Item O1MEMORANDUM Office of the County Administrator TO: Board of County Commissioners FROM: Debbie Frederick Deputy County Administrator DATE: June 3, 2009 SUBJECT: County Divisions' Monthly Activity Report for May, 2009 MONTHLY ACTIVITY REPORT - MAY, 2009 KEY WEST AIRPORT • We completed a new Noise Exposure Map (NEM) using the new FAA computer program to outline noise impacts in the neighborhoods around the airport. To our surprise, the new program showed an expanded contour that could allow more than 200 homes into our Noise Insulation Program. The FAA has not yet ruled on the eligibility of those homes, but the documents have been submitted for their review. • Work on the renovation of the existing terminal is back on track. The framing is completed, the drywall is up and painted, and they are starting to install the grid ceiling. The opening date for this phase of the project is July IOtn • May was a month for preparation, training and drills. We are rewriting our Airport Security Program (ASP) and updating our Airport Certification Manual (ACM) in preparation for our annual FAA inspection in July. We participated in a local hurricane conference, and the state hurricane drill. And finally, all airport personnel attended a mandatory ethics training session. MARATHON AIRPORT • Airport Layout Plan (ALP) update for Florida Keys Marathon Airport is still being reviewed by the FAA. • Airport Certification Manual (ACM) revisions reflecting current conditions have been approved by the FAA and distributed appropriately. • Airport Emergency Plan (AEP) revisions reflecting current conditions have been approved by the FAA and distributed appropriately. • Air Operations Area (AOA) Non -Movement Area Training Program has been developed and is being implemented presently. • Initial and recurrent training classes associated and/or related to FAR Part 139 operations and certification are on -going. Recurrent training for this year has been completed as of May 2911 • Various leases regarding the use of existing hangars and the construction of additional hangars are being negotiated, prepared and/or revised. • Several construction and operations related projects continue to be in various stages of completion at the airport including: HMGP Wind Retrofit (Hurricane Shutter) Project; perimeter fence & gates installations; construction of generator building and electrical vault; terminal repair and renovation punch list items; HVAC system replacement; update of noise contours; Runway 7-25 Pavement Markings. 1 EMPLOYEE SERVICES I. WEBSITE UPDATES (other than normal position vacancy updates, etc.): Benefits: KPHA Provider Directory Updates EAP monthly bulletin Human Resources: Updated 8 job descriptions. II. TURNOVER NUMBERS TO DATE: May 2009 Turnover: 2.02% Turnover as of May 2009: 4.64% Turnover as of last May 2008: 7.68% Resignation s:0 Terminations:0 Retired: 0 Deceased:I Layoffs:2 III. MAJOR ACTIVITIES/MEETINGS: • Division Director attended FRMA Conference (business meeting as Membership Director). Human Resoures Risk Salary survey completed Sunshine meeting held with Goodman Gable Gould and Claims Solvers to discuss RFP's. Benefits (Group/Workers Comp) ■ Held annual Health Fairs in middle and upper keys ■ Held quarterly KPHA meeting ■ Sr. Admin. met with Southern Medical Group regarding handling of TB claims Safety Attended Shelter Board meeting. Marine Resources pump -out boat investigation. Met with Sheriff Peryam regarding Safety. BUDGET & FINANCE Budget Analysts: • Budget Transfers (Expenditure and Project transfers) • Completed Request to Purchase Process • Reports — Balance Sheet by Fund Daily to verify all funds are balanced. • Reports — Monthly Expenditure Status Report and Expenditure Audit Trail Report printed and forwarded to Lower Keys AARP, Big Pine AARP and Middle Keys AARP with an attached Memo outlining the available balance remaining for this fiscal year. • Inputted data from Budget Preparation Worksheet into Gov Max. Expenditure Detail report. • Resolution budget transfers monthly (Expenditure, Revenue and Project transfers) • Prep bills for Finance/Accts Payable • Prepared the Monthly Bank of America Purchasing Card bill for Finance (gathered signature approvals, travel exp reports, purchase receipts and completed daily purchase card reports from each card holder that has made a purchase in that month). • Updated Gov Max with workman comp codes that have changed. • Updated Budget Revenue Analysis Excel spreadsheets for Funds 404 — 502. • Put together the Fiscal Year 2010 Working Budget Book. • HSAB Meeting, input FY2010 appropriations in GovMax • Prepare resolutions, agenda, contract review and packet for May 2009 BOCC meeting. • Worked on the Budget Amendments for Fund 404 KW International Airport, Fund 403 Marathon Airport and creation of new Fund 406 Passenger Facility Charge. • Updated 2nd quarter revenue and expenditure report. • Handled the Sarasota County Agreement for Hosted Application Services. This Agreement will be on the June BOCC agenda for approval. • Created a new Capital Improvements Projects spreadsheet in time for the CIP meeting that was held on May 6th. This spreadsheet listed all the Capital Improvement Projects that are currently planned, how much has been spent to date and what projects will be schedule in the future. • Assisted in the SRF Loan application process. • Started to balance funds for the FY2010 budget. • Budget Transfers (Expenditure and Project transfers) • Reports — Reviews a Balance Sheet by Fund Daily to verify all funds are balanced. • Reports — Monthly Expenditure Status Report and Expenditure Audit Trail Report is printed and forwarded to Lower Keys AARP, Big Pine AARP and Middle Keys AARP with an attached Memo outlining the available balance remaining for this fiscal year. • Input data from Budget Preparation Worksheet into Gov Max. Expenditure Detail report is printed to reflect data. • Resolution budget transfers monthly (Expenditure, Revenue and Project transfers) • Prep bills for Finance/Accts Payable • Prepares the Monthly Bank of America Purchasing Card bill for Finance. (gathering signature approvals, travel exp reports, purchase receipts and completed daily purchase card reports from each card holder that has made a purchase in that month). • Updated Gov Max with workman comp codes that have changed. • Updated Budget Revenue Analysis Excel spreadsheets for Fund 503 • Completed final travel for Grant Administrator. • Reviewed Budget & Finance Contracts • Resolution data input and postings • Input each Resolution on the Schedule of Resolutions for the BOCC meeting for that month. • Researched item on agenda • Training on Sherriff Billing (911 Billings and Qtr. Billings) Purchasing Department: • Total purchase orders processed: 322 • Total orders placed for departments: 81 • Total orders entered for departments: 76 • Office Depot orders processed: 67 • Staples Orders processed: 4 • We opened 5 bids and processed another 9 which was above average from the previous months. Addendums entered 8, contracts reviewed 43, and bills paid 4, and voided 9 purchase orders. We also processed 824 pieces of mail which was a slight decrease from last month. Grants Department: • HSAB FY 2010 Grants: Completed HSAB grant cycle. Collected all funding applications and disseminated copies to HSAB members. Read/reviewed all HSAB applications; scheduled, held HSAB funding recommendation meeting; prepared meeting minutes and recommendations spreadsheet. • BOCC-direct grants to non -profits: prepared solicitation letter, collected requests; prepared funding request spreadsheet. • RSAT Grant: Completed application for FY 2010 RSAT grant, prepared agenda item. • Byrne JAG Grant: Coordinating County wide -process for new Byrne JAG grant monies. Assisted each municipality with funding application process. Prepared applications for Byrne grants. Organized meeting of the Substance Abuse Policy Advisory Board. • Reviewed, approved, processed invoices for all current HSO, HSAB, Byrne and RSAT grants. • Criminal Justice Mental Health Substance Abuse Planning Council Grant: Completed Final Financial Report. • Strategic Plan: continued to schedule/arrange/attend additional focus group and community meetings; inputted responses from Residential Survey and Business Survey; posted surveys on website; prepared minutes for SP meetings. • FEMA: Continued closeout work for Dennis and Ivan. Completed last PW for closeout of Dennis, secured an additional $147,000. Responding to ongoing follow-up questions and information requests from FEMA joint field office on various pending PWs. Continued communications with State and FEMA officials to obligate funds for County expenditures related to Ike and Fay. COMMUNITY SUPPORT SERVICES In -Home and Nutrition Services (IHNS) OAA, Older Americans Act Programs: Nutrition (Information in this section is for the period 4/21/09 — 5/20/09) • C-1 Congregate Meals totaled 1189 units this month, just slightly under the monthly goal of 1223 units. The majority of the seasonal clients have now left the area. We expect to make up the small shortfall in attendance with the reopening of the mealsite in Big Pine. • C-2 Home -Delivered Meals totaled 2526 units, underachieving by 329 units. We are actively seeking home delivered meal client referrals in the Middle and Upper Keys, which have been identified as underserved areas by the Alliance for Aging. In -Home Services (Information in this section is for the period 3/21/09 — 4/20/09) • III-B Screening and Assessment: 7.5 units this period, 37.83% year-to-date achieved, 4.49% overachieved. 57 clients on the waiting list. • III-B Homemaking: 73.5 units this period, 18% year-to-date achieved, 15.34% underachieved. 60 clients on the waiting list. • III-B Personal Care: 123 units this period, 42% year-to-date achieved, 8.66% overachieved. 27 clients on the waiting list. We have spent $31,599.73, which is 29% of III-B funds. We are 4.34% underachieved but are activating a high ranking client from the wait list, which should take care of the underachievement. • III-E Facility Respite: 147.5 units this period, 11.46% year-to-date achieved, 21.88% underachieved. We will need to recruit more clients for this program or increase the hours for existing clients. Non-OAA Programs: CCDA (Community Care for Disabled Adults) for April 2009: • Case Management: 16 units for the month were produced; 62.75 units year-to-date. • Homemaking: 129 units for the month were produced; 413.25 units year -to date. • Home -Delivered Meals: Monthly units were 180 meals; 820 meals year-to-date. • Personal Care: Monthly units were 13; 90.25 units year-to-date. Overall Program Achievement was 57.6%, 9.09% underachieved. CCE (Community Care for the Elderly) for the period 3/21/09 — 4/20/09: • Case Management: 101 units for the period and 809 units year-to-date. 49.10% achieved year-to-date. There are 86 clients on the waiting list. • Intake: 9 units achieved and 43 units year-to-date. 29.19% achieved year-to-date. • Homemaking: 630.75 units for the period and 6974.75 units year-to-date. 94.83% achieved year-to-date. There are 74 clients on the waiting list. • Personal Care: 420.75 units for the period and 3764.25 units year-to-date. 74% achieved year-to-date. There are 36 clients on the waiting list. • Respite: 195.75 units for the period and 712 units year-to-date. 45% achieved year to date. There are 10 clients on the waiting list. CCE overall year-to-date is at 75% achievement which is an 8.55% underachievement. However, we have received 7 new referrals and have added a CCDA client who aged out of that program. • ADI (Alzheimer's Disease Initiative) for the period 3/21/09 — 4/20/09: 100 units were produced in the period and 2355.5 units year to date. 94.76% year-to-date achieved, 11.41% overachieved, due to the $6155 reduction of funds from the Alliance for Aging. There are 9 clients on the wait list. • HCE (Home Care for the Elderly Program) for the period 4/16/09 - 5/15/09: 10.25 billable units this period, 171.25 billable units year-to-date. Current spending level year to date is at 64.28%, 14.68% underachieved. The wait list for HCE is controlled by the Alliance for Aging, which has allowed us to take on two new clients. Monroe County Transit (MCT) Department Activity for May 2009 • One-way trips provided: 1849 • Unduplicated clients served: 229 Special Needs Clients registered: 362 • Awarded the 5310 FDOT Grant for the funding of a new Paratransit bus and the 5316 FDOT Grant for funding the Mobile Data Terminals/software for the Trapeze Dispatching and Reservation System. The awards and agreements will be brought to the board in the fall BOCC meetings. Deposited Revenue: $2,317.90 Expenditures: $29,313.0 Percentage Spent Fiscal YTD: 61.6 % Community Support Services (CSS) / Compliance In the month of May 2009 we had: 26 New Welfare cases 319 Office visits 14 Home and field visits Incoming calls + referrals Combined total [1,887 ] We served 87 unduplicated Welfare client households (3) New EHEAP cases. Total $ 1,328.08 Low Income Home Energy Assistance Grant Program cases totaling $19,250.00 (75 -cases) Low Income Crisis Assistance cases totaling $ 6,240.78 (16 -cases) Spent in May $25,490.78 5 (87) cases peer reviewed by staff - including paupers, & scripts. • Staff members attend the Ethics Training at the Harvey Building. Bayshore Manor (BSM) Bayshore Manor's current census is 16 residents. The current census is five private pay and eleven subsidized. BSM provided 273 hours of OA3E respite care this month. Bayshore Manor has six OA3E clients. There are two clients on the wait list. Revenue for May 2009 $31, 815.79 Expenditures for the same period $54,097.48 Percentage of the budget spent year to date 60.25% LIBRARY • Library usage has continued to increase in several areas over that of a year ago, in spite of the reduction in hours and days of service: circulation totaled 34,979 items in April, an increase of 7% over last year's total for the same month. 366 new Library cards were issued in April100 more cards than were issued in April, 2008; we are now nearing a total of 40,000 cardholders, a significant portion of the total county population. • Library visitors totaled 41,465 for the month of April, an increase of 1% over last year. • Library use of the FY 2009 budget continues to proceed on a pace with the year as we go into the final third of the fiscal year; use of discretionary funds, such as those for supplies and materials, is being consistently monitored by Managers and Administration and needs are prioritized on an ongoing basis. • The State Aid to Libraries Grant was nearly eliminated from the state budget by last-minute moves on the part of the State Legislature, but reaction from Library supporters around the State (including a great show of support from Monroe County Library advocates) helped to sway their decision, and the funding, although reduced from the original figure, was restored. We anticipate a reduction of around $ 10,000 from this year's award of $ 75,000. EXTENSION SERVICES • Number of services provided: 390 phone calls, 33 office visits, 29 visits to clients, 13 group teachings with 1,154 people in attendance, 6 media submissions, and 366 bulletins distributed. Total Budget for FY 08/09: $186,485.00; Year to Date Expenditures and Encumbrances: $151,646.67; Remaining Balance: $34,838.33; Percentage of budget spent and/or encumbered year to date: 81%. • The Extension Director joined the Florida Sea Grant Climate Change workgroup and participated in a conference call to initiate an education plan for the state, and agreed to develop literature on solar energy options as an alternative energy source for homeowners and businesses; participated in a one -hour webinar on Federal Solar Tax Incentive conducted by the Interstate Renewable Energy Council; assisted four students from an FKCC Speech Class with their project on the potential of solar energy to reduce greenhouse gases and our dependence on fossil fuels; had a meeting with MC Public Works to discuss the potential for using solar electric and hot water systems to reduce operational costs at Higgs Beach. • The Environmental Horticulture Agent and 18 Master Gardeners educated 500 homeowners in their tree selection at the Keys Energy Services Tree Giveaway Day held at two locations (Key West and Cudjoe Key). They also educated the homeowners on Florida Keys Friendly - Landscaping practices. ro • The Family, Youth & Community Sciences Agent beta tested a Municipal Clean Energy Toolkit for ICLEI that included guidance on how municipalities can finance, purchase, install, and promote clean energy. The Toolkit contained material for any knowledge level — from municipal clean energy expert to beginner. Additionally, this product has a checklist that outlines thirteen broad steps that a municipality should undertake during its clean energy process. GROWTH MANAGEMENT GMD COMPARATIVE REVENUE SUMMARY Revenue Total Total Revenue Revenue Revenue % Variance Budget Revenue Revenue Ending Ending Ending Revenue FY 2009 Collected in Collected May 2009 May 2008 May 2007 Ending May FY 2008 in FY 2007 2008 To May 2009 Building $2,790,632 $2,857,684 $2,769,314 $1,751,579 $2,036,475* $2,101,175 -14% Permit Licenses & Permits Planning $430,000 $488,081 $532,000 $403,231 $461,580 $438,417 -13% Department Fees Code $90,000 $110,412 $97,940 $210,705 $76,228 $66,808 +76% Enforcement Fines & Forfeits *Note: '08 was a Contractor License renewal year, which generated an additional $129k. • These are the primary, customer driven revenues and do not include the revenues obtained by taxes etc. EXPENSES Budget Total Total 2009 2008 2007 % FY'09 Expenses Expenses Expenses Expenses Expenses Variance FY 2008 FY 2007 Ending May Ending Ending Expenses May May Ending May 2008 To May VA 2009 Growth M mt. Admin. $916,526 $648,098 $1,637,473 $270,988 $526,336 692,439 -51% Building $2,434,746 $2,311,238 $2,299,758 $1,350,206 $1,384,539 $1,296,856 -2% Code Enforcement $1,009,885 $894,006 $1,021,256 $598,596 $530,371 $678,732 +13% Planning $1,149,516 $878,366 $1,333,008 $519,870 $551,587 $863,900 -10% Environmental Resources $299,302 $330,016 $313,488 $94,978 $204,284 $192,506 -54% Planning Commission $100,541 $88,345 $86,226 $52,601 $54,361 $51,069 -3% Comprehensive Plan $358,400 $74,655 $290,478 $7,843 $41,659 $96,547 -81% Geographic Info. GIS $314,133 $181,935 $310,576 $94,978 $96,086 $155,367 -1% Marine Resources $55,051 $84,753 $235,623 1 $34,207 $56,546 1 $135,937 -40% Pump Out Boat $68,587 $64,640 $48,275 1 $43,261 $36,813 1 $33,220 +18% MARINE RESOURCES OFFICE • Handled approximately 30 customer inquiries; performed 4 site visits • Performed surveys of channel marking/regulatory systems in the lower keys • Removed 2 derelict vessels • Installed new buoys at the Whale Harbor Channel regulatory zone • Provided a response to an internal audit of the derelict vessel program procedures • Evaluated navigational problems in canal system at Calusa Campground • Attended Ethics Training class • Prepared agenda for June MPAC meeting • Performed survey of Village of Islamorada regulatory buoy system • Completed annual evaluation for Pumpout Captain • Assisted the Pilot House Marina with information for installing a pumpout system • Took resolution to Board regarding unpermitted moorings throughout the Keys • Coordinated with Engineering on bid request for rebuilding boat ramp at Sunset Pt Park • Performed survey at Tarpon Creek for mangrove trimming • Held meeting with new Safety Officer to initiate new safety procedures for pumpout boat • Worked with WWF Team to finalize documentation for WWF comp plan amendment • Performed 20 hour service on new boat engine • Coordinated efforts with Village of Islamorada to replace missing regulatory buoys Vessel Pumpout Program Functions: • Pumped out 65 boats • Assisted emergency crews after a marina fire in the upper keys CODE ENFORCEMENT DEPARTMENT Number of New Cases Opened 284 Number of Inspections completed 1561 Number of Cases Heard before Special Magistrate- 105 Fines Collected $ 131,477.18 After the Fact Fees Collected Number of Contractor Citations Issued Number of Contractor Citations Heard Contractor Citations Paid 12,060.00 34 $ 1,500.00 Flood insurance Inspection Fees Collected $ 2,170.00 Totals Collected $ 147, 207.18 PLANNING & ENVIRONMENTAL RESOURCES Environmental Resources Code Enforcement Referral 20 Permit Application Site Visit 92 Other Pentamation Templates 1 Permit Condition Templates 1 Permit Application Review/Assessment 115 GIS Habitat Review 3 Code Book Corrections 1 Assorted Pre Application 2 Code Enforcement Hearing 2 Special Projects/Outdoor Resorts Wastewater 2 CURRENT PLANNING CATEGORY Appeal to Planning Commission Completed 2 Appeal to Planning Commission in Progress 2 Alcoholic Beverage Complete 1 Appeal to DOAH in Progress 1 Alcoholic Beverage Applied I Alcoholic Beverage Completed 1 Alcoholic Beverage in Progress I Code Enforcement Referral (estimated at 1 per week per Current Planner (4) 16 Conditional Use, Major in progress 6 Conditional Use, Minor, Applied 2 Conditional Use, Minor in progress 6 Conditional Use, TDR in progress 2 Conditional Use Time Extension, Applied 2 Conditional Use Time Extension in Progress 2 Development Agreement in progress 1 Home Occupational Permits applied 2 Home Occupational Permits issued 1 Home Occupational Permits in progress 3 Public Assembly Permits Applied 1 Public Assembly Permits Issued 1 Road Abandonment in progress 5 Setback Waiver, Administrative, applied 1 Setback Waiver in Progress 2 Variance, Administrative Applied 1 Variance, Administrative in progress 3 Variance, Administrative Issued 1 Variance, Planning Commission in progress 2 Permits Reviewed & Processed 171 Vacation Rental applied 5 Vacation Rental issued 2 Vacation Rental Mgr. License applied 3 Vacation Rental Mgr. License issued 1 D] ROGO related applications ROGO Exemptions Applied 7 ROGO Exemptions Issued 14 Meetings Pre -Application Conference 4 Written Correspondence Letters of Understanding 3 Administrative Meetings Development Review Committee/Agenda Items 1/1 Customer Service In -person inquiries estimated at 5 per day per planner (2) 300 Telephone inquiries estimated at 10 per planner (7) per day 2100 Email inquiries estimated at 5 per planner (7) per day 300 Pre -Application Conferences 1 Letters of Understanding 3 Historic Preservation Committee Application I COMPREHENSIVE PLANNING CATEGORY LUD Map Amendment, BOCC Adoption Hearing Packet Completed 1 Tier Map Amendment Applied 1 FLUM Map Amendment, Applied 1 FLUM Amendment BOCC Adoption Hearing Packet Completed 3 Comp Plan Text Amendment, Applied 3 Comp Plan Text Amendment, DRC Meeting, Completed 2 OTHER ITEMS Sign Code Public Meetings 3 Affordable Housing Advisory Committee Meeting 1 Florida Scenic Highway Meeting 1 Application review costs for Tier Amendment 1 Edited CIE Policy 1 Wrote ORC Response 3 Edited plat paperwork 1 DRC - presented new policies 3 Recommendation for potential fence in BPK 1 Wrote BOCC Adoption Packets 6 Wrote Ads for BOCC Adoption Hearing 6 Wrote difference between May I and May 9 rule versions I Wrote and edited Ordinances 6 Wrote recommendation transient uses in Tier 1 BPK 1 Wrote Excel "How to" manual 1 Wrote opinion for FLUM/LUD timelines 1 Assisted Planners with projects 5 Meetings Sign Ordinance Amendment staff meetings 2 Lower Keys LCP staff meeting 1 Scenic Highway meeting 1 DRC Meetings 1 PC Meetings 2 10 Staff Meeting with GMD 2 CBRS/No Name Key 1 FKAA meeting re Water/sewer LOS 1 Customer Service meeting 1 Working Waterfront meeting Other Meetings on various planning related topics 12 Review of project management software 1 Response to DCA ORC Report 1 Trained Staff on Excel 5 Ad creation 1 Assist staff with project 1 Edited major documents 7 Created permit count subtotal report for GMD 1 Rockland Industrial Park, re -plat; found surveyor 1 FDOT JPA Amendment 1 Research Tasks 9 Research mailing list for LCP 1 Research LOS for wastewater 1 Research Roads & Utilities via Engineering Dept. 1 Research CIP DOAH Process 1 Research Boundary Map question for public 1 Research Brownsfield Resolution for public 1 Customer Service Impromptu meetings (staff) 23 Phone calls (Estimated 20 calls, 10 min.each) 200 minutes Email correspondence, sent 76 Email correspondence, received 126 ENVIRONMENTAL RESOURCES PERFORMANCE REVIEW CATEGORY: Site Visits Administrative Relief/Beneficial Use Apps 1 Code Enforcement Referral 15 Land Authority Referral 1 Permit Application Site Visit 130 Wetland Delineation 1 Pre App Conference 1 OTHER: Habitat Aerials 26 Turtle Stranding 3 Site Visits [Miscellaneous] 49 WRITTEN CORRESPONDENCE/ BIOLOGICAL ASSESSMENTS Administrative Relief Beneficial Use 2 Code Enforcement Assessment Memo 6 GIS Map (assorted) 49 GOCEA Recording 4 Interagency Coordination (DEP, ACOE, FKEC, 11 FL Park Serv., FWC) 30 Land Authority Assessment 1 OTHER: Pentamation Templates 1 Permit condition Templates 1 Permit Application Review/Assessment 162 Gis Habitat Review [Hours] 19 hrs. MEETINGS DRC 1 Pre -Application — Assorted 2 Special Projects 2 Ethics Training 3 Phone Calls (estimated) 450 Front Counter Walk-in (estimated) 200 Electronic Logging of Files (ELF) 1 BUILDING DEPARTMENT NUMBER OF PERMITS 05/01/09-05/30/09 APPS SUBMITTED 403 PERMITS ISSUED 354 WALK THRU 136 CERT OF OCCUPANCY 14 INSPECTIONS TOTAL 1903 AVERAGE PER DAY (21 days) 91 PER DISCIPLINE BUILDING/ROOFING 1052 ELECTRICAL 297 PLUMBING 241 MECHANICAL(A/C) 93 GAS 12 PLANS REVIEWS TOTAL 3109 AVERAGE PER DAY 155 PER DISCIPLINE ABO 290 BIO 110 BIO PEND 2 C.O. 0 CODE ENF 2 10 CODE ENF 3 10 COORD 118 ELECT 70 ENG 1 12 EXAM 175 FEMA 1 FILE 5 FIRE 14 FLOOD 58 MAR-BLDG 461 MECH 21 OFFICIAL 0 P.K.BUILDING 7 PENDING 15 PLAN 59 PLUMB 49 READY 2 ROGO 3 ROOF 12 S.I. BUILDING 114 TRACK 3 UK-ABO 195 UK-BIO 93 UK-BLDG 314 UK -CODE 18 UK-COORD 336 UK -ELECT 51 UK-ENG 1 UK -EXAM 162 UK -FILE 10 UK -FIRE 43 UK -PENDING 26 UK-MECH 35 UK -PLAN 124 UK -PLUMB 37 UK -ROOF 11 UK -READY 8 UK-ROGO 0 UK -TRACK 20 ADDITION -COMMERCIAL Average 5 AIR CONDITIONING Average 5 AIR CONDITIONING -WALK THRU Average 0 ALARMS -COMMERCIAL (BURGLAR/FIR Average 22 13 ALARMS -RESIDENTIAL (BURGLAR/FI Average BOAT DAVITS Average BUILDING MISC WALK-THRU Average BUILDING MISCELLANEOUS Average CARPORT Average CHICKEE HUT Average CISTERN Average COMMERCIAL MISC Average CONCRETE SLAB Average DECK Average DEMO Average DEMO-FEMA COMPLIANCE Average DOCK Average DOCK/SEAWALL REPAIR Average ELECTRIC MISC Average ELECTRIC MISC WALK THRU Average ENCLOSURE - OTHER Average EXCAVATION Average EXTERIOR CONCRETE REPAIRS Average EXTERIOR RENOVATIONS Average FEMA INSP COMPLIANCE PROGRAM Average FEMA INSP PRIVATE INSPECTOR Average FEMA INSP SALE COUNTY INSPECTO Average FENCE/RETAIN WALLS -WALK THRU Average FENCE/RETAINING WALLS Average FILL Average FIRE PROTECTION SYSTEM Average GARAGE/ENCLOSED CARPORT Average GAS TANKS - ABOVE GROUND Average INTERIOR RENOVATIONS Average LAND CLEAR/EXOTICS WALK-THRU Average LAND CLEARING Average 2 32 1 19 0 49 14 46 24 23 6 35 45 23 22 0 32 2 11 37 0 0 0 0 11 1 49 20 24 30 0 38 14 LANDSCAPE MISC Average 0 LAWN SPRINKLER SYSTEM Average 4 MH REPLACED WITH SFR Average 61 PAINTING Average 14 PAVING Average 21 PILINGS Average 1 PLUMBING - MISCELLANEOUS Average 13 PLUMBING - SEWER TIE-IN Average 2 PLUMBING - SEWER TIE-IN WALK-T Average 0 POOL & SPA Average 43 PORCH -SCREEN Average 61 POST CARD A/C PERMIT Average 0 REMODELING - RESIDENTIAL Average 23 ROOFING -COMMERCIAL Average 26 ROOFING -RESIDENTIAL Average 8 SEWAGE TREAT PLANT - COMMERCIAL Average 63 SHED Average 37 SHUTTERS Average 10 SHUTTERS WALK-THRU Average 0 SIGNS Average 47 STAIRS Average 0 STUCCO Average 22 TRAILER - TEMPORARY Average 7 WINDOW REPLACEMENT Average 23 EMERGENCY SERVICES Fire Rescue • Attended Monroe County Fire Chiefs meeting. • Participated in a panel discussion on hurricane preparedness for the Monroe County tourism industry and participated in the Statewide Hurricane Exercise. • Attended mandatory ethics training. • Reviewed and qualified FF/EMT/Paramedic applications for the selection of 60 who will be tested and scored at the Joe London Training Academy to fill two current vacant firefighter positions. The results will be maintained and used to fill subsequent vacancies. 15 • The Apparatus and Equipment Committee reviewed bids for a 3000 gallon Tanker with 1500 GPM Pump and submitted their recommendation to contract with Ferrara Fire Apparatus to purchase this fire apparatus. An agenda item was prepared to award the bid and contract and will be placed as an item on the June BOCC meeting. Training • Paramedics and EMTs completed online training for Rescue Awareness and Operations. • 1st Responder class started with 16 students in attendance. • Scheduled an EVOC (Emergency Vehicle Operators Course) for June • The State inspected the Fire Academy and identified a couple areas of concrete spalling that needed to be repaired. Repairs have been completed and the facility is scheduled for reinspection in early June Fire Marshal • Reviewed numerous commercial plans for adherence to building and fire codes. • Worked with the Building Dept on developing a new electronic permitting process. • Met with FKAA regarding hydrant/water supply improvements in conjunction with wastewater installation. • Investigated eight structure fires, including one fatality, and one arson which will be investigated in conjunction with the State Fire Marshal. Emergency Management • Planned, coordinated and participated in the 2009 Statewide Hurricane Exercise. This involved coordination between the County EM and all entities working with EM in response to emergency events. • Worked with Department of Health and the State Division of Emergency Management regarding the H1N1 (Swine Flu) protective measures implementation if such cases were to occur in Monroe County. • Participated in the Turkey Point Nuclear Power Plant Hostile Action Based tabletop exercise. • Met with Regional EM staff and vendors to discuss a formulation of ESF 18 (Emergency Support Function) Business Planning to be part of the EOC response team. • Participated in Emergency Preparedness presentation to the Monroe County Chambers of Commerce and the Lodging Association. • Reviewed and analyzed current shelter facilities data and met with the Monroe County School Board to inspect possible new sheltering areas. 16 Trauma Star • Community Education o Trauma Star Flight crew participated in on -site training for the Prom Promise exercise at Key West High School. o Trauma Star members coordinated with Emergency Management in the preparation of Hurricane shelter cots. • Continuing education for flight crew to maintain highest level of patient care. o Flight team members attended the Florida Safety Summit. • Critical Care Patient Care Delivery: o 16 patients were transported in March. (12 Hospital to Hospital, 1 Stroke Alert from scene, 3 Trauma Alerts) There were 13 additional stand-by transports Upper Keys Health Care District Attended mandatory ethics training. PUBLIC WORKS • Pollution Control removed 23.73 tons of debris from the county rights of way and also collected 9.37 tons for other departments (6,500 lbs from the Key West Garage; 3,560 lbs from the Marathon Garage; and 8,680 lbs of exotics for the Land Authority) • Clean Harbor performed the yearly clean -out of our Hazardous Waste sheds and E-Scrap performed our yearly pick-up of electronic recycling • Completed renovations for Clerk's office at the PK Court House and replaced a/c compressor with one salvaged from the Social Services building • Installed conduit for Technical Services at Court Room B • Final inspections completed for Ellis remodel, Social Services demolition and Clerk's office re -model • Obtained Jersey barricades from FDOT contractor for use of the County Land Authority and County right-of-way issues • Made two signs for the Nelson GC • Transported a truck load of rock to Marathon for the MCSO • Excavated, formed and poured concrete walkway at the Nelson GC • Blocked access to State property at Summerland Road, Key Largo • Installed trench drain at Reef Road for the Key Largo Fire Department • Transported Special Needs Cot Trailer to Marathon and back to PK • Construction of the PK Court House parking lot is in progress • Completed conceptual designs for new projects at Higgs Beach • Completed cost estimates associated with proposed Higgs Beach Projects • Attended DAC1 meeting with "Friends of Higgs Beach" and to obtain special beach funding for projects • Compiled drawing and procured permit from the City of KW to repair exterior wall at the Records Storage Facility • Compiled drawing and procured permit from the City of KW for emergency repairs to the seawall at Higgs Beach • Finalized contract for delivery of Bio-Diesel Fuel 17 • Finalized generator contract renewal, in order to assure the County has standby assistance should we experience a hurricane or other emergency and have to exercise our (60 plus) generators requiring, fuel, maintenance, repairs, etc. • Facilities Maintenance staff, and a team of inmate trustees completed painting, and refurbishment of the County's Key West Fuel tanks, and equipment ENGINEERING • Request for Qualifications for Ongoing Engineering Services - staff prepared a Request for Qualifications (RFQ) for professional engineering services under a continuing services contract and submitted it to County Attorney for review; request to advertise for responses is on the June 2009 BOCC agenda. • Palm Drive Bridge — construction drawings, project manual, LAP construction checklist, LAP right of way certification and LAP Agreement submitted to DOT for review and approval on April 9, 2009. Staff working with design engineer to address DOT comments. Project will be funded with Stimulus money. • Geiger Creek Bridge — draft Design/Build Request for Proposals, LAP construction checklist, LAP right of way certification and LAP agreement submitted to DOT for review on April 20, 2009; waiting for DOT comments. Staff submitted Request for Qualifications for Construction Engineering and Inspection Services for bridge repair project to County Attorney and FDOT for review; project will receive $625,489 stimulus funding. • Sunset Point Park Boat Ramp — bids opened on May 12, 2009, with eight bids received. Staff is preparing contract and agenda item for June 2009 BOCC agenda. The contract amount will be $49,800; the project will be funded with a grant from Fish and Wildlife Commission and Boating Improvement (County) Funds. • Big Coppitt Sewer Project - staff overseeing FKAA construction on three contracts for collection system installation to insure compliance with County procedures, including site inspection, attending construction progress meetings on all contracts, responding to requests for information from contractors and FKAA and investigating resident complaints and questions. Three of the four transmission/collection system contracts are close to completion (pending final documents submittal). • Key Largo Sewer Project — staff performing oversight on four Key Largo sewer construction projects, including overseeing KL contractors to confirm compliance with Monroe County requirements, attending construction progress meetings as needed. Staff has notified KLWTD that contractors are not properly repairing and replacing street signs in contract area, and they are not installing temporary signs during work in accordance with requirements. • South Florida Water Management District Grant 2009 — staff submitted first reimbursement request in the amount of $139,974 for grant money for various projects included in stormwater grant. • Tropical Storm Fay / Hurricane Ike — staff assisting grant management with preparation and review of FEMA project worksheets for various projects. • 2005 Hurricanes - staff working with OMB to assist in closing out project worksheets from 2005 season. 18 • Duck Key Bridges — staff requested revised proposal from Kisinger Campo for repair design for the Tom's Harbor Channel bridge, connecting US 1 to Duck Key; revised proposal received; waiting to determine whether Surface Transportation Reauthorization Bill will fund design and repairs. • Duck Key Security Cameras — staff met with Duck Key Security District group on May 5, 2009 to discuss. The District would like to pursue a security system that is separate from the Hawks Cay resort due to continual change at resort. County staff will research options. • Duck Key Pedestrian Bridges — staff attended status meeting with Duck Key residents on May 5, 2009 to discuss pedestrian bridges. Duck Key would like two options for pedestrian bridges (county has provided one). County staff will research issues such as vegetation trimming, power pole locations, etc. that will impact bridge installation. • Boca Chica Road Study — second appeal was sent to State Department of Emergency Management on October 3, 2008; additional information has been provided to DEM staff to facilitate review and approval of appeal; staff met with DEM personnel in April to discuss status; appeal is being reviewed by FEMA Region IV. • Pigeon Key Ferry Service —staff managing on -going contract, including processing monthly invoices from ferry contractor and preparing reimbursement requests to DOT for payment though Joint Participation Agreement for ferry service funding; amendment to extend service through December 2009 was approved at the May 2009 BOCC meeting. • DOT Traffic Signal/Street Light Maintenance Agreements - staff met with representatives from DOT Traffic Operations in Miami on May 21, 2009 to clarify issues related to the maintenance agreements between the County and DOT. Staff sent updated Exhibit A for the Traffic Signal Maintenance Agreement to DOT for 2009-2010 reimbursement. • Key Largo Overseas Heritage Trail/Bicycle Path - staff participated in a conference call regarding constructing a shared use path on the oceanside of US 1 in Key Largo; staff is researching planning, construction and funding issues. • Cudj oe Gardens Roads - staff met with representatives of Cudj oe Gardens to discuss feasibility of turning private roads over to the County; staff is working with County Attorney and homeowners to determine ownership and legal issues involved in transfer. • Emergency Fire Signals — Upper Keys — sent request to DOT to evaluate Upper Keys fire signals that are not working to determine whether equipment upgrade is warranted. DOT plans to fix two Key Largo signals under its push button contract for signalization. • County Street Light Survey — staff reviewing Keys Energy Services and Florida Keys Electric Coop records of County funded and maintained street lights for accuracy; requires review of lists, site plans, site visits and meetings with utilities to compile information; staff received updated information from FKEC for Upper Keys and is reviewing; site visits with FKEC staff were conducted in January. 19 • FDOT Sign Permit Request - staff submitted a sign permit request to DOT for the driveway connection for the Medical Examiners Building at the request of the Overseas Heritage Trail Coordinator. • Engineering Services Ongoing Work - • Staff reviewed 10 right of way applications, issued 7 right of way (ROW) permits, inspected 4 permits for work completion, and forwarded 2 violations to Code Enforcement. • Resolved requests from residents and Sheriffs Office regarding Big Pine key traffic signal; DOT is performing traffic survey to determine whether light reprogramming is necessary. • Staff coordinated investigation of ROW complaints /violations from residents and other County departments. • Staff handled various citizen inquiries regarding wastewater assessment payoff inquiries, drainage and flooding complaints, miscellaneous sewer and road inquiries, requests for street light installations, and traffic signals. PROJECT MANAGEMENT • ADA Compliance Survey and Assessment — final report reviewed and approved; Florida Keys Council for People with Disabilities were updated on the status of Assessment Reports on May 21, 2009. Copies of the Evaluation Assessments reports have been placed in the Key West Library, Marathon Library and Key Largo Library for public review and comments; alternative report format for the visually impaired is also available for public review. • ADA Compliance Transition Plan Request for Qualifications — opening date scheduled for June 9, 2009; Public Notice for RFQ Committee Selection Meeting scheduled for advertising on June 12-14, 2009, with the Committee Selection Meeting scheduled for June 29, 2009. • TDC Fund Grant Applications — prepared and submitted grant applications for funding for construction of emergency fire stairs and repair of interior access stairs for East Martello, and for demolition and replacement of existing perimeter fencing for West Martello. • Emergency Operations Center — Marathon — request for State sub -grant HB-7121 funding extension was received May 14, 2009; Modification #2 for extensions of grant funds for both HMGP and HB-7121 were approved at the May BOCC meeting. Review of schematics meeting held with A/E on May 21, 2009, with schematic design phase at 90% completion. • Big Pine Key Fire Station — project is 75% complete and substantial completion date is scheduled for mid July 2009. HVAC ductwork installation, electrical and plumbing rough -in, communications system rough -in, and concrete slabs for bay entrance and apron are 100% complete. Curbing, windows and storefront, and roofing at 90% complete, with drywall at 95% complete. Keys Energy pole installation work is scheduled for the 1 st week in June. • Sunset Point Boat Ramp — bid opening was held on May 22, 2009; staff recommendation for award of contract is on the June BOCC agenda for approval. • Architect/Engineer Small Project Annual Contract — draft for professional services RFQ for Architect is in process. 20 • Plantation Key Fueling Facility — contractor and permitting agencies coordination for permits is in process; architect and county staff negotiating with Village over additional landscape and fire protection requirements; final plans may be revised pending outcome of negotiations. Pre -construction meeting originally scheduled for May 7th has been postponed, also pending outcome of negotiations. • Medical Examiner's Facility Litigation — at the mediation conference held on May 13, 2009, a settlement agreement was reached, which was approved at the May BOCC meeting; final payments and releases are being developed, with project closeout expected in June 2009. • Medical Examiner's Facility Wetlands Mitigation — no change in the regulatory aspects of permit compliance; ACOE compliance deadline is May 2010. • Freeman Justice Center — Tower Group negotiation meeting is scheduled for June 5, 2009, with litigation research and coordination with County Attorney's office and outside counsel ongoing for Tower v. Monroe County and Gonzalez v. Monroe County. • Conch Key Fire Station — final construction plan package was received April 14, 2009, with staff researching possible ARRA-SCG funding available for construction. • Marathon Courthouse Renovations — design development in process; front end documents (division 1) are in process. • Stock Island Fire Station — meeting held with private investors/contractors to discuss an un-solicited proposal for a Stock Island Fire Station; private group to prepare a formal proposal to the County for consideration. • Public Works Rockland — bid and construction phases on hold. • Jefferson B. Browne Building — on hold. • Old Tavernier School Town Meeting Hall — on hold. TECHNICAL SERVICES We completed 136 work orders for the month of May, we performed a mock setup for the EOC in preparation for hurricane season, relocated computers for Public Works to Gato and provided network access to Gato tenants, continued our evaluation of Windows 7, finished the Boards and Committees section of the Website, installed a new wireless link to the Airport (MCSO) and completed the Metro Ethernet project. VETERANS AFFAIRS Clients Assisted: 1876 New Clients Assisted: 4 Field Visits: 7 Benefits Delivery at Discharged: 9 Van Clients Transported: 168 (to the VAMC, Miami as well as other Miami area hospitals, without incident) 21 The Veterans Affairs Department: The financial data for the month of May $246,698.00 indicates the amount of new revenue brought into Monroe County derived from claims for the entire department, including Key Largo and Marathon. The financial data captured monthly will vary due to the Veterans Administration variable time frame on adjudication of awards, as well as the amount awarded. PA