Loading...
07th Change Order (voided) .t;,A.INSTR.8800.2 i:.a IIII IIII III", I,:��� "I ,.-der IIII pppllll�o��� �.h'I�.h'I I IIII Ilg I�, IIII �I:"III....... 3/21o5�i 1, (1) �III:1 `, I. w II "I� r f I under r f 'M ���`�w'�N�r 110 1)III I,.11l, ° M � IIII �.�N' I'�I�".III.. I �.�.!�. ��I IIII �.I;'014���.'��'�w����. � Page 3 MONROE COUNTY/DEPARTMENT OF AIRPORTS CONTRACT CHANGE ORDER PROJECT TITLE: KWIA Concourse A&Terminal Improvements CHANGE ORDER NO.: INITIATION DATE: 12/20/2023 TO CONTRACTOR: NVPA/Gulf Keystar 1V CONTRACT DATE: 8/17/2022 The Contract is changed as follows The Original(Contract Sum)(Guaranteed,,Maxium Price) $ 101,461,771.00 Net change by previously authozied Change Order $ 8,415,245.92 The(Contract Sum)(Guaranteed Mxium Pricp, prior to this Chage order was $ 109,877,016.92 The(Contract Sum)(Guaranteed Mxium Price)v ll be(ulndhainged)by this Change Order $ The new(Contract Sum)(Guaranteed Mxium Pric4,,including this Change Order is $ 109,877,016.92 The Contract Time will be(ulndhaingeg)by 0 days The date of Substantial Completion as of the date of this Cha"inge Order is 3/9/2026 Detailed Description of change order and justification: In the spirit of processing change orders in order,PCCO#007 is submitted""as voideO'and PCCO#016 will be issued to address PCO#017 scope of work and cost. POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# I Title Schedule Impact Amount 017 1 TKAS-PBB Storage 0 $ Total: $ This change order is 0.00%of the original contract price. Not valid until signed by Owner,Architect(if applicable),,,z"nd Contractor ARCHITECT: DATE: CONTRACTORS: DATE: EXECUTIVE DIRECTOR OF AIRPORTS DATE: COUNTY/DEPUTY ADMINISTRATOR DATE: GULF BUILDING NV K =" KE=-YST*R PCCO #007 NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd, Suite 600 Program Miami,Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West, Florida 33040 Prime Contract Change Order #007: TKAS - PBB Storage TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West, Florida 33040 Miami, Florida 33156 DATE CREATED: 10/30/2023 CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) CONTRACT STATUS: Approved REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: 10/30/2023 INVOICED DATE: PAID DATE: SCHEDULE IMPACT: 0 days EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 20-2039-01:Key West International Airport TOTAL AMOUNT. $495,000.00 Concourse A DESCRIPTION: TKAS-PBB Storage Per the Owner's request, Passenger Boarding Bridges will be stored at Thyssen Krupp Airport Solutions Factory in Fort Worth,Texas until delivery to the KWIA project.(20-2039-01) This change order includes the cost of Storage of 7 Passenger Boarding Bridges.2 Walkways,and Components as agreed in the FAT meeting on 08/16/2023. Invoice,meeting minutes,and location plan are attached. DescriptionTotal Cost IStorage of 7 PBB's,2 Walkways,and Co I mponents1l $450,000.0 Location: TK Airport Solution, Inc. 3201 N.Sylvania Ave.,Suite 117 Fort Worth,TX 76111 Attachment: Executed PCO 017-TKAS PBB Storage ATTACHMENTS: NV2A PCO#0 17 TKAS PBB Storage-j2df POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# Title Schedule Impact Amount 017 Storage $495,000.00 Total: $495,000.00 The original(Contract Sum) $101,461,771.00 Net change by previously authorized Change Orders $8,415,245.92 The contract sum prior to this Change Order was $109,877,016.92 The contract sum will be increased by this Change Order in the amount of $495,000.00 The new contract sum including this Change Order will be $110,372,016.92 The contract time will not be changed by this Change Order. NV2A/Gulf Keystar JV Page 1 of 2 Printed On: 10/30/2023 11:52 AM GULF BUILDING NV K KEYST*R Inc. I A� rpo NV2A/Gulf Keystar JV Christopher Kopec McFarland Johnson, a est International p p ( ona 9 3491 y e ,,r t' oulevard 9100 South Dadeland Blvd,Suite 600 Ro W to'da 33040 Miami, Florida 33156 49 Court Street,Suite 240 Binghamton, New York 13901 Ke �A/ d 0 #0 m,�"'��'� III III I"III ep,Z7 -13 SIGNATU ATE SIGNATURE DATE S URE DATE NV2A/Gulf Keystar JV Page 2 of 2 Printed On: 10/30/2023 11:52 AM GULF BUILDING G PCO #017 �NV' " K R NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami,Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West,Florida 33040 Prime Contract Potential Change Order #017: TKAS - PBB Storage TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West,Florida 33040 Miami,Florida 33156 PCO NUMBER/REVISION: 017/0 CONTRACT: 20-2039-01-Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 9/26/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: _ TOTAL AMOUNT: $495,000.00 POTENTIAL CHANGE ORDER TITLE:TKAS-PBB Storage CHANGE REASON: No Change Reason POTENTIAL CHANGE ORDER DESCRIPTION:(The Contract Is Changed As Follows) Per the Owner's request,Passenger Boarding Bridges will be stored at Thyssen Krupp Airport Solutions Factory in Fort Worth,Texas until delivery to the KWIA project,(20- 09-01) This change:order inciudes the cost of Storage of 7 Passenger Boarding Bridges.2 Walkways,and Components as agreed in the FAT meeting on 08/1612023,Invoice,meeting minutes,and location plan are attached. Description Total Cost Storage of 7 PBB's,2 Walkways,and Components $450,000.00 I.oc�klon: TK Airport Solution,Inc. 3201 N.Sylvania Ave.,Suite 117 Fort Worth,TX 76111 ATTACHMENTS: # Budget Code Description Amount " 1 34-.77.13.10.S Moving WaIks.Subcontractor PBB Storage $450,000.00 _--- ..._....._ .. .... -. _ ... 2 99-.99.99.66.0 Procore OH&ROther Markup $45,000.00 Grand Total: $495,000.00 Sohn- fora(McFarland Johnson,Inc.) Key West International Airport NV2A/Gulf Keystar JV 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Sulte 600 Binghamton,New York 13901 Key West,Florida 33040 Miami,Florida 33156 Christopher Digitally signed by h' Christopher Kopec e� Date:2023.10.2016:07:50 Kopec -04'00 ,� )D ra�- SIGNATURE DATE IGNATURE DA E SIGN TURE DATE NV2A/Gulf Keystar JV Page 1 of 1 Printed On:9/26/2023 04:41 PM TK Airport Solutions,Inc. 3201 N.Sylvania Ave.,Suite 117 Fort Worth,TX76111 Initiated on:06/30/2023 Description of Ca ng Crdor Storage of 7 PBBs+Components and 2 walkways TK Self,Perforrh Costs Urals QTY Unit Cost Hours total, Project Manager Hrs 1 $ 166,00 0 $ - Engineering Hrs t $ 140,00 0 $ TK Travel Costs Unit Unit Cost QTy Total TK:Materlal Costs U6&h ; Unit Cost QTY Total Monthly Storage Month $ 4.554,00 96,3 $ 438.550 Truck Unit $ 935,00 9 $ 8.415 $ TK Manufacturing Costs Unit Unit Cost QTY Total Labor hours Hrs $ 135,58 216 $ 29.285 Subcontrs rµ and Supplier Costs Unit Unit Cost Q YI Total $ Marla Mark-up Total TK Self Perform Costs $ $ TK Travel Costs $ $ TK Material Costs $ 446.965 $ 67.045 $ 514.010 TK Manufacturing Costs $ 29.285 $ 4.393 $ 33.678 Spare parts credit $ (50.000) Tom Prppoi i �.SSS:; Agree to during FAT meeting Z08/11646a $ 460.000 By: By: ACCEPTED:TK EMPLOYEE DATE APPROVED: DATE CO2_FOR_04E,Rev 0 01/17/2022 Page 1of 1 . PROJECT RELEASE AUTHORIZATION CHECKLIST - (Glass Bridge) Document Number: Revision Latest Revision By: Approved By: Page: C06_FOR_07 6 J.Salinas J.Salinas 1 of 6 This document is a final inspection report of project specific Passenger Boarding Bridges (PBB). Refer to C06_PF_01, Project Release Authorization Workflow for guidance. Airport 755000091-01 Key West Gate Number Sales Order Number 02 Sales Order Item Number PBB Model Number PBB Serial Number Factory Fort Worth Date 8/16/2023 LLL] *Please sign forAuthorization for Product Release from Test Stand Quality Representative Engineering Representative Signature: Signature: Date: Date: Project Management Representative Manufacturing Representative Signature: Signature: Date: Date: *Once completed and signed, QC will file with Quality's Project Documentation. Sales Order # 760000090 PROJECT RELEASE AUTHORIZATION CHECKLIST Lmmm - 02 Component to be Inspected Comments Status ,,. ` ' SECTION 1�-Visual InsPeof ion of Rotbnda Major Assembly OK/NC/NA 1 Rotunda Assembly Completed per engineering Spec. NA 2 Exterior/Interior Painted per engineering Spec. NA 3 Curtain Assembly Properly installed NA 4 Exterior/Interior Free from rust,dents,and blemishes. NA SECTION 2 Visual Inspection of PBB Cab Exferior'Assernbly OK/NC/NA 5 Cab assembly Completed per engineering Spec. OK 6 Ex 11 terior Painted per engineering Spec. OK 7 Articulating Floor Properly installed. OK 8 Curtain/Covers Properly installed, OK 9 Canopy Assembly Properly installed. OK 10 Drive chain Properly installed, OK 11 Exterior Free from rust,dents,and blemishes„ OK SECTION 3 Visual Inspection of IRB Tuhnels Exterior Assert blyr OK/NC/'NA 12 Tunnels exterior assembly Completed per engineering Spec. OK 13 Tunnel weather seals Properly installed. OK 14 Rollers Are greased and free from rust. OK 15 Tunnels Fit without problem OK 16 Exterior paint Painted per engineering Spec. OK 17 Bridge exterior Free from rust,dents,and blemishes OK ('SECTION 4-Visual I is -ri of Elevation,Assernbl % OK/NC/NA 18 Elevation Is mounted at the proper P-Position, OK Hydraulic power unit,cylinders,and N/A 19 There is no oil leakage or damaged hoses. connections. 20 Wheel bogie FRONT and REAR signs Are clearly identified. N/A Warning"CRUSH HAZARD-KEEP FEET N/A 21 CLEAR" Mounted each side of wheel bogie cross tube. SECTION 5-Visual irlepeclo of Electrical General Wirirl �Exterior OK/NC/NA Various Junction boxes-properly installed and labeled, OK All wires are neatly routed and secured. OK 22 Wiring/Cables Wires labeled and are terminated in correct terminal. OK Electrical conduit is straight,without damage and OK secure. Trolley moves smoothly with no binding. OK Electrical cable is properly supported and labeled. OK 23 Side trolley system Correct side of cord grips attached at the end of each OK cable. SECTIoN 6-dual inspection of PBB Tunnels Interior ,+sIr la OK/NC/NA 24 Wail,ceiling,and corner trims Properly installed OK 25 Carpet flooring Properly installed,no bubbles are visible. OK 26 Floor Gutter Properly installed,no bubbles are visible OK 27 Transition ramp Ramp is secure and not a trip hazard„ OK 28 "V%,,ATC;i YOU UIII S i EIP""signs Installed at above the Transition Ramp. N/A 29 Handrails Rails are properly secured with no sharp edges. OK C06_FOR_07,Rev 6 02/10/2023 Page 2 of 6 ..... _._.. ........ ... Sales Order # 760000090 PROJECT RELEASE AUTHORIZATION CHECKLISTmmmmmm Item # 02 EC:o7mpon:e�ntto ���,� �� .......� �a be Inspected Comments Status 30 1 Tunnels interior Free from rust,dents,and blemishes 'SECTION 7-Visual inspection of PBB Cab Interior Assembly.. 01(/NC NA , 31 Cab curtains Properly installed,free from dents and blemishes OK Brushes and seals are properly installed. OK 32 Cab flooring Properly installed,no bubbles are visible. OK Installed properly, OK 33 Service door assembly Caulking and weather sealed properly installed OK Lock is mounted and operate properly. OK 34 Weather Door assembly Properly installed;and operates properly. OK 35 Cab interior Free from rust,dents,and blemishes OK SECTION 8-Visual lnsPectfon of Eieatricel Assembly;Interior OK/NC/NA' 36 Light fixtures Light fixtures operate correctly. OK 37 Light bulbs Installed per engineering Spec, OK 38 Diffusers Placed inside TA with fully wrap. OK 39 GFI plug(receptacle) Operates correctly OK 40 Telephone preparations for connection and Installed in the left wall of the cabin. Not Installed assembly of a telephone 41 CCTV camera monitor Installed on left wall of cabin above CC1 OK 42 Operating Instruction placard/UL labels Installed on left wall of the cabin, Not Installed SECTION 9. Visual inspection the of Primary Power` I~" and control Cohsoiei' QK/NC/NA 43 Control Console desktop and faceplate The functions are clearly labeled on the control panel OK All wires are neatly routed and secured. OK Wires are identified with approved labels. OK 44 PP1 and CC1 wiring Labels are visible and match the wiring diagram. OK Spare wires shall be numbered and labelled as SPARE. OK 45 PP1 Door Properly installed,open and close without issue. OK 46 11 IGH V0111...TA III /II UVd iiru7ilnq signs Installed per engineering Spec„ OK ,SECTION 1p=Functional Inspection OK NC j NA 47 Operation and Functional Inspection Completed per Engineering Inspection Protocol OK 48 Control console cabinet(CC1) Is secured.Interlocks are functional. OK 49 Primary power cabinet(PP1) Is secured.Interlocks are functional. OK 50 Press LAMP TEST Button All the panel lights are ON and the buzzer and siren OK sound audibly. Press and reset"EMERGENCY STOP"button All output should be off,and no movements allowed. OK 51 on CC1 Auto lever Alarm Buzzer and CC1 Buzzer should be on. 52 Tunnel lighting-three-way switches Operates correctly OK 53 Emergency lighting Illuminates only when Main power is shut off. OK 54 Red battery light for emergency lighting Illuminates only when switch is off. OK 55 HMI push button for Exterior Cab lights Outside front of rotating cab light is on, OK 56 HMI push button for Interior Cab Lights Light above CC1 in on. OK Extends/retracts fully;and stops on the limit OK 57 Canopy Operation Canopy extended bridge will not move forward. OK 58 Articulating Floor Operation Raises and lowers;and maintains a level position. OK 59 Auto leveler Operate correctly. OK C06_FOR_07,Rev 6 02/10/2023 Page 3 of 6 ......... ....... .------- Sales Order# 750000090 PROJECT RELEASE AUTHORIZATION CHECKLIST Item # 02 Component to be Inspected Comments =Statu Cab rotates and stops on the limit with no issues. OK Drive chain runs properly and has enough clearance from OK 60 Cab rotations the nearby components. Curtain is tight on both sides when cab is moved in both OK directions. The bridge raises up and lowers smoothly OK 61 Vertical Operation Check for bounce or shudder. OK The door stays closed with the bridge at the lowest OK 62 Service door(check in various positions) height. The door opens easily at the highest height. OK Wheel rotates properly and stops on the limit. OK 63 Wheel Bogie Rotations Wheel guard system fully encompasses both wheels,and OK it stops movement of the PBB when it is contacted/activated by a person or obstruction. The tunnel extends and retract without noise. OK The tunnel Rollers support evenly. OK The exterior of the inner tunnel does not rub the inner OK wall panels of the exterior tunnel. 64 Tunnel extends and retract The antismoke sealing seals well. OK The gap on the left and the right side has the same OK width. The ramp moves freely. OK SECTIC'kil--Critical of Notfficatfon�Incomlplete Work„ft Shot Parts e ; A piicable Specification-Description Comments,Delivery ETA,etc. QTY P � wME C06_FOR_07,Rev 6 02/10/2023 Page 4 of 6 Sales Order# 760000090 PROJECT RELEASE AUTHORIZATION CHECKLIST Item # 02 Component to be Inspected Comments Status If yes,create QOD/FPR for the parts identified in Section QOD Applicable? 13. YES❑ NO ❑ Email to the QOD-FPR Notification group at ��._FI -I�Io�mifacalion- ��-�1S�tCCel�v �o .�ro. NCR# Discrepancy Reason Description of Issue C06_FOR_07,Rev 6 02/10/2023 Page 5 of 6 SgIes Order# PROJECT RELEASE AUTHORIZATION CHECKLIST Item # 02 Component to be Inspected Comments Status FAT Meeting status • FAT documents to be provided by end of business tomorrow • Submittals Pending calculations will be submitted with revised information by end of business today r Action items to follow up on • The interior lighting RFI appears to be accurate • Customer approves lighting as reviewed during FAT • HPU HPU mounting must be under the PBB not side mounted Engineering to confirm the under mounting is on all PBB's if that is not the case we will discuss adjusting gate 1 fleet mix • Under skins Customer does not accept the finish as is • MFG to rework with caulking and paint to • MFG confirms the structural integrity of the PBB is not affected by the skin installation a Warranty 0 To be verified by TK and provide by end of business tomorrow a AUX equipment installation TK to provide the AUX equipment layout TK to provide the commissioning check list • Rotunda Rotunda is to be painted Provide pictures to support upon completion C06_FOR_07,Rev 6 02/10/2023 Page 6 of 6 From:Gonzalez, Lorena Sent:jueves, 17 de agosto de 2023 11:35 To:Amanda Pfeiffer<AmandaP@gulfbuilding.com>;strickland-rchard@monroecounty-fl.gov; Beckham,Tyler <tyler.beckham@tkelevator.com>; Bobadilla,Alonso<alonso.bobadilla@tkelevator.com>; Hoover, Brant <brant.hoover@tkelevator.com>; McCage,Carla<carla.mccage@tkelevator.com>; Blanco,Jaime <jaime.blanco@tkelevator.com>;Antonio Pinto<apinto@nv2agroup.com>; Martinez Chapa,Adrian <adrian.martinezchapa@tkelevator.com> Cc: Moran, Eduardo<eduardo.moran@tkelevator.com> Subject:755/90 Key West FACTORY ACCEPTANCE TEST- MOM All, Please find below the minutes from yesterday's FAT. BR Lorena Key West FACTORY ACCEPTANCE TEST miercoles,16 de agosto de 2023 15:54 Notes Pre FAT follow up notes . Storage TK submitted change order for$508k for storage in house . 50k in spares credit was granted Agreed to$450k change order total to be revised and resubmitted by Friday of this week Confirm in writing that insurance coverage will support any acts of God • Training TK to follow up and provide proposal for additional training and exact training being offered Provide by Friday Aug 25th • Maintenance TK to have an internal meeting on August 17th for review Proposal to be submitted by no later than Aug 25th Spares and Auto Docking TK to provide the spares parts list and costing directly with Richard • To be provided by Aug 18th • Auto Docking to be reviewed as well tomorrow Pay App#1 Receipt of payment to site yesterday • TK to receive payment in the next week 1 • Pay App#2 Reviewed during meeting to be submitted today prior to end of business • Value of 2.9M • Bird Frit Approval • Original sample was lost by UPS . New samples were ordered and follow up with delivery date by next week FAT Meeting status • FAT documents to be provided by end of business tomorrow • Submittals Pending calculations will be submitted with revised information by end of business today . Action items to follow up on • The interior lighting RFI appears to be accurate • Customer approves lighting as reviewed during FAT • HPU • HPU mounting must be under the PBB not side mounted • Engineering to confirm the under mounting is on all PBB's if that is not the case we will discuss adjusting gate 1 fleet mix • Under skins • Customer does not accept the finish as is • MFG to rework with caulking and paint to • MFG confirms the structural integrity of the PBB is not affected by the skin installation • Warranty • To be verified by TK and provide by end of business tomorrow • AUX equipment installation • TK to provide the AUX equipment layout • TK to provide the commissioning check list • Rotunda Rotunda is to be painted • Provide pictures to support upon completion 2 r I y uu IIIII '�qti�a�� I tl�ii III I 99 I i c I I I 1 / I I. V Y r la r a.,� � �u�l,�%�/lii�fll������f%�0�l�i���G 1✓;"fw� �fj/%/�,,:, ! TK AIRPORT SOLUTIONS, FORT WORTH, TX. PBB:Pre-Assy Main:Assembly PBS:Testing 8 Shipping 1.Insulation Unteriors 1.Test stand area 2.Canopy 2.Rotating Cab 2.Wrapping 3.Shi in 3.Electrical pP 9 f Warehouse 5 3��" i� Tot Ek i I�III