05th Change Order 12/04/2023 DocuSign Envelope ID:B07EA9C6-AA4A-4D4F-B206-25E1BE77OF9E M.C.A.INSTR,8800,2 Enclosure(1) 3/28/2017 Page 3 MONROE COUNTY/ENGINEERING/PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECTTITLE: KWIA Concourse A&Terminal Improvements CHANGE ORDER NO.: 005 INITIATION DATE: 9/5/2023 TO CONTRACTOR: NVZA/Gulf Keystar JV CONTRACT DATE; 8/17/2022 The Contract is changed as follows: The Original(Contract Sum)(Guaranteed Maxium Price) $ 101,461,771.00 Net change by previously authozied Change Order $ 8,415,245.92 The(Contract Sum)(Guaranteed Mxium Price)prior to this Chage order was $ 109,877,016.92 The(Contract Sum)(Guaranteed Mxium Price)will be f,uunchaangecll)by this Change Order 0 The new(Contract Sum)(Guaranteed Mxium Price) including this Change Order is $ 109,877,016.92 The Contract Time will be 1 ii.unahreaau&Iio:,'Il by 0 days The date of Substantial Completion as of the date of this Change Order is 3/9/2026 Detailed Descdptlon.of change order and)usWicat'low As per the attached approved PCO#009,JV is proposing to self-perform the temporary construction partitions work in a lump sum amount of 118,802,64.The cost breakdown,work phases,and locations are provided in the backup documents. POTENTIAL CHANGE ORDER'S IN THIS CHANGE ORDER: Pco# Title Schedule Impact Amount 009 '.Temporary Construction Partitions Inside Existing Terminal 0 0 Total: 0 This change order is 0.00%of the original contract price. Not valid until signed by Owner,Architect(if applicable),and Contractor 177— usigned by: 11/30/2023 N 10:45:41 PST ARCHITECT: aY' I}ocuSigned by: IgiG0:, 10487 DATE: �7 2023 20:37:26 PST CONTRACTORS: m.� 01;�85k.9fk2TA'TdP7.... �aa'3IJfJtlA817Er"%L7�',. DATE: .... DIRECTOR ENGINEERING'. N/A DATE: DIRECTOR PROJECT MANAGEMENT: N/A DATE: la3 Executive Director of Airports � � 7ATE: DEPUTY ADMINISTRATOR µm a ^ COUNTY/DEPUTY „���' °.°�... 12�4�2023 DATE: 47S RM El A NRC7 OI.II�ITY AT� NAY ITE;CI d,L A A 'SI5, d,lNTY ATTORNEY Date 1211/23 DocuSign Envelope ID:B07EA9C6-AA4A-4D4F-B206-25E1 BE770F9E GOLF BUILGaNG KEYST R PCCO #005 NV2A/Gulf Keystar JV Project:20-2039-01-KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami,Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key Wesl,Florida 33040 Prime Contract Change Order #005: Temporary Construction Partitions Inside Existing Terminal TO: Key West International Airport FROM: NV2AIGulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West,Florida 33040 Miami,Florida 33156 DATE CREATED: 9/05/2023 CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) CONTRACT STATUS: Approved REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY. DUE DATE: REVIEW DATE:: 10/2012023 INVOICED DATE: PAID DATE: SCHEDULE IMPACT: EXECUTED, NO REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 20-2039-01:Key West International Airport TOTAL AMOUNT: $0.00 Concourse A DESCRIPTION: As per the attached approved PCO#009,JV is proposing to self-perform the temporary construction partitions work in a lump sum amount of $118,8 2A4,The cast breakdown,work phases,and locations are provided in the backup documents. -Phase A-Arrival Terminal:t+Iew Elevator,Passenger Bridge,East Carrousel,Airline Offices $34,772.59 Phase B-Arrival Terminal,New West!Baggage Ctalm Carrousel,and the New'Vestibules $41,236.54 Phase C-Departure Terminal:New T'SA Security Checkpoint,TSA Offices $42,793.51 TOTAL: $118,802.64 ATTACHMENTS: POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: __—••• Schedule Impact Amount PCO# 009 Temporary Construction Partitions Inside E�xistingrminal $0,00 _- Tote I: $0,00 The original(Contract Sum) $101,461.771.00 Net change by previously authorized Change Orders $8,415,245.92 The contract sum prior to this Change Order was $109,877,016.92 The contract sum will not be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $109,877,016.92 The contract time will not be changed by this Change Order. O'"r � +P C Iatrt ra McFarland Johnson,Inc.) Key West International Airport NV2A/Gulf Keystar JV 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton,New York 13901 Key West,Florida 33040 Miami,Florida 33156 SIGNA E DATE .IGNATURE', DA E S ATURE DATE. DS NV2A/Gulf Keystar JV Page 1 of 1 ;*ted On:10/20/2023 09:33 AM DocuSign Envelope ID:B07EA9C6-AA4A-4D4F-B206-25E1BE770F9E GULF BUILDING PCO #009 NVI" I KEYST R NV2A/Gulf Keystar JV Project:20-2039-01-KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami,Florida 33156 3941 South Roosevelt Blvd. Key West,Florida 33040 Phone:(786)233.5060 Prime Contract Potential Change Order #009: Temporary Construction Partitions Inside Existing Terminal TO: Key West Internalkinal Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West,Florida 33040 Miami,Florida 33156 PCO NUMBERIREVISION: 009/0 CONTRACT., 20-2039-01-Key West International Airport Concourse A REQUEST RE. CEIVED FROM: CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) STATUS: Approved CREATED DATE: 6/712023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: 3'a $0A, .,ii,.i POTENTIAL CHANGE ORDER TITLE:Temporary Construction Partitions Inside Existing Terminal CHANGE REASON:Client Request POTENTIAL CHANGE ORDER DESCRIPTION:(The Contract/s Changed As Follows) of '_ray rsi uc'ia n "artttla its Iros6d i ,iin -Ter 'ta Description The JV is proposing to self-perform the temporary construction partitions work in a lump sum amount of$118,802.64.The cost breakdown,work phases,and locations are provided in the backup documents. -Phase A-Arrival Terminal: New Elevator, Passenger Bridge,East Carrousel, Airline Offices $34,772.59 -Phase B-Arrival Terminal: New West Baggage Claim Carrousel, and the New Vestibules $41,236.54 -Phase C-Departure Terminal: New TSA Security Checkpoint,TSA Offices $42,793.51 TOTAL: $118,802.64 ATTACHMENTS: Emall.odf Description Amount # Budget Code p i p i.VV,. 1 .4" '30 O'Te 3 "`Gheel"" i � Temporary Construction Partitions at Existing Terminal 1 "8 1 Allowance-Other W, 6,"R W Vu af�ti�rt�„yq" urrnMm Grand Total: 0 00 McFarland Johnson,Inc. Key West International Airport NV2A/Gulf Keystar JV 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Lin harntotl,,New York 13901 Key West,Florida 33040 Miami,Florida 33156 7/27/2023 SIGNATURE DATE SIGNAL RE' DATE ATU DATE NV2A/Gulf Keystar JV Page 1 of 1 Printed On:611512023 08:48 AM DocuSign Envelope ID:B07EA9C6-AA4A-4D4F-B206-25E1BE770F9E From:Antonio Pinto Sent:Wednesday, May 24,2023 4:42 PM To: Leto-Beth<Leto-Beth@ M onroeCou nty-FL.G ov>; Bethel-Tyler<Bethel-Tyler@MonroeCounty-FL.Gov>; Mercado- Pedro<Mercado-Pedro@MonroeCounty-FL.Gov>; Emie Simeone(simeone-emie@monroecounty-fl.gov)<simeone- emie@monroecounty-fl.gov>;MansourS@gulf build ing.com Cc:Saenz-Stephanie<Saenz-Stephanie@MonroeCounty-FL.Gov>;Oscar Benito<obenito@nv2agroup.com> Subject:KWIA Temporary Construction Partitions Good afternoon Beth,Tyler and Pedro, Following up on this morning's meeting, please find below a description on the approach the JV would like your concurrence to move forward. The JV included Modern Containment System (MCS) in GMP 2 to perform the temporary construction partitions for the project. GMP Amendment 2, Section 05 Bid Leveling Sheets page 2 of 60 shows total $118,802.64 for the temporary construction partitions. The JV is unable to execute an agreement with MCS, and in order not to jeopardize the project, is proposing to self-perform the temporary construction partitions work in a lump sum amount of$118,802.64 broken down as follows: • Phase A-Arrival Terminal:New Elevator, Passenger Bridge,East Carrousel,Airline Offices o Temporary construction partitions at the Baggage Claim Room and Hold Room at the Arrivals Terminal First Floor for$34,772.59 including the new elevator construction, new passenger bridge construction, new east baggage claim carrousel, and Airline's offices. Please see pages 4 and 5 of 8 of the Terminal Improvements Phasing Plan Revision 8 dated 10/28/2022. • Phase B-Arrival Terminal: New West Baggage Claim Carrousel,and the New Vestibules o Temporary construction partitions at the Baggage Claim Room at the Arrivals Terminal First Floor for$41,236.54 including the new west baggage claim carrousel, and the new vestibules. Please see page 7 of 8 of the Terminal Improvements Phasing Plan Revision 8 dated 10/28/2022. • Phase C- Departure Terminal: New TSA Security Checkpoint,TSA Offices o Temporary construction partitions at the Departure Terminal Second Floor for$42,793.51 including the new TSA Security Checkpoint,and the new TSA offices. Please see page 8 of 8 of the Terminal Improvements Phasing Plan Revision 8 dated 10/28/2022. The temporary construction partitions work in the current Schedule of Values (SOV) are included in line-item MOT/Movement of Passengers for GMP 2(Phase A and B-Terminal Improvements First Floor), and GMP 4 (Phase C-Terminal Improvements Second Floor). Please review this issue and let us know if you have questions or require additional information. Regards, Antonio Pinto 5450 MacDonald Ave., Suite 3 Key West, FL 33040 C 305.202.0610 E alginto nv2a rou .c m N 0 Ar �"� GULF HIIILONN'G KEYST