06th Change Order 12/04/2023 DocuSign Envelope ID:523AO3D9-COE1-458F-A1D9-1B5DC20A2172 M.CA.INSTR,8800,2 Enclosure(1) 3/28/2017 Page 3 MONROE COUNTY/ENGINEERING/PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECTTITLE: KWIA Concourse A&Terminal Improvements CHANGE ORDER NO.: 006 INITIATION DATE: 9/5/2023 TO CONTRACTOR: NVWGulf Keystar JV CONTRACT DATE: 8/17/2022 The Contract is changed as follows: The Original(Contract Sum)(Guaranteed Maxium Price) $ 101,461,771.00 Net change by previously authozied Change Order $ 8,415,245.92 The(Contract Sum)(Guaranteed Mxium Price)prior to this Chage order was $ 109,877,016.92 The(Contract Sum)(Guaranteed Mxium Price)will be{unchaiui nged by this Change Order 0 The new(Contract Sum)(Guaranteed Mxium Price) including this Change Order is $ 109,877,016.92 The Contract Time will be(asvrctwn ged)by 0 days The date of Substantial Completion as of the date of this Change Order is 3/9/202.6 Detailed Description of charge order and justification: Per the attached approved PCO#010,1V will self-perform the Passenger Tunnels modifications for a lump sum amount of$136,967.36.The cost breakdown is provided in the backup document. POTENTIAL CHANGE ORDERS IN THIS CHANGE CPRDER.. PCO# I Title Schedule Impact Amount 010 1 Passenger Tunnels Phase 2 0 0 Total: 0 This change order is 0.00%of the original contract price. Not valid until signed by Owner,Architect(if applicable),and Contractor DocuSign-ed by: ARCHITECT: ..5 4' 11/30/2023 10:47:11 PST Ft�cxcuSMpned by: DATE: u a �. s 1 2023 20:38:29 PST CONTRACTORS: 01?b().y3rSYA"a'SiSv..._ DATE: DIRECTOR ENGINEERING: N/A DATE: DIRECTOR PROJECT MANAGEMENT: N/A DATE: Executive Director of Airports II ..„ D .. COUNTY/DEPUTY ADMINISTRATOR �" � „� 12.4.2023 7 DATE: 09 DS NROE couNTY ATTO NEY �µ Afp� ROVE[ � FORM AM'7 NTY ATTORNEY Date 12/1/23 DocuSign Envelope ID:523A03D9-00E1-458F-A1D9-1B5DC20A2172 1 NV �'^ GULF BI11L G6hC t KEYST P PCCO #006 NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements Program 9100 South Dadeland Blvd,Suite 600 3941 South Roosevelt Blvd. Miami,Florida 33156 Key West,Florida 33040 Phone:(786)233-5060 Prime Contract Change Order #006: Passenger Tunnels Phase 2 TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West,Florida 33040 Miami, Florida 33156 DATE CREATED: 9/05/2023 CREATED BY., Mansour Sodagari(NV2A/Gulf Keystar JV) CONTRACT STATUS: Approved REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: 1012012023 INVOICED DATE: PAID DATE:. SCHEDULE IMPACT: EXECUTED' NO REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 20-2039-01:Key West International Airport TOTAL AMOUNT: $0.00 Concourse A DESCRIPTION: Per the attached approved PCO#010,JV is willing to self-perform the Passenger Tunnels modifications for a lump sum amount of$136.967.36.The cost breakdown is provided in the backup document. Mobilization 20% $27,393.47 Modify 7 new tunnels 35% $47,938.58 Relocate existing 7 tunnels 20% $27,393.47 Demo existing ramps and infrastructure 5% $6,848.37 Reconfigure construction fence 5% $6,848.37 Prepare temporary pavement 4% $6,848.37 Transport&install 14 tunnels 4% $5,478.69 Construct ramps and infrastructure 3% $4,109.02 Final connections and inspections 2% $2,739.35 Temporary pavement striping 1% $1,369.67 TOTAL $136,967.36 ATTACHMENTS: oy POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO 010 P# s a seng Title Schedule Impact Amount $0.0..._ er Tunnels Phase 2 The original(Contract Sum) $101,461,771.00 Net change by previously authorized Change Orders $8,415,245.92 The contract sum prior to this Change Order was $109,877,016.92 The contract sum will not be changed by this Change Order in the amount of $0.00 The new contract sum including this Change Order will be $109,877,016.92 The contract time will not be changed by this Change Order. DS DS DS NV2A/Gulf Keystar JV Page 1 of 2 �� Printed On:10/20/2023 09:34 AM DocuSign Envelope ID:523A03D9-COE1-458F-A1D9-lB5DC20A2172 our euaorbc PCCO #006 KEY5T I I star JV (McFarland Johnson,Inc.) Key West International Airport NV2AIGulf Ke Y 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton,New York 13901 Key West,Florida 33040 Miami,Florida 33156 1 SI6NATLI D is I NATURE D- ATUR [1AIF. NV2A/Gulf Keystar JV Page 2 of 2 inted On:1012012023 09:34 AM DocuSign Envelope ID:523AO3D9-COE1-458F-A1D9-lB5DC2OA2172 am V Tr J=Sla GULF BUILDING PCO #010 N '' 1k KEYST R NV2A/Gulf Keystar JV Project:20-2039-01-KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Mlaml,Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 y Ke West,Florida 33040 Prime Contract Potential Change Order #010: Passenger Tunnels Phase 2 TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West,Florida 33040 Miami,Florida 33156 PCO NUMBERIREVISION: 010/0 CONTRACT: 20-2039.01-Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY: Mansour Sodagari(NV2AIGulf Keystar JV) STATUS: Approved CREATED DATE: 6/7/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: �'y �� $0 00 POTENTIAL CHANGE ORDER TITLE:Passenger Tunnels Phase 2 CHANGE REASON:Client Request POTENTIAL CHANGE ORDER DESCRIPTION:(The Contract Is Changed As Follows) E1491=21VI 0MIAP18902 Description The JV is willing to self-perform the Passenger Tunnels modifications for a lump sum amount of$136,967.36-The cost breakdown is provided in the backup document. Mobilization 20% $27,393.47 Modify 7 new tunnels 35% $47.938.58 Relocate existing 7 tunnels 20% $27,393.47 Demo existing ramps and infrastructure 5% $6,848.37 Reconfigure construction fence 5% $6,848.37 Prepare temporary pavement 4% $6,848.37 Transport&install 14 tunnels 4% $5,478.69 Construct ramps and infrastructure 3% $4,109.02 Final connections and inspections 2% $2,739.35 Temporary pavement striping 1% $1,369.67 TOTAL $136,967.36 ATTACHMENTS: Email.odf NV2A/Gulf Keystar JV Page 1 of 2 Printed On,6/15/2023 08:44 AM DocuSign Envelope ID:523AO3D9-COEi-458F-A1D9-1B5DC2OA2172 w-w,.,,,,.... .- .. em = V'� TM GULF BUILDING PCO #010 ME OKI � -VST R MIN# Budget Code Description�== Amount 1 01-.55.28.50.0 Seacrate Passengers Movement.Other Passenger Tunnels Phase 2 y im S0 "V1. Grand Total: �•3 V.1 ��0� McFarland Johnson,Inc. Key West International Airport NV2A/Gulf Keystar JV 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton,New York 13901 Key West,Florida 33040 Miami,Florida 33156 S6GNATtt 7DA/E023 tCNAT RE DATE tdATtt DATE NV2A/Gulf Keystar JV Page 2 of 2 Printed On:6/15/2023 08:44 AM DocuSign Envelope ID:523AO3D9-COEI-458F-A1D9-IB5DC2OA2172 ............. LEGEP&. W I nt Z, "aWIN, 0 z IN.= .................. Z AIRSIDE RE w., PHAS11111 PLANi, PHAS MIN, GAV �F', DocuSign Envelope ID:523AO3D9-COE1-458F-A1D9-1B5DC2OA2172 Int ............. w . < < zi -Val P --j AIRSIDE 4W PHASING PLAN PHASE2 G-1 1