sirj. 9308 PAY DATE AMOUNT r0 THE THE SUM OF TWENTY THREE THOUSAND i'tyL HU REp S 2 TMSEVEN D **,..******" 7RDER 23, 577.00 )F OLL4RS Citizens Property Inc. Corp. _ lie ,..._.�...__..�_._ . M "_O oe�!, MON Vs A �w 7 s �Di�nYln cNscK woa 009 308N 1;0660 L i 1921: 0606 i ?ti —, ...._ +CE Oi MWf U.3. MTlM MUMslllf uNlpEp QIO.'Ar i WOICATp CHECK fRAUDt 1► q h Bq AID /RdtTEp WII}I F =gWTw MA( b WILL 03AP" WNiN lkoWW6 On Ruuug; rNTICiELLA CONSTRUCTION CORPORATION ---- — ns Propwty Inc. Corp. 109 111O " Waftel EMMInees Facility Prior 23 23 0.00 --... _ 23,M,00 . 23,577.00 0.00 ORd CALL AMMUtAyr CMW{/M FORKS AT rJM OR iAx r,WOS 48 FON W ILM 9308 Check: 9308 Date: 12/19/2006 Vendor: CIT010 •Q.k4J1rlt 0,00 23� 0.00 23,57760 Payor. ril/ 44/ zr�r I U1: 4vi JUOZZ04100 f- UNI IUIt" A UUNbI l;U h'Hl�t 1111`J CITIZENS PROPERTY INSURANCE CORPORATION WIND ONLY POLICY 1 ' CITIZENS.6676 Corporate Center Parkwa -,. ,..,n,,,,m,,, a.,...,,,. Jacksonville, Florida 32216-0973 CldzemsPobcyNo.; 1096870 PONTICIRLLA CONSTRUCTION CORPORATION 11400 W FLAGLER ST STIB 206 MIAMI, FL 33174 3ILL1Na REASON: POLICY ISSUED, PAPAW SHORT. ToWPromum: 27, 527. 00 _ PsymWPaceived. 23, 577.00 5' BALANCE DUE: (Pay d* OMMO 4,186.00 M DATE, BILL116 DATE 2/08/2007 12/29/2006 FNot*S'- rNsugm FOWICIELI-h CONSTRUCTION JONSB PAw 11400 N FLA== 8T STB 20P OMIAMI, FL 33174 rwrim► -*�, FL 33030 (305) 247.512 Vtr 6L/ L.VVr ul.LU JVJLLVYIVJ f'UIYIll.1GLLN I+INYJI l,l-1 I"'fiUC 1Jll� 9467 ;"•" r ! r " y 7ctJOApi /•15/ WI - :" r Vendor' CIT016 , P'41-i 'I, . r _ P.O. Num. .: :$�( Retention SOS 09�870 01/15/07 4t8;t.:,�� 4,18e:00' 0.00 0.00 4,186.00 ' 4;186.00 40188.00 0:00 0.00 4,186.00 i i Fl!! ®H07fl1• Pu 1�` �.�„ n" R � ♦T AR PAIP 00 M MA i[1YmU IYN ALA µ=lx= 11400FWP A`n`OWLEJR T• �� }jY..�,. : as nS �.�fJ+�, -4� it � t?0 7NE : THE'SUM OF FOUR THOUS_ A' �iOER •�MF,�w.. :� ��� ps-fYCfteM Property Inc'',Cp%. '�.7!J '1•r. .� , y '7.L 1 .o '�•:1 It t,�1�•w. ++w r +• .{,'' ,'q.'•`.yrr'�' Ir Y •}, �y1yLIf1i0NTlJrM!MpV1E11T"QNfGfIYOIIOMIO u.9. r HYY 677�150 5L'iiN■, sU51,r':, 6"ISaSJ, c `ia.'S .. ci'r,.v w00946?0 ;1.0660 L LMI: 0606 ?4 L6?�'05 WM CP ►" U.l. M"W MMMM W" M10MAT = WM;ITEI*W= A FlI*=X MT FA MT M/MIM AM /1Mi M *M HW MK A OM .PftN1 WHO M wwm Cft fte"m oNrcM.0 cot+ucnoN coMlino� 9467 mftopwW Inc. Corp. Checlo. 5487 y :1 Datc 1/lWO07 Vendor. CIT010 P.Q.I4 6�70 01J15/07 - :W �.t I 'I*4 µ . �� Amt. Paid MW EXAM PMT SHORT #109R$Q Y �> 1r~ ', 0:00 ` 0.00 4,186.00 r �t= �c V11K i. J .. �.. r�� r 7 '43iibtJ 4i �86 �0' 0.00 0.00 4,186.00 • J '1n /L��� A J L� ,1� M=MC LLAAWW.J*CMVVFMFOtaliA Cal/ LG: LCJt1 r C11 . zu 3C1OGL0410J rUN 111,1tLLH UUlY51 W t-'Atat 14/ 1'J - �- T.R. JONES & COMPANY tnswanae and Fbu%nckd sen,kes POST OFFICE BOX i-%M • 1780 NORM ig cmz AVENUE HOWSMAD, FWRIDA S3030 PRONE: (30S) 2474121 FAX: (305) 24841343 TOLL FREE: 1-NO-333-0777 Fantiemm Construcdm Corp 11400 W Flasler Street suits 200 M1wnl. FL 33174 PLEAM WTACN AND RRTIM WITH PAYMM Cgent Fa udem Conshuction Corp 1 F I t T V41 OftUATI014 Ivit 01/09/2006-07./09/2007 Ameriean 213569 01/09/2007 Policy change Builders Alternative Risk - Extension to 3/9/07 Brokerage Co Fee Brokerage F14CF Surcharge P.O Job: G.L Acct:.�._ 4. Cat.. 0042. - Notes: Approved By:Gate, _—___�_ E 305j247-5129 8,940.00 175.80 89.40 4.00 Thank You A^WI J0616e Cfi'i0 Semm, INC. C,lr cLr GrJrJr Cll: GrJ 3C1�LL041GO rUNl iUlLLLH I,UN.11 UU YHI 10/ 17 7 FOMfIC1LA CONSTRUCTION CtJRPO 9468 '.It JONES S COMPANY Check: 9468 • Date: 1/15/2007 Vendor: TRJ001 Prior LYE P.O..Num. Invoice 8mt Balamotion Discou 8mt,.Paid 13569 1/09/07 9,212.20 9,212.20 0.00 0.00 9,212.20 MEDICAL EXAMINER FACILITY 9,212.20 9,212.20 0.00 0.00 9,212.20 _.�.�. �_=.•.� �= FONTICmLLA CONSTRUCTION CORPORkT[ONi...-- L -,-- 9468 NK 11400 W FLAOLER STREET, STE 204 MIAN, FL 33174 x 9468 AIMOWT PAY E ,t ' 1Ftwool """'•" *019,212.20 TOTHE THE SUM OF NINE THOUSAND � TWO HUNCf EDOL1AAj AN0 20 CENTS ORDER OF T.R. JONES 8 COMPANY x� ��.�_� ����.�,�,�.��.......... __ a•�; •• 80809MBO,WA GONTAMMA KNOW A PINGWAMW CHMW0110N1a-"-- p'009468sm i:06601 i 39 2#: 06064 74 i6 70 s. iO1Cl (W PWC ", PATUIr NUMB M UHMW 6"#ft4 f #4WAT= CWGM 4 PRAUODUW.1XMT "*WU AW PW= MM NEAT $Mff [ INK A W I WAPP&R M4" MW W" OR RU40" =OIVT' 1151*1.A CONSTRUCTION CORPORATION JONES & COMPANY Check: 9468 Date: 1 /16/2007 Vendor: TRJ001 %a Pa.y. Num, lrwoice Bala Retanfl Discount Amt. Paid 560 1/09/07 9,212.20 9,212.20 0.00 0,00 9,212.20 MEDICAL EXAMINER FACILITY 9.212.20 9,212.20 0.00 0.00 9,212.20 a •. 11 IOWOM CAM AWN CQMPVMR FOMA AT'MMV04W OR FAX 00600VA0 FON001 M C UNTY KEY WESTjo'�MONROE ORIpA 33040 005)294-4641 September 20, 2006 Fonticiella Construction Corp. 11400 West Flagler Street, STE 206 Miami, FL 33174 Re: Medical Examiner's Office Notice to Proceed Letter Dear Armando: BOARD OF COUNTY COMMISSIONERS r� Mayor Charles "Sonny" McCoy, District 3 Mayor Pro Tem Dixie M. Spehar, District 1 George Neugent, District 2 Mario Di Gennaro, District 4 Glenn Patton, District 5 This letter is for the purpose of rescinding the previously issued Notice to Proceed, issued on March 16"' 2006, for the construction of the new Medical Examiner's Office located at Crawl Key, Florida and to issue a new Notice to Proceed, which is effective September 25", 2006. Due to additional permitting and survey problems, which were not the fault of Fonticiella Construction, the commencement date for the project will be September 251', 2006. Any previous Notice to Proceed letters are to be disregarded. The first payment to Fonticiella Construction was issued for the month of July 2006 in the amount of $137,088.62 for: Line Item #1 General Conditions $14,048.92 Line item #2 Supervision/($9,714.33/mo) $9,714.33 Line Item #3 Builder's Risk $46,326.49 Line Item #4 Bonding $48,694.60 Line Item #6 Submittals $1,653.09 Line Item #8 Surveying $2,560.73 Line Item #130 Contractor's Fee $29,322.53 No other payment has been issued and no onsite construction has taken place as of the date of this letter. 1100 Simonton Street Tel: 305-292-4429 Key West FI 33040 Fax: 305-295-4321 You are authorized and directed to proceed with the construction of the new Medical Examiner's Office as of September 25t", 2006. Sincerely, 11-4 )Jerry Barnett, Director Facilities Development Department cc: David Koppel Danny Kolhage Jackie Clynes Kevin Wilson, County Project Mgr. William Harrington, County Construction Inspector Victor De La Mata, Project Mgr, Harvard Jolly Architects Dr. Michael Hunter, Medical Examiner 1 100 Simonton Street TeL 305-292-4429 Key West FI 33040 Fax: 305-295-4321 :�` , March i . %( GF, r=or.-i��,:�la �on;truction 1 4.00 ati. Rao street, S T E 206 Miarr.i, =L 33174 Attn: _.envy Font+cie!la Re, Examiner's Facility BOARD OF Cdf TPUTY CO MICCiQNERc Mayor G varies Sonny" McCoy, Distrct 3 ylayor pro Tem Murray E. Nelson, District S Dixie M. Spehar. District 1 Gecrge Neuger. , District 2 David P. ':ice, District 4 s ,w'! erne as four offic•ai "`lot.ce to �"-Oceed" effective Thursday, ,March 16, 2006. i ycur Scnedul2 cf V�;irres an•a Construction Schedule to our office as soon as possible. ese two schedules are also required tc be subn fittY Pay ed with ever ° A • pplrcation. Other required scr ,. -es also reed to be submitted accor,-'ing to your contract, i.e, submittal schedules. i.ounty is Pleased -o !r,'tiate thi; Pi-c;act and finally looks forward to the construction and i•'1^pGr:ar ,tt- 'acaliLy. concerns, please feel free to contact our office at 305 292-4429. J j •) �� r J rac .-t e:3 ., 2v� cpmr ^, i a�rclinator MONROE COUNTY FACILITIES DEVELOPMENT DEPARTMENT M E M O R A N D U M DATE: 31 August 2007 TO: Jerry Barnett FROM: Kevin Wilson�� SUBJECT: Change Order #2 — Medical Examiner's Facility — Insurance Expenses Action Requested: Resubmit Change Order #2 to County Administrator with a recommendation for approval. Recommendation: Approve the attached Change Order Request #2 for Fonticiella Construction Corporation in the amount of $43,876.10 (1.48%). Basis for Recommendation: 13he contractor acted in snood faith and in accordance with the contract provisions. 2.The County did not, at the time in question, ask him to cancel his insurance pending a revised Notice to Proceed start date. 3.The contractor has submitted the attached letter (dated 29July 2007) requesting reconsideration of the change order. Background: The contractor requested an additional payment for extension of his insurance due to project delays beyond his control. These delays were primarily delays for permits from the U.S. Army Corps of Engineers, FL Dept. of Environment Protection, and the City of Marathon. The first two of these were for work in a wetland area and the latter arose after the two initial Notices to Proceed (NTP) were issued. The net result was that there were several abortive attempts to start construction, each interrupted by additional regulatory requirements that were not foreseen. The standard County contract requires that the contractor provide evidence of insurance before the contract can be effective and that it not be cancelable without County approval. This he did. The various fits and starts of the project left the contractor in a virtually perpetual state of "be prepared to start" pending imminent final permit issuance. The County has asked that the contractor request a refund for his premiums based on the fact that the project never actually started. This he has done and been advised by his insurance company that they considered the premium earned and, therefore, not subject to a retroactive refund. The County has taken the position that the contractor could have, and perhaps should have, cancelled his insurance until such time as a firm start date was determined. While the contractor did not ask County permission to do so, it appears that the County's standard contract language requires that the insurance be continuously in force for the contract to remain valid unless otherwise agreed by the County. That said, the contractor appears to have acted, much as the county did, on his assumption that start of construction was imminent and, hence, did not request permission to cancel the insurance. Copies of the pertinent contract section is attached. MEDICAL EXAMINER'S FACILITY MONROE COUNTY, FLORIDA RISK MANAGEMENT POLICY AND PROCEDURES CONTRACT ADMINISTRATION MANUAL General Insurance Requirements for Contractors and Subcontractors Prior to the commencement of work governed by this contract (including the pre -staging of personnel and material), the Contractor shall obtain, at his/her own expense, insurance as specified in the attached schedules, which are made part of this contract. The Contractor will ensure that the insurance obtained will extend protection to all Sub -Contractors engaged by the Contractor. As an alternative, the Contractor may require all Subcontractors to obtain insurance consistent with the attached schedules. The Contractor will not be permitted to commence work governed by this contract (including pre -staging of personnel and material) until satisfactory evidence of the required insurance has been furnished to the County as specified below. Delays in the commencement of work, resulting from the failure of the Contractor to provide satisfactory evidence of the required insurance, shall not extend deadlines specified in this contract and any penalties and failure to perform assessments shall be imposed as if the work commenced on the specified date and time, except for the Contractor's failure to provide satisfactory evidence. The Contractor shall maintain the required insurance throughout the entire term of this contract and any extensions specified in any attached scheduleat Failure to comply with this provision may result in the immediate suspension of all work until the required insurance has been reinstated or replaced. Delays in the completion of work resulting from the failure of the Contractor to maintain the required insurance shall not extend deadlines specified in this contract and any penalties and failure to perform assessments shall be imposed as if the work had not been suspended, except for the Contractor's failure to maintain the required insurance. The Contractor shall provide, to the County, as satisfactory evidence of the required insurance, either: • Certificate of Insurance or • A certified copy of the actual insurance policy. The County, at its sole option, has the right to request a certified copy of any or all insurance policies required by this contract. � All insurance policies must specify that they are not subject to cancellation, nonrenewal, material change, or reduction in coverage unless a minimum of thirty (30) days prior notification is given to the County by the 4/13/2004 8:49 AM INSURANCE REQUIRMENTS AND FORMS 00400-1 Jerry, From: Armando J. Fonticiella [ajfont@fonticiella.com] Sent: Wednesday, August 29, 2007 10:24 AM To: Barnett -Jerry Cc: Wilson -Kevin; Leonardo J. Fonticiella; Herminia M. Fonticiella Subject: Change Order # 2- insurance policy renewal attachments: Exhibit l.jpg; Exhibit 2.jpg; Exhibit 3.jpg; Exhibit 4.jpg; Fonticiello Construction 37A2IM 1000332-OO.pdf Jerry, 3y means of this letter we are again requesting payment and a formal written explanation why our change )rder # 2, which was originated in January of 2007and, previously approved by the Architect, has not been xocessed and paid. would like to once more clarify and/or remind you of the events that lead to the renewal of the insurance )olicy: 1. Insurances were purchased and maintained as required by Section 00400 of the General Specifications. This insurance is required prior to signing of the contract and needs to be maintained throughout the entire term of the contract and any extensions. 2. The County issued a notice to proceed in March 16, 2006 and requested that we start work, even though the county knew that there were outstanding issues that would delay the progress of the work. However in a spirit of cooperation, we followed those directives. Upon commencement we encountered numerous obstacles which did not allow us to perform work in a normal sequential manner. These obstacles were beyond our control, and in the process of being resolved by others. There is copious amount of documentation in which we were led to believe that resolution to the different obstacles was imminent and that work would resume at any time. This condition is evident by the issuance of two additional notices to proceed, the final dated Sept. 25, 2006. Examples of these obstacles included permitting for mitigation issues, permitting through Marathon, dimensional information required to layout the silt fence and bldg., etc. 3. During the delay period the County never requested that we remove ourselves from the project nor to cancel the insurance policies. In fact, during the delay period there were numerous meetings, site visits and preparatory work performed. These site events included our own personnel, subcontractors, county personnel and consultants. 4. After the insurance policy had elapsed and a change order had been requested by us, you verbally requested to ask the insurance company for a refund. We followed your directives and the insurance company replied that the contract period had elapsed and that all premiums were earned. These documents were all previously sent to you, but we are attaching them for your use. s we previously stated in our letter to Kevin, the County has and continuous to place a financial burden i our company, for no other reason than our following of directives given by your office. We need this range order processed and paid. We hope that we can close this matter promptly and in the same spirit cooperation that we demonstrated to your office when the County was having problems in getting this 'oject started. lank you Jerry, Fonticiella Construction Corp. 4rmando J. Fonticiella 3jfont .fonticiella.com Tel: (305)207-9605 =ax: (305)226-4165 MEMORANDUM TO: Board of County Commissioners From: Thomas J. Willi County Administrator bate: September 5, 2007 RE: Change Orders Attached is a proposed change order for Fonticiella Construction Corp. for the Medical Examiner's Facility (Change Order #2 for $43,876.10 is for insurance expenses that arose due to project delays. See explanation.) According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the 8OCC agenda. The Administrator intends to approve this change order on Thursday, September 6, 2007. Thomas J Willi County Administrator TJW: adc Page 1 of 1 Campo-Abra From: Campo-Abra Sent: Wednesday, September 05, 2007 3:44 PM To: County Commissioners and Aides Subject: Medical Examiner's Facility Attachments: Change Order #2-Fonticiella Construction Corp.pdf Please review the attached Change Order #2 for Fonticiella Construction Corp. Abra Campo Sr. Administrative Assistant Office of County Administrator 1100 Simonton St. Suite 205 Key Wes 4 R 33040 (305)292-4445 )/5/2007 PROJECT TITLE: Medical Examiner's Facility MM 56 U.S. 1 Crawl Key Marathon, FL 33050 TO CONTRACTOR: Fonticiella Construction Corp. 114001W. Fiagler Street Ste 206 Miami, FL 33174 The Contract is changed as follows: CONSTRUCTION CORPORATION CHANGE ORDER NO: 4 INITIATION DATE: 07/16/07 CONTRACT DATE: May 19, 2004 The original (Contract Sum) (Guaranteed Maximum Price) ........................................ $2,983,000.00 .......... Net change by previously authorized Change Orders .......................... ..... ....$1,050,377.4 The (Qontract SOM) (Guaranteed Maximum Price) prior to this Change Order was ......... $4,013,377.40 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (,i nchanged) by this Change Order.... . ............ $ 0.00 The new (contract Sum) (Guaranteed Maximum Price) including this Change Order is ... $4,013,377.40 The Contract Time will be its (decreased) (unchanged) by ............................. 104 Days The date of substantial Completion as of the date of this Change Order is ............ . ..... February M, 2008 Detailed description of change order and justification: ARCHITECT: CONTRACTOR: DIRECTOR, FACILITIES DEVELOPMENT: COUNTY ENGINEER: COUNTY ADMINISTRATOR F n Corp.11ate Date D S. Kap i, E. / Date Thomas dii/Debbie Frederick Date General Contractors • Design -Build • Construction Management i I Ann West Racier Street, Suite 206, Miami, Florida 33174 • Tel 305,207,9605 • Fox 305.226.4165 • www,fonticiello.com CONSTRUCTION CORPORATION Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: No cost time extension due to the time required to obtain building structural design revfsrions and pemtils for some to reduce the expected costs. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No [] If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No IZ Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: General Contractors • Design -Build • Construction Management 11400 West Flagler Street, Suite 206, Miami, Florida 33174 • Tel 305.207.9605 • Fax 305,226.4165 • www.fonticiella.com MONROE COUNTY FACILITIES DEVELOPMENT DEPARTMENT M E M O R A N D U M DATE: 5 September 2007 TO: Jerry Barnett FROM: Kevin Wlson� SUBJECT: Change Order #4 — Medical Examiner's Facility —No Cost Time Extension of 104 days Action Requested: Approve Change Order #4 and forward to County Administrator with a recommendation for approval. Recommendation: Approve the attached Change Order Request #4 for Fonticiella Construction Corporation for a time extension of 104 days to the substantial completion date. The new substantial completion date will be 19 February 2008. Basis for Recommendation: 1.The contractor acted in good faith to revise the structural drawings to reduce the overall cost (avoid additional escalation costs) of the building. 2.The Contractor expected to receive expedited service from the City of Marathon based upon a meeting attended by County representatives. The absence of this constituted the majority of the delay (76 days). 3.The delays due to "muck hole' were not foreseen when the funding for the extra costs were approved in Change Order #3. Background: Upon issuance of the third revision of the Notice to Proceed (NTP) the contractor advised that the delay of the start of the project was already causing price increase (escalation) pressures from some of his suppliers and subcontractors. At a project meeting in October 2006, the contractor provided a list of value engineering items that would, if implemented, offset a majority, if not all, of the price escalation pressures. The contractor agreed at the time to retain his own structural engineer to revise and simplify the structural design (and some other elements) to reduce approximately $400k from the escalations he foresaw at the time. Initially, and after a meeting with the City of Marathon Building Department (permit authority) in December 2006, the contractor believed it was possible to revise the structural design without any schedule effect since the new design was a simpler one to construct. The review time, for whatever reason, eventually evolved to over 10 weeks (partially since the time frame involved the year end holidays). This delay was not foreseen at the time of the original meeting and according to the contractor's request, accounts for 76 of the104 day extension requested. The remaining 28 days are split evenly between the additional time required to deal with unforeseen underground conditions (muck holes) and an initial delay waiting for site layout data from the architect. hie:/u(-I/Documents/c2oand /ozusettinus/ W ilson-Kevin/Desktop/ KE%,...Urder'7o2O%234 7c20Time%20Extension%20Explanation`/o20-rle20l AUG07.htm From: Leonard J. Fonticiella [ljfont@fonticiella.com] Sent: Wednesday, August 01, 2007 12:38 PM To: Wilson -Kevin; 'Armando Fonticiella'; 'Victor De La Mata' Cc: 'Y London'; Harrington -William Subject: RE: Change Order #4 Time Extension Kevin, In regards your email of July 27: Item #1— The 14 day request for delay at the beginning of the project stems from the fact that :here was a lack of information in the Civil Engineering drawings to properly layout the building )ad within the site. This information was requested as far back as July 2007, and the situation liscussed with Mr. Barnett prior to the issuance of the Notice to Proceed date. However, the lrawing file with the complete information did not arrive in our office until the afternoon of 1 0/9/06. The building pad construction is the critical path on this project. 'lease note that Fonticiella Construction is not requesting compensation for this delay, created by he owner, and as allowed by the contract documents. Had Fonticiella Construction mobilized on he date of the new Notice to Proceed, work would have been stopped after 2 or 3 days with the esulting additional costs of demobilization and remobilization passed on to the owner. This ituation was discussed with Mr. Barnett and we all agreed at the time that, since our company vould not seek additional compensation, it would make more sense to wait a few days until all he information was received. In retrospect, the decision was a wise one and saved the owner honey. tem #2 — As I recall, the Oct/Nov 2006 discussions, as well as the ones held in the June/July ime period, in regards to Value Engineering arose out of concern that the unprecedented price Icreases in the construction industry would jeopardize the viability of the project. These price Icreases had occurred due to several postponements in the commencement date of the project for alasons not created by Fonticiella Construction. ►ut of a spirit of cooperation, we suggested several ideas that could substantially cut down the mount of the price increases without degrading the quality of construction or Efecting the usefulness of the building. One of these ideas was the redesign of the structural cell. The discussions about structural redesign foresaw that there would be no net impact to the ;hedule E and only if we could get preliminary approval from the City of Marathon building department ►r the proposed construction method that we had envisioned, and also with the stipulation that .e building department would issue a foundation permit only in an expeditious manner. fter the meeting at the building department at which you were an attendee, we all came out with I uc.uit p uVuuueuia iowauu ioavJeuingsi w usou-nevuuuesKiopiicc ro...I t ime'rowGxtens ion�icLUGxpiananonliozU-veLU I ALI(;U /.htm :he same opinion that the building department had been very receptive. The Building Department given suggested that we pay an additional fee so that they would hire an outside consultant in )rder to expedite the plans processing to what we all assumed would be about a week or so. Based on this information we were given a go ahead to proceed on December 13, and mmediately hired a Structural Engineer. In spite of the holidays, we were able to submit the Mans to the building department the first week of January 2007. On February 29th., and after )aying a fee of $2,520.00 for "expediting the process", we received an email notification that the foundation plans had been approved by the hired consultant. n spite of the emailed approval, the building department did not issue the official foundation )ermit until March 6th. due to some questions they had in regards to site drainage, a totally znrelated issue. However, in order to save time, Fonticiella Construction started to work on the ;xcavations immediately after February 29th. and before the site drainage issue was resolved. 'ince work was not interrupted prior to the official issuance of the foundation permit our ;ompany is only claiming time up to February 29th. and not up to the official date of permit issue. leither Fonticiella Construction nor the owner could foresee, predict, or control the inordinate amount of time that it took to process the Foundation plans through the building department. >ince the idea of the redesign was primarily to save money, Fonticiella Construction agreed, once .gain, not to seek any compensation for the time delay in the schedule due to the redesign and irocessing of the plans. In return, we were assured that we would not be penalized for that time ither. Based on this verbal agreement we proceeded with the redesign. eonard j. Fonticiella, P.E. 7&tom (6,V/Z, .el : 305-207-9605 ax: 305-226-6888 mail: Ijfont@fonticiella.com rom: Wilson -Kevin [maiIto: Wilson-Kevin@MonroeCounty- FL. Gov] ent: Friday, July 27, 2007 3:48 PM o: Armando Fonticiella; Leonard J. Fonticiella; Victor De La Mata c: Y London; Harrington -William ubject: Change Order #4 Time Extension rmando, pon arrival in Key West for approval, several questions have been raised about the time extension quest. I'll need a more robust justification statement from you to support the claimed time to include with e request as it moves through the approval process in Key West (Jerry, County Engineer, County lministrator). The justification should address the following questions that have been raised: 1) Why should the County extend the construction period for the 14 days at the beginning of the i ucauk p uocuments-icauanuveau,-,eaingsi w uson-r eviry uesKropncr_Yc... uruer /czu,/v2.14 /u/U 1 imelichit.xtension'/e-IOExplanation'/cZU-'/oZU 1 AU(j07.htm project for site layout? 2) The OCT/NOV 2006 discussions about structural changes foresaw that there would be no schedule impact to achieve the cost reductions proposed and that the savings would be net of any additional costs incurred by FCC for design/permit changes. Why is there now a request for a 76 additional days for the structural changes? cevin (evin G. Wilson, Project Manager Monroe County Facilities Development the Historic Gato Cigar Factory 1100 Simonton Street, Suite 2-216 (ey West, FL 33040 305) 797-1547 phone 305) 451-7069 fax -Key Largo 305) 295-4321 fax -Key West vilson-kevin(aD.monroecounty-fl.gov -lelp us to help you! 'lease take a moment to complete our Customer Satisfaction Survey: http: nonroesurvey.virtualtownhall.net/survey.php?9acc14ae1 b 'lease note: Florida has a very broad public records law. Most written communications to or from the County regarding County business are ublic records available to the public and media upon request. Your e-mail communication may be subject to public disclosure. Page 1 of 1 Campo-Abra From: Campo-Abra Sent: Friday, September 07, 2007 11:45 AM To: County Commissioners and Aides Subject: Medical Examiner's Facility Attachments: Change Order #4-Fonticiella Construction Corp.pdf Please review the attached Change Order #4 for the Fonticiella Construction Corp. Abra Campo Sr. Administrative Assistant Ofte of County Administrator 1100 Simonton St. Suite 205 Key Wes4 FL 33040 (305)292-4445 )/7/2007 ALCM ORA ND UM TO: Board of County Commissioners From: Debbie Frederick Deputy County Administrator Date: September 6, 2007 RE: Change Orders Attached is a proposed change order for The Medical Examiner's Facility. (Change Order #4 for the Fonticiella Construction Corp. is for a no cost time extension of 104 days changing the completion date from November 8, 2007 to February 20, 2008.) According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. (Ylal E The Deputy Administrator intends to approve this change order on FeWay; September, 2007. 10, �] C - , - �C Debbie Frederick Deputy County Administrator DLF: adc