Loading...
2022-49 NPDES Permit Renewal for KWIA MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date Upon Execution Task Order No. 2022 - 49 Client Project No. 404-630203-G1Q04 Engineer Project No. _EGXM7949 This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS PROJECT MANAGEMENT CO. ("Consultant"), dated February 15,2022 ("Agreement"). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized—NPDES Permit Renewal for Key West International Airport Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 5 page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price of$ 34,537.00 N/A Other(Describe): Schedule Services may commence on Execution Services will cease by 365 days Recommended by: Approved by: Director of Airports Date:9.26.2023 Asst./County y Ad instrator Date:09.27.2023 CONSULTANT: JACOBS PROJECT MANAGEMENT CO Dlgilally signed by Jacquellne Ross By Jacqueline ❑N cn=Jacquellne Ross,-US ,-Ja,,bs Engineering, BOSSa l='acq.eline.—aj.cebs.com Director Witness Dace zo2s.oscsoaos20-oa'oo' Title �6 ROE COUNTY A NEY ROVE File: MSTRAPSMonroe County P.;EOPage 1 of 1 A' SI � �ATORNEY Date,, 9/26/23 Exhibit A —Scope of Work (2022-49) Monroe County Key West International Airport (EYW) NPDES Permit Renewal for Key West International Airport SCOPE OF WORK CLIENT has requested that CONSULTANT prepare documents required to renew the existing NPDES, Multi-Sector Generic Permit MSGP, Sector "S" Permits, for Key West International Airport (Permit FLR05F355), including updates to the NPDES Stormwater Pollution Prevention Plans (SWPPP). The following Articles constitute the Scope of Services for this Project: Article 1 —DATA COLLECTION AND INSPECTIONS Existing data related to drainage at Key West International Airport (Permit FLR05F355) will be collected and reviewed. This data may include existing drainage studies and plans, soils information, land use maps, floodplain maps, aerial photographs, topographic maps, and existing permits. As part of the NPDES SWPPP, the airport areas contributing to a stormwater discharge associated with industrial activity will be visually inspected for evidence of, or the potential for, pollutants entering the drainage system. Existing measures to reduce pollutant loadings will be evaluated to determine whether they are adequate and properly implemented in accordance with the terms of the EPA/FDEP NPDES permit, Multi-Sector Generic Permit (MSGP) requirements or whether additional control measures and other structural pollution prevention measures need to be identified and included in the revised SWPPP. A visual inspection of equipment needed to implement the plan, such as spill response equipment, shall be made. Deliverable: Summary Report of Site Inspections and Minutes of meetings will be submitted to CLIENT at conclusion of Article 1. Article 2—NPDES SWPPP PREPARATION CONSULTANT will prepare an updated SWPPP that meets the requirements of Sector S of the MSGP for Key West International Airport (Permit FLR05F355). The Draft and Final SWPPP will include the following: Overview, Notice of Intent (NOI), Notice of Termination (NOT), Pollution Prevention Team, Existing Conditions discussion, Tenant Coordination & Tenant Questionnaire, Materials Inventory, List of Significant Spills and Leaks, Non-Stormwater Discharges, Best Management Practices (BMP), BMP Implementation, Employee Training, and Comprehensive Site Compliance Evaluation. Pagel of 5 Three copies of the Draft SWPPP will be submitted to the CLIENT for review and comment. CONSULTANT will incorporate any CLIENT comments and submit two (2) copies of the Final SWPPP to the CLIENT. Deliverable: two (2) copies of the Final SWPPP Article 3—Preparation of NPDES MSGP Notice of Intent (NOI) CONSULTANT will prepare the NPDES Notice of Intent(NOI)form, to operate the facility under the MSGP, Sector"S" General Permit, for execution by the CLIENT. The CLIENT will provide the $500 NOI submittal fee, which is not included in this scope or fee. CLIENT RESPONSIBILITIES The following will facilitate the efficient provision of the proposed services: Upon receipt of the Notice to Proceed, CONSULTANT will forward a Request for Information(RFI) letter to CLIENT for the following information associated with EYW: • Updated contact information for the members of the SWPPP Team. • Updated list of tenants and their contact information. • Preventive maintenance records. • Procedural changes to spill response and containment. • Facility Response Plan. • All SWPPP data from the most recent update, including electronic files. Copies of all previous documents, reports, files, inspections forms, SWPPP brochure, SPCC pamphlet and training material (e.g. Power Point Presentation). • SWPPP monitoring and compliance reports. • Material Safety Data Sheets (MSDS) of significant materials for Airport operated facilities. Significant materials are defined as raw materials; fuels; finished materials such as diesel, gasoline, petroleum products, hydraulic fluid, fertilizer, pesticide, herbicides, sealants, and paint; and waste products that have the potential to be released with stormwater discharges. • The most recent Drainage and Basin Delineation maps of each Airport in AutoCAD format(if available). SCOPING AND FEE ASSUMPTIONS/ADDITIONAL SERVICES This scope does not include the design, permitting, construction or operation of any pollution prevention measures that may be recommended by CONSULTANT in the SWPPP. Should the Florida Department of Environmental Protection/EPA take enforcement action against the County for non-compliance related to the NPDES permits, from past or Page 2 of 5 future acts related to compliance with the NPDES MSGP permit,the Consultant will not be held responsible for such non-compliance. The scope for assessment of any required actions, reports, meetings, testing, SWPPP modifications or submittals, required due to non-compliance related items will be prepared and addressed in a supplemental Work Authorization. It is not anticipated that wetlands, wildlife habitat or soil / groundwater contamination or Geotechnical report(s) will be impacted by the operation of the Airports, or that any government agency permitting or mitigation will be required for these environmental concerns by Jacobs under this task order. If any such environmental concerns are identified in the SWPPP process, the scope for assessment of the environmental concern will be prepared and addressed in a supplemental Work Authorization. Subsurface utility exploration and topographic land surveying and mapping is not included in the scope of services. If required, the scope will be prepared and addressed in a supplemental Work Authorization. When changes are made to the Airport, or tenant changes occur, modifications to the SWPPP plan is required. When new facilities are constructed that affect stormwater control practices; the SWPPP needs to be revised to reflect the changes to the stormwater system. The changes beyond the initial submittal and approval of the revised NPDES MSGP, SWPPP are not included in this proposal. This scope of services does not include Environmental Compliance Monitoring, Stormwater sampling or analysis and required SWPPP Inspection & Training Services as may be identified in the SWPPP prepared under this scope of services. Development of numeric effluent limitations is not included in this scope of services. Environmental Site Assessment Investigations (Phase I / II) are not included as part of this scope and cost estimate. This scope of services does not include preparation of a NPDES Individual Permit. Items identified as not included or limited in the scope of services can be provided or expanded upon as additional services under a separate agreement or supplemental to this agreement. GENERAL PERFORMANCE REQUIREMENTS Meetings: The CONSULTANT shall be required to attend meetings as described below, conduct research, surveys, and visit sites or perform other activities to advance, achieve and complete the work. The CONSULTANT shall be responsible to CLIENT for the effective and timely administration, management, and technical execution of the Scope of Services. Page 3 of 5 The CONSULTANT shall attend a Kick-Off Meeting for the PROJECT. The purpose of the meeting will be to review the Scope of Services, the criteria for the design and engineering of the PROJECT, and to establish the initial schedule for the PROJECT, including schedules and milestones for the completion of tasks, subtasks, and supporting activities. PROJECT progress meetings will be held between the CONSULTANT's Project Manager and the CLIENT'S Task/Project Manager, on a monthly basis. The purpose of these meetings will be to apprise CLIENT'S Task/Project Manager of the results of the activities, to schedule future tasks and to ensure that project progress is maintained in conformance to the desires of the CLIENT. Other support staff will participate in these meetings as required. Compensation: For the required services, compensation shall be based on the pre- negotiated contract amount. Before making additions or deletions to the work described in the Agreement, and before undertaking any changes or revisions to such work, the parties will negotiate any necessary cost changes and will enter into an Amendment covering such work and compensation. Reference herein to the Agreement will be considered to include any Amendment to the Agreement. INVOICING AND REPORTING REQUIREMENTS Agenda and Minutes: CLIENT's Task/Project Manager and the CONSULTANT's Project Manager shall jointly determine meeting agendas and level of CONSULTANT's participation. At minimum, the CONSULTANT shall prepare and distribute an agenda for each meeting. The agenda shall be distributed at least two (2)working days prior to the meeting, whenever possible. The CONSULTANT shall be responsible for keeping and distributing minutes of meetings for which they develop the agenda. Minutes of progress meetings and other meetings shall be distributed within two (2) working days after the meetings. Meetings will be planned to last no more than two (2) hours. Monthly Progress Reports: The CONSULTANT shall prepare a monthly progress report through the duration of the project, regardless of whether the CONSULTANT's work exceeds the Time for Completion of any Article or Milestone, as stated herein. The report shall address, but is not limited to, descriptions of work completed, work in- progress, work to be accomplished, problems encountered and solutions to the problems, schedule compliance, cost estimates, and budget compliance. The report shall include forecast and milestones. An updated schedule shall be submitted with the report. Invoices: The CONSULTANT shall prepare monthly invoices for the professional services and expenses. Page 4 of 5 DELIVERABLES The CONSULTANT shall provide two (2)printed copies of each deliverable item and an electronic copy as indicated above of each deliverable item, unless otherwise directed or approved by CLIENT. SCHEDULE The proposed schedule of these activities is as follows: NTP Execute task work order Week 1-3 Gather existing permit information and perform Field Inspections and Surveys Week 4 Evaluate existing permit information and surveys, develop SWPPP. Week 7 Complete first draft report of all tasks and present to CLIENT. Week 9 CLIENT complete review of first draft and review their comments with CONSULTANT. Week 10 CONSULTANT to incorporate CLIENT comments and complete pre-final version of report and submit to CLIENT. Week 11 CONSULTANT to prepare final version and submit report to CLIENT for final review. Week 12 CLIENT complete review of pre-final report and submit comments to CONSULTANT. Week 13 Complete the final report and submit to CLIENT. Page 5 of 5 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Key West International Airport Project: NPDES Permit Renewal for Key West International Airport FEE SUMMARY BASIC SERVICES Hours Fee DBE AMOUNT Article A: Data Collection and Inspections 100 $ 16,809 Article B: NPDES SWPPP Preparation 88 $ 15,585 Article C: Preparation of NPDES MSGP Notice of Intent(NOI) 13 $ 2,143 Total Basic Services Lump Sum Fee 201 $ 34,637 $ SPECIAL SERVICES Hours Fee Total Special Services Lump Sum Fee 0 $ - $ TOTAL LUMP SUM PROJECT FEE 201 $ 34,637 $ DBE Percentage 0.00%