06th Change Order 12/04/2023 DocuSign Envelope ID:523AO3D9-COE1-458F-A1D9-1B5DC20A2172
M.CA.INSTR,8800,2
Enclosure(1)
3/28/2017
Page 3
MONROE COUNTY/ENGINEERING/PROJECT MANAGEMENT
CONTRACT CHANGE ORDER
PROJECTTITLE: KWIA Concourse A&Terminal Improvements CHANGE ORDER NO.: 006
INITIATION DATE: 9/5/2023
TO CONTRACTOR: NVWGulf Keystar JV CONTRACT DATE: 8/17/2022
The Contract is changed as follows:
The Original(Contract Sum)(Guaranteed Maxium Price) $ 101,461,771.00
Net change by previously authozied Change Order $ 8,415,245.92
The(Contract Sum)(Guaranteed Mxium Price)prior to this Chage order was $ 109,877,016.92
The(Contract Sum)(Guaranteed Mxium Price)will be{unchaiui nged by this Change Order 0
The new(Contract Sum)(Guaranteed Mxium Price) including this Change Order is $ 109,877,016.92
The Contract Time will be(asvrctwn ged)by 0 days
The date of Substantial Completion as of the date of this Change Order is 3/9/202.6
Detailed Description of charge order and justification:
Per the attached approved PCO#010,1V will self-perform the Passenger Tunnels modifications for a lump sum amount of$136,967.36.The cost
breakdown is provided in the backup document.
POTENTIAL CHANGE ORDERS IN THIS CHANGE CPRDER..
PCO# I Title Schedule Impact Amount
010 1 Passenger Tunnels Phase 2 0 0
Total: 0
This change order is 0.00%of the original contract price.
Not valid until signed by Owner,Architect(if applicable),and Contractor DocuSign-ed by:
ARCHITECT: ..5 4' 11/30/2023 10:47:11 PST
Ft�cxcuSMpned by: DATE:
u a �.
s 1 2023 20:38:29 PST
CONTRACTORS:
01?b().y3rSYA"a'SiSv..._ DATE:
DIRECTOR ENGINEERING: N/A
DATE:
DIRECTOR PROJECT MANAGEMENT: N/A
DATE:
Executive Director of Airports II
..„ D
..
COUNTY/DEPUTY ADMINISTRATOR �" � „� 12.4.2023
7 DATE:
09 DS
NROE couNTY ATTO NEY
�µ Afp� ROVE[ � FORM
AM'7 NTY ATTORNEY
Date 12/1/23
DocuSign Envelope ID:523A03D9-00E1-458F-A1D9-1B5DC20A2172
1 NV �'^ GULF BI11L G6hC t
KEYST P PCCO #006
NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements
Program
9100 South Dadeland Blvd,Suite 600
3941 South Roosevelt Blvd.
Miami,Florida 33156 Key West,Florida 33040
Phone:(786)233-5060
Prime Contract Change Order #006: Passenger Tunnels Phase 2
TO: Key West International Airport FROM: NV2A/Gulf Keystar JV
3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600
Key West,Florida 33040 Miami, Florida 33156
DATE CREATED: 9/05/2023 CREATED BY., Mansour Sodagari(NV2A/Gulf Keystar JV)
CONTRACT STATUS: Approved REVISION: 0
DESIGNATED REVIEWER: REVIEWED BY:
DUE DATE: REVIEW DATE: 1012012023
INVOICED DATE: PAID DATE:.
SCHEDULE IMPACT: EXECUTED' NO
REVISED SUBSTANTIAL SIGNED CHANGE ORDER
COMPLETION DATE: RECEIVED DATE:
CONTRACT FOR: 20-2039-01:Key West International Airport TOTAL AMOUNT: $0.00
Concourse A
DESCRIPTION:
Per the attached approved PCO#010,JV is willing to self-perform the Passenger Tunnels modifications for a lump sum amount of$136.967.36.The
cost breakdown is provided in the backup document.
Mobilization 20% $27,393.47
Modify 7 new tunnels 35% $47,938.58
Relocate existing 7 tunnels 20% $27,393.47
Demo existing ramps and infrastructure 5% $6,848.37
Reconfigure construction fence 5% $6,848.37
Prepare temporary pavement 4% $6,848.37
Transport&install 14 tunnels 4% $5,478.69
Construct ramps and infrastructure 3% $4,109.02
Final connections and inspections 2% $2,739.35
Temporary pavement striping 1% $1,369.67
TOTAL $136,967.36
ATTACHMENTS:
oy
POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER:
PCO
010 P# s a seng Title Schedule Impact Amount
$0.0..._
er Tunnels Phase 2
The original(Contract Sum) $101,461,771.00
Net change by previously authorized Change Orders $8,415,245.92
The contract sum prior to this Change Order was $109,877,016.92
The contract sum will not be changed by this Change Order in the amount of $0.00
The new contract sum including this Change Order will be $109,877,016.92
The contract time will not be changed by this Change Order.
DS DS DS
NV2A/Gulf Keystar JV Page 1 of 2 �� Printed On:10/20/2023 09:34 AM
DocuSign Envelope ID:523A03D9-COE1-458F-A1D9-lB5DC20A2172
our euaorbc PCCO #006
KEY5T
I
I
star JV
(McFarland Johnson,Inc.) Key West International Airport NV2AIGulf Ke Y
49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600
Binghamton,New York 13901 Key West,Florida 33040 Miami,Florida 33156
1
SI6NATLI D is I NATURE D- ATUR [1AIF.
NV2A/Gulf Keystar JV Page 2 of 2 inted On:1012012023 09:34 AM
DocuSign Envelope ID:523AO3D9-COE1-458F-A1D9-lB5DC2OA2172
am V Tr J=Sla GULF BUILDING PCO #010
N '' 1k
KEYST R
NV2A/Gulf Keystar JV Project:20-2039-01-KWIA Concourse A and Terminal Improvements
9100 South Dadeland Blvd,Suite 600 Program
Mlaml,Florida 33156 3941 South Roosevelt Blvd.
Phone:(786)233-5060 y
Ke West,Florida 33040
Prime Contract Potential Change Order #010: Passenger Tunnels Phase 2
TO: Key West International Airport FROM: NV2A/Gulf Keystar JV
3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600
Key West,Florida 33040 Miami,Florida 33156
PCO NUMBERIREVISION: 010/0 CONTRACT: 20-2039.01-Key West International
Airport Concourse A
REQUEST RECEIVED FROM: CREATED BY: Mansour Sodagari(NV2AIGulf Keystar
JV)
STATUS: Approved CREATED DATE: 6/7/2023
REFERENCE: PRIME CONTRACT None
CHANGE ORDER:
FIELD CHANGE: No
LOCATION: ACCOUNTING METHOD: Amount Based
SCHEDULE IMPACT: PAID IN FULL: No
EXECUTED: No SIGNED CHANGE ORDER
RECEIVED DATE:
TOTAL AMOUNT: �'y �� $0 00
POTENTIAL CHANGE ORDER TITLE:Passenger Tunnels Phase 2
CHANGE REASON:Client Request
POTENTIAL CHANGE ORDER DESCRIPTION:(The Contract Is Changed As Follows)
E1491=21VI 0MIAP18902
Description
The JV is willing to self-perform the Passenger Tunnels modifications for a lump sum amount of$136,967.36-The cost
breakdown is provided in the backup document.
Mobilization 20% $27,393.47
Modify 7 new tunnels 35% $47.938.58
Relocate existing 7 tunnels 20% $27,393.47
Demo existing ramps and infrastructure 5% $6,848.37
Reconfigure construction fence 5% $6,848.37
Prepare temporary pavement 4% $6,848.37
Transport&install 14 tunnels 4% $5,478.69
Construct ramps and infrastructure 3% $4,109.02
Final connections and inspections 2% $2,739.35
Temporary pavement striping 1% $1,369.67
TOTAL $136,967.36
ATTACHMENTS:
Email.odf
NV2A/Gulf Keystar JV Page 1 of 2 Printed On,6/15/2023 08:44 AM
DocuSign Envelope ID:523AO3D9-COEi-458F-A1D9-1B5DC2OA2172 w-w,.,,,,.... .- ..
em = V'� TM GULF BUILDING PCO #010
ME OKI
� -VST R
MIN# Budget Code Description�== Amount
1 01-.55.28.50.0 Seacrate Passengers Movement.Other Passenger Tunnels Phase 2 y im S0 "V1.
Grand Total: �•3 V.1 ��0�
McFarland Johnson,Inc. Key West International Airport NV2A/Gulf Keystar JV
49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600
Binghamton,New York 13901 Key West,Florida 33040 Miami,Florida 33156
S6GNATtt 7DA/E023 tCNAT RE DATE tdATtt DATE
NV2A/Gulf Keystar JV Page 2 of 2 Printed On:6/15/2023 08:44 AM
DocuSign Envelope ID:523AO3D9-COEI-458F-A1D9-IB5DC2OA2172
.............
LEGEP&.
W I nt
Z,
"aWIN,
0
z
IN.=
..................
Z AIRSIDE RE
w., PHAS11111
PLANi,
PHAS
MIN,
GAV
�F',
DocuSign Envelope ID:523AO3D9-COE1-458F-A1D9-1B5DC2OA2172
Int
.............
w .
<
<
zi
-Val
P
--j
AIRSIDE
4W
PHASING
PLAN
PHASE2
G-1 1