Loading...
1st Change Order 09/05/2023 MoNRoE o Y1 N E Gf PRojEcr MANAGEMENT CoNTRAcr CHANGE ORDER PROJECT TITLE: Card Sound Road Resurfacing Project CHANGE ORDER NO: 1 INITIATION DATE: 8/23/23 TO CONTRACTOR: General Asphalt Co., Inc. CONTRACT DATE: 3f22/23 The Contract is changed as follows: The original Contract Sum ........... .... ..... ......... ......... ......... ..............................$2,069,431.24 Net change by previously authorized Change Order....... .. ................................ ....... .........-.. ..$0 The Contract Sum prior to this Change order was.............. ............................... .........$2,069,431.24 The Contract Sum is increased by this Change Order#1 ............. ....... .............. .................. ......$0 The Revised 1 Contract Sum including this Change Order........................... ........... .. ..$2,069,431.24 After further review of mix design„ FC 12.5 would only be required to be placed in one lift and would address poor surface conditions of the underlying asphalt better than originally designed. Change order 41 is for a decrease in item 337-7-80 Asphalt Concrete Friction Course, Traffic 8, FC-9.5, PG 76-22, and an increase in item 337-7-83 Asphalt Concrete Friction Course,Traffic C, FC-12.5, PG 76-22. The project commencement was June 6, 2023. Contractor agrees to accept the increase in monetary compensation and hereby waives and releases any and all claims for any additional compensation related to these bid items. This Change Order is(0,00%)of the original contract price. CONTRACTOR n� ate Judith Clarke, P.E.Datea202309.05b 09 09 08:51127y-ludith-04'00'arke,PE ENGINEERING SERVICES DIRECTOR Date ASSISTANT COUNTY ADMINISTRATOR Aav�e� (rt/44e,111 5 SEPTEMBER 2023 Date IN L9GENERAL ASPHALT NCO.$ I!NIC. 48SO NORTHWEST 72,1410 AVENUE To: General Asphalt Contact: Jose Cami Address: Miami, FL 33166 Phone: Fax: Project Name: Monroe County-Card Sound Road Resurfacing (CO#1) Bid Number: 23119 Project Location: Card Sound Road,Key Largo,FL Bid Date: 2/23/2023 Item # Item Description Estimated Quantity Unit Unit Price Total Price 337-7-80 ASPHALT CONCRETE FRICTION COURSE,TRAFFIC B, FC- -6,612.00 TON $175.00 ($1,157,100.00) 9.5, PG 76-22 0337 783 ASPHALT CONCRETE FRICTION COURSE,TRAFFIC C, FC- 6,612.00 TON $175.00 $1,157,100.00 12.5,PG 76-22 Total Bid Price: $0.00 Notes: • The above price does not include MOT. • The above price does not include Sawcutting • The above price does not include any Testing. • The above price does not include As Builts. • The above price does not include Striping • The above prices do not include Permits. • The above prices do not include Protection of Brick Pavers or Stamped Concrete • The above prices do not include Quality Control (QC) • The above prices are good until • Unless indicated otherwise,this proposal is based on average thickness of asphalt,not minimum thickness. • This proposal is may be withdrawn by GAC if not accepted within (30)days. • Final payment will be based upon actual quantities installed as determined by field measurement after completion. • Any Punch List items must be submitted in writing. • GAC shall not be responsible for birdbaths or water flow when projects are designed with less than 1%fall. • No Under Roof paving is included unless specifically stated in the proposal! • No behind the curb paving is included unless specifically stated in the proposal! • The above prices do not include any edging of grass! • The above pricing does not include the protection of brick pavers, bridge decks or stamped concrete! • The above prices do not include any driveways unless specifically stated in the item listed above! 8/10/2023 1:57:10 PM Page 1 of 2 Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Change in asphalt recommendation at no charge was based upon an FDOT Materials Lab recommendation. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project engineer/architect approves the change order. Yes ® No ❑ If no, explanation of why: N/A • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: