Loading...
2nd Change Order 09/02/2023 a�,��,�r BOARD OF COUNTY COMMISSIONERS County of MonroeMayor Craig Cates,District 1 The Florida Keys Mayor Pro Tem Holly Merrill Raschein,District 5 Michelle Coldiron,District 2 �. James K.Scholl,District 3 David Rice,District 4 Memorandum DATE: 8/31/2023 TO: BOCC Diitally gWilson,P.E.by Kevin Kevin G. G FROM: Kevin G. Wilson, P.E. Wilson, P.E. Date:2023.08.30 V V e 17:41:08-04'00' SUBJECT: Proposed Change Order to be Approved Attached is proposed Change Order Memo #2 for the Monroe County Historic Jail Museum Buildout Project. This change order increases the final contract sum by $28,2147.57. The substantial completion date is increased 58 days. Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the Administrator to approve change orders within specified limits after providing Board of County Commissioners with at least 24 hours to review them and pose any questions or objections that they may have. It is the Administrator's intent to approve the attached change order under that authority after the 24- hour BOCC notification time. MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Monroe County Historic Jail Museum Buildout CHANGE ORDER NO: 02 INITIATION DATE: 08/24/2023 CONTRACT DATE: 05/18/2022 TO CONTRACTOR: Pedro Falcon Contractors, Inc. 31160 Avenue C Big Pine Key, FL 33043 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price)..................................... $714,631.00 Net change by previously authorized Change Orders.................................................... ($39,784.94) The (Contract Sum) (Guaranteed Maximum Price) prior to this Change order was....... $674,846.06 The (Contract Sum) (Guaranteed Maximum Price)will be (increased) (decreased) (unchanged) by this Change Order................... $28,217.57 The new (Contract Sum)(Guaranteed Maximum Price) including this Change Order is. $703,063.63 The Contract Time will be (increased) (decreased) (unchanged) by........................... 58 days The date of Substantial Completion as of the date of this Change Order is ................. 09/30/2023 Detailed description of change order and justification: Additional finish carpentry is now possible due to the cost savings realized in change order one. Contractor will furnish and install cabinets, wall panels, and additional lighting. Contractor will also fabricate and install new exterior signage. Contractor requested 80 additional days. The TDC grant ends 913012023 therefore the contract will be extended 58 days. Change order is 3.9%of original contract price. Not valid until signed by Owner Architect if applicable), and Contra c r�PV'DI SA(AY`9 �. Ae9745' .o I.. a v I h,",'A �'aD r.� a STF/2ED ARC '/,.9 6 /G.,"9 ARCHITECT: Bender&Associates Architects Date Digitally signed by Christian Christian Brisson Brisson CONTRACTOR: Date:2023.08.3011:07:54-04'00' 08/30/2023 Pedro Falcon Contractors, Inc. Date Digitally signed by Cary Knight Cary Knight Date:2023.08.30 11:15:27 DEPARTMENT DIRECTOR: -04'00' Cary Knight Date Project Management Kevin G. Wilson, Digitally signed by Kevin G. Wilson,P.E. COUNTY/ASSISTANT ADMINISTRATOR: P.E. Date:2023.09.02 13:41:22-04'00' Roman Gastesi Date Kevin Wilson Change Order Attachment per Ordinance No. 024-2015 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Additional needed work identified after construction began. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $50,000 or 5%of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: 31160 xa�n ue C, Ili Il Pin Key, IF IL. 3 04 3 4516 PEDROFALCONwww.1PedroIh_xI con.com Request for Change Order (Rev #2) Date Submitted: 08/24/2023 Project: Historic Jail PCO Number: 09 (Rev#2) Description: Provide the following additional work as described below: 1) Furnish and install cabinets, wall panels, additional lights, and receptacles. List of materials: • (2 x pack 10) Liberty classic round cabinet knobs • 4 ea - 2 x 10 x 16 PT for shimming cabinets • 24 ea - 2 x 4 x 8 PT for toe kick • 15 cases - Home decorators' collection (Carrara 12in x 24" Polished porcelain) 16 sft/case • 1 ea - Hampton Bay (cabinets 12 x 36 x 12 unfinished) • 2 ea - Hampton Bay (cabinets 18 x 36 x 12 unfinished) • 11 ea - Hampton Bay (base cabinets 24 x 36 x 12 unfinished) • 1 ea - Bel Air Lighting 1-light black Pendant • 5 ea - Globe Electric light black Swivel wall sconce • 6 ea - Legrand Wiremold plug mold 40 in 6-outlet power strips • 1 ea - Ledge Top Slatwall front register stand (Knockdown) • 72 ea - Gridwall Wall Mount brackets Black • 24 ea - Grid connector black • 18 ea - Slat grid Panels (2'x6' black) • Miscellaneous materials .............................................................................................................................. Pedro Falcon Contractors, Inc. (General Carpentry) Materials Cost (no tax).................................................................................... $4,312.39 Laborcost ................................................................................................ $10,830.60 Others ....................................................................................................... $1,500.00 Subtotal .................................................................................................... $19,662.59 Pedro Falcon Contractors, Inc. (Electrical) Materials Cost (no tax).................................................................................... $718.00 Laborcost ................................................................................................. $2,772.00 Others ....................................................................................................... $172.78 Subtotal .................................................................................................... $3,662.78 hridustirli4 Cori iineircli4l liWeirmCi4 UU:IiiIlllIy EstabI s[ed 1984 2) Fabricate exterior sign to match or look like the existing signs on site at the courthouse. See enclosed photo below. Pedro Falcon Contractors, Inc. (General Carpentry) Materials Cost (no tax).................................................................................... $300.00 Laborcost ................................................................................................ $1,333.20 Others ....................................................................................................... $0.00 Subtotal .................................................................................................... $1,633.20 3) Furnish and install bronze plaque per the attached proof design. Pedro Falcon Contractors, Inc. (General Carpentry) Materials Cost (no tax).................................................................................. $2,400.00 Laborcost ................................................................................................ $369.60 Others ...................................................................................................... $100.00 Subtotal .................................................................................................... $2,869.60 Subtotal: Items 1 + 2 + 3............................................................................. $24,808.57 Overhead5%.............................................................................................................. $1,240.43 Profit5%.......................................................................................................................$1,240.43 Taxes on Materials.................................................................................... $579.78 Subtotal................................................................................................ $27,869.60 P & P Bond 1.25% of Total Cost..................................................................... $348.37 Total..................................................................................................... $28,217.57 ............................................................................................................................... Total Request for Change Order Amount:.................................................... $28,217.57 Additional Time Requested for Change: An additional 80 calendar days from the Contract end date of 08/03/2023. Excludes: Installation of the porcelain tile countertops, 6-foot pony wall if bars are not practical. Permit Fees and Design Drawings are Not Included in this proposal. If additional permit fees are required, the Owner is to reimburse all permit fees. h'idusu:rW CorrirriercW lh'is tuu:oriA ReMderitW l�iur'fity stabIIVsIhed 1984 This proposal only encompasses the item(s) specifically outlined above and does not include any other items, whether stated or inferred, in any other documents. The terms set forth in this proposal shall have precedence over any other agreement and this proposal shall be included in any modification agreement. Please contact me if you have any questions. Thanks. Respectfully Submitted, Christian Brisson Project Manager iridustrial Cort"irriercial lhist'itut'iorial I'es'iderit'ial lit'ifit stabIIVsIhed 1984 a� w /r I, 1 f �r I f i ar •.. M� � //� / atiI.LJ JN.IY'W 11:11 Ile if ,« " 1 , M. f j 1532115 4 d""'OS i 11 �a ra Iv I�,�y�aiuiuuflf� r a M 1 � VI llw Cp III qu CU II U � � z V• Y c Hm N Lj U) m LL CO O o CL a> a> �• c Lij _ _ X � � co LU U X a0 w °> O „ w o ca a> ~ o o O U 0 DX : m W 0 N . � W CO 00 2 U) co >G X q (a N (a im w j E N --- O O N X N 0- � � (A m � (A m Z Z Z LO Q Lu.d N t, b 0 U) tr"b U) a)x a �: W l l l �� pl � Y m (� Iud f1 tr"b f k Y { �� hud v b �', dCO l Cl. Elf', Mud d Y l u d —,Gly�nPYDy9? (p Q k CY dY ph: 0 Q c r a �..,'�� L.i.. r.n �..t CD �..t ��... Y.L. r�.�. W Lu.4 �1.. r .r c ca z I O U) rlK I U) J U) P4Z O in I.f \LU CD L= r �/ (A J � � Q N r In :°, O l 2 (D O In CD Z w U) z III OI O LL II _ °I IIIIIIIIIIIIIIIIII Pq yl m 111 ui u Ium-uuuuw co iip O O 11110 Z m Lf) �eu.."" LO UJ 4) Lu w J CL 0