Loading...
Release of Contingency Funds #054 BOARD OF COUNTY COMMISSIONERS County of Monroe . Mayor Craig Cates,District I The Florida Keys Mayor Pro Tem Holly Merrill Raschein,District 5 h Michelle Lincoln,District 2 James K. Scholl,District 3 David Rice,District 4 Memorandum DATE: 08/04/2023 TO: BOCC Kevin G. Digitally signed by Kevin G.Wilson,P.E. FROM: Kevin G. Wilson, P.E. Wilson, P.E. Date:2023.08 14S 872.080'7 SUBJECT: Release of Contingency Funds Included with this memo is the proposed Release of Contingency Funds 454 for the Fl Keys Marathon Airport Non-Aeronautical Use Building (EOC)project. This does not affect the contract amount, but releases contingency funds already included in the Guaranteed Maximum Price for work that was either not foreseen or for which a price could not be determined at the time of contract execution. The amount requested is $4,930.00. The attached Release of Owner Contingency Request provides the details. This is being provided to ensure the BOCC is aware of this change. Please contact me with any questions. If there are none with the normal 24-hour window, I will approve the request. County of Monroe ✓ ;, i BOARD OF COUNTY COMMISSIONERS s Mayor or Craig Cates,District 1 The Florida Keys I',1ayor Pro Tem.Holly 14w1erroll a&cE*,in„Distr�ict 5 f Michelle;Lincoln,District 2 Junes K. schoEl„District 3 a Da-47id Rice,Dtstrict 4 MEMORANDUM DATE: 8/1/2023 TO: County Administrator THRU: Director, Project Management FROM: Jordan Salinger SUBJECT: Release of Contingency for: FL KEYS MARATHON AIRPORT NON- AERONAUTICAL USE BUILDING (EOC) Action Requested: Approval for RELEASE of contingency funds in the amount of $ 4,930.00 as outlined below. Basis for Recommended Action: 1. The requested release does not increase the total cost of the project as approved by the BOCC, and it will have no impact to contract time. 2. The scope for which the release is requested is within the intended project scope. 3. The release is not based upon an error or omission by the designer or the general contractor. Background: This is a cost change to the Contingency related to RFI 191, dated 05/10/2023, to adding power via dedicated receptacles with GFCI breakers from panel ESP for each elevator sump pumps alarm panel that will be located in their respective ground level lobby. Digitally signed by Marshall Marshall Quarles Quarles Digitally signed by Mickey Pruitt Date:2023.08.01 08:23:59-04'00' M i c key Pruitt Date:2023.08.03 09:34:18-04'00' Ajax Building Company Architects Design Group t Digitally signed by Cary Knight Kevin G. Wilson, Digitally signed by Kevin G. Cary Knigh Date:2023.08.03 16:02:01 Wilson,P.E. -04'00' P.E. Date:2023.08.08 20:42:05-04'00' Cary Knight,Director of Project Management Kevin Wilson,Assistant County Administrator OWNER CONTROLLED CONTINGENCY LEDGER FL KEYS MARATHON AIRPORT NON-AERONAUTICAL USE BUILDING (EOQ Initial Contingency Amount: $955,613.00 Total Debits Total Credits Total Adjustments to Date: ($391„Q~20,75) $108,494.00 ($50 1 14 75) Current Contingency Balance: $563,992.25 *EO designates PCA as an Error or Omission on Designer Ir � Ir Initial Budget I 1 0.00 0.00%° $955,613.00 This is a cost change to the Project Contingency to add a GPR survey of the site prior to underground utilities installation beginning in order to locate potential unknown utilities that are not shown on the contract documents. Contract time is not impacted. 10/05/22 (6,500M) -0.68% $949,113.00' This is a credit change to Contingency for all work related to RFI 121, dated 10/12/2022,to document the email correspondence with Cardno that the injection well casing is only required to be 60' deep, not 120' deep per C-008. The total depth drilled will remain 120' but the casing is only required for 60'. Also, the material of the casing is acceptable to change to Schedule 80 PVC in lieu of DIP (ductile iron pipe). 12/08/22 12,000.00 1.26% $961113.00 This is a cost change to Contingency for RFI 113,dated 09/21/2022,to add window shades at the exterior windows in room 235 and 262 that were not previously; calling for shades. Reference sketch included in RFI response. 12/08/22 (2,09150) -0.22% $959,019.50 This is a credit change to Contingency for RFI 124, dated 10/06/2022 to document the variance between ID-202 and A-131 on the mirror manufacturer and the decision to go with the Bobrick B-165 series mirrors due to the cost savings to the Owner over the Renwil, vered mirrors. 12/08/22 16,455.00 1.72% $975,474.50 OWNER CONTROLLED CONTINGENCY LEDGER This is a credit change to the Contingency per RFl 151, dated 12/08/2022,for the Owner request to change all countertops in Food Prep room 260 from Quartz to Stainless Steel. 12/16/22 5,330.00 0.56% $980,804.50 This is a cost change to the Contingency to fund the FKEC fee worksheet for the electrical primary service. 01/10/23 (10,01432) -1.05% - $970,790.18 This is a cost change to the Contingency to fund the City of Marathon Utilities Force Main worksheet fees. ,01/10/23 (27,6616 $943126.55 3) 2.89% _ This is a credit change to the Contingency for changes from submittal 084113-1, dated 12/01/2022, to change the 1203 window from an insulgard ballistic window to a standard YKK interior storefront window, and to change door 218 from a double door to a single door with a sidelite due to a conflict between the corridor width and the required width for an insulgard double door. 01/23/23 14,607.00 1.53% $957,733.55 This is a cost change to the Contingency for ASI 01, dated 11/28/2022,for: -The changes to the primary electrical routing and equipment for the building's power per FKEC requirements, and -The addition of the quick-connect equipment to add the ability to connect a portable load bank. 11,511m 02/14/23 (65,712.00) -6.88% - $892,021.55 This is a cost change to the Contingency for RF1 154, dated 02/02/2023, to change doors 202 & 203 to Ambico ballistic hollow metal (HM)frames since the specified Insulgard HP500 ballistic door system required the doors to be outswing, which conflicted with the hallways. Ambico doors can accomoclate an inswing to match the floor plan intent. 02/14/23 (870g00) -0.09% - $891,151.55 This is a cost change to the Contingency for RFl 115, dated 12/05/22,to expand the chase in room 219C and add chases in rooms 254& 251 or the vertical storm piping drops from the roof drains down to underneath the 1st floor slab. 02/14/23 (1,282 00) -0.13% $889,869.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency for RFl 111, dated 10/03/22, for updates to A-132 &A-133 clarifying quantity and locations of I PA bathroom accessories. 02/14/23 (1,50100) -0.16% $888,366.55 HIM This is a cost change to the Contingency for RF1 164, dated 02/14/2023,to increase the depth of the clumpster enclosure per revised sheets A-001 and A-030 tol meet the clumpster size and clearance requirements. Dumpster enclosure CMU walls that have already been constructed will be removed,foundation will be extended to support the increased depth, and the CMU walls will be re- constructed, (10,495M) -1.10% - $877,871.55 This is a credit change to the Contingency for RFl 173, dated 01/19/2023, to eliminate the Masterseal 581 waterproofing noted in the details for the clumpster enclosure.The clumpster enclosure walls will have a standard stucco finish. 02/14/23 1,581.00 0.17% $879,452.55 MIN This is a credit change to the Contingency for eliminating the BP 05.01 Scope requirement to furnish and install two (2) elevator pit access ladders,since the BP 14.01 Elevator subcontractor will furnish and install their own ladders which they have included, 03/07/23 1,390.00 0.15% $880,842.55 This is a cost change to the Contingency for the work related to RFl 167, dated 01/03/2023, to install a 6" trench drain system between the planters on the west elevation of the building, and tie the trench drains into the site storm system at Structures S-1 and S-3.This includes required core drilling work to run the drain between the different sections of the planters. 03/07/23 (15,077M) -1.58% $865,765.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency for RFl 133, dated 12/27/2022, to change multiple exterior walls at the mechanical yard and generator room to CMU walls in lieu of tilt panel walls due to constructibility issues with being able to set the tilt panels with the roof beams and precast joists in place.This includes adding stucco to these CMU walls. 03/24/23 (14,381-00) 1.50% $851,384.55 - This is a cost change to the Contingency for RF1 159 dated 03/14/2023 to increase the circuit breakers in panel ELDP and increase the wire size for the elevator pumps based on increased HP requirements per the manufacturer. 03/24/23 (720M) -0.08% - $850,664.55 MANI This is a cost change to the Contingency for RFl 169, dated 01/16/2023, to provide an additional disconnect and point of connection to the ACCU-3 condensing unit based on electrical requirements provided by the manufacturer in submittla 237313-1.2. There will now be (2) 60amp disconnects and (1) 30amp disconnect for ACCU-3 in lieu of (2) 100amp disconnects. 04/06/23 (4,475.00) -0.47% - $846,189.55 This is a cost change to the Contingency for RF1 158, dated 02/27/2023,to add 3 biometeric readers to doors 243, 25313, 277 for access control and to delete the camera in Storage room 233.This includes all infrastructure, devices, and licenses for the added readers and door hardware changes to make these doors electrified. 04/06/23 (20,781-00) -2.17% $825,408.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency for RFI 194 Stairwell doors hardware and fire rating changes to meet fire and FEMA 361, dated 03/20/2023, to change the door hardware specified for doors S102B and S103 per manufacturer requirements in order for the doors to meet both a FEMA 361 rating and a 2hr fire rating. Separately, this RFI also updated all other stairwells doors from 1hr to 2hr and all glazing in these stairwell doors from 45min to 90min rating.There is no cost associated with these latter upgrades. 04/18/23 (5,87l ) =0.61% $819 533.55 lull IN This is a cost change to the Contingency related to Submittal 280537-1.2 to change the bi-directional antenna from a Yagi antenna (model# BDA-YDA763869-14-1)to a Westell panel antenna (model#CS03-777-999).This change was recommended by the BDA vendor,and reviewed and approved by Monroe County because the panel antenna is tested and rated for a higher wind MPH than the yagi antenna. 04/18/23 (1:b'!111�1 001111 lull =0.17% $817,951.55 This is a cost change to the Contingency related to RFI 188, dated 03/06/2023, to demo part of the retaining wall just northwest of GL 9 to provide more turning radius availability for when trucks or equipment drive up the access ramp and need to turn left k V 05/09/23 ( ,8 1.00) =0.40% $814110.55 This is a cost change to the Contingency related to RFI 199, dated 05/09/2023,to extend multiple P1 and P9 walls to the underside of the roof deck(framing, iso,and drywall extended)that were originally called to terminate at the ceiling.This change enhances sound transfer reduction between corridors, building areas, and offices. 05/09/23 (5 ,1.1AOO) =8.38% $733,996.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency related to RFI 198, dated 04/11/2023, to add beacon lights on the top of the building per request from the Monroe County Building Department.This includes eight (8) FAA-approved beacon lights positioned at the building corners and along the roof perimeter. ^ 05/09/23 (18,634 00) -1.95% $715 362.55 This is a cost change to the Contingency related to RFI 209, dated 05/09/2023,to confirm the additional stucco and Masterseal 581 waterproofing intended for the CMU walls at the Outside Seating 263,Ground Level Lobbies 101& 102, and ground level electrical chases.This RFI also covers documenting stucco CJ layout and the final sizes of the electrical chase walls and required'MAT4 foundations to encapsulate all electrical conduits from the Level 1 to the site. Cost previously being tracked for RFI 132 regarding the chase walls size increasing is included/covered by this RFI 209 response and pricing. Cost previously being tracked for RFI 200 regarding the ground level lobbies wall types is included/covered by this RFI 209 response and pricing. n 05/11/23 (76,311-00) -7.99% $639,051.55 This is a cost change to the Contingency related to RFI 204, dated 04/27/2023, to add a CIP parapet wall on top of RB- 48 to form the south parapet wall for the roof section over 11" the generator room 245. 05/12/237bSh.7u -0.19% $637211.55.1,M1111 This is a cost change to the Contingency related to RFI 193, dated 03/27/2023,to add (2) additional data drops to each of the consoles in Dispatch 235 per request from the MCSO.This increases the drops from 8 to i10 at each a console. g5/12/23 SN C3.CC -0.88% $628,803.55 This is a cost change to the Contingency related to RFI 189, dated 03/20/2023, for the clarification that the the two (2)water fountains, tagged E27 on the Architectural sheets, are intented to be the model Elkay EZWS-ERPBM28K, which are recessed units with a bottle filler, not the Elkay LZSTL-8-C tagged EWC-1 on the plumbing sheets and schedule.This includes minor electrical changes for in wall rough in and the addition of a chase wall at water fountain wall between Restrooms 255 & 256. ^ 05/15/23 (11,867.00 -1.24% $616,936.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency related to responses to Submittal 274100-1 and Submittal 274100-2. Submittal 274100-1 response provided model changes for mutiple AV equipment including speakers, antennas, microphones, processors, amplifiers etc. Submittal 274100-2 response changed the mini-PC modules from HP to Lenovo models based on Monroe County IT submittal review and preference. 05/18/23 (14,905.00) -1.56% - $602,031.55 This is a credit change to the Contingency related to RFI 178, dated 03/02/2023, to furnish and install a RainFlo MiniGen03 Ozone Generator in lieu of the Rainflo UVS-25 Filtration system for the 5,943 gallon Rainflo water tank per the updated P-203 sheet. 05/19/23 1,749.00 0.18% $603,780.55 This is a cost change to the Contingency related to RFI 183, dated 03/27/2023, updating the perimeter soffits and ACT ceiling details in rooms ICC 219 and Dispatch 235, including changing of light fixture layout, quantity and type, and also updating the F2 cove lighting in Facility Restrooms 255 and -256. 06/01/23 (13,142.80) -1.38% $590,637.75 This is a cost change to the Contingency related to RFI 197, dated 04/28/2023, to change the TEF-1 grille to a FPA/NOA rated louver since it is located in an exterior soffit.The TEF- I fan is located above ceiling in room Security 202. 06/01/23 (1,210 00) -0.13% - $589,427.75 This is a credit change to the Contingency related to Submittal 095100-1 response,dated 05/17/2023,to change to the acoustical ceiling tile throughout the building from Armstrong(originally spec'd manufacturer)to Rockfon (equivalent manufacturer). I IN N 06/07/23 17,030.00 1.78% $606,457.75 This is a cost change to the Contingency related to RFI 177, dated 05/09/2023, to add three (3) structural mounts per sketch SSK-008 on the roof for attachment points for antennas. 06/08/23 (10,264.00) -1.07% $596,193.75 OWNER CONTROLLED CONTINGENCY LEDGER This is a credit change to the Contingency related to Submittal 113013.2-1 response, dated 04/13/2023,to change multiple elements of the residential appliances including the under counter ice makers manufacturer, and changing the hood in Food Prep room 260 to a residential hood with a roof vent instead of a commercial hood with a roof exhaust fan. This CCR also includes a credit for the 3-compartment sink in Food Prep room 260 that B&I included, but will be furnished and installed by the Plumbing subcontractor. 06/08/23 13,201.00 1.38% $609,394.75 This is a credit change to the Contingency related to RFI 208, dated 05/16/2023, to change rooms 244- Mechanical Yard and 245- Emergency Generator Room from VCT-1 to bare concrete, and rooms 238 A/B- Electrical Rooms and Room 243 Plumbing from VCT-1 to SC-1, and room 239- UPS room from VCT-1 to ESD-2. , IND 06/08/23 8,846.00 0.93% $618240.75 This is a cost change to the Contingency related to RFI 213 response, dated 05/19/2023,to add 120V power for the Clean Agent Fire Protection system controller for rooms 241 and 242.The controller requires a dedicated circuit per submittal 212200-1. Per RFI response,spare circuit 68 on panelboard ESP is to be used. 06/20/23 (1,44100) -0.15% - $616,797.75 This is a cost change to the Contingency related to RFI 223, dated 06/19/2023, to add insulation, framing and drywall to the exerior walls of rooms 237 Future Expansion and 238 Electrical for exterior envelope insulating and to credit back the VCT flooring in Room 237 and use a concrete sealer for a floor finish in this room instead. Summation of costs and credits result in a net cost. 06/20/23 (13,152.00) -1.38% - $603,645.75 This is a credit change to the Contingency related to RFI 232 response, dated 06/21/2023,to eliminate the casework shown around sink HL-2 in room 231-Rest Room per detail #5 on ID-202. Per RFI response,this is a finished fixture and does not need to be set in casework. 06/22/23 3,080.00 0.32% $606,725.75 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency related to RFI 216, dated 05/18/2023, to install aluminum flashing along the perimeter of the roof to span the gap between the roof slab and the tilt wall panels.This flashing will support the perimeter edge of the secondary(bottom) roof layer that runs up the parapet wall formed by the top of the tilt panels. 07/05/23 (4,045.00) -0.42% $602,680.75 This is a cost change to the Contingency related to RFI 218, dated 06/02/2023,to add two roof exhaust fans for ventilation of the two elevator shafts. 07/06/23 (21,7110.00) -1.23% $590,970.75 This is a cost change to the Contingency related to RFI 222, dated 06/02/2023, to install box, conduit, and pull strings at doors 214, 215, 230, 232, 281, 282, 284, 285, and 287. This rough-in will prepare these doors for future access controls. 07/07/23 7N 2:G 7.7C -0.46% $586,619.75 This is a cost change to the Contingency related to Submittal 122400-1, dated 06/29/2023,to install an RS-2 blackout manual roller window shade in room 219 at interior window 1203 between ICC Room 219 and Press Briefing Room 203. 07/07/23 ( 2 50) -0.09% $585,798.25 This is a credit change to the Contingency related to RFI 229, dated 06/29/2023, to remove 6 acoustical wall panels in ICC room 219 that were in conflict with the audio/visual displays (wall mounted TVs). See RFI sketch for clarity. 07/07/23 5484.00 0.57% $591,282.25 This is a cost change to the Contingency related to RFI 221, dated 05/30/2023,to upgrade the finish of the retaining walls from standard paint to textured Texcote finish to match the exterior walls.The retaining walls are to be painted Oxford White,with a "Medium"texture. 07/11/23 (8,559.00) -0.90% $582 723.25 This is a cost change to the Contingency related to RFI 224, dated 06/09/2023, to establish a power connection for the microwave in Food Preparation Room 260, including the installation of required conduit and upgraded breaker. 07/11/23 (1,969.00) -0.21% $580,754.25 This is a cost change to the Contingency related to Submittal 107516-1, dated 06/02/2023,to provide power to the flagpole light via 20A spare circuit on panelboard LP- 30, and to add the flagpole to the grounding ring around the building. 07/11/23 (7,987.00) -0.84% $572,767.25 OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency related to RFI 235, dated 07/12/2023, to furnish and install two additional electrical boxes on the North wall of Room 221-AV Control Room per the request of the Monroe County IT department.This will provide power to the desk equipment. - ,07/18/23 (2, -0.22% $570643.25 124.00) This is a cost change to the Contingency related to RFI 240, dated 07/19/2023,to furnish and install an additional receptacle under the counter in the Mini-Break Room 216 for the undercounter refrigerator (tag Ell). 012 07/19/23 (458M) -0.05% - $570,185.25 This is a credit change to the Contingency related to RFI 211, dated 05/11/2023 and later updated 07/20/2023, to credit the furnishing and installation of the Netgear AV switches and the Antaire security switches. MC IT will furnish these switches and supply Cisco switches instead as their preferred manufacturer. The plan is for MC IT to purchase the Cisco Catalyst 9300, model C9300-48H-E for the AV and the Cisco IE-2000-4TS-F- B for the industrial switches for security. 07/20/23 7,741.00 0.81% $577,926.25 This is a cost change to the Contingency related to RFI 239, dated 07/12/2023,to install a 2nd set of generator annunciator panels (1 for each generator) in Corridor 276 just outside of Admin Office 286 so it can be seen down Corridor 276 and Corridor 218. 07/25/23 (6,960M) -0.73% - $570,966.25 This is a cost change to the Contingency related to RFI 233, dated 06/26/2023, to remove the ceiling in room 239-UPS Room to accommodate large amounts of conduit.The acoustical ceiling tiles will be eliminated and the exposed ceiling structure will be painted. In addition, the lights will change from a Cl &CIE type fixture to a DI & DIE type fixture to match the other exposed areas. 07/27/23 (2,044.00) 0.21% $568,922.25 - This is a cost change to the Contingency related to RFI 191, dated 05/10/2023,to adding power via dedicated receptacles with GFCI breakers from panel ESP for each elevator sump pumps alarm panel that will be located in 111.0 their respective ground level lobby. 07/31/23 (4,930M) $563,992.25 0.52% - ! 5� i1 Project: FL Keys Marathon Airport Non-Aeronautical Use Building(EOS)(202011) Subcontractor: PEDRO FALCON ELECTRICAL CONTRACTORS,INC. Subcontractor tracking#: Change(RFI#,ASI#,etc): COR-021 Based Con-191 Elevator Sump Pump Clarification Date: 6/19/2023 Request for Additional Time 3 days. Monday-Friday 7AM-3.30PM LABOR Quantity Units Description unit Cost of labor 6 Hour Forman $ 45.00 $ 270.00 20 Hour Electrical $ 35.00 $ 700.00 20 Hour Electrical Helper $ 25.00 $ 500.00 Labor Subtotal $ 1,470.00 Labor Burden Percentagel 38% $ 558.60 Labor Total $ 2,028.60 MATERIAL(SUPPLIER BACK-UP REQUIRED) 0-yantity Units Description 2unit Cost of Material 2 Each GFCI Receptacle WP $ 30.00 $ 60.00 2 Each WP box for WP Receptacle $ 25.00 $ 50.00 2 Each Receptacle cover $ 15.00 $ 30.00 2 Each 2G J-Box $ 10.00 $ 20.00 1250 Feet #10 Wire solid $ 0.30 $ 375.00 250 Feet 3/4"EMT CONDUIT $ 1.02 $ 255.00 25 Each 3/4"EMT Compression COUPLINGS $ 3.70 $ 92.50 6 Each 3/4"EMT Compression CONNECTORS $ 3.00 $ 18.00 25 Each 3/4 EMT SUPPORTS $ 5.80 $ 145.00 2 Each 3/4 LB $ 15.00 $ 30.00 20 Feet 3/4"Rigit CONDUIT $ 2.50 $ 50.00 4 Feet 3/4"Rigit Compression COUPLINGS $ 13.60 $ 54.40 4 Each 3/4"Rigit Compression CONNECTORS $ 15.70 $ 62.80 2 L.E Misc.material $ 50.00 $ 100.00 4 Feet Fire wall penetration $ 35.00 $ 140.00 Notes: Will shore :?14 pipe frr„/'rustmcture Wfith "V legator lfoistwmy ventilation" Prom electruicaf p:Gnel to elevator Material subtotal $ 1,482.70 Material Sales Taxi 7.50% $ 111.20 Material Total $ 1,593.90 O_uantity Units Description Vunit Cost of E/S/U 1 L.E. Additional CB. ESI Quote $ 784.75 $ 784.75 1 L.E. S&H Charges $ 75.00 $ 75.00 Labor Total $ 2,028.60 Material total $ 1,593.90 Subtotal $ 4,482.25 Allowable OH&P 10% $ 448.23 GRAND TOTAL(no pennies) $ 4,930 AjdxAjax Building Company, LLC Project:202011 Monroe County FL Keys Marathon 109 Commerce Blvd Airport NAUB EOC Oldsmar, Florida 34677 7280 Overseas Highway P: +1.1379239.. Marathon, Florida 33050 RFI #Con-191 : Elevator Sump Pump Clarification Status Closed on 05/10/23 To Devon Ayers(K2M Design) From Jeffrey Whipple(Ajax Building Company, LLC) Mickey Pruitt(Architects Design Group) 424 SW 7th Terrace Gainesville, Florida 32601 Date Initiated Mar 7,2023 Due Date Mar 12,2023 Location Project Stage Course of Construction Cost Impact TBD Schedule Impact TBD Spec Section Cost Code Drawing Number P-001, P-401 Reference Attached RFI Linked Drawings Ijjj 101, I'-100 Received From Jeffrey Whipple(Ajax Building Company, LLC) Copies To Giselle Albisu(TLC Engineering Solutions(Jax)), Devon Ayers(K2M Design), Frank Dittrick(TLC Engineering Solutions(Jax)), Victor Carrasco(TLC Engineering Solutions(Jax)), Erick Gonzalez(TLC Engineering Solutions(Jax)), Nathy Grullon(Architects Design Group), Donald Harcrow(Ajax Building Company, LLC), Cary Knight(Monroe County),Travis Mauldin(Ajax Building Company, LLC),Juan Perez(TLC Engineering Solutions(Jax)), Mickey Pruitt(Architects Design Group), Marshall Quarles(Ajax Building Company, LLC), Banistka Rodriguez(Architects Design Group),Jordan Salinger(Monroe County), Denise Saltzman (TLC Engineering Solutions(Jax)), Steven Sanders(Monroe County), Daniel Taylor(Architects Design Group),Cary Vick (Monroe County),Jeffrey Whipple(Ajax Building Company, LLC) Activity Question Question from Jeffrey Whipple Ajax Building Company,LLC on Tuesday, Mar 7,2023 at 04:03 PM EST Drawing P-001 depicts the elevator sump pump to be a Stancore Model SE-40 O/M. (see attached cut sheet). Drawing P-401 depicts the elevator sump pump to be a Zoeller package system model#940-0006.(see attached cut sheet).The Stancore pump is what has been priced and included in the fixture submittal. Please advise on which model is desired. Additionally,the remote alarm panel for either system will require a GFCI receptacle nearby to power it as depicted on P-401 (see attached). Please provide the preferred location for this alarm panel and associated power. Provide recommended panelboard and circuit number to feed these GFCI receptacles please. Attachments Stancore I::'ump.pdf, :Rl::�ll 191.pdf,Zoeller I::'un)p.pdf Official Response Response from Mickey Pruitt Architects Design Group on Wednesday, May 10, 2023 at 02:40 PM EDT Revised response attached. Attachments 120825,,,,,.Response,,,,,.:Rl::�ll Con-191.1 f.::.Ievator SumpI::'ump Cllamification.pdf All Replies Response from Mickey Pruitt Architects Design Group on Wednesday, May 10, 2023 at 02:40 PM EDT Revised response attached. Attachments 120825,,,,,.Response,,,,,.:Rl::�ll Con-191.1 f.::.Ievator SumpI::'ump Cllamification.pdf Ajax Building Company, LLC Page 1 of 2 Printed On: May 10,2023 05:50 PM EDT RFI#Con-191 -Elevator Sump Pump Clarification Project:202011 Monroe County FL Keys Marathon Airport NAUB EOC Response from Devon Ayers K2M Design on Monday,Apr 24, 2023 at 12:32 PM EDT See TLC's response from Mickey's response. Response from Mickey Pruitt Architects Design Group on Monday,Apr 10, 2023 at 08:43 AM EDT See TLC response attached.ADG has no objection for the alarm locations. Attachments 120825..MOINIROI::::.....(.OUNTY......I::::.00..Con-191..I::::.Ile.vator......Su.�rmmp......Flu.�rmmp......Clladficatlon 2023..04-10.pdf Ajax Building Company, LLC Page 2 of 2 Printed On: May 10,2023 05:50 PM EDT I�1110��VlWlii�� �pIJ}�N!IIII�Nyc E N G I N II ih R 1 l J G �Wr 0 1- L,I r I o I`I s,,, RFI Response Con-191.1 RFI# Con-191.1 Reviewer: Victor Carrasco Project: 120825 - MONROE COUNTY EOC Received: 04/12/2023 Name: Elevator Sump Pump Clarification Returned: 04/20/2023 Please Note: The following RFI response is not intended to authorize any deviation or modification to the design documents except as specifically clarified below for this specific application and circumstance. Furthermore, this response is not intended to authorize any increase in construction cost, schedule or time extension, or construction in conflict with any applicable codes or specified design standards. It is the responsibility of the Contractor to notify the design team immediately of any perceived scope, schedule, or cost impacts or adjustments. Attachments 1 2 0 8 2 5 RFII Con....191.1 Elevator Sump Pump Il irif-il q atilon._p Questions Attached are additional comments made on 04.12.23 to RFI Con-191 Elevator Sump Pump Clarification for your review. Comments TLC takes no exception to the circuits, ESP-65 and ESP-67, proposed by the Contractor. Please provide duplex receptacle with weatherproof cover at each location and a 20A/1 P GFCI circuit breaker for each circuit, connected with (2) #12, (1) #12 GND, in 3/4" conduit. Page 1 of 1 AaxAjax Building Company, LLC Project:202011 Monroe County FL Keys Marathon 109 Commerce Blvd Airport NAUB EOC Oldsmar, Florida 34677 7280 Overseas Highway P: +1.1379239.. Marathon, Florida 33050 Email - Elevator Sump Pump Clarification #191 : Elevator Sump Pump Clarification Subject: FW: RFI#Con-191: Elevator Sump Pump Clarification Sent: Apr 12, 2023 01:51 PM EDT From Devon Ayers(K2M Design) To Denise Saltzman Cc Devon Ayers,Juan Perez, Mickey Pruitt Message Hello Denise, We received an email from Marshall stating: "Good Morning Team, Part of the RFI 191 question was requesting information on the power to the elevator alarms GFCI receptacles(Panel and circuit# needed).Can you please take a look at our subcontractor's recommendation below,and advise if that works?I have re-opened this RFI in Procore so an answer can be added regarding panel and circuit info. For dedicated circuits we recommend using two spaces, #65 and#67, Inside ESP emergency panel.—Pedro Falcon" Would you be able to assist on a response for this one? Thanks, Sent From Procore. Ajax Building Company, LLC Page 1 of 1 Printed On:Apr 12,2023 01:56 PM EDT VAM � .✓J i y' a I p a r a � U� �W I Q CL Uz O yJsOO _ zO¢w SO O U A a; - W F�� __ Zf wwmz sOw� � o sa l o _ �e� a se m a, M © a J m — s � � r ( u a ( m o Qo.olE c mm 1 � a m ^ � � r w al �� ma ho i Q �f c� w w J w � .... . z o �m I�1110��VlWlii�� �pIJ}�N!IIII�Nyc E N G I N II ih R 1 l J G �Wr 0 1- L,I r I o I`I s,,, RFI Response Con-191 RFI# Con-191 Reviewer: Giselle Albisu Project: 120825 - MONROE COUNTY EOC Received: 03/07/2023 Name: Elevator Sump Pump Clarification Returned: 04/09/2023 Please Note: The following RFI response is not intended to authorize any deviation or modification to the design documents except as specifically clarified below for this specific application and circumstance. Furthermore, this response is not intended to authorize any increase in construction cost, schedule or time extension, or construction in conflict with any applicable codes or specified design standards. It is the responsibility of the Contractor to notify the design team immediately of any perceived scope, schedule, or cost impacts or adjustments. Attachments 1 RFII Con....191 Elevator Sump �u�� Cfarilfii �l�air�,_pdf Questions Attached is RFI Con-191 Elevator Sump Pump Clarification for your review. Comments TLC Responses: Refer to attached Plumbing pdf for the proposed location of the elevator sump pumps alarm/controls. Locations have been coordinated with the architect for approval. Elevator sump pumps selection (STANCOR) provided in the schedule on sheet P-001 are the selections to be installed. Page 1 of 1 ESP-1, ESP-2 Slainc,oir I OM40SR Cat : I STANCOR WASTEWATER ® SOLUTIONS LLC STANCOR Oil-MinderO �����Simplex Duplex Pu",M a,n d Co",n trol Syste",M, s The Stancor Oil-Minder° Control and Solid State,NEMA 4x Pump System allows water to be au- Oil-Minder°Control tomatically pumped from elevator pits,transformer vaults, and indus- trial sumps without danger of ejecting potentially harmful oily sub- SE50 Pump stances into sewers, rivers and wa- �% with Float& terways. There is no need for a Oil-Minder® separate oil-water separator. The Probe product is engineered for efficient and trouble free pumping, even ! „ under the most severe conditions. lb The Stancor Oil-Mindee System is the overwhelming choice among design engineers and compliance authorities worldwide, and has a proven record for protecting valuable equipment and the environment. Fe a. . .:res • NEMA 4x weathertight corrosion resistant polycarbonate enclosures • Stainless steel sensor probe with patented electronic technology that repels dirt contamination • Single direct plug-in power source for operation of entire system • Solid state components • Alarms,lights,silence switch,and remote monitoring circuit for oil,high liquid,and high amperage conditions • Complete factory assembly and testing insures quality of entire pump and control system • Patented-Pat.#4,715,785,#4,752,188,#6,203,281 and others pending • Oil-Minden'System can be combined with a variety of different pumps and valves • Choice of: 115v or 220v(1 phase) OR 230v/460v/575v(3 phase) • LED indicator lights for oil spill,power,high liquid level,overload,and pump run • UL 508 and 778 approved • ENT+ELA tested and approved as a system a II l°Iier e Is Only One O1l N .in14 e.r/ Sysh,)I1.1 a'Mid Slanl.4w,or Makes H" Qtlahly I(1 a l l (,. a n Believe 1111. ..,,,e ::;; okS gage 10 ESP-1, ESP-2 Slainc,oir I OM40SR Q1 : I Description cor Sinipl :l i r"I Systems. The Stancor Simplex Oil-Minder°System is available in two primary configurations,as follows: The Multi-Option Oil-Minder@ System is designed for easy,fool-proof installation. All pump and control ca- bles are factory wired into a wall mountable junction box. Between the junction box and the main Oil-Minder° control panel is a multi-pin quick connect cable. This single cord,8-pin system allows the electrical cable be- tween the junction box and control panel to be run through conduit and interconnected up to 250 feet long, using a single"push and turn'motion. There is no need for field wiring. Electrical installation costs are re- duced by approximately 75% and all connections are secure and water-tight. The junior Oil-Minder@ System is a good choice where the main control is located in the same area as the pump pit,or where the main control will be located remotely and conventional"hard wiring"is used between a junction box and the main control. Comparative features of each model are as follows: Feature included in standard package O/M O/M Multi-Option Junior SE-40(A HP)or SE-50(.5 HP)115V or 230V single phase pump x_ x Solid state NEMA 4x control panel x x Separate LED indicator lights on NEMA 4x control for A)oil alert,B)high water, C)high motor amps,D)power to system, and E)pump activation _ x x Self cleaning,hermetically sealed stainless steel oil detection probe x x Float switches for pump activation and high water alert x_ x Monitoring relays for alert conditions at remote locations x x High decibel,water tight horn and silence switch for alert conditions x x Direct plug-in activation of entire pump and control system from the main control panel (6' cord and molded plug included) x x Factory hard wiring of pump,oil probe, and floats into NEMA 4x junction box x Factory hard wiring of pump,oil probe, and floats directly into main NEMA 4x control panel x junction box with female 8-pin cable receptacle and disconnect x 25'8-pin Quick Connect cable(expandable to 250'with interconnecting extension cables) x Female 8-pin cable receptacle installed in the NEMA 4x control panel x 2 ..,,,e ::;; ks gage 109 ESP-1, ESP-2 SSoho(..,( it I OMI40SR Qty I Standard Pump .......................................................................................................................................................... Selection Chart Oil-Minder°Multi-Option Oil-Minder°Junior FLOAT 15„ i 17 Power Ir, RMS - RMS SE-40 16 ft. Paw cables Pump Power FLOAT;'' Multi-Pin Fllarm 16.5" Connector 25 ft.standard Pima (optional 25' F oat additional increments) With Selected Pump 17" SE-50 Junction Bo'. .... .... .... .... .... .... .... .... .... .... .... 40 ....................................................... ........................... .. .. ....... 16 ft. cables „ Pump Power 30 ..,., Pun, H On Lgh-1 Float Flea m -F� ��,�.,� .�..�..�. �..�..�...�..�..�. .�..�..�.. ..�. ..�..�..�..�..�..�..�..�. .�..�..�..�..�..�.�..�..�...�. .�. oat 20 ....... ......... ........ ......... .......... ........ .... ..... ......... ............. .. Probe (Z ..... ......... .. ............. ....... .. .. ....... ..... ................ .. ......... With Selected Pump 0 Q 0 0.............................................................................40...............................................................--_I 80 Flow-U.S.Gal./Min. 6(eu eu°�n& I' e(fi'ke,l Spae(ffii(aflons(Spre(i,fl V(lPag,es and pk a imlek avaflabne u,q)oGm ireapuuesPp ........................................................................................................................................................................................................................................................................................................................................ Model H.P. Voltage RPM Rated Discharge Max Max Full-Load Size Head Flow Amps Ft. GPM SE50 0.5 115/230 3600 8/4 2" 37' 74 460 SE40 0.4 115 3600 5 2" 22' 64 STANCOR 3 S v,,,e ;;; S gage 110 ESP-1, ESP-2 Slainc,oir OM40SR CAI : I 9 „ `' RMS:o: POWER IN 8 PIN MALE CONNECTOR O MULTI-PIN CONNECTOR&CORD IN CONDUIT LENGTHSAS REQUIRED,25 FT.STANDARD, 25 FT INCREMENTS PUMPPOWER GATE VALVE 6 COVER 5 7 2 8 0= 1. Stancor Model SE-50 submersible effluent pump.5 HP,115 volt,3600 RPM,2" discharge connection 2. Check valve(2") 3. Stancor Oil-Minder 115V,10 control system with built-in audible and visual alarm when pump does not run due to oil in pit or high liquid or high amperage condition. Provide silencing button for audible alarm built into panel. Panel shall have two contacts for a remote alarm location(one each for oil and high water or amperage alert). Junction box will be provided with multi-pin connector and cord in lengths as re- quired,25 ft.standard,optional 25 ft.increments. 4. Junction box will be provided with multi-pin connector and cord in lengths as required;25 ft.is standard, optional 25 ft.increments available up to 250 ft. 5. All buried pump pressure discharge piping shall be protected with tapecoat CT corrosion protection tape 6. Pump cable,probe cable,high liquid alarm cable,and pump"on"float cable(16 ft.lengths) 7. High liquid alarm float with clamp device to mount to pump discharge piping 8. Pump On float 9. Power cord and molded ground plug(6 ft.length) ITEMS 1,2,3,4,6,7,8 AND 9 PROVIDED BY STANCOR AS A STANDARD PACKAGE 4 S v,,c:;;; kS gage I I I. ESP-1, ESP-2 Stain(.;()ir I OMI4-O R Qty 'I AVENGER SERIES SE-40 sznxc®�a Dwg: DS-A09-001 Rev: 2 Date: 01/16 MOTOR SPECIFICATIONS Motor Design Induction Motor Type Enclosed submersible Insulation Class Class E ; Motor Protection Bi-metallic Thermal Switch Bi-Metallic Temp Trip 120°C±5°C Service Factor 1.3 Voltage Tolerance ±10%from nominal MOTOR DATA,60Hz Output Full Locked NEMA Power Motor Pole/ Model Phase Power Volts Load Rotor Code Factor Efficiency Speed BHP Am s Am s Letter 100%Load 100%Load r m 6 6 III 1 0.4 115 4.6 23.0 H 0.91 0.67 2/3450 1 0.4 230 2.3 11.5 H 0.90 0.64 2/3450 SE-40 3 0.4 230 1.4 7.0 H 0.91 0.66 2/3450 3 0.4 460 0.7 3.5 H 0.89 0.67 2/3450 3 0.4 575 0.6 3.0 J 0.90 0.65 2/3450 MATERIALS OF CONSTRUCTION Upper Motor Lid Nylon 66 Motor Housing AISI 304 Stainless Steel Oil Chamber FC-20 Cast Iron Volute FC-20 Cast Iron External Hardware AISI 304 Stainless Steel 0-Rings Nitrile(Buna N) Motor Shaft Stainless Steel(410) Upper Bearing Single row Sealed Lower Bearing(s) Single row Sealed Upper Shaft Seal CA/CE(carbon/ceramic) Lower Shaft Seal SIC/SIC(silicon carbide/silicon carbide) Impeller FC-20 Cast Iron DIMENSIONS,WEIGHT,AND MISC. Pump weight single phase 241bs(11 kg) Pump weight three phase 241bs(11 kg) Maximum submergence 30 feet(9m) Discharge size,standard 2 inch NPT female vertical Maximum temp.of pumped fluid 104°F 40°C CABLE SPECIFICATIONS MODEL PHASE/VOLTAGE POWER CABLE LENGTH OUTER JACKET 10-115V SJTOW 16/3 16 feet(5m) NBR 10-230V SJTOW 16/3 16 feet 5m NBR SE-40 30-230V STOW 16/4 16 feet(5m) NBR 30-460V STOW 16/4 16 feet 5m NBR 30-575V STOW 16/4 16 feet 5m NBR Power cable suitable for all standard voltages listed in"MOTOR DATA"section. Arturo Garcia WASTEWATER 102 NE 2nd Street,Suite 610 O U T I O N L 48 Boca 3 33432 (9s4)463 926969 arturo@wws-lir.com Specifications subject to change without notice Stancor, Inc.515 Fan Hill Road,Monroe,CT 06468 Tel: 203-268-7513 Fax:203-268-7958 www.stancorpumps.com r(1;;;c B;,`O ks Page 112 ESP-1, ESP-2 Stainc,oir I OM�4-OSR Qty�� 'I AVENGER SERIES SE-40 srnxcoa Wg: DS-A09-003 Rev: 2 Date: 03/16 SE-40 Horsepower: 0.3 lip Stancor Model SE-40 Hertz:"60 liz Individual Performance Curve ITF( % ) BHP 30 100 1.00 25 80 0.80 20 H-Q 610 0.60 1ww 5 40 0.40 10 BHP 20 0.2,0 5 EFL F 0 0 0.00 0 2'0 40 60 so Arturo Garcia WASTEWATER 102 NE 2nd Street,Suite 510 Bora Raton FIL 33432 SOLUTIONS LLC (954)483 9269 arturo@wws-lic.com Specifications subject to change without notice Stancor,Inc.515 Fan Hill Road,Monroe,CT 06468 Tel: 203-268-7513 Fax:203-268-7958 www.stancorpumps.com S���',',','.'ec s 'age 113 ESP-1, ESP-2 Stainc,oir I OMI4-O R City': 'I AVENGER SERIES SE-40 sTnxc®�a Dwg: DS A09 004 Rev: 1 Date: 05/15 SE-40 J .1 } Y�J ly -_ f f� I r ,f Type DISCHARGE A Al A2 1 B 1 131 1 132 1 C C1 C2 C3 INCHES 2" 5.71" 2.60" 1 3.07" 1 5.20" 1 2.83" 1 9.09" 1 15.59" 10.47" 4.33" 4.33" A TEWATE 102 N Garcia '' 02 NE 2nd'Street,Suite 510 Boca SOLUTIONS L (954)Ra 4'83 3 9F26933432 954) 9 arturo@wws-llc.com Specifications subject to change without notice Stancor, Inc.515 Fan Hill Road,Monroe,CT 06468 Tel: 203-268-7513 Fax:203-268-7958 www.stancorpumps.com VAM .✓J i Wa i zQraOMAN O CL A Z.',b all wwmz � Wtrpy w O a U 1 a s 0 U � (n �w Q a £ im nil M i ON 5 �s oa a ��= off` a nil 11w _�° j_- S - >8g m£p s _s - oi - - w� g o2c � .� 5 � 0 0 Ej oow o I k:=.$ VAM .✓J i Wa p ara � w � �W I U Z U b o ,,, c r z O a w Zp _ SOU r H m _ Zf wwmz s v �$a of s W y�o I LU W ` Cl) \ Cl) W X a cn r o° awsaw 9 - O w 5- 2Mi W U o g = 0 ( a � +' a z rW Irl r d a Cl)z N ^oil III w III� a Z W r a W d N 0 0 � U J� W n Zz �z y 34 Y I 5� � - a a O S M cn N X w �r- w Ht==tJ a� W CL \\ 2 p LLI R W z a ,. -.. m z Trusted.Tested.Tough.T"" SECTION:2.35.050 p OELLE/� FM2809 00716 Product information resented here reflects conditions at time of publication.Consult factory Supersedes regarding discrepancies or PUMP COMPANY 0516 inconsistencies. TECHNICAL DATA SHEET �'svard®SYSTEM For Submersible Dewatering Applications Designed to help protect the environment and equipment from the dispersion of oils and/or hydrocarbons. SYSTEMS: • Operation of the Zoeller° Oil Guard° System has been independently verified by OnSpeX, a division of CSA, when installed in accordance with our instructions. • Choose from four pump models. Includes pump,Oil Smart°switch and alarm(optional control panel) • Controls are ASME A17.1 compliant Oil Smart SWI TCH AND ALARM PANEL FEATURES: • NEMA-4X alarm panel enclosure! • Audible,light alarms and dry contacts • Preset"on"and "off" points differentiate oil and water and alerts maintenance personnel of high water or oil detected conditions • 20'(6 m)piggyback electrical supply cord • 20 amp internal relay • Alarm test and silence switches • UL508 approved switch probes304 stainless steel PUMP FEATURES: a > • Pumps are durable,cast iron construction with powder coated epoxy finish and all stainless steel fittings. Product may not be exactly as • Tested to UL Standard UL778 and Certified to CSA Standard CSA 22.2 No. 108 shown. PUMP PERFORMANCE CURVE F MODELS 57/152/153/161 TOTAL DYNAMIC HEAD FLOW PER MINUTE � , MODEL 57 152 153 161 Feet Meters Gal. Liters Gal. Liters Gal. Liters Gal. Liters 5 1.5 43 163 69 261 77 291 100 379 10 3.0 34 129 61 231 70 265 93 352 15 4.6 19 72 53 201 61 231 85 322 20 6.1 -- -- 44 167 52 197 79 299 25 76 34 129 42 159 70 265 30 9.1 23 87 33 125 62 235 35 10.7 -- -- 22 83 54 204 40 12.2 11 42 45 170 ,o 20 �o ao .o Eo ,o 1. so ,00 „o 50 15.2 20 76 R�o,�R 24 Shut-off Head: 19.25ft(5.9 m) 38ft(11.6 m) 44ft(13.4 m) 56ft(17 m) °TR o F010 PER 1°11°' 00018939 018939 DEy' A WARNING These systems are not designed for hazardous environments.Please consult factory for special cD t`�o options and requirements. ©Copyright 2016 Zoeller°Co.All rights reserved. 502-778-2731 1 800-928-7867 1 3649 Cane Run Road I Louisville,KY 40211-1961 1 www.zoeller.com MODEL 57 MODEL 1521153 MODEL 161 6-7/32" 83/4" 3-7B" 6-3/16" 1158 mm1 [98­1 [157 mm] 3-7/8"(98 4-5B" mmJ 4-5/8" (101 mm 6--1/1/2" 2 mm) 1117 I (165 mm)� 117 mm[ m m 3-7/8"(98 m m 3-7/8"[98 mm] ® 4" 01 MM) 1 4 0 © 3-7/8"198 m m 3-7/8"[98 mm] 1-1/2"NIT 1-1/2"NIT 1 1/2"NIT 2"NIT OR 3"NIT AVAILABLE 12-1/8"1308 mm J _ � I 10-1/16"[256 mm] L�pl� I 9, - 5 — "1137 mml 18-9/16"(471 mm 3-3/32"[79 mm] j46"(152 mm) SK1015 SK2064 SK2644 See FM2778(model 57),FM2784(model 152,153),FM2785(model 161)for complete pump specifications. CHOOSEA PREPACKAGED SYSTEM Part Alarm Oil Smart° Nonautomatic Pump Elevator Number Description Panel Pump Pump Part Number Volts HP Amps System Switch 940-0005 Oil Guard®Pump Switch and Panel 10-1526 10-1528 N57 57-0002 115 3/10 9.7 N 940-0006 Oil Guard®Pump Switch and Panel 10-1526 10-1528 N152 152-0002 115 4/10 8.5 N 940-0007 Oil Guard®Pump Switch and Panel 10-1526 10-1528 N153 153-0002 115 1/2 10.5 N 940-0008 Oil Guard®Pump Switch and Panel 10-1526 10-1528 N161 161-0002 115 1/2 15.0 N 940-0012 Oil Guard®Pump Switch and Panel 10-1526 10-1528 *N152 *152-0028 115 4/10 8.5 Y 940-0013 Oil Guard®Pump Switch and Panel 10-1526 10-1528 *N153 *153-0027 115 1/2 10.5 Y 940-0014 1 Oil Guard®Pump Switch and Panel 10-1526 10-1528 *N161 *161-0090 115 1 1/2 15.0 Y *6'(1.8 m)SO jacketed cord for oil resistance. OR BUILD YOUR OWN SYSTEM Oil Smart° Oil Smart° Oil Smart° Part Description Alarm Pump High Liquid High Liquid ACAUTION Number Panel Switch Alarm Switch Switch All installation of controls, protection devices and wiring 10-1526 Oil Smart"Alarm Panel should be done by a qualified 10-1528 Oil Smart®Pump Switch --- --- --- licensed electrician. All electrical and safety codes should be 10-1727 Oil Smart®Pump Switch w/o Plug --- --- --- followed including the most recent National Electrical Code (NEC) 10-2149 Oil Smart®Simplex Panel --- and the Occupational Safety and Health Act(OSHA). 10-2150 Oil Smart®Duplex Panel J J J J 10-2516 Oil Smart®Simplex Panel w/Mtr. J J J INCLUDED *VARIABLE LEVEL FLOAT SWITCH SIMPLEX PANEL: DUPLEXALTERNATING PANEL: • 115V,single phase • 115V,single phase • NEMA 4X watertight enclosure w/lockable latch • NEMA 4X watertight enclosure w/lockable • 30 amp motor start relay % latch • Pump HOA switch r • (2)30 amp motor start relays • Top-mounted red alarm beacon light • Pump HOA switches • 81-84 decibel rated alarm horn • Top-mounted red alarm beacon light • Horn silence and alarm test switches , /� • 81 -84 decibel rated alarm horn • Alarm automatically resets �� • Horn silence and alarm test switches 1 , • Dry auxiliary alarm contacts • Alarm automatically resets • Separate circuit protection for alarm / • Dry auxiliary alarm contacts • Circuit breaker protection • Separate circuit protection for alarm • Pump"Run"indicator light Model 10-2149 • Pump"Run"indicator light Model 10-2150 ©Copyright 2016 Zoeller°Co.All rights reserved. 502-778-2731 1 800-928-7867 1 3649 Cane Run Road I Louisville,KY 40211-1961 1 www.zoeller.com OIL SMART PUMP SWITCH Application The Oil Smarto Switch is factory-calibrated and set up for immediate installation and operation. The dielectric design is extremely Dielectric Data Chart sensitive to variations in dielectric constant of air,water,oil and/or 00.0 80.4* hydrocarbons(see Dielectric Data Chart). Material 70.0 - - - - - - - - - - - - - - - • The Oil Smarto Switch is constructed of high-impact, injection- molded plastic. R = Enclosure(Ignition-Proof). 50.0 — — — — — — — — — — — — — — — • � • 304 stainless steel sensor probes. 40.0 — — — — — — — — — — — — — — — d d 0 Temperature 30.0 - - - - - - - - - - - - - - - • The Oil SmartO Switch standard temperature operation range is 20.0 — — — — — — — — — — — — — — - -33°F(-36°C)to 170°F(77°C). 2.1* 2.2* 1.0* Operating Pressure 0.0 • The Oil SmartO Switch is designed to operate to 30 psig (2 bar) water Petroleum oil Transformer oil Air @ 68°F @ 68°F @ 68°F @ 68°F at 70°F(21°C)• 120°cl 120°cl 120°cl 120°cl Standby Current *Note: Estimated values. • 0.004 Amps. Signal Output The Oil SmartO Switch is configured at the Factory. • 120 VAC-50/60 Hz(6 Amps). Relay Configuration • 20 Amp internal relay. Approval • UL Marine Listed • CE Certified Control Circuit • Solid State. Power Input a a • 120 VAC-50/60 Hz. ON OFF SK2404 ©Copyright 2016 Zoeller°Co.All rights reserved. 502-778-2731 800-928-7867 1 3649 Cane Run Road I Louisville,KY 40211-1961 www.zoeller.com Oil GUARD° PUMP SYSTEM Single Phase Pumps 2. The Oil SmartO Pump Switch is an industrial grade switch with General internal 20 amp relay and 304 stainless steel sensor probes 1. Pump motor shall be hermetically sealed, submersible-type used to control water pumps in elevator, utility, marine and operating in a high-quality dielectric oil for cooling the windings industrial sump applications. Installation will prevent oil and and for lubrication of the motor bearings and ceramic-carbon or hydrocarbons from being inadvertently pumped into the shaft seal. Single phase motor shall have internal automatic environment. resetting,thermal overload protection. Construction shall be of Options: cast iron with 100% baked-on, powder coated epoxy finish for 20'(6 m)cord with piggyback plug. corrosion-resistance and longer casting durability.All fasteners and external metal parts shall be of stainless steel. Impeller 3. 115 Volt Piggyback Power Plug shall be of vortex non-clog design. Check applicable series. 4. Oil SmartO Alarm will alert residents or maintenance personnel 57(0.3 HP)cast iron series pump shall have a shaded pole of liquid level problems. High Oil and High Water Level Lights motor. Guard and handle shall be stainless steel. and standard Remote Dry Contacts(SCADA Monitoring System). 152(0.4 HP) 153(0.5 HP)series pump shall have a Alarm System with High Liquid Audible Alarm (71db @ permanent split capacitor motor. Motor housing shall be cast 2' [0.6 m]), Red Beacon, Oil Present - Yellow Light and Water iron. The impeller shall be glass reinforced thermoplastic. Present-White Light. Built with Oil SmartO technology. 161 (0.5 HP) series pump shall have a 3450 RPM motor. 5. Liquid Smart Sensor' incorporates both an electro-optic and Motor housing, switch case and pump housing shall be cast Oil Smarto Sensor all in one encapsulated unit. Differentiates iron.The impeller shall be bronze. and indicates the presence of oil and or water under high water condition. 6. Check Valve Recommended(purchased separately). 0' ` 7. Optional Oil Smarto Simplex Control Panel - Built with Oil 3 � ° SmartO technology. Will control pump and alert residents or i ®- OR maintenance personnel of liquid level problems. High Oil and SIMPLEX High Water Level Lights and standard Remote Dry Contacts (SCADA Monitoring System). OR Simplex Panel 10-2149. 8. Optional Oil SmartO Duplex Control Panel - Built with Oil 5 2 Smart@ technology. Will control pumps and alert residents or DUPLEX maintenance personnel of liquid level problems. High Oil and High Water Level Lights and standard Remote Dry Contacts $ (SCADA Monitoring System). ° Duplex Panel 10-2150. Notes: 20 Amp Relay is inside pump switch. SK2423 For float tree installation see FM2364. ©Copyright 2016 Zoeller°Co.All rights reserved. 502-778-2731 800-928-7867 1 3649 Cane Run Road I Louisville,KY 40211-1961 1 www.zoeller.com Trusted. Tested. Tough.T" SECTION: 2.35.060 presented A,?KA, ' ) FM���� Productinformation here reflects conditions atti me of publication.Consultfactory Supersedes regarding discrepancies or PUMP COMPANY 0811 inconsistencies. MAILTO: P.O. BOX 16347•Louisville, KY 40256-0347 SHIPTO: 3649 Cane Run Road •Louisville,KY 40211-1961 Visit our web site: TEL:(502)778-2731 •1 (800)928-PUMP•FAX:(502)774-3624 zoellerpumps.com Oil Smart System Kit Applications: The Zoeller Oil Smart°System Kit,when combined with • Elevator sumps a manual sump pump, will automatically pump water • Transformer containment areas without the risk of pumping oil into the environment. • Underground vaults The panel provides complete pump protection and • Areas where water removal below a layer of oil/ hydrocarbons is required monitoring.Additionally,the system alerts maintenance Models: or building personnel in the event of a high oil or high UL Listed and CSA Certified water condition.The control panel comes complete with • P/N 10-3163- 120/208/240 VAC Single Phase,operates all required controls and panel monitoring capabilities. pumps up to 1 HP @ 120V,2 HP @ 208/240V Installation of the Simplex Panel allows you to comply Also available:Consult Factory with State and Federal regulations while reducing the risk UL Listed for the US and Canada(panel and controls)• of adverse publicity, fines and expensive cleanup costs. • 208/240 VACThree Phase,operates pumps up to 3 HP @ 208/240V • 480 VACThree Phase,operates pumps up to 7.5 HP @ 480V, includes main disconnect • 575 VACThree Phase,operates pumps up to 7.5 HP @ 575V, includes main disconnect Kit Includes: 0 0 • Simplex Control Panel o o O • Oil Smart@ Pump Switch • Alarm Panel • Liquid Smart@ Switch 10'power cord Features: 100'cord to remote panel • Pump control and high liquid alarm differentiate between oil and water. Includes Oil Smart@ pump control and Liquid Smart@ alarm switch. 10' cords included. Pump Control Features: • Pump Hand-Off-Auto (H.O.A.) switch,green pump run light and power on light • Remote monitoring dry contacts: oil,water, high liquid • Pump protection: Pump circuit breaker Alarm Features: • Remote alarm panel equipped with yellow light for oil, white light for water,alarm test and silence buttons,85 decibel alarm,and high red beacon alarm light. 100' cord included to wire to main control panel. Includes dry contacts: oil,water,high liquid Technical Specifications: • Panel enclosure: Opaque front heavy duty NEMA 4X polycarbonate, 10"x 8" x 4"with lockable latches • Switches:Type 3R high impact injected plastic • Oil Smart"switch dimensions: 2.5"w x 6" h x 1.75" d plus 6" sensor *Pump sold separately SK2891 • Liquid Smart switch dimensions: 3.5" h x 1.5" w x 1.5" d • Remote panel enclosure: NEMA 4X,6"x 5"x 2.5" @ Copyright 2011 Zoeller Co.All rights reserved. M M E E E 0 u > z z N N O O O O N N N N N N N N N N N y N N N N N NN N N N N N N N N N N N N N N N N N > O N N N N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O N \\\\N N N N N N N N N N N m N N N N ry ry N N N N N N N N N N N N N N N N N N Q. N N N N M M M M O. N N N N \\\\ rl rl rl rl In O a N N N N N M M M M M M M M M M M M M M M M M M M M M M M M M M txo � N N N N N N N N N N N N N N M M M N N N N N N M M N N N N N N N N M M M M M N N N M M M O O O O O O O O O O O O O O N N N O O O O O O N N O O O O O O O O N N N N N O O O N N N f0 N N N N N N N N N N N N N N O O O N N N N N N O O N N N N N N N N O O O O O N N N O O O \\\\\\\\\\\\\\ N N N \\\\\\N N \\\\\\\\N N N N N \\\N N N s E M ao 00 00 O O N a a a a a w \\\a a O N oD oD \\O .-I N N oD O .-I \\\\\ O O N \\\ ^ ^ � N N M M rl rl � � rl rl rl rl rl rl rl M ~ ^ � � � N N N w C N to � O u O C C f/1 O m U m w ui a m V1 }Z > N O1 F � u •n. W Q O O O O O N M O O O O O O O O O Q O O O O O O O O O O O O O O O O O O O O O O O O O O O u' O O of O O M cD O O O O O O O O O O O O O O O O O O O O O O O O 00 O O O O O O O O O O O ly N O O M M O V M 1, N O N M vi O 1� 0 O u1 N u1 N tV O O V N w M tV O u1 O N O y ¢ u1 O O a M O tD W 1� oD W J O/ lD N N/D u)O n V V1 V.-I�-1 O N N u1 a V a 0 u1 �-1 M O 00 lD.-I 00.-I �-1 M.-I n m rl rl rl N rl lD rl rl rl N 00 rl n rl rl rl rl rl rl rl rl h =a u 0 °7S .nvlNvlvlvlvlNv> vlNv> vlvlvlvl vINN �Nv> vlinini NNininin �Nv> Nv> vlNv> N } rn Z m 0 fx 0?1 a W W 0 v a Z OE cn m 0 w m cn o G ni C N c J C7 O OJ i H N N T ei F a W � ti' N m all HI vl m �^ v C N a 0 m a 3 Z u c m N c ¢ ~ o G Mo w o ,N on LL a Lu Z N T I C Off 0' LL D: OJ N of C7 a 3 c E Z O N = N Q L N T = m a N Y O G d O Z O 3 ¢� E =I a v a o w-. o o =° c - X O d' N 06 N u a� E p c M O O o a iL O N DD M C O O N N A D: X u 0 14acn a ¢ al z m o ¢ >p �, O y a ml u •(a A �'• a ° O m OI y w c ¢ U a 06 c c vl M °- `u' c u al " a ^^'a cn c C7 o > > N O o c Qj 3 E o o y a N � > y am. m .� o c a m s a l7 OI s N Q j cn o7S � m v m N O O m a OJ m cn p m ?� O u n N ° c 'm o -mm�u a 3 � m ° u ¢ E $ m o o N c N o E a `- N c c ono 3 O ° t U b0 T C Y C ° t a I!1 C M w c o ''�" —^ G m °'0 E b0 QI y. G u s V O m 71 E N I C u .Y u C t C O OJ m M N p m '^ m 3 N N O. C OJ p u p' i Li 00 aai c •`m u m c 9 =U t O 3 aDD m a c +' O m 3 u t o:l ml•� s o *' o: a, a o � •g N vc > a � v u 3 u A M . w c 3 °� o ° c Lw a u c 3 a Cr 14 U W w o7S 3 a u = u i 0 C - O C p W J O O O a T m N w 00 C y! co t E ,r a a p o O m - 0 c0 p vl al m > c a t+ �' �• c o a > s ;. a •ia E c u a, o` M a *' > 'a m -.0 m > `- a on- 0 c`p u L y u l u i0 c u u a O H o u a ° a- a s 'A 3 m n A 'c m N � ,m o7S a ° s u CL - ° 00 Y+ o c x u s a u a x u c u Q E N E N u m E m o m a s o7S c L ' a = a a ° A o u a u o a 0 0 �a ° m o u u on ° c a = o E u c c > o ^ o f m A O o o ._ N m o ° v o c F a, A - N - m t o m o u E a 3 'L ;. o: on W M E m on s H c a 3 m c '� 3 E w c m w ° a` E ,° -" u In c > c > a N u E O fl- OJ OJ O i 'n u 'a ° > O N !0 O c0 OJ u 0) l0 E s 3 'a o a 3 u o m u _p > ,T. o °: ;' a = ie c > o a a a t u ; ua - a •c ° > a °° + •- - Qj W. AN m o '. M E a o o CL a c a u o o v w a j w y u 3 o o ° "' o 't ,°1., m o m '^ ;; L o: a ._ 3 A a W �_ N o a c c Q c > a O c > > m 3 0 =U a j w a ¢ " " E ° ° _ N cr d LL O OJ OJ O = of a Zi y U 7 m N Y 0 7 eY y N y O W tL p ° E o E o o ° o - °1 a ° m 3 > c ^ o cn a s oo E x v 3 c E o a a N u -M a o T onM M p p 0 y 0 5 N A ° m u CJ m y ,y N N N OTio E O E O 3 O F ¢ c o -p o y y s �' a Q Q > a 3 a a o rn °- E v .� In m u c c s E m a ° > v+ ° - m o i o u Ol m rn ° .� `o ° E E m O C upi al 3 s c`0 E 0 0 0 > p 0 0 je O CJ ° m N + m CJ N c0 O al ¢ A C w O u ey O ami O O p 0 3 =w 0 O o 0 0 m W W ¢ GO In j O d o W F LL al I O d I w I I 1 3 00 0 I I I N 0 � I V P, V l V cn N Q W 0 m a .� a In .� a m m rn rn oo a l� oo rn 00 o a m rn o 0o m l, oo m m N �o W N (� N eY N v1 3 1f1 r1 eY w 1, ♦+ w cn v1 w v1 01 cn 00 01 T O O 01 00 0 11 00 01 n 0 eY N cn eY eY N Ua a eY eY eY eY W T O eY eY eY eY eY a eY eY eY eY eY eY I!1 eY eY eY N N eY eY eY eY eY eY E eY E N N N N N N N OJ O a LL LL LL LL Y '�^ V1 LL LL LL LL LL i LL LL LL LL LL LL 000 LL LL LL LL LL LL LL ^ LL LL LL LL LL LL LL LL LL LL LL D: Wiwi D: D: N 0' 0' 0' 0' 0' 0' 0' N 0' 0' 0' V1 0' V1 0' 0' 0' 0' 0' 0' 0' N 7 eY N cn 7 fluflumulflumuUtHwul M 7 1f1 l0 n 00 T O eY N M 7 1f1 l0 n 00 T O eY N M 7 1f1 l0 n 00 T O eY N M °' O O O O O Y eYN NFO OO OuuuuumuUt D: wuumuou0: umuuUuNumuUUUuuuu Vu u u u u V u u u u u u V u u u u u u u u u u u u u u u u u u U mwwm000mNo0 0Inl� rna Nmm �0mNwNawInInONmOa0wwa000000NIn cn iC N N t0 t0 00 O O O v1 N T 00 O eY M O O v1 M O v1 1� t0 n t0 00 00 t0 t0 v1 M M 00 O 00 t0 T O O eY O O O Z O O O O 0 0 eY O O o O O 0 0 eY eY eY eY eY eY eY eY eY eY eY eY eY eY eY eY eY eY eY N eY eY eY N N N N N N F O O O O O O CIO O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O CIO ey Q u u u u u u CJ u U U CJ CJ u u CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ \ a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a r, v vv c � N : : ° a>i ° ° a>i a>i a s a a a a c rc � rc rc m z O rc rc rc ^+ x x x x x x x E o ¢ o o ¢ ¢ G ¢ aoo y 7 y y 7 7 y 7 a 7 7 7 c c c 0 0 0 0 0 0 0 0 0 0 0 C c a on N O O O O O o O O O O O O O N m m m m m O> 0 a ~ O ~ ~ o V ~ ~ ~ O M o W rn U Ln n Ln Ln .i a M ci m Ln w C N N U VD C N NN NNN N �/D a 0 0 0 0 0 0 0 0 0 0 0 (n M o 0 0 0 0 0 0 0 0 o n v o, a, 1*1 c o 0 0 N 0o M w oD N M w M N aovMaiairi no+ Orn Ili V Ln T M 55 Z C7 Z w Z Z Q Q � U W z u � u W O Z z W z � F Z a a z � � O u u Q U w 3 0 6 Z O c a • " w u > O O C ~ W t E o o a O u o m 3 au o a E m i c O O O u o O u A •m 71 A d DD C N C •� O N �O O a c U a+ co . T m O G N a0+ u ( n U ° n N u �O Y m °_° u o A a E A O N c c > I s Q u .� m c A Q a .ur O u c E O L IL o eN.i a a ° ° a ¢ A DD rn a c a G H a '� o '~^ sown N o7S =I «a o ¢ ° alEIL o "tea ° : E � c , m x O O E u Q O u U a o s A `y u o c 5 u k 3 t o o6 3 E- m `- y a o w m o a E 0 c c m a fl o a E A w o a r A a v c a A rE c a v o 'o t u A $ 3 a a > c a m a o°_o a c c E A "' u a U c m r a A 'on a ° c ° a c ° u o 0 ° — O LL 3 c c CL y ° E _ is a ^i ((A N 3 `` y a a Q a Q a o j o ° o .m, o O o 3 oo ^ c o u n ° n O E ni > ,_ (,( M o ` a O ~ c E > a ° E a a t N 3 u a O a o u a a a c c o m 0 3 w c ooN o rn a o (n o of cn c ( N o � w w v N N N eY In 7 eY fn In 'n W eY N N 7 O I cn 7 7 N N N i!1 N N N N N eY `u oo N N N N N N N N E (NV LL LL LL O LL LL LL LL LL LL N LL LL LL LL LL LL LL LL 3 LL o a O 'n a (nwr" oorn Nma w 0 0 0 0 0 0 0 0 0 0 o r u u u u u u u u u u u u u u u u u u u u u u u t u u u u u u u u u u u u a Oar, w r, M goo m m m N w c N tTww N N O eY eY M M T N N 1� M T O eY N N M M M M M 7 N N N N N N N eY N N eY Z eY eY N N N N N N N N N N U U U U U U U U U U U Q U U U U U U U U U U U U a a a a a a a a a a a a a a a a a a a a a a a O O O y N N N C m m N y N N y N E a m E m E m m E u° c `O `O u° u u O > m m E 0 0 n m z z N N Vf � 7 Q Q Q u O : �- m C m L w w 0 0 LO O d o 0 o CA w 0 N P, rl D N i d OMM N Mn YUp L C v � C m o @; o w 3 4 m o N C o a o 0 o N m o N — m a Lo 0 0 Plil 0 cn Q O/ N S � 3 +� vvi u v�• v�• V °�' � � �� .n W 00 O M u1 O O 00 O T M O of O O O O O Q T Mi n n m a cn 0 M O O O " w N N O C N a cn N a mrl lA Y m u O z O o g Q u N y W bq F � z v W 7 � u d' C u z co u z 3 0 a 0 W C A IL OJ N `u w o v y -- 0 = a C � C C O 7 u N y A M "U ra u C y > C A m N C N 3 Ca 00 eY N d A Q y y O ML A A p 0 y ?i b4 O ry d 0 C OD C y Vf ° N o o m t c c a 00 b4 C LL C Lij O u. d A A d u. F C •(- OJ OJ N N E OJ y - C �i J CO d Vf O CL O iC O O O O O T OD m F m m m m m O a 0 0 0 0 0 a N 00 x 00 00 Oi z O N Y Y cc cc a a a a