Loading...
10/18/2023 Grant Application SEP Application Document—template: Gulf Consortium General Information Organization: Monroe County Board of County Commissioners Project Title: Monroe County-Canal Restoration Projects-Big Pine Key Avenues(Canals 293, 295,297,299, 300,and 315) Abstract: The Monroe County Canal Water Quality Restoration Program was established under the auspice of the National Oceanic Atmospheric Association (NOAA) Florida Keys National Marine Sanctuary (FKNMS) Water Quality Protection Program (WQPP) a set of guiding principles geared toward improving canal water quality while ensuring no degradation of the Florida Keys National Marine Sanctuary nearshore waters. The program evaluates, constructs, and implements canal restoration technologies to improve canal water quality throughout the Florida Keys in order to restore and preserve the marine environment of the Florida Keys that supports unparalleled biodiversity and an annual$1.3 billion tourism industry. In November 2020, the Florida Department of Economic Opportunity(DEO)included a new Work Plan for Canal Restoration implementation. The Work Plan sets forth a definitive timeline for canal restoration with essential milestones for the completion of the program within the next 10 years. The County has taken action to create a Canal Restoration List containing 96 projects estimated to cost $538 Million to implement,ranging from$200,000 to$50 million/project. The County is working on the design,permitting and procurement and is requesting$12,650,000 for the construction, oversight, and post effectiveness of six canal restoration projects(Canals 293, 295, 297, 299, 300, and 315) within the Big Pine Key area of the Avenues which represents some of the worst water quality throughout the Florida Keys. Its this a construction proJect?;: Yes I111iriinnary Ef i iiHe Activity. Select 1 of the following as the primary eligible activity(should match the SEP): 1) Restoration and protection of the natural resources, ecosystems,fisheries,marine and wildlife habitats,beaches, and coastal wetlands of the Gulf Coast region 2) Mitigation of damage to fish, wildlife, and natural resources 3) Implementation of a federally-approved marine, coastal, or comprehensive conservation management plan, including fisheries monitoring 4) Workforce development and job creation 5) Improvements to or on State parks located in coastal areas affected by the Deepwater Horizon oil spill 6) Infrastructure projects benefiting the economy or ecological resources,including port infrastructure 7) Coastal flood protection and related infrastructure 8) Planning assistance 9) Administrative costs of complying with the RESTORE Act 10) Promotion of tourism in the Gulf Coast region, including recreational fishing 11) Promotion of the consumption of seafood harvested from the Gulf Coast region Project Fairs-flan (years): years Requested Funding Anniount- 12, , 0 oII Project Start Date: September 1,2024 Project End Date: September 1,2028 Primary Comprehensive Plan Goal. Select from the following(should align with SEP) 1. Restore and Conserve Habitat:Restore and conserve the health, diversity, and resilience of key coastal, estuarine, and marine habitats. 2. Restore Water Quality and Quantity:Restore and protect the water quality and quantity of the Gulf Coast region's fresh, estuarine, and marine waters. 3. Replenish and Protect Living Coastal and Marine Resources:Restore and protect healthy, diverse, and sustainable living coastal and marine resources. 4. Enhance Community Resilience:Build upon and sustain communities with capacity to adapt to short-and long-term changes. 5. Restore and Revitalize the Gulf Economy:Enhance the sustainability and resiliency of the Gulf economy. Primary Comprehensive Plan Objective: Select from the following(should align with SEP) 1. Restore, Enhance, and Protect Habitats:Restore, enhance, and protect the extent, functionality,resiliency, and sustainability of coastal,freshwater, estuarine, wildlife, and marine habitats. These include barrier islands,beaches, dunes, coastal wetlands, coastal forests,pine savannahs, coastal prairies,submerged aquatic vegetation, oyster reefs, and shallow and deepwater corals. 2. Restore, Improve, and Protect Water Resources:Restore,improve, and protect the Gulf Coast region's fresh, estuarine, and marine water resources by reducing or treating nutrient and pollutant loading;and improving the management of freshwater flows, discharges to, and withdrawals from critical systems. 3. Protect and Restore Living Coastal and Marine Resources:Restore and protect healthy, diverse, and sustainable living coastal and marine resources including finfish,shellfish,birds, mammals,reptiles, coral, and deep benthic communities. 4. Restore and Enhance Natural Processes and Shorelines:Restore and enhance ecosystem resilience,sustainability, and natural defenses through the restoration of natural coastal, estuarine, and riverine processes, and/or the restoration of natural shorelines. 5. Promote Community Resilience:Build and sustain Gulf Coast communities'capacity to adapt to short-and long-term natural and man-made hazards,particularly increased flood risks associated with sea-level rise and environmental stressors. Promote ecosystem restoration that enhances community resilience through the re-establishment of non-structural,natural buffers against storms and flooding. 6. Promote Natural Resource Stewardship and Environmental Education:Promote and enhance natural resource stewardship efforts that include formal and informal educational opportunities,professional development and training, communication, and other actions for all ages. 7. Improve Science-Based Decision-Making Processes:Improve science-based decision-making processes used by the Council. 8. Restore, Diversify, and Revitalize the Gulf Economy with Economic and Environmental Restoration Projects(Consortium-defined objective) Secondary Comprehensive Plan Objectives: optional Secondary Comprehensive Plan Goals: optional Planning Framework Restoration Technique(s): To be completed by Gulf Consortium Location The County is working on the design, permitting, and procurement for the construction of six canal restoration projects(Canals 293,295,297,299,300,and 315)within the Big Pine Key area of the Avenues which represents some of the worst water quality throughout the Florida Keys. Big Pine Key is in Monroe County and is about 100 miles south of Miami and 30 miles north of Key West. Narratives airs d Over ew: The Monroe County Canal Water Quality Restoration Program was established under the auspice of the National Oceanic Atmospheric Association (NOAA) Florida Keys National Marine Sanctuary (FKNMS)Water Quality Protection Program (WQPP) a set of guiding principles geared toward improving canal water quality while ensuring no degradation of the Florida Keys National Marine Sanctuary nearshore waters. The program evaluates,constructs and implements canal restoration technologies to improve canal water quality throughout the Florida Keys in order to restore and preserve the marine environment of the Florida Keys that supports unparalleled biodiversity and an annual $1.3 billion tourism industry. Keys'tourism is a strong economic engine for both the local and state economies, and it relies almost entirely on clean waters. The restoration of water quality in Monroe County's residential canals is a complex and costly venture that requires long-term commitments from participating entities.Through the development of the program, Monroe County and its local partners have documented areas where costs and project schedules can be managed to reduce the expense associated with implementing and operating canal restoration projects. In 2013, Phase II of the Monroe County Canal Management Master Plan (CMMP)was completed that evaluated the conditions of the Keys canals, prioritized the need for water quality improvement, and identified appropriate restoration options for each canal: • Culvert • Air Curtain • Organic Removal • Backfill The CMMP selected technologies, above,that could address the specific Class III water quality exceedances (dissolved oxygen and nutrients)within the canals and surrounding near shore waters. Depending upon the specific canal(s) selected, one or a combination of techniques were proposed. The CMMP provided an initial technology selection as well as,the ranking for prioritization and selection. In response to the recommendations of the CMMP, Monroe County in 2014 allocated approximately $5 million for the restoration of water quality in seven residential canals within unincorporated Monroe County. As part of the Canal Restoration Demonstration Program, Florida International University(FIU) assessed the effectiveness of the various technologies implemented by Monroe County and its partners by comparing treated canals against nearby, unaltered controls over a period of three years. Based on data collected during the limited monitoring period, FIU made the following conclusions about the organic removal and backfilling technology(s): • Organic removal: The removal of organic material from the canal bottom showed immediate and drastic improvements in environmental conditions, though observations suggest further steps may need to be taken to preserve the conditions that this technology quickly generated. • Backfilling: This technique resulted in an immediate change in the canal's water quality by significantly improving the water column's DO content. The decreased water depth allowed light to penetrate to the sediment.As a result, there were measurable increases in benthic vegetation,fish diversity and abundance and inhabitants of the sea walls; • Air Curtains: The use of air curtains or weed gates appeared to be effective in reducing the amount of seaweed wrack entering into the canals;however, canals that only implemented a weed barrier as their treatment method displayed no improvement in water quality parameters; Using these results from the Demonstration Program along with water quality data from the CMMP the County is moving forward with organic muck removal,backfill,and air curtain restoration projects at Canals 293,295,297,299, 300 and 315. In November 2020,the Florida Department of Economic Opportunity(DEO)amended Chapter 28-20 Land Planning Regulations for the Florida Keys Area of Critical State Concern in Monroe County to include a new Work Plan for Canal Restoration implementation.The Work Plan sets forth a definitive timeline for canal restoration with essential milestones for the completion of the program within the next 10 years.The County has taken action to create a Canal Restoration List containing 96 projects estimated to cost$538 Million to implement, ranging from $200,000 to$50 million/project. The County is working on the design, permitting and procurement and is requesting$12,650,000 for the construction, oversight, and post monitoring effectiveness of six canal restoration projects (Canals 293, 295, 297, 299, 300 and 315) within the big pine key area of the Avenues which represents some of the worst water quality throughout the Florida Keys. These projects will restore canal water quality, and protect healthy,diverse, and sustainable living for coastal and marine resources. Additionally clean water will restore and conserve the health, diversity,and resilience of key coastal,estuarine, and marine habitats,as well as restoring and revitalizing the Gulf Economy. Right now,the canals waters have poor circulation,weed wrack loading,organic sediment accumulation,and excessive depths. The restoration work aims to improve the oxygen level, remove accumulated organics from within the canals,and add physical barriers to minimize additional organic accumulation in these areas. These technologies will improve the water quality in canals. The anticipated project start date is September 2024. It will take a 3 year to construct the projects and post-monitoring and maintenance will take place an additional year after construction has ended. The entire project is estimated at 4 years. The Florida Keys National Marine Sanctuary Water Quality Protection Program partners with both the Florida Department of Environmental Protection and the Environmental Protection Agency Region4. (E. .!:::u:. .P'..i,.s......(:..q.!::.!.:b.. .!.:r:. ..!:.:.!...P.°..q..!:.:'Y Methods: The canal screening and ranking process was broken down into two categories: 1) Canal Water Quality Ranking ➢ Water quality—Dissolved Oxygen-Related Issues: Using the updated FDEP rule for dissolved oxygen (DO),the ranking process attempted to separate canals that either have no monitoring data available or have displayed consistently compliant water quality readings from those canals that have displayed non-compliant or borderline compliant water quality readings. Canals with more than 50 percent of the monitoring data exhibiting DO saturation greater than 70 percent are likely to be compliant and as such were given a low score. Canals that have either consistently displayed DO values below the compliance level of 42 percent or whose data has been borderline compliant and given likely environmental conditions would potentially exhibit non-compliant DO levels were given higher scores. Due to the direct relationship to compliance,water quality was given the greatest weight in the canal ranking process. ➢ Evidence of Nutrient Accumulation: As noted during the CMMP, canals that receive seaweed loads have a significant source of nutrients that can result in near continuous eutrophication of the canal.The impact of seaweed loading on nutrient concentration is often visually evident through algal growth (e.g.slime on the canal surface or walls) and reduced water clarity.The ranking process attempted to score canals with varying degrees of seaweed loading higher than those canals that do not experience such impacts. For instance, a canal that experiences significant seaweed loading, maintains a moderate to severe growth of blue green algae, reduced visibility,and diminished presence of aquatic life received the highest score. ➢ Likelihood of Toxicity: During the Monroe County Canal Demonstration projects,canals that were noted as having extreme depths(>20 feet below the water surface) displayed an accumulation of hydrogen sulfide in their lower depths.As such,the ranking process weighted deeper canals over shallower canals due to those canals containing hydrogen sulfide that could potential impact near shore waters. ➢ Connectivity to Nearshore Waters:The basis for cleaning up non-compliant canals is that not only do they present a nuisance condition to homeowners, but noncompliant canals could potentially have a detrimental effect on nearshore waters and the associated aquatic habitat (i.e.coral reefs,seagrass beds, etc.).The process of ranking canals based on their environmental settings resulted in higher scores for canals that discharge either directly into Florida bay or the Atlantic Ocean higher than those that discharge into a basin.The assumption is that the basin would have a moderating effect on water being discharged from the canal before it eventually makes its way into open water where sensitive resources typically exist. ➢ Potential Nearshore Impact:This category assumes that the more homeowners that live along a canal,the larger the benefit would be; since more residents would experience the effects of having a restored canal. 2) Canal Technology Ranking ➢ Restoration Technology: Scoring is based on the potential to implement a proven technology that is capable of complete canal water quality restoration. Canals that are amenable to proven technologies, such as backfilling with or without organic removal, that are expected to provide complete restoration were given a score of 5. Canals that are only amenable to alternative technologies, such as capping, but are expected to achieve complete restoration were given a score of 3,and canals that are only expected to achieve partial restoration through the recommended technology received a score of 0. ➢ Implementation Costs:The availability of funding to complete a restoration is a significant constraint and as such excessively expensive (>$5M) restoration projects received a score of 0 while the more cost effective restorations received the higher scores.This issue focused on the implementation of all applicable technologies required to restore water quality within the canal. ➢ Project"Implementability":This criterion accounts for factors such as staging areas, complexity of permitting issues, mitigation requirements,and potential complications with existing utilities or difficulty of access.Canals that are more suited for the existing restoration program and don't have characteristics that could affect the implementation or timing of the restoration were scored higher than those which might have extenuating circumstances that could delay or prevent the project from occurring. ➢ Potential Resource Impacts: Monroe County being classified as a National Marine Sanctuary with protected coral, mangroves, and seagrass fields necessitated that any potential impact to these resources be considered when ranking a canal. Rankings ranged from -5 to 5 with canals that are expected to negatively impact resources greater than 7,500 sq.ft. receiving a score of-5 and canals expected to have no impact to resources receiving a score of 5. Each of these criteria were assigned a score with a weighting factor to help prioritize the parameters which have the largest influence on water quality degradation. Below are the summary results for the selected canals for this project: Canal Name Water Quality Summary Water Quality Ranking Conceptual Construction Cost 293 Poor #15 of 96 $2.0 Million 295 Fair #7 of 96 $1.3 Million 297 Poor #9 of 96 $1.5 Million 299 Poor #13 of 96 $2.0 Million 300 Fair #6 of 96 $1.7 Million 315 Poor #4 of 96 $1.7 Million Total $11.5 Million The County is working on the following tasks for the design, permitting, and procurement for Canals Canals 293,295,297,299,300 and 315: • Data Collection—Topographic and Bathymetric Survey, Ecological Assessment and Engineering Evaluations • Design—Plans,Technical Specifications,and Cost Estimates • Permitting—South Florida Water Management District (SFWMD), United States Army Corps of Engineers (USACE), Florida Keys National Marine Sanctuary(FKNMS) and Monroe County permits • Procurement—Request for Proposal package, evaluation of bidders and selection of Contractor. The RESTORE grant will include the following tasks: 1. Construction - Removal of organic mucks via hydraulic dredging/dewatering, backfilling of clean fill material using barge and excavator,and placement of seagrass barrier to prevent future loading within the canal system. All permit conditions will be met by Contractor during construction. 2. Construction Management—Full time inspector(s)will oversee the Contractor to ensure compliance with plans, permit and specifications. 3. Post Monitoring Effectiveness — The water quality measurements will consist of DO, temperature, pH, and conductivity. Water quality readings will be collected as a single grab sample. The Global Positioning System (GPS) location (i.e. latitude and longitude) of each sample location will be recorded,along with the date and time of sample collection.The water quality samples will be taken 3 hours prior to high tide and based on the following schedule: o Weekly samples prior to the beginning of operation (assume 2 months) o Daily samples three consecutive days prior to operation o Daily samples three consecutive days after o Weekly samples thereafter for the first month o Bi-weekly samples thereafter for two months o Monthly samples thereafter for six months itur ui°°uurm°m ui° III Illl inefurts— Canal Restoration Technologies focus on improving the canal water quality conditions related to lack of flushing and nutrient buildup resulting in reduced dissolved oxygen. Canals impact nearshore waters. Improving canals would also improve regional water quality by increasing diversity of both natural communities and benthic species that live in these waters.These technologies would also decrease pollution (nutrients)that are coming from some canals to nearshore waters.Additional benefits of canal technologies include the following: • Weed gates,air curtains or other physical barriers would minimize additional organic accumulation in the canals. • Culvert connections would facilitate flushing. • Backfilling would prevent occurrence of deep stagnant zones. • Capping would isolate existing organic bottom layer. UDC"tIrics: The following metrics will be used to evaluate project and program objectives: Metric Approach Technique Name Description Tracking the Metric HR011 Restore Restore Hydrologic Enter the number of miles of The activity completion hydrology natural restoration canals backfilled.Use the notes parameter(s)should include miles and salinity -Miles of field to provide the average width of canals backfilled.Activity natural regimes canals of the canals backfilled. completion parameters are not processes backfilled sufficient to support the goals/objectives of this technique. An activity completion parameter is not necessary if another selected parameter already captures the data collection activities needed to track the metric CO1002 Restore Restore Outreach/ Enter the expected number of The number of people reached and and Education/ stakeholders in attendance at and/or the number of reader revitalize revitalize Technical informational meetings, impressions should be used as a the Gulf the Gulf Assistance workshops,or events.Or,provide parameter in lieu of Activity economy economy -Number #of people who were directly completion.These parameters of people involved in outreach,training and may be able to support the goal reached or technical assistance activities Restore and revitalize the Gulf (this could be the number of economy. participants in a workshop, classes,webinar,townhall,event, listeners,etc.). CO1004 Restore Restore Outreach/ Enter the number of users An appropriate parameter for and and Education/ engaged in twitter,Facebook, tracking the metric should be used revitalize revitalize Technical blogs and other social media tools in lieu of activity completion.This the Gulf the Gulf Assistance used to disseminate information parameter may be able to support economy economy -Number about the project(include the the goal Restore and revitalize the of users type of social media tool and Gulf economy. engaged number and frequency of users). online Note the URL address for each site and the unique visitors or users only. The process of identifying risks and impacts will consist of an adequate, accurate, and objective evaluation and presentation of the proposed canal restoration project, prepared by competent professionals. For projects posing potential impacts to infrastructure and the environment,or where technically complex issues are involved, participating entities may need to involve external experts to assist in the risks and impacts identification process. The extent of project review required for each proposed canal restoration should give due consideration to the complexity of the subject matter and relevance of the proposed restoration. The program manager shall assign one or more individuals, sufficiently knowledgeable in the relevant field,to provide technical review(if required)for a proposed project.The program manager may assign the technical review to themselves, if they have sufficient background in the scientific subject of the work,and if the complexity, potential controversy and significance of the work do not warrant broader review.The project coordinator for the respective entity shall make recommendations to the program manager regarding approval or disapproval based on the information provided by the project sponsor. It is recommended that the technical reviewers document issues with proposed canal restoration projects, including any pertinent details.Additionally, it is recommended that staff document the process by which the issue was resolved. If the participating entity determines that knowledge of the issue and solution would benefit the Florida Keys Canal Restoration Program partners,they should feel free to communicate their lesson learned with the program's participants. a bor tiiion Monroe County and its local partners have documented areas where costs and project schedules can be managed to reduce the expense associated with implementing and operating canal restoration projects. The Florida Keys National Marine Sanctuary Water Quality Protection Program partners with both the Florida Department of Environmental Protection and the Florida Environmental Protection Agency Region 4. (E. .!:::u:. .P°..i,.s....(: .q.!::.!.:b.. .!.:r:. .!::..!...P.°..q..!:.:F;..). (If additional information is needed, here is a link to Canal Advisory Committee Canal Rf,-� toi°au:on Advis.i C�srnrr�iu:u;c c �I�si°icl�rr��i°ir�c .......................................................................................................................................................y..........................................................................(.................................................................................................F,..). 1)tfllk�� llliii IIIII':niga eiiii io ni"t, Otrtr aClll°°i�, and E t.icaflon— Stakeholder engagement is the basis for building strong, constructive, and responsive relationships that are essential for the successful management of a project.The Florida Keys Canal Restoration Program and its participating partners shall be willing to work collaboratively with peoples living within the geographic vicinity of a proposed canal restoration. Monroe County and municipalities have hosted a series of public meetings designed to engage the public at every step in the development of the Canal Restoration Program.As part of US EPA Grant #OOD26914, Monroe County in 2015 administered an outreach program that actively engaged the public and regulatory community.The outreach program was comprised of three public presentations held at community centers in the upper, middle,and lower keys.As a follow to the March 2015 presentations, Monroe County in August 2015 hosted on-site educational seminars at two active canal restoration projects. Since the completion of the outreach program in 2015,the public has remained engaged in the development of the program through the Canal Restoration Advisory Subcommittee meetings and County hosted workshops.Additionally, Monroe County, FL has created a webpage devoted solely to canal restoration.The website assists interested parties by presenting the programs latest developments and provides a library of materials associated with the programs development.Additionally,the canal restoration website provides links to canal focused scientific resources and databases. h.tt .,..../ .1. ...... -R,-� toi°�uon . .. ... .... . . v... S ........................................................................� Input in the completion of this document is key to continuing the canal restoration program's long term strategy of working with residents, municipalities, and stakeholders who have an interest in ensuring that the water quality in the residential canals remain compliant with the state water quality standards. 11 evera ling: N/A Complete environmental compliance word document template under Templates heading from here: /E. l..:..g.1,.l grIfat .:..gg:g grgLI.L::g .2l.jff . 1: de14llll° ...Rec',ogirit ,ed.III..uriii bes No I'Nbho ra hy: 1) "Canal Restoration I Monroe County, FL- Official Website." Www.monroecounty- Fl.gov,ww u ionroecou 2.3. 2) "Water Quality Protection Program."Floridakeys.noaa.gov, floridakeys.noaa.gov/wgpp/. � E ropy+ nw i VII�V Q�^V:A' i rr rI ° u�Aiar o�ua , f a Nr ,;q�i�p811aa r xr a �k fry `'k�^vl7ia tiiJ� oar z r i r I rrr' , o� i m qm a� k r ��lw'119� � err k � I /i frt r�i W r r r , orJ r �,rp f e ill 11 i I'j 1 I I 6�h t#1 � u wr l� 1� i r r 1 l VII`°�V QwV�\i i P Legend Canals Source:Aerial Image;ESRI 2021;WSP 2023 N Big Pine Key Avenues (Canals 293, 295, 297, 299, 300, and 315) 0 300 600 1,200 Feet Monroe County - Canal Restoration Projects Drawn Date Miami DLA 9/29/2023 Florida Figure Checked Date Project No. GWC 9/29/2023 Path:C:\Users\dustin.atwater\One Drive-WSP 0365\Monroe County\Big Pine Grant\Monroe County-Canal Restoration Projects.mxd dustin.atwater Date Saved:9/29/2023 4:35:50 PM ................................... ----- ............................... ----- ............................... ----- 0g'. cH ct O O O O O O O ct a> U ¢.i rl rl rl ct O ct ct ct U W bA ct 60 o ^60 r o 0ct o 60 ct cz p N c a o cz Ct 0 t ct Z ct a� a� r..� ... .. o 0 0 0 0 o to H o w •a. E E E E E E °vi c •� o 0 0 0 0 0 0 ..............E- .......E- ............. E-......... E- E- Q N N ct •� U m Ct Cf) Ste" ct N N CIS bA ct � M U N O cz r N 01 cz ~ N O p CIS •-•+ N O N tb Z O N " CIS i~ U cz cz O U �' C CIS o O cz 6I1 a� im. U �. �. cz O ct4 Oa O cz p a, ct cn ® ® v�A p O N U ¢ U s ce cz U CIS U E U U O N o C ct '� O b�A N ct tb ...........a ..............................................................----- ----- ----- ----- -----............................... ---- ----- ---- ............................... o O o 0 0 0 0 0 0 0 0 0 o p O p O O O O O O O O p O O O O p M bA bl9 bA bl9 rn yg rn bl9 rn bl9 bR 56 rA yg rfn 0 E-� ............................................................------ _____ _____ _____ _____ _____ _____ ____ o' ~ � y � C. A z z z z z z z z z z z z z z z a ............................................................_____ _____ _____ _____ _____ _____ ____ 0 � H a ............................................................_____ _____ _____ _____ _____ ____ _____ ____ 0 0 0 0 0 0 0 0 0 H o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ............................................................------ _____ _____ _____ _____ _____..............................------ _____ 0 U ............................................................_____ _____ _____ _____ _____ ____ _____ _____ w � c .° 0 C. z 2 z 2 z 2 z 2 z 2 z 2 z 2 z ____ _____ _____ _____ C `� V � o � a � w ' p.. ............................................................................................................................................................................................................................................................................................................................................................................................................................................. 7t \ \ •� e � & o k \ e t c g ct u % § ƒ ct \ o e t � / Ct ct 2 .� •_ \ g � � .c \ ' b = d & o ct u \ ct� o 0 o = \ § � I \ - � \ � o ct -a-), o u � � § § R 7 0 � � � � '/ � k � G . ' ............................................ ---- ............................ ---- ----- -----.............................------ ----- ----- ---- ............................... 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 •� y o 0 0 0 0 0 0 0 0 0 0 0 0 0 C�j .. ds ds ds ds ds ran dA r.6 dA r o Cq •°� cOH o, a o CG w 42 O 0 '.O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p O O p O O O O O p O p O p O U p O O p O O O O O p O p O p O � CC O O O � 0 0 � U 42 '0 zs o � E-� ............................................. ____ _____ ____ ____ ____ _____.............................. ____ ............................._____ vi N N N bA 4-a O O zs U � U o O � N z CA C�j to �Q to • C�j d s. a� to Z w Q 0 0 0 0 0 0 0 0 0 0 � �A � �A � � �A � c � o \ / .................... ..................... u = \ / � / 2 � .................................. ...................... o � ± « \ ) / a 2 . \ � 2 / j f � . . .. 2 \ ± � _ m � § \ � � / g � o Q : . _ § 0 � . .................................... --------............................................. ------. ................................----- ----- -----............................. ---- ------ ct � o 0 0 0 0 o c o 0 0 0 0 0 y �A ran � r C � � ran ran ran ct � o ct U N ------- ----- ---- -----............................ ------O O V '••� U 69 6'`? � O i-i � 0 O a'1 U N N �rj N "� 61 N U n N cli cli U cli H M � ct a N c 4-1 cli � p c p i .................................... ..N ............................................. ______ U ct U A � •� � � y .01 cr A U U O O 00 0 2 � t � © t / � Q •� o 7 t § g \ CIS u @ \ § � \ � C4--� 9 k % . \ § � \ � g CIS z \ � \ / ? •� § o t • / •- � 2 u � � � u U = § ° © •- � 2 / 2 e / q 'e � � ) / cn � § 2 ° t N EI ❑ El Fl \ ® E CIS C ct ct a� ct ° ct ct Nctct ct ^� ct ct C�.-, �• � � cd (D o ¢ U � ct c o C; C) cz z U ° cz cn cz cz �n i~ U N c O U O (D cz rcz 0 cz � � C-. � t U •� ° U O cz cz [� O cz cz `' O ® cz o OrU m N N cz Nczcz C3 C� W U O � .�U, —" cz '� �" s� r bA�z � cz U � N O � � O U �Ucz � U � O cz 'Tj p r--� �•' � ¢ U � N � cz cz cz U 0 U U cz cn CIS cz ct tb O N U N N U c�3 cn °cz cz ° cz N �— bA N m [� �. �. r� °+ [� cz � U O � � N N � U U � O ct N ct CIS c Cam• � U bA bA C's a� ct ct CIS ® CIS a, O ct o CIS ct �. �. cn CIS CIS ct •ct o oc •� ct bA ct cz v' O CA —� CA O N cz ® D ¢ cz O U CIS V cz N � U N N C-�-G' � •� H cz ............................ ____ ______ ____ ----- _____ _____. 0 0 0 0 0 0 0 0 0 0 0 CIS � o � N ............................ ____ ______ ____ ------ ____ ............................. ____ U � ____ ______ ____ _____— ____ ............................. ____ o U � O N N ct G� CIS Ct N ct Ca 4 H ce ct ' u O y O C's N Cli CIS o A c CIS C° o o 'e2 � Z O i~ CIS O bA CIS CIS CIS CIS O cn U U cn ¢a O U bA CIS U U U ® CIS U U O O U CIS Tj _ cC3CIS CIS CIS CIS El El El El El CIS w c'3 >, p CJ >' p N r�-i cn M o CIS ct U � CIS ce; OCt CIS cn cn . ® N CIS u cn N CG' Uj CIS N ® N Cf)ct o ct CIS o cn N � N �' '� N •� =N N bA O ® C's CIS C's cn CIS en w Q �, N i~ CIS ct H c', ct c N b�A CIS CIS O CISCIS C a� ct ® ct ® ° CIS N U ct ® C CIS 'ma 's' U � '�., �' � •� CIS Cj O cn Cf) Cf) o UCf) o � Cf)CIS cJ o O CIS CIS CIS o ® U ;-� , 2 � O En N N c'j N N ~ O N C rrC's� .......................... ____ ............................. ____ ____ _____ _____ _____ ____ ............................. ____ ____ _____ 0 0 0 0 0 0 0 o c7 0 0 o c7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o c7 0 0 o c7 0 0 0 0 0 o p 0 0 0 0 0 0 0 o c7 0 0 o c7 0 o c o 0 o C ran r r r r r-n ��6 rA o � U 0 E-� .......................... ____ ............................. ____ ____ _____ _____ _____ ____ ............................. ____ ____ _____ � O � V a .......................... ____ ............................. ____ ____ _____ _____ _____ ____ ............................. ____ ____ _____ o � 0 E� o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a W W W W ri�j W W W W W W W W W W W W W W H H H H H H H H H H H H H H H H H H H o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ........................... .... ............................. ---- ���� ����� ����� ����� ���� ............................. ���� ---- ----- O 1..1 u a" ce W Z u W ~ a� U N cn N C N CIS N _CIS CIS CIS CIS N u N cn C O O N U N U O U cn U O can � O � � N � � N U � U U CIS �' U N � O ............................ ____ ............................. ____ _____ _____ _____ ____ ............................ ____ ............................. ____ _____ _____ �o bA bf3 ran bF3 bA bf3 ran bA ran bA 6R yg r.6 bA 6g yg bf3 yg ran � 0 E-� ............................ ____ ............................. ____ _____ _____ _____ ____ ............................ ____ ............................. ____ _____ _____ a v� 0 H ............................ ____ ............................. ____ _____ _____ _____ _____ _____ ____ ............................. ____ ____ ........................................................................................................................................................................................................................................... 2 z a� L7 00 a� CIS a� x 0 0 a� U O v� N O C Cam• O � O N bA N O O N N O � U U O N N O � N cn � O U � O cn �' CIS � can N � a+ CG O Cj O � N � ........................................ ____ _____ _____ _____ ----- 0 0 � � � o � o bA o C's U Qn a� N bA N CA ct .sue. � `� o w L7 x a c's V a d bA SCIS � U CIS �, aI Z o U U CG RCIS O Cj .a `'s ... � U U U •r" N U Sct ~ C/1 U U N � A-•i C Z O O cn 7� �, o �N 4-� R cn U a� S U O tb tb U � � CIS t N N i~ N � N •® N O bA �" U tb ® ® CIS bA a� tb :~ CIS bA V1 V1 CIS U CISCIS ........................... ____ _____ _____ _____ ____ ................................ O S -� O s o 6f3 c0 — O. U cIS ct O � o ct Ct � � ........................... ____ _____ _____ _____ ____ ct V N ® N U O CIS U ct ct ce; N71 •� U U -- ct CIS g.- '=j U u CIS C's ® -- 0 F U ct a� p C O ° cn ct bA U N v N M ........................... ____ _____ _____ _____ ____ ® M ® N Qn N O U 0 cn N cd CIS bA M "� N CIS _n U H z N N c � � N Nw ct CIS ct a, bA CIS ct CIS ct ct o U N � � •� N U ® �C� ¢a s U 4-4 O Qa U C j U CIS O CISU N C's U •�a, N � ,� V CIS •� O bA CIS N �. ® v c o .......................... ____ _____ _____ _____ ____ _____ y ran 56 ran 56 bA 5A ran bl9 bA bl9 bf3 o � U 0 H v� .......................... ____ _____ _____ _____ ____ _____ cn � U CIS y ® U a � Q A 0 O O O U O cn N cn N cn O U o •,�i C ----- CIS •U yy� U U � N A CIS N ........................... ---- p N ran � � U 0 � � N U � O � N � O N U o bA U � U � O bA ... y r Ct 0 C4 � � O C/1 bA N � o Z 0.0 Q W � o � CIS CIS U CIS (D CIS CIS O U N v� O i" Z � M ...........................--------- --------- ----------.............................--------- --------- ----------.............................--------- ---------- ..........0...... O N O � 6f� d an w 0 U ........................... ____ ____ _____ _____ _____ ____ ............................. ____ ____ H H H H H H H H H H H H H H H H o U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U � ap bA bq bA bq by bq bA bq bA bq bA bq bA bq w w U U U U U U U U U U U U U U U p a� U O � an an an an an an an an an an an � an an an � t U p I�'����� O O O O O O O O O O O O p O O c c � � U ® CIS N N � U O U N � N C's a N N. CIS U •� N O � � U N � � N U a� C o a� a� C4--� 0 '° cli C's a� CIS a� C en tb tb =CIS CIStb ❑❑❑❑ O N U w CIS O Z � O N O N N bA N N N bA N O U CIS bA O bA C" CIS N N � N � bA � O N tb O tb _O O O C', tb O � � v 14 N cn U N N rr9� I� > � —_ y on 0 a 3 L� -C 41 N O u u C cu cu O -0 (n on y O Q N H co N N N CL CL O E N N cu -0 onaU > mcu cu .L w O 4' -0 4V ,L Q C C ± c -0co O OL -0 cu cu 4L L > Q -C u N O M CL O � > mCU i O W m u CU N E 0) � O N u N L O N 4' N m N 4-- u U L N N L a••' L N O � N 4 4— -0 cu m C cu O 4- Z L u -0 O O CL N Qj O C CU to 41 E N � Oon E L C N L L Qj N E cu N C N O ON cuO cuN u tu > cuCO -C 0) y C -C C — - CL a 4� u W N �O CL Q dA i C:f0 N mC N y CU on Qj N N y 3 C .0 _3 0) N 4 J N N O C N L a- w V -0 C C cucu CU C CL C (0 � N z -C y O cu O U O u N 4 t O E E L U U >` O O O u 0 i O O O - � co 4" :a- LL -0 LL L QJ +J 1 L 41 co C ` CU G cLo > coo >cu p a cu O +- O O L 4- - C dA O m C E -C .> CL O � O Z c - j 4' N m N 4- N N O C O a� o U a j co c � L U > N 4O N � 4O co N 3 a N +� � > L c U N N U N CL � (0 N (0 N O U 4 J E 5- - 4- � 4- CU N 3 Cr 4 3 M — N m N N 4- c,. � O � co C C COC N >, O N � N N CU _ O N w 3 U L G N 4y C ro tw O E m ro O L o O O C -0 CL M �C: E � -0 O N N > a N O O O > m m cu N 4 CLO O cu O N N C cu cuN C � m dA m O > �o o o °' E N 4JE w a E - OEo tw 4 N E C c E >, 4, 4' C�C " � cco a�i aci ago a� u c l7 4_' O C 4- L C u -C 0) M 3 CLN u Z 4- Z C N C U +�.� >- O > C m = O L cuL cu M O L CO 4y CO U L N �CC O y N L L CL o OA N - O on 3 4y G 4 N N -0 -0 0) cu u w CL VI N 47- onu ;a_, N c0 0) 0) u L -0 'In N C O N '� L C O O > L (0 N M CL OU M on (0 N N a•'te N on 1-0tin U a cu te- o (0 C C C �' c on (0 N y N C U L O O O N C dA (0 ,4; (0 C on N +O CL w•� dA N cu N (0 E O N N 3 C E O O m N N > co }C--, � U u N N CL u co a0D C H >- " Ou cu M O �i� N N d C u N ~ i L N M O u N Q N O CL C w 3 N = L CU Z Ntw -C � w > �+ O C CL Z O C X C Z u M = O E N i.� S O U C N w N C N (0 C N N Z (0 N �= N C �' Z U (B -� N N O cu zH N O cn c 3 'u z H - O E cn c 3 C O N co O co O O c a; U Q o N p O O 4� U cLo cn �o N O N C N y V1 U -0 C C Q N O V1 (A (0 O O N 0 u N c0 .� .� N w N N � N D 4J C N c0 .� N CL C O co 3 +� N U N U L N E O L U N N +J L N UWC U C N N dA '+- L N N N +J i C N dA m m C- L co +� O m O �O � co co Q L co +� 0 O O E N O N +J +J X N N O L +J 4J 4J X N N L Q cn cn w a a w ^ a = cLoon cn cn w a a w ^ a = tw o m C C O ECML i a Q ii Q > N Q � U m E E E a � 2 a ƒ \ � : \ \ } \ � � � � � 3: / / . 0 & / : t g _ aj § _aj \ \ / / \ $ [ k j m k / \ % g / 7 & / / / \ \ : _ » e , 0 ± \ ! / @ e = aj \ a = cu \ � / � aj \ / 0 w =1 / 0 / = y m / ± / . _ % y j ` ® \ \ ( t 8 \ / \ \ \ ) j / \ ( ( s j § \ } } / ) \ § 2 § 3 § 7 � \ � 3 CA \ ? \ \ d o 0 E / / / m 7 0 ? 0 \ k Ln § J / 0 0 0 0 0 0 k aCL d d d ) § u » » m c r4 r14 r14 � k k 2 r14 r14 r14 E A o gLU v 0 0 0 & / / / % % > > > \ \ \ z z z CL = y M u \ ® ° E c m E 2 j > t / \ ( 7 m J / \ \ a u \ / 5 0 > § / } z \ \ { / \ � = E a \ Mn2 ) ) t / / c ® ° 3 u u / \ \ r,4 m Piro)ect Project SLflrnirnairiies/LJinllks to Project Metiriio:s Project 1-Project Information Project name Monroe County-Canal Restoration Projects-Big Pine Key Avenues Canals 293 295 297 299 300 and 315 Agency overseeing the project Monroe County Board of County Commissioners Project phase Implementation CDP point of contact POC Rhonda Haag Phone 305-453-8774 Email I..laa _I:IPioricia@ yr o.ir,oeCOLarlt: -fl. OV Data steward Greg Corning Phone 314-920-8359 Email re c. rr it @Ws p.rwvn Expected data collection start date 9/1/2024 Expected data collection end date 9/1/2028 Short description of the project location construction,oversight and post effectivness of six canal restoration projects(Canals 293,295,297,299,300,and 315) Overall projectgoals and objectives Iwater quality improvement Specific goals and objectives of data collection improved dissolved oxygen concentrations to meet or exceed FDEP state standards of 42%saturation Observational Data Budget Estimated total budget for observational data collection and 1000000 reporting Estimated total budget for data management 150000 Locations in the application budget Task#2 Construction Management and Task#3 Post Monitoring Effectiveness Data Consistency and Compatibility List any consistent local or regional monitoring efforts, methods,or FDEP State Standards standards if applicable Describe potentially complementary datasets, Monroe County Canal Management Master Plan Database if known and applicable Adaptive Mana ement Describe the extent to which adaptive management will be used The data will help provide lessons learned for future canal restoration ro'ects and technology selection. Data Management Describe how data will be: Stored Local network and onedrive Archived Monroe County website Made available to the public and the Council Yes Will DOls be used? Yes Metrics Use the Approach and Technique menus to filter the list of metric options, or start typing the metric name to generate suggested auto fill text. You do not need to enter an approach or technique to select a metric. If an appropriate metric is not shown,you may enter a custom metric for consideration(if possible,please coordinate this with Council staff in advance). Invalidation warnings indicate that the metric, technique, and approach do not match,but may be ignored. Approach All(click to select one) Technique Metric 1 Restore hydrologic connectivity HR011-Hydrologic restoration-Miles of canals back filled 2 Restore and revitalize the Gulf economy C01002-Outreach/Education/Technical Assistance-Number of people reached 3 Sediment placement PRM008-Monitoring-Miles being monitored 1 of 57 4 Click to select one 5 Click to select one 6 Click to select one 7 Click to select one 8 Click to select one 9 Click to select one 10 Click to select one Metric Instructions Consider the following instructions for the use of each metric as well as parameters appropriate for tracking metric progress(e.g.,Activity completio see the ODP Guidelines Appendix F.1.2.1 for details). Tin-Tn ntitnfit instructions displayed in a areen row. move your cursor to the left marain and double click the line beneath the row number. HR011-Hydrologic restoration-Miles of canals backfilled Enter the number of miles of canals backfilled. Use the notes field to The activity completion parameter(s) should include miles of provide the average width of the canals backfilled. canals backfilled. Activity completion parameters are not sufficient to support the goals/objectives of this technique. An activity completion parameter is not necessary if another selected parameter already captures the data collection activities needed C01002-Outreach/Education/Technical Assistance-Number of people reached Enter the expected number of stakeholders in attendance at The number of people reached and/or the number of reader informational meetings, workshops, or events. Or, provide # of impressions should be used as a parameter in lieu of Activity people who were directly involved in outreach, training and or completion. These parameters may be able to support the goal technical assistance activities (this could be the number of Restore and revitalize the Gulf economy. participants in a workshop, classes, webinar, townhall, event, PRM008-Monitoring-Miles being monitored Enter the number of miles monitored as a direct result of the project. [These instrucions may vary depending on technique--please This metric should only be used for monitoring intended to track select one above.] The activity completion parameter(s) should something other than the project's benefits (which should be include number of miles monitored. This parameter can be used monitored for all RESTORE-funded projects). This metric should be to support the objective Improve science-based decision-making selected for in-stream habitat restoration and shoreline restoration processes. It is important to also select any additional parameters projects. Please indicate the width of the area being monitored in the that may be needed to capture all observational data collected notes field. For beach nesting birds, includes linear length of beaches collected through monitoring (e.g., such a "Total nitrogen" for a or circumference of islands where suitable habitat has been water quality monitoring program). Success criteria for such confirmed. parameters may be considered not applicable'. Metric 1 Target HR011-Hydrologic restoration-Miles of canals backfilled 0.80 Metric specifics/notes Target notes Enter response =1tor rev�;wnse Parameter A Target Miles of restoration 0.80 Parameterspecifics/notes Target notes As-built surveys showing the restored canals lifnter response 2 of 57 Purpose Methods Methodspecifics/notes li�nter response li�nter response Baseline data Reference/control comparison li�nter response li�nter response Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Sample size li�nter response li�nter response Sample sites Quality assurance/quality control QA QC li�nter response ji�nter response • Data type 1 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response • Data type 2 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response ji�nter response Projection Horizontal and vertical datum ji�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response • Data type 3 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response Parameter B Target Parameterspecifics/notes Target notes li�nter response li�nter response Purpose li�nter response Methods Methodspecifics/notes li�nter response li�nter response Baseline data Reference/control comparison li�nter response li�nter response Statistical analyses/mathematical models Potential corrective action 3 of 57 Schedule/timing Schedule/timing Sample size Sample sites QuaHtv assurance/quality control QA QC • Data type 1 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e • Data e 2 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Enter re io re e • Data Qlpe 3 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e Parameter C Target Earetoarvre io re e 019 Parameterspecifics/notes Target notes Purpose fareWarvarv ,:ore e Methods Methodspecifics/notes Baseline data Reference control comparison Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Schedule/timing Sample size Sample sites QuaHtv assurance/quality control QA QC • Data type 1 Units 4 of 57 Frequency Duration Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter D Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response 5 of 57 POC name POC phone POC email Enter re io re e • Data Qlpe 2 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum POC name POC phone POC email Earetoary re io re e • Data Qlpe 3 Units i�nter response i�nter response Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e Parameter E Target l:aitoarvre io re e 019 Parameterspecifics/notes Target notes Purpose fareWarvarv ,:ore e Methods Methodspecifics/notes Baseline data Reference control comparison Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Schedule/timing Sample size Sample sites QuaHtv assurance/quality control QA QC • Data type 1 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Enter re io re e • Data Qlpe 2 Units 6 of 57 Frequency Duration Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter F Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone 7 of 57 i 6'pter res:pe6`pse i 6'pter res:pe6`pse POC email i:n erres:ponse • Data type 3 Units i',nter response i',nter response Frequency Duration i',nter response i',nter response Storage format GIS res resentation i,nter response i',nter response Projection Horizontal and vertical datum i,nter response i',nter response POC name POC phone i,nter response i',nter response POC email 1:n erres:ponse Metric 2 Target CO1002-Outreach/Education/Technical Assistance-Number of 0.99 people reached Metric specifics/notes Target notes Enter response =Iterres;�wnse Parameter A Target 1:areier response 0.99 Parameterspecifics/notes Target notes i,nter response i',nter response Purpose inter response Methods Method s ecifics/notes i,6"p'te9"response i',nter response Baseline data Reference/control comparison i,6"p'te9"response i',nter response Statistical analyses/mathematical models Potential corrective action i,nter response i',nter response Schedule/timing Sample size i,nter response i',nter response Sample sites Quality assurance/quality control QA/QC i,nter response i',nter response • Data type 1 Units i,nter response i',nter response Frequency Duration i,nter response i',nter response Storage format GIS res resentation i,nter response 1',Iter response Projection Horizontal and vertical datum i,nter response i',nter response POC name POC phone i,nter response i',nter response POC email 1:n erres:ponse • Data type 2 Units i,nter response i',nter response Frequency Duration i,nter response i',nter response Storage format GIS res resentation i,nter response i',nter response Projection Horizontal and vertical datum i,nter response i',nter response 8 of 57 POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter B Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response 9 of 57 Frequency Duration Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter C Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose ji�llter response Methods Methodspecifics/notes li�llter response ji�llter response Baseline data Reference control comparison li�llter response ji�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Schedule/timing Sample size li�llter response ji�llter response Sample sites Quality assurance/quality control QA QC li�llter response ji�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone 10 of 57 POC email i�llter response Parameter D Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter E Target 11 of 57 Parameterspecifics/notes Target notes li�nter response li�nter response Purpose li�nter response Methods Methodspecifics/notes li�nter response li�nter response Baseline data Reference/control comparison li�nter response li�nter response Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Schedule/timing Sample size li�nter response ji�nter response Sample sites Quality assurance/quality control QA QC li�nter response ji�nter response • Data type 1 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response • Data type 2 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response ji�nter response Projection Horizontal and vertical datum ji�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response • Data type 3 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response Parameter F Target Parameterspecifics/notes Target notes li�nter response li�nter response Purpose li�nter response Methods Methodspecifics/notes li�nter response li�nter response Baseline data Reference/control comparison 12 of 57 i II ter re :polIse i II ter re :polIse Statistical analyses/mathematical models Potential corrective action i nter response i nter response Schedule/timing Schedule/timing Sample size i nter response i nter response Sample sites Quality assurance/quality control QA QC i nter response i nter response • Data type 1 Units i nter response i nter response Frequency Duration i nter response i nter response Storage format GIS res resentation i nter response i nter response Projection Horizontal and vertical datum i nter response i nter response POC name POC phone i nter response i nter response POC email i:n erre :ponce • Data type 2 Units i nter response i nter response Frequency Duration i nter response i nter response Storage format GIS res resentation i nter response i nter response Projection Horizontal and vertical datum i nter response i nter response POC name POC phone i nter response i nter response POC email i:n erre :ponce • Data type 3 Units i nter response i nter response Frequency Duration i nter response i nter response Storage format GIS res resentation i nter response i nter response Projection Horizontal and vertical datum i nter response i nter response POC name POC phone i nter response i nter response POC email i:n erre :ponce Metric 3 Target PRM008-Monitoring-Miles being monitored 0.99 Metric specifics/notes Target notes Enter response =Iterrev;ense Parameter A Target i:n erre :ponce 0.99 Parameterspecifics/notes Target notes Dissolved Oxygen Concentrations and Natural Benthic Recruitment Meet or exceed FDEP State Standards for Dissolved Oxygen concentrations Purpose i:n erre :ponce Methods Methods ecifics/notes i nter response i nter response 13 of 57 Baseline data Reference/control comparison li�nter response li�nter response Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Sample size li�nter response li�nter response Sample sites Quality assurance/quality control QA/QC li�nter response li�nter response • Data type 1 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response • Data type 2 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response ji�nter response Projection Horizontal and vertical datum ji�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response • Data type 3 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response Parameter B Target Parameterspecifics/notes Target notes li�nter response li�nter response Purpose li�nter response Methods Methodspecifics/notes li�nter response li�nter response Baseline data Reference/control comparison li�nter response li�nter response Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Sample size li�nter response li�nter response Sample sites Quality assurance/quality control(QA/QC) 14 of 57 • Data type 1 Units Frequency Duration Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter C Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose ji�llter response Methods Methodspecifics/notes li�llter response ji�llter response Baseline data Reference control comparison li�llter response ji�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Schedule/timing Sample size li�llter response ji�llter response Sample sites Quality assurance/quality control QA QC li�llter response ji�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS respresentation 15 of 57 Projection Horizontal and vertical datum ji�llter response P�Ilter response POC name POC phone P�Ilter response ji�llter response POC email PIlter response • Data type 2 Units P�Ilter response P�Ilter response Frequency Duration P�Ilter response P�Ilter response Storage format GIS res resentation P�Ilter response ji�llter response Projection Horizontal and vertical datum ji�llter response P�Ilter response POC name POC phone P�Ilter response P�Ilter response POC email PIlter response • Data type 3 Units P�Ilter response P�Ilter response Frequency Duration P�Ilter response P�Ilter response Storage format GIS res resentation P�Ilter response P�Ilter response Projection Horizontal and vertical datum P�Ilter response P�Ilter response POC name POC phone P�Ilter response P�Ilter response POC email PIlter response Parameter D Target PIlter response 0.99 Parameterspecifics/notes Target notes P�Ilter response P�Ilter response Purpose PIlter response Methods Methodspecifics/notes P�Ilter response P�Ilter response Baseline data Reference/control comparison P�Ilter response P�Ilter response Statistical analyses/mathematical models Potential corrective action P�Ilter response P�Ilter response Schedule/timing Sample size P�Ilter response P�Ilter response Sample sites Quality assurance/quality control QA/QC P�Ilter response P�Ilter response • Data type 1 Units P�Ilter response P�Ilter response Frequency Duration P�Ilter response P�Ilter response Storage format GIS res resentation P�Ilter response ji�llter response Projection Horizontal and vertical datum ji�llter response P�Ilter response POC name POC phone P�Ilter response P�Ilter response POC email PIlter response 16 of 57 • Data Qlpe 2 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Enter relionse • Data Qlpe 3 Units i�nter response i�nter response Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Enter relionse Parameter E Target Parameterspecifics/notes Target notes Purpose Methods Methodspecifics/notes Baseline data Reference control comparison Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Schedule/timing Sample size Sample sites QuaHtv assurance/quality control QA QC • Data type 1 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email • Data Qlpe 2 Units Frequency Duration Storage format GIS res resentation 17 of 57 Projection Horizontal and vertical datum POC name POC phone P�Ilter response P�Ilter response POC email PIlter response • Data type 3 Units P�Ilter response P�Ilter response Frequency Duration P�Ilter response P�Ilter response Storage format GIS res resentation P�Ilter response P�Ilter response Projection Horizontal and vertical datum P�Ilter response P�Ilter response POC name POC phone P�Ilter response P�Ilter response POC email PIlter response Parameter F Target PIlter response 0.99 Parameterspecifics/notes Target notes P�Ilter response P�Ilter response Purpose PIlter response Methods Methodspecifics/notes P�Ilter response P�Ilter response Baseline data Reference/control comparison P�Ilter response P�Ilter response Statistical analyses/mathematical models Potential corrective action P�Ilter response P�Ilter response Schedule/timing Sample size P�Ilter response P�Ilter response Sample sites Quality assurance/quality control QA/QC P�Ilter response P�Ilter response • Data type 1 Units P�Ilter response P�Ilter response Frequency Duration P�Ilter response P�Ilter response Storage format GIS res resentation P�Ilter response ji�llter response Projection Horizontal and vertical datum ji�llter response P�Ilter response POC name POC phone P�Ilter response P�Ilter response POC email PIlter response • Data type 2 Units P�Ilter response P�Ilter response Frequency Duration P�Ilter response P�Ilter response Storage format GIS res resentation P�Ilter response P�Ilter response Projection Horizontal and vertical datum P�Ilter response P�Ilter response POC name POC phone P�Ilter response P�Ilter response POC email PIlter response 18 of 57 • Data type 3 Units Frequency Duration Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Metric 4 Target 0.99 Metric specifics/notes Target notes Enter response =Iter res��wllse Parameter A Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response IfIlter response Projection Horizontal and vertical datum POC name POC phonli�llter response ji�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response 19 of 57 • Data type 3 Units Frequency Duration Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response Parameter B Target Parameterspecifics/notes Target notes li�nter response li�nter response Purpose li�nter response Methods Methodspecifics/notes li�nter response li�nter response Baseline data Reference control comparison li�nter response li�nter response Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Schedule/timing Sample size li�nter response li�nter response Sample sites Quality assurance/quality control QA QC li�nter response li�nter response • Data type 1 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response • Data type 2 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response • Data type 3 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum 20 of 57 POC name POC phone li�llter response ji�llter response POC email li�llter response Parameter C Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response 21 of 57 Parameter D Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Schedule/timing Sample size li�llter response ji�llter response Sample sites Quality assurance/quality control QA QC li�llter response ji�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter E Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Method specifics/notes 22 of 57 Baseline data Reference control comparison li�llter response ji�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Schedule/timing Sample size li�llter response ji�llter response Sample sites Quality assurance/quality control QA QC li�llter response ji�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter F Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose ji�llter response Methods Methodspecifics/notes li�llter response ji�llter response Baseline data Reference control comparison li�llter response ji�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Schedule/timing Sample size li�llter response ji�llter response 23 of 57 Sample sites Quality assurance/quality control QA/QC li�nter response li�nter response • Data type 1 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response ji�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response • Data type 2 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response ji�nter response Projection Horizontal and vertical datum ji�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response • Data type 3 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response Metric 5 Target 0.99 Metric specifics/notes Target notes Enter res��wnse Enter resi�wnse Parameter A Target Parameterspecifics/notes Target notes li�nter response li�nter response Purpose Methods Method s ecifics notes li�nter response IfIlter response Baseline data Reference control comparison li�nter response IfIlter response Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Schedule/timing Sample size li�nter response ji�nter response 24 of 57 Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter B Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response 25 of 57 Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter C Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose ji�llter response Methods Methodspecifics/notes li�llter response ji�llter response Baseline data Reference control comparison li�llter response ji�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Schedule/timing Sample size li�llter response ji�llter response Sample sites Quality assurance/quality control QA QC li�llter response ji�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email 26 of 57 • Data type 2 Units Frequency Duration Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter D Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS respresentation 27 of 57 Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e • Data e 3 Units i�nter response Enter m2mme Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e Parameter E Target l:aitoarvre io re e 019 Parameterspecifics/notes Target notes Purpose fareWarvarv ,:ore e Methods Methodspecifics/notes Baseline data Reference control comparison Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Schedule/timing Sample size Sample sites QuaHtv assurance/quality control QA QC • Data type 1 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Enter re io re e • Data Qlpe 2 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e 28 of 57 • Data type 3 Units Frequency Duration Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter F Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response 29 of 57 Projection Horizontal and vertical datum POC name POC phone P�Ilter response P�Ilter response POC email PIlter response Metric 6 Target 0.99 Metric specifics/notes Target notes Enter response =Iter res��wllse Parameter A Target PIlter response 0.99 Parameterspecifics/notes Target notes P�Ilter response P�Ilter response Purpose PIlter re :polls Methods Methodspecifics/notes P�Ilter response P�Ilter response Baseline data Reference/control comparison P�Ilter response P�Ilter response Statistical analyses/mathematical models Potential corrective action P�Ilter response P�Ilter response Schedule/timing Sample size P�Ilter response P�Ilter response Sample sites Quality assurance/quality control QA/QC P�Ilter response P�Ilter response • Data type 1 Units P�Ilter response P�Ilter response Frequency Duration P�Ilter response P�Ilter response Storage format GIS res resentation P�Ilter response IfIlter response Projection Horizontal and vertical datum POC name POC phonP�Ilter response ji�llter response POC email PIlter response • Data type 2 Units P�Ilter response P�Ilter response Frequency Duration P�Ilter response P�Ilter response Storage format GIS res resentation P�Ilter response P�Ilter response Projection Horizontal and vertical datum P�Ilter response P�Ilter response POC name POC phone P�Ilter response P�Ilter response POC email PIlter response • Data type 3 Units P�Ilter response P�Ilter response Frequency Duration P�Ilter response P�Ilter response Storage format GIS res resentation P�Ilter response IfIlter response 30 of 57 Projection Horizontal and vertical datum Ater relions li�nter response POC name POC phone POC email Enter rev ionre Parameter B Target Enter relionse 1 019 Parameterspecifics/notes Target notes Purpose fa1Wary mv:pome Methods Methodspecifics/notes Baseline data Reference control comparison Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Schedule/timing Sample size Sample sites QuaHtv assurance/quality control QA QC • Data type 1 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Enter rev ion re • Data Qlpe 2 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Enter relionse • Data e 3 Units i�nter response Enter m2mme Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email 31 of 57 i Parameter C Target Earetoarvre io re e 019 Parameterspecifics/notes Target notes Purpose fareWarvarv ,:ore e Methods Methodspecifics/notes Baseline data Reference control comparison Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Sample size Sample sites QuaHtv assurance/quality control QA/QC • Data Qlpe 1 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e • Data e 2 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Enter re io re e • Data Qlpe 3 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e Parameter D Target Earetoarvre io re e 019 Parameterspecifics/notes Target notes Purpose lEnter response 32 of 57 Methods Methodspecifics/notes li�nter response li�nter response Baseline data Reference/control comparison li�nter response li�nter response Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Sample size li�nter response li�nter response Sample sites Quality assurance/quality control QA/QC li�nter response li�nter response • Data type 1 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response • Data type 2 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response ji�nter response Projection Horizontal and vertical datum ji�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response • Data type 3 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response Parameter E Target Parameterspecifics/notes Target notes li�nter response li�nter response Purpose li�nter response Methods Methodspecifics/notes li�nter response li�nter response Baseline data Reference/control comparison li�nter response li�nter response Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Sample size 33 of 57 Sample sites Quality assurance/quality control QA Qli�llter response ji�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter F Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose ji�llter response Methods Methodspecifics/notes li�llter response ji�llter response Baseline data Reference control comparison li�llter response ji�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Schedule/timing Sample size li�llter response ji�llter response Sample sites Quality assurance/quality control QA QC li�llter response ji�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration 34 of 57 Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Metric 7 Target 0.99 Metric specifics/notes Target notes Enter res��wllse Enter resi�wllse Parameter A Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose Methods Method s ecifics notes li�llter response IfIlter response Baseline data Reference control comparison li�llter response IfIlter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Schedule/timing Sample size li�llter response IfIlter response Sample sites Quality assurance/quality control QA QC li�llter response ji�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration 35 of 57 Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter B Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response 36 of 57 POC email Earetoarvre io re e • Data Qlpe 2 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e • Data Qlpe 3 Units i�nter response i�nter response Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e Parameter C Target Earetoarvre io re e 019 Parameterspecifics/notes Target notes Purpose fareWarvarv ,:ore e Methods Methodspecifics/notes Baseline data Reference control comparison Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Schedule/timing Sample size Sample sites QuaHtv assurance/quality control QA QC • Data type 1 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Enter re io re e • Data Qlpe 2 Units Frequency Duration 37 of 57 Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter D Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email 38 of 57 • Data type 3 Units Frequency Duration Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter E Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose ji�llter response Methods Methodspecifics/notes li�llter response ji�llter response Baseline data Reference control comparison li�llter response ji�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Schedule/timing Sample size li�llter response ji�llter response Sample sites Quality assurance/quality control QA QC li�llter response ji�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS respresentation 39 of 57 Projection Horizontal and vertical datum ji�llter response P�Ilter response POC name POC phone P�Ilter response ji�llter response POC email PIlter response Parameter F Target PIlter response 0.99 Parameterspecifics/notes Target notes P�Ilter response P�Ilter response Purpose PIlter response Methods Methodspecifics/notes P�Ilter response P�Ilter response Baseline data Reference/control comparison P�Ilter response P�Ilter response Statistical analyses/mathematical models Potential corrective action P�Ilter response P�Ilter response Schedule/timing Sample size P�Ilter response P�Ilter response Sample sites Quality assurance/quality control QA/QC P�Ilter response P�Ilter response • Data type 1 Units P�Ilter response P�Ilter response Frequency Duration P�Ilter response P�Ilter response Storage format GIS res resentation P�Ilter response ji�llter response Projection Horizontal and vertical datum ji�llter response P�Ilter response POC name POC phone P�Ilter response P�Ilter response POC email PIlter response • Data type 2 Units P�Ilter response P�Ilter response Frequency Duration P�Ilter response P�Ilter response Storage format GIS res resentation P�Ilter response P�Ilter response Projection Horizontal and vertical datum P�Ilter response P�Ilter response POC name POC phone P�Ilter response P�Ilter response POC email PIlter response • Data type 3 Units P�Ilter response P�Ilter response Frequency Duration P�Ilter response P�Ilter response Storage format GIS res resentation P�Ilter response ji�llter response Projection Horizontal and vertical datum ji�llter response P�Ilter response POC name POC phone P�Ilter response P�Ilter response POC email PIlter response 40 of 57 i Metric 8 Target 0.99 Metric specifics/notes Target notes Enter response =Ite 9"9"e vi;w6'lr Parameter A Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response IfIlter response Projection Horizontal and vertical datum POC name POC phonli�llter response ji�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum POC name POC phonli�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response IfIlter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response ji�llter response POC email li�llter response 41 of 57 i Parameter B Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference control comparison li�llter response ji�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Schedule/timing Sample size li�llter response ji�llter response Sample sites Quality assurance/quality control QA QC li�llter response ji�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter C Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose 42 of 57 Methods Methodspecifics/notes li�llter response ji�llter response Baseline data Reference control comparison li�llter response ji�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Schedule/timing Sample size li�llter response ji�llter response Sample sites Quality assurance/quality control QA QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter D Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose ji�llter response Methods Methodspecifics/notes li�llter response ji�llter response Baseline data Reference control comparison li�llter response ji�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response 43 of 57 Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter E Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response 44 of 57 Frequency Duration Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter F Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose ji�llter response Methods Methodspecifics/notes li�llter response ji�llter response Baseline data Reference control comparison li�llter response ji�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Schedule/timing Sample size li�llter response ji�llter response Sample sites Quality assurance/quality control QA QC li�llter response ji�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone 45 of 57 POC email i�llter response • Data type 2 Units i�llter response i�llter response Frequency Duration i�llter response i�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Metric 9 Target 0.99 Metric specifics/notes Target notes Enter res��wllse Enter resi�wllse Parameter A Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose Methods Method s ecifics notes li�llter response IfIlter response Baseline data Reference control comparison li�llter response IfIlter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Schedule/timing Sample size li�llter response IfIlter response Sample sites Quality assurance/quality control QA QC li�llter response ji�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone 46 of 57 POC email i�llter response • Data type 2 Units i�llter response i�llter response Frequency Duration i�llter response i�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter B Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration 47 of 57 Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e • Data Qlpe 3 Units i�nter response Enter m2mme Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e Parameter C Target Earetoarvre io re e 019 Parameterspecifics/notes Target notes Purpose fareWarvarv ,:ore e Methods Methodspecifics/notes Baseline data Reference control comparison Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Schedule/timing Sample size Sample sites QuaHtv assurance/quality control QA QC • Data type 1 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Enter re io re e • Data Qlpe 2 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone 48 of 57 POC email i�llter response • Data type 3 Units i�llter response i�llter response Frequency Duration i�llter response i�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter D Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response 49 of 57 Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter E Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose ji�llter response Methods Methodspecifics/notes li�llter response ji�llter response Baseline data Reference control comparison li�llter response ji�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Schedule/timing Sample size li�llter response ji�llter response Sample sites Quality assurance/quality control QA QC li�llter response ji�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email 50 of 57 Parameter F Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose ji�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Metric 10 Target 0.99 51 of 57 Metric specifics/notes Target notes Enter resgonse Enter resgonse Parameter A Target Earetoarvre io re e 019 Parameterspecifics/notes Target notes Purpose fareWarvarv ,:ore e Methods Methodspecifics/notes Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size Sample sites QuaHtv assurance/quality control QA/QC • Data Qlpe 1 Units Frequency Duration Storage format GIS res resentation IlDiter relionse IBM,response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone POC email Enter re io re e • Data e 2 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone POC email Enter re io re e • Data Qlpe 3 Units Frequency Duration Storage format GIS res resentation IlDiter relionse IBM,response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone POC email Enter re io re e Parameter B Target lDiter relionse 1 019 Parameterspecifics/notes Target notes 52 of 57 Purpose Methods Methodspecifics/notes li�nter response li�nter response Baseline data Reference/control comparison li�nter response li�nter response Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Sample size li�nter response li�nter response Sample sites Quality assurance/quality control QA QC li�nter response ji�nter response • Data type 1 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response • Data type 2 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response ji�nter response Projection Horizontal and vertical datum ji�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response • Data type 3 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email li�nter response Parameter C Target Parameterspecifics/notes Target notes li�nter response li�nter response Purpose li�nter response Methods Methodspecifics/notes li�nter response li�nter response Baseline data Reference/control comparison li�nter response li�nter response Statistical analyses/mathematical models Potential corrective action 53 of 57 Schedule/timing Schedule/timing Sample size Sample sites QuaHtv assurance/quality control QA QC • Data type 1 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e • Data e 2 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Enter re io re e • Data Qlpe 3 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e Parameter D Target Earetoarvre io re e 019 Parameterspecifics/notes Target notes Purpose fareWarvarv ,:ore e Methods Methodspecifics/notes Baseline data Reference control comparison Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Schedule/timing Sample size Sample sites QuaHtv assurance/quality control QA QC • Data type 1 Units 54 of 57 Frequency Duration Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 2 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response • Data type 3 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response li�llter response Projection Horizontal and vertical datum li�llter response li�llter response POC name POC phone li�llter response li�llter response POC email li�llter response Parameter E Target Parameterspecifics/notes Target notes li�llter response li�llter response Purpose li�llter response Methods Methodspecifics/notes li�llter response li�llter response Baseline data Reference/control comparison li�llter response li�llter response Statistical analyses/mathematical models Potential corrective action li�llter response li�llter response Schedule/timing Sample size li�llter response li�llter response Sample sites Quality assurance/quality control QA/QC li�llter response li�llter response • Data type 1 Units li�llter response li�llter response Frequency Duration li�llter response li�llter response Storage format GIS res resentation li�llter response ji�llter response Projection Horizontal and vertical datum ji�llter response li�llter response 55 of 57 POC name POC phone POC email Enter re io re e • Data Qlpe 2 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum POC name POC phone POC email Earetoary re io re e • Data Qlpe 3 Units i�nter response i�nter response Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Earetoary re io re e Parameter F Target l:aitoarvre io re e 019 Parameterspecifics/notes Target notes Purpose fareWarvarv ,:ore e Methods Methodspecifics/notes Baseline data Reference control comparison Statistical analyses/mathematical models Potential corrective action li�nter response li�nter response Schedule/timing Schedule/timing Sample size Sample sites QuaHtv assurance/quality control QA QC • Data type 1 Units Frequency Duration Storage format GIS res resentation Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone POC email Enter re io re e • Data Qlpe 2 Units 56 of 57 Frequency Duration Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email i:ntrrrresponse • Data type 3 Units li�nter response li�nter response Frequency Duration li�nter response li�nter response Storage format GIS res resentation li�nter response li�nter response Projection Horizontal and vertical datum li�nter response li�nter response POC name POC phone li�nter response li�nter response POC email i:ntrrrresponse Summary Name Specifics/Notes (Project II-Il oniroe County-Canall IRestoiratiion Projects-Big IFliine IKey Avenues(Canalls 293,2 5�2 7�2 �300,and 31 s) Metriic.l - HRO..I...I.- Hydrollo ,ic restoraborro- Wes of canals Ibackfilllled Parameter A\-(files of restoration As..Ilaraullt srauveys sllrowling the aestoued ranallls Metriic 2-Q:U002-OUtireaclh/isdUcaborro/ Ifeo:hrroiio::all Aasaaiistarroo:e- NUrnbeir of Ipeolplle readhed Metric 3-PfllM008-(Monitoring-(files being monitored 57 of 57