2022-42 ARFF Expansion = Programming & Planning MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date Upon Execution Task Order No. 2022 -42 Client Project No. 404-630203-G1Q04 Engineer Project No. EGXM7942 This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS PROJECT MANAGEMENT CO. ("Consultant"), dated February 16, 2022 ("Agreement"). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized — EYW Aircraft Rescue and Fire Fighting (ARFF) Expansion — Programming and Planning Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein,which Exhibit A is marked with the above noted Task Order No. and consists of m�33 ,page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price of$ 46,219.00 N/A Other(Describe): NROE COUNTY ATE NEY p Ar 07 /T FORM Schedule PED 01 A Services may commence on p ecuti t ASSli ATTORNEY uaa 6/5/23 Services will cease by 548 da s Recommended by: Approved by: Director of Airports Date:5.31.2023Asst./County Admmstrator Date: 06.09.2023 CONSULTANT: JACOBS PROJECT MANAGEMENT CO Diglbw7y aegnod�by Jacqueline Ross Jacqueline DN:ce Pftuwline Ross,r US. Rn o-Jecobs E"9 mr apbs Director Witness _ R Ay/�� emeil'IeWuelna neuamm tlll c,b.com Title File: MSTR APS—Monroe County Page 1 of 1 Exhibit A—Scope of Work (2022 -42) Monroe County Key West International Airport(EYW) EYW Aircraft Rescue and Fire Fighting (ARFF) Expansion —Programming and Planning SCOPE OF WORK Jacobs will provide data collection, programming, code research and diagrammatic design services for the expansion and renovation of the existing ARFF facility. The intent is to design for an expanded facility to accommodate additional area based on increased staffing and a fourth apparatus bay. The existing facility areas will be documented in a current areas program and a proposed program of areas will be developed based upon the Aircraft Rescue and Firefighting Station Building Design,AC No. 150/5210-15A. In addition, Jacobs will review the possibility of incorporating additional EYW staff sleeping quarters into the additional area for potential emergency operations where EYW staff is needed to stay on site during storm or other emergency events. Up to three block diagram layout options will be developed and reviewed with Airport staff. M/E/P/FP and structural disciplines will be incorporated at the programming level only. A rough order of magnitude cost will be included for each option. These improvements will be located at the Key West International Airport in Key West, Florida. All design work shall be designed in accordance with the codes; Florida Building Code 2020, NFPA and AC 150/5210-15A. EXISTING CONDITIONS The current ARFF facility was constructed in 1998 and there have not been any revisions or expansion to the original building. This facility is a two-level building comprised of three apparatus bays and associated support spaces. A fourth apparatus bay will be developed at ground level and additional supports spaces will be located at the second level. DES RIl*`M"'MOCK OF WORK The data collection and preliminary design,will provide the following: Article A—Data Collection Field Verification: Visit and inspect the site (1 visit) to determine if existing conditions match those provided by Monroe County (as-builts, 8/1998). Take photographs and make written documentation, sketches, notes or reports to confirm and record the general conditions of the existing facility and site. Within this initial phase we will review all applicable requirements. Page 1 of 3 Perform code research for applicable codes, abovementioned, to apply to the planning documents submittal. Initial Meeting: Conduct a meeting with representatives from Monroe County and the design A/E team to include architect and engineer. The purpose of the meeting will be to discuss the design intent and project features. Review available record drawings 0 Perform a site investigation Services for Article A will be provided under a lump sum basis. Article B—Programming/Planning Phase The specific tasks Jacobs will perform are as follows: After data collection and the development of an existing space program Jacobs will develop a proposed space program for the expanded / renovated facility. This will include the fourth apparatus bay and all associated support areas. A virtual meeting with Monroe County will be held to review the proposed space program and generate comments towards the diagrammatic layouts. Once the proposed space program is accepted by the owner the diagrammatic development will progress. Up to three alternative diagrammatic layouts will be developed which will examine the ground level bays, associated impacted apron area and second level expansion&renovation. A virtual meeting with Monroe County will be held to review the diagrammatic layouts and agree to the selected option for future design not included in this task. The preferred alternative selected will be noted in the planning report. The preferred alternative will include apron vehicular movements. Architectural, civil, M/E/P/FP and structural input will be provided at the programming phase and incorporated into the planning document. In addition, a rough order of magnitude estimate of cost will also be developed for each of the three options. Documents shall include the following: + Diagrammatic-Develop up to three diagrammatic layout options; first and second level Site Plan • Apron movement/parking plan Order of magnitude cost estimate. Services for Article B will be provided under a lump sum basis. QUALIFICATIONS AND ASSUMPTIONS For the purpose of providing a stipulated fee amount, this proposal has been based on the following qualifications and assumptions: Page 2 of 3 • As-built documents have been provided by the owner • Owner to provide size of new equipment to be accommodated in the new bay. o In providing opinions of cost, financial analyses, economic feasibility projections, for the project, Jacobs has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions;time or quality of performance by operating personnel or third parties; and other economic and operational factors that may materially affect the ultimate project cost or schedule. Therefore, Jacobs makes no warranty that Client's actual project costs, financial aspects, economic feasibility, will not vary from Jacobs' opinions, analyses, projections, or estimates and Jacobs' shall have no liability for such variances. Other services not described in the scope of work are excluded. Items identified as not included or limited in the scope of services can be provided or expanded upon as additional services under a separate agreement or supplemental to this agreement. COMPENSATION See attached spreadsheet. SCHEDULE We anticipate completion of the deliverables in accordance with the following schedule: The overall duration of this effort will be as noted below: Item Duration(Business Days) A. Data Collection 10 business days from agreement authorization B.Programming/Planning 60 business days after completion of Data Collection Page 3 of 3 JOB HOUR AND FEE ESTIMATE %Jaco s. Monroe County Airport: Key West International Airport Project: EYW Aircraft Rescue and Fire Fighting(ARFF)Expansion-Programming and Planning FEE SUMMARY flaaL1c DEB Hours Fee DBE AMOUNT Article A-Data Collection 69 $ 11,581 Article B-Prog marnin8 and Planning 236 $ 34,638 't"O 1" L LUMP SUM FEE 305 $ 46,219 S " L9Bi Percerdcage 0.00%