Release of Contingency Funds #084 BOARD OF COUNTY COMMISSIONERS
County of Monroe . Mayor Holly Merrill Raschein,District 5
The Florida Keys Mayor Pro Tem James K. Scholl,District 3
h
Craig Cates,District 1
Michelle Lincoln,District 2
David Rice,District 4
Memorandum
DATE: 11/20/2023
TO: BOCC
Digitally signed by Kevin
�� V�_,�` c._._ G.Wilson,P.E.
FROM: Kevin G. Wilson P.E. Date:2o2a11.2o
20:09:01-05'00'
SUBJECT: Release of Contingency Funds
Included with this memo is the proposed Release of Contingency Funds 484 for the Fl Keys Marathon
Airport Non-Aeronautical Use Building (EOC)project. This does not affect the contract amount, but
releases contingency funds already included in the Guaranteed Maximum Price for work that was either
not foreseen or for which a price could not be determined at the time of contract execution.
The amount requested is $1,781.28. The attached Release of Owner Contingency Request provides the
details. This is being provided to ensure the BOCC is aware of this change. Please contact me with any
questions. If there are none with the normal 24-hour window, I will approve the request.
County Of Monroe ROARD OF COUNTY ccM NIISSIONERS
t Nfay r Holly Merrill Rascheicn,'District 5
The Florida Keys 1tfayor Pro T'emmm James K.Scholl,D stricl,3
` Craig Cates,District 1
Ifichelle,Lincoln,District 2
��✓ Da Ed Rice,D strict 4
MEMORANDUM
DATE: 11/17/2023
TO: County Administrator
THRU: Director, Project Management
FROM: Jordan Salinger
SUBJECT: Release of Contingency for: FL KEYS MARATHON AIRPORT NON-
AERONAUTICAL USE BUILDING (EOC)
Action Requested: Approval for RELEASE of contingency funds in the
amount of $ 1,781.28 as outlined below.
Basis for Recommended Action:
1. The requested release does not increase the total cost of the project as approved by the
BOCC, and it will have no impact to contract time.
2. The scope for which the release is requested is within the intended project scope.
3. The release is not based upon an error or omission by the designer or the general
contractor.
Background:
This is a cost change to the Contingency related to RFI 282, dated 11/15/2023, to document the owner
requested purchase of a sludge pump to facilitate the transfer of solids from the sanitary holding tanks
to the lift station. The goal of this would be to be able to eliminate the need for a pump truck during
storm events.
Approved l y Mai h lill Quarles
11/1 712023 11-11-55 AM
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 11-20-2023
Ajax Building Company Architects Design Group
Digitally signed by Cary Knight Digitally signed by Kevin G.
Cary Kn i g t Date:2023.7 7.20 7 7:7 3:76 ' �/y� Wilson,P.E.
-05'00' Date:2023.11.28 08:13:27-05'00'
Cary Knight,Director of Project Management Kevin Wilson,Assistant County Administrator
PSI Technologies Inc Invoice
Date Invoice
TECH1 Sales Offices 11/8/2023 P8368
NDLDGIM3 Ft Lauderdale Palm Beach Orlando Tampa Jacksonville Terms Due Date
wwuvpsi-tediinc.cam (954)952-6378 (305)998-1371 (407)451-4000 (954)410-0175 (904)588-2132
COD 11/9/2023
BILL TO SHIP TO
Ajax Building Company Ajax Building Company
7280 Overseas Hwy
Marathon, FL 33050
Attn: Marshall Quarles
marshall.quarles@ajaxbuilding.com
321-507-2113
Customer PO Ship Via Tracking Number Sales Rep
Credit Card Delivery House Account
Item Description Qty Unit Price Amount
CPSEV512A Champion 2"Sewage Pump 1 $1,290.00 $1,290.00
1/2hp,3450rpm, 115V,20ft Cable
110GR-200 PVC Suction/Discharge Hose 1 $367.00 $367.00
includes 2" Male NPT&2" Female Camlock fittings
banded to hose
Subtotal $1,657.00
Remittance Il clI� Edddorcss�c:.m. Duevoitd do mot lio recent„° Tax $124.28
a,ctoi..�to no increaseEar 221 normd2A 2 Ill�d„omIIl�in
Si151 IN information iear.Ill�l�ollloFoie„ Ions Total $1,781.28
Plantation,IV��I� IIII�IIII IRoad,24 `Guit��� � W, tll,222t ar llllll„oi �o�a9" 'E222 ii„ng1,o ERM22g
uor fi nao,ce del d.oton om Peor oom„ Illlllym Iht@ ,i t cl°iic c��u°n oiom o....�
Prepared by: Billy Decherniss bid p i_-tec inc.ccrfr'n (407)451-4000
Please note:Credit cards will be accepted at the point of sale without a fee. Credit card payments made after point of sale on open
account balances will be subject to a 3.5%convenience fee.
11/8/23, 11:36AM Print
Transaction Information
Merchant Name
PSI Technologies Inc
Merchant Address
151 N Nob Hill Rd, Ste 293 Plantation, FL 33324, US
Merchant E-mail
accounting@psi-techinc.com
Status
Approved
Name
Marshall Quarles
Amount Paid
$1781.28
Date
11/8/2023
Payment method
Credit card
Card Information
Card Type
American Express
Card Number
xxxxxxxxxxx1852
Payment IDs
Auth Code
262936
Transaction ID
MU0191653965
No additional transfer fees or taxes apply.
Payment services brought by:
Intuit Payments Inc.
2700 Coast Avenue, Mountain View, CA 94043
Phone number 1-888-536-4801
NMLS 91098819
For more information about Intuit Payments' money transmission licenses,please visit
https://www.intiit.com/legal/licenses/payment-licenses/.
about:blank 1/1
AaxAjax Building Company,LLC Project:202011 Monroe County FL Keys Marathon
109 Commerce Blvd Airport NAUB EOC
Oldsmar, Florida 34677 7280 Overseas Highway
P:+18137923900 Marathon, Florida 33050
RFI #Con-282: Sludge Pump Confirmation
Status Closed on 11/15/23
To Mickey Pruitt(Architects Design Group) From Jeffrey Whipple(Ajax Building Company, LLC)
Devon Ayers(K2M Design) 424 SW 7th Terrace
Gainesville, Florida 32601
Date Initiated Oct 30,2023 Due Date Nov 4,2023
Location Project Stage Course of Construction
Cost Impact TBD Schedule Impact TBD
Spec Section Cost Code
Drawing Number N/A Reference
Linked Drawings
Received From Marshall Quarles(Ajax Building Company, LLC)
Copies To Giselle Albisu(TLC Engineering Solutions(Jax)),Victor Carrasco(TLC Engineering Solutions(Jax)), Kristina Connelly(Cardno),
Donald Harcrow(Ajax Building Company, LLC), Cary Knight(Monroe County),Travis Mauldin(Ajax Building Company, LLC),
Juan Perez(TLC Engineering Solutions(Jax)),Marshall Quarles(Ajax Building Company, LLC), Banistka Rodriguez(Architects
Design Group),Jordan Salinger(Monroe County), Denise Saltzman(TLC Engineering Solutions(Jax)),Steven Sanders(Monroe
County),Scot Stuart(Cardno), Daniel Taylor(Architects Design Group),Cary Vick(Monroe County)
Activity/
Question Question from Jeffrey Whipple Ajax Building Company,LLC on Monday, Oct 30, 2023 at 09:59 AM EDT
This RFI is to document the owner requested purchase of a sludge pump to facilitate the transfer of solids from the sanitary
holding tanks to the lift station.This would eliminate the need for a pump truck during storm events. Please review the
attached product data for the 100GPM 2"Champion Pump and confirm acceptance.
Attachments
Champion Pump PD.pdf
............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Official Response Response from Devon Ayers K2M Design on Wednesday, Nov 15, 2023 at 03:45 PM EST
See attached.
Attachments
ADG Response RFl#282.pdf
Ajax Building Company, LLC Pagel of 1 Printed On: Nov 15,2023 04:07 PM EST
AdXAjax Building Company,LLC Project:202011 Monroe County FL Keys Marathon
109 Commerce Blvd Airport NAUB EOC
Oldsmar, Florida 34677 7280 Overseas Highway
P:+18137923900 Marathon, Florida 33050
RFI #Con-282: Sludge Pump Confirmation
Status Open
To Mickey Pruitt(Architects Design Group) From Jeffrey Whipple(Ajax Building Company, LLC)
Devon Ayers(K2M Design) 424 SW 7th Terrace
Gainesville, Florida 32601
Date Initiated Oct 30,2023 Due Date Nov 4,2023
Location Project Stage Course of Construction
Cost Impact TBD Schedule Impact TBD
Spec Section Cost Code
Drawing Number N/A Reference
Linked Drawings
Received From Marshall Quarles(Ajax Building Company, LLC)
Copies To Giselle Albisu(TLC Engineering Solutions(Jax)),Victor Carrasco(TLC Engineering Solutions(Jax)), Kristina Connelly(Cardno),
Donald Harcrow(Ajax Building Company, LLC), Cary Knight(Monroe County),Travis Mauldin(Ajax Building Company, LLC),
Juan Perez(TLC Engineering Solutions(Jax)),Marshall Quarles(Ajax Building Company, LLC), Banistka Rodriguez(Architects
Design Group),Jordan Salinger(Monroe County), Denise Saltzman(TLC Engineering Solutions(Jax)),Steven Sanders(Monroe
County),Scot Stuart(Cardno), Daniel Taylor(Architects Design Group),Cary Vick(Monroe County)
Activity/
Question Question from Jeffrey Whipple Ajax Building Company,LLC on Monday, Oct 30, 2023 at 09:59 AM EDT
This RFI is to document the owner requested purchase of a sludge pump to facilitate the transfer of solids from the sanitary
holding tanks to the lift station.This would eliminate the need for a pump truck during storm events. Please review the
attached product data for the 100GPM 2"Champion Pump and confirm acceptance.
Attachments
Champion Pump PD.pdf
Awaiting an Official Response
Ajax Building Company, LLC Pagel of 1 Printed On: Oct 30,2023 10:33 AM EDT
IIII
FEATURES/BENEFITS
ri ¢r
PERFORMANCE IMPELLER DESIGN
Heads up to 77 TDH Vortex cast iron impeller
Flows up to 217 GPM -Designed to help reduce clogging by foreign
material
MOTOR(Single Phase)
High efficient, 115v or 230v,oil filled, POWER CORD
permanent split capacitor motor with upper Sealed entry quick disconnect power cords
and lower ball bearings and thermal overload Prevents water from entering the motor
protection housing through a cut cord
Constant bearing lubrication Easy to replace in the field without having
Maximum motor cooling to run a new power cord
Runs cooler and lasts longer Available in lengths up to 100'
Internal overload protection
Quiet operation SWITCH
Fasteners and shaft made from rugged, Piggy-back switch design(Single Phase)
corrosion resistant stainless steel Defective switches can be diagnosed over
the phone
MOTOR(3 Phase) Pump can be operated manually or
230v or 460v,requires control panel supplied with other piggy-back switches
Switch can be replaced without having to
SEAL DESIGN replace the pump
Single,mechanical, running in oil filled
chamber allowing dry run and cooling APPLICATIONS
Optional double seal models available that Residential developments,commercial
provides additional protection and optional developments and wastewater applications 1/2.2 II IIIIl cash uu t:)u"'n cullcurueumclillclle Ilcuffupc that
moisture sensing capabilities
Optional seal failure feature that will alert haillde up fit:)2"scfllidc aii d have a
you when the seal has failed 2"c)r 3"discharge
PERFORMANCE CURVE
90
80
70
60
0 50
r
a
v
x
-75 40 a II°`I\II II°tlD
0
30
20
10 UI 3I1 1,r'"I1 0
0
0 50 100 150 200
Gallons per Minute,GPM
rev010923
T mum uuul CAL T
DISCHARGE 2"NPT Vertical Standard,3"(Optional)
LIQUID TEMPERATURE 140 Degrees F.(Intermittent) d
MOTOR HOUSING Cast Iron
VOLUTE Cast Iron
SEAL PLATE Cast Iron ° ° 12.35
6.2.5
IMPELLER Ductile Iron
SOLIDS HANDLING 2"
SHAFT 416 Stainless Steel
SEAL PLATE Cast Iron 1.94
SHAFT SEAL(SINGLE SEAL) Carbon-Ceramic/Buna-N-Elastomer 2°'NPT
300 Series Stainless Steel-Hardware
SHAFT SEAL(DOUBLE SEAL) Tandem Double Mechanical Upper& a.25...........................
Lower/Carbon-Ceramic,Buna-N-Elasto- _.
mer 300 Series Stainless Steel-Hardware
BEARINGS(UPPER&LOWER) Single Row,Ball,Oil Lubricated C7
HARDWARE 300 Series Stainless Steel
O-RINGS Buna-N
CORD Quick disconnect 20'cord standard.Up
to 30'with a plug and 100'available
without a plug.3 phase 30'cord stan-
dard. UL/CSA(SJOW)14/3(.375 OD)
*UL/CSA(SO)Cord 14 Ga.(.60)
w
MOTOR(SINGLE PHASE) 3450 RPM.60 Hz Includes Overload
Protection in the Motor.Oil Filled,
Class F,PSC Permanent Split Capacitor ........
MOTOR(Three Phase) 3450 RPM.60 Hz,Oil Filled,Requires
Overload Protection to be Included
in Control Panel
_ r
OPTIONAL SEAL FAILURE 20'Length Standard UL/CSA(SJTW)
16/3(.330 OD)
MODEL(S) INFORMATION
CPSEV512(A)+ 1/2 115 1 14,5 20' M (Wide-Angle Float) No
CPSEV522(A) 1/2 230 1 7.3 20' M (Wide-Angle Float) No
CPSEV533 1/2 230 3 5.3 30' Manual Yes
*CPSEV543 1/2 460 3 2.7 30' Manual Yes
CPSEV1022(A) 1 208/230 1 13.9/12.6 20' M (Wide-Angle Float) No
CPSEV1033 1 208/230 3 8.5/7.7 30' Manual Yes
*CPSEV1043 1 460 3 3.8 30' Manual Yes
CPSEV1522(A) 1-1/2 208/230 1 14.7/13.3 20' M (Wide-Angle Float) No
CPSEV1533 1-1/2 208/230 3 10.4/9.4 30' Manual Yes
*CPSEV1543 1-1/2 460 3 4.7 30' Manual Yes
CPSEV2022(A) 2 230 1 18 20' M (Wide-Angle Float) No
CPSEV2033 2 208/230 3 12.1/11 30' Manual Yes
*CPSEV2043 2 460 3 5.5 30' Manual Yes
CPSEVH2O22(A) 2 230 1 18 20' M (Wide-Angle Float) No
CPSEVH2O33 2 208/230 3 12.1/11 30' Manual Yes
*CPSEVH2O43 2 460 3 5.5 30' Manual Yes
IIII
FEATURES/BENEFITS
ri ¢r
PERFORMANCE IMPELLER DESIGN
Heads up to 77 TDH Vortex cast iron impeller
Flows up to 217 GPM -Designed to help reduce clogging by foreign
material
MOTOR(Single Phase)
High efficient, 115v or 230v,oil filled, POWER CORD
permanent split capacitor motor with upper Sealed entry quick disconnect power cords
and lower ball bearings and thermal overload Prevents water from entering the motor
protection housing through a cut cord
Constant bearing lubrication Easy to replace in the field without having
Maximum motor cooling to run a new power cord
Runs cooler and lasts longer Available in lengths up to 100'
Internal overload protection
Quiet operation SWITCH
Fasteners and shaft made from rugged, Piggy-back switch design(Single Phase)
corrosion resistant stainless steel Defective switches can be diagnosed over
the phone
MOTOR(3 Phase) Pump can be operated manually or
230v or 460v,requires control panel supplied with other piggy-back switches
Switch can be replaced without having to
SEAL DESIGN replace the pump
Single,mechanical, running in oil filled
chamber allowing dry run and cooling APPLICATIONS
Optional double seal models available that Residential developments,commercial
provides additional protection and optional developments and wastewater applications 1/2.2 II IIIIl cash uu t:)u"'n cullcurueumclillclle Ilcuffupc that
moisture sensing capabilities
Optional seal failure feature that will alert haillde up fit:)2"scfllidc aii d have a
you when the seal has failed 2"c)r 3"discharge
PERFORMANCE CURVE
90
80
70
60
0 50
r
a
v
x
-75 40 a II°`I\II II°tlD
0
30
20
10 UI 3I1 1,r'"I1 0
0
0 50 100 150 200
Gallons per Minute,GPM
rev010923
T mum uuul CAL T
DISCHARGE 2"NPT Vertical Standard,3"(Optional)
LIQUID TEMPERATURE 140 Degrees F.(Intermittent) d
MOTOR HOUSING Cast Iron
VOLUTE Cast Iron
SEAL PLATE Cast Iron ° ° 12.35
6.2.5
IMPELLER Ductile Iron
SOLIDS HANDLING 2"
SHAFT 416 Stainless Steel
SEAL PLATE Cast Iron 1.94
SHAFT SEAL(SINGLE SEAL) Carbon-Ceramic/Buna-N-Elastomer 2°'NPT
300 Series Stainless Steel-Hardware
SHAFT SEAL(DOUBLE SEAL) Tandem Double Mechanical Upper& a.25...........................
Lower/Carbon-Ceramic,Buna-N-Elasto- _.
mer 300 Series Stainless Steel-Hardware
BEARINGS(UPPER&LOWER) Single Row,Ball,Oil Lubricated C7
HARDWARE 300 Series Stainless Steel
O-RINGS Buna-N
CORD Quick disconnect 20'cord standard.Up
to 30'with a plug and 100'available
without a plug.3 phase 30'cord stan-
dard. UL/CSA(SJOW)14/3(.375 OD)
*UL/CSA(SO)Cord 14 Ga.(.60)
w
MOTOR(SINGLE PHASE) 3450 RPM.60 Hz Includes Overload
Protection in the Motor.Oil Filled,
Class F,PSC Permanent Split Capacitor ........
MOTOR(Three Phase) 3450 RPM.60 Hz,Oil Filled,Requires
Overload Protection to be Included
in Control Panel
_ r
OPTIONAL SEAL FAILURE 20'Length Standard UL/CSA(SJTW)
16/3(.330 OD)
MODEL(S) INFORMATION
CPSEV512(A)+ 1/2 115 1 14,5 20' M (Wide-Angle Float) No
CPSEV522(A) 1/2 230 1 7.3 20' M (Wide-Angle Float) No
CPSEV533 1/2 230 3 5.3 30' Manual Yes
*CPSEV543 1/2 460 3 2.7 30' Manual Yes
CPSEV1022(A) 1 208/230 1 13.9/12.6 20' M (Wide-Angle Float) No
CPSEV1033 1 208/230 3 8.5/7.7 30' Manual Yes
*CPSEV1043 1 460 3 3.8 30' Manual Yes
CPSEV1522(A) 1-1/2 208/230 1 14.7/13.3 20' M (Wide-Angle Float) No
CPSEV1533 1-1/2 208/230 3 10.4/9.4 30' Manual Yes
*CPSEV1543 1-1/2 460 3 4.7 30' Manual Yes
CPSEV2022(A) 2 230 1 18 20' M (Wide-Angle Float) No
CPSEV2033 2 208/230 3 12.1/11 30' Manual Yes
*CPSEV2043 2 460 3 5.5 30' Manual Yes
CPSEVH2O22(A) 2 230 1 18 20' M (Wide-Angle Float) No
CPSEVH2O33 2 208/230 3 12.1/11 30' Manual Yes
*CPSEVH2O43 2 460 3 5.5 30' Manual Yes
E xx
� a a
z z
O N N N
d N N O O
NNN ONN OMN OMN OMN OMN OMN OMN OMN OMN OMN OMN OOO MN -0 OMN OMN OMN OMN OMN OMN OMN OMN OMN OMN OMN OMN OMN OMN MN MN MN MN MN MN NM MN MN MN MN MN MN MN MN MN MN MN O O O O O O O O O O O O
O N \\\\N N N N N N N N N N N y N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N
txQ
a \\\\\N N M N N N N N N N N d N N N N \\N N N N N N N N N N N N N N \\\\N N N N N N N N
eel eel eel eel
VI
d N N N N O N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N
C L O O O O O O O O O O O O O O O O O O O O O O O O O O \O \O \O \O OO O NNNNNNN
NNNN OO OO
£ OO NN NN N NO
N N N
V � \\\\� eel eel N eel eel eel eel eel eel I� n Of N N M M eel eel Of m eel eel eel eel eel eel eel M eel I� W W W N N N 1l1 b n n n eel eel eel
b b\\\^^^^^\\\
V VI N N N N !y N N N N N N N N N M M M M a a Vf Vf Vf Vf Vf Vf Vf Vf b b b n n n
C
Ol
+ d O
C ry
O � N
V and e
� d m
O
G
O.V N
� Q 0 0 0 0 0 N m O 0 0 0 0 0 0 0 0 p 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 o 0 O O O O O O O
W O O Vf O O M b O O O O O O O O O O O O O O O O O O O O O O O O o0 O O O O O O O O O O O Vf O O O O
Z £ O O M Vf O a M N O N M Vf N O n O N O V1 N V1 N N v -eN O 0I� V1 Of N O O a N b M N O Vf O N N a 0 0 n
O O 0 V7 M eel b O eel I 00 0 00 n > 00 N n 0n 0a eel M eel e O b O a a eel M b O a a V 00 a eel Vf N 00 Vf b 00
W ¢ Vf O O a M O V;b n W N Vf a Lr M O M I: a n 0V7 0eel b M 00 a 00 0 n eel N O N N 0a eel O O 14 M
V d fp N N tD Vf O I� a Vf'ri ri O ri ri vi v'v O Vf ri M O o0 tD ri o0 ri a ri M ri n O M o0 ri M M a ri a Vf o0 ri n
} to `-'eel `-'eel eel N eel b `••'`••'eel eel eel ••••N ••••••••••••W eel I� `••'`••'eel eel eel `-'eel eel eel ••••ey ••••ey •••• ••••••••••••
LL L
V
L V
W �
m
a
0 co
O d
0 d
m _
co Q `O
O
W W
a o0
Z O N
Z
0 W
� 0 O
a W + d
L
W d m E
Z ` N N M
u 0 O M O N a
uw Z O d N N N
F
M a
d dl ell
F- O a N d 0 M M O
Z O ° Mo N a s ¢ N a
3 toO Z N u ^r, �I co C LL C W N N
c0 N - £ c E R i c c
C N N C O p y
ciNry +Ec' c3 C °Y E INy°•ii Oc isWC ao Na Q« 3 �, °CUdy'� •"YO° °
NM d C C£ Wto
u �M = O i E
QO ° OC
O O O 0 0 LL
•da Nai9 0NVoNNmudm0
C5V o$ 0f
L�aRy
•V�cO to aca E o Ny N u ' °" ym °
0 o Eo o O
w 1 EaE EO E ° ciM0y
Ca y U ° ° � cp « o 3L°q3'
zaE mwo O E°0 d to" c 0
d C •q ' d
o o
° oY m c d3,
c m c o oif •3 -° u = 5 •q L}danLdd, VyudC Yi3 jLa' C0EOy ww wd` dd •u N '•r�00 Ca�°d' —C 'm6 oMi$ C L 4E O dcd =c'$6 Nd mo°id "u yCd o
Lo 0 E °c
y 'Co1
o o m E
Jo' o 3
OcCa O Om
E Oo k O E
ovpp3i
o
d ad;? —�u3 q d iCdO .Oa3°3+ ,sF°3O tm?� WNi 3° pN 'C° pd3 p130 .° mda —ydc xWu QNy fyL Ldd N'' Y m oYi$ ma°' '«•'V"�d�'' q=VN:u°:Ii �aEg d oad Ymdy =z7F iWQVGoE 'o c c -E osd o — iL �C•c, CN L=zo md N
R3u�su d = °c u E $ c o o
oN o x c NEO
£O ° O d
d ° CNt 0uN 0 od ° 3R33O o 3 LLOn d 03 d ^ ¢ dd 6 i N 0 a0 EE y Ev
d•00 ° YcNiG ° Lo d ' Od 0° N . ` q N N ° ' °° E Q s 3 ° o EE 'ca? _ o .cdEo
d E " oo dV N °Oo E o o 0 3 W o 'o o° °e c a W °?-
•
p N C C N
O () N eMl N Vf 3 o eMl N Vaf eNl ell taD n ,�+ b M Vmf tmD V�f Oaf M W Omf 00 0 0 0 W O n .0 O^f '�-, n Y 0 eM�l N M ew�l e�l N O N N N e�l
u '� N eel eel eel V eel O eel eel eel eel eel -0 eel eel eel eel eel eel 1l1 eel eel eel N N eel eel eel eel eel eel E N E N N N N N N N a N N N U7
p V ¢ C C C C u. V O ¢ C C C C C V C twill C C N C C C C C C C N C C C VI C VI C C C C C C C eel C C C eel
d eel N M a a V7 b n W Of O eel N M a V7 b n W Of O eel N M a V7 b n W Of O eel N M a V7 b n W Of O eel N M a V7 b n W
°• O O O O O O
FV O V O V V V V V V V VVV O O O N N N N N N N N eel N N N N N N N N N N N M M M M M M M M M M a a a a a a a a
O O O O O O O O O O O O O O O O O 00000000000000000000000000000000
tom C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V
ryf eel M 00 0 M O eel I� M I� 0b V1 n 0 e N M n b n b eel I� a b V1 V1 O N a O a b 0 0 a O 0 0eel N Vf a O a n b
of N N b b W O O O , N Of W O eel M O O Vf M O Vf I� b n b W W b b V7 M M W O W b Of O O eel O O O N N O eel eel
Z O O O O O eel eel eel O eel O O eel eel eel eel eel eel eel eel eel eel eel eel eel eel eel eel eel eel eel eel eel N eel eel eel N N N N N N N N N N N
n F O O O O O O O O O O O O O O O O 00000000000000000000000000000000
eel Q V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V
a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
N
3 3 3 3 3 3 3 3
u .
E m o c m o
« « « p « « «
E G o o a a o p o 0 o Q a o 0
M M M M M M M M M M M M M M M
N M M M M M M N N N M M M M M N N N N N N N N N N N N N N N N N N N
O N N N N N N O O O N N N N N O O O O O O O O O O O O O O O O O O O
�O O O O O O O O O O O N � � � \N N
� � � N N N N N N N N N N N N
N N N N N N N N N N N \ \
\\\\\ \ \ \ \ \ \ N M M M M M M M M M M M M M M
^ Of Of Of Of Of Of � � � ^ ^ ^ ^ ^ e•I � � � N N N N N N N N N � e•I e•I e•I e•I e•I
^W W W W W W � � � Ot Ot Ot Ot Ot O � � � O O O O O O O O O � e•I e•I e•I e•I e•I
eel eel eel eel eel eel eel eel eel eel eel eel eel eel eel
M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M y
N N N N N N M M N N N N N N N M N N N N N N N N N N N N N N N N N N N N
O O O O O O N N O O O O O O O N O O O O O O O O O O O O O O O O O O O O
N N N N N N O O N N N N N N N O N N N N N N N N N N N N N N N N N N N N
Of O O Vf ^ e•I \ \ a Vf M a a W W \ N Vf Vf e•I N N N M M M tD tD M I� O O eel eel O I� t
e•I N N N N M M M e•I e•I N N N N N � N N N � � e•l e•l e•l e•l e•l e•l e•I N N M M M M N N (.7
n n n n n n W W W W W W W W W 0\t m m m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N
eel eel eel eel eel eel eel eel eel eel eel eel eel eel eel eel eel �j
C
Ol
tl0
O O p p O p p O p p p O O p p
N O m m O m m O m m m O O m m
v c d N o o o
a v voi m n voi 0
eti V eti I� Oi Vf"O
Na N \ `-' N e•I `-'I�
Ol V
N C N N N N N
__ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ a_ _ _
0 00 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M o 0 0 00 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 o N o 0 0 0 o n o 0 o N o0
a 0e•I O a O Vf n O a Vf n 0N e•I w 0 e•I N M 0 0a a N e•I O I� O w N M e•I M Vf e•I 00
N Vf a b a M 0N a M N M w 0w N I� N e N V , I� 0a b O e•I I V V O M a Vf 0e•I
e•I a n Of O 0 M N r4 rr O Vf N Vf t0 N a N N - M , u1 0N a Of Vf O a b e•I a b N ^ e•I
N I� b N a M N M eti M M a e•I e•I N e•I I� Ol a Vf M Lr Vf W Ol M e•I W N e•I e•I a
.... ............ ey ey .... .... !y .... .... .... .... .... .... ^ eel `-' eel N `••' N `••' ey M .... .... .... .... M
.... .... .... .... .... .... .... .... eel N Vf
V
W
C7
Z
Z
O
V
Z
C
7
V
C
eel Y
O G
� d d
a �
6 d
O « M c Q ba
@ a
co
O y 'O N 10 q y R
L O O N C
u u oI
O C O d c i C V N
m 'o L E
O O
N co
d cc
N o °• a° c o f to u ad+
G i O d d a N 0G y N N G d y p E
V M e O C
d V C N M N m m a 10 0 d '6 d d C M cc eel 6 u C -
O N Y R d d O D d C 'i+ LVd E0Y 2 d RNl m0
O .0 d
° NE m M c oE Nay a dd LU+OOd'• a°3+ °•!d-Oy0� OYaaf d3 c6N ° N p3+ LNauou,t L23Ed '•dLE -•,MNayny+ sY-''i6n oNdCy V^o3°Oo -�NNMN30 oyNaN'3"� =i3ddNe cNN33° �onN�30' wEmWco �-C°°c QOaoddi Cs_ ?�c°dd -.mV_d°cd -Ccdcd° Rdu £O NVYdiaao LmEOoC yd'-cLL
yd0dmd
•ijn_dOad .aaO N_Lcio
ud iN °E d6 id -N O NN 03
oo 0
o ° E r ua
O0 =
d m d N N d E3aL.
awVVo
d ` o
N E oNa E £ Eg y � abo
yq 0 NE k N CN Y d O Wm £ 0 - Nd
Ed 3 Y o (7N d O 'O dW m O
daoo E
o y ° N • Cc Nm m Yco d c co c g q E
d d O m d 6 da O No C 3 - u
E L E
C
W C NC N Y d0I
bo o y ad+ •C a N N E a G d - 7 a •� w d ut d u d O E N q d d R C d a d W N W
a C y Q - E fit 3 i L p u p C a+ d u a - 6 O 3 d d a c d 0o u}'di 6 3 = � 3 a
3 a " E M o a '" 3 o E w d '^ :°
m N c o u M M i E n oo M �n a > > Y g z o d M x c o
O N tD tD M R Q Q O C d 3 Y 6 bo Y N eel
O N i i j Y N C VI C d N N N N N W '6 W W L" '6 3 O d C o F O d 6 E 0 L 3 y
E F o M d c c c c d d 'a, ad+ £ c d W W N
o d d c E a c s a E E E E 0 3 W .° a '« 3 a 0 i7 10 d o
o W c E O '" �i �° a m Q '° '° d -° e L L
.O O V y d y N 3 3 C M o O O O O ° '�° '�° '6 'o 'O E
Q (7 z u� m Q p N �� a z z z z c C7 Q Q c M.
d Q V1 = -° fV d Q V1 u u C
M o N m M N �0 �0 a in M a M a N �0 M '� oo N N o e ^ m n N a 0 a d N �0 N a N M o g X M M N M a O m N
M a N M M m M a M N a a �0 �0 �0 M �0 c �0 n n n n n M a a N N N N 00 00 v M a 00 n o0 00 00 00 m
N N N N N e•I N N N m N N N N N N N y N N N N N N N N N N O g O E N N u N N N 0 - NO E N N N N O N N
O _ N E N
C C C C C C VI C C C M C C C C C C C C C C C Q C C C C C C C 6 C N u. C C p d: d: d: a z a VI C C C C 6 C C
0 O e•I N M a Vf b ^ 00 0 O e•I e•I M a Vf b ^ 00 0 O e•I N M a Vf b ^ 00 0 O e•I N M a C
a V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 w w w w �0 a a a a a n n n ^ ^ n n n n n 00 00 00 00 00 a
O 00 00 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O z C C C C C C C C C C C C CV V V V V V V V V V V V V V
z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z
u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u u m u u u u u u u u u u u u u u
V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V L
V
N ^ O 0 N 00 N b 00 N a 00 N Vf 0 b O N N O ^ 00 M N ^ O N ^ N M a a a N 0 ^ Vf 00 Ot O Vf 00 00
M M Of N N ^ a a N Vf Vf M M Vf Vf Vf M I� ^ b b b ^ 00 I� 00 00 Vf w O M 0I� 0 0a N a Vf b ^ 00 . 0 00 0 0
N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Z N N N N N N N N N N N N
O O 0 O O 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O F O O O O O O O O O O O O
V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V Q V V V V V V V V V V V V
a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
O O
O N
M eel
o a
v n
N Of
eel N
N N
W �
() Z
Z Z
Q a
V
V C
uZi V
O Z
Z �
Z Z
O Z
V O
a V
F W
Z F
F V
a O
a
( \ \ \ ( o
■ ■ § 6 \
2
bb
\ § - :
—
§ .0 m
� o § § } § §\
] cc
)
\ § § k \ ( ) 0 00 m0 k00
ba
3 f -
cc
cc
§ 7
\ -
A �
\
a
k
#
) �
! `
, �§ ) 2
| / }k)
} o -
- k \ j l
E
f § � 00000
) ) ) )
OWNER CONTROLLED
CONTINGENCY LEDGER
FL KEYS MARATHON AIRPORT NON-AERONAUTICAL USE BUILDING (EOC)
Initial Contingency Amount: $955,613.00
Total Debits Total Credits
Total Adjustments to Date: ($!)34 l :1.8.80) $341,448.73 )$87!) !)6 !)3) $ -
Current Contingency Balance: $421,494.20
*E IOII designates PCA as an Error or Omission on Designer
�V III vi
Initial Budget 0.00 0.00%I $955,613.00
This is a cost change to the Project Contingency to add a
GPR survey of the site prior to underground utilities
installation beginning in order to locate potential unknown
utilities that are not shown on the contract documents.
Contract time is not impacted. .
10/05/22 (6,50 $.0 ) -0.68% $949,,113.00
This is a credit change to Contingency for all work related
to RFI 121, dated 10/12/2022,to document the email
correspondence with Cardno that the injection well casing
is only required to be 60' deep, not 120' deep per C-008.
The total depth drilled will remain 120' but the casing is
only required for 60'. Also,the material of the casing is
acceptable to change to Schedule 80 PVC in lieu of DIP
(ductile iron pipe). 12/08/22 12,000.00 1,26% $961,113.00
This is a cost change to Contingency for RFI 113, dated
09/21/2022,to add window shades at the exterior
windows in room 235 and 262 that were not previously
calling for shades. Reference sketch included in RFI
response.
a 12/08/22 (2,093.50) -0.22%- $959,019.50
This is a credit change to Contingency for RFI 124, dated
10/06/2022 to document the variance between ID-202 and
A-131 on the mirror manufacturer and the decision to go
with the Bobrick B-165 series mirrors due to the cost
savings to the Owner over the Renwil, vered mirrors.
12/08/22 16,455.00 _ 1.72%I $975,474.50`
This is a credit change to the Contingency per RFI 151,
dated 12/08/2022,for the Owner request to change all
countertops in
Food Prep room 260 from Quartz to Stainless Steel.
am 12/16/22 5330.00 0,56% $980,804.50'
This is a cost change to the Contingency to fund the FKEC
fee worksheet for the electrical primary service.
01/10/23 (10,01432) -1.05%- $970,790.18
OWNER CONTROLLED
CONTINGENCY LEDGER
This is a cost change to the Contingency to fund the City of
Marathon Utilities Force Main worksheet fees.
01/10/23 (27,663.63) _ -2.89% $943,126.55
This is a credit change to the Contingency for changes from
submittal 084113-1, dated 12/01/2022,to change the 1203
window from an insulgard ballistic window to a standard
YKK interior storefront window, and to change door 218
from a double door to a single door with a sidelite due to a
conflict between the corridor width and the required width
for an insulgard double door.
= 01/23/23 14,607.00 1.53% $957,733.55
This is a cost change to the Contingency for ASI 01, dated
11/28/2022,for:
-The changes to the primary electrical routing and
equipment for,the building's power per FKEC
requirements, and
-The addition of the quick-connect;equipment to add the
ability to connect a portable load bank.
� 02/14/23 (65,712.00) =6.88%'= $892,021.55 �
This is a cost change to the Contingency for RFI 154, dated
02/02/2023,to change doors 202 & 203 to Ambico ballistic
hollow metal (HM)frames since the specified Insulgard
HP500 ballistic door system required the doors to be
outswing, which conflicted with the hallways. Ambico
doors can accomodate an inswing to match the floor plan
intent.
02/14/23 ( 70.00) 0.09%," $891,',151.55
This is a cost change to the Contingency for RFI 115, dated
12/05/22,to expand the chase in room 219C and add
chases in rooms 254&
251 for the vertical storm piping drops from the roof drains
down to underneath the 1st floor slab.
n 02/14/23 (1,282.00) 0.13%'- $889,869.55
This is a cost change to the Contingency for RFI 111, dated
10/03/22,for updates to A-132 &A-133 clarifying quantity
and locations of
bathroom accessories. 02/14/23 (1,503.00) _ -0.16%'- $888,366.55
This is a cost change to the Contingency for RFI 164, dated
02/14/2023,to increase the depth of the dumpster
enclosure per revised sheets A-001 and A-030 to meet the
dumpster size and clearance requirements. Dumpster
enclosure CMU walls that have already been constructed
will be removed,foundation will be extended to support
the increased depth, and the CMU walls will be re-
constructed.
(:l.0,49 .00) -1.10%= $877,871.55
OWNER CONTROLLED
CONTINGENCY LEDGER
This is a credit change to the Contingency for RFI 173,
dated 01/19/2023, to eliminate the Masterseal 581
waterproofing noted in the
details for the dumpster enclosure.The dumpster
enclosure walls will have a standard stucco finish.
02/14/23 1,581.00 0.17%'' $879,452.55
This is a credit change to the Contingency for eliminating
the BP 05.01 Scope requirement to furnish and install two
(2) elevator pit access ladders, since the BP 14.01 Elevator
subcontractor will furnish and install their own ladders
which they have included.
03/07/23 1,390.00 0.15%'' $880,842.55
This is a cost change to the Contingency for the work
related to RFI 167, dated 01/03/2023,to install a 6"trench
drain system between the planters on the west elevation
of the building, and tie the trench drains into the site storm
system at Structures S-1 and S-3.This includes required
core drilling work to run the drain between the different
sections of the planters.
LN03/07/23 (15,077 ) -1.58%, $865,765.55
This is a cost change to the Contingency for RFI 133, dated
12/27/2022,to change multiple exterior walls at the
mechanical yard and generator room to CMU walls in lieu
of tilt panel walls due to constructibility issues with being
able to set the tilt panels with the roof beams and precast
joists in place.This includes adding stucco to these CMU
was. 03/24/23 ����r <a�.w �D� - =1.50%= $$51,384.55
This is a cost change to the Contingency for RFI 159 dated
03/14/2023 to increase the circuit breakers in panel ELDP
and increase the wire size for the elevator pumps based on
increased HP requirements per the manufacturer.
ME 03/24/23 (720.00) 0.08%, $850,664.55
This is a cost change to the Contingency for RFI 169, dated
01/16/2023,to provide an additional disconnect and point
of connection to the ACCU-3 condensing unit based on
electrical requirements provided by the manufacturer in
submittla 237313-1.2.There will now be (2) 60amp
disconnects and (1) 30amp disconnect for ACCU-3 in lieu of
(2) 100amp disconnects.
04/06/23 (4,475.E ) -0.47%' $846,189.55
OWNER CONTROLLED
CONTINGENCY LEDGER
This is a cost change to the Contingency for RFI 158, dated
02/27/2023,to add 3 biometeric readers to doors 243,
253B, 277 for access control and to delete the camera in
Storage room 233.This includes all infrastructure, devices,
and licenses for the added readers and door hardware
changes to make these doors electrified.
UM 04/06/23 (20,781.00) -2.17%= $825,408.55
This is a cost change to the Contingency for RFI 194
Stairwell doors hardware and fire rating changes to meet
fire and
FEMA 361, dated 03/20/2023,to change the door
hardware specified for doors S102B and S103 per
manufacturer requirements in order for the doors to meet
both a FEMA 361 rating and a 2hr fire rating.
Separately,this RFI also updated all other stairwells doors
from 1hr to 2hr and all glazing in these stairwell doors from
45min to 90min rating.There is no cost associated with
these latter upgrades.
04/18/23 (5,875.00) -0.61% - $819,533.55
This is a cost change to the Contingency related to
Submittal 280537-1.2 to change the bi-directional antenna
from a Yagi antenna (model# BDA-YDA763869-14-1)to a
Westell panel antenna (model #CS03-777-999).This
change was recommended by the BDA vendor, and
reviewed and approved by Monroe County because the
panel antenna is tested and rated for a higher wind MPH
than the yagi antenna.
04/18/23 (1,582.00) -0.17% $817,951.55
This is a cost change to the Contingency related to RFI 188,
dated 03/06/2023,to demo part of the retaining wall just
northwest of GL 9 to provide more turning radius
availability for when trucks or equipment drive up the
access ramp and need to turn left
05/09/23 (3,841.00) -0.40% $814,110.55
OWNER CONTROLLED
CONTINGENCY LEDGER
This is a cost change to the Contingency related to RFl 199,
dated 05/09/2023,to extend multiple P1 and P9 walls to
the underside of the roof deck (framing, iso, and drywall
extended)that were originally called to terminate at the
ceiling.This change enhances sound transfer reduction
between corridors, building areas, and offices.
05/09/23 (80,114.00) 8.38% $733,996.55
This is a cost change to the Contingency related to RFl 198,
dated 04/11/2023,to add beacon lights on the top of the
building per request from the Monroe County Building
Department.This includes eight(8) FAA-approved beacon
lights positioned at the building corners and along the roof
perimeter.
05/09/23 08,634w00) -1.95% - $715,362.55
This is a cost change to the Contingency related to RFl 209,
dated 05/09/2023,to confirm the additional stucco and
Masterseal 581 waterproofing intended for the CMU walls
at the Outside Seating 263, Ground Level Lobbies 101 &
102, and ground level electrical chases.This RFl also covers
documenting stucco CJ layout and the final sizes of the
electrical chase walls and required MAT4 foundations to
encapsulate all electrical conduits from the Level 1 to the
site.
Cost previously being tracked for RFl 132 regarding the
chase walls size increasing is included covered by this RFl
209 response and pricing.
Cost previously being tracked for RFl 200 regarding the
ground level lobbies wall types is included covered by this
RFl 209 response and pricing.
05/11/23 (76,311.00) -7.99% -
$639,051.55
This is a cost change to the Contingency related to RFl 204,
dated 04/27/2023,to add a CIP parapet wall on top of RB-
48 to form the south parapet wall for the roof section over
the generator room 245.
LIM 05/12/23 (1,840.00) -0.19% - $637,211.55
This is a cost change to the Contingency related to RFl 193,
dated 03/27/2023,to add (2) additional data drops to each
of the consoles in Dispatch 235 per request from the
MCSO.This increases the drops from 8 to 10 at each
onsole.
C 05/12/23 (8,408.00) -0.88% $628,803.55
OWNER CONTROLLED
CONTINGENCY LEDGER
This is a cost change to the Contingency related to RFI 189,
dated 03/20/2023,for the clarification that the
the two (2)water fountains,tagged E27 on the
Architectural sheets, are intented to be
the model Elkay EZWS-ERPBM28K, which are
recessed units with a bottle filler, not the Elkay LZSTL-8-C
tagged EWC-1 on the plumbing sheets and schedule.This
includes minor electrical changes for in wall rough in and
the addition of a chase wall at water fountain wall between
Restrooms 255 & 256.
05/15/23 01,867�00) -1.24%_ $616,936.55
This is a cost change to the Contingency related to
responses to Submittal 274100-1 and Submittal 274100-2.
Submittal 274100-1 response provided model changes for
mutiple AV equipment including speakers, antennas,
microphones, processors,amplifiers etc.
Submittal 274100-2 response changed the mini-PC
modules from HP to Lenovo models based on Monroe
County IT submittal review and preference.
05/18/23 (14,9 5.00) -1.56%'_ $602,031.55
This is a credit change to the Contingency related to RFI
178, dated 03/02/2023,to furnish and install a
RainFlo MiniGen03 Ozone Generator in lieu of the
Rainflo UVS-25 Filtration system for the 5,943 gallon
Rainflo water tank per the updated P-203 sheet. 05/19/23 1,749.00 0.18%I $603,780.55
This is a cost change to the Contingency related to RFI 183,
dated 03/27/2023, updating the perimeter soffits and ACT
ceiling details in rooms ICC 219 and Dispatch 235, including
changing of light fixture layout, quantity and type, and also
updating the F2 cove lighting in Facility Restrooms 255 and
256. 06/01/23 13,142.8 ) -1.38%= $590,637.75
This is a cost change to the Contingency related to RFI 197,
dated 04/28/2023,to change the TEF-1 grille to a FPA/NOA
rated louver since it is located in an exterior soffit.The TEF-
1 fan is located above ceiling in room Security 202.
CE 06/01/23 ( r? mD ) _ -0,13%- $589,427.75
This is a credit change to the Contingency related to
Submittal 095100-1 response, dated 05/17/2023,to
change to the acoustical ceiling tile throughout the building
from Armstrong (originally spec'd manufacturer)to
Rockfon (equivalent manufacturer);
06/07/23 17,030.00 1.78% _ $606,457.75
OWNER CONTROLLED
CONTINGENCY LEDGER
This is a cost change to the Contingency related to RFI 177,
dated 05/09/2023,to add three (3) structural mounts per
sketch SSK-008 on the roof for attachment points for
antennas.
06/08/23 (10,264w00) 1.07%= $596,193.75
This is a credit change to the Contingency;related to
Submittal 113013.2-1 response, dated 04/13/2023,to
change multiple elements of the residential appliances
including the under counter ice makers manufacturer,and
changing the hood in Food Prep room 260 to a residential
hood with a roof vent instead of a commercial hood with a
roof exhaust fan.
This CCR also includes a credit for the 3-compartment sink
in Food'Prep room 260 that B&I included, but will be
furnished and installed by the Plumbing subcontractor.
06/08/23 13,201.00 1.38% $609,394.75
This is a credit change to the Contingency related to RFI
208, dated 05/16/2023,to change rooms 244- Mechanical
Yard and 245- Emergency Generator Room from VCT-1 to
bare concrete, and rooms 238 A/B- Electrical Rooms and
Room 243 Plumbing from VCT-1 to SC-1, and room 239-
UPS room from VCT-1 to ESD-2.
06/08/23 8,846.00 0.93%'' $618,240.75
This is a cost change to the Contingency related to RFI 213
response, dated 05/19/2023,to add 120V power for the
Clean Agent Fire Protection system controller for rooms
241 and 242.The controller;requires a dedicated circuit per
submittal 212200-1. Per RFI response, spare circuit 68 on
panelboard ESP is to be used.
06/20/23 (1,4 100) 0.15%;- $616,797.75
This is a cost change to the Contingency related to RFI 223,
dated 06/19/2023,to add insulation,framing and drywall
to the exerior walls of rooms 237 Future Expansion and
238 Electrical for exterior envelope insulating and to credit
back the VCT flooring in Room 237 and use a concrete
sealer for a floor finish in this room instead. Summation of
costs and credits result in a net cost.
Im 06/20/23 (13,152w00) -1.38%; $603,645.75
This is a credit change to the Contingency related to RFI
232 response, dated 06/21/2023,to eliminate the
casework shown around sink HL-2 in room 231-Rest Room
per detail #5 on ID-202. Per RFI response,this is a finished
fixture and does not need to be set in casework.
06/22/23 3080.00 0.32%'' $606,725.75
OWNER CONTROLLED
CONTINGENCY LEDGER
This is a cost change to the Contingency related to RFI 216,
dated 05/18/2023,to install aluminum flashing along the
perimeter of the roof to span the gap between the roof
slab and the tilt wall panels.This flashing will support the
perimeter edge of the secondary(bottom) roof layer that
runs up the parapet wall formed by the top of the tilt
panels.12 o
07/05/23 (4,045.00) -0.42/0;- $602,680.75
This is a cost change to the Contingency related to RFI 218,
dated 06/02/2023,to add two roof exhaust fans for
ventilation of the two elevator shafts.
07/06/23 ('11,710.00) 1.23%" $590,970.75
This is a cost change to the Contingency related to RFI 222,
dated 06/02/2023,to install box, conduit, and pull strings
at doors 214, 215, 230, 232, 281, 282, 284, 285, and 287.
This rough-in will prepare these doors for future access
ME controls. 07/07/23 (4,351.00) -0.46%, $586,619.75
This is a cost change to the Contingency related to
Submittal 122400-1, dated 06/29/2023,to install an RS-2
blackout manual roller window shade in room 219 at
interior',window 1203 between ICC Room 219 and Press'
Briefing Room 203.I'm 07/07/23 (821.50) 0.09% $585,798.25 "
This is a credit change to the Contingency related to RFI
229, dated 06/29/2023,to remove 6 acoustical wall panels
in ICC room 219 that were in conflict with the audio/visual
displays (wall mounted TVs). See RFI sketch for clarity.
07/07/23 5484.00 0,57% $591,282.25
This is a cost change to the Contingency related to RFI 221,
dated 05/30/2023,to upgrade the finish of the retaining
walls from standard paint to textured Texcote finish to
match the exterior walls.The retaining walls are to be
painted Oxford White, with a "Medium"texture.'
07/11/23 (8,559w00) -0.90% $582,723.25
This is a cost change to the Contingency related to RFI 224,
dated 06/09/2023,to establish a power connection for the
microwave in Food Preparation Room 260, including the
installation of required conduit and upgraded breaker.
07/11/23 (1,969.00) 0.21% $580,754.25
This is a cost change to the Contingency related to
Submittal 107516-1, dated 06/02/2023,to provide power
to the flagpole light via 20A spare circuit on panelboard LP-
30, and to add the flagpole to the grounding ring around
the building.
= 07/11/23 ( r88 .00) 0.84%'- $572,767.25
OWNER CONTROLLED
CONTINGENCY LEDGER
This is a cost change to the Contingency related to RFI 235,
dated 07/12/2023,to furnish and install two additional
electrical boxes on the North wall of Room 221-AV Control
Room per the request of the Monroe County IT
department.This will provide power to the desk
equipment. 07/18/23 (2, . ) 0.22% $570,643.25I
This is a cost change to the Contingency related to RFI 240,
dated 07/19/2023,to furnish and install an additional
receptacle under the counter in the Mini-Break Room 216
for the undercounter"refrigerator(tag E11).
n 07/19/23 (458.00) -0.05% $570,185.25
This is a credit change to the Contingency related to RFI
211, dated 05/11/2023 and later updated 07/20/2023, to
credit the furnishing and installation of the Netgear AV
switches and the Antaire security switches. MC IT will
furnish these switches and supply Cisco switches instead as
their preferred manufacturer.
The plan is for MC IT to purchase the Cisco Catalyst 9300,
model C9300-48H-E
for the AV and the Cisco IE-2000-4TS-F-
B for the industrial switches for security.
07/20/23 7,741.00 0.81%' $577,926.25
This is a cost change to the Contingency related to RFI 239,
dated 07/12/2023, to install'a 2nd set of generator
annunciator panels (1 for each generator)in Corridor 276
just outside of'Admin Officel286 so'it can be seen down
InCorridor 276 and Corridor 218.
07/25/23 ( ,960.00) 0.73%," $570,966.25
This is a cost change to the Contingency related to RFI 233,
dated 06/26/2023, to remove the ceiling in room 239-UPS
Room to accommodate large amounts of conduit.The
acoustical ceiling tiles will be eliminated and the exposed
ceiling structure will be painted. In addition,the lights will
change from a Cl& CIE type fixture to a D1
& DIE type fixture to match the other exposed areas.
07/27/23 (2,044.00) -0.21%;- $568,922.25
This is a cost change to the Contingency related to RFI 191,
dated 05/10/2023,to adding power via dedicated
receptacles with GFCI breakers from panel ESP for each
elevator sump pumps alarm panel that will be located in
their respective ground level lobby. 07/31/23 (4,930.00) -0.52%'- $563,992.25
OWNER CONTROLLED
CONTINGENCY LEDGER
This is a cost change to the Contingency related to
Submittal 263213.13-2.1 Diesel Emergency Engine
Generators Exhaust System SD's-AAN, dated 07/05/2023,
to provide two generator exhaust stacks per generator(per
the generator manufacturer) in lieu of one stack per
generator as shown on the contract documents.
08/03/23 03,385M) -1.40%, $550,607.25;.
This is a cost change to the Contingency related to RFI 256,
dated 07/31/2023,to add medium texture primer to all
three stairwells walls, ceilings, and underside of the stairs
and landings.This RFI also clarified for all stairwells to have
P4 epoxy paint.
08/03/23 ( ,227.00) 1.28% $538,380.25I
This is a cost change to the Contingency related to RFI 246,
dated 07/14/2023,to furnish and install an anodized
aluminum break metal to cover the embeds and gap at the
outdoor seating area as depicted in detail #2 on sheet A-
311. 08/14/23 (3,740.00) _ -0.39% _ $534,640.25
This is a credit change to the Contingency related to RFI
254, dated 07/31/2023,to change the storm laterals
feeding storm structures S-10 and 5-8 from DR14 pipe to
SDR 26;pipe.
08/15/23 1,334.00 0.14%'' $535,974.25
This is a cost change to the Contingency related to
Submittal 323113-1, dated 07/18/2023,to furnish and
install a double swing gate for access at the SE corner of
the side for FKEC access to the transformer and other
maintenance access to this area.
08/23/23 (3,025.00) -0.32% $532,949.25
This is a cost change to the Contingency related to RFI 245,
dated 07/18/2023, and Submittal 260923-1.1, dated
08/08/2023, clarifying lighting controls requirements
throughout the building which included additional control
devices in the breakout conference rooms off of the ICC,
the Command Conference Room, and Sleeping Rooms and
multiple offices.
lam 08/24/23 (13,537.00) -1.42%'- $519,412.25
This is a cost change to the Contingency related to RFI 244,
dated 07/17/2023,to furnish and install additional
dedicated power and data for the copy machine located in
Room 289. 08/24/23 (4,2 a8.00) -0.45% $515,144.25
This is a cost change to the Contingency related to RFI 263,
dated 08/23/2023,to installl a drywall bulkhead and
"shadow box" between Columns 1-B.2 and 1-C in room 227
to transition the lower ceiling height at 10'AFF to the top
of W14'window elevation at 12'AFF. 08/28/23 (1,582.00) 0.17% $513,562.25
OWNER CONTROLLED
CONTINGENCY LEDGER
This is a cost change to the Contingency related to RFI 264,
dated 08/25/2023, to furr out the P5 wall behind the two
(2) dryers in room 268 in order to accommodate
concealing the two (2)4" round ducts inside the wall that
connect to the in-wall dryer box for connection to the
dryer's vents. In addition,two lint traps will be added in the
wall above the dryers to prevent lint clogs in the exhaust
duct due to the long route to the exterior wall louver.
Im08/28/23 (663.00) -0.07%'- $512,901.25
This is a cost change to the Contingency related to RFI 262,
dated 08/23/2023,furnish and install an A-50 supply grille
in Shower Room 265 to match the other 3 Shower Rooms
267, 269, and 271. This grille should be fed from the 12x10
supply duct downstream of VAV-04 above ceiling in the
adjacent room 264.
09/06/23 (1,22 .00) -0.13%'- $511,675.25
This is a cost change to the Contingency related to RFI 236,
dated 07/11/2023,to furnish and install additional
acoustical wall panels (AWPs) in Dispatch 235 for enhanced
sound absorption. 09/22/23 (2,479.00) -0.26%, $509,196.25
This is a cost change to the Contingency related to RFI 265,
dated 09/05/2023,to frame a shadow box soffit along the
west wall of room 262 in order to trasition from the 10'AFF
ACT ceiling to the 12'AFF top of window elevation. 09/25/23 (2r22 .m0 ) -0,13%; $507,975.25
This is a cost change to the Contingency related to
Submittal 211313-1.4, dated 06/08/2023.for re-
engineering/re-calculating work for the fire sprinkler
system after it was already complete and submitted for
permitting due to the FKAA(water utility company)water
main flow and pressure changes throughout the keys.
Revised flow tests data and revised calculations for the fire
,,sprinkler system were required, as well as multiple
corridination meetings with the Fire Marshal.
09/25/23 (7,212.00) -0.75%'- $500,763.25
This is a cost change to the Contingency related to RFI 268,
dated 09/19/2023,to add traversing sidewalks and
hardscape area, increase the granite gravel thickness to 4"
and add geotextile fabric underneath all gravel at the
ground level, and to add (2) removeable bollards at the top
of the vehicle ramp.
09/25/23 (79,12 40) -8.28%' $421,639.85
OWNER CONTROLLED
CONTINGENCY LEDGER
This is a cost change to the Contingency related to RFI 271,
dated 09/28/2023,to add full access controls to doors 214
and 215 that were previously infrastructure only. Per detail
2 on T-607 these doors will receive and electric mortise,
biometric reader and'a door position switch.
09/29/23 (14,359.00) -1.50% = $407,280.85
This is a cost change to the Contingency related to RFl 272,
dated 09/25/2023,to add a typical office AV package per
detail I on T-404 which includes a 55"TV display that was
previously said to not be needed in RFl 225.
IS09/29/23 (5,558.0 -0.58%0) $401,722.85
This is cost change to the Contingency related to Submittal
263213.13-2.1 Diesel Emergency Engine Generators
Exhaust System SD's-AAN, dated 07/05/2023,for
additional electrical scope that was not included in CCR
055.The cost of this CCR includes the generator material (2
additional silencers and wye fitting) and install labor and
materials required by the addition of a 2nd generator
exhaust stack per generator.
CCR 055 included the additional exhaust duct material and
install required by the addition of a 2nd generator exhaust
stack per generator.
10/13/23 (13,574.00) -1.42% - $388,148.85
This is a cost change to the Contingency related to RFl 274,
dated 10/09/2023, MC request to add a typical breakout
room AV package per detail 3 on T-404 to room's 224 and
227.
10/13/23 (25,884M) -2.71% - $362,264.85
This is a cost change to the Contingency related to RFl 277,
dated 10/09/2023, adding Corian solid surface sills at all
exterior window sills per the locations shown in the RF1 277
sketch. Color to be Corian Rain Cloud and thickness to be
IrM 1/2 inch. 10/13/23 (5,242.00) -0.55% $357,022.85
This is a cost change to the Contingency related to RFl 279
dated 10/10/2023, adding an RS-1 window shade to the
W12 window between room 263-Outdoor Seating and
UM Room 262-Seating Area 10/13/23 (463.10) -0.05% - $356,561.75
This is a cost change to the Contingency related to RF1 257,
dated 08/02/2023,this clarifies the design intent to have
full height tile at the wet walls and partial height tile on the
other 3 walls in Unisex Shower Rooms 265, 267, 269 and 10/16/23 (900-00) -0.09% - $355,661.75
This is a credit change to the Contingency related to RFl
261, dated 08/22/23,to change the flooring in the
mechanical room 249 from VCT-1 (vinyl floor tile)to SC-1
(grey sealed concrete). 10/16/23 0.05% $356,178.75
IMM 517.00
OWNER CONTROLLED
CONTINGENCY LEDGER
This is a cost change to the Contingency related to RFI 266,
dated 09/21/2023,tofurnish and install framing and
Hardie board at the exterior canopies in order to conceal
the exposed roof fasteners and upgrade the finish under
the two canopies
10/23/23 (28,070.00) -2.94% $328,108.75
This is a cost change to the Contingency related to RFI 220,
dated 06/15/2023, to provide power to the grease
interceptor alarm and communicator at the ground level
mounted on a column near the vehicle access ramp to be
within close proximity of the grease interceptor tank, and
to provide power to the sanitary holding tank alarm and
float switches that will be mounted on the utility rack next
t the lift station.
10/27/23 (9,956.00) -1.04% - $318,152.75
This is a cost change to the Contingency related to PR 01,
dated 08/11/2023, to install a concrete platform for the
MTS and quick connect electrical gear that sits outside of
the building.
10/30/23 (1.1.3,652.00) -11.89%- $204,500.75
This is a credit change to the Contingency to move all of
the realized Sales Tax Savings to-date into Contingency.
See attached CDP log for reference.
UM 10/30/23 231,103.73 _ 24.18%_ $435,604.48
This is a cost change to the Contingency related to
Submittal 260526-2.1, dated 10/19/2023,for the
grounding system underneath the access flooring in ICC
219 and Rooms 203, 221, 223, 225, and 227.
UM 10/31/23 (8,431-00) -0.88% = $427,173.48
This is a cost change to the Contingency related to
purchasing and installing the independent meter can
required by FKEC for the permanent power service.This
independent meter required a unistrut stand and rough in
to the secondary termination enclosure.
10/31/23 (2,643.00) 0.28% $424,530.48
This is a cost change to the Contingency related to RFI 286,
dated 11/08/2023,to add an accent color paint (color:
Cicely 74-B-2T)to
the smooth section of exterior wall of the public stairwell 5
203 above and below window W02 in lieu of leaving it the
same color as the rest of the stairwell.
11/10/23 (1,255M) 0.13% $423,275.48
This is a cost change to the Contingency related to RFI 282,
dated 11/15/2023,to document the owner requested
purchase of a sludge pump to facilitate the transfer of
solids from the sanitary holding tanks to the lift station.
hre goal of this would be to be able to eliminate the need
for a pump truck during storm events.
11/17/23 (1,781.28) -0.19% $421,494.20