Item C13BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: January 16, 2008 Division: Engineering Bulk Item: Yes X No Department: Facilities Development Staff Contact Person/Phone #: Jerry Barnett X4416 AGENDA ITEM WORDING: Receipt of monthly report on change orders reviewed by the County Administrator's Office, and a list of change order requests submitted by contractors, and rejected by Engineering/Facilities Development. ITEM BACKGROUND: There were five change orders considered and approved by the County Administrator for the period beginning December 1, 2007 and ending December 31, 2007, for a total net credit of $68,370.47, and there was one change order request submitted by contractors and rejected by Engineering/Facilities Development for an amount of $61,532.10 (see attached). PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No. 026-1998 was adopted in order to provide that the County Administrator may approve separate, non -cumulative change orders for construction projects and professional service contracts in amounts not to exceed $25,000.00 or 5% of the original contract price, whichever is greater. The BOCC requested a monthly report of all change orders considered by the County Administrator. CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATIONS: N/A TOTAL COST: N/A COST TO COUNTY: N/A BUDGETED: Yes N/A No _ SOURCE OF FUNDS: N/A REVENUE PRODUCING: Yes _ No , AMOUNT PER MONTH Year APPROVED BY: County Atty OMB/Purchasmg Risk Management DOCUMENTATION: DISPOSITION: Revised 11/06 Included X Not Required AGENDA ITEM # W 9 W a V W N LL LL O O FI ra r M O V W H m W W 0 U) Z O U 7� m N \ 0 \ N 0 9 IL W ce O U. t L H E : L y m -Ncc CN E O MO A A c C) �C W IY p(Ain Cl Cp CD Ec t'�5 � � d ry c _ c m� to c2 E@� f Vo ES y ' o S 469 vn Q p ^ h p `5 p to to a d* s �► L L V $ v x z o U:lj. Z d c t g cvv � , c XID � 8 E u E c� a O- Q MONROE COUNTY FACILITIES DEVELOPMENT M E M O R A N D U M TO: David Koppel County Engineer FROM: Ann Riger, Contracts Administrator Facilities Development DATE: January 2, 2008 RE: Agenda Item -- Change Order Report AGENDA ITEM WORDING: Receipt of the monthly report on Change Orders reviewed by the County Administrator's Office, and a list of change order requests submitted by contractors, and rejected by Engineering/Facilities Development. ITEM BACKGROUND: There were five change orders considered and approved by the County Administrator fora net credit of $68, 370.47. They are as follows: 1. May Hill Russell County Library —Change Order No. 1 fora credit of $8, 063.47 includes a change from the Batten Roof System to a Foam Patty System to achieve a higher wind uplift rating, resulting in a credit of $18, 283.47, and wood replacement netting a cost of $10, 220.00. 2. Murray E Nelson Government & Cultural Center — Change Order No. 3 for a credit of $34, 782. 00 is for materials that Monroe County purchased directly from Cemex in the month of July to save on sales tax. 3. Murray E Nelson Government & Cultural Center —Change Order No. 4 for a credit of $37, 075. 00 is for materials that Monroe County purchased directly form Cemex in the months of June and August to save on sales tax. 4. Freeman Justice Center Brick and Stone Exterior Cladding —Change Order No. 3 for a no costume extension of 110 days for substantial completion, from November 23, 2007 to March 12, 2008, due to time needed by the manufacturer to cast the stone panels. S. Freeman Justice Center — Change Order No. 39 in the amount of $11, SSO.00 is to adjust the opening at door #G129 to accommodate a thicker granite floor tile, and to correct the un-level floor elevations caused by tile -to -carpet transitions. This will be funded by the 16`h Judicial Court. PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No. 026-1998 was adopted in order to provide that the County Administrator may approve separate, non -cumulative change orders for construction projects and professional service contracts in amounts not to exceed $25, 000.00 or S% of the original contract price, whichever is greater. The BOCC requested a monthly report of all change orders considered by the County Administrator. CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATIONS: N/A Thank you. If you have any questions please call me at ext. 4439. CHANGE ORDER REQUESTS BY CONSTRUCTION CONTRACTOR REJECTED BY ENGINEERING/CONSTRUCTION DEVELOPMENT FOR THE MONTH OF DECEMEBER, 2007 Project Tavernier Fire Station Total COR # Description 24 Extended General Conditions Amount $61,532.10 C O 0 E U Q U C O a C O U G N 0 CD W N CHANGE ORDER PROJECT: 070057 May Hill Russell County Library 700 Fleming Street Key West FI TO: Decktight Roofing Services, Inc 6680 NW 17th Ave Fort Lauderdale, FL 33309 The Contract is changed as follows: 1. Change from Batten System to Foam Patty System 2. Wood Replacement 11/6-11/28 OWNER ARCHITECT CONTRACTOR FIELD OTHER CHANGE ORDER #: 1 CHANGE ORDER DATE: 11/27/2007 PROJECT #s: DATE OF CONTRACT: 10/25/2007 FOR: Decktight has offered a $5,000 contribution for wood replacement Total of this change order -$18,283.47 $15,220.00 -$ 5,000.00 -$8,063.47 (See Attachment #1) (See Attachment #2) The original Contract Sum was $386,887.55 The net change by previously authorized Change Orders is $0.00 The Contract Sum prior to this Change Order was $386,887.55 The Contract Sum will be decreased by this Change Order in the amount of ($8,063.47) The new Contract Sum including this Change Order will be $378,824.08 The Contract Time will be increased by 0 days. The date of Substantial Completion as of this Change Order therefore is Unchanged Not valid until signed by all parties below. x&� Decktight Roofing Services, Inc. Monroe County ARCHITECT CONTRACTOR OWNER ZYYY"` /0C-) L/, ��� h St' 6680 NW 17th Ave APOUSS i'L- 4Fs"f—=Lt3�r—'ss�`C��� 3301(t) ADDRESS BY (Signature) A fe-WP"FL- V., t�t6RANk (Typed Name) DATE /2/N/o Fort Lauderdal 333 B ignature Richard Spreen, President (Typed Name) DATE . 's ADDRESS BY we) � �,nrz.�i �Cn � ( /, (Typed Name) DATE QSS, INC. DOCUMENT ATTACHMENT #1 The following represents the overall credit to achieve a higher wind uplift rating utilizing foam (large patty) attachment versus the batten and screw attachment. Included in this is the change to a thick butt edge tile set in large patty foam ten screwed to deck per code (edge metal not needed as will fill with dirt and leaves) Materials: Labor Wood Batten- 15,000 I/f with screws and protecto wrap -$ 6,522.15 Metal edge closure versus drip edge and thick butt tiles now proposed -$ 351.00 Poyfoam Large Patty - .38 per tile x 23,386 tiles $ 9,114.68 1 screw 1 st row and every 3rd tile every 5th row per code to prevent slippage (Screws will be secured throught foam patty for watertight seal) 2,500 X .03 $ 75.00 Hurricane Clips - 1,000 x .25 -$ 250.00 Wood Batten System hours: 1,500 I/fx .03 hrs per 1/f=575 hrs @ $50.00 hr-$28,500.00 Foam Attachment System: 23,386 tiles x .007 = 163 man hours @ $50.00 hr $ 8,150.00 "Hourly rate includes overnight stay allowance TOTAL-$18,283.47 ATTACHMENT #2 As per your request I have calculated the board feet measurements of wood replaced from 11/6/07- 11 /28/07: Calculated as follows: Each Sheet of Plywood = 24 bf 1x6x8= 4 bf 4x6x8=16 bf 11/6/07: 5 sheets of plywood = 120 bf. 11/7/07: 5 sheets of plywood = 120 bf. 11 /8/07: 8- 1 x6x8 = 32 bf 1- 4x6x4= 8 bf 11/9/07: 5 sheets of plywood = 120 bf. 2- 1 x6x8 = 8 bf. 1 /2- 4x6x8 = 8 bf. Speciality Cut = $100,00 11/10/07: 2- Sheets Plywood=48 bf 2- 1 x6x8 = 8 bf 11/12/07: 4-Sheets Plywood=96 bf 11/13/07: 8 Sheets Plywood=192 bf 11/14/07: 8- 1x6x8 =32 bf 11/15/07: 5 - Sheets Plywood = 120 bf 11/16/07: 2 - Sheets Plywood = 48 bf 8 - 1 x6x8 = 32 bf 11/27/07: 1 - 4x6x8 = 16bf Totaling 1008 bf @ $15/ bf=$15,120.00 Plus the $100.00 for the specialty cut TOTAL: $15,220.00 M E M O R A N D U M DATE: December 17, 2007 TO: Belle DeSantis, Deputy Clerk FROM: Beth Leto, Public Works Division RE: May Hill Russell Library Roof Project Enclosed for your information and file, please find a fully -executed copy of Change Order No. 1 reducing contract sum by $8,063.47 for the above -referenced project. This change order was executed by Debbie Frederick, Deputy County Administrator, on December 15, 2007, in accordance with Ordinance 026-1998. Should you have any questions, please feel free to contact me at x4560 or John King at x4531. bpl cc: Jackie Clynes John King MONROE COUNTY / ENGINEERING / FACILITIES DEVELOPMENT CONTRACT CHANGE ORDER PROJECT TITLE: Murray E. Nelson Government & Cultural Center 102050 Overseas Hwy Key Largo, FL 33037 TO CONTRACTOR: AFCO Constructors, Inc. 1804 NW Madrid Way Boca Raton, FL 33432 The Contract is changed as follows: CHANGE ORDER NO: 3 Initiation Date: 11/26/2007 Contract Date: November 15, 2006 The original (Contract Sum) (Guaranteed Maximum Price) was ..................................... $ 10,867,266.00 Net change by previously authorized Change Orders ...................... ($ 451,487.51) The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was ............ $ 10,415,778.49 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order........................................................................... ($ 34,782.00) The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be $ 10,380,996.49 The Contract Time will be (increased) (decreased) (unchanged) by ( 0 ) days The date of Substantial Completion as of the date of this Change Order therefore is............ May 31, 2008 Detailed description of change order and justification: The contractor has agreed to direct purchase materials through the County to enable the County to take advantage of its tax free status to reduce the overall costs of the project This change order reflects the actual amount of materials paid for by the Countv as detailed on the attached letter from AFCO and which reduces the amount due to AFCO The tax savings are already accounted for on Change Order 11 for this project. The FL Sales Tax savings corresponding to this Change Order are $ 2 608 37 which are alreadv reflected in Change Order #1. This Change Order is -0.32% of the original contract sum (guaranteed maximum price) Not valid until signed by Owner Architect and Contractor ARCHITECT: CONTRACTOR: DIR OF FACILITIES DEVELOPMENT COUNTY ENGINEER COUNTY ADMINISTRATOR C MD007-1 /20/06 Currie,iS"alosu Architects AFCO Constructors, Inc. Date ,Jerry arne Date ' o0� o P.E. Date Thomas J. Willi/Debbie Frederick -Deputy Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The savings for direct purchase of materials by the County was developed as part of a post contract execution value engineering effort. • Change Order was included in the original specifications. Yes [] No If Yes, explain what event or circumstance compels an increase in the contract price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: CMD007-1 /20/06 ,wpm* 1Z IM . VW 'I" AM CONSTRUCTORS, INC� 1804 NW Madrid Way Boca Raton, FL 33432 T: (561) 338-2160 F: (561) 338-5037 AFCO-06-119-155 October 24 2007 Attention: Mr. Jose Aguila Currie, Sowards, Aguila Architects 134 NE 1" Ave. Delray Beach, FL 33444 Reference: Murray E. Nelson Government and Cultural Center CCP 10 — Deduct for Direct Payment #1 Gentlemen: In response to the Direct Payment Agreement, AFCO Constructors, Inc herewith submits change order request in accordance with our direct payment agreement in the amount of-$34,782.00 (negative thirty four thousand seven hundred eighty two and 00/100) The County of Monroe has realized a savings on tax of apr. $2608.65 because of this action. Cemex 2374780 11-Jul-07 $8,695.50 Cemex 2374762 11-Jul-07 $7,246.25 Cemex 2374765 11-Jul-07 $10,144.75 Cemex 2377870 12-Jul-07 $2,898.50 Cemex 2377872 12-Jul-07 $5,797.00 $34,782.00 $2,608.37 Please issue a formal change order for the corresponding cost. Very truly yours, AFCO Constructors, Inc. Kevin Land Project Manager Attachments CC: K. Wilson, Monroe County J. Barnett, Monroe County Aldo Ferrera, AFCO AFCO expressly reserves its right to claim for time extension and compensation of all related damages, including indirect cost and time impacts. This change order shall not be construed as a waiver by AFCO of any claim (time or money) arising out of the performance of the work caused by unforeseen conditions, or design errors or omissions in the change order. MEMORANDUM TO: Board of County Commissioners From: Debbie Frederick Deputy County Administrator Date: December 3, 2007 RE: Change Orders Attached is a proposed change order for AFCO Constructors, Inc. (Change Order #3 for the Murray E. Nelson Government do Cultural Center is for a decrease of $34,782.00. The contractor has agreed to direct purchase materials through the County to enable the County to take advantage of its tax free status to reduce the overall costs of the project. The FL Sales Tax savings corresponding to this change order are $2608.37 which are already reflected in change order #Q According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The Deputy Administrator intends to approve this change order on -Tu"day, December, 2007. Debbie Frederick Deputy County Administrator DLF: adc Page 1 of 1 Campo-Abra From: Campo-Abra Sent: Tuesday, December 04, 2007 12:31 PM To: County Commissioners and Aides Subject: Change Orders Attachments: Change Order #4.pdf; Change Order #3.pdf Please review the attached Change Orders #3 and #4 for AFCO Constructors, Inc. for the Murray E. Nelson Government Center. Sr. Administrative Assistant Office of County Administrator The Historic Gato Cigar Factory 1100 Simonton Street, Suite 2-20S Key west, R 33040 Office 305-292-4441 Fax 30S-292-4544 camera-abradmonroecount�fl gov Help us Help You! Please take a moment to complete our Customer Satisfaction Survey.- http:ilmonroec_ofl.virfualtownhall.net/Pages/MonroeCoFL WebDo_cs/css Your feedback is in portalit to list Please note: Florida has a very broad public records law. Most written communications to or from the County regarding County business are public record available to the public and media upon request. Your email may be subject to public disclosure. 2/4/2007 MONROE COUNTY / ENGINEERING / FACILITIES DEVELOPMENT CONTRACT CHANGE ORDER PROJECT TITLE: Murray E. Nelson Government & Cultural Center 102050 Overseas Hwy Key Largo, FL 33037 TO CONTRACTOR: AFCO Constructors, Inc. 1804 NW Madrid Way Boca Raton, FL 33432 The Contract is changed as follows: CHANGE ORDER NO: 4 Initiation Date: 11/26/2007 Contract Date: November 15, 2006 The original (Contract Sum) (Guaranteed Maximum Price) was ..................................... $ 10,867,266.00 Net change by previously authorized Change Orders ...................... ($Aa2, .rst The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was ............ $ 10,380,996.49�'���J!' The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order........................................................................... The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be $ 10,343,921.49) The Contract Time will be (increased) (decreased) (unchanged) by ) days The date of Substantial Completion as of the date of this Change Order therefore is............ May 031, 2008 Detailed description of change order and justification: The contractor has agreed to direct ourchase materials throw h the County to enable the Coun to take advantage of its tax free status to reduce the overall costs of the roiect This chance order reflects the actual amount of material aid for b the County as d tailed on the attached letter from AFCO and which reduces the amount due to AFCO The tax savings are project already accounted for on Change Order #1 for this The FL Sales Tax savin s corres ondin t this Chan a Order are 2 780.63 which ar ahead reflected in Change Order #1 This Change Order is-0.34% of the original contract sum Quaranteed maximum rice ARCHITECT: ('L I Currie -or A architects Date CONTRACTOR: AFCO Constructors, Inc. Dat6 DIR OF FACILITIES DEVELOPMENT L �� Jerry Bare Date COUNTY ENGINEER D Koppe P.E. Date COUNTY ADMINISTRATOR `� < / Thomas J. Willi/Debbie Frederick -Deputy to C M D007-1 /20/06 Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The savings for direct purchase of materials by the County was developed as part of a post contract execution value engineering effort. • Change Order was included in the original specifications. Yes ❑ No If Yes, explain what event or circumstance compels an increase in the contract price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: CM D007-1 /20/06 CONSTRt!C'TORS, INC, 1804 NW Madrid Way Boca Raton, FL 33432 T: (561) 338-2160 F: (561) 338-5037 A FCO-06-119-155 October 30 2007 Attention: Mr. Jose Aguila Currie, Sowards, Aguila Architects 134 NE I" Ave. Delray Beach, FL 33444 Reference: Murray E. Nelson Government and Cultural Center CCP 12 — Deduct for Direct Payment #2 Gentlemen: In response to the Direct Payment Agreement, AFCO Constructors, Inc herewith submits change order request in accordance with our direct payment agreement in the amount of-$37,075.00 (negative thirty seven thousand seventy five and 00/100) The County of Monroe has realized a savings on tax of apr. $2,780.63 because of this action. Total Cemex 2438215 8-Jun-07 $8,848.00 Cemex 2440908 8-Aug-07 $4,424.00 Cemex 2443966 9-Aug-07 $10,531.00 14-Aug- Cemex 2453810 07 $5,530.00 22-Aug- Cemex 2472647 07 $7,742.00 $37,075.00 Taxes $663.60 11-Oct-07 10/25/2007 Paid $331.80 11-Oct-07 - 10/25/2007 Paid $789.83 11-Oct-07 10/25/2007 Paid $414.75 11-Oct-07 10/25/2007 Paid $580.65 11-Oct-07 10/25/2007 Paid $2,780.63 Please issue a formal change order for the corresponding cost. Very truly yours, AFCO Constructors, Inc. Kevin Land Project Manager Attachments CC: K. Wilson, Monroe County J. Barnett, Monroe County Aldo Ferrera, AFCO AFCO expressly reserves its right to claim for time extension and compensation of all related damages, including indirect cost and time impacts. This change order Shall not be construed as a waiver by AFCO ofany claim (time or money) arising out of the performance of the work caused by untbreseen conditions, or design errors or omissions in the change order. M EM ORA ND UM TO: Board of County Commissioners From: Debbie Frederick Deputy County Administrator Date: December 3, 2007 RE: Change Orders Attached is a proposed change order for AFCO Constructors, Inc. (Charge Order #4 for the Murray E. Nelson Government de Cultural Center is for a decrease of $37,075.00. The contractor has agreed to direct purchase materials through the County to enable the County to take advantage of its tax free status to reduce the overall costs of the project. The FL Sales Tax savings corresponding to this change order are $2780.63 which are already reflected in change order #1.) According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the SOCC agenda. d The Deputy Administrator intends to approve this change order on -T sday, December , 2007. 4, C-'e Debbie Frederick Deputy County Administrator DLF: adc rage i or i Campo-Abra From: Campo-Abra Sent: Tuesday, December 04, 2007 12:31 PM To: County Commissioners and Aides Subject: Change Orders Attachments: Change Order #4.pdf; Change Order #3.pdf Please review the attached Change Orders #3 and #4 for AFCO Constructors, Inc. for the Murray E. Nelson Government Center. 1 M- Sr. Administrative Assistant Office of County Administrator The Historic Gato Cigar Factory 1100 Simonton Street, Suite 2-205 Key West, FL 33040 Office 305-292-4441 Fax 305-292-4544 cam�a-abra@a monroecou_nty-ii,gov_ Help us Help You! Reese take a moment to complete our Customer Satisfaction Survey.• http://monroecofl.virtualtownhall.neVPa es/MonroeCoFL WebDocs/css Your eedhack is iniportatit to rrs! Please note: Florida has a very broad public records law. Most written communications to or from the County regarding County business are public record available to the public and media upon request. Your email may be subject to public disclosure. 2/4/2007 MONROE COUNTY / ENGavEERiNG /FACn rms DEVELOPMENT CONTRACT CHANGE ORDER PROJECT TITLE: Brick and Stone Exterior Cladding Freeman Justice Center 302 Fleming Street Key West, FL TO CONTRACTOR: E.G. Braswell Construction, Inc. 5635 MacDonald Avenue Key West, FL The Contract is changed as follows: CHANGE ORDER NO: 3 INITIATION DATE: November 30, 2007 CONTRACT DATE: May 16, 2007 The original (Contract Sum) (Guaranteed Maximum Price) ........................................ $ 1,923,718.00 Net change by previously authorized Change Orders ................................................ $ 125,030.00 The (tract Sum) (Guaranteed Maximum Price) prior to this Change Order was ......... $ 2,048,748.00 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (urichanaed) by this Change Order ................. $ WA The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is ... $ 2,048,748.00 The Contract Time will be ,(Increased) (decreased) (unchanged) by .............................. 110 Days The date of Substantial Completion as of the date of this Change Order is .................... March 12, 2008 Detailed description of change order and justification: 1 II_ L IL - ARCHITECT: CONTRACTOR: DIRECTOR, FACILITIES DEVELOPMENT: COUNTY ENGINEER WA _ = Date E.G. Briswell Construction, Inc. Date .E. COUNTY ADMINISTRATOR 1 i/' � ( f(�-' Thomas Willi/Debbie Frederick — Deputy //-" q Change Order Attachment per Ordinance No. 004-1999 • Change Order was not Included in the original contract specifications. Yes ® No ❑ If Yes, explanation: This change order 1s for a contract dme extension of 110 days, from November 23, 2007 to March 12, 20M. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it Is not subject for a calling for bids: • Project architect approves the change order. Yes ❑ No If no. explanation of why: The Arch/tW is not required to approve Change orders for the Freeman Justice Center. • Change Order is connecting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: NUV-1U-;�UU( ?K1 Uy:L1 Hn ?HX NU. V. UL E.G. BRASWELL CONSTRUc-now iNC 5635 MACDONALD "E: KEY WEST, FLORIDA 3300 PHOPIE 305.296.0305 FAX 305.296.1824 [Maria opose! Subw�itted to Date: Nov. 21, 2007 onroe County Faciliti:s Dev. Job Name: Frceen,an Justice Center Graziano Job Location: XPY West, Fl. Freeinaa Justice Center Court House h ey West, FL. Hank Goldman Architect of Record Extension of Time #-..I: We received a notification from K&T Stoneworks via email dated November 21, 2007, that the casting of all stone panels will take 190 days from said date. We will need an additional 30 days allowed for installation, 'Therefore we are ri:qucsting an extension of 210 days. Total Price: 00.00 All work co be completed in a wi *manlike manner according to standard piactices. Any alteration or deviation frum above speciScatians involving coots costs, will be executed only upon wntten orders, and will become'A extra ch"O over and above the estimate. This proposal is subject to acceptance within 10 days and is void thereafter at the optic® on the umde�rilmad_—� Edgar B sweU, resident __ E.G. Inc. The above ..... ._ , �,... y.,r urum� L prates, specificatiais gad conditions are hereb accepted- Yogi ar., authorized to do the work as specified. Payment will be nude as outlined above. ACCEPTED - Date: siguat a --- Printed Nance NUV-3U-2UU( hKi U8:22 AM FAX NO. Windows Live liotm W Print Message: Windows Live" Fwd: Schedule Freeman Justice Center From: Jamie Nelson (jarvlskeywest@yahoo.com) Sent: Wed 11/21/07 2:57 PM To: kai39B@hotmall.com Attachments: Schedule Freeman Justice Center (0.0 KB) _ Note: forwarded message attached. Be a better sports nut! Let your teams follow you with Yahoo Mobile. T.1, it now. —Forwarded Message Attachmen-:-- From: aalbarran@ktstonework,%cDm To: jarviskeywestayahoo.com Subject: Schedule Freeman Justl(v Center Date. Wed, 21 Nov 2007 07:50: C 3 -0500 V. U3 Page 1 of 1 i Security scan upon dowitiaad ISTIR0 Good Morning Jarvis, Per our conversation yeste-rday it is our understanding that a schedule has been requested for the completion of the cast stone on thie Freeman Justice Center in order to determi»e your tinal dates of completion to the City of Key West. After talking with our Detai..ers, Head of Production,an3 ,:onsidering the current jobs we are currently dedicated to, It is our Position that a (18o DAY)comPletion of product aIai:e is a realistic time frame to base your schedule on, Might I add that this date would be a worse case scenar.io.As current jobs wind down that available space will undoubtedly be used EOr Freeman Justice Center and in turn move our Final delivery date forward. Please call me if you have any questions. Best Regards, Andre Albarran K&T Stoneworks 101 Benoist Farms Rd. West Palm Beach, Fla. 33411 Phone: (561) 793-5924 Fax: (561) 795-8707 Cell: (561) 718-2570 (561) 722-2637 AlEMORAA/DUM TO: Board of County Commissioners From: Debbie Frederick Acting County Administrator Date: December 11, 2007 RE: Change Orders Attached is a proposed change order for the Brick and Stone Exterior Cladding for the Freeman Justice Center. (Change Order #3 for E.G. Braswell Construction, Inc. is for a no cost time extension of 110 days (worst case scenario 180 days) for the casting of all stone panels needed for the exterior of the Freeman Justice Center.) According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The Acting 2007. Administrator intends to approve this change order on W�41day, December Ji, Debbie Frederick Acting County Administrator DLF:adc rage i of i Campo-Abra From: Campo-Abra Sent: Wednesday, December 12, 2007 8:49 AM To: County Commissioners and Aides Subject: Change Order Attachments: Change Order #3.pdf Please review the attached change order #3 for E.G. Braswell Construction for the Brick and Stone Exterior Cladding for the Freeman Justice Center. Sr. Administrative Assistant Office of County Administrator The Historic Gato Cigar Factory 1100 Simonton Street, Suite 2-205 Key West, FL 33040 Office 305-292-4441 Fax 305-292-4544 campo-abra@ monmec_ountyH.gov Help us Help You! Please take a moment to complete our Customer Satisfaction Survey.• h://monroecofl.virtualtownhall.ne�/PaAes/MonroeCoFL WebDocs/css Your feedback is important to us! Tease note: Florida has a very broad public records law. Most written communications to or from the County regarding County business are public record available to the public and media upon request. Your email may be subject to public disclosure. 2/12/2007 MONROE COUNTY / ENGINEERING /FACILITIES DEVELOPMENT CONTRACT CHANGE ORDER PROJECT TITLE: Freeman Justice Center Jackson Square Key West, FL TO CONTRACTOR: 405 SW 141P Avenue Suite One Davie, FL 33325 The Contract is changed as follows: CHANGE ORDER NO: 39 INITIATION DATE: 08/29/07 $ 09/19/07 CONTRACT DATE: June 16, 2004 Change Order Request #114 and #121 The original (Contract Sum) (Guaranteed Maximum Price) ........................................ $13,804,000.00 Net change by previously authorized Change Orders ................................................ $2,128,900.33 The (Contra Sum) (Guaranteed Maximum Price) will be (decreased) The new (Contract Sum) (Guaranteed Maximum Price)Including tthis thhis Change 11,550.00 nge Order is ... 315,944,450.33 The Contract Time will be (increased) (decreased) (unchanged) by ............................. N/A The date of Substantial Completion as of the date of this Change Order is ..................... January 25, 2007 Detailed description of change order and justification: ,► ntis cnaf7agyrayr � •�� n• lli@ O%/d!/»I cnMiratri nlIC9 Not valid NO siaeed by OWNS C0111 C110nJA MOW and Cont ARCHITECT: WA Date CONTRACTOR: - The ower Group Date DIRECTOR, FACILITIES DEVELOPMENT. Q"; 2,s � ' COUNTY ENGINEER: I2- w -vI COUNTY ADMINISTRATOR --T>W CO? C/C- Thomas WIII/Debbie Frederick -Deputy �. • r ••� Wes.. v_ October 1, 2007 Dd0"i24f COUNTY FACWPn S DEVEICPMENT OCT Z�ltl r nME: 12ECETVDBy SXXTEENTH JUDICUL CIMCVIT of AoRm.& 502 WHIT[HEAO STREAD STREE ANNEX ET KEY WEST, FLORIDA 33040 TELEPHONE(305) 292-3423 S V NCOM: 494-3423 TELEFAX (305) 292-3435 Mr. David Koppel Monroe County Engineer 1100 Simonton Street Key West, FL 33040 RE: Freeman Justice Center Dear Mr. Koppel: It has come to our attention that Change Order Requests 4114 and #121, with regard to flooring adjustments, have been submitted by the Tower Group. Please be advised that the Court is willing to fund these change orders from the Courthouse Facilities budget, as they are a result of the flooring changes we requested. Thank you for your attention to this matter. If you need any additional information or have any questions, please do not hesitate to contact me. Sincerely, dC''� Holly H. omina Administrative Services Manger Enclosures: Change Order Request # 1 14--$3,150.00 Change Order Request #121---$8,400.00 cc: Chief Judge Sandra Taylor r-'•1 zi; John Chandler, The Tower Group OCT 0 2 7 1 TL _ rr U:111nu bivl.l,vrNj(1.Vti uuKY. j. sic 1 V wee 405 SW 148 Avenue Suite One Davie, FL 33325 croup, Inc. Phone: TITLE: Door #G129 Adjustments for New ile PROJECT: Freeman Justice Center (FJC) TO: Attn: Clark Briggs Monroe County Facilities Development 1100 Simonton Street Key West, FL 33040 Phone: (305) 295-4306 Fax: (305) 295-4321 RE: 4P54 To: 7Te DESCRIPTION ON PROPOSAL 14 002/004 CHANGE ORDER REQUEST 476-3200 No. 00114 474-3111 DATE: 8/29/2007 JOB: 0417 CONTRACT NO: I N'10Ptac;E Cc�,,v�'r =ACIUTtES - CI Y V 'CC;n;?D 8v From: �sy � Number: _ The originally -speeded interior design scheme far the Fr Judielasy circuit. During the process of eernan Justice Center was sub CSA and Monroe C �L TTO sent Mice to all substantially revised at the request of the 16fb in the original Contract. y�) t reinforced concrete and CMU shell bad be constructed March 27, 2006 email 8»m TTO to ABS, interior design changes P c� concern addressed to the doors in the concrete and used °n the flooring systImm specified Proceeded using 1/2 the in nmd-set; without an �sonrY walls. In spite of this notice, the Y Provisions for the circumstancoa that TTG notified. CQR #114 seeks means ofpayrnent for the �� to adjust the in the Main Lobby. The cost of the work is based on the August at Door #G129 to accorte the thicker P68e)• Please issue a Change order to increase 16, 2007 proposal itn KenneyC iya attached, floor tile$ to a Contract Time Extension should we th Colmract Sum S3,150.00 fot this onstruction (copy attach, 1 corrections needed to accommodateflooring system that critical ib for c added work' The Tower (3r0uP reserves our right t1� flooring system cbangp O1°P�tion is a�`ected by the cumdative eff"t of the em Deacrlpd6�` StojW D01 Remove door and dame for DW #0129, modity c.,O u ploWde C � r dpcning gckw dk t $0t90% sad relnatydl Door #0129, Quantity Uut4 1.000 Description 5% Profit Unit Prko TAX 9ste T-- Amount Net AmoanE S3.000.00 0.00% $0.00 53.000.00 Unit Cost: $3,000 00 Unit T . $0.00 Unit Total: $3,000.00 Subtotal: S3,000.00 Markup Percent Markup Amount 5.000% S 150.00 Tots! Cost: $3,150.00 tel 06/213/2007 .:vy u:v11Cu >r:v�1.�CrK1vv 10:16 13052967757 (UltY. K 1' CONSTR XTION "MEX CONSTRUCT1iON, LLC 1075 Duval St. C-21 PMB 145 Key West, FL 33040 State Lich CBC1254682 PROPOSAL Date: August 16, 200-7 Sub Itted to: The Tower GrvV, rno 405 SW 148t° Avenue, Suite 1 Davie, FL 33325 Prajaet: FrCCIUM Justice Cuter 302 Fleming Sty Key West, FL 33040 Scope of work: SC# 0417-050 CSiM 6-100S 1- Rmove sh gle hollow metal door 00129 from taro 2. Adjust uaetal door jam unbftWed in co uwd Floor Lobby. 3. Ynstau hollow m door concrete and aU associated hardware. in.4talled Lobby granite tiles aPprapinafe adju�rneats to ensure clearance over newly A I work executed in accordance with job speeii'`ications, code r+equvements and All plans relatesd to scope of work Total - $3,000.00 Sincerely, fen Kenney 305.942.1092 fax:305.296.7757 kenneyj@bellsouth.nct t003/004 PAGE 03/03 The Tower Group, Inc. CHANGE ORDER REQUEST 405 sw lag Avenue Suite One Phone: (954) 476-3200 Davie, FL 33325 Fax: 954 474-3111 TITLE: Tile -to -Carpet Transitions DATE: 9/19/2007 PROJECT: Freeman Justice Center (FJC) JOB: 0417 TO: Attn: Clark Briggs CONTRACT NO: Monroe County Facilities Development 1100 Simonton Street Key West, FL 33040 Phone: (305) 2954306 Fax: (305) 2954321 RE: To: From: Number: DESCRIPTION OF PROPOSAL Change Order Request #121 seeks compensation for the added work to correct interior tile -to -carpet transitions that out of compliance with the building code because of the changes to the floor tile system were caused to be The original Contract Documents specified 1/40 floor tale in thin -seat that could as Mrnodsts thr"hold installations per Detail 2 on GA Dwg. 2" floor (cry amud-sd, l Pagel, which moat Building Code requiteeet$, The interior d� modfikajow floors to 1/2" floor file in mud -set, which increase flu sip at cep transitions $�om 1/2" to 1.25"�changed these Building Code. Trd's flooring snbconhator, se th step Go ' minimum, in violation of the to Ong rheas into , mshfied g� � with a 1/4" per foot slope at an of these locations Building Code compliance. The cost for this work is based on the August 31, 20ol proposal 6vm Some To Go (copy attached, 1 page) Please process a Change Order in the amount of $9,400.00 for this extra wo& Item Description Stock# Quantity Units Unit Prke Tax Rate Tax Amount Net Amount 00W1 Court W grout 1/40 per Cant ramps at all interior transidoss 1.000 $ti,000.00 0.00% $0.00 A000.00 Sam the New Venedm Gold rile floor W carpeted gown, Unit Cost: $8,000.00 Unit Tax: $0.00 Description 5% Profit Unit Total: $5,000.00 Subtotal: $81000,00 Markup Percent Markup Amount 5.000% Total Cost: $8,400.00 SEP-01-2007 12:39 FROM:+ 9543110540 T0:30SS949774 P,4 5 STONE TO GO STONE DESIGN FLOORING 2322 L°091 Oak*d Parts ew. Fat Lauderdale; Fbr4a 33300 Tet (054) 3mo m Fax (964) 31Q-0040 Date Customat �ToworGroup, lne. 405 $W 14M Ave Davie, Florida 3332$1 Fa* (ob4)474-3111 F" (054) 476-3200 Aft, John C.handim M nFoEacRiPTIgN Chan�e�.pr.�r t w 31-Aug-07 134ilgin0 Pr Location Freemen Juadc* Center 302 Flwrft ST Kay Weal, Flonda Umo Fax 305.208.2587 PRIo6 TOTAL RAMPING To repair unleveled floor elevations and achieve proper and safe transitional Ares due to extreme unleveled conditions of the _____,substrate concrete, This matter Was discussed and approved with Mark from tower. ►w , .., s _a.oao.001s TOTAL 41 TOTAL ESTDAAT6 ITERIOR )OR FRAME TE THRESH CHAMFERED -S GRANITE TILE JAMB WIDTH THRESHOLD DETAIL SCALE: 1-1/211=1'41FULL 311=11-011 M EM ORA ND uM TO: Board of County Commissioners From: Debbie Frederick Acting County Administrator Date: December 10, 2007 RE: Change Orders Attached is a proposed change order for The Tower Group, for the Freeman Justice Center. (Change Order #39 is for $11,550.00 for flooring adjustments. This change order will be funded by the 16t' Judicial Court.) According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The Acting Administrator December 1�2007. Ct l Debbie Frederick Acting County Administrator DLF: adc k�e intends to approve this change order on Tuesday, rage 1 ut 1 Campo-Abra From: Campo-Abra Sent: Tuesday, December 11, 2007 8:43 AM To: County Commissioners and Aides Subject: Freeman Justice Center Attachments: Change Order #39.pdf Please review the attached Change Order #39 submitted by the Tower Group for the Freeman Justice Center. (Ma C ampa Sr. Administrative Assistant Office of County Administrator The Historic Gato Cigar Factory 1100 Simonton Street, Suite 2-205 Key West, FL 33040 Office 305-292-4441 Fax 305-292-4544 cameo=?bra�monrc ecounty--fi Help us Help You! Please take a moment to complete our Customer Satksfacbon Survey.• http://monroecot[ virtualtownhall.net/Pages/MonroeCoFL.WebDocs/css Your feedback /s important to usl Please note: Florida has a very broad public records law. Most written communications to or from the County regarding County business are public record available to the public and media upon request. Your email may be subject to public disclosure. 2/11/2007