2nd Change Order 08/07/2023 MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Key West Lighthouse Oil Display &Tower Repairs CHANGE ORDER NO: 02 INITIATION DATE: 08/01/2023 CONTRACT DATE: 08/17/2022 TO CONTRACTOR: Marino Construction Group 7025 Shrimp Rd. suite 2E Key West, FL. 33040 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price)..................................... $282,820.00 Net change by previously authorized Change Orders.................................................... $0.00 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was....... $282,820.00 The(Contract Sum) (Guaranteed Maximum Price)will be (increased) (decreased) (unchanged) by this Change Order................... $0.00 The new (Contract Sum)(Guaranteed Maximum Price) including this Change Order is. $282,820.00 The Contract Time will be (increased) (decreased) (unchanged) by........................... 10 days The date of Substantial Completion as of the date of this Change Order is ................. 8/17/2023 Detailed description of change order and justification: This is a no-cost change. The contractor has requested 10 additional days to finish the sidewalk repairs. Therefore, the substantial completion date will be moved from August 7, 2023, to August 17, 2023. This allows time for project completion prior to the TDC grant expiration date of September 30, 2023. Chance order is 0% of on final contract hZ . OF. Not valid until signed by Owner Architect if applicable), and Contracto ` ARCHITECT: Davd Sal r� ...aR�` ( / / 3 David Salay Date CONTRACTOR: , Marino Construction Date Cary Knight Digitally signed by Cary Knight DEPARTMENT DIRECTOR: Date:2023.08.0316:48:24 04'00' Cary Knight Date Kev nt . gen P.E, Digitally signed by Kevin G.Wilson,P.E. i Date:2023.08.07 11:39:57-04'00' COUNTY/ASSISTANT ADMINISTRATOR: Roman Gastesi Date Kevin Wilson Change Order Attachment per Ordinance No. 024-2015 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Time extension to facilitate completion of the sidewalk repairs. • Change Order was included in the original specifications. Yes❑ No If Yes, explanation of increase in price: • Change Order exceeds$50,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes❑No Should a claim under the applicable professional liability policy be made? Yes❑ No Explain: IM / RIN01 . C O N S T R U C T I O N G R O U P Change Order to Owner OWNER: Monroe County BOCC PROJECT: Key West Lighthouse Date: 7/24/2023 500 Whitehead Street Contract Date: 8/17/2023 Key West,FL 33040 Change Order No: I The Contract is changed as follows: Zero Dollar Change Order for sidewalk repairs agreed upon at the site meeting on July 14,2023 The sidewalk repairs will include the following: Two areas of sidewalk repairs at entrance ofthe Lighthouse,measuring 17x4 and 32x5. Initial removal ofthe V layer ofPortland to expose the concrete base for inspection of cracks and damage. Removal ofthe entire sidewalk as shown on the supplemental page. Replace the top layer of white Portland and texture as close as possible.A white stain or color pack may be used as an alternate. Other patch repairs to include filling cracks with a clear crack bond to make for safe conditions. A 2'x2'test/mock up sample will be done. See attached pg.2 The Original Contract Sum was $ 282,820.00 ................................................................................. The net change by previously authorized Change Orders W$ 0 ........ The Contract Sum prior to this Change order was $ 282,820.00 The Contract Sum will be Unchanged by this Change Order in the amount of $ 0 The new Contract Sum including this Change Order will be $ 282,820.00 The Contract Time will be Increased by ( 10 )daze_ The date of Substantial Completion as ofthe date of this Change Order,therefore is NOT VALID UNTIL SIGNED BV THE OWNER AND CONTRACTOR: Marino Construction Group,Inc. OWNER(firm Name) CONTRACTOR(Firm Name) P.O.Box 1706 Key West,FL 33041 ADDRESS ADDRESS BY(Signature) B�Y{�(Sad„ncraure) �___6�S'6✓a t��'EI� l��'N,� k (onaaed)Varraae) (Printed Name) P DATE DATE CGCO21647 305-359-5269 PO Box 1706 Key West,FL 33041 www.marino-construction.com r - - - -- - - - - - - - omxm I " ti k " $ ; L ++ter wrww err �rwwr M... ..r. awxrrr •rrr w..r ypµ _ ! AREA OF WORK: WISTORtC V HOUSE ` H15TO IC Oil.:HOU trrh, Rr " s 1 A W4 Orl" ........... µ 6 .G as 3"r�1 66 d r v ktry - { d � s f W IAN UNWAK ra ""1.G