Item Q1 M E M O R A N D U M Office of the County Administrator TO: Board of County Commissioners FROM: Debbie Frederick Deputy County Administrator DATE: September 2, 2009 SUBJECT: Monthly Activity Report for August, 2009 ______________________________________________________________________________ MONTHLY ACTIVITY REPORT AUGUST, 2009 KEY WEST AIRPORT The FDOT presented the airport the award for the Commercial Service Airport Project of the Year for 2009 for our new terminal complex. The ceremony took place at the Florida Airports Council annual conference in Miami Beach. The FAA has given us a grant for $2.5 Million to sound proof the last of our approved homes in our Noise Insulation Program. These homes will bring the total to more than 300 completions over the last nine years. We have applied for a US DOT Small Community Air Service Development grant to attract low cost air carriers to Key West International Airport. So far we have interest from Air Tran and Spirit Airlines. MARATHON AIRPORT Joint Participation Agreement (JPA) with Florida Department of Transportation was approved by BOCC and has been executed for the purchase of Airport Rescue Fire Fighting (ARFF) Vehicle and Equipment. Specifications for ARFF Vehicle and Equipment are being developed in cooperation with City of Marathon Fire Rescue Department and will be advertised for competitive bids. Air Operations Area (AOA) Non-Movement Area Training Program implementation is on-going. Initial and recurrent training classes associated and/or related to FAR Part 139 operations and certification are on-going. Several construction and operations related projects continue to be in various stages of completion at the airport including: HMGP Wind Retrofit (Hurricane Shutter) Project: installation of motorized roll- down shutters on storefront windows has begun; a Notice of Calling for Sealed Bids is being advertised for shutters for remaining windows. Perimeter fence & gates installations have been completed. Construction of generator building and electrical vault has been completed. Passenger Terminal HVAC system components have been ordered by contractor. 1 FAA Grant has been approved by BOCC for funding of the Environmental Assessment associated with the runway extension and runway relocation proposals. EMPLOYEE SERVICES I. Website Updates (other than normal position vacancy updates, etc.): Benefits: KPHA Provider Directory Updates EAP monthly bulletin Working Wellness Newsletter Human Resources: Updated 7 job descriptions II. Turnover Numbers To Date: August 2009 Turnover: .20% Turnover as of August 2009: 6% Turnover as of last August 2008: 14.96% Resignations: 1 Terminations: 0 Retired: 0 Deceased: 0 Layoffs: 0 III. Major Activities/Meetings: Division Director attended HR Florida Conference as local chapter (FLKSHRM) Ambassador Human Resources Held 1 Unemployment Hearing Met with Teamsters to resolve Grievance Personnel Policy Board annual Committee meeting. IAFF Negotiations Teamsters Negotiations Risk Met with representative from Lexington Insurance Company to review four insured locations. Performed Safety inspection of MCSO Administration Building with Bob Stone. Benefits (Group/Workers Comp) Wkrs Comp TPA & Excess Carrier bids reviewed KPHA Quarterly meeting held. EAP representatives now participating in meeting. Safety No major activities. BUDGET & FINANCE Budget Analysts: Reviewed Fund Balances for several funds. This review included updating revenue collections and expenditures. I have Updated the FY10 budget for the Solid Waste Fund 414 and determined to leave the FY10 Road & Bridge Fund 102 the same. 2 Updating the Capital Project schedule with project rollover requests from Public Works, Project Mgmt. and Wastewater. This should be completed and revised in time for the FY10 Tentative budget. Reviewed Parks & Beaches Impact Fee Fund 131 for potential FY10 projects. This will help reduce the FY10 Fund 147 Uninc. Parks & Beach budget. Review grant contracts, process budget transfers, r prepare/review September BOCC agenda packet before final submission Estimate revenues, expenditures, and balance FY 2010 KW Airport funds. Prepare resolutions, set-up new budget accounts and true-up GMD, Social Services, and Airports grant revenue budgets. Budget Transfers (Expenditure and Project transfers) Reviewed all accounts and took action for insufficient funds in personal line items. Worked and processed Legal Aid contract renewal. Prepare resolutions, set-up new grant budget accounts and true-up Miscellaneous Fund, and Social Services grants revenue budget. Balance and adjust FY10 Key West Airport budget. Budget Transfers (Expenditure and Project transfers) Reports Reviews a Balance Sheet by Fund Daily to verify all funds are balanced. Reports Monthly Expenditure Status Report and Expenditure Audit Trail Report is printed and forwarded to Lower Keys AARP, Big Pine AARP and Middle Keys AARP with an attached Memo outlining the available balance remaining for this fiscal year. Resolution budget transfers monthly (Expenditure, Revenue and Project transfers) Prep bills for Finance/Accts Payable Prepares the Monthly Bank of America Purchasing Card bill for Finance. (gathering signature approvals, travel exp reports, purchase receipts and completed daily purchase card reports from each card holder that has made a purchase in that month). Reviewed Budget & Finance Contracts Resolution data input and postings Input each Resolution on the Schedule of Resolutions for the BOCC meeting for that month. Prepared gas/diesel billing for Finance Prepared postage billing for Finance Timesheets Reviewed Travel Expense Reports, then forwarded to Finance. Administered/changed card status for new Purchasing cards Updated files for purchasing card holders Prepares Suncom billings for Finance Vendor setup preparation Created purchase orders 3 Purchasing Department Totals for the month of August 2009 are as follows: Total purchase orders processed 264 Total orders placed for departments 60 Total orders entered for departments 55 Office Depot orders processed 55 Staples Orders processed 2 We opened 4 bids and processed another 4 which was average from the previous months. Addendums entered 4, contracts reviewed 60, and bills paid 5, and voided 12 purchase orders. We also processed 1408 pieces of mail which was an increase from previous months. Grants Administration Department: Completed final application process for final four 2010 regular JAG grant applications, submitted hard copy packages to FDLE. Contract Preparation, Approval and Execution for 2010 RSAT grant with FDLE. Contract Preparation and approval for 2010 RSAT grant with Care Center. Contract Preparation, Approval and Execution for 2010 ARRA JAG with FDLE. Contract Preparation, Approval and Execution for 2010 ARRA JAG grant with Care Center. Reviewed, approved, processed invoices for all current HSO, HSAB, Byrne and RSAT grants. Modification of HSO contract language to reflect concerns regarding audit Preparation of 2010 contracts for HSAB and BOCC-direct funded organizations in preparation (36 contracts in total). Preparation and approval of new resolution changing audit requirements in Management of various issues related to 2009 HSO contracts. 2009 JAG grants: Completed quarterly programmatic and financial reports. 2009 RSAT grant: Completed quarterly programmatic and financial report. 2006 OJP LLEBG grant: Completed, updated financial reports. 2007 OJP LLEBG grant: Completed, updated financial reports. Compilation and tracking of Recovery Act funds. FEMA Storms Ike and Fay: Securing and tracking payments for various small project PWs for Hurricane Ike and TS Fay. Continued communications with State and FEMA officials to obligate balance of funds owed to County. Continued communications with State on problem PWs. FEMA: Wilma: Continued closeout work for Wilma PWs. Completed closeout of last marine debris PW; and in process of closing out several others. FEMA: Dennis: Completed last PW for final closeout of Dennis (secured an additional $147,000.) Responding to ongoing follow-up questions and information requests from FEMA joint field office on closeouts of old marine debris PWs. 4 COMMUNITY SUPPORT SERVICES SOCIAL SERVICES DEPARTMENT (SSD) In-Home And Nutrition Services (IHNS) OAA, Older Americans Act Programs: Nutrition (Information in this section is for the period 7/21/09 8/20/09) C-1 Congregate Meals totaled 1052 units this month, reflecting an increase in mealsite attendance due to recent outreach efforts. The Big Pine mealsite is scheduled to re-open in September which is expected to add significantly to the units produced. C-2 Home-Delivered Meals totaled 2502 units, a 10% increase over last month. New clients continue to be added in the Middle and Upper Keys, eliminating any wait list for clients with high nutrition eligibility scores. In-Home Services (Information in this section is for the period 6/21/09 7/20/09) III-B Screening and Assessment: 23 units this period, 111% year-to-date achieved, 52.66% overachieved. 47 clients on the waiting list. III-B Homemaking: 286 units this period, 47% year-to-date achieved, 11.34% underachieved. 55 clients on the waiting list. III-B Personal Care: 242.75 units this period, 88.89% year-to-date achieved, 30.55% overachieved. 21 clients on the waiting list. We have spent $73,352.31, 66.95% of III-B funds, which is 8.61% overachieved. Two clients have been terminated and two more clients will be transferred to Medicaid Waiver to reduce this overachievement. III-E Facility Respite: 253.25 units this period, 24.42% year-to-date achieved, 33.92% underachieved. We will need to recruit more clients for this program or increase the hours for existing clients. Non-OAA Programs: CCDA (Community Care for Disabled Adults) for July 2009: Case Management: 19.75 units for the month were produced;19.75 units year-to- date. Homemaking: 137.25 units for the month were produced; 137.25 units year-to date. Home-Delivered Meals: Monthly units were 205 meals; 205 meals year-to-date. Personal Care: Monthly units were 12; 118.5 units year-to-date. Overall Program Achievement was 6.65%, 1.61% underachieved. CCE (Community Care for the Elderly) for the period 7/1/09 7/20/09 (beginning of the contract year): Case Management: 59.25 units for the period and 59.25 units year-to-date. 6% achieved year-to-date. There are 82 clients on the waiting list. 5 Intake: 6.5 units achieved and 6.5 units year-to-date. 12.8% achieved year-to- date. Homemaking: 404.75 units for the period and 404.75 units year-to-date. 5% achieved year-to-date. There are 75 clients on the waiting list. Personal Care: 263.75 units for the period and 263.75 units year-to-date. 5% achieved year-to-date. There are 34 clients on the waiting list. Respite: 144.5 units for the period and 144.5 units year-to-date. 8.36% achieved year to date. There are 10 clients on the waiting list. CCE overall is at 5.17% achievement, 3.16% underachieved due to a short billing period in the first month of the contract year. 7/20/09: 70 units were produced in the period and 70 units year to date. 3% year-to-date achieved, 5.33% underachieved due to a short billing period in the first month of the contract year. There are 6 clients on the wait list. HCE (Home Care for the Elderly Program) for the period 7/16/09 - 8/15/09: 6.75 billable units this period, 16 billable units year-to-date. Current spending level year to date is at 7.14%, 4.2% underachieved. We have requested that one person be taken off the wait list. Monroe County Transit (MCT) Department Activity for August 2009 One-way trips provided:2007 Unduplicated clients served: 240 Special Needs Clients registered: 373 Awarded the 5310 FDOT Grant for the funding of a new Paratransit bus and the 5316 FDOT Grant for funding the Mobile Data Terminals/software for the Trapeze Dispatching and Reservation System. The awards and agreements will be brought to the board in the fall BOCC meetings. Deposited Revenue: $2,139.55 Expenditures: $25,947.86 Percentage Spent Fiscal YTD: 76.9 % Community Support Services (CSS) / Compliance In the month of August 2009 we had: 15 New Welfare cases 436 Office visits 26 Home and field visits Incoming calls + referrals Combined total [2,214] We served (99) unduplicated Welfare client households (15) New EHEAP cases. Total $ 3,952.21 Low Income Home Energy Assistance Grant Program cases totaling $ 17,200.00 71 -cases) Low Income Crisis Assistance cases totaling $ 28,819.15 72-cases) Spent in August: $ 46,019.15 143-cases . (158) cases peer reviewed by staff.- including paupers, & scripts 1 staff member attended the SHAL meeting in Key West on 8-29-09. 6 Temporary employment applications are being accepted for one LIHEAP position open in Key West Bayshore Manor (BSM) private pay and twelve subsidized. BSM provided 439.75 hours of OA3E respite care this month. Bayshore Manor has seven OA3E clients. There are two clients on the wait list. Revenue for August 2009 $30,423.35 Expenditures for the same period $47,891.55 Percentage of the budget spent year to date 84.11% LIBRARY Summer usage of Library services continued the trend toward new record figures: total for the same month, and 370 new Library cards were issued, bringing the total number of Monroe County Library cardholders to 40,995. Reference questions rose by 9% over last year, totaling 7,724 for the month, and overall Library visits also rose by 9%, with a total of 40,420 visitors using our services onsite. This was a last-minute initiative that proved extremely useful and much used by our community. Summer leading lists were obtained from various Monroe County schools and a virtual book display was created linking book jackets to the titles in our online catalog. We definitely plan to offer this service again next summer. Our summer reading programs, in concert with the State Library sponsored Florida Library Youth Program, were again highly successful and widely popular. Although the formats varied among branches, according to local preferences, the results were uniformly rewarding: 54 programs were offered and nearly 2,900 participants responded to themes including storytelling, birds, art, music, dance, and science. The attendees ranged from toddler to teen-age, and the books reported as read by the attendees exceeded 4,000. Library spending for the FY 2009 budget year remains on a pace with the year discretionary funds are being used only for customary needs and basic operating expenses, as we continue to use donations and State Aid funding to supplement these requirements. EXTENSION SERVICES Number of services provided: 430 phone calls, 39 office visits, 21 visits to clients, 4 group teachings with 31 participants, 9 media submissions, and 292 bulletins distributed. Total Budget for FY 08/09: $186,485.00; Year to Date Expenditures and Encumbrances: $170,461.03; Remaining Balance: $16,023.97; Percentage of budget spent and/or encumbered year to date: 91%. The Extension Director participated in a two-day meeting of the Gulf of Mexico Catch Working Group meeting in Tampa to review methodologies for comprising the new NOAA guidelines for establishing allowable biological catch levels to 7 prevent overfishing that incorporate precautionary buffers based on various levels The Environmental Horticulture Agent assisted Master Gardener Darrell Dye of the Navy landscaping project design. Four Master Gardeners volunteered with planting and watering landscape beds for the project. The Family, Youth, & Community Development Agent worked with teachers at Coral Shores and Marathon High Schools to plan the High School Financial Literacy Program which will be offered in seven classrooms this year. The Agent also worked with Treasure Village Montessori and Plantation Key School teachers to plan middle school student financial education programs, which will be series-type programs similar to the high school program but with more age appropriate material. GROWTH MANAGEMENT GMD COMPARATIVE REVENUE SUMMARY Revenue Total Total Revenue Revenue Revenue % Budget Revenue Revenue Ending Ending Ending Variance FY 2009 Collected Collected August August 2008 August Revenue in in FY 2007 2009 2007 Ending FY 2008 August 2008 To August 2009 Building $2,790,632 $2,857,684 $2,769,314 $2,325,792 $2,741,767* $2,359,001 -15% Permit Licenses & Permits Planning $430,000 $488,081 $532,000 $547,155 $630,421 $652,244 -13% Department Fees Code $90,000 $110,412 $97,940 $267,914 $103,706 $85,343 + 258% Enforcement Fines & Forfeits renewal year, which generated an additional $129k. These are the primary, customer driven revenues and do not include the revenues obtained by taxes etc. EXPENSES Budget Total Total 2009 2008 2007 % Variance Expenses Expenses Expenses Expenses Expenses Expenses FY 2008 FY 2007 Ending Ending Ending Ending August August August August 2008 To August 8 2009 Growth Mgmt. Admin. $916,526 $648,098 $1,637,473 $380,497 $689,765 $1,236,131 -55% Building $2,434,746 $2,311,238 $2,299,758 $1,933,350 $2,015,794 $1,998,986 -4% Code Enforcement $1,009,885 $894,006 $1,021,256 $860,863 $786,583 $923,335 +9% Planning $1,149,516 $878,366 $1,333,008 $771,719 $791,481 $1,216,866 -2% Environmental Resources $299,302 $330,016 $313,488 $241,508 $295,278 $278,238 -18% Planning Commission $100,541 $88,345 $86,226 $74,500 $80,153 $76,773 -7% Comprehensive Plan $358,400 $74,655 $290,478 $31,295 $45,679 $221,598 -31% Geographic Info. (GIS) $314,133 $181,935 $310,576 $221,034 $148,339 $277,756 +149% Marine Resources $55,051 $84,753 $235,623 $46,013 $76,580 $227,591 -40% Pump Out Boat $68,587 $64,640 $48,275 $61,173 $56,775 $47,141 +8% MARINE RESOURCES OFFICE Marine Resources Functions: Handled approximately 50 customer inquiries; performed 5 site visits Drafted extension amendment to the CVA grant agreement for the Pumpout Program Removed 5 derelict vessels Finalized mangrove trimming permit for Tarpon Creek. Coordinated efforts with DCA and SFRPC regarding necessary revisions to the Marina Siting Plan Coordinated efforts with DEP and DOH on vessel pumpout facilities at marinas with state regulated on-site wastewater systems Coordinated efforts with FWC to have Monroe County participate in the statewide Pilot Project addressing anchoring regulations Held kickoff meeting with NOAA, DEP and USFWS regarding the upcoming FWC Pilot Project and issues related to long-term anchoring in the Key West area Coordinated efforts with DEP and DOT on state leases for trap storage areas throughout the Keys Coordinated efforts with Engineering on the re-construction of the Sunset Pt Park boat ramp Coordinated efforts with PBS&J regarding inventorying anchored vessels in the lower Keys Prepared agenda and public notice for the September 1, 2009 Marine and Port Advisory Committee meeting Assisted Engineering on the closeout of the FEMA Project Worksheet for Hurricane Wilma marine debris cleanup Assisted the Building Dept in inspections on Cooks Island Completed field surveys of all channel markers and regulatory buoys in the middle Keys area for updating the FWC database Prepared agenda items for the September BOCC meeting Coordinated efforts with the Village of Islamorada regarding the 9 Vessel Pumpout Program Functions: Pumped out 59 boats Building Department Number Of Permits 08/02/09-08/27/09 Apps Submitted 429 Permits Issued 365 Walk Thru 89 Cert Of Occupancy 11 Inspections Total 1687 Average Per Day (20 Days) 84 ì×ÊøÓÉÙÓÌÐÓÎ× Building/Roofing 903 Electrical 238 Plumbing 307 Mechanical(A/C) 62 Gas 24 Plans Reviews Total 2738 Average Per Day (20 Days) 137 ì×ÊøÓÉÙÓÌÐÓÎ× :Abo 267 Bio 82 Bio Pend ---- C.O. ---- Code Enf 2 12 Code Enf 3 4 Coord 74 Elect 57 Exam 136 Fema ---- File 3 Final 1 Fire 5 Flood 76 M-Storage 1 Mar-Bldg 378 Mech 25 N-Rogo ------- Official 4 Pending 22 Plan 30 Plumb 30 Ready 3 Rogo 1 Roof 1 S.I. Building 153 10 Track 2 Uk-Abo 153 Uk-Bio 92 Uk-Bldg 307 Uk-Code 13 Uk-Coord 241 Uk-Elect 29 Uk-Eng 3 Uk-Exam 147 Uk-File 11 Uk-Fire 41 Uk-Pending 34 Uk-Mech 19 Uk-Nrogo Uk-Plan 67 Uk-Plumb 47 Uk-Roof 12 Uk-Ready 128 Uk-Rogo 2 Uk-Track 27 Planning And Environmental Resources Department Current Planning Category Appeal to Planning Commission in Progress 1 Appeal to Planning Commission in Progress 2 Appeal to DOAH in Progress 1 Alcoholic Beverage in Progress 1 Code Enforcement Referral (estimated at 1 per week per Current Planner (4) ) 16 Conditional Use, Major Permit in progress 7 Conditional Use, Minor, Permit issued 1 Conditional Use, Minor Permit in progress 2 Conditional Use, TDR Issued 1 Conditional Use, TDR in progress 1 Home Occupational Permits in progress 1 Road Abandonment applied 1 Road Abandonment in Progress 6 Setback Waiver Administrative in Progress Variance, Administrative in progress 3 Variance, Planning Commission, in progress 1 Permits Reviewed & Processed 75 Vacation Rental applied 6 Vacation Rental issued 6 ROGO related applications ROGO Exemptions Applied 3 11 ROGO Exemptions/Denials Issued 3 Customer Service In-person inquiries estimated at 5 per day per planner (2) 300 Telephone inquiries estimated at 10 per planner (7) per day 2100 Email inquiries estimated at 5 per planner (7) per day 300 Request for Research Applications 2 Pre Application Conferences 1 Historic Preservation Committee Application 1 Comprehensive Planning Category Meetings DRC Meetings/5 agenda items 2 Meetings on Various planning related topics 10 Interviews Planner Interviews 5 Researched: FLUM amendment project for Land Steward 1 Researched & Learned Project Management Software 1 Edited: Public Facilities Capacity Report 1 rd HCP-3 Annual Report 1 Edited and Submitted Rockland Industrial Park Replat BOCC documents for August meeting 1 Edited and Mailed Assisted: Computer help for Staff(includes PowerPoint, Excel, Pentamation,& Alchemy) 1 City Planner with cell tower question 1 Attended Toastmasters meeting 1 Computer software classes for permitting 1 Computer training 5 Wrote: 1 Draft of MDJ Investment Staff Report for DRC LUD 1 Draft of Lloyd Good Staff Report for DRC LUD amendment 1 1 Environmental Resources Performance Review Administrative Relief/Beneficial Use Applications 1 Code Enforcement Referral 14 Conditional Use Application Review 4 Land Authority Referral 1 Permit Application Site Visit 108 12 Letter of ROGO Land Dedication 2 Other: Army Corps of Engineers 2 Site Visits [Miscellaneous] 44 Written correspondence/ biological assessments Administrative Relief/Beneficial Use 1 Vegetation Mitigation Letter 1 Code Enforcement Assessment Memo 8 Land Authority Assessment 1 GIS Map (assorted) 35 GOCEA Recording 1 Conditional Use Staff Report 2 Interagency Coordination (DEP, ACOE, FKEC, FL Park Serv., FWC) 14 Letter of Understanding 1 Other: Pentamation Templates 3 Tier/ROGO Score Sheets 2 Permit Application Review/Assessment 135 Meetings & miscellaneous DRC 2 Pre-Application-Assorted 1 Code Enforcement Hearing 1 Special Projects (Reverse Rogo) 2 Phone Calls (estimated 3 persons) 500 Front Counter Walk-in (estimated 3 persons) 225 Code Enforcement Department Number of New Cases Opened 185 Number of Inspections completed 1744 Number of Cases Heard before Special Magistrate- 112 Fines Collected $ 44,323.02 After the Fact Fees Collected $ 6,576.00 Number of Contractor Citations Issued 12 Number of Contractor Citations Heard 4 Contractor Citations Paid $ Report not available Flood insurance Inspection Fees Collected $ Report not available Totals Collected $50, 899.02 13 EMERGENCY SERVICES Fire Rescue Interviewed twenty- July. Three candidates were selected for current Fire Rescue vacancies, and processing has begun for employment. Collective bargaining session with IAFF 3909, August 24. A neighborhood open house was conducted at Tavernier Fire Station 20 on August 29 An emergency management conference call was held to review status of Storms Ana, Bill and Claudette on August 17. Training Fire Fighter II class is on going, three days a week. Conducted Span of Control and Accountability training. Coordinated 12-Lead EKG and Strategy &Tactics I classes. Attended the Pre-Construction meeting for Tanker 10. Assisted with firefighter candidate interviews. Fire Marshal Reviewed numerous commercial plans for adherence to building and fire codes. Investigated two trailer fires and one boat fire at a boat yard. Completed Mariners Hospital fire inspection. Attended the NFPA 13 Sprinkler Update Class. Emergency Management Conducted a County Shelter Task Force Meeting. Met with Monroe County School District (MCSD) personnel, MCSD Attorney and Monroe County Assistant Attorney, regarding the payment process for Marathon High School Enhanced Hurricane Protection Area (EHPA) project (to add a generator to the school gym) and the Inter Local Agreement to be presented at the October 2009 BOCC meeting. Attended Radiological Emergency Preparedness training at the Bureau of Radiation Control on Radiological Detection Portal use and Radiological Resources in Orlando. Active participation in the H1N1 (Swine) flu local and regional discussion and preparedness Trauma Star Community Education LZ refresher training was completed for all fire stations within Monroe Î County by the Flight Team and Pilots. Continuing Education for Flight Crew to maintain highest level of Patient Care 12 Lead EKG refresher training was provided Î Critical Care Patient Care Delivery Through 8/31 @ 1200, 20 patients were transported in August. Î (12 Hospital to Hospital, 2 Stroke Alerts from scene, 2 Cardiac Alerts, 3 Trauma Alerts, 1 primary response to Boot Key). There were 5 additional stand-bys for transport. 14 Upper Keys Health Care District One patient was airlifted from the UKHCTD to Ryder Trauma Center. An Advisory Board meeting was held on August 21. PUBLIC WORKS Pollution Control removed 33.66 tons of debris illegally dumped in the County rights of way, and also collected 5.88 tons for other departments (5,520 lbs from the Key West Garage; 1,760 lbs from Marathon Public Works; 1,140 lbs from the Marathon Garage; and 3,340 lbs from the Key West Courthouse g office nd space at the DJJ Building, 2 Floor, Stock Island Facilities Maintenance staff along w/inmate trustees completed painting and ronic fuel monitoring system Plantation Key fuel facility project began Completed annual countywide refueling of emergency generator tanks Improved process of tracking and notifying Departments of past due vehicle inspections and maintenance Overhead Rolling Door replacement at Marathon Garage and the Stock Island Detention Facility 95% complete; grant reimbursement in progress Received final inspection from the City o f KW for the new 90-ton chiller at the DJJ building; project was approximately $10,000 under budget Notice to proceed provided for the Marathon & PK Jail security fencing improvement project In-house staff completed EOC emergency back-up generator improvements along with operational testing Media room project at Marathon Government Center completed with the exception of equipment Contract executed for new convection steamer ovens for the Stock Island Detention Facility State Accreditation inspection was conducted and all correction facilities passed with flying colors Replaced a/c compressor at the Islamorada Library (under warranty) Replaced decking on dock at Harry Harris Park Installed parking bumpers, striped parking spaces and planted/trimmed trees at the new PK Court House parking lot Provided inspection coverage of the Key Largo Waste Water operations during the absence of the Engineering Department inspector  Engineering Services: Palm Drive Bridge Notice to Proceed and executed LAP Agreement received from DOT on July 17, 2009. Revised construction documents were submitted to DOT for review and approval. Project is currently being advertised for bids and bid opening is scheduled for September 10, 2009. 15 Geiger Creek Bridge Project Construction documents revised and submitted to DOT for review. Staff working on revising contract documents based on updated information and requirements from the American Recovery and Reinvestment Act (ARRA) stimulus program. Waiting for Notice to Proceed from DOT. Stimulus Discretionary Grant Staff is preparing an application for an additional $8,500,000 of transportation stimulus money that will be awarded on a th discretionary basis in February 2009. Application is due on September 15. Hurricane Wilma 2005 Staff working with FEMA and Dept. of Emergency Management to close out Marine Debris project worksheets from 2005. Staff provided paperwork and back up for trap debris project close out. Anticipate $499,000 additional reimbursement upon close out. (Ongoing) Staff provided close out documentation to FEMA and DEM for Derelict Vessel project worksheet close out on July 15th. Anticipate $260,000 additional reimbursement from FEMA upon review of documentation. FEMA required additional documentation from regulatory agencies prior to closing out PW. Boca Chica Road Repair project (Hurricane Wilma) Second appeal for additional funding for repairs was denied by FEMA on July 6, 2009. Staff will revise construction documents and contact FEMA regarding proceeding with approved repairs. Hurricane Preparation 2009 Working with Department of Environmental Protection (DEP) to obtain pre-approval letters for temporary debris sites. Drafted memo to Administrator to obtain guidance on County plans for debris clearance on non-county maintained roads. South Florida Water Management District Grant 09 Staff preparing third reimbursement request for stormwater grant money. Staff is identifying stormwater grant opportunities for the FY2010 period and preparing grant application. Key Deer Sod Project Staff issued Ecoscapes a Notice to Proceed on June 26, 2009. Project cost will be $10,760.10. Work was completed and payment is being processed. 50% of the project cost will be reimbursed by stormwater grant. Request for Qualifications for Ongoing Engineering Services Responses to the RFQ were opened on July 28, 2009. The County received forty- four responses. A selection committee is reviewing the responses and has advertised the public th ranking meeting for September 28. The Vandenburg Project staff reviewed two TDC contracts and the ILA between the City of Key West and the County and provided memo to the City regarding required paperwork for reimbursement of funds under the three agreements. Ongoing work includes reviewing submittals from City of Key West. (ongoing) Duck Key Security Cameras Staff researched options for security systems for Duck Key bridges. Staff briefed Mr. Tom Neville from Duck Key Security district on various types of systems to obtain direction prior to proceeding. Ongoing work includes obtaining consensus from Duck Key on type of system desired and preparing RFQ to advertise for the project. Duck Key Pedestrian Bridges Staff attended status meeting with Duck Key residents on May 5, 2009 to discuss pedestrian bridges. Duck Key would like two 16 options for pedestrian bridges (county has provided one). County staff will research issues such as vegetation trimming, power pole locations, etc. that will impact bridge installation. Big Coppitt Sewer Project Field inspection staff overseeing work on County roads to insure adherence to County requirements. Road restoration and paving on the Boca Chica/Geiger/Rockland Key sewer project is scheduled to begin in mid August. Pigeon Key Ferry Service - Staff processes monthly invoices from ferry contractor and prepares reimbursement requests to DOT for payment through Joint Participation Agreement for ferry service funding. (ongoing) FDOT Road Projects Staff reviewed construction plans and provided comment letters and clear letters for DOT US 1 projects; provided 30% construction drawings for Cudjoe Regional Transmission Main to DOT consultant for project coordination. Staff attended final inspection of Big Coppitt Fire Station signal installation. Street Light Survey Staff received updated list of lights in Upper Keys from FL Keys Electric Coop; staff will review list and compare to invoices to check for accuracy. DOT Traffic Signal/Street Light Maintenance Agreements Staff is working with DOT to include non DOT street lights on US 1 under the agreement for reimbursement. (ongoing). Lighting Task Force Engineering staff participated in the Lighting Task Force meeting to look at new lighting technology for energy saving purposes. Participants include Keys Energy and various municipalities. (ongoing). Cudjoe Gardens Roads staff met with representatives of Cudjoe Gardens to discuss feasibility of turning private roads over to the County. Staff is working with County Attorney and homeowners to determine ownership and legal issues involved in transfer. (ongoing). FDOT Sign Permit Request staff is preparing a sign permit request to DOT for the driveway connection for the Medical Examiners Building at the request of the Overseas Heritage Trail Coordinator. (ongoing). Ongoing Work - staff communicating with DOT to obtain information on constructing a paved Î pathway on bayside of US 1 in Key Largo. (ongoing). provided comments on 2 road abandonment applications to Planning Î department. Staff reviewed and approved a right of way permit for ATT to place upgraded Î equipment on Right of Way.. General Right of Way permits reviewed - 5 Î Right of way permits issued 5 Î Right of way permits (work completed) inspected 6 Î FKAA pavement cuts inspected - 3 Î Staff handled various calls from public regarding wastewater assessment Î payoff, drainage and flooding complaints, miscellaneous sewer and road inquiries, requests for street light installation, traffic signal timing  17 PROJECT MANAGEMENT ADA Compliance Survey and Assessment Public review of the of the Evaluation Assessments reports placed in the Key West Library, Marathon Library and Key Largo Library is ongoing. ADA Compliance Transition Plan Negotiations BOCC approved commencement of negotiations with the number one ranked firm on 19AGU09. First negotiation meeting held August 27, 2009. Staff compiling and providing to Bender & Associates copies of county policy and procedures, program services, Evaluation and Survey Assessment documents, etc. Vendor to submit project proposal to Project Management September 2009. Warranty Support to Public Works Staff continues to provide on-going warranty support to Public Works for the Murray Nelson Government Center, the Freeman Justice Center, Big Pine Park, and the Medical Examiner Facility. Litigation Support to the County Attorney Office staff continues to provide on- going litigation research, documents, and support for the Tavernier Fire Station, Tropex v. Monroe County, Freeman Justice Center, Tower Group v. Monroe County as well as Monroe County v. Gonzalez Architects Freeman Justice Center Litigationlegal research and negotiations for a Î settlement agreement on-going. Draft agreement prepared by outside counsel county Î due to design errors by architect forwarded to attorneys.. Tavernier Fire Station Litigation BOCC met in closed meeting on August Î company will reimburse county for lack of performance by Tropex Construction. Grant Research, application and administration ongoing process ARRA Stimulus Fund Grant- Staff is actively researching and reviewing available fund grants. FEMA- ARRA Fire Station Construction Grants: Grant submitted on July 10, Î 2009 is in peer and technical review process. Earliest notification of award of funds will be late fall (November 2009). Department of Energy-ARRA Energy Efficiency Initiative Grants. At the Î request of the GITF, staff researched requirements, availability, and application deadlines for EEI grants SFWMD Fund Grants FY2009 Progress reports and invoice reimbursement request for $144,520.88 prepared by staff as per Agreement #4600001593-FY2009 for stormwater work completed on the following county projects: Big Pine Fire Station Î Key Deer Boulevard Sodding Project Î Lower Keys Wastewater Treatment Plant Î Key Largo Wastewater Treatment Plant. Î Duck Key Wastewater Treatment Plant Î Plantation Key Fuel Facility Project Î 18 SFWMD Fund Grants FY2010 Staff creating budgets, scope of work and project schedules to submit to SFWMD for stormwater drainage improvements grant funding in FY2010 TDC Fund Grants Staff prepared and submitted applications for two projects which have received first round DAC approval: East Martello Tower- construction of emergency fire stairs and repair of Î interior access stairs West Martello Tower - demolition and replacement of existing perimeter Î fencing Staff is awaiting notification from the TDC of final ranking and award of grants. TDC Grant Compliance Inspections and Pay Applications Review Inspections and reviews for TDC projects were done on the following projects: Western Union Schooner Î work is underway. Botanical Gardens TDC project completed Î Tropic Cinema Renovation TDC project work has started, inspections and Î reviews on-going Î Marine Mammal Conservancy TDC project application review complete Î Butterfly Garden TDC project application review complete Î Sombrero Beach Playground Equipment Replacement TDC project Î application review complete Tennessee Williams Theater Fire Curtain TDC project application review Î complete Dolphin Research Center TDC project application review complete Î Marathon Community Theater TDC project application review complete Î Freeman Justice Center- All Construction Completed Close-Out Phase on-going As-builts Drawings: Comparison by staff of the third revised set of security Î system as-builts is complete. Deficiencies and missing equipment found were forwarded to Navarro Security System to meet contractual obligations to provide completed security system and accurate as-built drawings. Emergency Operations Center Marathon Airport Design Development phase: A review meeting with the A/E and his Î consultants was held on August 6, 2009 at the A/E office to reiterate the comments which included input from Emergency Management and Technical Services were forwarded to the A/E on August 23, 2009. Review with for a 380 agreement for a building height variance. The A/E has been advised that future appeals for exceptions from County regulations must route through Project Management. Per the Florida DEM review of the design development phase, the design package is considered to have achieved the 50% construction document milestone meeting the grant criteria milestone schedule. EOC Grant Reports and Reimbursements: Î 19 HB7121Grant: Staff is awaiting payment of reimbursement request to Federal HMGP Grant: Additional information and documents provided. Staff is awaiting payment of reimbursement request for the 75% match submitted to the HMGP Grant Coordinator in the amount of $9,035.96 Big Pine Key Fire Station Construction Complete- Close Out Phase Substantial completion of project documented and approved by architect, contractor and Project Management. Certificate of Occupancy issued August 10, 2009. Capt. Steve Zavalney accepted keys and took possession of Fire Station #13 on August 14, 2009. Dedication ceremony date to be determined by Chief Callahan SFWMD Grant Reports and Reimbursements: Staff has submitted progress Î report and reimbursement request for stormwater work completed. Sunset Point Boat Ramp Notice to proceed issued August 1, 2009. Permitting completed. Construction scheduled to start September 8, 2009 with substantial completion approximately September 30, 2009. FWC Grant Reports and Reimbursements: Staff submitted the required Î monthly progress report. Reimbursement request will be submitted at completion of project. RFQ-Continuing Contract for Architects/Engineers Opening date was August 25, 2009 with 26 responses received. Selection of Committee Members and delivery of documents completed on August 27, 2009. Public Noticed Meeting is scheduled at the Marathon Government Center on Friday, September 25, 2009 beginning at 9:00 AM RFQ-Professional Engineering Services Opening date was July 28, 2009 with 44 responses received. Selection of Committee Members and delivery of document completed on August 13, 2009. Public Notice Meeting is scheduled at the Gato Building, Conference Rooms 2 and 3, on Monday, September 28, 2009 beginning at 9:00 AM. Plantation Key Fueling Facility Construction started on August 24, 2009. As of August 31, 2009 existing tanks have been removed and ground contamination appears minimal. Storm drainage structures partially excavated and installed. Hickory House RFP BOCC at August 19, 2009 meeting did not approve the only proposal received. Staff awaiting direction regarding property studies and new RFP. no change in the regulatory aspects of permit compliance; ACOE compliance deadline is May 2010. Conch Key Fire Station Permitting process continues in progress, with permit application under review by the Building Department and USACOE and SFWMD permits still pending. Grant Submittal: Grant requesting a 50 % Federal match in the amount of Î $1,351,529 for the construction of the Conch Key Fire Station is in federal review process. Marathon Courthouse Renovations permit applications and submissions have started. Bid documents are in process. Stock Island Fire Station RFP is being prepared for approval by BOCC to advertise. 20 Grant Submittal: Grant requesting a 50 % Federal match in the amount of Î $2,122,069 for the construction of the Stock Island Fire Station is under federal review process. Stormwater Reviews Staff reviewed one stormwater submittal in August. Higgs Beach Restroom Renovation Architect to be selected October 2009. Higgs Beach Visitor Center Discussion to be scheduled with Higgs Beach Committee Projects On Hold Public Works Rockland on hold. Î Jefferson B. Browne Building on hold. Î Old Tavernier School Town Meeting Hall on hold. Î TECHNICAL SERVICES We completed 143 work orders for the month of August, gathered equipment and prepared for new Pentamation training for Growth Management, migrated marathon file servers to new SAN disks, upgraded backup software, updated public access computers in libraries with new service pack and security updates, installed new IP phone service at from 2004 and 2005, pushed out new Microsoft security updates and selected new hosting solutions for our website. VETERANS AFFAIRS Clients Assisted: 1513 New Clients Assisted: 71 Field Visits 12 Benefits Delivery at Discharged 10 Van Clients Transported: 161 (to the VAMC, Miami as well as other Miami area hospitals, without incident) The Veterans Affairs Department: The financial data for the month of August $224,823.00 indicates the amount of new revenue brought into Monroe County derived from claims for the entire department, including Key Largo and Marathon. The financial data captured monthly will vary due to the Veterans Administration variable time frame on adjudication of awards, as well as the amount awarded. 21 11111 CARDENAS .4PARTNERSLLC MEMORANDUM TO: Monroe County Board of County Commissioners FROM: Cardenas Partners LLC DATE: September 16, 2009 Overview of Monthly Reports OCARDENAS• .ARTNERSY_i:C: CONGRESSIONAL CALENDAR: The House of Representatives passed the FY2009 Omnibus (H.R. 1105) on February 25th by a vote of 245-178. The bill was then received in the Senate and passed without amendment by a voice vote on March 10th. The legislation contained the FY2009 appropriations for: Agriculture, Commerce-Justice-Science, Energy & Water, Financial Services, Interior & Environment; Labor-HHS=Education, Legislative Branch, State & Foreign Operations, and Transportation-HUD.. th H.R. 1105 was signed into law by the President on March 11 . The funding secured in the FY2009.appropriations;bill is as follows: $2,392,000 for the Florida Keys Water Quality Improvements Program This money was secured by Congresswoman Ileana Ros-Lehtinen. FY2010 Appropriations Season: Last month Cardenas Partners .LLC prepared and successfully submitted all three appropriations requests for Monroe County for FY2010. Cardenas Partners LLC worked closely with designated staff from the County to . develop a list of priorities for appropriations funding requests. Forms were submitted to Congressman Mario Diaz- Balart, Congresswoman Ileana Ros-Lehtinen, Senator Bill Nelson and Senator Mel Martinez. This month Cardenas Partners LLC has met with the appropriations staff members; specifically, Sarah:Gamin from Congresswoman Ileana Ros-Lehtinen's office and Nilda Pedrosa from Congressman Mario Diaz-Balart's office, to push for the inclusion of the County's priorities in the FY2010 appropriations bill. The priorities include: 1. Wastewater Infrastructure Improvements; 2:Bridge Repair Project; and 3. Emergency Operations Center. The deadline for submission by the Congressional offices is.April 3rd; Cardenas Partners LLC will continue to be in contact with Congressional staff to make sure County projects are submitted. Cardenas Partners LLC has recommended a DC Fly-In for County officials in the coming month in order to sit down with its Congressional delegation as well as certain department officials regarding its priorities. Clean Water State Revolving Fund: The CWSRF program is a low-interest loan program for local government wastewater and stormwater projects. Loans are made based on a federally-approved, competitive priority system reflecting environmental and public health considerations and readiness- 11111 ARDENAS;*PARTNERS Li.c to-proceed. Moneys are disbursed based on completed, invoiced work. Loans are generally made for a 20-yearr term at interest rates at least 40%below rates. EPA expects to award state capitalization grants by early April. Total Florida State funding amount: $132.29 million. Cardenas Partners LLC .met with Valerie.Johnson from the. Environmental Protection Agency (EPA) to :discuss the Clean Water State Revolving fund. She addressed questions regarding how to access funds as well:as the timeline that is expected once the funds reach the state. Drinking Water State Revolving Fund: The DWSRF program is a low-interest loan program primarily for local government drinking water projects. Loans are made based on a federally-approved, competitive priority system reflecting public health and regulatory compliance considerations and readiness-to-proceed. Moneys are disbursed based on completed, invoiced,work. Loans are generally made for a 20-year term at interest rates 40%'below rates. Loan repayments are returned ("revolve") to the program to make new loans,combining with any available federal funds, state matching moneys (waived for ARRA), and interest earnings on the SRF. Federal funds, including ARRA funds, are allotted to the states based on a formula in federal regulations. EPA expects to award state capitalization grants by early April, 2009. All funds must obligated through construction contracts at the local government level no later than one year after the effective date of the ARRA. The total Florida State budget amount: $88.07 million. Cardenas Partners LLC met with Pete Mitchell and Susie Perez-Quinn from Senator Nelson's office to discuss the option of obtaining funding for Monroe County through the stimulus that goes directly to the County, not the Florida Keys Water Quality Improvements Program (FKWQIP). Cardenas Partners LLC has conducted a number of conference calls with Monroe County officials regarding meetings that have taken place on behalf of the County concerning stimulus dollars and to discuss the best course of action moving forward. FY2010 Appropriations: During the month of April, Members of the House and Senate Appropriations Committees (and Subcommittees) began the behind-the-scenes work of: drafting the appropriations bills for fiscal year 2010. Markups for all the appropriations bills are not yet scheduled, but are expected in the coming months. 111PCAR.DE NAS•PARTNERS L1_i Cardenas Partners LLC will certainly attend and monitor the Appropriations Committees' markups for the appropriations bills which the firm has made funding requests on behalf of Monroe County. Throughout the month of April, Cardenas Partners LLC remained in close contact with the offices of Congresswoman Ileana Ros-Lehtinen and Congressman Mario Diaz-Balart regarding the progress of the FY2010 appropriations ro riations bills. At the end of April,Cardenas Partners LLC gathered the list of which Member submitted which of the FY2010 funding requests on behalf of Monroe County. • Congresswoman Ileana Ros-Lehtinen submitted: Emergency Operations Center Homeland Security.bill $3 million - Wastewater Infrastructure Improvements Interior& Environment bill $10 million - Bridge Repair Project Transportation, Housing and Urban Development bill $2 million During the month of May,-Cardenas Partners LLC will plan and attend supplementary meetings with appropriate House and Senate Committee Members (and staff) in order to educate them about the County's requests and urge for their inclusion in this year's appropriations bills. 2009 MONROE COUNTY.DC FLY-IN: Throughout April, Cardenas Partners LLC worked diligently to assist in planning and executing. the DC Fly-In for the Monroe County delegation that took place April 27th through April 29th. On April 20th, members of the Cardenas Partners LLC team participated in the second conference call to plan the DC Fly-In. Cardenas Partners LLC scheduled the following requested meetings:for the trip: ■ Spencer Wayne (Legislative Assistant to Senator Mel Martinez) o Spencer handles Appropriations and Transportation issues for the Senator o Topic: discussed Monroe County's.appropriations requests (Wastewater Infrastructure: Improvements, Bridge Repair Project and the Emergency Operations Center). Also discussed were the County's requests for the Surface Transportation Reauthorization bill. ■ Congressman Mario Diaz-Balart and his Chief of Staff Nilda Pedrosa CARDENAS• ..ARTNERS tLe, o Topic: discussed Monroe County's appropriations requests (Wastewater Infrastructure .Improvements, Bridge Repair Project and the. Emergency Operations Center). Also discussed were the County's requests for the Surface Transportation Reauthorization bill: • Michael Blake, White House Office of Intergovernmental Affairs o Lori Faeth from the Department of the Interior was also present o Topic: The. need for federal funding for.Monroe County's wastewater infrastructure • Congresswoman Ileana Ros-Lehtinen and.her Legislative Director Sarah(Jamino o Topic: discussed Monroe County's appropriations requests (Wastewater Infrastructure Improvements, Bridge Repair Project and the Emergency Operations Center). o The Congresswoman was also thanked for her efforts in helping to secure $25,408,000 in stimulus funds for the Florida Keys Water: Quality Improvement Program through the Army Corp of Engineers. • Senator Bill Nelson and his Chief of Staff Pete Mitchell o Topic: discussed Monroe County's appropriations requests, specifically Wastewater Infrastructure Improvements o The Senator was also thanked for his efforts in helping to secure $25,408,000 in stimulus funds for the Florida Keys Water Quality Improvement Program through the Army Corp:of Engineers. • Frank Walker(Federal Policy Advisor to Governor Charlie Crist) o Frank handles environmental policy issues for the Governor o Topic: Overview of visit, discussed the possibility of a 1 cent gas;tax to pay for wastewater infrastructure improvements, the possibility of designating Monroe County as a rural area to enable them to receive grants from the State Clean Water Revolving Fund During the month of May, Cardenas Partners: LLC will schedule and conduct supplementary meetings with the appropriate staff from the House and Senate offices. SURFACE TRANSPORTATION REAUTHORIZATION BILL: Tn April, the House Transportation Committee Chairman, Congressman James Oberstar, announced his intention to pass a Surface Transportation Reauthorization bill by:the Memorial recess: This bill comes up every five years making it very important to make .. sure requests are :submitted. The Committee provided guidance for Member High- Priority Projects and set the Committee deadline as May 8th. Cardenas Partners LLC worked with Monroe County staff to identify eligible projects and complete the necessary forms. Projects are required to show 80% identified financing. It was highly recommended that projects were onlyrequested where work could be completed. within the.authorization time frame. All project requests were accompanied by a letter of support from a state or local government or government agency to both the Committee on Transportation and 1111 CARDENAS.•PARTNERS Infrastructure's Chairman and Ranking Member. All outside sources of financing (Federal, state, local or private) had to be listed in:these letters and all projects are required to have a public comment period (usually accomplished through environmental assessment process). Projects should meet requirements under.US code and must comply with highway and transit program objectives; museums, horse trails, historic battlefields and other non-transportation projects will not be considered. All projects will be vetted by the Federal DOT. Monroe County submitted a total :of nine (9) projects to Congresswoman Ileana Ros- Lehtinen's office as well as Congressman Mario Diaz-Balart's office. These projects.. were: ■ No Name.Key bridge • Similar Sound bridge • Tom's Harbor Channel bridge ■ . S.R. 940—Leg A bridge • Card Sound bridge • Truman Bridge . ■ Seaview Drive bridge • Bimini:Drive bridge ■ Harbor Drive bridge Cardenas Partners LLC will keep the County updated as this bill progresses. STIMULUS UPDATE: The American Recovery and,Reinvestment Act of 2009 authorized the General Services Administration's (GSA) Public Building Service (PBS) to invest $5.55 billion in federal public building projects. This includes $4.5 billion to transform federal facilities into exemplary high-performance green buildings,$750 million to renovate and construct new. federal offices and courthouses, and $300 million to construct and renovate border stations. GSA recently submitted a list of proposed projects and cost estimates to Congress. Buildings were selected based on the speed at which jobs could be created and g g p the magnitude of improved energy efficiency. Florida will receive $168 million in federal stimulus money to pay for projects that reduce energ y use, greenhouse gas emissions and improve energy efficiency: The money is being made available through the Energy Efficiency and Conservation Block Grant (EECBG) program, which was signed into law in 2007. However, the program was not funded until the American Recovery and Reinvestment Act of 2009 was signed into law. The money will be allocated through grants to 17 counties ($74 million)., 69 cities ($64 million), two tribal governments ($243,000) and the governor's Energy Office ($30 million). In addition, the Energy Office will distribute $18 million in sub-grants — 60 4111 C:A R D E N A S•.PA RT N E:R S percent of its federal allocation to smaller cities and counties that are ineligible for direct formula grants. FY2010 APPROPRIATIONS: During the:month of May, Members of the House and Senate Appropriations Committees (and Subcommittees) continued the work of drafting the appropriations bills for: fiscal year 2010. Most of the subcommittees with the appropriate p jurisdiction have held J preliminary hearings and received testimony from a variety of sources in order to educate themselves on current issues and fundingrequests. Markups for all of the appropriations u q bills are not yet scheduled, but are expected:in the coming months. Cardenas Partners LLC will certainly attend and monitor the Appropriations Committees' markups for the appropriations bills which the firm has made funding requests on behalf of Monroe County. Throughout the month of May, Cardenas Partners LLC remained in close contact with the offices. of Congresswoman Ileana Ros-Lehtinen and Congressman Mario Diaz-Balart regarding the progress of the FY2010 appropriations bills: House Appropriations leaders expect to begin subcommittee markups when Congress returns the week of June 1. House leaders want to pass all 12 fiscal 20.10 appropriations bills before the start of the August recess, which would give them eight weeks, excluding the one-week July 4th recess. FY2010 requests that have been submitted are as follows: • Wastewater Infrastructure Improvements ($5,000,000) Senator Bill Nelson • Emergency Operations Center ($3,000,000) Congresswoman Ileana Ros- Lehtinen • Bridge Repair Project($2,000,000)—Congresswoman Ileana Ros-Lehtinen • Wastewater Infrastructure Improvements ($10,000,000) - Congresswoman Ileana Ros-Lehtinen SURFACE TRANSPORTATION REAUTHORIZATION BILL: The current authorization that guides national.'transportation policy.was adopted in 2005. and authorized $287 billion: The bill expires on Sept. 30, 2009.. In April, Cardenas Partners LLC worked with Monroe County to submit nine (9) projects for the Surface Transportation Reauthorization bill to Congressman Mario .Diaz-Balart and. Congresswoman Ileana Ros-Lehtinen's offices. The following projects were submitted in May as High-Priority Projects to the House Transportation and Infrastructure Committee on behalf of the County: Congresswoman Ileana Ros-Lehtinen: -Monroe County Bridge Rehabilitation and Repair Projects: Amount- $3,633,800 For the following bridge repairs;No Name Key Bridge, Similar Sound Bridge, and Tom's Harbor Channel Bridge. IP CARDENASP. • A RTN E R S Lz, Cardenas Partners.LLC will continue:to keep the County updated on the progress of this bill. 2009. . MONROE COUNTY DC FLY-IN: April 27th.through April 29th delegates from Monroe County flew to. DC for meetings with their Congressional Representatives as well as staff from relevant Departments and the White House to discuss the County's priorities. As a follow up to the meetings Cardenas Partners LLC helped to draft and send thank you letters. Cardenas Partners LLC also delivered Honorary Conch Certificates to. the Congressmen/women, Senators and staff the delegation met with. Cardenas Partners LLC has also followed up with Lori Faeth from the Department of Interior regarding a point of contact within the DOI for the Coastal Barrier Relief System (CBRS). FY2010 APPROPRIATIONS: Throughout June, Members of the House and Senate Appropriations Committees (and Subcommittees) continued drafting the appropriations bills for fiscal year 2010-.: Most of the subcommittees with the appropriate jurisdictions have held preliminary hearings and. received testimony from a variety of sources in.order to educate themselves on current issues and funding requests. The following Monroe County request was included in the House Homeland Security appropriations bill: -Emergency Operations Center:$200,000 We look forward to seeing the remainder of the Committee Reports (including funded projects) in the coming weeks, especially for the Transportation and Housing & Urban Development Appropriations bill. Cardenas Partners LLC will continue to monitor and update the County as the bills move through committees. HIGHWAY BILL UPDATE: In June, Congressman Oberstar rolled out his blueprint for a six-year, $500 billion dollar bill designed to overhaul the Department of Transportation (DOT), expedite projects, coordinate planning for different modes of transportation and tie; federal funds; to.. measurable benchmarks. This came after DOT Secretary, Ray Lahood, proposed enacting a short-term, 18-month reauthorization to ensure there is time to replenish the Highway Trust Fund, which is scheduled to run a large deficit by the end of the current authorization on September.30. .. CARDENAS• ARTN ERS LL.c. Congressman Oberstar has committed to get this bill passed and signed by the President before the: September 30th deadline. The bill would provide roughly $450 billion for surface transportation projects and an additional $50 billion for high-speed rail. With Congress working on the 12 appropriations bills, healthcare reform and global warming legislation this timeline seems unreachable. Cardenas Partners LLC will keep the County updated as this bill moves through Congress.. STIMULUS: TIGER Grants The stimulus appropriated $1.5 billion to the grant for investments in surface transportation infrastructure. The deadline for submission is September 15, 2009. These grants are to be awarded on a competitive basis for capital investments in surface transportation projects that will have a significant impact on the Nation, a metropolitan area or a region. This grant is called"TIGER Discretionary Grants". Funds are awarded to State and local governments and eligible projects include: -interstate rehabilitation . -bridge replacement -.seismic retrofit projects for bridges road realignment -public transportation projects Further grant information is available at http://www.dot.gov/recovery/ost/ Monroe County was forwarded this information in early June and was encouraged to apply. Smart Grid Technologies and Electric Transmission Infrastructure U.S. Energy Secretary Steven Chu announced this month that the Department of Energy is soliciting applications for $3.9 billion in grants to:support efforts to modernize the electric grid, allowing for greater. integration of renewable energy sources while increasing.:the reliability, efficiency and security of the nation's transmission .and distribution system, as part of the American Recovery and Reinvestment Act. Secretary Chu announced the release of the final Funding Opportunity Announcements (FOA) for$3.9 billion in Recovery Act funds. Approximately $3.3 billion for the Smart Grid:Investment Grant Program and $615 million for smart grid demonstration projects will e p develop and implement smart grid technologies across the country. As part of the Smart Grid Investment Grant Program, DOE will provide cost-shared grants to support -manufacturing, purchasing and installation of existing smart grid technologies that can be deployed on a commercial scale. Funding under the Smart Grid Demonstration Program will be used to.demonstrate how emerging technologies can be 111 : C.ARI ENAS:•.:AR'TN'ERSLT,.r • applied in innovative ways within the electric delivery system to provide integrated and economically-feasible solutions.. The Investment Grant program is intended to enable smart grid functions on the electric system as soon as possible, while the Demonstration program is aimed at identifying and developing new and more cost-effective smart grid equipment, tools, techniques, and system configurations that can significantly improve upon today's technologies. The final FOAs reflect the more than 600 comments: DOE received on the draft previouslyannounced that while the maximum award solicitations. The Department limits for both programs were being increased, the Department will support projects of all sizes: Under the final solicitations, the maximum award for the Smart Grid Investment Grants will be $200 million; the maximum award for the Smart Grid Demonstrations will be $100 million. FY2010 APPROPRIATIONS: Throughout July, Members of the House and Senate Appropriations Committees (and Subcommittees) continued drafting the appropriations bills for fiscal year 2010. Most of the subcommittees with the appropriate jurisdictions have held preliminary hearings and received testimony from a variety of sources in order to educate themselves on current issues and funding requests. Cardenas Partners monitored all of the scheduled Appropriations markups for the House and Senate as well as obtained and reviewed Committee Reports (which detail earmarked projects) for all of the bills which have been made available. The following Monroe County request was included in the House Homeland Security appropriations bill: Emergency Operations Center: $200,000 Cardenas Partners will continue to monitor and update the County as the bills move through committees and head to conference. FUTURE COUNTY FLY-IN: Cardenas. Partners is attempting to coordinate a September fly-in for a delegation from Monroe County to discuss appointing the Marathon airport as a point of entry to the U.S., meet with EPA officials to discuss the possibility of the Keys being designated an area of critical concern in order to be eligible for grant funding, and possibly meet with FEMA Director Craig Fugate regarding the County's need for an Emergency Operations Center. Also discussed were the issue of basement dwellings, and environmental zoning concerns that need to be addressed. , Throughout July, Cardenas Partners participated in two conference calls,with County officials and staff to discuss this fly-in: Cardenas Partners will continue to stay in contact IP C.ARDENAS•PARTNERS Li_c with the County through the month of August regarding preparations and meetings that are scheduled for the trip. TRANSPORTATION BILL UPDATE: Yielding to Senate lobbying, the House boosted to $7 billion a short-term fix for the nearly depleted Highway Trust Fuiid in legislation it passed Wednesday. The bill (HR 3357) was passed by 363-68. It now goes to the Senate, which is expected to.clear it swiftly for President Obama's signature. The measure also would extend funding for the Unemployment.Insurance Trust Fund and increase the commitment authority for the Federal Housing Administration's two main mortgage assistance programs. The House bill initially included only $5 billion to shore up the highway fund however; the Transportation Department has told Congress that $7 billion is needed to ensure the trust fund can continue making payments to states through the end of fiscal 2009.: Senate negotiators insisted on the $7 billion total, according to aides. The money would be transferred to the highway fund from the general fund. The House and Senate are at odds over a broader reauthorization of highway, bridge and transit programs. House Transportation and Infrastructure Chairman James L. Oberstar, D-Minn., is pushing for action this year on.a six-year, $500 billion overhaul of the current law. The Senate and the White House, preoccupied with other priorities, want to extend the current:authorization for 18 months after it expires Sept. 30. The administration plan would require$20 billion to keep:the transportation fund solvent through the 18-month period,including the immediate $7 billion infusion. Oberstar had hoped to limit the short-term transfer to $3 billion to maintain pressure for the six-year authorization when lawmakers return in the fall however; he agreed to accept the $7 billion transfer. The Highway Trust Fund depends largely on revenue from a federal tax on motor fuels, but the revenue has fallen as motorists respond to higher fuel prices by driving less and buying more fuel-efficient vehicles. The tax also is not indexed to inflation, so it has lost ground over the years. Oberstar is by no means the only House members who wants to tackle a full-scale overhaul now. Ways and Means has been holding hearings on different options for replenishing the Highway Trust Fund and putting it on a more secure fiscal footing in the future. WASTEWATER: IP/ CARDENAS•PARTNERS[.7_e; Another avenue of funding for Monroe County to seek funding for its wastewater compliance is through the Small Community Wastewater Construction Grants program through the State of Florida. Currently, the County is unable.to receive funding through this grant because of the criteria for"disadvantaged communities". Cardenas Partners has drafted a letter for the County Commissioners.to sign and send to. Secretary Michael Sole, Florida Department of Environmental Protection, requesting the DEP to reconsider its current criteria. The..County's true socio-economic profiles includes as average working wage that is far less than the median income with 40 percent of families earning less than$40,000 per year. Further the County feels that the designation of Monroe County and the Florida Keys as an Area.of Critical.State Concern by Chapter 380.0552 of the Florida Statutes serves as a justifiable basis for inclusion in the "disadvantaged community" for the purpose of distributing state revolving fund monies. The letter has been signed by the Commissioners and. Cardenas Partners is currently waiting to receive a copy to .give to the County'.s delegation. Cardenas Partners will also draft letters of support to be sent to the DEP from Congresswoman Ileana Ros-Lehtinen and Senators Mel Martinez and Bill Nelson. MISCELLANEOUS: Throughout the month of July, :Cardenas Partners has worked on various issues for Monroe County. For example, Cardenas Partners was tasked with locating a contact at the Department of Interior for County staff to contact regarding the Coastal Barrier Relief System Digital Mapping Overhaul. Cardenas Partners was able to locate the correct staff at the DOI and forward the information on to the County. Additionally, Cardenas Partners was asked to research possible opportunities for Federal funding for WomanKind in Monroe County and was able to find grant money available through the Department of Health and Human Services. The funding is for Health centers that are community-based and patient-directed organizations that serve populations with limited access to health care. These include low income populations, the uninsured,.those with limited English proficiency, migrant and seasonal farm workers, individuals and families experiencing homelessness, and those living in public housing. FY2010 APPROPRIATIONS: The House of Representatives broke for the five-week August Recess on August 1st while the Senate broke Friday, August 7th. Therefore, there were no substantive developments' throughout the past month in the current appropriations cycle. 1P CARDENAS• PARTNERS 1_I, To reiterate the latest developments and best predictions for the coming months: The following Monroe County request was included in the House Homeland Security appropriations bill: - Emergency Operations Center:.$200,000 Cardenas Partners will continue to closely monitor all appropriations activity in both the House and the Senate throughout the upcoming months and keep Monroe County updated in a timely fashion. FUTURE COUNTY FLY-IN: Cardenas Partners, after noting the federal focus on healthcare and talks with the County, has decided to push back the County fly-in to October. The County plans to discuss appointing the Marathon airport as a point of entry to the U.S., meet with EPA officials to discuss the possibility of the Keys being designated an area of critical concern in order to be eligible for grant funding, and possibly meet with FEMA Director Craig Fugate regarding the County's need for an Emergency Operations Center. Also to be discussed were the issue of basement dwellings, and environmental zoning concerns that need to be addressed. Cardenas Partners will continue-to stay in contact with the County through the month of September regarding preparations and meetings that are scheduled for the trip. CARDENAS PARTNERS UPCOMING VISIT TO MONROE COUNTY: Cardenas Partners is planning a trip to the County September 16th-19th to update the County on their federal agenda and discuss the upcoming fly-in. Cardenas Partners plans on meeting individually with each Commissioner as well as key staff while in the Keys. Cardenas Partners will be presenting at the County Commission meeting planned for Wednesday, September 16th. WASTEWATER: Another avenue of funding for Monroe County to seek. funding for its wastewater compliance is through the Small Community Wastewater Construction Grants program through the State of Florida. Currently, the County is unable to receive funding through this grant because of the criteria for"disadvantaged communities". Cardenas Partners has drafted a.letter for the County Commissioners to sign and send to.. Secretary Michael Sole, Florida Department of Environmental Protection, requesting the DEP to reconsider:.its current criteria. . The County's. true socio-economic profiles includes as average working wage that is far less than the median income with 40 percent of families earning less than$40,000 per year. .. 111111 CARDENAS • PARTNERS Lit:: Further the County feels that the designation of Monroe County and the Florida Keys as an Area of Critical State Concern by Chapter 380.0552:of the Florida Statutes serves as a justifiable basis for inclusion in the "disadvantaged community" for the purpose of distributing state revolving fund monies. The letter has been signed by the Commissioners and Cardenas Partners is currently waiting to receive a copy to give to the County's delegation. Cardenas Partners will also draft letters of support to be. sent•lo the DEP from Congresswoman Ileana Ros-Lehtinen and Senator and Bill Nelson: The. County has also..approached Cardenas Partners regarding H.R. 3202, the "Water Protection and Reinvestment Act." This bill was introduced in.,July by Congressman Blumenauer from Oregon. If passed, H.R. 3202 would establish a $10 billion annual fund for improvements to the Nations drinking water and sewage treatment systems. The bill is currently in the House Subcommittee:on Energy and Environment and has 14 cosponsors. As is, Cardenas Partners feels that the County has the best chance of obtaining funding through section 206: Sec. 206: High Priority Project Grants. This section provides that a state must allocate 50 percent of the amount received from the Trust Fund in the form of grants or "grants equivalent" (loans under which the State forgives repayment of 100%o of the principal amount of the loan). Some communities can take on debt and pay back loans for wastewater projects, but others may not have.this capacity. Grants can help communities that cannot make loan repayments, such as those with declining or low-income populations. In this section, water agencies will still be responsible for paying for half the project cost. By continuing to distribute half of the SRF funding in the form of loans, states will ensure financial stability of the SRFs, which will continue to revolve. In addition to developing a priority list for traditional SRF loans, the state must incorporate additional priorities for grants. The priority for the use of grant funds will be given to projects that address the most serious water pollution problems and benefit communities with the greatest need or incorporate nonstructural or decentralized treatment practices. These criteria are very broad so that states will have maximum flexibility in determining the use of these grant funds. This section also provides that Indian tribes shall be eligible for this funding. Cardenas Partners is working setting up meetings with Congressman Blumenauer's staff during their fly-in in October and is working with County staff on a resolution to pursue this funding. 11111 C.ARDENAS •PARTNERSi.1..0 STIMULUS UPDATE: Broadband Demand: The Commerce Department's National Telecommunications and Information Administration (NTIA) and:the Department of Agriculture's Rural Utilities Service (RUS) announced today that they received almost 2;200 applications requesting nearly $28 billion in funding for proposed broadband projects reaching all 50 U.S. states and territories and the District of Columbia. This is the first round of American Recovery and Reinvestment Act funding aimed at expanding broadband access and adoption to help bridge the technological divide and create jobs building Internet infrastructure, with $4 billion available through . loans, grants, and loan/grant combinations. The Recovery Act provided a total of$7.2 billion to NTIA and RUS to expand access to and adoption of broadband services. Of that funding, NTIA will utilize $4.7 billion to deploy broadband infrastructure in unserved and underserved areas in the United States, expand public computer center capacity, and encourage sustainable adoption of broadband service.:RUS will invest $2.5 billion to facilitate broadband deployment in primarily rural communities. Approximately $2.4 billion from RUS and up to $1.6 billion from NTIA is available in this first grant round. Applications came in from a diverse range of parties including state, local, and tribal governments; nonprofits;.industry; anchor institutions, such as libraries, universities, community colleges, and hospitals; public safety organizations; and other entities in rural, suburban, and urban areas. Registration for Recovery Recipients: Recipients of funds disbursed by federal agencies under .the $787 billion economic recovery program will be able to register at a government website beginning Monday, Aug. 17. State and local governments, contractors, universities, non-profits and others that have received a grant, loan or contract of$25,000 or more under the American Recovery and Reinvestment Act of 2009 are required to register on the website, www.FederalReporting:gov. Individual recipients of Recovery funds are not required to register or .. report. Registration is the first step in a process that requires recipients to submit spending reports to FederalReporting.gov beginning Oct. 1. Recipients have until Oct.. 10 to submit reports, which, among other things, should detail the amount of money they have received and spent, the project scope and timetable, and the number of jobs created. Thereafter, recipients must file quarterly status reports. INVESTMENT AMOUNT BY AGENCY State: Florida 111 CARDENAS •PARTNERS Lix: - - . ,• -. r: .- .„_ , . ' ' , ., -. , -'-- ''., . Announced- . ,la5ChAvailable Agency -.',,, :. 1-,:a.:,i:::- : .:',,,..,.,,,.; . . ,•,,, ...:,.::,,,,,/.:.-:-:%,,-,,,„,,r1., .: • ._`,:::-. ,:,,,...,.. .,,,,::. 0 q,-1:hot4ndl,, Department of Health and Human Services $2,128,231 $2,169,798 $1,569,766 Department of Labor $199,748 $691,949 $1,068,610 Department of Education $4,575,983 $3,099,348 $261,677 Department of Agriculture $45,623 $244,611 $212,428 Department of Housing and Urban $385,274 $343,816 $52,060 Development Department of Transportation $1,694,159 $1,347,738 $5,548 Department ofjustice $225,755 $236,905 $3,953 Department of Energy $470,717 $1 54,566 $2,089 Environmental Protection Agency $247,203 $243,304 $656 National Science Foundation $0 $46,867 $468 National Endowment for the Arts $0 $1,644 $400 Railroad Retirement Board $7,049 $0 $0 US Army Corps of Engineers $24,839 $0 $0 Corporation for National and Community $1,771 $2,507 $0 Service • Department of Veterans Affairs H $42,113 $0 $0 Social Security Administration $918,890 $0 $0 General Services Administration $70,664 $0 $0 Department of the Interior $27,585 $10 $0 Department of Commerce • $3,283 $49,359 $0 Department of Defense $249,588 $0 $0 Total $11,318,475 $8,632,423 $3,177,654 r�""I"1 I I "I I /,,,N1 I/H € D EMYY D m ECTOR OF RDENAS-PARTN ERS W., (.,.yVyR.KMENT AF1,AIRS TAIJAHANKE MUSHMUrON DO, 701 IST11STREW m; 1 95o =MNITIAM DO 20ry0ti .1.'2.0 2•9 0 4.. 0 W2 F 202,904 2051 PA R.C'N F R C A 111R 1),E N AJS PA R11"N E R 8 uz MIAMI - IALLAHASSJRE 'WASHINGTOIq DC 70 1 surnIv9so WASHRACT()�,,, T"2 TUsgy��, F,2012.:1104,205I, Thai LTIFIll �,�ojq 4''CARDENAS [��ARTNIERSILc PAR1.'h4ER WAM , rALLAHA,,;q.p,.F, j,f,, 701 131 H STREET�' SUITE 9go WMEIMM&M DO 2000c, F 202.904.2059 F 202 A04.205 I (unMLOW@CAP,DEINASPART44E.k'.SDC.C.'OY,f