Item C19BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: May 16, 2007 Division: Enginng Bulk Item: Yes X No Department: Facilities Development Staff Contact Person/Phone #: Jerry Barnett X4416 AGENDA ITEM WORDING: Receipt of monthly report on Change Orders reviewed by the County Administrator's Office. ITEM BACKGROUND: There were five change orders considered and approved by the County Administrator for the period beginning April 1, 2007 and ending April 30, 2007, totaling a net credit of $82,889.26. PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No. 026-1998 was adopted in order to provide that the County Administrator may approve separate, non -cumulative change orders for construction projects and professional service contracts in amounts not to exceed $25,000.00 or 5% of the original contract price, whichever is greater. The BOCC requested a monthly report of all change orders considered by the County Administrator. CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATIONS: N/A TOTAL COST: N/A COST TO COUNTY: N/A BUDGETED: Yes N/A No SOURCE OF FUNDS: N/A REVENUE PRODUCING: Yes _ No _ AMOUNT PER MONTH Year APPROVED BY: County Atty OMB/Purchasing Risk Management — DOCUMENTATION: Included X Not Required DISPOSITION: Revised 11/06 AGENDA ITEM # MONROE COUNTY FACILITIES DEVELOPMENT M E M O R A N D U M TO: David Koppel County Engineer FROM: Ann Riger, Contracts Facilities Developmer DATE: April 30, 2007 RE: Agenda Item — Change Order Report AGENDA ITEM WORDING: Receipt of the monthly report on Change Orders reviewed by the County Administrator's Office. ITEM BACKGROUND: There were 5 change orders considered and approved by the County Administrator totaling a net credit of $82, 889.26. They are as follows: 1. N. Key Largo Fire Station Change Order No. 12 in the amount of $1, 050.00 for the additional cost of afire pole that was eliminated form the original design. The contractor was instructed in July, 2006, to eliminate the purchase and installation of the fire pole for a cost savings of $14, 900.00. In October 2006, the contractor was instructed to move forward with the installation for the fire pole. The vendor, McIntire Brass Works, Inc. quoted a price increase of $1, 000.00. $50.00 is the 5% overhead charge from Overholt Construction. 2. Big Pine Key Park Retaining Wall & Basin Fill-in Change Order No. 3 for a credit of $88, 830.42 is for an over calculation of the amount of fill that was needed to fill the basin. The specifications required 20, 000 cubic yards of fill, at a unit price of $31.61, or $632, 200.00. The actual amount of fill needed was 17,189.80 cubic yards at $31.61, or $543, 369.58. 3. Tavernier Fire Station Change Order No. 1 in the amount of $1, 616.09 is for the removal of a concrete slab. While excavating for the new fire station, a 130 sf concrete slab was found under 10" of fill. This slab was below grade and not included in the plans. It was not foreseeable until the start of excavation for the foundation. 4. Tavernier Fire Station Change Order No. 2 in the amount of $3, 275.07 to purchase and install 3 ADA water closets, faucets, guards, showers, grab bars, and ramps to comply with ADA requirements. The Architect was instructed to provide an ADA compliant design in only those areas accessed routinely by the public in the belief that ADA compliant systems were not required for areas in which access was limited to public safety employees. This view failed to account for access to the restricted areas by supervisory personnel and other (non emergency responders) who might rightfully need to access other parts of the building. S. N. Key Largo Fire Station Change Order No. 13 for a no cost time extension of 14 days. Delays occurred through the approval process of Change orders, as well as the delay in the final water service connections from the FKAA. PREVIOUS RELEVANT BOCC ACTION: On September 9, 1998, Ordinance No. 026-1998 was adopted in order to provide that the County Administrator may approve separate, non- cumulative change orders for construction projects and professional service contracts in amounts not to exceed $25, 000.00 or 5% of the original contract price, whichever is greater. The BOCC requested a monthly report of all change orders considered by the County Administrator- CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATIONS: N/A Thank you. If you have any questions please call me at ext. 4439. W V N U. LL O U) ie O 1�1 Q Q O V W H m W W U) Z O U O ate+ INO QI Q � LL s YQ W N f0 p CO >` N W pf V E c p o 2 o 3 ti t Q Qmo Q w s M o v o Z� O o Cl 0 _ S U 5-v m c 8 Q oQ 8 0 � C = N 8. E E c �i `PL c Q c� P G O ry �. O 16 O ui O g N 40? H g � V Ln Ln [L Q a o 21 O J Y C C J m Q Cl Q MONROE COUNTY / ENGINEERING /FAcmrius DEVELOPMENT CoNTRAcr CHANGE ORDER PROJECT TITLE: N. Key Largo Fire Station #25 TO CONTRACTOR: Overholt Construction Corporation 10460 SW 187a' Terrace Miami, FL 33157 The Contract is changed as follows: CHANGE ORDER NO: 12 INITIATION DATE: March 14, 2007 CONTRACT DATE: May 18, 2005 The original (Contract Sum) (Guaranteed Maximum Price) ........................................ $2,030,500.00 Net change by previously authorized Change Orders ................................................ 84,924.82 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Omer was ......... $2,115,424.82 The (Contract Sum) (Guaranteed Maximum Price) will be fincrea (decreased) (unchangecQ by this Change Order .................. 1,050.00 The new (Contract Sum) (Guaranteed Maximum Price) including this Change Omer is ... $2,116,474.82 The Contract Time will be (increased) (decreased) (unchanged) by .............................. N/A The date of Substantial Completion as of the date of this Change Omer is .................... April 3, 2007 Detailed description of change order and justification: forward with the installation of the lire Pole, The Price quoted for the same model 20 slide pole unit increased to $15 900 00 This chancre order is for an addltfona/ $1000 00 for the cast of the slide pole. plus $50.00 overhead ARCHITECT: CONTRACTOR: DIRECTOR, FACILITIES DEVELOPMENT: COUNTY ENGINEER: COUNTY ADMINISTRATOR 3 21 7 William . Ho rchitect .A. Date ?�M Overholt Co orp. Date JAg, 24 3 %>? 07 J Ba Date "i David S:; P.E. Date Thomas Willi/Debbie Frederick -Deputy Date Change Order Attachment per Ordinance No. 004-1999 Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The fire pole was originally included in the contact specif cadons. The County directed the contractor to remove N from the scope of the project as a cost savings measure. The County subsequently dfnecied the contractor to reinstate the pole in the scope of the project. In the interim, the vendor applied an increase in price. 0 Change Order was included in the original specifications. Yes ❑ No JE If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: ARRiMIT 10460 SW 187fh Terrace CONSTRUCTION CORPORATION tiBaml, Florida 33157 CGC 057740 COC 001e4 Phone: 305-234-9677 Fax: 305-234-6535 Exparknoe in 5RA Florida Since 190 REQUEST CHANGE ORDER NUMBER Twenty Eight (28) O: Jerry Banter DATE : MWCh 8, 2007 Monroe co" Facomm oarebpmax 1100 Simonton SWOK Room 2-216 PROJECT: Morwm Key We:l, FL 33W0 Cp+^h taatlart arz5 OCC JOB #: m tom Cost Increase from McIntire Brass Works, Inc for the Fire Pole $1,000.D0 After the Fire Pots was originally ordered By C*edv# Consbu;bon Corp. It was decided by the Flee Dew to remove it fawn the Scope. Fare Months atier the order for the Frs Polo was canr.,eNed it was decided that it would be Instated. DurIN that tune period McIntire Braes woft. Inc. had a ciao increase. REA ARKS: SII* attached Quota and Correspondence CAST OF THE WORK $1.000.00 Subialmi $1.000.00 Overtmw a 5% MOO TOTAL COST OF TM WORK s1 650.00 >tEs�crl~uLLr SUBlwrr�`n, REVIEWED AND APPROVED BY, CONSTRUCTION CORPORATION MONROE C0t1NiY BOARD OF COMMISSIONERS Rodney Ovedx*L Project Manager DATE: DATE: Page I of I Teresa Pries From: WPHORN@aol.com Sent: Friday, July 21, 2006 11:50 AM To: Teresa Pries Subject: Re: FW: Fire Pole & appliances - MCFS #25 e have asked Rod for a credit to not have the fire pole and to fill the hole in the floor and he is or will be working on na av at t e coup May Itut wan to nave the appliances speced, but that is all I know, Carl is working on that 1 think, you need to call him. Bill McINTI BRASS WORKS9 INC,, 14 HORACE STREET •:. SOMERVILLE, MASSACHUSETTS 02143 -:• TEL 617-547-I819 •:• FAX: 617-547 4466 June 26, 2006 Mr. Rodney Overholt Overholt Construction Corp. 10460 SW 1870- Terrace Miami, FL 33157 Dear Mr. Overholt: Thank you for your order of a Model 20 Slide Pole Unit for �490000Enclosed please find two prints. Fill in dimensions 1, 2 and 3, affix architect's approval and return one to US. Our payment terms are as follows: If bonded: one-third with P.O., one-third at time of shipment, and one-third 30 days after shipment. Please provide us with bonding information. We' ship freight prepaid FOB Somerville, MA and invoice you for same. If not bonded: one-third with P.O., and two-thirds at time of shipment. We ship COD for freight charges FOB Somerville, MA. WE CANNOT START PRODUCT70N UNTIL WE RECEIVE FaSI PAYMENT AND DIMENSIONS. WE HAVE A LEAD TINE OF THREE TO FOUR MONTHS. We will be on vacation starting 7-1-06 to 7-15-06. If you have any questions, please let us know. Very truly yours, �taz� Elaine M. Anthony EA:bhs Enclosures 2C29W,E r r----- I JUL 0 2 2006 �! OVEHHOLi CONS ► RUCTION McINTIRE BRASS WORKS, INC. 14 HORACE STREET -:- SOMERVILLE, MASSACHUSETTS 02143 TEL: 617-547-1819 •:- FAX: 617-547-4466 November 2, 2006 Overholt Construction Corp. 10460 SW 187`s Terrace Miami, FL 33157 Dear Sins: Re: Monroe County, Fire Station #25 NOVOv /W Thank you for your purchase or odel 20 Slide Pole Unit. We have to advise you that we had a price increase to�5900. plus freight since yourlastpurchaseorder.If you could issue a new purchould appreciate it. I am enclosing two prints and I have circled the old style guards and gates. We have When orb d g, fill guardsdated the dimeniogates a2 I am closing prints of those on separate Pages. US. approval and return one to Please be advised of our payment terms when ordering: If bonded: one-third with P.4., one-third at time of shipment and one-third 30 days after shipment. Please provide us with bonding information. We ship freight prepaid FOB Somerville, MA and invoice you for same. If not bonded: one-third with P.O. and two-thirds at time of shipment. freight charges FOB Somerville, MA. We ship COD for WE CANNOT START PRODUCTION UNTIL FIRST ONE-THIRD OUR LEAD TIlVM IS 4-5 MONTHS. IS RECEIVED. Very truly yours, Elaine M. Anthony EMA: bhs Enclosures 10/09, -bat, 1:47 3059718926 ++� Us as: 58a Yi 11 "elm 11 P. Horn OVERHOLT DOWNSTAIRS PAGE 01 r � P-1 s wDnNSTRUCTION WELL AM P H01M A11tCMnX C T, p p, -...,.,.. alaaET, I(&Y w'M-FW1UDA.1-Ve cam! No. AA GWJM caber 6, 2Ni MONROE COUNW MW STATION 023 NOR= Iry AGO MEEMiG IV URnrES WEEKLY MOMM MTO. Q4 WAD ON SITE 10.04.06 WJP. Nora A*M P-C BMJ> 1 OXN 303-2% DM FAX 303-2% M3 M )MR06 DO1JI1'1y CML CORMIER 305-M 1456 rAX: 301-29 M73 J6RRY BARNETP FAX 3054517M OVZRHO1.T (7IAN T. A1�7' MM DRION 736 M 5156 FAX: 30S-4S14933 OVRRHVAX 3QS OLTaomr. ROD OVERHO T 4 FAX: -9 77 1926 0117 - q 2005 926 10/u9�0va D6 U9t 5ea85971 Yi 1 l i Am P. Horn 13051292-1033 PAGE 02 P.l 71* Aw t OPOWW at 10.30 AA AJI P+des wm&od the SW mad b WWb4;. �g ' • Ebaaia.l die b 9t % oageplats. AH a..W y is b Pok p,4. 1. aroma prkbW. 2. AIC mq* mawa& is 100% oompla.. 3. Fk a ipeidcim 1�iK bam *wbd. 25% oompielG D" Is dog !or 4. Wbdmm / bmwn on sibs — ft% irk 3. A/C + SmaMaor pod is oompk* ai�o Ide SeeearMtar 1a be mat an To"do . 6. Floor t& an siW 7. Ebralar is an sila. 3. !leafii-dryed4o, 01. 11e tine Pal* war diem" Mod it wig be V ft in w per spec. WO will be ad&g a wa8 + door at the harbors of the. pale area b the pram tbet WiR bo 3 or 2bur mbd (b be °j- z T� UM abo dimWNW rd nie ge.i is aa:are Ser*io flail eemee ft" b !veer the aoaeas:edsi grade wommom (mad mod canes U& for ew ymm yo**w for the fim 3. 1La alsoreio08699mmd win be aarparpios %Wapole in Arcot plao0rr art& iiarn coo ihOw t•"'W arb"w r a■ma. We No MN lwieb* dW W.W w W mmp* m d pa 9ee mo"Y WHM b 6e ntmbr (io boot of � Thu w m void aw POOR" mromy beios Headed *an tore ws.OW dbwamoe Mad mrt noney aan be m d 6or **w itm L 4. Ormr6Mit his a Pan* For the vmvind apri ** drwria�t wtd sdn recede to het Bono a appy °f ► O Aok aeboloed sw chew over for eaoceediei we ma was" of lls,Mfat 113e. S. OrO&A. to odor* (3 mp t]nlmm far go eeclrM■ a d c - am sooa ae ponRle, 6. Owdeoit b■a sdd dset in ggkg hem P.T, to C.D.X pbwrood it did nor now any moeoy s" Cod asd JOKY *ate, 4bmfm Jaw wwt a=WX 7. Son""oag/wWN Pmd shop deawiMp (miJtmd md,eaw by an i mdll how am bema maiommod sw mvb w. 10/09/.006 i1:47 3059718926 von un uu un:38a Villiatr P. Horn OVERHOL_T DOWNSTAIRS 1303)298-1033 PAGE 03 P.2 & ft awkw he c"Ms raviaMrod rr� Ohs (o0efrsplpr aeedsc tv sole fad Ibi "m an *awmp and submit oador + R NOWAK + dam, 7U doP I srorpim amd a be wed fbr mvkw. Swap,= of tiles saess� b ► buts* d!ma !bust 9 k s+ki *0 boa* pa i1S,000 k dlowtrtm hr sswW tta,oamt py� ca„d � is caul sbm Sao W 3 mw. 7U givil dmswedW for an kawWm swaW 4*001 Pill 1*1*adus V ibect m Ma& butdid no lfsc* &,e&*pm it SAO in hie sebC"m of'vahm for dlk W" bm tuned arc so to t be aeovyh. A CbA m8s order lass diroeaad, 10. yea sa tawett'asW*d@d 16r Oc obw 1S„ 20M g 10:3o. Slim you find =7 440"" to thew minx" dye to artnr or ossheiON plain 000llct oar am= 9&M*. wohm r. Hon, W-P. Bwn Ar "N4 r s. Page I of 1 Teresa Pries From: Craig Overholt Sent: Friday, August 04, 2006 9:07 AM To: Teresa Pries Subject: RE: MCFS # 25 ok .................................................................. . ................................................................. From: Teresa Pries Sent: Thursday, August 03, 2006 9:30 AM To: Craig Overholt; Rodney Overholt Cc: Cindy Burke Subject: MCFS # 25 Importance: High Just directed by Carl via Fire Chief please wait on ordering appiances and filing hole in slab for fire pole until further notice. They may still want to install pole and order different appliances. Teresa Pries Project Administrator Overholt Construction Corp. 35 Ocean Reef Drive, Suite 148 Key Largo, FL 33037 Office 305-367-1069 Fax 305-367-4069 Page I of 1 Teresa Pries From: VVIlson-Kevin [Wilson-Kevin@MonroeCounty-FL.Gov] Sent: Monday, October 30, 2006 11:47 AM To: Teresa Pries Cc: WPHORN@aol.com; Sarnethlery; Graziano -Maria; Cormier -Carl; Rodney Overholt Subject: RE: Fire pole Yes it has. Sorry for not confirming that in writing back with a copy to you kevin Kevin G. Wilson, Project Manager Monroe County Facilities Development The Historic Gato Cigar Factory 1100 Simonton Street, Suite 2-216 Key West, FL 33040 (305) 797-1547 phone (305) 451-7069 fax -Key Largo (305) 295-4321 fax -Key West Wilson-kevin®monraecouMv�gov Help us to help you! Please take a moment to complete our Customer Satisfaction Survey: ht!p://monroesurvey.virtualtownhall.net/survev.php?9acc14ael b Please note. Florida has a vary broad pubhc records law. most written comhtrnicatlons to or torn the Co records available to the public and media upon request. Yow Ferrell n con ricafion may be sub' to �Y regarding County business are public Y subject pubic disclosure. ......................................................... ..................... ..... From: Teresa Pries [mailto:4)lies@overhotbcc.Com] SOnt: Monday, October 30, 2006 10:08 AM To: Wilson -Kevin Subject: Fire pole Has this be added back? Teresa Pries Project Administrator Overholt Construction Corp. 35 Ocean Reef Drive, Suite 148 Key Largo, FL 33037 Office 305-367-1069 Fax 305-367-4069 Page 1 of 2 Teresa Pries ............. From: Rodney Overholt Sent: Tuesday, November 07, 2006 11:50 AM To: Teresa Pries Subject: RE: Info Needed to Pursue Funding by KLVFD for NKLFS Appliances and Fire Wall Copy kevin ......... ........ ............ ......- ..................... ..... From: Teresa Pries Sent: Tuesday, November 07, 2006 10:27 AM To: Rodney Overholt Subject: RE: Info Needed to Pursue Funding by KLVFD for NKLFS Appliances and Fire Wail 1. Stiff waiting on Bill to spec a range hood so we can price 2. Lotspeich currently working on oricina rinnr/harriwore NEW — since the fire pole was last quoted it went up $1,000.00 with a lead time of 4-5 months ......................... From: Rodn ey Overholt Sent: Tuesday, November 07, 2006 10:16 AM To: Teresa Pries Subject: FW: Info Needed to Pursue Funding by KLVFD for NKLFS Appliances and Fire Wall Can you help with this ........... ......................_....._........ _........... _....... From: Wilson -Kevin [maiko:Wilson-Kevin@MonroeCounty-FL.Gov] Sent: Tuesday, November 07, 2006 10:02 AM To: Rodney Overholt; Teresa Pries; WPHORN@aol.com Cc: Cormier -Carl; Graziano -Maria; Bamett Jerry Subject: Info Needed W Pursue Funding by KLVFD for NKLFS Appliances and Fire Wall Attached is a draft memo for Sergio Garcia asking him to explore obtaining the additional funding to pay for the upgrade of the appliances and the fire wall at the base of the fire pole. It lacks some numbers because my information is not yet complete. I have- -costs of appliances (except the range hood) from Overholt - - - total cost $15,506.77 -amount of money originally allocated in the schedule of values - - - $5,000.00 I still need: -Range hood costs (need Bill Horn toaelect and Overholt to supply costs) -Cost to add fire rated wag/door at the base of the fire pole (Already drawn by Bill Horn; need cost from Overholt) I would like to send the attached to Sergio so we can get a read out on what he can do before the next project meeting (15NOV06) so... please provide the above missing information asap but before the weekend 0 will send it to Sergio over the weekend so he has it NLT 008 on Monday, 13NOV06) kevin Kevin G. Wilson, Project Manager Monroe County Facilities Development The Historic Gato Cigar Factory MEMORANOUM TO: Board of County Commissioners From: Debbie Frederick Deputy County Administrator Date: April 2, 2007 RE: Change Orders Attached is a proposed change order for the N. Key Largo Fire Station #25. (Change Order #12 for Overholt Construction Corporation is for $1,050.00 for the increase in price of the f ire pole plus overhead.) According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The Deputy Administrator intends to approve this change order on Tuesday, April 3, 2007. ,-77-_ Debbie Frederick Deputy County Administrator OLF: adc Page 1 of 1 Campo Abra From: Campo-Abra Sent: Monday, April 02, 2007 1:17 PM To: County Commissioners and Aides Subject: Change Order for N. Key Largo Fire Station #25 Attachments: 00004409 570.tif Please review the attached Change Order #12 for Overholt Construction. Abra Campo Sr Adminis mV a Assistant Of%e of County Administrator 1100 Simonton St. Suite 205 Key West FL 33040 (305)292-4445 t/2/2007 MONROE COUNTY / ENGINEEMNG /FACILMES DEVELOPMENT CONTRACT CHANGE ORDER PROJECT TITLE: Big Pine Key Park RetainMp Wag & Basin FiMV MM 31 and the intersection of Sands Road and Atlantis Drive Big Pine Key, Florida TO CONTRACTOR: Charley Toppino and Sons P.O. Box 787 Key West, FL 33041 The Contract is changed as follows: CHANGE ORDER NO: 3 INITIATION DATE: February 20, 2007 CONTRACT DATE: November 15, 2006 The original (Contract Sum) (Guaranteed Maximum Price) ........................................ $973,619.50 Net change by previously authorized Change Orders ................................................ $19,804.00 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was ......... $993,423.50 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order .................. $(88,830.42) The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is... $904,593.08 The Contract Time will be (increased) (decreased) (unchanged) by N/A The date of Substantial Completion as of the date of this Change Order is .................... July 21, 2007 Detailed description of change order and justification: LL � ��1LL:1'li� / L! _ L . !i .! = . ' 1 :L ! 1 = _ •1i 11i ILi� / RAI � rl I l�il lyl K.0 I Not valid until sianed by Owner. and Contractor ARCHITECT: N/A ate CONTRACTOR: I S (3 17 Charley Toppino and Sons Dat DIRECTOR, FACILITIES DEVELOPMENT:a",'/2- , z2 ., COUNTY ENGINEER: COUNTY ADMINISTRATOR Frederick -Deputy Date 0/ Date Date Change Order Attachment per Ordinance No. 004-1999 Change Order was not included in the original contract specifications. Yes 0 No ❑ If Yes, explanation: The original specifications asked for 20,000 cubic yards of fill, and needed was only 17,189.80 cubic yards. • Change Order was included in the original specifications. Yes 0 No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes 0 No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ❑ No If no, explanation of why: There Is no architect on this project • Change Order is correcting an error or omission in design document. Yes DNo Should a claim under the applicable professional liability policy be made? Yes 0 No Explain: 4 F� O� 4 w� tom �ci �+ U 0 0 pa HOP O Ix O F- 0 p F 1 �Y ?CT 2E(-'EPdEC) nY �- I00 9d 90/SZ/60 80:Zi ouI moo-eTAUO:Wd ouTddol 4uejj :ol'• 83/23/2087. W:42 305248911.2 CEMEX PAGE 02 l�� Mart 23, 200"f Ra WT Cm" Ubw Rio* Fill Rear � Tea a vdw lima M& yvnr comp w is.Pmbmft fiom CZMEX for ft Big Pink Basin • ..t Frill Ia Project is DOrT. Qerd�tad Coed i�pq,e 1Loc*. �'o cak�te �n voiamao oi'made� Pm hum punh=cd in >nxfs.Mnw* the u I I R. a£um 60 is pri�od on each delivery �F�,.�Y •'7'� �. Eatah .c�bic�at+d ofcinsi�ed Hraa rodr weighs 13 tons, Otis ldsae+efi Dihic Cbdx�Kcyi k Monroe Concrete Products MM 9 Overseas Highway Monroe Co. Fl Attn: Ronald L Armstrong Re: Unit weight volume conversion factor Project: Big Pine Basin Fill In Project #0619 Contractor. Charley Toppino & Sons Inc. Owner. Monroe County Mr. Armstrong; At the request of Bobby Heydrich I submit the following concerning conversion factors for our Limerock Base. 1.30 Tons/Cubic Yard This is an inventory density factor we have developed over years of experience and measurement including laboratory and full sole testing. Inventory density factors are used to convert measured vokunes (commonly in cubic yards) to weights (commonly in shout tons). If you should need additional information please do not hesitate to contact me. Janes R.D. Cox Director of Technical Services Rinker Materials AggTe Division 13292 NW 118 Ave Miami, F133178 305 818-4957 MEMORANDUM TO: Board of County Commissioners From: Debbie Frederick Deputy County Administrator Date: April 9, 2007 RE: Change Orders Attached is a proposed change order for Charley Toppino and Sons, for Big Pine Key Park Retaining Wall & Basin Filling. (Change Order #3 for an $88,830.42 credit due to a lesser amount of fill-in needed for the basin than originally anticipated.) According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Charge orders not within the Administrator's authority are placed on the SOCC agenda. The Administrator intends to approve this change order on - uesday, April 10 2007. /f � J Debbie Frederick Deputy County Administrator DLF: adc rage i or i Campo-Abra From: Campo-Abra Sent: Thursday, April 12, 2007 5:02 PM To: County Commissioners and Aides Subject: Big Pine Key Park Retaining Wall & Basin Filling Attachments: 00004550 5Mtif Please review attached Change Order #3 for Charley Toppino and Sons. Abra Campo Sr. Administrative Assistant Offxe of County Admin&trator 1100 Simonton St. Suite 205 Key West FL 33040 (305)292-4445 4/12/2007 MONROE COUNTY / ENGINEERING /FACHIM DEVELOPMENT CONTRACT CHANGE ORDER PROJECT TITLE: Tavernier Fire Station TO CONTRACTOR: Overholt Construction Corporation 10460 SW 1870' Terrace Miami, FL 33157 The Contract is changed as follows: CHANGE ORDER NO: 1 INITIATION DATE: March 23, 2007 CONTRACT DATE: August 16, 2006 The original (Contract Sum) (Guaranteed Maximum Price) ........................................ $984,458.00 Net change by previously authorized Change Orders ................................................ N/A The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was ......... $984,458.00 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Omer .................. $1,616.09 The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is ... $986,074.09 The Contract Time will be (increased? (decreased) (unchanged) by .............................. WA The date of Substantial Completion as of the date of this Change Order is .................... July 28, 2007 Detailed description of change order and justification: Removai of a 130 s. f. concrete slab that was found under 10" of existing fill while excavating for the new fire stabon. r ors cnanae uroer rs .164%f the original contract amount Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The existing slab was below grade and not included in the plans and specifications of Me project Its presence was an unanticipated underground condition and not foreseeable until the start of excavations for the fioundadons. 0 Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: ormosir 10460 SW 187th Tnnacs CGC 057740 CONSTRUCTION CORPORATION Miami, Florida 33157 oao oatiss Phone: 305-234-9677 Fax: 305-234-6535 Exper4me is -qwM FAPHda Since I M rREQUEST FOR CHANGE ORDER NUMBER TWO (2) D: Jwry BwnW DATE. moci 23, 2w Mims Cau* Fac0 im Deer opmev 1100 Sknoraon SVOK Roan 2-216 PROJECT: Tavwnlw F!n Sheen N= Key West. FL 33040 QCC JOB is OQ-1014 RonxrdW of Existing Slab discovered while sxe vxdng To Dame Only- 130 ep tt x 9' Concrete slab that was uncovered under 10' of cuing fill "lie excavNing new addition. Demo consleling of concrete and wlr+e mesh only - does not Include mbar. $1 A03.00 114 Cost for a 20 yd Dumpster $136.13 REMARKS: See attached back-up iniorrnation, COST OF THE ItJC REASF E 1,539.13 Overhead @ 5% $76.96 TOTAL COST OF TM WORK $1,61ti.Qg RESPECTFULLY SUONWrTED, REVIEWED AND APPROVED BY, OVERHOLT CONSTRUCTION CORPORATION MONROE COUNTY BOARD OF COMMISSIONERS Rodney Overholt. Rx4w Manger DATE : DATE: 28 FAI 13054315339 YCF FRAYING 0 002 MCF FRAMING & TRIM, INC. GENERAL CONTRACTOR STATE CER TIF1Ep • C(;C,p�gg . March 22, 00 Overholt Construction 35 Ocean Reef Dr. Ste 148 Job: # 07-5423P Ocean Reef Club KeY largo, FL 33037 Site: FIRE STATION #22 Phone: 305-367-1069 Fax: 305-367-4069 SCOPE OF WORK +;,■ IPM... l.s.l .-►t:1! Im, vr, 1-7t71-71 r, 1777•....r. 'tom a � 1AX .t L MCF J imming & iris», Inc, will SUP01y labor & equio ent for the fallowi To Dermo only - 130 SVL X V depth a possible sidewalk slab. With wire m"h only and no rebar. DisPmal to be made into owner Supplied dumpster. PROPOSAL TOTAL Esdmated to be a 2 day fob. 07-5423P - Fine Statism #22 C?VWSC Urdcx -pem unman SIa6 3-22-07 $2,,403.00 t 1 's e " i �'� � �� •fit-t�� i, -� �n0 I �re3n Fes* . x -795 r +;emu MAR 2 7 2007 04n LafM'7 -cAMC 1 �G ' (L7� �.. .-eiw�V�T tell r^ttC, cw t , , IEQTE MAR 1 2007 210 - r .:, IQ-, .c a::�.l, T?Z :,i•?::�•�ca' " T_a-- --.:iQ�:�.+. J-�? �.Z1���EII.iaiLF='�'�.'..`:-,'aY. •- x cs 1" as a �.r^T -off ia4bcc v MMM,."9c!!- _ }n.. v =""i,T.t23'=v--3I. - •v�_:iul.uus�=.%mac �:t.=:i.T'� �-^_t�'1� .� _.:- .��..,�.-.!� _ :.1�i:2 Z•. �v} .y� i�'Y:.%� ..- a i Jec'i'LRS -e OWNER framell' CGC 000iu CGC CONSTRUCTION CORPORATION RESIDENTIAL CONSTRUCTION INC. CGc 05774o1 Etmienm in South Florida Since 1948 Main OMO - 10460 SW 187 Terrace Miami, FL 33157 PH: 305-234-9677 FAX: 305-971-8926 ACCT FAX: 305-234-653; Ocean ReW - 35 Oce®n Reef Dr_, Suite 148 Key Largo, FL 33037 PH: 305-367-1069 FAX 305-367.4069 RF/ To: Matthew Fowler, ArcWed 21 Ships Way Big Pine Key, FL 33043 Ph: 3OSS72-4= Fax: 3%472-1170 RFl #: is Deb: 3i1?J2007 Job: 200&1010 Monroe Co. Fire Station #22 Phone: CC: � , Kevin (Monroe Cnty Conte Dept), Cornier. Cart (Monroe Cnty Consir DW)� Ingraham, o (Morn Cnty Carratr Dicey of exts*y slab under new conairuction Drawhw coo, 0 "t yes Spy 30cflon: Schedule h.qmct yes Request 1Ntrerr excavating existing materisk in the area where new addition is be an Data Rrund w 312312of GAVing W it appears tot this slab is 130 sq ft with e• slab #**rm a k dab g sly was brrxf under 10' of We can not delennhre at this tine if there are tom* or jhere is stab d a pad for mekirsu►ical equipment, auger holes Ned with oorx:nete or if there is a grade beam. Pieaee advise on how 10 proceed as removal of ttus unknown stab is not covered in scope and will iwdve additional costs. &Acon tractor carxrot proceed urd given further direcijon. Requested by: Pries, Teresa Ovad" Constriction Corp. R06PONHIC 71e slab will Pave to be removed in order to complete the new foundation for the new addition. Please provide an estimate for the removal of the slab for review and approval by the County. Do not cenumWe work on this item before obtaining approval from the County. Ara Bred by Matthew Fowler Matthew Fowler, Architect Dab 3/23/67 Page 1 of 1 TO: Board of County Commissioners DECEIVED BY: " From: Debbie Frederick Deputy County Administrator Date: April 20, 2007 RE: Change Orders Attached is a proposed charge order for the Tavernier Fire Station. (Change Order #1 for Overholt Construction Corporation is for $1,616.09 for the removal of a 130 s.f. concrete slab found under 10" of existing fill while excavating for the new fire station.) According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The Deputy Administrator intends to approve this change order on Monday, April 24, 2007. Debbie Frederick Deputy County Administrator OLF:adc MONROE COUNTY FACILITIES DEVELOPMENT APRU� AME" RECENNED BY' Campo-Abra From: Campo-Abra Sent: Monday, April 23, 2007 8:42 AM To: County Commissioners and Aides Subject: Change Orders Attachments: 00004594_583.tif; 00004595_585.tif R R 00004594_583.tif 00004595 585.tif (4 MB) (7 MB) For your review: Change Order #1 and #2 for Overholt Construction Corp. for the Tavernier Fire Station. Abra Campo Sr. Administrative Assistant Office of County Administrator 1100 Simonton St. Suite 205 Key West, FL 33040 (305)292-4445 MONROE COUNTY / ENGINEERING /FACILITIES DEVELOPMENT CON RACr CHANGE ORDER PROJECT TITLE: Tavernier Fire Station TO CONTRACTOR: Overholt Construction Corporation 10460 SW 187"' Terrace Miami, FL 33157 The Contract is changed as follows: CHANGE ORDER NO: 2 INITIATION DATE: March 23, 2007 CONTRACT DATE: August 16, 2006 The original (Contract Sum) (Guaranteed Maximum Price) ........................................ $984,458.00 Net change by previously authorized Change Orders ................................................ $1,616.09 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was ......... $986,074.09 The (Contract Sum) (Guaranteed Maximum Price) will be increased (decreased) (unchanged) by this Change Order .................. $3,275.07 The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is ... $989,349.16 The Contract Time will be (increased? (decreased) (unchanged) by N/A The date of Substantial Completion as of the date of this Change Order is ................... July 28, 2007 Detailed description of change order and justification: Purchase and install 3 ADA water Closets faucets guards showers Grab bars and ramps for compliance with ADA reguaements All pubric entity facildies in which alteration Commenced alter January 26 1992 shall be altered in such a manner that the altered portion of the facility be readily aWamble to and useable by individuals with a disability This Chance Order is .332%f the original contract amount Not valid until si ned bv Owner Construction Manaaer and Contractor ARCHITECT: L q! /C /D t CONTRACTOR: DIRECTOR, FACILITIES DEVELOPMENT: COUNTY ENGINEER: COUNTY ADMINISTRATOR Matthew , Aitect Date Overho bn CW Date � Date KP.E. Date Thomas Wiili/Debbie Frederick -Deputy Date Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: In the original design, only one bathroom facility and the entrance foyer were designed to be ADA compliant to minimize the cost of the project. Complete ADA compliance was deferred until a future ('indeterminate) date. A review of the changes required to make the entire facility ADA compliant determined that the changes could be made a nominal cost if done concumerit with the initial renovation. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes []No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: The anrhiiect was instructed to provide ADA compliant design in only arose areas accessed routinely by the public in the belief that ADA compliant systems were not required for areas in whkh access was limited to public satiety employees. This view failed to account for access to the restricted areas by supervisory personnel and other (non emergency responders) who might rightfully need to access other parts of the building. OWSHVIT CONSTRUCTION CORPORATION CDC 00184 10480 SW 187th Terrace Miami, Florida 33157 Phone: 305-234-9677 Fax: 305-234-6535 Experie w in South fbrido Since 19a REQUEST FOR CHANGE ORDER TO: .ferry Sanwa MOM* County Facftm Oeveiopnom 1100 SanWbn Shoal, Room 2-216 Kay We2L FL 33040 Plumbing Changes - see athChed detailed breakdown (3) additional 36S (3) 48' graft bars for wadr closets ►Iddidonal barking for grab bars; and showers Addkfonal Fkxx Tile and Rwnps to showers in nesovonis Crrdiit for changing (3) 36' x 36, mirrors to (3) 38' x 20' Credit for (3) isv Cabinda and acrylic taps All 'Dispensing" Toilet Accsseorles provided by oll w See attached back-up information. T CONSTRUCTION CORPORATION Ovedxk Proud Manager CGC 057740 NUMBER Four (4) DATE. march 29. 2007 PRWECT: Tavwrww Firs sumcin s27 OCC " 0: 0&101O t4,MT.88 $5'58.00 NIC -ttiST.00, COST OF THE INCREASE OvedwLed 1@5% TOTAL COST OF THIS WORT[ G .1 u"4 1 CQ _ U L $155.96 MONRQE COUNTY &9 Zi OF COMMISSIONERS TIE. . DATE: Mar. 13. 2007 12: 04PM �rip■1�-�a Sara r" of &Ad" UN41PS WVAM) .—±wa C • tabu ..—. OWNP•� ,mow w xw • .. , WA* L • �a� porye. • �,��eaa,. aeaoa, one :Ih- dW. , ao* ■a@& 0 L-A""&KPlIwm-wmft low —Moto OL %be kWA V plll�w►Iniri rIW4flMWUftdWYtMaliY�aww/1�1�Yre�rr�otM M AU �J lASM DOr - Inc. • Ml E Kftw Dhd., ham CA 92m • (� ��=406 a t> —7WU MOrLlfbiWWd •AMb*i%IM = "fowa, • emu oars we rwr. w.rrr� e� parry rw�, it Mi rr,IM�Mr b M1r M �iilai i � fd04 (I3/16/100! 14 03 FAX 3053673331 ib001/001 Seaway Plumbing, Inc. Bus: 305-367-3225 Feat: 305-367-3331 9r0brrtlt To Ove dw* Coso w tkn AW TWOM SB: Mo rsm Co. Fbc 9lation # 22 Proposal no* Es*rmft 3/16aM 6% TirM p 30 days MOM DNpipllon TOW 001 We heto6y p+oPo�e 1 i� a!1 labor and maid moeenry 16c the aampladee 3 .3a � prejoct @� prn$eet i 6Se 11Vllovr[n� WATER C1 OMM MAMA Water Mumb----_ S93s 30 (3) ail" w--�—:�-- $10-00 LAVA7MY FAUCETS (3) ADA Urmimy'auma s30&87 M Ofthw edLpsiney Fmwet& -- $21520 DiQomm - $91.67 ✓ LAVAIMY GUARDS / (3) Lwaxy Ownda and Lobar 33ZOA91✓ SHOWERS (3) ADA R6ow+er $5.MA0 (3) SI.M.00 (3) uir �.��•�--- $345.00 Diffammm d Labo a38;6= an f *IfrM 6wve aw W:Wou or now Ta && amwaatioo rep"IM *k r wo=4 *M tree w WN$MO seew" ft=bft we loots lbrw�d to dui finllrer bae�ea wi14 you Total Aw shave ow or deviaoion Des above W*dftgWm Wvdvhm =a ooM %0 be RespecffiXy submitted =WOd V" 0* W eddy and "I becomr an 002 &OW over aed about me COW" . AT1 arcemean "advamt upon P°P°mb' W *IM*ma by us if ever aooa�ad ur ttrOoeR acr3 MO or Map berad ow ooe�oT. 03/08I2007 14:39 9545107702 ►iARDALE SPECIALTIES PAGE 01 MA"ALE SPECIALTIES DIRECT 4101 Nw IN Avenue; Corsi Sp��• Phoxe: (954) 510-7700 Far: (954) 5a7 02 WWW.SPE TIESDIRE .0 TO: (#l0-0VE100 O MAIL: NFO@SPECIALTIESDIRF,C r.COM vERHOLT CONSTRUCTION QUOTE #: l ODC2581 ATTN: Cindy Burke FAXX, 305-971-8926 DATE: March 8, 2007 - REVISED PHONE: 305-234-9677 SALESPERSON: Anim Diaz @ Ext. 2o4 PAGE: 1 of 2 DomNor ON VqpoftMATrox PltMMM ByPLANS AM SPECS. +rw*www+tr*r trrD0Z rNwwrw,tttr" NCX WrTF1 HC COD=S oR ADA **+www=***w*wwwww=***'ww*wwrw"WanaNn rwr JOB: MONROE COUNTY FIRE STATION *w*wwrwwrww,►www�rwwrw,rw #22 TAVERNIER *rw*w=**t*+r+wrww wwwwwrwwwww,tnrww,twwwww*www*r.w,twwr*w*r,�,�,w� TOILET' ACCESSORIES (03) 0625 3636 by A_M�uTl+ AN SPFi^rAi,T�, c �r w/�lf� x 36" (03) 0740-Z Single Robe Hook (03) 0745-Z Double Robe Hook (03) 1200-V60 Shower Cmtain . (33) 1200-SHU Shower Curtain Hooks (03) 1214- 48 Shower Curtain Rod Please Note: • Lead Time 2-3 weeks after receipt of approved s • Lead Time 4-8 weeks after receipt of ubmittals for stands ri� Shelf Time a in weeksproducaftion they p improved submittals and steed dimensions for Minors with Installatiaan is based on a eY cannot be changed, cancelled or returned. • one- Nation, NO phase instaliabon included in Quote is based on Spec's provided. Floor Plans Show e quote as spec's not provided for Lockers and S Lockers and Toilet Paper Holders, not included in • If 0625 Mirror w/Shelf is , PeC's did not call for Toilet Paper Holder. required in 30" x 36 in lieu of 36" x 36", plea deduct �47.� ft. the . above supply Price. DISTRIBUTOR OF ARCAITECTURAL SPECIALTIES CONDMONS: The priees and W.. a-' _ tMt upon Wkea, ,cc; jj 0% «, are not gra or otba tgreemett� unless appal by the Slier. AM q�+a<ationa uid C=WWWmvCm nts� of9uotatioa and are its. fires, a 6Wikbillit'y f materials and all Ober a� beyand our lhf stated hmm shan be pow W by ambushed Bade before tcoepunce. Typog t °pA�. P1eat arc baled m coca: WW �� m not be binding on the Seller. P and are cam• Term, inc qd with tltost gated herein whicSIXIDWvbic h aK subject !a o0o teCh ft Co"t� no t mmantt, which arc past due hi the event n becomes o mwy sated items mwtu6cMMA tb Turd dirmnSim . A Y on 't formal order gtnet arge to be tdponsNe for an attorneys fees urcorred by for Seller tD retaffi p s b t any of the arnoemd Doff � month may be added dis fees ittconed thtnugh appeal. COOS then Purehaxr ACCEPTED BY DATE: 03/08/2007 14:47 9545107702 MARDALE SPECIALTIES PAGE 02 MA",A&--E SPECIALTIES DIRECT, INC. 4101 NW 124 Avenue; Coral Springs FL 33065 Phone: (954) 510-7700 Fax: (954) 510-7702 WWW SPECIAL T1E.SDIRECT COM MAIL: INFOQSPECIALTIESDIRECT.COM TO: (#10-OVE 100) OVERHOLT CONSTRUCTION QUOTE #: IODC2581 ATTN: Cindy Burke DATE: March 8, 2007 - REVISED FAX: 305-971-8926 SALESPERSON: AnIM Diaz Q Ert: 204 PHONE: 305-234-9677 PAGE: 2 of 2 BID RASED ON INFORMATION PROVIDED EY PLANS AND SPECS. rr DOLS NOT GUARANM COMPLIAN(X WrrK HC CODES OR ADA REQUlREM1Uu n +******t*****rr******rr+rrt*r+**s,►**eat*++r*r+r+s#*+w*t+**r+*r++***,k*++*t**+*rlt+******�t�t++ JOB: MONROE COUNTY FIRE STATION #22 Q TAVERNIER *+*+++r*rlt+!*t*+*tlr++1R*f++**ynY******f***+r***;*1*!*r****!*�R*+k#i* *tR#+*}Yr*�t!*y►*+lfy*r ***N TOILET ACCESSORIES by AMERICAN SPECIALTIES: TIE$ (01) 3 701-36 Grab Bar 36" (01) 3701-42 Grab Bar42" Please Note: TO SUPPLY $19&00 • Lead Time 2-3 weeks after receipt of approved submittals ttaLs for standard. accessories. • Installation is based on a MINIMUM CHARGE and a one-time installation, NO phase installatino included in quote. FIRE EQUIPMENT by LARSEN'S• (05) WC2% UL Rated 2A:-& 2% gal wet chemical w/standard bracket #1007, Tagged. Please None: • Lead Time 2-4 weeks after receipt of approved submittals. • Installation is based on a MINIMUM CHARGE and a one-time installation, NO phase installation included in quote. • Quote is based on spec's and quantities provided. • Spec's call for 1.6 gal extinguisher, gal specified is not available. DISTRIBUTOR OF ARCHITECTURAL SPECIALTIES CONDCna; — : The s r �'quoation �Fs or other AVeMMU unless approved by �Ilet. Ail quotations and am not mblect to vabW agrecnmts arc Conlin fires, availability of materials and ap other caused beyond existin; on date of gootwon and are $object to change by the senor before accepteooe. Typo�aphipl and °� control. Priors are based on Cott, and condibom specifca"y stared herein shall be governed by esmbadW trade eummu. Tertrs incarsistmt with those sm o -ran are sabjetx to carto s Coodi[ians not wiz! ad be binding oa the Seder. Putiriau and mirrors are herein which may appear an OctPuurbasc's formal order m amounts, which are prz&btiwted items nranufictumd to fixed ditnmsions. A semoc charge of I.S% per amth racy be added agrees to be responsible for all s (n the eve it b eared$ ynecessary for Seller to retain as attortuey to collect arty of the amoumtr reflected by t>� rAp>�; dm Pea ttomty's fees irtraartd by Seller, meluding any attotneyrs fees incmrcd tluauigJu appeal. TRO O LWE Is V r.ID FOR to na v¢ rvrc rL TION EX A r iT O rr c t Q��u� .. Ax ACCEPTED BY DATE: Gemini Tile Service Inc. 3 770 N.W. 52nd Street Mf iami, FL 33142 305-637-6665 phone 305-637-6594 fax Name / Address Overholt Construction Corporation 10460 S.W. 187 Terrace Miami, Fl 33157 reye Estimate Date Estimate # E 17/2006 407 Gemini Tile Service Inc. 3 770 N.W. 52nd Street Miami, FL 33142 305-637-6665 phone 305-637-6594 fax Name / Address Overholt Construction Corporation 10460 S.W. 187 Terrace Miami, F1 33157 rage Estimate Date Estimate # 5/172006 407 [Code of Federal Regulations] [Title 28, Volume 11 [Revised as of July 1, 2002] From the U.S. Government Printing Office via GPO Access [CITE: 28CFR35.1511 [Page 512-513] TITLE 28--JUDICIAL ADMINISTRATION CHAPTER I --DEPARTMENT OF JUSTICE PART 35--NONDISCRIMINATION ON THE BASIS OF DISABILITY IN STATE AND LOCAL GOVERNMENT SERVICES --Table of Contents Subpart D--Program Accessibility Sec. 35.151 New construction and alterations. (a) Design and construction. Each facility or part of a facility constructed by, on behalf of, or for the use of a public entity shall be designed and constructed in such manner that the facility or part of the facility is readily accessible to and usable by individuals with disabilities, if the construction was commenced after January 26, 1992. (b) Alteration. Each facility or part of a facility altered by, on behalf of, or for the use of a public entity in a manner that affects or could affect the usability of the facility or part of the facility shall, to the maximum extent feasible, be altered in such manner that the altered portion of the facility is readily accessible to and usable by individuals with disabilities, if the alteration was commenced after January 26, 1992. (c) Accessibility standards. Design, construction, or alteration of facilities in conformance with the Uniform Federal Accessibility Standards (UFAS) (appendix A to 41 CFR part 101-19.6) or with the Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities (ADAAG) (appendix A to 28 CFR part 36) shall be deemed to comply with the requirements of this section with respect to those facilities, except that the elevator exemption contained at section 4.1.3(5) and section 4.1.6(1)(k) of ADAAG shall not apply. Departures from particular requirements of either standard by the use of other methods shall be permitted when it is clearly evident that equivalent access to the facility or part of the facility is thereby provided. (d) Alterations: Historic properties. (1) Alterations to historic properties shall comply, to the maximum extent feasible, with section 4.1.7 of UFAS or section 4.1.7 of ADAAG. (2) If it is not feasible to provide physical access to an historic property in a manner that will not threaten or [[Page 513]] destroy the historic significance of the building or facility, alternative methods of access shall be provided pursuant to the requirements of Sec. 35.150. and (e) Curb ramps. (1) Newly constructed or altered streets, roads, highways must contain curb ramps or other sloped areas at any intersection having curbs or other barriers to entry from a street level pedestrian walkway. (2) Newly constructed or altered street level pedestrian walkways must contain curb ramps or other sloped areas at intersections to streets, roads, or highways. [56 FR 35716, July 26, 1991, as amended by Order No. 1694-93, 58 FR 17521, Apr. 5, 19931 MEMORANDUM TO: Board of County Commissioners From: Debbie Frederick Deputy County Administrator Date: April 20, 2007 RE: Change Orders Monroe County ra,'11Wes Development PR } 1 200 2ECENEO ?�Y: Attached is a proposed change order for the Tavernier Fire Station. (Change Order #2 for Overholt Construction Corporation is for $3,275.07 for the purchase and installation of 3 ADA water closets, faucets, guards, showers, grab bars and ramps for compliance with ADA requirements. These ADA requirements necessary for all public entity facilities with alterations commencing after 01/26/92.) According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. -T-C ((I�j . The Deputy Administrator intends to approve this change order on Monday, April 0, 2007. Debbie Frederick Deputy County Administrator DLF: adc MONROE COUNTY FACILITIES DEVELOPMENT APQ MIME: Campo-Abra From: Campo-Abra Sent: Monday, April 23, 2007 8:42 AM To: County Commissioners and Aides Subject: Change Orders Attachments: 00004594_583.tif; 00004595_585.tif 00004594_583.tif 00004595_585.tif (4 MB) (7 MB) For your review: Change Order #1 and #2 for Overholt Construction Corp. for the Tavernier Fire Station. Abra Campo Sr. Administrative Assistant Office of County Administrator 1100 Simonton St. Suite 205 Key West, FL 33040 (305)292-4445 MONROE COUNTY / ENGINEERING /FACII.Im DEVELOPMENT CONTRACT CHANGE ORDER PROJECT TITLE: N. Key Largo Fire Station #25 TO CONTRACTOR: Overholt Construction Corporation 10460 SW 187"' Terrace Miami, FL 33157 The Contract is changed as follows: CHANGE ORDER NO: 13 INITIATION DATE: April 5, 2007 CONTRACT DATE: May 18, 2005 The original (Contract Sum) (Guaranteed Maximum Price) ........................................ $2,030,500.00 Net change by previously authorized Change Orders ................................................ 85,974.82 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was ......... $2,116,474.82 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order .................. N/A The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is ... $2,116,474.82 The Contract Time will be (increased) (decreased) (unchanged) by .............................. 14 Days The date of Substantial Completion as of the date of this Change Order is .................... April 17, 2007 Detailed description of change order and justification: Contractor is reauestina a fame extension for Substantial CwwMdon by 14 days from Avril 3 2007. to Avdi 17, 2007. Delays occurred throuah the avvroyalyrocess of Chance Orders and the final water service connections from the FKAA. There are no additional costs for this Chance Order. ARCHITECT: P.A. CONTRACTOR: rp. DIRECTOR, FACILITIES DEVELOPMENT: COUNTY ENGINEER: COUNTY ADMINISTRATOR C/ �- Thomas ebbie Frederick -Deputy Date Date (d Date Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The extension request is based upon delays incumed in receipt of final approvals or inspections that have Impacted finishing work. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,DDO or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: OWNIMIT CGC 000164 10460 SW 187th Terrace CGC 022801 CONSTRUCTION CORPORATION Miami, Florida 33157 CGC 057740 coc 00164 Phone: 305-234-9677 Fax: 305-234-6535 Experience in South Florida Sine 1948 REQUEST CHANGE ORDER Jerry Banuft MOMM Cavrty Facades Develop mo t 1100 Simonton Street, Room 2-216 Key VMSL FL 33040 NUMBER DATE: April 5. 2w7 Thirty Two (32) PROJECT: Monroe County Flue Sbflon tn3 OCC JOB it: 05-1003 Overholt Construction is requesting an Extension of time for the completion of the No* Key Largo Finn! Station # 25. The extended time requested is to April 17, 2007. We ask that the Substantial completion date be extended due to 1. Request Change Order Approval 2. Clear Story Engineering 3. Waiting on Water Service from FKAA COST OF THE WORT{ $0 00 Subtotal .$0.00 Overhead a 5% $0.00 TOTAL COST OF THIS WORK i0.00 RESPECTFULLY SU88AITTEO, REVIEWED AND APPROVED BY, OVERHOLT CONSTRUCTION CORPORATION MONROE COUNTY BOARD OF COMMISSIONERS Rodney Overholt, Project Manager . DATE: BATE: MEMORANDUM TO: Board of County Commissioners From: Debbie Frederick Deputy County Administrator Date: April 26, 2007 RE: Change Orders Attached is a proposed change order for the N. Key Largo Fire Station #25. (Change Order #13 for Overholt Construction Corporation is for a time extension of 14 days due to delays in change order approvals and water service connections from FKAA. There is no additional cost in the contract amount) According to the ordinance adopted by the Board of County Commissioners, proposed change orders are to be presented to members of the Board of County Commissioners prior to approval, assuming they are within the Administrator's prescribed limits. Change orders not within the Administrator's authority are placed on the BOCC agenda. The Deputy Administrator intends to approve this change order on Friday, April 27, 2007. Debbie Frederick Deputy County Administrator DLF: adc rage i or i Campo-Abra From: Campo-Abra Sent: Thursday, April 26, 2007 5:05 PM To: County Commissioners and Aides Subject: North Key Largo Fire Station #25 Attachments: 00004646 569.tif Please review the attached change order #13 for Overholt Construction Corp. Abra Campo Sr. Administrative Assistant Cft a of County Administrator 1100 Simonton St, Suite 205 Key West FL 33040 (305)292-4445 4/26/2007