05th Change Order 06/09/2023 BOARD OF COUNTY COMMISSIONERS County of Monroe � � .� Mayor Craig Cates,District 1 The Florida Keys Mayor Pro Tem Holly Merrill Raschein,District 5 Michelle Coldiron,District 2 James K.Scholl,District 3 David Rice,District 4 Memorandum DATE: 6/08/2023 TO: BOCC Kevin G. Digitally signed by Kevin G.Wilson,P.E. FROM: Kevin G. Wilson, P.E. Wilson, P.E. Date:202.06.08 13:125SUBJECT: Proposed Change Order to be Approved Attached is proposed Change Order#5 for the Public Defender 16th Judicial Circuit - Key West Offices project. This change order increases the final contract sum by$27,000.00. The substantial completion date is unchanged. Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the Administrator to approve change orders within specified limits after providing Board of County Commissioners with at least 24 hours to review them and pose any questions or objections that they may have. It is the Administrator's intent to approve the attached change order under that authority on Friday, June 9, 2023. MoNwE Corr NTY/ENGINEERING/ PRO, EcT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Public Defender 16th Judicial Circuit—Key West Offices CHANGE ORDER NO: 05 INITIATION DATE: 0512412023 CONTRACT DATE: 10/19/2022 TO CONTRACTOR: D. L. Porter Constructors, /tic, 6574 Palmer Park Circle Sarasota, FL 34238 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price)... ................................ $2,936,539.00 Net change by previously authorized Change Orders. ---............ ............. $ (23,741.59) The (Contract Sum (Guaranteed Maximum Price) prior to this Change order was......, $2,91:2,797.41 The(Contract Sum) (Guaranteed Maximum Price)will be (increased) (decreased) (unchanged) by this Change Order................... $ 27,000�.0!0 The new(Contract Sum)_(Guaranteed Maximum Price) including this Change Order is. $2,939,797.41 The Contract Time will be (increased) (decreased) (gDLhanqed) by...--................- 0 days The date of Substantial Completion as of the date of this Change Order is ............. 08/20/2023 Detailed description of change order and justification: Due to cost of materials discrepancies, a change in roofing manufacturer(from Tromco to Fibertite) was negotiated and agreed-upon between Monroe County and the Contractor(DL Porter Constructors). The selected Fibertite roofing systern matches what we have been installing of/ate on County projects. The additional cost increase of$54,000is being split 50150 between the County and DL Porter. Change order is 0.92% of oLigLjnal,contract price. Not valid until signed by Owner,Architect fif-applicable), and Contractor . 'Wf'�4�' ARCHITECT: DaM Salay 6/61,23 Bender&Associates Date CONTRACTOR: ............ D.L. Porter Date Digitally signed by Cary Knight DEPARTMENT DIRECTOR: Cary Knight Date:2023.06.08 09:01:07-04'00' Cary Knight Date Project Management Digitally signed by Kevin G.Wilson, Kevin G. Wilson, P.E. P.E. COUNTY/ASSISTANT ADMINISTRATOR: Date:2023.06.10 17:07:41-04'00' Roman Gastesi Date Kevin Wilson Change Order Attachment per Ordinance No. 024-2015 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: A Tremco roofing system was designed for this project, however the SubContractor made a very large mistake in bidding to DL Porter. After numerous discussions, the best solution was to move to a reduced cost solution (Fibertite), with the same warranties and dependability of the Tremco solution that was designed. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: 0 LJ LPI O rq cz U z 00 C C U M O O O O L v L N cC 'CS O O w Z > O a O v "CS iC .O a d z �z u N N v w w cc '' U U cc c� p 3 o O � � m io cn cC Z O + v oLu � U w w v a w a t9 Lu o H O <= Q � u0- Z4A ° o O y U S C U O U 'LS > 0 cs c °o 0 In aluo o o Al�''1 10 aj v o v a ° c m O m y o o + U o o Cf O O C O v�i cn P� �U •ty 0.i y. w w o c Q OC v O U ° v _ on OC E v o w n o o Q Qj OC a m Y aj -- Y m aj Y c o f � x aj � Z q U w Z Lu w F— 6i 'C '^ 'y O y ° W I w s NVR NEXT CENTURY ROOFING Single Pl'y-TPO-ComnieTcld-Qualty Uceg,s�C C CC 1331FB-1, May 16,2023 D.L. Porter Constructors, Inc. 6574 Palmer Park Circle Sarasota,F1 34238 Attn: D.Janies Frederick 9,41-929-9400 Public Defenders Office—Key West Proposal For Buildings 1,2&5 we shall provide and install V2""Securock"over wood decks and a 50 mil Fibertite XT mechanically attached NOA 20-1414.07 p 10 roof system applied to meet code and Fib,ertite's warranty requirements. All drip edge flashing to meet manufacturer's requirements and stainless-steel cap flashing has been included per your request. Flashing of skylights(installed by others)has been included for building 5. This roof system comes with a 20+10 NDL Warranty. For Building 3 we shall cut openings in 5-v panels for new skylights, install curb flashing,address panels per plan notes and apply a coating system over existing single ply in place.The warranty for this building's roof is limited to I year as the products addressed exist and are not the type or in a condition to provide otherwise. For Building 4 price assumes existing gravel, modified roof system, all(lashings and drip edge has been removed,therefore we shall provide and install a 50 mil Fibertite Fleece Back fully adhered NOA 20-0414.11 p62 roof system over existing concrete deck,installing the appropriate wall flashing,counter flashing, and drip edge. This roof system comes with a 20+10 NDL Warranty, General Conditions: We shall provide our own equipment, including cranes,to stage(on-site)and set products on the various roofs. All excess debris shall be removed daily and placed in the GC's durnpster on site.NCR will assist the GC in acquiring its permits to perform this work(permit fee is not included in our pricing). Pricing assumes all roofs,particularly the wood roof conditions,have been Corrected,properly cleaned and each has adequate slope to meet code mininurnis and meets the standards of the Fibertite system. The cost for the above scope is: $146,296.63 Exclusions: 1) Furnish&install skylights 2)Copper gutters and downspouts(BTW Copper is discouraged as Fibertite does not allow copper flashings, to be used) 3)Cutting of openings for skylights over wood deck 4)insulation of any type Roof Plan Legend i !Description Wand deck areas iConcrece deck areas 5-V Crimp deck areas Coating over existing single ply Respectfully, Next Century Roofing Donna Warren 305-491-1922 Rickey Warren 395-200-9994 lI14@11 �c nt ucyreufll we aln Igor Royzman Project Engineer Tel 954 554-4231 E-mail: izyaroyzmangrnail.com