Loading...
Release of Contingency Funds #044 BOARD OF COUNTY COMMISSIONERS County of Monroe . Mayor Craig Cates,District I The Florida Keys Mayor Pro Tem Holly Merrill Raschein,District 5 h Michelle Lincoln,District 2 James K. Scholl,District 3 David Rice,District 4 Memorandum DATE: 07/25/2023 TO: BOCC Diitally Kevin G. GgWilson,signedby Kevin P.E. FROM: Kevin G. Wilson, P.E. Wilson, P.E. Date:2023.07.25 20:03:20-04'00' SUBJECT: Release of Contingency Funds Included with this memo is the proposed Release of Contingency Funds 444 for the Fl Keys Marathon Airport Non-Aeronautical Use Building (EOC)project. This does not affect the contract amount, but releases contingency funds already included in the Guaranteed Maximum Price for work that was either not foreseen or for which a price could not be determined at the time of contract execution. The amount requested is $821.50. The attached Release of Owner Contingency Request provides the details. This is being provided to ensure the BOCC is aware of this change. Please contact me with any questions. If there are none with the normal 24-hour window, I will approve the request. County of Monroe ✓ ;, i BOARD OF COUNTY COMMISSIONERS Mayor Craig,Cates,District 1 The Florida Keys I',1a�ror Pro Tem.Holler 14w1erroll RascE*,in„lDistr�ict 5 f Michelle Lincoln,District 2 hunes K. SchoEl,District 3 a Da-47id Rice,Dtstrict 4 MEMORANDUM DATE: 7/7/2023 TO: County Administrator THRU: Director, Project Management FROM: Jordan Salinger SUBJECT: Release of Contingency for: FL KEYS MARATHON AIRPORT NON- AERONAUTICAL USE BUILDING (EOC) Action Requested: Approval for RELEASE of contingency funds in the amount of $ 821.50 as outlined below. Basis for Recommended Action: 1. The requested release does not increase the total cost of the project as approved by the BOCC, and it will have no impact to contract time. 2. The scope for which the release is requested is within the intended project scope. 3. The release is not based upon an error or omission by the designer or the general contractor. Background: This is a cost change to the Contingency related to Submittal 122400-1, dated 06/29/2023, to install an RS-2 blackout manual roller window shade in room 219 at interior window 1203 between ICC Room 219 and Press Briefing Room 203. Digitally signed by Mickey Digitally signed by Marshall Pruitt Marshall Quarles Quarles Mickey Pruitt Date:2023.07.11 12:08:44 Date:2023.07.10 12:14:09-04'00' -04'00' Ajax Building Company Architects Design Group Digitally signed by Cary Knight Kevin G. Wilson, Digitally signed by Kevin G. Date:2Cary Knight 04'00'023.07.12 14:09:21 P.E. Dante:2 23.07.27 14:21:46-04'00' Cary Knight,Director of Project Management Kevin Wilson,Assistant County Administrator OWNER CONTROLLED CONTINGENCY LEDGER FL KEYS MARATHON AIRPORT NON-AERONAUTICAL USE BUILDING (EOQ Initial Contingency Amount: $955,613.00 Total Debits Total Credits Total Adjustments to Date: ($369,814,75) $95,269.00 ($465 083 75) Current Contingency Balance: $585,798.25 *EO designates PCA as an Error or Omission on Designer Ir � Ir Initial Budget I 1 0.00 0.00%° $955,613.00 This is a cost change to the Project Contingency to add a GPR survey of the site prior to underground utilities installation beginning in order to locate potential unknown utilities that are not shown on the contract documents. Contract time is not impacted. 10/05/22 (6,500M) -0.68% $949,113.00' This is a credit change to Contingency for all work related to RFI 121, dated 10/12/2022,to document the email correspondence with Cardno that the injection well casing is only required to be 60' deep, not 120' deep per C-008. The total depth drilled will remain 120' but the casing is only required for 60'. Also, the material of the casing is acceptable to change to Schedule 80 PVC in lieu of DIP (ductile iron pipe). 12/08/22 12,000.00 1.26% $961113.00 This is a cost change to Contingency for RFI 113,dated 09/21/2022,to add window shades at the exterior windows in room 235 and 262 that were not previously; calling for shades. Reference sketch included in RFI response. 12/08/22 (2,09150) -0.22% $959,019.50 This is a credit change to Contingency for RFI 124, dated 10/06/2022 to document the variance between ID-202 and A-131 on the mirror manufacturer and the decision to go with the Bobrick B-165 series mirrors due to the cost savings to the Owner over the Renwil, vered mirrors. 12/08/22 16,455.00 1.72% $975,474.50 OWNER CONTROLLED CONTINGENCY LEDGER This is a credit change to the Contingency per RFl 151, dated 12/08/2022,for the Owner request to change all countertops in Food Prep room 260 from Quartz to Stainless Steel. 12/16/22 5,330.00 0.56% $980,804.50 This is a cost change to the Contingency to fund the FKEC fee worksheet for the electrical primary service. 01/10/23 (10,01432) -1.05% - $970,790.18 This is a cost change to the Contingency to fund the City of Marathon Utilities Force Main worksheet fees. ,01/10/23 (27,6616 $943126.55 3) 2.89% _ This is a credit change to the Contingency for changes from submittal 084113-1, dated 12/01/2022, to change the 1203 window from an insulgard ballistic window to a standard YKK interior storefront window, and to change door 218 from a double door to a single door with a sidelite due to a conflict between the corridor width and the required width for an insulgard double door. 01/23/23 14,607.00 1.53% $957,733.55 This is a cost change to the Contingency for ASI 01, dated 11/28/2022,for: -The changes to the primary electrical routing and equipment for the building's power per FKEC requirements, and -The addition of the quick-connect equipment to add the ability to connect a portable load bank. 11,511m 02/14/23 (65,712.00) -6.88% - $892,021.55 This is a cost change to the Contingency for RF1 154, dated 02/02/2023, to change doors 202 & 203 to Ambico ballistic hollow metal (HM)frames since the specified Insulgard HP500 ballistic door system required the doors to be outswing, which conflicted with the hallways. Ambico doors can accomoclate an inswing to match the floor plan intent. 02/14/23 (870g00) -0.09% - $891,151.55 This is a cost change to the Contingency for RFl 115, dated 12/05/22,to expand the chase in room 219C and add chases in rooms 254& 251 or the vertical storm piping drops from the roof drains down to underneath the 1st floor slab. 02/14/23 (1,282 00) -0.13% $889,869.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency for RFl 111, dated 10/03/22, for updates to A-132 &A-133 clarifying quantity and locations of I PA bathroom accessories. 02/14/23 (1,50100) -0.16% $888,366.55 HIM This is a cost change to the Contingency for RF1 164, dated 02/14/2023,to increase the depth of the clumpster enclosure per revised sheets A-001 and A-030 tol meet the clumpster size and clearance requirements. Dumpster enclosure CMU walls that have already been constructed will be removed,foundation will be extended to support the increased depth, and the CMU walls will be re- constructed, (10,495M) -1.10% - $877,871.55 This is a credit change to the Contingency for RFl 173, dated 01/19/2023, to eliminate the Masterseal 581 waterproofing noted in the details for the clumpster enclosure.The clumpster enclosure walls will have a standard stucco finish. 02/14/23 1,581.00 0.17% $879,452.55 MIN This is a credit change to the Contingency for eliminating the BP 05.01 Scope requirement to furnish and install two (2) elevator pit access ladders,since the BP 14.01 Elevator subcontractor will furnish and install their own ladders which they have included, 03/07/23 1,390.00 0.15% $880,842.55 This is a cost change to the Contingency for the work related to RFl 167, dated 01/03/2023, to install a 6" trench drain system between the planters on the west elevation of the building, and tie the trench drains into the site storm system at Structures S-1 and S-3.This includes required core drilling work to run the drain between the different sections of the planters. 03/07/23 (15,077M) -1.58% $865,765.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency for RFl 133, dated 12/27/2022, to change multiple exterior walls at the mechanical yard and generator room to CMU walls in lieu of tilt panel walls due to constructibility issues with being able to set the tilt panels with the roof beams and precast joists in place.This includes adding stucco to these CMU walls. 03/24/23 (14,381-00) 1.50% $851,384.55 - This is a cost change to the Contingency for RF1 159 dated 03/14/2023 to increase the circuit breakers in panel ELDP and increase the wire size for the elevator pumps based on increased HP requirements per the manufacturer. 03/24/23 (720M) -0.08% - $850,664.55 MANI This is a cost change to the Contingency for RFl 169, dated 01/16/2023, to provide an additional disconnect and point of connection to the ACCU-3 condensing unit based on electrical requirements provided by the manufacturer in submittla 237313-1.2. There will now be (2) 60amp disconnects and (1) 30amp disconnect for ACCU-3 in lieu of (2) 100amp disconnects. 04/06/23 (4,475.00) -0.47% - $846,189.55 This is a cost change to the Contingency for RF1 158, dated 02/27/2023,to add 3 biometeric readers to doors 243, 25313, 277 for access control and to delete the camera in Storage room 233.This includes all infrastructure, devices, and licenses for the added readers and door hardware changes to make these doors electrified. 04/06/23 (20,781-00) -2.17% $825,408.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency for RFI 194 Stairwell doors hardware and fire rating changes to meet fire and FEMA 361, dated 03/20/2023, to change the door hardware specified for doors S102B and S103 per manufacturer requirements in order for the doors to meet both a FEMA 361 rating and a 2hr fire rating. Separately, this RFI also updated all other stairwells doors from 1hr to 2hr and all glazing in these stairwell doors from 45min to 90min rating.There is no cost associated with these latter upgrades. 04/18/23 (5,87l ) =0.61% $819 533.55 lull IN This is a cost change to the Contingency related to Submittal 280537-1.2 to change the bi-directional antenna from a Yagi antenna (model# BDA-YDA763869-14-1)to a Westell panel antenna (model#CS03-777-999).This change was recommended by the BDA vendor,and reviewed and approved by Monroe County because the panel antenna is tested and rated for a higher wind MPH than the yagi antenna. 04/18/23 (1:b'!111�1 001111 lull =0.17% $817,951.55 This is a cost change to the Contingency related to RFI 188, dated 03/06/2023, to demo part of the retaining wall just northwest of GL 9 to provide more turning radius availability for when trucks or equipment drive up the access ramp and need to turn left k V 05/09/23 ( ,8 1.00) =0.40% $814110.55 This is a cost change to the Contingency related to RFI 199, dated 05/09/2023,to extend multiple P1 and P9 walls to the underside of the roof deck(framing, iso,and drywall extended)that were originally called to terminate at the ceiling.This change enhances sound transfer reduction between corridors, building areas, and offices. 05/09/23 (5 ,1.1AOO) =8.38% $733,996.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency related to RFI 198, dated 04/11/2023, to add beacon lights on the top of the building per request from the Monroe County Building Department.This includes eight (8) FAA-approved beacon lights positioned at the building corners and along the roof perimeter. ^ 05/09/23 (18,634 00) -1.95% $715 362.55 This is a cost change to the Contingency related to RFI 209, dated 05/09/2023,to confirm the additional stucco and Masterseal 581 waterproofing intended for the CMU walls at the Outside Seating 263,Ground Level Lobbies 101& 102, and ground level electrical chases.This RFI also covers documenting stucco CJ layout and the final sizes of the electrical chase walls and required'MAT4 foundations to encapsulate all electrical conduits from the Level 1 to the site. Cost previously being tracked for RFI 132 regarding the chase walls size increasing is included/covered by this RFI 209 response and pricing. Cost previously being tracked for RFI 200 regarding the ground level lobbies wall types is included/covered by this RFI 209 response and pricing. n 05/11/23 (76,311-00) -7.99% $639,051.55 This is a cost change to the Contingency related to RFI 204, dated 04/27/2023, to add a CIP parapet wall on top of RB- 48 to form the south parapet wall for the roof section over 11" the generator room 245. 05/12/237bSh.7u -0.19% $637211.55.1,M1111 This is a cost change to the Contingency related to RFI 193, dated 03/27/2023,to add (2) additional data drops to each of the consoles in Dispatch 235 per request from the MCSO.This increases the drops from 8 to i10 at each a console. g5/12/23 SN C3.CC -0.88% $628,803.55 This is a cost change to the Contingency related to RFI 189, dated 03/20/2023, for the clarification that the the two (2)water fountains, tagged E27 on the Architectural sheets, are intented to be the model Elkay EZWS-ERPBM28K, which are recessed units with a bottle filler, not the Elkay LZSTL-8-C tagged EWC-1 on the plumbing sheets and schedule.This includes minor electrical changes for in wall rough in and the addition of a chase wall at water fountain wall between Restrooms 255 & 256. ^ 05/15/23 (11,867.00 -1.24% $616,936.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency related to responses to Submittal 274100-1 and Submittal 274100-2. Submittal 274100-1 response provided model changes for mutiple AV equipment including speakers, antennas, microphones, processors, amplifiers etc. Submittal 274100-2 response changed the mini-PC modules from HP to Lenovo models based on Monroe County IT submittal review and preference. 05/18/23 (14,905.00) -1.56% - $602,031.55 This is a credit change to the Contingency related to RFI 178, dated 03/02/2023, to furnish and install a RainFlo MiniGen03 Ozone Generator in lieu of the Rainflo UVS-25 Filtration system for the 5,943 gallon Rainflo water tank per the updated P-203 sheet. 05/19/23 1,749.00 0.18% $603,780.55 This is a cost change to the Contingency related to RFI 183, dated 03/27/2023, updating the perimeter soffits and ACT ceiling details in rooms ICC 219 and Dispatch 235, including changing of light fixture layout, quantity and type, and also updating the F2 cove lighting in Facility Restrooms 255 and -256. 06/01/23 (13,142.80) -1.38% $590,637.75 This is a cost change to the Contingency related to RFI 197, dated 04/28/2023, to change the TEF-1 grille to a FPA/NOA rated louver since it is located in an exterior soffit.The TEF- I fan is located above ceiling in room Security 202. 06/01/23 (1,210 00) -0.13% - $589,427.75 This is a credit change to the Contingency related to Submittal 095100-1 response,dated 05/17/2023,to change to the acoustical ceiling tile throughout the building from Armstrong(originally spec'd manufacturer)to Rockfon (equivalent manufacturer). I IN N 06/07/23 17,030.00 1.78% $606,457.75 This is a cost change to the Contingency related to RFI 177, dated 05/09/2023, to add three (3) structural mounts per sketch SSK-008 on the roof for attachment points for antennas. 06/08/23 (10,264.00) -1.07% $596,193.75 OWNER CONTROLLED CONTINGENCY LEDGER This is a credit change to the Contingency related to Submittal 113013.2-1 response, dated 04/13/2023,to change multiple elements of the residential appliances including the under counter ice makers manufacturer, and changing the hood in Food Prep room 260 to a residential hood with a roof vent instead of a commercial hood with a roof exhaust fan. This CCR also includes a credit for the 3-compartment sink in Food Prep room 260 that B&I included, but will be furnished and installed by the Plumbing subcontractor. 06/08/23 13,201.00 1.38% $609,394.75 This is a credit change to the Contingency related to RFI 208, dated 05/16/2023, to change rooms 244- Mechanical Yard and 245- Emergency Generator Room from VCT-1 to bare concrete, and rooms 238 A/B- Electrical Rooms and Room 243 Plumbing from VCT-1 to SC-1, and room 239- UPS room from VCT-1 to ESD-2. , IND 06/08/23 8,846.00 0.93% $618240.75 This is a cost change to the Contingency related to RFI 213 response, dated 05/19/2023,to add 120V power for the Clean Agent Fire Protection system controller for rooms 241 and 242.The controller requires a dedicated circuit per submittal 212200-1. Per RFI response,spare circuit 68 on panelboard ESP is to be used. 06/20/23 (1,44100) -0.15% - $616,797.75 This is a cost change to the Contingency related to RFI 223, dated 06/19/2023, to add insulation, framing and drywall to the exerior walls of rooms 237 Future Expansion and 238 Electrical for exterior envelope insulating and to credit back the VCT flooring in Room 237 and use a concrete sealer for a floor finish in this room instead. Summation of costs and credits result in a net cost. 06/20/23 (13,152.00) -1.38% - $603,645.75 This is a credit change to the Contingency related to RFI 232 response, dated 06/21/2023,to eliminate the casework shown around sink HL-2 in room 231-Rest Room per detail #5 on ID-202. Per RFI response,this is a finished fixture and does not need to be set in casework. 06/22/23 3,080.00 0.32% $606,725.75 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency related to RFI 216, dated 05/18/2023, to install aluminum flashing along the perimeter of the roof to span the gap between the roof slab and the tilt wall panels.This flashing will support the perimeter edge of the secondary (bottom) roof layer that runs up the parapet wall formed by the top of the tilt panels. 07/05/23 (4,04 115 O) -0.42% $602,680.75 This is a cost change to the Contingency related to RFI 218, dated 06/02/2023,to add two roof exhaust fans for ventilation of the two elevator shafts. 07/06/23 ) ., ) -1.23%' $590,970.75.0 This is a cost change to the Contingency related to RFI 222, dated 06/02/2023, to install box, conduit, and pull strings at doors 214, 215, 230, 232, 281, 282, 284, 285, and 287. This rough-in will prepare these doors for future access controls. 07/07/23 (4,351.00) -0.46% $586,619.75 This is a cost change to the Contingency related to Submittal 122400-1, dated 06/29/2023,to install an RS-2 blackout manual roller window shade in room 219 at interior window 1203 between ICC Room 219 and Press Briefing Room 203. 07/07/23 (82L50) -0.09% $585,798.25 Hile's Curtain Specialties, Inc. 2701 Success Drive Odessa, FL 33556 US (727)753-0600 http://www.hilescurtains.com ADDRESS SHIP TO PROPOSAL# 17934 AJAX BUILDING AJAX BUILDING DATE 07/05/2023 CORPORATION CORPORATION EXPIRATION DATE 08/05/2023 109 Commerce Blvd 109 Commerce Blvd Oldsmar, FL 34677 Oldsmar, FL 34677 JOB NAME SALES REP Press Briefing and ICC Clayton Price to supply and install 1 manual Blackout shades manual roller shades in 1 775.00 775.00T room 219 We are an "SBE" Company SUBTOTAL 775.00 Estimates are good for 90 days. TAX(6%) 46.50 Terms and conditions may apply. TOTAL $821 .50 Accepted By Accepted Date 2.5% processing fee applies for all credit/debit card purchases AjdxAjax Building Company, LLC Project:202011 Monroe County FL Keys Marathon 109 Commerce Blvd Airport NAUB EOC Oldsmar, Florida 34677 7280 Overseas Highway P: +1.1379239.. Marathon, Florida 33050 Submittal #12 24 00-1.0 - 122400-1 Window Shades PD, SD, & Warranty 12 24 00 - WINDOW SHADES Revision 0 Submittal Manager TK Perkins(Ajax Building Company, LLC) Status Submitted Date Created Aug 30,2022 Issue Date Jun 27,2023 Spec Section 12 24 00-WINDOW SHADES Responsible Hile's Curtain Specialties, Inc. Received From Clayton Hile(Hile's Curtain Specialties, Inc.) Contractor Received Date Jun 27,2023 Submit By Jun 27,2023 Final Due Date Jul 12,2023 Lead Time Cost Code Location Type Product Data&Shop Drawing Approvers Devon Ayers(K2M Design), Mickey Pruitt(Architects Design Group) Ball in Court Devon Ayers(K2M Design), Mickey Pruitt(Architects Design Group) Distribution Denise Saltzman(TLC Engineering Solutions(Jax)),Travis Mauldin(Ajax Building Company, LLC),Steven Sanders(Monroe County), Marshall Quarles(Ajax Building Company, LLC), Donald Harcrow(Ajax Building Company, LLC), Rae Lark(K2M Design),Cary Vick(Monroe County) Description A. Shop Drawings: Include shade schedule indicating size, location and keys to details,head,jamb and sill details, mounting dimension requirements for each product and condition,and operation direction. Submittal Workflow Name Sent Date Due Date Returned Date Response Attachments General Information 12 400 1 Wndow Spades I11..), SI),_ Attachments Warranty.pdf TK Perkins Jun 28,2023 Jun 27,2023 Submitted Devon Ayers Jun 27,2023 Jul 12,2023 Pending Mickey Pruitt Jun 27,2023 Jul 12,2023 Pending Ajax Building Company, LLC Page 1 of 1 Printed On:Jun 27,2023 04:32 PM EDT Ajax, . SUBMITTAL AJAX JOB #202011 SPEC SECTION NO. 122400 SUBMITTAL NO. 122400-1 Marathon Airport NAUB EOC AJAX BUILDING COMPANY 109 Commerce Blvd. REVISION NO. Oldsmar, FL 34677 SENT DATE 6/27/2023 Specification Section Title: Ajax Stamp his I:)omlivvirl I Iraq:I k'eerr C'heclwd'I"crr General I::)ex igir C`,c��rralncclirrrr,Si(,and Window Shades c n lon'r7ily I o C orrlrad I;omliywr is C or lradnr/SiIpplier Shnll Verity All I7Ilywnsi nrs (S,i.ccarrhhes and CapacHiea Approval I7rrexa INc�fl RNiew I the vrrrflrradni/S'�i.crrCpher I or C'.ompliarlm,Willy C`,rrrflrcacl I7omllywrrfa. Submittal Type: i pi w[R,OVED ❑ i pi w[ROVED AS NO i ED Product Data &Shop Drawing NO i Ai°i°C/GVi/ I/ i./II l/Jll..i.. El AJAX IlEHiIIIII,...ILll119G COIII II'')ANY Submitting Contractor: i/ai 6/27/2023 I y: TK Perkins .................................................................. Hile's Curtain Specialties, Inc. u.�ll:ru�rrii//Myl 1122400..1 Notes: Architect's Stamp SUBMITTAL REVIEW Name of Project: EOC Submittal Designation: Interiors 12 24001 Date Submitted: 06/27/2023 A-E REVIEW CONTRACTOR ACTION ■... ❑ II"J0 uI"Js ❑■ II)uwi IIbII:SV.,lllfJIl\JIIII..i.. ❑ Ilblllll ❑ Ilbll:sV.1lfJJll\vlll..i.. ❑ gull II ::0 II\JII II\JII II:II J i S ❑ II b II:s V,1 if JJ ll\vll l i II o i If:i o II i ❑. ❑ II b II �V II �`; II II� flu V..,V II"�II\JII D II i IL II\JII ❑ ( IltillN0\A/ G IN0 Ilbll:Vllll III III ❑ IIN0 (.TII 0N Ilbll:QI„q lll1 11 K2M DESIGN, INC.° IS CHECKING ONLY FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT OF THE PROJECTAND GENERAL COMPLIANCE WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. ANY ACTION SHOWN IS SUBJECT TO THE REQUIREMENTS OF THE PLANS AND SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR ALL DIMENSIONS AND QUANTITIES WHICH SHALL BE CONFIRMED AND CORRELATED ATTHE JOB SITE. IT IS HIGHLY RECOMMENDED AND REQUIRED THAT ALL DIMENSIONS ARE FIELD VERIFIED PRIOR TO ORDERING OR FABRICATION. FABRICATION PROCESSES AND TECHNOLOGIES OF CONSTRUCTION COORDINATION OF THEIR WORK AND THAT OF ALL OTHER TRADES AND THE SATISFACTORY PERFORMANCE OF THEIR WORK IS THE RESPONSIBILITY OF THE SUBMITTER AND/OR GENERAL TRADES CONTRACTOR. I� IIL 06/28/2023 II�� IIL\�+��V�III�h'° RML Comments are as follows and as noted on the enclosed submittal documents: Contact Information: K2M Design, Inc. Point of Contact: Devon Ayers 3121 Bridge Ave. Phone: 305.307.5846 Cleveland, Ohio 44113 Email: dayers@k2mdesign.com ��I 11;IIS dII J LL z Y v Z O r „,�, Yoiwo zoNa o s ,r tltl — tw7acw j co � W- a Y. Kf < — r w w.Z wo�w y Q LL Z ILL I aUa g a �j ICI W z, I l,w I I T I�� 11 f IJ° e ��I + LO $I III I a I I wl r r v ltl 1 1 a � I i II i I w w r tP L I � �, � r 111"li'll V L ll b: a I,,I zl CI .. I w�l I ,II II � I II Ir I! I I VL II I iI p L, LI TIFF" � �f � III �I�,�I � I III ��,�a11111I I IIIIII � I M IOl � ,� o� I IIII LL F— wr tl J it I° Clb � Clb Clb ' fk.".. fCS D ft1 i rF) M M E E E 0 u > z z N N O O O O N N N N N N N N N N N y N N N N N NN N N N N N N N N N N N N N N N N N > O N N N N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O N \\\\N N N N N N N N N N N m N N N N ry ry N N N N N N N N N N N N N N N N N N Q. N N N N M M M M O. N N N N \\\\ rl rl rl rl In O a N N N N N M M M M M M M M M M M M M M M M M M M M M M M M M M txo � N N N N N N N N N N N N N N M M M N N N N N N M M N N N N N N N N M M M M M N N N M M M O O O O O O O O O O O O O O N N N O O O O O O N N O O O O O O O O N N N N N O O O N N N f0 N N N N N N N N N N N N N N O O O N N N N N N O O N N N N N N N N O O O O O N N N O O O \\\\\\\\\\\\\\ N N N \\\\\\N N \\\\\\\\N N N N N \\\N N N s E M ao 00 00 O O N a a a a a w \\\a a O N oD oD \\O .-I N N oD O .-I \\\\\ O O N \\\ ^ ^ � N N M M rl rl � � rl rl rl rl rl rl rl M ~ ^ � � � N N N w C N to � O u O C C f/1 O m U m w ui a m V1 }Z > N O1 F � u •n. W Q O O O O O N M O O O O O O O O O Q O O O O O O O O O O O O O O O O O O O O O O O O O O O u' O O of O O M cD O O O O O O O O O O O O O O O O O O O O O O O O 00 O O O O O O O O O O O ly N O O M M O V M 1, N O N M vi O 1� 0 O u1 N u1 N tV O O V N w M tV O u1 O N O y ¢ u1 O O a M O tD W 1� oD W J O/ lD N N/D u)O n V V1 V.-I�-1 O N N u1 a V a 0 u1 �-1 M O 00 lD.-I 00.-I �-1 M.-I n m rl rl rl N rl lD rl rl rl N 00 rl n rl rl rl rl rl rl rl rl h =a u 0 °7S .nvlNvlvlvlvlNv> vlNv> vlvlvlvl vINN �Nv> vlinini NNininin �Nv> Nv> vlNv> N } rn Z m 0 fx 0?1 a W W 0 v a Z O m 0 w o G ni C N c J C7 O OJ i H N N T ei F a W � ti' N m all HI vl m �^ v C N a 0 m a 3 Z u c M N c ¢ ~ o G Mo w o ,N on LL a Lu Z N T I C Off 0' LL D: OJ N of C7 a 3 c E Z O N = N Q L N T = m a N Y O G d O Z O 3 ¢� E =I a v a o w-. o o =° c - X O d' N 06 N u a� E p c M O O o a iL O N OD M C O O N N A D: X u 0 14k6 OD ¢ al z m o ¢ >p �, O y a MI u •(a A �'• a ° O m OI y w c ¢ U a 06 c c vl M °- `u' c u al " a ^^' c C7 o > > N O O c Qj 3 E o o y a N � > y am. m .� o c a m s a l7 OI s N Q j cn o7S � m v m N O O m a OJ m cn p m ?� O u n N ° c 'm o -mm�u a 3 � m ° u ¢ E $ m o o N c N o E a `- N c c ono 3 O ° t U b0 T C Y C ° t a I!1 C M w c o ''�" —^ G m °'O E b0 QI y. G u s V O m 71 E N I C u .Y u C t C O OJ m M N p m '^ m 3 N N O. C OJ p u p' i Li 00 aai c •`m u m c 9 =U t O 3 aOD m a c +' O m 3 u t o:l ml•� s o *' o: a, a o � •g N vc > a � v u 3 u A M . w c 3 °� o ° c Lw a u c 3 a Cr 14 U W w o7S 3 a u = u i 0 C - O C p W J O O O a T m N w 00 C y! co t E ,r a a p o O m - 0 c0 p vl al m > c a t+ �' �• c o a > s ;. a •ia E c u a, o` M a *' > 'a m -.0 m > `- a on- 0 c`p u L y u l u i0 c u u a O H o u a ° a- a s 'A 3 m n A 'c m N � ,m o7S a ° s u CL - ° 00 Y+ o c x u s a u a x u c u Q E N E N u m E m o m a s o7S c L ' a = a a ° A o u a u o a 0 0 �a ° m o u u on ° c a = o E u c c > o ^ o f m A O o o ._ N m o ° v o c F a, A - N - m t o m o u E a 3 'L ;. o: on W M E m on s H c a 3 m c '� 3 E w c m w ° a` E ,° -" u In c > c > a N u E O fl- OJ OJ O i 'n u 'a ° > O N !0 O c0 OJ u 0) l0 E s 3 'a o a 3 u o m u _p > ,T. o :: ;' a = ie c > o a a a t u ; ua - a •c ° > a °° + •- - Qj W. AN m o '. M E a o o CL a c a u o o v w a j w y u 3 o o ° "' o 't ,°1., m o m '^ ;; L o: a ._ 3 A a W �_ N o a c c Q c > a O c > > m 3 0 =U a j w a ¢ " " E ° ° _ N cr d LL O OJ OJ O = of a Zi y U 7 m N Y 0 7 eY y N y O W tL p ° E o E o o ° o - °1 a ° M 3 > c ^ o cn a s oo E x v 3 c E o a a N u -M a o T onM M p p 0 y 0 5 N A ° m u CJ m y ,y N N N OTio E O E O 3 O F ¢ c o -p o y y s �' a Q Q > a 3 a a o rn °- E v .� In m u c c s E m a ° > v+ ° - m o i o u Ol m rn ° .� `o ° E E m O C upi al 3 s c`0 E 0 0 0 > p 0 0 je O CJ ° m N + m CJ N c0 O al ¢ A C w O u ey O ami O O p 0 3 =w O O o 0 0 m W W ¢ GO In j O d o W F LL al I O d I w I I 1 3 00 0 I I I N 0 � I V P, V l V cn N Q W N m a .� a In .� a m m rn rn oo a l� oo rn 00 o a m rn o 0o m l, oo m m N �o W N (� N eY N v1 3 1f1 r1 eY w 1, ♦+ w cn v1 w v1 01 cn 00 01 T O O 01 00 O 11 00 01 n O eY N cn eY eY N Ua a eY eY eY eY W T O eY eY eY eY eY a eY eY eY eY eY eY I!1 eY eY eY N N eY eY eY eY eY eY E eY E N N N N N N N OJ O a LL LL LL LL Y '�^ V1 LL LL LL LL LL i LL LL LL LL LL LL 000 LL LL LL LL LL LL LL ^ LL LL LL LL LL LL LL LL LL LL LL D: Wiwi D: D: N 0' 0' 0' 0' 0' 0' 0' N 0' 0' 0' V1 0' V1 0' 0' 0' 0' 0' 0' 0' N 7 eY N M 7 1f1 l0 n 00 T O eY N M iTE.01r.".0 OeY NM°' O O O O O O O O O O eY eY eY eY e e eY N N N N N N N N N N M M M M M M M M M MO OuO uuu uuuuu VVVVV u ou CJ u u V V V V V V V V V V V V V V V V V V V V .� moornmo .� l� ml� oo �olnl� rna Nm1� �o1� �o .� 1� a �olnlnoNaoa �ornooa00000 .� Nln 3F N N t0 t0 00 O O O v1 N T 00 O eY M O O v1 M O v1 1� t0 n t0 00 00 t0 t0 v1 M M 00 O 00 t0 T O O eY O O O cn Z O O O O O eY eY eY O eY O O I I eY I I I I I I I I I I 1 0 0 0 0 0 0 0 N 0 0 0 N N N N N N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V U U U U U U U U U U U U ¢ a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a r, v v 3 3 3 3 3 3 3 m > > > > > > • m m c v a a a 0 m N M N N N a 7 7 N N N N C 7 C 7 7 7 7 7 7 7 a V1 M N N C N � � U v c a on p on p o p o o p p p p o M Obi C =p I— I— I— I— po 1— tm0 M H H H H co 'vf-I n U Lq m L m ao LK u ri ui of co c N N U VD C N N N N �/f• a o �n v� n N N W a0 T �O M U W Z Z Q Q � U W Z u � O Z Z U W W Z (� d F Z Z F Z u u O ° ¢ u O h p Z W u F W 7 a o a O 3 m a d O a m a u A C m C N C a+ o ou v i O A c'u E b4 u o E A E 3 " o N L Q m „ o ILaEc � aka m c u° ai m a O Q t m L u Q N Vf b4 u u a N O a ] C o o6 o c N a 0 Ur- U E c d u O O IL a c a ° o a g o A .E a W > c is a o y c v c a a A a r o0 A ay — oLL co, E 3 u `0 °ou � E a° A c a N a °o � � a ,. •� a, E o � � ° E c o c E 3 ° u° � mv, m = A mum ¢ O C eY eY N O eY a t0 n m M X o N eY N N 'n X 7 u N N N N N i!1 N N N X (Ny N LL LL LL LL LL � LL O LL LL LL LL a a, u oo u u u u u u u u u u u u u � a oMma Nwm0 o0 N 'n M M O O O eY eY N N N N Z eY eY eY N N N N N N N N u Q u u u u u u u u u u u IL a a a a a a a a a a a O O O y N N N C m m N y N N y N E a m E m E m m E u° c `O `O u° u u O > m m E 0 0 n m z z N N Vf � 7 Q Q Q u O : �- m C m L w w 0 0 LO O d o 0 o CA w 0 N P, rl D N i d OMM N Mn YUp L C v � C m o @; o w 3 4 m o N C o a o 0 o N m o N — m a Lo 0 0 Plil 0 cn Q O/ N S � 3 +� vvi u v�• v�• V °�' � � �� .n W 00 O M u1 O O 00 O T M O of O O O O O Q T Mi n n m a cn 0 M O O O " w N N O C N a cn N a mrl lA Y m u O z O o g Q u N y W bq F � z v W 7 � u d' C u z co u z 3 0 a 0 W C A IL OJ N `u w o v y -- 0 = a C � C C O 7 u N y A M "U ra u C y > C A m N C N 3 Ca 00 eY N d A Q y y O ML A A p 0 y ?i b4 O ry d 0 C OD C y Vf ° N o o m t c c a 00 b4 C LL C Lij O u. d A A d u. F C •(- OJ OJ N N E OJ y - C �i J CO d Vf O CL O iC O O O O O T OD m F m m m m m O a 0 0 0 0 0 a N 00 x 00 00 Oi z O N Y Y cc cc a a a a