Release of Contingency Funds #041 BOARD OF COUNTY COMMISSIONERS County of Monroe . Mayor Craig Cates,District I The Florida Keys Mayor Pro Tem Holly Merrill Raschein,District 5 h Michelle Lincoln,District 2 James K. Scholl,District 3 David Rice,District 4 Memorandum DATE: 07/25/2023 TO: BOCC Diitally Kevin G. GgWilson,signedby Kevin P.E. FROM: Kevin G. Wilson, P.E. Wilson, P.E. °005202 3.477 5 SUBJECT: Release of Contingency Funds Included with this memo is the proposed Release of Contingency Funds 441 for the Fl Keys Marathon Airport Non-Aeronautical Use Building (EOC)project. This does not affect the contract amount, but releases contingency funds already included in the Guaranteed Maximum Price for work that was either not foreseen or for which a price could not be determined at the time of contract execution. The amount requested is $4,045.00. The attached Release of Owner Contingency Request provides the details. This is being provided to ensure the BOCC is aware of this change. Please contact me with any questions. If there are none with the normal 24-hour window, I will approve the request. ` CountyOf Monroe '' n, t ROAR ,OF COUNTY COMMISSIONERS Mayar Craig Cates Disttrkt 1 The Florida Keys Maycw Fro Temp.Holly lodeiTil1 Rasc+in:.District 5 ` Michelle L.iatcolx>n,District James K. Sr-hot],District_T Da-vid Rke,District 4 MEMORANDUM DATE: 7/5/2023 TO: County Administrator THRU: Director, Project Management FROM: Jordan Salinger SUBJECT: Release of Contingency for: FL KEYS MARATHON AIRPORT NON- AERONAUTICAL USE BUILDING (EOC) Action Requested: Approval for RELEASE of contingency funds in the amount of $4,045.00 as outlined below. Basis for Recommended Action: 1. The requested release does not increase the total cost of the project as approved by the BOCC, and it will have no impact to contract time. 2. The scope for which the release is requested is within the intended project scope. 3. The release is not based upon an error or omission by the designer or the general contractor. Background: This is a cost change to the Contingency related to RFI 216, dated 05/18/2023, to install aluminum flashing along the perimeter of the roof to span the gap between the roof slab and the tilt wall panels. This flashing will support the perimeter edge of the secondary (bottom) roof layer that runs up the parapet wall formed by the top of the tilt panels. Digitally signed by Marshall Marshall QUarleS Quarles Mickey Pruitt Digitally signed by Mickey Pruitt Date:2023.07.05 14:41:07-04'00' Date:2023.07.06 15:04:36-04'00' Ajax Building Company Architects Design Group Digitally signed by Cary Knight Kevin G. Wilson t Date:2023.07.17 09:45:51 P E Digitally signed by Kevin G.Wilson,P.E. Cary Knigh Date:2023.07.27 14:23:27-04'00' -04'00' Cary Knight,Director of Project Management Kevin Wilson,Assistant County Administrator OWNER CONTROLLED CONTINGENCY LEDGER FL KEYS MARATHON AIRPORT NON-AERONAUTICAL USE BUILDING (EOQ Initial Contingency Amount: $955,613.00 Total Debits Total Credits Total Adjustments to Date: ($3!) ,932. !)) $95,269.00 )$4.4 8, 2&L !)) Current Contingency Balance: $602,680.75 *E IOII designates PCA as an Error or Omission on Designer �V III vi r1nmaldget 0.00 ( 0,00% $955,613.00' This is a cost change to the Project Contingency to add a GPR survey of the site prior to underground utilities installation beginning in order to locate potential unknown utilities that are not shown on the contract documents.' Contract time is not impacted. 10/05/22 (6,500.00) -0.68%= $949,113.00 This is a credit change to Contingency for all work related to RFI 121, dated 10/12/2022,to document the email correspondence with Cardno that the injection well casing is only required to be 60' deep, not 120' deep per C-008. The total depth drilled will remain 120' but the casing is only required for 60'. Also,the material of the casing is acceptable to change to Schedule 80 PVC in lieu of DIP (ductile iron pipe). 12/08/22 12,000.00 1.26%' $961,113.00 This is a cost change to Contingency for RFI 113, dated 09/21/2022,to add window shades at the exterior windows in room 235 and 262 that were not previously calling for shades. Reference sketch included in RFI response, a 12/08/22 (2,093.50) 0.22%' $959,019.50 This is a credit change to Contingency for RFI 124, dated 10/06/2022 to document the variance between ID-202 and A-131 on the mirror manufacturer and the decision to go with the Bobrick B-165 series mirrors due to the cost savings to the Owner over the Renwil, vered mirrors. �' 12/08/22 16,455.00 1.72% $975,474.50' OWNER CONTROLLED CONTINGENCY LEDGER This is a credit change to the Contingency per RFI 151, dated 12/08/2022,for the Owner request to change all countertops in Food Prep room 260 from Quartz to Stainless Steel. EIN 12/16/22 5,330.00 0,56% $980,804.50 This is a cost change to the Contingency to fund the FKEC fee worksheet for the electrical primary service. 01/10/23 (10,01432) -1.05% - $970,790.18 This is a cost change to the Contingency to fund the City of Marathon Utilities Force Main worksheet fees. 01/10/23 (27,663.63) -2.89% - $943,126.55 This is a credit change to the Contingency for changes from submittal 084113-1, dated 12/01/2022,to change the 1203 window from an insulgard ballistic window to a standard YKK interior storefront window, and to change door 218 from a double door to a single door with a sidelite due to a conflict between the corridor width and the required width for an insulgard double door. 01/23/23 14,607.00 1.53% $957,733.55 This is a cost change to the Contingency for ASI 01, dated 11/28/2022,for: -The changes to the primary electrical routing and equipment for the building's power per FKEC requirements, and -The addition of the quick-connect equipment to add the ability to connect a portable load bank. 02/14/23 (65,712.00) -6.88% - $892,021.55 This is a cost change to the Contingency for RFl 154, dated 02/02/2023,to change doors 202 & 203 to Ambico ballistic hollow metal (HM)frames since the specified Insulgard HP500 ballistic door system required the doors to be outswing, which conflicted with the hallways. Ambico doors can accomodate an inswing to match the floor plan intent. 02/14/23 (870.00) -0.09% $891,151.55 This is a cost change to the Contingency for RFI 115, dated 12/05/22,to expand the chase in room 219C and add chases in rooms 254& 251 for the vertical storm piping drops from the roof drains down to underneath the 1st floor slab. N 02/14/23 I - - (1,282.00) -0.13% = $889,869.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency for RFl 111, dated 10/03/22,for updates to A-132 &A-133 clarifying quantity and locations of P, bathroom accessories. 02/14/23 (1,503.00) -0.16% $888,366.55 This is a cost change to the Contingency for RFl 164, dated 02/14/2023,to increase the depth of the clumpster enclosure per revised sheets A-001 and A-030 to meet the clumpster size and clearance requirements. Dumpster enclosure CMU walls that have already been constructed will be removed,foundation will be extended to support the increased depth, and the CMU walls will be re- constructed, (10,495.00) -1.10%= $877,871.55 This is a credit change to the Contingency for RFl 173, dated 01/19/2023, to eliminate the Masterseal 581 waterproofing noted in the details for the clumpster enclosure.The clumpster enclosure walls will have a standard stucco finish. 02/14/23 1,581.00 0,17% = $879,452.55 This is a credit change to the Contingency for eliminating the BP 05.01 Scope requirement to furnish and install two (2)elevator pit access ladders, since the BP 14.01 Elevator subcontractor will furnish and install their own ladders which they have included. 03/07/23 1,390.00 0,15% $880,842.55 This is a cost change to the Contingency for the work related to RFl 167, dated 01/03/2023,to install a 6"trench drain system between the planters on the west elevation of the building, and tie the trench drains into the site storm system at Structures S-1 and S-3.This includes required core drilling work to run the drain between the different sections of the planters. 03/07/23 (15,077M) -1.58% $865,765.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency for RFI 133, dated 12/27/2022,to change multiple exterior walls at the mechanical yard and generator room to CMU walls in lieu of tilt panel walls due to constructibility issues with being able to set the tilt panels with the roof beams and precast joists in place.This includes adding stucco to these CMU walls. 03/24/23 4,3 8 00) -1.50%;- $851,384.55;. This is a cost change to the Contingency for RFI 159 dated 03/14/2023 to increase the circuit breakers in panel ELDP and increase the wire size for the elevator pumps based on increased HP requirements per the manufacturer. 03/24/23 (720.00) 0.08%= $850,664.55 This is a cost change to the Contingency for RFI 169, dated 01/16/2023,to provide an additional disconnect and point of connection to the ACCU-3 condensing unit based on electrical requirements provided by the manufacturer in submittla 237313-1.2.There will now be (2) 60amp disconnects and (1) 30amp disconnect for ACCU-3 in lieu of (2) 100amp disconnects. 04/06/23 (4,475.00) -0.47%, $846,189.55 This is a cost change to the Contingency for RFI 158, dated 02/27/2023,to add 3 biometeric readers to doors 243, 25313, 277 for access control and to delete the camera in Storage room 233.This includes all infrastructure, devices, and licenses for the added readers and door hardware changes to make these doors electrified. 04/06/23 (20,781.00) -2.17%; $825,408.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency for RFI 194 Stairwell doors hardware and fire rating changes to meet fire and FEMA 361, dated 03/20/2023,to change the door hardware specified for doors S102B and 5103 per manufacturer requirements in order for the doors to meet both a FEMA 361 rating and a 2hr fire rating. Separately,this RFI also updated all other stairwells doors from 1hr to 2hr and all glazing in these stairwell doors from 45min to 90min rating.There is no cost associated with these latter upgrades. 04/18/23 (5,8 5.00) -0.61%': $819,533.55 This is a cost change to the Contingency related to Submittal 280537-1.2 to change the bi-directional antenna from a Yagi antenna (model# BDA-YDA763869-14-1)to a Westell panel antenna (model #CS03-777-999).This change was recommended by the BDA vendor, and reviewed and approved by Monroe County because the panel antenna is tested and rated for a higher wind MPH than the yagi antenna. 04/18/23 (1,582.00) -0.17% $817,951.55 This is a cost change to the Contingency related to RFI 188, dated 03/06/2023,to demo part of the retaining wall just northwest of GL 9 to provide more turning radius availability for when trucks or equipment drive up the access ramp and need to turn left 05/09/23 ( r841.0 ) -0.40%, $814,110.55 This is a cost change to the Contingency related to RFI 199, dated 05/09/2023,to extend multiple P1 and P9 walls to the underside of the roof deck (framing, iso, and drywall extended)that were originally called to terminate at the ceiling.This change enhances sound transfer reduction , between corridors, building areas, and offices. 05/09/23 (80,114.00) -8.38%= $733,996.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency related to RFI 198, dated 04/11/2023,to add beacon lights on the top of the building per request from the Monroe County Building Department.This includes eight(8) FAA-approved beacon lights positioned at the building corners and along the roof perimeter. 05/09/23 (18,634w00) 1.95% -- $715,362.55 This is a cost change to the Contingency related to RFI 209, dated 05/09/2023,to confirm the additional stucco and Masterseal 581 waterproofing intended for the CMU walls at the Outside Seating 263, Ground Level Lobbies 101 & 102, and ground level electrical chases.This RFI also covers documenting stucco CJ layout and the final sizes of the electrical chase walls and required,MAT4 foundations to encapsulate all electrical conduits from the Level 1 to the site. Cost previously being tracked for RFI 132 regarding the chase walls size increasing is included/covered by this RFI 209 response and pricing. Cost previously being tracked for RFI 200 regarding the ground level lobbies wall types is included/covered by this RFI 209 response and,pricing. 05/11/23 ( 6,31 i.00) -7.99%= $639,051.55 This is a cost change to the Contingency related to RFI 204, dated 04/27/2023,to add a CIP parapet wall on top of RB- 48 to form the south parapet wall for the roof section over the generator room 245. 05/12/23 (1,840.00) -0.19%- $637,211.55 " This is a cost change to the Contingency related to RFI 193, dated 03/27/2023,to add (2) additional data drops to each of the consoles in Dispatch 235 per request from the MCSO.This increases the drops from 8 to'10 at each console. 05/12/23 8ru8,GDuI -0,$8%; $628,803.55 This is a cost change to the Contingency related to RFI 189, dated 03/20/2023,for the clarification that the the two (2)water fountains,tagged E27 on the Architectural sheets, are intented to be the model Elkay EZWS-ERPBM28K, which are recessed units with a bottle filler, not the Elkay LZSTL-8-C tagged EWC-1 on the plumbing sheets and schedule.This includes minor electrical changes for in wall rough in and the addition of a chase wall at water fountain wall between Restrooms 255 & 256. 05/15/23 (11,867�00) -1.24% $616,936.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency related to responses to Submittal 274100-1 and Submittal 274100-2. Submittal 274100-1 response provided model changes for mutiple AV equipment including speakers, antennas, microphones, processors,amplifiers etc. Submittal 274100-2 response changed the mini-PC modules from HP to Lenovo models based on Monroe County IT submittal review and preference. 05/18/23 (14,905.00) -1.56% - $602,031.55 This is a credit change to the Contingency related to RFI 178, dated 03/02/2023,to furnish and install a RainFlo MiniGen03 Ozone Generator in lieu of the Rainflo UVS-25 Filtration system for the 5,943 gallon Rainflo water tank per the updated P-203 sheet. 05/19/23 1,749.00 0.18%I $603,780.55 This is a cost change to the Contingency related to RFI 183, dated 03/27/2023, updating the perimeter soffits and ACT ceiling details in rooms ICC 219 and Dispatch 235, including changing of light fixture layout, quantity and type, and also 11updating the F2 cove lighting in Facility Restrooms 255 and 256. 06/01/23 (13,142.80) -1.38% - $590,637.75 This is a cost change to the Contingency related to RFI 197, dated 04/28/2023,to change the TEF-1 grille to a FPA/NOA rated louver since it is located in an exterior soffit.The TEF- I fan is located above ceiling in room Security 202. CE 06/01/23 (1,210.0 -0.13%0) $589,427.75 This is a credit change to the Contingency related to Submittal 095100-1 response, dated 05/17/2023,to change to the acoustical ceiling tile throughout the building from Armstrong (originally spec'd manufacturer)to Rockfon (equivalent manufacturer). 06/07/23 17,030.00 1.78% $606,457.75 This is a cost change to the Contingency related to RFI 177, dated 05/09/2023,to add three (3) structural mounts per sketch SSK-008 on the roof for attachment points for antennas. IINUM 06/08/23 (10,264w00) -1.07%= $596,193.75 OWNER CONTROLLED CONTINGENCY LEDGER This is a credit change to the Contingency related to Submittal 113013.2-1 response, dated 04/13/2023,to change multiple elements of the residential appliances including the under counter ice makers manufacturer,and changing the hood in Food Prep room 260 to a residential hood with a roof vent instead of a commercial hood with a roof exhaust fan. This CCR also includes a credit for the 3-compartment sink in Food Prep room 260 that B&I included, but will be furnished and installed by the Plumbing subcontractor. 06/08/23 13,201.00 1,38% $609,394.75 This is a credit change to the Contingency related to RFI 208, dated 05/16/2023,to change rooms 244- Mechanical Yard and 245- Emergency Generator Room from VCT-1 to bare concrete, and rooms 238 A/B- Electrical Rooms and Room 243 Plumbing from VCT-1 to SC-1, and room 239- UPS room from VCT-1 to ESD-2. :5 06/08/23 8,846.00 0.93%I $618,240.75 This is a cost change to the Contingency related to RFI 213 response, dated 05/19/2023,to add 120V power for the Clean Agent Fire Protection system controller for rooms 241 and 242.The controller requires a dedicated circuit per submittal 212200-1. Per RFI response, spare circuit 68 on panelboard ESP is to be used. 06/20/23 (1,44100) -0.15% $616,797.75 - This is a cost change to the Contingency related to RFI 223, dated 06/19/2023,to add insulation,framing and drywall to the exerior walls of rooms 237 Future Expansion and 238 Electrical for exterior envelope insulating and to credit back the VCT flooring in Room 237 and use a concrete sealer for a floor finish in this room instead. Summation of costs and credits result in a net cost. 06/20/23 03,152�00) -1.38% - $603,645.75 This is a credit change to the Contingency related to RFI' 232 response, dated 06/21/2023,to eliminate the casework shown around sink HL-2 in room 231-Rest Room per detail#5 on ID-202. Per RFI response,this is a finished fixture and does not need to be set in casework. 06/22/23 3,080.00 0.32% $606,725.75 This is a cost change to the Contingency related to RFI 216, dated 05/18/2023, to install aluminum flashing along the perimeter of the roof to span the gap between the roof slab and the tilt wall panels.This flashing will support the perimeter edge of the secondary(bottom) roof layer that runs up the parapet wall formed by the top of the tilt panels. 07/05/23 (4,045.00 01.42% $602,680.75 Project: Monroe County EOC (202011) Subcontractor: Crowther Roofing Subcontractor tracking#: Change(RFI#,ASI#,etc): 216 Date: 7/3/2023 LABOR Quantity Units Description unit Cost of labor 1 M-days Fabricate aluminum flashing $ 220.00 $ 220.00 8 M-days Install aluminum flashing $ 220.00 $ 1,760.00 Labor Subtotal $ 1,980.00 Labor Burden Percentage 26% $ 514.80 Labor Total $ 2,494.80 MATERIAL(SUPPLIER BACK-UP REQUIRED) u a nt itV Units Description LuLnit Cost of Material 13 ea .040 Aluminum mill finish flat sheets $ 75.00 $ 975.00 1 box Fasteners $ 125.00 $ 125.00 Material subtotal $ 1,100.00 Material Sales Tax 7.50% $ 82.50 Material Total $ + 1,182.501 / �i Quantity Units Description unitCost of E/S/U Labor Total $ 2,494.80 Material total $ 1,182.50 Subtotal $ �3,677.30 Allowable OH&P 10% $ 367.73 GRAND TOTAL(no pennies) $ 4,045 AdXAjax Building Company,LLC Project:202011 Monroe County FL Keys Marathon 109 Commerce Blvd Airport NAUB EOC Oldsmar, Florida 34677 7280 Overseas Highway P:+18137923900 Marathon, Florida 33050 RFI #Con-216: Aluminum Flashing at Roof Level to Protect Continuous Foam Insulation Status Open To Mickey Pruitt(Architects Design Group) From Jeffrey Whipple(Ajax Building Company, LLC) Jana Ross(K2M Design) 424 SW 7th Terrace Devon Ayers(K2M Design) Gainesville, Florida 32601 Date Initiated May 16,2023 Due Date May 21,2023 Location Project Stage Course of Construction Cost Impact TBD Schedule Impact TBD Spec Section Cost Code Drawing Number A-311,A-322 Reference Linked Drawings Received From Kevin Callans(Crowther Roofing) Copies To Devon Ayers(K2M Design), Nathy Grullon(Architects Design Group), Donald Harcrow(Ajax Building Company, LLC),Cary Knight(Monroe County),Travis Mauldin(Ajax Building Company, LLC), Mickey Pruitt(Architects Design Group), Marshall Quarles(Ajax Building Company, LLC), Banistka Rodriguez(Architects Design Group),Jordan Salinger(Monroe County), Steven Sanders(Monroe County), Daniel Taylor(Architects Design Group), Cary Vick(Monroe County),Jeffrey Whipple(Ajax Building Company, LLC) Activity/ Question Question from Jeffrey Whipple Ajax Building Company,LLC on Tuesday, May 16, 2023 at 02:50 PM EDT Please confirm it is acceptable to install aluminum flashing between the roofing insulation and the continuous foam insulation as depicted in the attached RFI 216 Sketch.This detail will be typical for all similar conditions at the roof level.This is a recommendation from our roofing subcontractor. Attachments RFI 216 Sketch.pdf Awaiting an Official Response III:: IC:iiirlds dt accept.dI Ie Ajax Building Company, LLC Pagel of 1 Printed On: May 16,2023 03:12 PM EDT .. aluminum flashing at this the 8.2 ... . - ;'B.5 foam insulation REDUNDANT ROOF'SYSTEM SITE-CAST FACADE PANEL WITH REVEALS WITH TEX-COTE COOLWALL FINISH l f 4"CONCRETE SLAB CAN PRESTRESSED f CONCRETE JOISTS WITH SOFFIT BEAMS r J FILL GAP WITH CONT.FOAM INSULATION I Q f I I I Sims 11 I::iroi,r i A 322 .. aluminum METAL COPING CAP �BLOCKING ATTACHE b 50 LA T location toprotect CONT (�At ANIZED NITS - L�t.E r TENT Wr ABM . �, continuous ANNULAR RINGSHANK � � .... _ � .. m insulation TR ADH SIW ,•w. �. �"TR� EMBI�AIN FLASHING BUIT'"aI SEwALING TAR`E�, ,, 6'="1`R ALUM,T RMIIMIA"U'[k INI � HOT AM WE,LID R;S1 RAV1NT BAR ATTACHED Wr APPROVED FASTENER a 1 r I 1 Y r f P Y s PP 99 yy m 4 Vj I I y[ f i ry p • ° r ,y j u r y 0 i ,� � ,n ,�,. q ¢d, . 1 t o a m u DETAIL PARAPETAT Apr-\*' E A "'C'� . m m �o �o m m m E E 0 E E a a V > N N K K W N 0000 N N N N N N N N N N N y N N N N N N N N N N N N N N N N N N N N N N N N N > O N N N N O O O O O O O O O O O — O O O O O O O O O O O O O O O O O O O O O O O O N \\\\N N N N N N N N N N N y N N N N N N N N N N N N N N N N N N N N N N N N G M N N N N N N O N N N N N W V V n T T T M M N N l\O N N N N M M N N N N N M M M M G \\\\\`~ `••� M N N N N N N N N m N N N N N \\\\ Q N N N N N N N N N N N N N M M U M V V a Ln M M M M M M M M M wwwww ^ ^ ^ ^ N N N a-I N 00 M m m m m m m m m m m m m m m m m m M M M m m m m m m m m m m m m m m m M W N N N N O N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N m O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O f6 ._' N N N N N N N N N N N N N N O O O N N N N N N O O N N N N N N N N O O O O O N N N O S \ N N N N N N N N N N N \\\\ \\\\\\\\\ \\\\\\ \\\\\\\\ \\\ V L Vf 00 00 00 N O O N V V V V l0 ^n T V V 0 a-I 00 00 T T O a-I N N Vf 00 T M a\I n W N N O O N M \\\\ a-I a-I N a-1 a-1 a-1 a-1 a-1 a-I N N M M N N N N N N N N N M N N N >, 3 O N N N N\\\\\\\\\M M M\\\\\\M M\\\\\\\\� \\\^ I In N N N N N N m m m m In In In In In In In In l0 l0 l0 C N 00 O r u O C O f6 N LU V is io m Ln ^ > c Z w ° uw O V 3 W Q O O O O O N M O O O O O O O O O p O O O O O O O O O O O O O O O O O O O O O O O O O LL O O Vf O O M U0 O O O O O O O O O O O O O O O O O O O O O O O O 00 O O O O O O O O O W N O O M Vf O V M I� N O N M Ln N O I� > N O Ln a-I Vf N N V V N O 00 I� Vf m N O O V N w M N O Vf O O T �n M N w O N Il 00 O m 00 m Il > 00 N I4 00 I� 00 V N M N V pp w O V V N M w O V Vf 00 V V ¢ Ln O O Q M O l0 W Il 00 N Vf V ll1 M O M ^ V ^ 00 Vf 00 a-I w M 00 Q 00 Ol I, N N O N N 00 N O O W l0 N N l0 Vf O I,V V1"'�a-1 a-I O a-1 a-I Ln V"'�V O Lr N M O 00 l0 a-I 00 N V N P9 N I�O M 00 N P9 P9 V W m `-'a-I `-' ........ .... .... .... .... .... ............ ........ .... .... .... m O. U O ca yr yr yr yr yr v}v} v}yr yr yr v}yr yr v} �*ti*v}ti*v}v}v} Z Z m O c u W W `o V O0 c Z O V o om e M M rn O W O M O N G 4 Di N F a W y 0> NN M¢ N u M c rx a-I y rn pO OZ 00,W Z I G ot cc cc v +°/ N IOU w I X Z L O/ G N > 3 m Q Ln' Y p O/ OV Z rj L >.•_ w 'O o O m 2 N O ' M R_0 X LL tw L m W tl.0 O N i a o - a N E N a w +° N o v m i c c O c zZQ c� L°n 03 ° * � +°- a u * m 31 0) u L ^ tw + w e +3 E rl OI O/ l0 Q y, O. G m In m N m O/ m u -O N m l7 O 3 3 0 tw m 3 N m 0 2 N m 0/ N 0) rl tl0 O/ U 0/ MI L N C 0� ^ a 0 m a 0/ O U - m L ¢ i -6 W i aM-I O L C 3 +L+ 'O l7 N 00 N Q 3 Z u i M 3 N u v = CC E 3 ao u m N o u M v u ¢ N m ° o N c v p w 'm E L K u w 3 O O O/ W m ^ oD Q O/ I m U o O/ G I m c u u C m '6 l!1 L m N m p N = O m N tlD N O u L O m O/ cm m — L C m 0 O/ m OA m '++ m m '++ 3 W G m W O u i 'L V O/ c Y 3 L ++ O 3 m a u a m m O m = 3 m L P'1 .3 '++ m y, K W E K m m u I I L o 0 +°- a c-0 u * 3 m u c c + �° m 3 c s 3 a m W °_° a c m *" m 3 a m m W •y, m �i CZ{ 3 '6 _ m w w C G OA O N O O W 0/ = O m m u O/ > O O O W L' Y 3 O/ 0 m 0. t, j K 'y ++ 'a tw y m > m ' c U w on= `m u a v 3 c X L N ,_ = o� 'v 31 " .2 a `w u m �' E w ° m c w `w u w +, °tf c L w °/ °'°v `w m -M p u v u •u ¢ o N u o 0 m m W O ++ �1 L u tl.0 G a' m 'O u L O E u m m > p In w 'u m O 3 W O O O m m w O tl0 c F O/ m .N _ - ++ H ++ m L u m O U N O/ 3 G++ K OA W N ++ m 3 oD ly L V1 m m '6 3 m C 3 �0 3 O/ C m O/ ° W +0, _ u In m m >. ++ on m o m a �' `w o in u '6 0 > o w - m o m w ''+. u y m u Y ++ 3 'a O -0 3 u ++ O N U v '++ a > O +m+ N +m+ a , m 'o _ X c 1' OA 3 O 'O 3 �n 3 3 W U u O/ m ++ O lu u A= m '++ W l X m N N W m O m o M E R +m+ G'6 C O/ �n u N w -6 m U >• p K 'o O/ lu N = u W Oi N w 3 m O O O m C m m .O O _ N m O m yW. w i C w m i y E N O/ u N N u m m m W m O m O > 7 t`c 3 3 +m+ m ._ O/ u Q N 11 m m w N 3 w W •L otf ¢ y y a �_ v° u Ln Ln m �_ Y o w N w N w c W 7 LL O 3 W m E N o W W +°+ C O/ p u K O/ W +m+ M > m �` O R N > 0) M M y O O O W O N m O N N m E O +°+ M ++ l2u u . U W N u O y p 0 >r. O F Q N N Oi W W �' �n '6 G G > O m W C W W p T G ++ '6 +' N in O M m > u m N m L L E m w > j m = m o 0 u 3 `w m rn N `o 0 0 m u N w 3 `o o E E `w U m +, '6 LL u m O/ 3 i m E O O W 3 3 W O ++ W U O ++ N 3 m U N m O d ¢ m G W O C W O O 3 C W GC C� GC � � p K � p p m W W ¢ [O In i..j � O. K W F LL a I O a` I w I I I °2{ I I I N 3 7 I m m I U K K ¢ m (D N emi N In O emi -0 In e�i a-I l0 Pn ++ l° M In w In m m 00 T T O O m 00 O r, 00 m � I, � O emi N m a1O-I u a-I a-I a-I a-I W O in a-I a-I a-I N N a-I a-I a a-I a-I a-I a-I N N N N N W O O LL LL LL LL Y �n LL LL LL LL LL i LL LL LL a LL LL W LL LL LL LL LL LL LL ^ LL LL LL 3 LL 3 LL LL LL LL LL = = = = = N = = = = = = = N = = = 0 GC 0 GC GC GC GC GC GN N M V Ln wI� 00 T O N N M V Ln I� 00 T O N N M V Ln wI� 00 T O N N M V Vf l0 I� 00 Ol O N >• O O O O O O O O O O N N a-I a-I a-I a-I a-I a-I a-I a-I N N N N N N N N N N M M M M M M M M M M T V F O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O tw m K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K U O U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U a-I M 00 OUo1. MUo. O NUo. ^Oo. PUo9. IUo,. co wUo. Uon. IUo-. OUo1. VUo. NrUo.l Uo. I, w ^ w N ^ VU wU Ln Ln OU NU VU OU VU wU OU1 00 UT U 00 0U0 N Nww0OO OLnNm00OOOVf MO Vf I, w ^ w0000l0l0f MM0O0w mO O O Z O O O O O r rOO O O rOOOOOOr N N N N NN OO OOOO U O O O O O O O O O O O O O O O O O O O O O O O O O O vi NU d d � d dd d dada m o m >• m m can �' 3 3 3 m m m m w _ - a m m � o c 'S 'S o 0 0 0 � - o 0 v m m m x x x m m m m a m � o oc Q Q Q o m c c c N 04 N N N d y 7 7 7 N N N N v c v v v v v v v v 7 c 7 7 7 7 7 7 7 7 a N 00 c S V V c N 00 of c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O of n ++ ++ m m m O m O m m O O O [O [O [O [O O Il W c -p F F F m F c; F F Vf a) N F F F F W N io V aj m Ln M a) Ln io 0 N U n n V1 O jp \ a-I M W Ln c O y U a N N T N Ln N U w (7 Z V Z_ w Z Z z Q Q Z U W Z U K 0 } F W Z Z W K A= Z Z 3 0 F U c U Z °u a 0 o Z F F U 0 w O o M 0 E cc 3 m M o c M O �_+ u pmp U N � W W m c u w o O m 3 m6 u n i O + pq Co W u c N U E tw o N m W C L +m+ 'N m u E c m c co z 3 O O y i IDQ m pca w o •3 w o v oao m a E c ? + m Q o O y 1m' � W J N O Q + K U U/ u oa tlq 00 _ Q Q W t �n c Y u m K y uA• u , + P E 20 v7 33 ' p w x `m U/ e Na o W m 3 p O W Ll W M i s u E v) a v u 0 o 0 o E R N a tlCL W W w m F 'm ++ G F+ y — m e�i O LL 7 0l C m y Q '0 W 3 u t N �i W OL N - 2 In pp t; E V O (ry u 3 i C N N 3 y 0 o -o o U CU W m OID o O (7 U E i C K W In cc Q 0 cca-I N U K a-I a N N N 00 O N X N a l0 I, T M O 00 N N N N : XX N N N N N M O u N N N N N N � X N N l!1 N N N � m O LL cLL �LL (NV 0 a N N a F U U U U U U U U U U U U U U U L U U U U U U U U U U U U U U U U N O O1 N P9 V Vf r� w cn O N V ik M (n (n O O O O O N N N N N Z N N N N N N N N N N N N N QO O O O O O O O O O O O O U U U U U U U U U U U U U o. / \ 0 \ j J ! § In 2 ® - ƒ �n \ � NO � Ln } _ Ij \ f mE www - L - tD 22 wwLn w \ � 7 ) | \ ( ! RR a � m 2 / @oQ2 % 2 / ate $ \ § § rn rn \ c a m } /5 — Ln \ M S 7 ) \) kk ) k ) ) } A Ln k 0 ( \ - § IOU § tw - \ \ \ a k § # § ( \ I \ tw £ : ) ! S & [] § § ) � Ik \\ kk IV - / � \ \ / / / L ` ! ; ; | § ! - �3 ! ] II ) IV T § § 1-Z 00000f r 00000 N Go « u u u u