Loading...
HomeMy WebLinkAbout1st Change Order 07/07/2023 NROE CO[Its"CY/ GINTER3NG/Egg Ot NAGr-m"x" CONTRACT CHANGE ORDER PROJECT TITLE: Aircraft Overflow Apron and Mitigation CHANGE ORDER NO: 1 Client Project Number: 404-630224(G2E62) INITIATION DATE: 06/27/2023 TO CONTRACTOR: Charley Toppino&Sons CONTRACT DATE: 02/16/2022 The Contract is changed as follows.- The original Contract Sum ..................................................„.,,.. ...,,...,..,....,......... .,$ 5,416,177.15 Net change by previously authorized Change Order ........................................... .........$ 0.00 The Contract Sum prior to this Change order was....... ......... . ....... o,..,,.., $ 5,416,177.15 The Contract Sum is (increased) by this Change Order $ 74,995.00 The Revised 1 Contract Sum including this Change Order .. ......_............. $ 5,491,172.15 The asphalt pavement on the Runway 9 End at Key West International Airport has experienced premature cracking. To maintain safety on the runway for departing and arriving aircraft, it is imperative that the asphalt be replaced as an emergency response. This change order, Change Order No. 1, includes the mill and overlay of the failed pavement areas. The total cost to complete the work as noted within this change order is an increase of$74,995.00. See attached price quotation from Charley Toppino&Sons, Inc. Net change to contract Change Order 1 $74,995.00 The project commencement was July 61h, 2023 This Change Order 1 increases contract time by 14 calendar days. Contractor agrees to accept the increase in monetary compensation and hereby waives and releases any and all claims for any additional compensation related to these bid items. This Change Order 1 represents 1.4 % increase of the original contract price. Not valid until approved by Owner Architect if a licable and Contractor ARCHITECT/ENGINEER 6/27/2023 Date CONTRACT d AIRPORTS DIRECTOR 75.2023�✓° -5 Date COUNTY/ASSISTANT ADMINISTRATOR L Date ONROE N OINE'Y PR E PIED 04E �.�... ,„ ,ASSIST T COUNTY ATTORNEY 3/z3 Date, — [ // Change Order Attachment per Ordinance No. 004-1999 0 Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: 1. This additional work was not anticipated as it is in response to a premature failure on the asphalt runway at Key West International Airport. This work is being performed in the most expeditious manner to return the asphalt pavement to a safe operating surface for arriving and departing aircraft. Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds$25,000 or 5%of contract price(whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project engineer/architect approves the change order. Yes ® No ❑ If No, explanation of why: a Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: , PRICE QUOTATION Attention: DATE: 6/20/23 Jacobs 200 W Forsyth Street,Suite 1520 Jacksonville,FL 32202 IT IiIt ED QUANTITIES Location: 34911 S Roosev0 Blvd,Key Wesl FL 31040 � Scope: 7 SHP alt-Pave nen sa eir � LtaU kaarrva Destn lion Quanta" Umts Cos[ er Unil 1 une Btiosrn 9 os'k fipsaaes Mobilization .'". ..�...�._ 1 0. LS $ 7,500.00 $ 7,506 00 :? a1a.^�al�a¢i1 r'auerruen[rwnino�eNl v'�SID SY $ �.�.� 93 00 $ 16,275 00 3 ALL shalt Surface CoOrse ..... mm 350 TON $ 1.42000 5 49,700 00 4 As haft Tack Coal .. .... ,. 380 CAI 5 4000 $..�......1 520 00 ... �.. .�...,.... �W�.��.,...__ ...._.......... ........._. ��_...,,,, �. ......... ......�,_...._. .._...�..,�„ $ubttrytal $ 74,9950D .� ..� .....�..................... 5 PeAonnancelPament Bonds(S20 00?housand) ....... m,mw...__ __ ,�............. 0 LS $...... dAltwl+uauuk6oa�1,"ieanaigaJi,aa@i4En �_........ .._... .... .�.�..» ,. 7 4aenarA a9 C,omrd4¢omt.fi(0.7a. ':'E rnan 1 0 I-S S ' � ....... .... Notes: Exclusions: Caroavi.. ,Permdfr .Fermat Fees Bontlm Speaal HMA Mixes Prepared by: lTe�ieu rrygae�ri Estimator Charley To ino 3 Sons,Inc. _... _. Sheet 1 of 1 Date: 6120123