CONTRACT CHANGE ORDER
PROJECT TITLE: Aircraft Overflow Apron and Mitigation CHANGE ORDER NO: 1
Client Project Number: 404-630224(G2E62)
INITIATION DATE: 06/27/2023
TO CONTRACTOR: Charley Toppino&Sons CONTRACT DATE: 02/16/2022
The Contract is changed as follows.-
The original Contract Sum ..................................................„.,,.. ...,,...,..,....,......... .,$ 5,416,177.15
Net change by previously authorized Change Order ........................................... .........$ 0.00
The Contract Sum prior to this Change order was....... ......... . ....... o,..,,.., $ 5,416,177.15
The Contract Sum is (increased) by this Change Order $ 74,995.00
The Revised 1 Contract Sum including this Change Order .. ......_............. $ 5,491,172.15
The asphalt pavement on the Runway 9 End at Key West International Airport has experienced premature cracking. To
maintain safety on the runway for departing and arriving aircraft, it is imperative that the asphalt be replaced as an
emergency response.
This change order, Change Order No. 1, includes the mill and overlay of the failed pavement areas.
The total cost to complete the work as noted within this change order is an increase of$74,995.00. See attached price
quotation from Charley Toppino&Sons, Inc.
Net change to contract Change Order 1 $74,995.00
The project commencement was July 61h, 2023
This Change Order 1 increases contract time by 14 calendar days.
Contractor agrees to accept the increase in monetary compensation and hereby waives and releases any and all claims for
any additional compensation related to these bid items.
This Change Order 1 represents 1.4 % increase of the original contract price.
Not valid until approved by Owner Architect if a licable and Contractor
ARCHITECT/ENGINEER 6/27/2023
Date
CONTRACT d
AIRPORTS DIRECTOR 75.2023�✓°
-5 Date
COUNTY/ASSISTANT ADMINISTRATOR
L Date
ONROE N OINE'Y
PR E
PIED 04E �.�... ,„
,ASSIST T COUNTY ATTORNEY 3/z3
Date, — [ //
Change Order Attachment per Ordinance No. 004-1999
0 Change Order was not included in the original contract specifications. Yes ® No ❑
If Yes, explanation:
1. This additional work was not anticipated as it is in response to a premature failure on the asphalt runway at Key
West International Airport. This work is being performed in the most expeditious manner to return the asphalt
pavement to a safe operating surface for arriving and departing aircraft.
Change Order was included in the original specifications. Yes ❑ No
If Yes, explanation of increase in price:
• Change Order exceeds$25,000 or 5%of contract price(whichever is greater). Yes ❑ No
If Yes, explanation as to why it is not subject for a calling for bids:
• Project engineer/architect approves the change order. Yes ® No ❑
If No, explanation of why:
a Change Order is correcting an error or omission in design document. Yes ❑No
Should a claim under the applicable professional liability policy be made? Yes ❑ No
Explain:
,
PRICE QUOTATION
Attention: DATE: 6/20/23
Jacobs
200 W Forsyth Street,Suite 1520
Jacksonville,FL 32202
IT IiIt ED QUANTITIES
Location: 34911 S Roosev0 Blvd,Key Wesl FL 31040 �
Scope: 7 SHP alt-Pave nen sa eir � LtaU
kaarrva Destn lion Quanta" Umts Cos[ er Unil 1 une Btiosrn 9 os'k fipsaaes
Mobilization
.'". ..�...�._ 1 0. LS $ 7,500.00 $ 7,506 00
:? a1a.^�al�a¢i1 r'auerruen[rwnino�eNl v'�SID SY $ �.�.� 93 00 $ 16,275 00
3 ALL shalt Surface CoOrse ..... mm 350 TON $ 1.42000 5 49,700 00
4 As haft Tack Coal .. .... ,. 380 CAI 5 4000 $..�......1 520 00 ... �.. .�...,....
�W�.��.,...__ ...._.......... ........._. ��_...,,,, �. ......... ......�,_...._. .._...�..,�„
$ubttrytal $ 74,9950D
.� ..� .....�.....................
5 PeAonnancelPament Bonds(S20 00?housand)
....... m,mw...__ __ ,�............. 0 LS $......
dAltwl+uauuk6oa�1,"ieanaigaJi,aa@i4En
�_........
.._... .... .�.�..» ,.
7 4aenarA a9 C,omrd4¢omt.fi(0.7a. ':'E rnan 1 0 I-S S '
� ....... ....
Notes:
Exclusions: Caroavi.. ,Permdfr .Fermat Fees Bontlm Speaal HMA Mixes
Prepared by: lTe�ieu rrygae�ri
Estimator
Charley To ino 3 Sons,Inc. _... _.
Sheet 1 of 1
Date: 6120123