08th Change Order 12/12/2023 DocuSign Envelope ID:C4A3690E-FE81-4A3A-A2CC-D95A3230FCBC M.C.A.INSTR,8900.2 Enclosure Ill 3/28/2017 Page 3 MONROE COUNTY/DEPARTMENT OF AIRPORTS CONTRACT CHANGE ORDER PROJECTTITLE: KWIA Concourse A&Terminal Improvements CHANGE ORDER NO.: 008 INITIATION DATE: 11/20/2023 TO CONTRACTOR: NV2A/Gulf Keystar JV CONTRACT DATE: 8/17/2022 The Contract is changed as follows: The Original(Contract Sum)(Guaranteed Maxium Price) $ 101,461,771.00 Net change by previously authozied Change Order $ 8,415,245.92 The(Contract Sum)(Guaranteed Mxium Price)prior to this Chage order was $ 109,877,016.92 The(Contract Sum)(Guaranteed Mxium Price)will be('iincireased)by this Change Order $ 3,323,990.00 The new(Contract Sum)(Guaranteed Mxium Price) including this Change Order is $ 113,200,996.92 The Contract Time will be(unchairnged)by 0 days The date of Substantial Completion as of the date of this Change Order is 3/9/2026 Detailed Description of change order and justification: 'Chas Change Order includes the costs associated with the changes in the Scope of Work for the electrical power and lighting systems resulting from the incorporation of the revisions depicted in the 100%Conformed Design Drawings compared to the 90%Contract Documents for the KWIA project. 20.2039.01 POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: p00 Title Schedule Impact Amount 018 FKE•D,&slgn Chan.90%CD to Conformed Set-Elec.ftwerMighting 0 $ 3,323,980„00 Ttntal: $ 3,323,980.00 This change order is 3.28%of the original contract price. Not valid until signed by Owner,Architect(if applicable),and Contractor E(�J6�a, Signed by: S, I 6/2023 1 15:56:59 PST ARCHITECT: , DocuSigned by: DocuWpned by, DATE: I � 12/6/2023 1 15:03:25 PST CONTRACTORS: -- 0190p'382W—A8F..„ 613'DD4BAB$7r-'14D4 w_... DATE: 'Doctr''8lgned by: 12/7/2023 1 07:13:35 PST EXECUTIVE DIRECTOR OF AIRPORTS DATE: 8E66F52F4C21-4D3...„u , „ ���... COUNTY/DEPUTY ADMINISTRATOR 12.12.2023 � "' �•� � DATE: I+POE COUNTY ATTOnNEY DS 0s � AO4'E P1=D G:1,I. A -7 ASSISTA LINTY ATTORNEY Date 12/7/23 DocuSign Envelope ID:C4A3690E-FE81-4A3A-A2CC-D95A3230FCBC �" � GULF ruwbmar�r " YT PCCO #008 NV2A/Gulf Keystar JV Project:20-2039-01-KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami,Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West,Florida 33040 Prime Contract Change Order #008: FKE-Design Chan. 90%CD to Conformed Set-Elec. Power&Lighting TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West,Florida 33040 Miami, Florida 33156 DATE CREATED: 11/20/2023 CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) CONTRACT STATUS: Approved REVISION: 0 - DESIGNATED REVIEWER: REVIEWED BY: DUE DATE; REVIEW DATE;__ 12/06/2023 INVOICED DATE: PAID DATE: - SCHEDULE IMPACT: 0 days EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER 11/20/2023 COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 20-2039-01:Key West International Airport TOTAL AMOUNT: $3,323,980.00 Concourse A DESCRIPTION: FKE-Design Changes 90%CD to Conformed Set-Electrical Power&Lighting This Change Order includes the costs associated with the changes in the Scope of Work for the electrical power and lighting systems resulting from the incorporation of the revisions depicted in the 100%Conformed Design Drawings compared to the 90%Contract Documents for the KWWA project.(20- 2039.01) This Change Order amount is a Lump Sum of$3,323,980.00 broken down as follows: 1 Direct Cost-Electrical Power and Lighting 9 9 $ 2,900,000.00 2 'Payment and Performance Bonds Included 3 Insurance(Excluding Builder's Risk)(Note 1) 1.20% $ 34,800.00 4 Builder's Risk Insurance Note 1 100% 5 Subtotal: $ 3,021,800.00 6 Markup Fo-00% $ 302,180.00 7 Total $ 3,323,980.00 Note 1:Insurance amounts shown are allowances.Final insurance amounts shall be based on the actual insurance costs at the end of the Project. REFERENCE: PROCORE>Drawings>90%CD Drawing Set os os os Ds PROCORE>Drawings>Conformed Set p p ATTACHMENTS: NV2A/Gulf Keystar JV Page 1 of 2 Printed On: 12/6/2023 04:39 PM DocuSign Envelope ID:C4A3690E-FE81-4A3A-A2CC-D95A3230FCBC NV K YS't" R LICO 7T008 POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: .................. .. PCO# Title Schedule Impact Amount 018 FKE-Design n Chan.90%CD to Conformed S g et-Elec.Power&Lighting j 0 days $3,323,980.00 ... .... . _. Total: $3,323,980.00 The original(Contract Sum) $101,461,771.00 Net change by previously authorized Change Orders $8,415,245.92 The contract sum prior to this Change Order was $109,877,016.92 The contract sum will be increased by this Change Order in the amount of $3,323,980.00 The new contract sum including this Change Order will be $113,200,996.92 The contract time will not be changed by this Change Order. Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton,New York 13901 Key West,Florida 33040 Miami,Florida 33156 oaaca fined by, p Dmo5igned by:: Doca«'•ftned'by: d � f �1v1mil 12/6/2023 I 15:03:2 5 56:59 S 3 I 07:13:35 P � - 'a SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE os os y F-`�r-*d��n,:._NV2A/Gulf Ke star JV Page 2 of 2 � 1`2 612023 04:39 PM DocuSign Envelope ID:C4A3690E-FE81-4A3A-A2CC-D95A3230FCBC I� = V - K wo GULF BUILDING PCO #018 IV =" KEYST R NV2A/Gulf Keyslar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd, Suite 600 Program Miami,Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West,Florida 33040 Prime Contract Potential Change Order #018: FKE-Design Chan. 90%CD to Conformed Set-Elec. Power&Lighting TO: Key West International Airport FROM: NV2A/Gulf Keyslar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West,Florida 33040 Miami,Florida 33156 PCO NUMBER/REVISION: 018/0 CONTRACT: 20-2039-01-Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 10/11/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 0 days PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $3,323,980.00 POTENTIAL CHANGE ORDER TITLE:FKE-Design Chan.90%CD to Conformed Set-Elec.Power&Llghling CHANGE REASON:A/E Design Changes POTENTIAL CHANGE ORDER DESCRIPTION:(The Contract Is Changed As Follows) FKE-Design Changes 90%CD to Conformed Set-Electrical Power&Lighting This Change Order includes the costs associated with the changes in the Scope of Work for the electrical power and lighting systems resulting from the incorporation of the revisions depicted in the 100% Conformed Design Drawings compared to the 90% Contract Documents for the KWIA project. (20-2039-01) This Change Order amount is a Lump Sum of$3,323,980.00 broken down as follows: 1 Direct Cost-Electrical Power and Lighting $ 2,900,000.00 2 Payment and Performance Bonds Included - 3 Insurance(Excluding Builder's Risk)(Note 1) 1.20% $ 34,800.00 4 Builder's Risk Insurance(Note 1) 3.00% $ 87,000.00 5 Subtotal: $ 3,021,800.00 6 Markup 10.00% $ 302,180.00 7 Total $ 3,323,980.00 Note 1: Insurance amounts shown are allowances. Final insurance amounts shall be based on the actual insurance costs at the end of the Project. REFERENCE: PROCORE> Drawings> 90% CD Drawing Set PROCORE> Drawings> Conformed Set NWA/Gulf Kaystar JV Pape 1 of 2 Printed On:10/12/2023 05:40 PM DocuSign Envelope ID:C4A3690E-FE81-4A3A-A2CC-D95A3230FCBC N- 10 GULF ]BUILDING PCO #018 T ATTACHMENTS: I i 1 J e7 fa c NV2AlGulf Keystar JV McFarland Johnson,Inc.) Key West International Airport 9100 South Dadeland Blvd,Suite 600 49 Court Street,Suite 240 3491 South Roosevelt Boulevard Binghamton,New York 13901 Key West,Florida 33040 MIamI,Florida 33156 4 . SolE ATe st NATu OAT GATUIRE 000uaign Envelope ID:o4AonooE-rso1