Item D35 BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: December 20. 2006 Division: Engineering Bulk Item: Yes ~ No Department: Facilities Development Staff Contact Person/Phone #: Jerry Barnett x4416 AGENDA ITEM WORDING: Approval of Change Order No. 25 to The Tower Group, Inc. for HV AC modifications at the Freeman Justice Center in Key West. ITEM BACKGROUND: HV AC Modifications. See attached. PREVIOUS RELEVANT BOCC ACTION: On June 16, 2004, the BOCC approved to award bid and execute a contract with The Tower Group, Inc. for the construction of the Freeman Justice Center in Key West. On July 20,2005, the BOCC authorized to amend the contract with The Tower Group, Inc., to remove the requirement that the Architect approve change orders for the Freeman Justice Center project, and on ~ 2" the BOCC approved Change Order #12 for Security revisions. CONTRACT/AGREEMENT CHANGES: Increase the contract price by $359,637.93, from $15,177,406.91 to $15,537,044.84 STAFF RECOMMENDATIONS: Approval as stated above. TOTAL COST: $359.637.93 BUDGETED: Yes -L No COST TO COUNTY: $359.637.93 SOURCE OF FUNDS: Bond Proceeds REVENUE PRODUCING: Yes No X AMOUNTPERMONTH_ Year APPROVED BY: County Atty ;// OMBlPurchasing _ Risk Management _ DOCUMENTATION: Included Not Required_ DISPosmON: AGENDA ITEM # Revised 11/06 MONROE COUNTY Engineering Department MEMORANDUM TO: Dave Koppel, County Engineer Engineering Department FROM: Jerry A. Barnett Director Facilities Development DATE: December 14,2006 RE: Approval of Change Order No. 25 to The Tower Group, Inc. for HV AC modifications at the Freeman Justice Center in Key West. AGENDA ITEM WORDING: Approval of Change Order No. 25 to The Tower Group, Inc. for HV AC modifications at the Freeman Justice Center in Key West. ITEM BACKGROUND: On June 16, 2004, the BOCC granted approval to award the bid and execute a contract with The Tower Group, Inc. for the construction of the Freeman Justice Center in Key West, in the amount of$13,804,000.00. Since then, 24 change orders have been approved, bringing the contract amount (prior to this change order) to $15,177,406.91. The original architect's design for the HV AC system was inadequate and would not work properly. In addition, due to new security requirements, the building needed to be redesigned, which significantly affected the HV AC system. The Fire Marshall also had issues with the HV AC detectors. Therefore, major modifications were required. To support these changes, Concrete and Masonry wall cutting, HV AC controls, Variable Air Volume (V A V) devices, and temperature sensors are required. PREVIOUS RELEVANT BOCC ACTION: On June 16,2004, the BOCC granted approval to award the bid and execute a contract with The Tower Group, Inc. for construction of the Freeman Justice Center in Key West. On July 20,2005, the BOCC authorized amending the contract with the Tower Group, Inc. to remove the requirement that the Architect approve change orders for the Freeman Justice project. On April 19, 2006, the BOCC approved Change Order # 12 for Security revisions, since the amount exceeded the County Administrator's authority. CONTRACT/AGREEMENT CHANGES: Increase the contract price by $359,637.93, from $15,177,406.91 to $15,537,044.84. STAFF RECOMMENDATIONS: These are changes, additions, and corrections required to make the system function properly, Security changes, and Fire Marshall mandated changes. They are essential for the project to go forward, and Staff recommends approval. MONROE COUNTY BOARD OF COUNTY COMMISSIONERS CONTRACT SUMMARY Contract with: The Tower Group Contract #_ Effective Date: 06/16/04 Expiration Date: 01/25/07 Contract PurposelDescription: HV AC modifications for the Freeman Justice Center. Contract Manager: Ann Riger 4439 Facilities Develop/Stop #4 (Name) (Ext. ) (Department/Stop #) for BOCC meetin~ on 12/20106 A~enda Deadline: 12/05/06 CONTRACT COSTS Total Dollar Value of Contract: $ 359,637.93 Current Year Portion: $ 359,637.93 Budgeted? Yesr:8J No D Account Codes: 307-24003-560620-CE0601-530340 Grant: $ N/A _-_-_-_-_ County Match: $ NIA _-_-_-_-_ - - - - ----- ADDITIONAL COSTS Estimated Ongoing Costs: $~yr For: (Not included in dollar value above) (eg. maintenance, utilities, ianitorial, salaries, etc.) CONTRACT REVIEW Changes ~l)~ Date In Needed Rev:' er .. Division Director 1~-f5-(x YesD No~ (/ · RiSkManag,ent klJlW YeSONo[r)-{\.~ ~B'Jp",.~sil1i\~~/vt.YesO Nom/---+:--- ~:-/ I J uJ140( YesO No@" ~Y'J-'l4. 'Y",-?...(V; County Attorney Comments: OMB Form Revised 2/27/01 MCP #2 Date Out /2- -t)'d l. MONROE COUNfY / ENGINEERING /FACILITIES DEVELOPMENT CONTRACf CHANGE ORDER PROJECT TITLE: Freeman Justice Center Jackson Square Key West, FL CHANGE ORDER NO: 25 INITIATION DATE: Various TO CONTRACTOR: The TO\I\Ier Grou~, Inc. 405 SW 148 Avenue Suite One Davie, FL 33325 CONTRACT DATE: June 16, 2004 COR # 19, 47R-2, 56, 59,64, and 70 MQnr08 Counr)/ ;:~,~~;VO,~.~)Drr:enr (\ v The Contract is changed as follows: '._'___w~,~-* The original (Contract Sum) (Guaranteed Maximum Price) ......... ...... ...... :....: :.~.:.\ ;:: .... $13,804,000.00 Net change by previously authorized Change Orders ............... ... ......... ...... ......... ...... $1,373,406.91 The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was ......... $15,177,406.91 The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order ... ... ... ... ...... $ 359,637.93 The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is ... $15,537,044.84 The Contract Time will be (increased) (decreased) (unchanaed) by .................. ( ) N/A The date of Substantial Completion as of the date of this Change Order is ... ...... .........January 25,2007 Detailed description of change order and justification: HVAC duct and modifications Delete sal/wort restroom fixtures and Dlumb/na & add exhaust fan to sallvDort HVAC controls for one VAV and 12 soace temoerature sensors Intealilfe fire alann oanel with securitv access control svstem Add VAV box #40 and relocate soace temDerature sensor for box #27 Concrete and masonrv wal/ ooen/nos to accommodate the flVAC installation Total $320.494.36 4.979.20 13.932.77 10.272.28 2.646.11 7.313.21 $359.637.93 See Attached Analvsis. This Chanae Order is 2.6 %f the orlainal contract amount Not valid until siGned bv Owner. Construction Manaaer and Contractor ~ ARCHITECT: z )-0: wO.- ~ S: CONTRACTOR: ~>- l- Z . 6 DIRECTOR, FACILITIES DEVELOPMENT: ~o. Zl- <z ~ ~ oJ OUNTY ENGINEER: C/J'!2 (/) ~., ~OUNTY ADMINISTRATOR BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, FLORIDA '~lj 1f~ ~~ The Tower Group Date r(:-7-0~ Date '.2 -o--a Date , ~ :?-ob Date Thomas WillilDebbie Frederick-Deputy Date (SEAL) ATTEST: Danny U. ~olhage, elerk By By THE FREEMAN JUSTICE CENTER ANALYSIS OF CHANGE ORDER #25 Chance Order Reauest # COR #47R-2 HVAC ductwork and insulation modifications. Return air ducts in the ground floor HVAC design that were omitted from the original design, delete insulation from ducts where they are not needed, and zoning requirements by the Fire Marshall: Ductwork, Fire Damper changes, accessories, and Hi-Lift $202,240.24 Rental and added engineering & CADD work. (Air Dynamics, Inc.) Travel, room and board. 6 men, 8 weeks. 35,420.00 Air Dynamics, Inc. 5% overhead, 5% profit 23,766.02 Net insulation (Gomez Quality Insulation) 29,271.57 5% Profrt Weathertrol Maintenance Corp. 14,534.89 5% Profit The Tower Group 15.261.64 Total $320.494.36 COR #19 Delete sallyport restroom fixtures and associated plumbing, and add an exhaust fan to the sallyport and one to the Main Electric Room. Delete plumbing and fIXtures for sallyport restroom. ($4,040.00) 7,490.50 749.06 Material, equipment, and labor for exhaust fans Elite Ductwork, 5% overhead, 5% profrt Weathertrol 5% overhead/profrt 411.96 5% Profit The Tower Group 230.58 Net Sales Tax 137.10 Total $4.979 20 COR #56 Furnish and Install HVAC Controls for one VAV and 12 space temperature sensors: 12 New wall mount temperature sensors, programming and graphics, and electrical installation (ESSI) $10,464.00 Installation of VA V box, materials, programming, and start-up (ESSI) 1,599.00 ESSI, 5% overhead, 5% profit 1,206.30 663.47 $13.932.77 5% Profit - The Tower Group COR #59 Integrate the Fire Alann Panel with the Security Access Control System and the Zoned HV AC Smoke Detectors as requested by the Fire Marshall, including the costs to furnish an additional 20-amp single-phase breaker: Material to integrate fire alarm, security and AlC control Panels Labor (The Tower Group) Material to add 20 amp breaker Labor (The Tower Group) 5% overhead, 5% profrt - The Tower Group Sales Tax Labor Burden Total COR #64 Furnish and install one new VAV Box #40 and relocate the space temperature sensor for box #27: Materials, programming & graphics, and electrical installation (ESSI) 5% overhead, 5% profrt - ESSI 5% Profrt - The Tower Group Total COR #70 Concrete and Masonry wall cutting relating to the HV AC installation: Materials and equipment - American Cutting & Drilling Compo 1 week rental of 60' manlifl 5% overhead, 5% profrt - The Tower Group Total Grand Total Change Order #25 $5,311.46 2,312.88 28.00 110.40 776.28 400.46 1.332.80 $1027228 $2,291.00 229.10 126.01 $2.646.11 $5,300.37 1,348.00 664.84 $7.313.21 $359.637.93 Change Order Attachment per Ordinance No. 004-1999 . Change Order was not induded in the original contract specifications. Yes ~ No 0 If Yes, explanation: Return air ducts on the ground floor HVAC design were omitted form the original design. . Change Order was induded in the original specifications. Yes 0 No ~ If Yes, explanation of increase in price: . Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes 0 No ~ If Yes, explanation as to why it is not subject for a calling for bids: . Project architect approves the change order. Yes 0 No 0 If no, explanation of why: The Architect is not required to approve Change Orders for the Freeman Justice Center. . Change Order is correcting an error or omission in design document. Yes ~No 0 Should a daim under the applicable professional liability policy be made? Yes ~ No 0 Explain: The original Architect did not meet the requirements of the HVAC system. The rower Group, Inc. 405 SW 148 Avenue Suite One Davie, FL 33325 CHANGE ORDER REQUEST No. 00019 Phone: (954) 476-3200 Fax: (954) 474-3111 TITLE: Sallyport Restroom and EF-5 & EF-6 DATE: 11/17/2006 JOB: 0417 CONTRACT NO: 1 PROJECT: Freeman Justice Center (FJC) TO: Attn: Clark Briggs Monroe County Facilities Development 1100 Simonton Street Key West, FL 33040 Phone: (305) 295-4306 Fax: (305) 295-4321 /-' RE:RFP To:TTG DESCRIPTION OF PROPOSAL Change Order Request # 19 addresses the costs and time to incorporate the changes described in RFP # 1 from Gonzalez Architects (GA), dated June 17,2005 (copy attached), and RFP #2 from GA, dated August 9, 200S (copy attached). From: GA Number: #1 & #2 GA issued RFP #1 to add code-required ventilation for vehicle exhaust in the Sallyport, EF-S, and for transformers in the Main Electric Room, EF-6, which were omitted in the original design. GA issued RFP #2 to delete the Sallyport restroom and floor drains in response to RFI #128, RFI #131 and RFI #139 issued by ITG to reconcile floor grade conflicts wth sanitary and floor drain slope requirements. EF-S and EF-6 were not shown on the HV AC design changes for COR #47, and the cost for the work was not included in that COR. The MEP Engineer subsequently confirmed that EF-S and EF-6 are required. The value of this COR is based on Subcontractor Proposed Change Order #WTOOIRI, attached, which combines Weathertrol Change Order Request #04-790-0006 & 04-790-0019. Please process a Change Order to increase the Contract Price $4,979.20, with no change to the Contract Time. Item ??oo1 Description Stock# Delete plumbing, plumbing fixtures, exhaust fan, EF-4, and exhaust fan accessories for deleted Sallyport Restroom, Room #0004, and add exhaust fans EF-5 & EF-6 to ventilate the Sallyport and Main Electric Room, respectively, less sales tax (Re: peo #WTOOIRI, attached). Quantity Vnits 1.000 LS V nit Price $4,611.52 Tax Rate Tax Amount Net Amount 0.00% $0.00 $4,611.52 Unit Cost: $4,611.52 Unit Tax: $0.00 ../ Unit Total: $4,611.52 Subtotal: $4,611.52 Description Sales Tax Profit Markup Percent Markup Amount $137.10 ;/ 5.000% $230.58 ./ Total Cost: $4,979.20 / /" Weathertrol Maintenance Corporation PROPOSED CHANGE ORDER No. WTOOIRl 7250 NE 4th Ave. Miami, FL 33138 Phone: 305-908-1000 Fax: 305-908-1039 TITLE:Sallyport Restroom, EF-5 & EF-6 PROJECT: Freeman Justice Center (FJC) TO: DATE: 11/1712006 JOB: 0417 CONTRACT NO: 0417-004 Attn: John Chandler The Tower Group, Inc. 405 SW 148 Avenue Suite One Davie, FL 33325 Phone: (954) 476-3200 Fax: (954) 474-3111 ," I.... RE:RFP To:TTG DESCRIPTION OF PROPOSAL Item ??oo1 ??oo2 By: Date: Ex~dit)on @ From: GA Number: #1 & #2 Description Stock# Delete plumbing and fixtures for deleted Sallyport Restroom, Room #G004 less sales tax (Weathertrol COR #04-790-0006, dated 9/27/05) Delete Exhaust Fan #EF-4 from deleted Sallyport Restroom and Add Exhaust Fan #EF-5 to the Sallyport and Exhaust Fan #EF-6 to the Main Electtric Room less sales tax (Weathertrol COR #04-790-0019, dated 11114/06) Quantity Vnits 1.000 LS Tax Rate Tax Amount Net Amount 0.00% $0.00 ($4,040.00) V nit Price ($4,040.00) $8,651.52 1.000 LS 0.00% $0.00 $8,651.52 Unit Cost: Unit Tax: Unit Total: Subtotal: $4,611.52 $0.00 $4,611.52 $4,611.52 Description Markup Percent Markup Amount Sales Tax for Item 00001 ($84.00) Sales Tax for Item 00002 $221.10 Total Cost: $4,748.62 By: Hector Ruiz John Chandler Date: :; c'. L O. L I) i) ? J. : Lj ~ IVI I~\J. ~ b b r. j reo J- !N(CVI u)eq,t~~~:fr9! ~ CHANGE ORDER REQUEST Change Order Request #: 04-790-0006 Date: 9/27/2005 Project: Freeman Justice Centor To: The Tower Group Attn: Greg Galmin 405 S.W. 148 Avenue Davie, FL 33325 Project #: 04-790 From: WeathertroI Heotor J. Ruiz 500 Whitehead Street Key West, FL 33040 Ph.: (954) 476~3200 Fax: (954) 474.3111 Ph.: (305) 908-1000 Fax: (305)908-1039 We hereby propose to make the following changes: RFP#2 Deleta sally port restroom and two floor drains f~ Change Order Prioe ($4,124.00) This price Is good for 0 days. If conditions change, this price Is void. We are requestIng a time extension of 0 days In conjunction with this change. Hector J. RUiz Author 9/27/2005 Date .h H o Accepted The above prices and specIfications of this Change Order request are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise specified. Authorized Signature Date of Acceptance ., ': 0 2 Q 2 il11 r '):, I. v. 'L? 2: 23F'v1 NO. ~bb CHANGE ORDER REQUEST SUMMARY . 'Project: Freeman Justice Center COR #: 04-790-0006 Subcontracts IsUbcontractor T ASCO Ossclptlon .._~~Ieto sally. ~ort restr~.o_'!l_ ~nd two f1oo~ drai~,. Total ._j$4, 124.0~) ($4,124.00) $0,00 $0,00 ($4,124.00) Subtotal Total Cost Subcontract Total ($4,124.00) ~. V J.p I ~, 4 ~U.j~~~f7;1.:jf::.lH:"'\.,r:',:,~~~r'!27!!F"'~l,/~I~:;U~Jt-C"'Lrr~"1 . ,'.. ' Change Order No. 2 Proposal # C002.09270~ Date 9/27/2005 .'ascti PI.l.JMClINQ. r-w1CCHANlC..1.. COFl~O_TION 301 Ea~ 10th Avenue Hialeah, FL 33010 Phone {305} 455-1377 Fax (3(J5) 455-1396 CUSTOMER: PROJECT: Wellthcrttol MlIlnt8nMl" Corp, 7':20 NE 4111 ^V~ MJarnl FL J3138 Phone Fax C?:2621PRenT6n lu,Uee Blda. (305) 906-1100 (305) 908.1039 .'. DESCRIPTION OF WORK TO BE PERFORMED: Delete sally po:rt restroo.m and two floor drain as pc:r RFP#2. Delete sanitAry wute vcntt wat=r lIupply and plumbing fixtures. Materials: Qty 1 1 1 2 60' 20' 1 4 ] 2 2 10 10 r\ . IY' Description Water Closet Lavatory La~ry faucet FLoor drains 3" 4" JIve Pipe )" PVC Pipe 4"C,O. 4.901 4ft Combo 311 P~Trap 4SPVC 1" Copper Pipe 1" Copper Fittings Material!l S 1,200 Labor 80 hri @ 52$,00- $21000 Materials · Tax Labor 42% Labor Burden ($1,200.00) (584.00) ($2000.00) (S&40.00) 0.00 0,00 TOTAL CHANGE ORDER ACCEPTANCE or CHANGE ORDEk tile pH~Nf ,p.dflCftIJODE, pa)'IIWAt term., 11M canaJtfoDS .,,,ud oa tld. ckll1~ order Ira IIwflQwf} l!:Jd IU-e ker",)' lleup1ed. Tur.o Ph.mblnll COrpot'ItSOtl J~ ."Ulor1;ctd to <It llie "ork M .p~cla.d Sllll1ltur. X Oltc_J _/ ____ fill)' ,,",. 11l0l'll"1io., ..tit.11l'o1ll1~1I aMt 41l";1l<.lk~ 1&1'<<'1';'. CAll' mlt wj,! !;>e~1 enlt -,xiii If';'!:',l :orin,y,,;.., ili t~ ,',:~" ,,~~ <I.' .~,'. 'Jnl nil ,':I;wro ~lt ",l1lli .,;. Ai; "11.c';~IIC;"~"" \O(.f. rn1l:a. ~ e.fd~..,. "l)""~' \lIl, ,-o,....~, I'ropr>I'I"~ be "'i.."'....~ ""c;r<,, jr :,,< II' ,:, ',.',.',' ',. (',... ." .......; ......,_ , . 301 Easl10\hAv<<Iue ~~ f-lialeah, FL 33010 ascc:l PhO'1e(308)455-1377 "'WM51N::f........c:>l"NtCAol.. =Oflllll'Cl,..~T1QN Fax (305) 456-1396 Change Order No. 2 Proposa1 # CO02-o92705 Date 9/27/2005 CUSTOMER: PROJeCT: We.thettrol MatDtena~e Corp. 7no NS.l.h Aven\le Miami FL 33138 Cp.26UFtlllllln Juaelcc Bld" Pl\one Fu (JOS) ;08.t 100 (305) 9Q8.LOJ9 DESCRIPTION OF WORK TO BE PERFORMED: SUBTOTAL Change Order PtOCC88 ($4142.00) 5518,00 0.00 0,00 0,00 . De<N~ve Cbange Order Total (S",124.00) T \ \ .). . TOTAL CHANGE ORDER ACCEPT ANa OF CHANGE ORDER Th. ptic.., .ptdflcltlObJ. plyatt1le term.., ..d corullUou luted 011 IbI. dl1ac' ardar an Atf.faotary aad aJ'.IL,rfby .~eep"d. Tuco PlvlDblol Corpant:!oJlI. allUtor'U.d to do th, ,",rk II qJecUled. Slp.tart X IhCe --1_' _ . pece'- II.., ......Ucmllll' ""~'<<ot\ u- ~..... qe~~ ItrwJo;lo. ilII",* MIl ..RIIIo ultlltiil Ql\fr..poII .,..,111tlI cmIet, 11I<.I ",IU ~ III tJ;ru ct..'1C Ot"If.nd lIbowl 1~..tllll"l. ,.,11 t;;TtIt1I\Iftll _I iii,... ~l'GII1!d_ _u...... tr<trlD1t 1Ic)'Olld rill, l~l. J'~poIll ~!lot ",il."l\"Q n(kr aftat)(l ~I 01 T_o t"WIl.bfn& torpoMtiqnlJ dU:mlu, Pcv {t WT 001" f21 lueqJ~~~t~Ql ~ CHANGE ORDER REQUEST Change Order Request #: 04-790-0018 Date: 11/1412006 \ ~- d :-~./ Project: Fr.-man JUltie. Center To: The Tower Group @ Freeman JU,UCI Center Attn: John Chandler 500 Whitehead St. Key West, FL 33040 ProJect': 04-190 : From: W..thertrol Hector J. Rulz 500 Whitehead Street Key West, FL 33040 Ph.: (3015) 296-2521 Fax: (305) 296-2587 Ph.: (30!) 908-1000 Fax: (305) 908-1039 We hereby propose to make the following changes: PCO#1 Dw'g'M1.101 revIsions Change Order Price $81 e>7:l .~'2 U,583.9S-- This price is good for 0 days. If condltlo~s change, this price Is void, We are requesting a time extension of 0 days in conjunctJon with this change. Hector J. Ruiz Author 1111412006 Date o Accepted The above prices and specifications of this Change Order request are satisfactory and are hereby accepted, All work to be performed under same terms and conditions as specified in original contract unless otherwise specified, Authorized S:gnature Date of Acceptance ,,,' , ,..;.: ~ "'1'1' ,.1' , " , 7' ".,. . J _< , 'C ,It CHANGE ORDER REQUEST SUMMARY Project: Freeman Justice Cent.r COR #: 04-790-0019 Subcontracts Is \lbGontractor EIlI. Ductwork DeacrtpUan Add EF-5, & EF-6 systems and cr-.dll f9r EF-4 Iystem $ubtot.l Total Cost Subcontract (k-sc;..fz.-)l.") Markup Subcontract TCl.)( Total ,,",0".68 Ii. 9QQ ,QO.- $0,00 $8,999,eo .....84.9& .-$8.saS,96 '.' ,. ~ ;1. - ...... j; ....:. i 1 r: f'.1 'i t ;',. _ _ ,i r . -~I I ~ - \' Total $e./~31 S'S- 411 ,~8 1-'2.-1. 10 i&;.,e,-r;..b'2- ,1 \' rty~ f; J '..., r~ Noy.15. 2006 11:04AM ELITE DUCTWORK INC No.2066 P,2/3 .., , ,I, , ( \ " Elite Du.ctwork IDe. 8427 NW 611t Strc:~l MlanU, 1-'I.ocidt $J1~ ph. (305) 499.'151 ra (~') ~99-9152 CSC#t 110259 Inc. , CHANGE ORDER REQUEsT TOI W...thertrol 7200 NIt 4th AYODUI Attn: Hector J. Rub Date of Propos-.1: Propow Requ~t Number: Project Name: 10/9/2008 P<lO t1 FreeDlus oJ.e. Descrlptlo... otCbaq. Order aequeat..: Add... per ~on f2 dated d/13/:l00S Material &; Equipment 3'U.btotal Sales Tax @ 7% 3j \6B,~ /' ..a,.U9.ee . ~aa."Q" 'J.'2.f. 10 . 4,332.00 Labor SubtotllJ Chane- Order Subtotal Coets .o~eb.t> @.. Profit @ . 7';ni.M . 51(/ 5% * '01+ .f>3 8ee~..314.~3 TOTAL PRICE OF CBANQZ ORDER . . 8,999.88 8,~.b,5' THIS n.OPO$A.t.1S fl1.RM FOR ACCEPTANCE WITHlN 30 DAYS. WE CANNOT PROCEED wmc THE WOjU{ , COVERED BY THE PltOPOSI:D CHANG!: UNTIL WE ARE SO DtUCTEo IN WRlTI1'lG APPROVING COS'lS. OR UNTIL WE RECMVS YOUJlt. WRImN CHANGE AUTHO~nON, WHICH MUST BE WlTHlN THE AJSOV!: TIME LIMIT' TO AVOID AOomONAL COSTS. ' ACCEPTIro !r.t: DATE CUS1'OM!:R JU;PRESENTATIVF. ~a,;''': U'.~ rf -- I rl-r:;",'{1 ..-...~'~, '1""1 '".l'"Jt: .- ,-,\.,: ,\J ,JLI :;..-.) _ I.i. '..~ _' _I, <""=' ........... C"':> Cl- u::> c.o c::> o:"J u ...~~ . g I ~~ o ~ ~ II., C> :z: . . Q.l .. ~ i ~ il'!;. ~aJ; <...> :z:: ::...::: a::: o ~ I-- <..:> ==- ~ L.LJ .....- .....J L.LJ I 2 ~ !2 I .~ ::l!! oeC ...r c::::I c.o c::::I c::::l c:--J \.&? .... >- <::> = ~ Co:) ~ ~o::~ f-iOfi) O~O ~:So 04~~ ~oo ~j= ~ ~ ~iX~ ~.~ 8 ~. t; ~ s58 ~ ~ ~. :i='u z I g C1 ." " 00 00 \!ig ~.. ciN .... <"'~ ." '" \, ;erg .0..0 roo C") ~CW? MC'f ....~ ~g ..;~ ..., It)O ~ 0 ri\!i ~ . (It ..., ('C ~--~ 4lt=..I""f.-.. ~ ~ I~ '. :::0 Co . ~ ~lGr~ al&~j~~ i~~I-8;a :E~~B!~lO .... ~8~ii.s ~~ ~., O-J-fIt -w; .,....0;; ~C;~~N~':': ~1Il:a_ ><O~ Q.c't)130~oC1"" <....:Ic(~lz.C'(....14 po( OU) ~ '10 .... ... ~ \ \'\ 888 V:.c~ e) ~ - - ;..; ~+t., ~""'N '\ " '\ ~g8 ...0.0 t-C'l0'0 CO') -- ~ .,.,., i88 "':~g ...,.. ~o8 t-. 0 ~~g -fit ~ ! ~ 6 I 2 :Ii Qo ~ ti(ltj a~i:J ~~S~ ... o .... I/) '. (lO .... - ....01 I t~/' ''"'' . 8 to '" l' 89 co " o o 1ri ('l flit o o g tit g lIS N flit ~ti '" '0 U. H Q If g.-9 ..c: It rh~ -'\ \ o o <'i ~ ..;- ., S! ~ .... cri' ~ ~'/U~/~UUO ~~~UO rftA ~a~ J/U aQVi Date: To: From: Project: Re: Cc: ~"b'"h""'"b LU"e. ~uuz Gonzalez Architects Architecture * Planning * Interiors MEMORANDUM June 17,2005 Greg Galmin, The Tower Group' Jose A. Gonzalez, NCARB AlA Freeman Justice Building Request for Proposal- RFP # 1 - Ventilation Larry Chalmers, Director of Construction & Planning, Monroe County Please provide pricing for the revisions pertaining to the ventilation as defined on the attached drawings, E3.02, E3.04 and M1.01. Four signed and sealed sets have been provided for your convenience. 32 East Bay Street, Savannah, Georgia 31401 * (912)201-9888, F 2720 A North Roosevelt Blvd., Key West, Florida 33040 * (305)294-3 1602 Alton Road, PMB 503, Miami Beach, Florida 33139 * (305)672- r,,~/--'--- ~ \ J,..L ." .l~_r o [g(g~D~~O )2JH~k 1 2005 8,F 4lhtP1gW9f.6~, Inc. .1.._' ""V, "'"'VV""' .L_. V'V .I..l1..J.1. ..Iv'"! '"' I V v"'t:V.1. Lll~.1.LnU n~b~~nnft~~b LUftr. I I .I I 1 ',1 I ,I il ~ I ' ~ I I I II !I : ,I ;' I', II I ;1 igJ UU;i I; I' I, I. , \XY , I, ~ I ! i I' II 1 , i i , H !~' d -J >. -- . -, . I" -- ...~,. > ., J , ,I . ~ 'j i , 1)6'. Ij ~ '=' f ~~--, @ i. l ~.l ==~. :__ I ,'.':' ,~' ---I. j I ,.: _ _ ...' ' ! .... --1" · .r==] . ',__L__...t . '----'1- - - 4, c.--c- -:- -t " I , . '-~--~-~-3 I,] --------1-__ ~ 12xl0 ~--_.~------_. · '-l2xl2 ! Df5CHARD LOUve~ L~/Vv/LVUU ~~.uU rfiA ~v~ J/V v~Vi Ul~ 11!'.V !'.l~ull~!'.!'.Klj~C ".. L;UKY. IgJUU4 I' c' \ -r -=-\ j 1-+ -i\ ,I h c-, , . . . , , . i J. -:cB .c '_'gI+-,J . 1- c ~ 7~' , r I j, -i.ta. I ''gf-r- - '1;- ' ", ; ~ ~ ~ -k'r"'" ~" ~ .~.'.~", ~.r.Lr'", 0." '.""1""-""- , ,f '( IJ '! II ' ii,' 'i Q '" -EB- -D==---=-, ___u:- ---- 8=' -- "--" --- -- -- I __ .__-=--=.- flf l~/UD/~UUO l~;DI rftA ~Dq diU DQUl UN1~hV hNblNhhKlNb CUKr. AUG 10,2005 17:24 GONZALEZ ARCHITECTS 305-294-8217 ~ Igj uU:J Page 2 fAK~ 0 -Cd lA)C;tI{~rzl!..(J ( 8/12..(or Gonzalez Architects ArcbUedurc * r'rannin~ · Interiors MEMORANDUM Date: To: -......- From: Prol~,~: Re: Cc: August 09, 200S . . .. "'-. . Greg Galmin, The Tower G.ro~p Jose A. UoruaJez, NCAKH AlA ". "'-...-. -.. . Freeman JUNlj~ Building Request for Proposal- RFP #'1- DcMjun ofSnJlyport Rcs(J'oom & 2 I'loor Dr.uns - .. ..- ..- ,- tarry Cluilrners. Director or Construction &. Planning. Monroe Count.)' ..-_. . Please provide pricing for the deletion of the snllyport restroom {lx,lUTes and ac;sociat.cd plumbing... the mom will be utilized {or storage. ^lso. provide pricing for the deletion of lwn (2) floor drains, one in the lWlllyport and One in Conidor GO 18. Insure floor iN sJored 1:4' drain out of1hc snUypor1. ~ -.".- - - - - ._,..._' - . The Tower Group, Inc. 32 F,al'll Hay Street, SavaDub, GeOl1il 31401 * (9 1 1)10r-9888, Fax (912)101-0240 2720 A Nortb Ro<<nevelt Hlvd., Key West, Florida 33040 I< (JO~)19""J74H. Fa. (305)19~82J 7 1601 Alto a ROld, rMB 503, Miami Delicia. Flurida 33139 * (3fl$)671-9044, Fax (305)866-3324 -- -- The I'ower Group, 10\... 405 SW 148 Avenue Suite One Davie, FL 33325 <- AI Z ORDER REQUEST No.00047R2 Phone: (954) 476-3200 Fax: (954) 474-3111 TITLE: HY AC Ductwork Design Corrections DATE: 9/27/2006 JOB: 0417 CONTRAC;tJ1m;;~~~~,)~, PROJECT: Freeman Justice Center (FJC) TO: Attn: Clark Briggs Monroe County Facilities Development 1100 Simonton Street Key West, FL 33040 Phone: (305) 295-4306 Fax: (305) 295-4321 :;EP ': I iuUo Id-",1[ !;'ECEiVED W , RE:PCO To:TTO DESCRIPTION OF PROPOSAL From: WEA THERT Number: WT008R3 In October 2005, TTG sent RFI # 172 to the MEP Engineer, Franyie Engineers, concerning the absence of return air ducts in the ground floor HV AC design. In the subsequent Weekly Meeting, ITG notified that the return air plenum design for the 2nd and 3rd floors was not workable because the plenum space was partitioned by the fire-rated walls extending to the upper slabs. In that meeting, the replacement Architect, CSA Architects, asked to review the Life Safety Plan. Monroe County responded that Gonzalez Architects had not prepared one and directed CSA to do so. CSA prepared the Life Safety Plan and submitted it to the Fire Marshall for review and approval. As a means to control evacuations, the Fire Marshall required changes to the HV AC System so that each AHU conditioned distinct zones of the building. In the process of addressing the return air and zoning changes, the replacement MEP Engineer, TYEC, also discovered errors in the original design for the make-up air. On June 27, 2006, CSA delivered marked up HV AC shop drawings showing the changes needed to correct the return air design deficiencies, the zoning requirements of the Fire Marshall, and the make-up air design deficiencies. COR #47-R2 supersedes COR #47-Rl and addresses the cost to furnish and install these modifications, including Engineer Review Comments for Shop Drawings #15891-01 R3 & #15891-05 RI and RFl #228 and corrections to the housing and travel costs, with the flollowing exceptions: Exception #1) COR #47 excludes additional labor costs to install the second floor HV AC ductwork out of sequence (after rough framing, rough electrical, rough plumbing and rough fire sprinkler installations). TTG proposes that this condition be addressed on a time and material basis including costs for re-framing and other trades if affected. Exception #2) COR #47 excludes costs for adding EF-5 and EF-6 and deleting EF-4. These changes are distinct from the HV AC design deficiencies and will be addressed under a separate COR. Exception #4) COR #47 excludes costs for any electrical and fire alann changes arising from the corrections of the above-referenced design deficiencies. These changes will be addressed under a separate COR once TTG receives revised Electrical and Fire Alarm Drawings, Exception #5) COR #47 does not address compensation for extended Contract Time or extended General Conditions costs. These issues will be addressed in a separate COR should the impact analysis detennine that these changes affect the critical path. Item 00001 Description Weathertrol Proposed Change Order #WT008R3 (copy attached. 8 pages) Stock# Quantity Vnits 1.000 LS Vnit Price $307,483,38 Tax Rate Tax Amount Net Amount 0.00% $0.00 .$:W7.483,J8- Unit Cost: Unit Tax: Unit Total: ~s C_r ;}3:)..,'!:)., )1307,483.58 $0.00 $381,483.38 Description Profit Subtotal: __ S367',483.38 ~~c.) /,)3 ~ .7;?.. Markup Percent Markup Amount 5.000% $15,37<1.17 I~J'~Lf Total Cost: ~ $Jl1,SS7.SS '~:;.O/ 4 9'/.3 ~ - - Weathertrol Maintena...Ct ~orporation PR. ,'C ,D CHANGE ORDER No. WT008R3 7250 NE 4th Ave, Phone: 305-908-1000 Miami, FL 33138 Fax: 305-908-1039 TITLE:HV AC Ductwork Design Corrections DATE: 9/27/2006 PROJECT: Freeman Justice Center (FJC) JOB: 0417 TO: Attn: John Chandler The Tower Group, Inc. 405 SW 148 Avenue Suite One Davie, FL 33325 Phone: (954) 476-3200 Fax: (954) 474-3111 CONTRACT NO: 0417-004 . ,~\10fl(O(~ Co! ;nt'( -.,---;.,:,:~;.t:eG :I<,\orncn~ ('or--p )t .~ / /Guti RE:RFI To:CSA DESCRIPTION OF PROPOSAL Duct and Insulation Modifications Proposal revised to incorporate Engineer's review comments on Shop Drawings # I 5891-0 I Rev. 3 (Ground Floor Ductwork) and # 15891-05 Rev. 1 (Penthouse Ductwork), and to incorporate Engineer's response to RFI #228 deleting insulation from RIA ducts. From: TTG HJ1~ i)~C-"iVED "y' "Number: Oof8L-'---'--'-~-~ This revision also incorporates corrections to the Room & Board and Travel costs. Item Description Stock# Quantity Vnits Vnit Price Tax Rate Tax Amount Net Amount 00001 Ductwork Scope Changes I. 000 LS $139,638,54 0,00% $0,00 $139,638,54 ,/ 00002 Fire Damper Scope Changes I. 000 LS $22,111.00 0,00% $0,00 $22,111.00'/ 00003 Duct Accessories Scope I. 000 LS $10,490.70 0.00% $0,00 $10,49070 Changes 00004 Add'l Equipment Costs 12.000 WK $1,000.00 0,00% $0,00 $12,000.00 \/ 00005 Added Eng'g & CADD Work 1.000 LS $18,00000 0.00% $0.00 $18,000.00 00006 Added Room & Board for 6 40,000 DAY $525.50 0,00% $0,00 $21,020.00/' men 00007 Added Travel Time (6 men X 8 384,000 Man-Hour $37.50 0,00% $0,00 $14,400,00 v hr/wk X 8 wk) 00008 10% Overhead & Profit for 1.000 LS $23,766,02 0,00% $0,00 $23,766.02 ./ Sheet Metal Subcontractor ,/'71'>1,> .S-~ 00009 Insulation for All Duct I. 000 LS $49,300,00 0,00% $0,00 ~ Modifications 00010 Credit for No Insulation on RiA I. 000 LS ($17,884,95) 0,00% $0,00 ($17,884.95) / Ducts Description Profit ~ C/o) &9fJ.f!3 $292,841.!1 $0.00 $292,841.31 $-29%,841.31 a.9~ &titJ,.';.1 Markup Percent MarJ{up Amount 5.000% $l1,642.0r- I JI,,~y../ 'ill Unit Cost: Unit Tax: Unit Total: Subtotal: Total Cost: $387,483.38 /'}~. -- d 3~ ,} J- <. ")(.I ~ I "-'..;:)."'....J I(.JU It.JU.L."": ~.J.)V\'J 1o'ol.l..ol.""":lJ.4J ._..~.. -'"'" '-'"",-,~"",,,,,,_""'-"'" WTco~ ' AIR DYNAMICS, INC ", L 'J ", I '" ' Re: FREEMAN JUSTICE CENTER - '" .- ,.:...r.a~sis of chances in costs due to revision by 0, Tr,or,pson dated 6/271C6 ,t(~t,',d :'.' _. . ----< '- Descripton Units UF Units Lbs Lts/sO.ft. Tctallbs, Cost/lb Cost Totals DUCTVJORK 24ca10x10 271 900 1.156 1,040AO S 6.40 S 6,65856 ...../ 24qa 8x8 66 176 1.150 203.46 S 6.40 S 1.302,12 / , v 240a 26x12 37 234 1,156 270,50 S 6,40 S 1,731,23 1/ 24~a 14)(8 16 59 1.156 68,20 $ 6.40 S 436.51 v 24 qa 12x8 82 273 1.156 315.59 S 6.40 S 2,019.76 -..-/ 240a 1 Qx6 - 16 43 1.156 49.71 S 6.40 S 318.13 ./ 24 qa 20xS -: 2 214 1.156 247.38 S 6.40 S 1,583.26 / 24 qa 25xS 46 245 1.156 283.22 $ 6.40 S 1,812.61 / 24 oa 24x1 0 41 233 1.156 269.35 $ 6.40 S 1,723.83 \/ 24 Qa 6x6 " 221 442 1.156 510.95 $ 6.40 S 3,270.09 v 24 aa 20x1 0 48 .~ 240 1.156 277.44 $ 6.40 S 1.775.62 v 24qa16x10 '. - 15, 65 1 156 75.14 S 6.40 $ 480.90 J 24 qa 12x10 29 107 1.156 123.69 S 6.40 $ 791.63 // 24 oa 8x6 "' 18 39 1.156 45.08 S 6.40 S 288.54 '/ 24 aa 20x$ 30 140 1,156 161.84 S 6.40 S 1.035.78 I~ 22 aa 30x22 " 89 980 1 A06 1.37788 S 6,40 $ 8,818.43 ,/ 20 oa 36 x",2 30 240 ~,656 397.44 S 6.40 S 2,543.62 /' " , 20 oa 26x26'" 20 198 1.656 327.89 5 6.40 S 2,098.48 V -- " 20 oa 3Sx20" 20.' . 206 1.656 341.,14 S 6.40 S 2,183.27 / 20 Qa 38x16- . 48 . 457 1.656 756.79 S 6.40 S 4.843.47 ./ 200a 38x16- 20' 206 1,656 341.14 S 6.40 S 2,183.27 / : 20 CIa 30x20. ' 5' . ~a 1.656 79.49 S 6,40 S 508.72 v 20 ga 30x2S- 55 ' 608 1.656 1,00e.85 S 6.40 S 6,443.83 \/ 20 oa 24xS- 12 69 1.656 114.26 S 6.40 S 731.29 V 18 aa 40x22 37 383 2.156 825.75 S 6.40 S 5,284.79 v 18 qa 40x12 20 174 2.156 375.14 S 6.40 S 2,400.92 / 18 qa 38x12 33 275 2.156 592.90 S 6.40 S 3,794.56 V- 1S qa 42x16 10 97 2,156 209,13 S 6.40 $ 1.338.44 \/ - i6ea 5Cx10 89 980 2,656 2,602.88 S 6.40 $ 16,E'58.43 j 16 aa 56x14 10 116 2,656 308. 1 0 S 6.40 $ 1.971,81 'J -- ~ 5 qa 48x24 28 317 2,656 841.95 S 6.40 $ 5,388.49 / ;6 aa 50x14 69 736 2,656 1,95482 S 6.40 $ 12,510,82 j 16aa52x18 32 373 2656 990.69 $ 6.40 $ 6,340.40 'j 16 qa SOx16 15 690 2,656 1,832.64 $ 6.40 $ 11.728,90 ,/ 16oa48x10 24 232 26513 516.19 $ 6.40 $ 3,943.63 / S:";PDOrt etc,10% tot 1,983,50 $ 6.40 S 12,694,41 ,/ Sub Total $139,638.54 j 08/08/2006 Tl.'E 08:34 [TX/RX ~O i5Si] @003 l{J~-~;~- '(./w I{,JO, L..""i: C'nl-"\.J loI<l.L...\.j.lj~ .....'. Vv ~V ~...".'-" '-.I............ W' WTCO't" .,--.... , , ' AIR DYNAMICS, INC ,'1___1 I , Re: FREEMAN JUSTICE CENTER :F ;r;u . -,., !Analysis of charcesin costs due to revision by D, Thompson dated 6/27/06 I - I Size Q~antty Cost!cn:t Cost Tct.a:s FIRE DAMPERS i Ox1 0 10 S 1C670 S 1 067,00 ',.,/ 38x22 2 S 184 50 S 369.00 ~/ ,Dx22 2 S 180,00 S 360,00 ,/ 4 'Jx22 1 S 139.00 S 139.00 ,,/ 22x12 2 S 97,50 S 195,00 '- 38x12 - 3 S 138.67 S 416.00 26x5 2 S 34.00 S 168.00 .J 26x14 1 S 128.00 S 128.00 "'-"'.1 20x5 2 S 71,50 S 143.00 v 36x12 2 S 140.50 S 281.00 \ ,/ 0,/ 42x16 1 S 180.00 S 180.00 , " 14x6 - 1 S 161.00 S 161.00 ~ 1 8x12 1 S 98.00 S 98,00 J 24x5 , 1 S 92.00 S 92.00 ./ 24x10 . 2 S 92.00 S 184.00 J 26x8 8 S 11,50 S 92.00 J 12x8 2 S 60.00 S 120.00 \..,./ 56x10 . 8 S 246,00 S 1.968,00 v 40x16 1 S 180 00 S 180.00 J 56x14 1 S 25700 S 257.00 ./ 16x10 1 S 92,00 S 92.00 \// 48x20 2 $ 201,00 $ 402.00 \/ 20x10 .' 2 S 67.50 S 135,00 / 58x18 1 S 281.00 S 28100 / . / 5O.xt4 3 S 256.67 S 77 0.00 / 8xS 1 S 60.00 $ 60,00 \/ 12x10 1 . $ 63.00 $ 63.00 ~,./ 60X16 1 $ 300.00 $ 300.00 / 48x8 1 $ 145,00 $ 145.00 'L/ 6x5 1 $ 60.00 $ 60.00 48x10 1 $ 145.00 $ - 145.00 ",. Fire Rated Access Doors 68 S 106.50 $ 7,242.00 "../ F/D Sleeves 68 S 85.56 S 5.818.00 ~/ Sub Total $ 22,111.00 GRILLES Size 10x10 3 S 252.45 $ 75735 50x12 1 S 145,35 $ 145,35 ,// 08/08/2006 TCE 08: 34 [TX/Rl ~o i5871 @004 /wJ U'..J. ~"7. .. .)'-'\' "'_"f" .J... . \.. -- '-" ..... - "" -- - - - - - \..U\CO~ Louvers 24x24- 2 S 621 00 S 1.2t.2.00 \-:1 24;:(12- 1 S 310.00 S 31 0,00 30x20' 5 S 6~6, 00 S 3,230ro .J p,; 24x16" 1 S 4 1 4 00 S. "~iJtf4,.QQ( ('[1~A'1"1 L'" I, ~ I AIR DYNAMICS, INC I,r r -)1 '; :jlj\J '..,\'- ., ' \ ,-' ...-' Re: FREErv1AN JUSTICE CENTER (\~"'l'T ---'. ,-' Analysis of chan~es in costs due to revision by D. Thorrpson da~ed 612ilO6 ~t(~ E\\' dJ " ,- , SiZe - Quant'tY Cost'~nit Cost Tctals FLEX DUCT - Size 6" (Boxes) 5 S 52.60 S 253.00 I ./ 10" (Boxes) 1 S 75,00 $ 75,00 / COLLARS Size 6" (Units) 22 $ 10,50 $ 231.00 / 10" (UnitS) 19 S 10.00 $ 190.00 .J NYLON TIE WRAPS . Boxes 4 $ 10.00 $ 40.00 j I VAV BOXES #8 1 $ 910.00 $ 910.00 1:/ . MOTORIZED DAMPERS 60x14 1 $ 1.710.00 S 1.710.00 \./ 2.4x..1 ~ 1 $ 973.00 $ 973,00 ,/ VOLUME DAMPERS · ' . //" ,.' ,,\ 30x20. 5 S' 627.00 . c r'/3.135.00 ,A 24x15- 1 S 476,00 L 476.00 ,f "<,'- Sub Total (grilles, etc) -. S 10,4.90.70 - OTHERS - Two 20' Hi-lifts weeks 12 S 1.000.00 S 12,000.00 ./ Cad Drawinqs & Engn'g 1 $13,000,00 $ 18,000.00 Room & Board (6 men/day) 40 S c;20).5o 1> '2.(, 02C.I)O / Travel Expenses 8 weeks <4 MeN @ B t-/R.lwK. 3i.?4 $ 3J.~ ~ (4- 4-00, "C' Sub Total .t> b~'.42c.Ot.'l I Grand Sub Total $ -vn ~.Go.:lA Overhead 5% . 1; II :e..~,)" i Profit 5 % $ II A~'>, ,or GRAND TOTAL(rev'd 8/3) ~,2{,( ,4u;,,;z.G., . Items marked represent changes made in last revision 08/08/2005 TIt: 08:34 [TX/RX ~O 7587] ~005 .J .(....J vV V\"".L.va 1110 1,-,,""01 '-"',..........1"'" 04. \,- 02'2-\ weathertrol MAINTENANCE CORPORATION -, September 21. 2006 i-,'~':.:.r:r''Jf? (>:-u~-IY ::'-,j<:;;fi:~:';:-> J<::i'-~~;jl-~-2'-nt Mr. John Chaodler The ToWer Group 4OS'SW 148~ Ave Suite-1 'Davie, FL 33-325 (..;EP ) ( z-".u ;fC LiJt'~ 'j" Dear loh.o.: . These are the items that are under discussion on '"other ~pe of work" ~ Room &. Board . 6 men for 8 weeks of'work (40 days.) 2 men per room,) room per week ESTIMATED COST (see attached rate from RadissOD. Hotel) Week of September 11 th, 2006 to February Sm, 2007 plus 8 weeks thereafter. September 11th th.ru No"'ember 1~ 2006 = $127.60 I day wi taXes Novembe:' 2ad tbru December 1$:2006 = S 140.40 I day wI taxes ~cember 1 Sl tbro.:1anuary 1" 2001" S l78.50 I day wI taXes January 2nd tbro April 14 2007 == S 199.~ I day wI taXes --- --- 1/ , O'j ,-) r<., :J 0 .,.J },-/ 'J <J _ . -~.~~ 7/ 0 DO', ,. "YY7'-j (. / /', i) -J I /<J"~ t 8 weeks x $127.60 K 4 Days = $4,283.20 4 weeks x $140.40 x 4 Days = $2,245.44 4 weeks x S175.50 x 4 Days'" $2,808.32 14 weeks x $198,90 x4 Days - $1 1.13g.40 " ';):) L;.. { ~ $20,275.36 _._-,,~--- ~ Average CQst ofa room I day for the duration of the projl:Ct = S168.96 ,J 3 rooms /4 days '8..8 weeks x $168.96 = $16.~O.OO J Meals,6 men x 4 days X. $25.00 x 8 :weeks = $4,800.00 / Total cost for room & bpard = S21,020.00 . " V~ry Truly Yours, Weathertrol Maintenance Corp. ...~ ,. . . . The Tower Group~ Inc. M E C H A N I C ALe 0 N. T RAe TOR S 7250 N.E. 4th A~enue · MiamL Fl33138 · Tel 305-908- HXX) · Fax 305-908-1039 · E-mail mon@wtrol.com .". A""" nrwJn 1 r\ 008-~ 20~d Sll-! ,6~0!806S0t 00 lNIVW 1oaLH~Hl~3M-~ S!:St 90,-ZZ-60 09/25/2006 MON 08:17 [TXlRX ~O 7773] 141003 Mr. Hec10r Auiz Weathemol October (per nlgnt rates) Week Days (Monday. Thursday) $110 plus \,ax November Weel< Days $120 plus tax wi1h the exception of 8&9 $170 (tl'1ls Is a special Event Week...ESPN Pcwerboat Races) December Week Days $150 plus ta)( until the 21st (Officially start of .season.) then...$190 plUS tax each night January--April Will be $170 each night (tentatively as 01 now rates fluctuate daily during seasoo) Radisson Heall !(l!)I WrtC 3810 NotIhlWo5 wek Soul C""fa KeyW~R. J 3040 Teleprone: 305-2'"4.55 II ~a>c )()5-'2'>1~39 Qth.erYl-.bolh.lc'@;oa~cQfl'\ www.ra&~.nfl TIM!: (;iECEIVED BY 0'\'1- 02\2.1 Katherine Behao\ Clitector of Gli_ rvies ~Ji,.)St>J:l ~ MonrO<? '--:OlJlty "('J,-;:i!i~Il'?S 1Jr. \"1ic;:;,,......;enf 'j[P '~ ( / ,. ~ ~~~~u'W~~ The Tower Group, Inc. 008-~ E00d SU-l 6~0!g06S0~ 00 l~IVW lOHLH3HlV3M-WOH~ S!:St 90,-2Z-60 09/25/2006 MON 08: 17 [TX/RX NO 7773] ~004 ~u W)U <.J U <.J I.J , ,,-..J . ,l, I_~ ~ ... __ . .. .. . lUTCO<g GOIVIEZ QUALITY INSULATION, INC. H.V.A.C.l\IECRAi"ITCAL INS"LL nON CO~lR.:\CTOR i865 X\V. 66 STREET; ~nA_'fi, FLORIDA 33166 PH: 305.477.5776 FAX: 305.477.8865 July 23, 2006 Y1r. Ralph Ross \Veat."'tertrol Maintenance Corp 72501'-;""E.4 Ave Miami, F1 33 US _ 'vbl'lr("~,' 1>-<:,-_ lI;ii(:.-s. _~'I ,'-, -nf1....< '~'c..f,~( -r'-~F--< i',! ~~r'F' '), -. ~ '-,' ,- Re: Freeman Ju.::.l:ice Center Re...ised Drawings 6/27/06 Cr -'P",-- -~ -~--'<~ '~_'__y~__ f',_ [""Fr:, d't,'------ ------ ;:fViE. Gentlemen: We have analyzed the referred revisions made by E. Thompson and we have the following comments. 1- Subs'\:antial changes were made in the duct system of the job. 2- These changes increase the metal area to be insulated. 3... }.io changes have been made in the piping and Lherefore no changes are made in the pipe L."1sulation. Accordingly we are requesting a proper change order to cover these increases as follo\vs: Added metal amountto 7,940 sq. ft. in total area @ $3 .33/sq. ft............... $ 26,440.20 ~ q ~ (l .0/ Rental equipment (Hi-tift) for si.~ extra weeks of work @ S460/wk......... $ 2,760.00:' - U I L/?: (I, { i ' Pick up and delivery of equipment.......................,....................,... ..$ 900.00 -.,..-.---... Room Board and cravel expenses for a crew of 4 men.... ........ ............ ...$ 19.200.00 t.1?, :, . TOTAL FOR TBlS CO............................................................S 49,300.00 ./'! /C(} Ple~ take note that ~e am~tUlts shown.alread?, have Gfor overhead an~ profit considered::- "'-:.,'-:.' ~'-~"." .A..lso the cost for the Insulation of S3.3 3 15 obtamed fro~ Means Book adjusted for the c/j i . location of the job and other pertinent factors. ' Sincerelv, / J I qomex Lo.sUla!l~ . 11/d-r;~.-" I,' /r /' ~;;...' .. /.. ....c.. -_7 ~e~orG ex / President 1/ <,1 .'''' .... t, 1 ' I '. .-- J, j.S - ~, I ./ ,- f :...f J ! - I {~, ~/:.i J - 'I; - -- it' n;' r 'C!, / /J , .' ~Gfe --.. - nll/nQ/?nOI'l TI"P 011:34 rTl/RX "<0 75871 talOOS WTCO~ GOMEZ QUALITY INSULATION, INC. B~ V.A.C. :MECHANICAL INSULATION CONTRACfOR 7865 N.W. 66 STREET; MIAMI, FLORIDA 33166 PH: 305.477.5776 FAX: 305.477.8865 August 8, 2,006 Monroe COunty' r<)':;;fllties D",' AI ' ~ v, Opment Mr. Ralph Ross W~rtrQI Maintenance Corp 7250 NE 4 Ave Miami, F133138 SEp" ') ," I ""', J I iUdb liME: RECEiVm~; "- --+,,"~~,.<- -~~----:---~ Re: Freeman Justi~ Center Gentlemeo: We have revised our Jetter-proposal dzted August 2,2006 as follows: In OUt original base bid and thec.hange order proposal dated OD July 2006 we included the insulation of the eutirc mum air duct. This includes ~ where dl~.c!uct is in n:.turn air pl~ums and ateti wbcrc the duct is in W'IlDl areas such as the equipmODt rooms. Please be aware that the price per sq. ft.,bas changed from. the original bid. The price used at thetinie Was S'1.67/sq. t\. ~llile the updated price ndw is S3.33/sq. ft. Also please be aware that our CO for $49,300 ~ included cx:tta' expenses for travel, etc. Yau will find below that we are a'editing some of the$e monies for the proposed CO but DO aUowmcc is made for the ,dUc:t that COilespoods to the origitxal base bid. , ' .' ' 1<.. ]- Delete insulation in retum air (base bid) 3125 sq. ft. @S1.67/sq. ft........$ 5,218.75 2- Delete insulation in return air (change order) 2040 sq. ft@S3.33/sq. ft....$ 6,793.20 3- Delete travel expenses for tb.e proposed CO, 2040 sq. ft @ $2.88/sq.ft.... ..$ 5.873 .00 4- TOTAL deduct for RJA insulation........................ ..................... ...$11)184.95 For your infot1I1ation, if a.t a later date you decide to insulate the retUm air in the eqt~"""t room p leas add S2,1 00.00 (hard board insulation) for this item Sincerely, l'he Tower Group, Inc. 405 SW 148 Avenue Suite One Davie, FL 33325 Phone: (954) 476-3200 Fax: (954) 474-3111 CHAN , ORDER REQUEST No. 00056 o TITLE: Additional HV AC Controls DATE: 8/23/2006 JOB: 0417 Monroe Co~nty CONTRACT N0~tles Dever4pment PROJECT: Freeman Justice Center (FJC) TO: Attn: Clark Briggs Monroe County Facilities Development 1100 Simonton Street Key West, FL 33040 Phone: (305) 295-4306 Fax: (305) 295-4321 AUG 24 2QJb TIME: RECEIVED BY: ~~ RE: RFI To: CSA From: TTG Number: 00212 DESCRIPTION OF PROPOSAL Change Order Request #56 addresses the cost to furnish and install HV AC Controls for one (1) V A V added by the HV AC Re-design Modifications (Re: TTG COR #47), and 12 space temperature sensors added by the Engineer's response to RFI #212. The changes are a result of corrections needed to resolve HV AC design deficiencies. Please process a Change Order in the amount of$I3,965.00 for this extra work. Item 00001 Description Stock# Labor. Material. Programming & Start-up for 12 Space Temperature Sensors added per Engineer's Response to RFI #212 (Re: PCO #ESS003, copy attached) Labor, Material & Equipment for controller, damper actuator and temperature sensor for one (I) V A V added by the HV AC Re-desgin Modifications addressed by COR #47 (Re: PCO #ESS002, copy attached) Quantity Vnits 1.000 LS Unit Price $11,537,00 Tax Rate Tax Amount Net Amount 0,00% $0.00' '11)37,66 /1 PO iflJ I 00002 I. 000 LS $1,763,00 0.00% $0,00 ~ 11~.10 Description Profit /'3,) l.i 9 30 ~3,.3uu.UU $0.00 m,366.00 $-13 ,366 .Olf /1:. g& '1 30 Markup Percent Markup Amount 5.000% ~6S.66 6(, '3-'17 Unit Cost: Unit Tax: Unit Total: Subtotal: Total Cost: $l~,~6~.66 /00/3;;),)1 ---' -- E551 <C..SSCC>3 Elllt:trllnlC $11.+_ SlIurttll.llt..&f& ?~Ii~ IInCB lI.ran kau'ltv.rd. 5u'l'tt ZIti I1Dc~ 111',,/'1117, F'lt/rld:J ;I;I'I~' Monroe County Facllltf03s De'h~loc,."ent August 23, 2006 AUG 24 2G26 The Tower Group, Inc. 405 SW 14Sth Avenue, Suite #1 Davie, FI 33325 ~ TIMEj REcSlVED BY: ! Attn: John Chandler Fax #: 305-296-2587 i Re: Freeman Justic:e Center RFCO #2 -)2 Additional Temperature Sensorsl , I I Dear John: ! I As per the Engineers request on the revised mechanical drawings, ESSI rcspcctNUy requests a change order for the addition and installation of 12 spaee temperature SeTl,sors f01 the courtrooms on the first and second floors. i f I The price includes the following: . 12 new wall mount temperature'sensors (stainless ~late) . Installation of pipe and wire in hard ceilings : · Programming and graphics . Start up 12 Sensors Programming and Graphics Electrical install 5% profit 5% overhead $ 360 $1 ,800 . l/ ( 'I $8~J~ _!C! ' J , $1~(}73 ) {:) ~/(f Y The request tor cbaDge order (or 12 T -stab S U,531 ) } I A quick response would be greatly appreciated, need to proceed with this work ~fore walls and ceilings arE: sheetrocked. If I can be of any further assistance please do not hesita~ to call me. V cry tm] y yours, ms Southeast, BOC., R..'l,ton: (6n) 955 900lS Fax: (561) 95~ Sl007 I E-5S~ CI.t:trllnlc ~m. SlIuttt...t..HrS 1"3 IIDINl R:lfoni6"UI.V#rd. Suft~ ~,,, "OC~IRqfO", FrO/WIll ~:7"~1 I ,_ " 1onroe County FaC'r'es D0'elopnent dG')4"'~~" Au J ..~' L _ :l I TIME: I fr}- / RECEIVED BYj I E551 August 23, 2006 The Tower Group~ Inc. 405 SW 148m Avenue, Suite #1 Davie, Fl 33325 Attn: John Chandler Fax #: 305-296-2587 I I i I Dear John: I As per the Engin.eers request on the revised mechanical drawings, ESSI respectn+ly requests a change order for the addition and installation of 1 new V A V Box located on the r:ond floors. The price includes the following: I · New VA V controller and damper actuator I · New wall mount temp sensors and supply tel'np setor · Field mount controls on VA V box · Installation of pipe and wire I · Programming and graphics I . Start up I I I j I I ! I I I A ~~ck response would be greatly appreciated, need ~ proceed with this wor~ bcjrore_walls and celhngs are shectrocked, If I can be of any .further assIstance please do not hesttat, to call me. ! I I I , I i Re: Freeman Justice Center RFCO #3 - 1 Additional VA V Box Materials Programming and Graphics Electrical install S% profit 5% overhead $ 600 S 300 S 699 J i;: q I.( $~ } 4 1,) -~ The request for ehanee order for V A V Box 5l;163 rl ,~.r? i:' r, /. / ;; f; - I !~.: .'" -Very truly YOUTS, F:lec:tr~ni ys 80ca Rato.('\: (877) ~SS 9006 Fax: (561) 9$5 9007 f ~Uv JU UU V! ,U;:1~ 111t::l IUWt::l1 I.;lIUUfJ "Uo-L~O-LOO ( pL The Tower Group, Inc. 405 SW 14B Avenue Suire One Davie, FL 33325 CHANGE ORDER REQUEST No. 00059 Phone: (954) 476-3200 Fax: (954) 474-3111 TITLE: Electrical Changes for HV AC Zoning DATE: 1111/2006 JOB: 0417 CONTRACT NO: PROJECT~ Freeman Justice Center (F1C) TO: Attn: Clark Briggs Monroe County Facilities Development 1100 Simonton Street Key West, FL 33040 Phone: (305) 295-4306 Fax.: (305) 295-4321 RE: RFI To: CSA From: TTG Number: 00229 DESCRIPTION OF PROPOSAL Change Order Request (COR) #59 addresses the costs to integrate the Fire Alarm Panel with the Security Access Control System and the Zoned HV AC Smoke Detectors as requested by the Fire Marshal, and the costs to furnish an additional 20-amp single-phase breaker for Panei 'RL' to accommodate HV AC components not accounted in the original electrical and mechanical design. The value of the additional work is based on the enclosed labor and material breakdowns (IO pages). Please process a Change Order to increase the Contract Price $10,272.28 for this Extra Work. These changes do not affect the critical path for Project Completion, Item Description Stock# Quantity Vnits VnitPrice Tax Rate Tax Amount Net Amount 00001 Material to integrate Fire l. 000 15 $5,311.46 0,00% $e,OO $5,31 /.46 / Alarm, Security & Me Control Panels (Jess sales tax), 00002 Labor to integrate Firc Alarm, l. 000 15 $2,312.88 0,00% $(J.OO $2,312 8.8/ Sccunty &. NC Control Panels (less burden). 00003 Matcrialto add 20A I.pole 1.000 15 528,00 O,OO'Y. $0,00 $28,00 ,/ breaker to Panel 'RL' (less sales tax). $110,4{) \/ 00004 Labor to add 20A I-pole 1.000 15 $110,40 0.00% $0.00 breaker to Panel 'RL' (less burden). Unit Cost: Unit Tax: Unit Total: Subtotal: $7,762.74 "/ $0.00 $7,762.74 $7,762.74 Description Overhead Profit Sales Tax Labor Burden Markup Percent Markup Amount 5.000% S388,14 / 5.000% S388,14/ S400.46 / $1,332,80 ,/ Total Cost: $10,272.28 '1UIJ JU UU V I.VvtJ 1111::i 1 UVVI::iI '-'I UUfJ .)UO-L:::10-LOO ( p,.) \ a::: QilQi/:co 0 0 Q U') Q It) Q Q 0 II)QOlOOQNONQQO o to It'i i 0 cD 0 c:i N c:i ci 0 c:i c:i ~ N I..... U') .... c( b I- \ ;!{! 4". ... -;Ai!' =<S'N ~(\'~ ;~!lli I- zww::eWOOUO::EOOO :J Q enQ(/e. O::MII) :t:NII) ~ ..J ~~ 1-0 ~ 0:: OMOQMOQQOQQQO m&t)MQ~OQu)OQQQO 1< 0 0 M!~ c:i I~ "i c:i an c:i I~ c:i .... ,\.\ 1"""1' .... &t) ex) ~ ol~ u) 0 ~ ...: ~ c4lls Q c(Q,......QNM.....COCDCQN QO ~uiaic:iciC'i..:NM=aia:i It'io ....w~~;~~...:~~;!:;: :e~ c( !;( .. fit- .0 .. fit- I!! ~~ ~ frl~ ~ ..JO .., w~ I- ZOOOWUOUU:EOOwww ;:) WOCD....QQ..-OO<DNCOQiSQ .....U)U)QNMv~~aa...QOO ONmONM"":.nNNmNolrio cx:cn.....IOQQ<OCO..........OCOQCO." o..NN......................I")II),..... en .... ~~ ",. ..~..iIII-~ 2 Q tJ) en rn ". ~ I- W en a:: 0:: ..... u. - CI)><!:::~OOI-(!) 3:en I- o w><mo:Jjl-....5~~::r:Q."z 9 Q 000"""'(1)< ;:) .... oZZ~wzW2~3::JO::~OI- ..J ceOO 20.... lDl-:lO:t: ~a3B:ii=O~~~08~!:!~~~S2 ~!::Wffi~ctOOI-....lI:I:t;2"0~ 0:: QI-;;l~w)(I-~:E~<(WO~u. c( ~X- :& w ..J.o::- :I ><W~Wiiw"'r' ~D..:!Q.o:: W ~.Mg:. - j;5~ ~M ~ a:: >< u..:! - < LI.. V p;M M :& ..J \ ~ @:I@ ~E .... o::Z ;-.QW m~ :5:J III - ~ IJ\ I- ~WWWI-WI- Z WW WWWWW :::l u. u. u. ~ Q08C'1QU)0 g~..-........ I- QQ 0 11)11) C'lU)..... II) U) ..... wv .jU UO U I :U~p I ne lower I..:Jruup JUv.L;:IU-L;,JO ( fJ,.... Barnes' Alarm Systems, Inc. 3201 Flagler Avenue, Suite 503 Key West, FL 33040 Quotation Quote Number: o 912gb Tower Group Quote Date: Sep 12, 2006 Pas:Je: 1 u-~c:o:~;r 10. u. _],;::~F -~~:tm~~~~-- . ~~~;-___. -1 - Qua;:!olnot_f~~~~---~ela; o~:tro~::~?n ---- ~~nit ~:. 0'; - Ext~:;i~ono. 0 ~ I 1.00 bar-fir-mat IMaterialS Discount 1)"1) 765.00! -765.::l0 3.00 lab-f.:.r-ir: sta':" 1 Lal::or to programl 95.00 I 285.CO I I ..--+- - 'Joice: :-388-294-6753 Fax: :-305-292-4905 Subtotal Sales Tax I Freight. Total 4 , 620 . 00 I j 325.13 50.00 ~~~9_95 . : 31 State Certified EF20000482 1 11\:;1 I UVV\:;lI \..:>1 uUfl - UV JU UU U I,U;:Ifl t"'- The Tower Group, Inc. l\fEETING :MINUTES No. FA-l 405 Southwest l48th Avenue Davie, Florida 33325 Phone: 954-476-3200 Fax: 954-474-3111 PROJECT TITLE: Freeman Justice Center (FJC) LOCATION: Job-site Trailer MEETING DATE: 8/2312006 SUBJECf: Security & Fire Alarm Coordinatic A:r~NDI INITIALS I ATTENDEE NAME I COl\lPANYNAME y JS Jerry Smith City of Key West Fire Marshall y JC Jose Clausell The Tower Group, Inc. y M'l Mike Nalepa Monroe County Facilities Development y SH Sharon Harrold Monroe County Sheriffs Office ITEM 00001 00002 00003 00004 00005 00006 STATUS STARTEDDVE NEW DESCRIPTlON The Fire Marsha! is ok with the Corrections Department having the ability to over ride the Fire Alarm system so that the prisoners holding cell will not open on an alarm for 90 seconds. The correction Department can over ride this and keep the cells close but, it has to be done before the 90 seconds. The Fire Marshal has agreed on opening all the accesses NEW controlled doors in the following events. By a Smoke Detector going into Alann AND a Sprinkle water flow in the same area, OR by a sprinkler water flow only in that particular area OR areas The Fire Marshal question if the elevator shafts had NEW sprinkles in them. This was field verified there will be sprinkles in the shafts. BALL IN COURT TIG JC ITG JC ITG JC The Fire Marshal stated that he har reviewed and approved NEW the smoke zone drawings and that there where only 3 zones in the building. I requested a set of the approved smoke zone drawings from the County. 8/31/2006 MCCM CB Ail doors that are controlled by a card reader or the accesses NEW control panel will need a Fire Alarm System relay so that the fire alarm System will release the doors on an Alarm. This is because the accesses control system is not a UL approved Life Safety Component. 10 reference to item 00005 The Tower Group will summit a NEW cost proposal to correct this requirement from the Fire Marshal 8/31/2006 TTG JC 8/31/2006 TTG JC 00007 The Fire Marshal requested that the Carbon Monoxide NEW ITG JC sensors to report back to the fire alann panel as a trouble if the levels are to high, also the system needs to report back to tbe fire alarm panel if the fans fail to start. COO08 -:-he Fire Marshal will come back for a courtesy inspection NEW ITG JC before we close :he callings to inspect exit light locations. IOV -'U UO U I , I up I rle lower \.::lIOUP 0VV-<:';1V-<:.>JU' .....u The Tower Group~ Inc. 4Q5 SW 148 Avenue Suite 1 Davie. Fl 33325 REQUEST FOR INFORMATION No. 00229 Phone: (954}4U-3200 Fu:: (954) 414-3111 TITLE: AlC- F/A sequence ofoperntion PROJECf: Freeman Justice Center (FJC) DATE: 7/2712006 JOB: 0417 TO: Attn: Hank: Goldman Currie, SO"\ll!ows. Aguila Architects 134 N.E. lstAvenue Defray B~ Fl. 33444- Phone: 561-276-4951 Fa.'"(~ 561-243-8184 STARTED: COMPLETED: REQlIIRED: 81312006 REQUEST: The original conttact drawings calls fOT the AIC sequence of opperatioos on a fire alarm to shut down tbe entire system. Question: Do to all the Ale scope changes will the sequence remain. the same? Reqaested By:~ Graap.1Dc.. SIg.ed: Jose ~11 Oak: , I.:J-., !Cl~ ~_. ANSWER: J r:J t//VL.Y .s/!{/'I jJ~tON t/JJIT 7774/ IT/lS /!5/#~~~,~ ' j).cr~C-rc/i?. 1).1 ;4LAR./11 " ~",u CJTf/P'/C?WI<-PS EONE hl<c 4~I!JI.,zM 6/fV T /Jow/---j tVI nl t//J/T 6'P1~~ #r T6e'- Td/2 :.. A.......... BY'c.z~~ ~- Sigaed: ' / tlt/A ~ Hank Goldman / '..r l 0312: 5 - /- V ~ "VV vv vv v.,, utJ .llV IVWVOI "-'IVUfJ fJ,1 ~uv-t:...';;;V-L.vU f FREEMAN JUSTICE CENTER FIRE INSPECTOR- PROJECT MTG. NO. 76 Date: Time: Location: Attendees: Contractor: Owner: Architect: Others: Thursday May 18,2006 10:00 A.M. Jobsite Trailer-Jackson Square Phone Fu Tbe Tower Group (TTG) John Chandler Tim Clarke (786) 367-0549 (305) 986-416 (305) 296-2587 Monroe County Facilities Development (MCFD) Clark Briggs (305) 797-2816 Michael Nalepa (305) 797-1584 Jerry Barnett (305) 292-4416 CSA Architects: Hank. Goldman (561) 276-4951 Fire InspectorCitv ofKev West: Jerald Smith This was a special meeting called to verify, confirm, and approve the Life Safety Drawings for the Freeman Justice Center with Chief Marston (not present) and the Fire Inspector of the Cit}. of Key West. Discussion: .Jerry B., John we are going to record this. JeraJd S.~ that's fine. Hank G., I think it was maybe four months ago. You were here and we talked about zoning. .Jerald S., right. At the time the zoning was for two things. One was for you and the Sheriff's Dept. thought it was a good move. They too wanted separate areas to handle any hazardous materials so they wouldn't have to shut the whole building down. You had it for different reasons, but basically agree. Jerald S., basically the same. Hank G., right. The theory was, we would, to the best of our abilities, run these as well as we can. Given the building was as far along as it was. JeraJd S., correct. The zoning has nothing to do with lour fire walls; we have one hour and two hour fire walls just to present to you. Jerald S., correct. So what happened was this, we have two air handlers that feed the second floor. So we can't zone it into anything more than two zones. Jerald S., correct. So on the second floor these are the two zones. We had to re-adjust some ducts. Here's what you end up with. One zone takes ~are of this half of the building and the entry and this zone takes care of this half of the building and the judge's quarters. You have two individual zones. ,\\7e can't do anything more because there are only two air handlers that will go in down there. The floor above we have more air handlers, but we would have to re-engineer aU the air Mtg, No. 76 May 18, 2006 ~uv .,Ju UU U I , I V'"' I 111::7 I U1JVOI \".;]1 uutJ \..JV...J-4..';:;U-L.,vU ( '"',u FREEMAN JUSTICE CENTER handlers up there if we were to go to more than these three zones. We felt ifyoa could live with the two zones below the three zones should be adequate above. We're hoping you are in agreement with this? Jerald S.~ yes. Hank G., perfect. Then we are done. Jerald S., yes. Chief Marston spoke with someone yesterday and this came up about the zones and the fact that you're as far along on construction and since this is a problem you inherited and that you would have to re-engineer e,'erything that basically this would be sufficient. We wanted it to be different, originally of course, so it would be safer for everyone. So basically yes, it's submittable to us. Hank G., could we get some piece of paper, perhaps your copy of this that you could sign off on it? JeraJd S., I~ll let the Fire Marshall, Chief Marston, sign off on it. Then I'll fax it to you. (5/18/06). OPEN Mtg. }\;o. 76 2 May 18,2006 ~o::~ o~o.. ~ eo .... cacl .... o .... t::: zw :;, 0:: 00 S~ a!8 ~~3 0< -~ 0:: t;~ Wo u::.... ... zw ::> o wo ur--: ii:" ~D. -I W ~ i!; a. as rn w ffi ..... ?S~2 LLJ!::.... 0:: Do ~ ~ w 0 C N ~ t: zw ::;) ~... a ~'d QONOQN oo...,...O....N 'liQOcDC'Ii""; ....COON4II'tO ....~~ N .". ~ CI (/)CI~ 0::: . 0 ::r::~:g .,.. g'@@ I- Clo::Z C!OW ClO~Q ~ 0::: :;, In ) QC7-Q~7-Cn" ~~ ...0 .... dnoJC) JaMO I au I dm: In em n~ ^ON /'~ I '1-,lli'AJU ...If.......... . "". .... .. .. .... V'" TdL~ ~ - -- ... ~- ~ - --.. -- - -- --- - ;(" = =- =--= .-( - := - '=-=' \:: ..JY noA;iCN&-~~~ , ',\:1.' 112 Sout1:u::a:st 10" Str:ecl Delny Bacf&, F1 :l348'3 Voice.: (561) 7.74-02.00 Fu: (S6J) 174-0112 I Z7.Z-7.95G E.m~iI: ltdiE!tec11a.~m \~.cedl:Leolft FAX COVER SHEET Date~ .eJ -/1- ;Lo" Go TJznc:: .:1....' 4S' p. m. . Job Name: pJfl. /!A SJAAN JobNumbcr: tJ.StJ." .;. .,", .~ -~ .. ~ . ~ ~'''.' ......;. -', .. ..' ," ,", To': Company: J'ou: liumbcT: 1'f.a1Jt<. 6. c:: .s.A ~PDJ- ~ ;:" .,~ ~ ~. :! " TRANSMl'I"T.JNG ATO'J'AJ./OF ~ PAGP.S,.1NCLUDlNG TBlS PAGE.. IF,YOUDO' . . , , l'lOTUCDVI:'ALL OFTlB PAGI'.S CJ..E.AJtt.Y, PLEASE CONTACF us. .:.~' ,'. COMMJ:NTS: Pi ;=.z. ~ () :r- ?" 1- 'to Jif;~ f(O~ TV '- ;!/J.1 ~~f>-- T:\'rI'I.C ..lOa !I~~!I'lCJ:\J'~.&JU.c O~'d L BSc-96c-Sm; dnoJE) J8MO 1- 841- dOl: LO 90 Of: AON ~;e4CirOn.ia'-- ~-airi8-- .. t... VT"-'-" REQUEST FOR tNFORMA nON .No. 00%37 The Tower Group, me. ' ' 40~ SW 1 Q ^VCUIe - S'IiD: 1 o..vie. n. 3332! TITLE.: E1ec:tCc PAI'd 'RI.,+ P a()JECT! l'r=;DIID JmtiC'C Cemcr (FIe) TO: A1tD: Hank Oo\cSmm1 CUn\e" So~ Apila A1chitc=s 1;4N.;E.lst Avt;1JUl: Dclra:.7 Bedf:h, F1. 33444 PhI:me: '61-2.16-49S1 Fa.: S6i.~.c3...al84 ftoIe (,9SA) 47~]lOO tas; (954)"""'" 111 DATE: I13l2OO6 JOB. 0417 STARTED: COMPLE1'&D: J REQUT.RJ:D: 1lJ0I2006 REQUESI'; ~Q1tUt Ora-..;na ro'04 sp:cifia Pand 'IU.' as a 1201201V. 3P. 30A ~1. Canttac:t OI:B\'MSI.E3.Dl sh~ a 9 JCVA~~1 ~,pm4' As shoM1aa 11se.t1lIdid ~iu~ (1 paGe)., d:v: NJJ load amps from du: CrigiaJ dCDp u 26.9 am,ps. cd 1:be fb11 toaA Idps ~ Ibe pI'Oposcd Act water cizcu1ati.ns pumps is 2~.3 ~ This klrvu.GO eapx;c, for spate lasW.rs. . .,' ~ " . .' ,. . ~ ~I' . . I' " , .' ~ 1'~ . , P1caSC'~~a"piIDd ~WitA'IG.d CllJcuJ8tions. We me eo~ ~tbe p;lMl aad~8r'e avc:rh;,t!dec. :. f'l..!'J :,!, ;~' , . , .~.; .~ I,':.. . '.. . ~:;;~ ,~ ' DolE.... ~/y~, , ~,.), l; . , ANSWER: . : r;.' PAN~L",'\~L', \'5 ~ \~jrJ.cS.,Jla PlUSE:',>PANEL.. ~W1P~TO-rAt-e.O' 'A '""(:, .....1-5 C> A W\ f' ~ ~ p." E A \..0 L- ~ \ ~ ~ l.:- e P~A~ e. IF L-DA 0 I ~ i,.&'L~'.b~''-e.D ,(MD~e:;"OR.. LE:~S") AC!;~~~(idLt... ~ Pr\.o..-:"a.s 11ft:. LObO ?e.f'.. p~~e \~ -i'J- \0 ~MP5, 'Tl"'tE: '-ro""~ L- y-v~ L.O.c>O 1::' -+.01- W~~~ f\t\ e.A~S11+A-r 1]+e~ l~ ileo\.i- f, j<:Vt> L-6yr ~ mE q K.V,ll..~N~fdt l"'Ie:R. -ntf ~f()~lorJ COl"w'c;!.$ fp.c:M 'M:: L+"yovt ef -rtle P.,lo.~e.~ ~ (AkW U L.E: (rr l..oa:s t..1 ~e; />. 5 I ~L.e f\-< t>~~ ~ ~ ~ ~ '-,." T~ l":, ~ f'JlIoe>\..€W1, . 5ee. .pI ! ~ ? fA' S~ U l;r;:., :, ",: ;" A&lJWCnd By7CUrm. ~J. .A&JoiJI ~ Siped: H=lr. OoIGll1M ~ .5. /1- ~ ~ D:a1r. L L'd LggZ-96Z-g0~ dnOl~ laMO I au I dL L: Ln on n" ^O~ ov 30 06 01:11p The Tower Group AU?'-14-2806 14:q4 FRQM:CURRIS SOWARDS AG~.~ ~bl-c~~-~l~ Ml.,.lT" l "-,,,..,1:.C) \I'U.A') I v ."'0 I, I. C. ..,. ~ ,. .:~. .: ,... ,I ~... "'.-: . ~r ~,: . . '! " r1 , .".' c- , .... ~ ~ ,)UO-L::10-LVO ( I u; . .)t:I;;x:',::ll:>c:::::IO r ~I ""J\JoJ1 'I'" ~ I tJ. I L. 1""...;) I .,vr../VI ~ 7- I. ~ I!aft~.l ~, ! tU ~ . ~: u-" , , ..' r -. :.., " ,I ,. . ~ I :... Ther:.:'ower Group, In 405 sw 148 Avenue Suite One Davie, FL 33325 Phone: (954) 476-3200 Fax: (954) 474-3111 ,-~ GE ORDER REQUEST No. 00064 TITLE: PROJECT: Freeman Justice Center (FJC) Add V A V #40 & Relocate Thermostat Attn: Clark Briggs Monroe County Facilities Development 1100 Simonton Street Key West, FL 33040 Phone: (305) 295-4306 Fax: (305) 295-4321 TO: RE:PCO To:TTG DESCRIPTION OF PROPOSAL From: ESSI DATE: 10/24/2006 JOB: 0417 CONTRACT NO: 1 I 1 \~'\ :) , \ Number: ESS003 This Change Order Request (COR) proposes to add V A V #40 and relocate Thermostat #27 based on the "Field Visit Changes" to the HV AC Ductwork Shop Drawings by Thompson and Y oungross (TYEe), dated October 12, 2006. The cost for this work is based on the enclosed ESSI Proposal, dated October 24, 2006. ESSI had already installed Thermostat #27 based on the previous HV AC Ductwork Shop Drawing mark-ups by TYEC. Therefure, this COR only addresses the labor costs to relocate the thermostat to the new position indicated on the 10/12/06 mark-ups. Please process a Change Order in the amount of$2,658.60 for this Extra Work. Item ??oo1 Description Stock# Fumish and install and program and start-up added V A V #40 Relocate Thermostat #27 00002 Quantity Vnits 1.000 LS 1,000 LS Description Profit Vnit Price Tax Rate Tax Amount Net Amount $1,763,00 0,00% $0,00 'I,Ju:>.= /7<si',QO $769.00 0.00% $0,00 ...,S1K'l.OO- ..- 71A-;}-U Unit Cost: d.~~O !~,.n2.0U Unit Tax: $0.00 Unit Total: -$2,~j..dR5' Subtotal: ;,1 ~;lO.,o-$2,~3!:1Jt) Markup Percent 1.\Iarkup Amount 5.000% ---$126.60 : '.' /).&-01 Total Cost: --52,6~8.60 d. 0</& -1/ ..-: .~ <= a~~.-' .~u~ .~..v ........loA. .JJ.J :l'CIotJ t:.::l:!l I:.~:.I 1"'~1.:lt:. tH I t:lL E551 . I Elllt:b"/Hllt: $.5tsttm.s- lhItJfh..st.-Jf.f. J!~t;:1 '>>tl1 ".rnnl ~qQIQIIP"d. SrrJtr ?1(1 8acorl h~/:m. f'1C1r1d~ ~"":31 I . I i I I i I I I E55 Cf5L ESSC03 October 24, 2006 The Tower Groupy Inc. 405 SW 148th Avenue, Suite #1 Davie, FL 33325 Attn: John Chandler I Fax #: 305-296-2587 I ! Re: Freeman Justice Center RFCO #4 - ] Additional V AV Bo;x and Relocat~d 1 Stat I I I Dear John: ! As pet the Weathertrol Duct drawings dated 9/2/06, ESSI ~ectfully requests abhange order for the addition and installation of one new V A V Box # 40 aoe ti:, relocate the space temperature sensor for box # 27 {box. # (5 on Weathertrol'$ drawings) located on the second floors. ! The price includes the fo1J.owing: . New V A V controller and damper actuator i · New walt mount temp sensoJ.:'S ~d supply tanp senbor. . Fi elt:! mount coJtttols on VA V box i I · Installation oC pipe and wire . Programming and graphics · Start up M atcrials Programming and Graphics Electrical install S% profit 5% overhead Total 1 new V A V Box $ 600 $ 300 S 629~ S 164 51,763 - ; -;) 9 ? /:;} 90 I '7 ':; :;) '10 Relocate I Space temp &x #27 Electrical install S% profit 5% ove.rb.ead Total for relocate $ 692 L..Z1 $ 769 The total reqtlest for c:hange order is S2,532 A quick response would be greatly ~pprccjated, need to proceed with this work before walls and ceilings are sheetroeked. If I can be of any further assistancE: please do not he..<:;itat~ to cill~ me, ~ '. . l,l'l\X: (561) 955 9007 10/24/2006 TU~ 14:09 [TX/RX NO 7879] ~001 .V"-t ~~~u .J..O uca j;...ru:lt.lC' c..;:J~", t;,..t-;;;;;J' ......at:. C~ftl.l ,. t:. Octoberl24. 2006 I I I' ; , V~rytru~y y urs,_--- --"'llect~~ ms Soutbelut, L;.ii? -, ('. . Pl1gct?' 10/24/2006 TUE ":'4:09 [TI/RX NO 7879] ~002 - T'he Tower Group, Inc. CHANGE ORDER REQUEST No. 00070 302 Fleming St. (Job-site Trailer) Key West, FL 33040 Phone: 305-296-2521 Fax: 305-296-2587 TO: Attn: Clark Briggs Monroe County Facilities Development 1100 Simonton Street Key West, FL 33040 Phone: (305) 295-4306 Fax: (305) 295-4321 DATE: 11114/2006 JOB: 0417 CONTRACT NO: 1 TITLE: HV AC wall cutting PROJECT: Freeman Justice Center (FJC) RE: To: DESCRIPTION OF PROPOSAL This Change Order Request (COR) serves to provide means for payment for concrete and masonary wall cutting relating to the HV AC installation. The original Gonzalez Architect HV AC design incorporated thru-roof make-up air which was revised to thru-wall penetrations via CSA direction. Additionally we are required to create wall penetrations on the ground floor at rooms G005 and G029 for new HV AC, and one 15" diameter wall penetration at the generator room in order to run the revised generator exhaust. From: Number: This COR only includes the portion of work outlined on the attached proposal from American Cutting & Drilling which is outside of ITG's original scope. ITG's portion of the proposal represents 12.069"10 of the subtotal. That proportion of the mobilization costs in the proposal are not included in this COR. This COR also includes the rental cost for one week of the equipment required to perform the work (copy attached), which was excluded in American Cutting & Drilling's proposal. Please provide a Change Order to increase the Contact by $7313.21 and no extension of the Contract Time. Item ??oo1 Description American eutting & Drilling Quote #94329 60' Manlift Stock# Quantity Vnits 0.879 Percent Unit Price $6.030.00 Tax Rate Tax Amount Net Amount 0.00"10 $0.00 $5,300.37 ??oo2 1.000 week $1,348.00 0.00"10 $0.00 $ 1,348.00 Unit Cost: $6,648.37 Unit Tax: $0.00 Unit Total: $6,648.37 ~/ Subtotal: $6,648.37 Description Overhead Profit Markup Percent Markup Amount 5.000% $332.42 ,~/ 5.000% $332.42 v / Total Cost: $7,313.21 &L1Lse~ - ,e.,;JQil!S toe ~o - n~ .e!~"'-t~ ~. 18663384158 QUOTATION JOB L8:J 0 Thut'sday, November 9, 200612:45:52 PM EST The (oncrete (utting AltemaliYe ERICAN liNG & DRILLING COMPANY, INC. Dade: 305-372.8878 Broward: 954-917-0240 Palm Bch: 561-832-87n Toll Free: 888.289-5300 2920 N. W. 22"4 Terr. Pompano Beach, FL 33069 Fax: 954-917-0250 Emall: jlcdc:c:oncretecuttlnQ(ftlluno.com Webslt.: concretecuttlngdemo.com COMPANY NAME: THE TOWER GROUP STREET ADDRESS: 405 SW 148nt AVENUE S-1 CITY, STATE, ZIP: DAVIE, FLORIDA 33325 PERSON REQUESTING BID OFFICI PHONli KUMIIR TIM CLARKE 954 370-5400 DATE QUOTED I QUOTED BY OFFICE FAX NUMBER 11.09.06 JUAN PEREZ 954 370 5401 Page 2 of 2 QUOTE NUMBER 94329 JOB ADDRESS CITY 302 FLEMING STREET KEY WEST JOB NAME MAP PAGE FREEMAN JUSnCE CENTER NEAREST CROSS STREET WHITEHEAD & FLEMING JOB PHONE MOBIL PAGER 305 296-2521 305986-4163 JOB FAX NUMBER P.O. NUMBER JOB NUMBER 305 296-2587 0417 PAY REQ REQUIRED PROJECT NUMBER DVES DNO WORK LAID OUT GENERAL ON JOB BY CUSTOMER WHERE TO MEET JOB START DATE DAY & TIME SEE ON JOB ASAP nM . ' .. . . . . AMERICAN CUTTING & DRILLING COMPANY, INC., PROPOSES TO SUPPLY ALL lABOR TOOLS, EQUIPMENT AND INSURANCE NECESSARY, TO ACCOMPLISH THE FOllOWING SCOPE OF WORK CUT AND REMOVE TO CUSTOMER'S DUMPSTER (2) 15" DIA. CORE X 8" SOLID WALL 9' AFF ON GROUND F Tr~ i 2z..~ $ 225 $ 450 (2) 12" DIA. CORE X 8" SLAB ON ROOF TOP ELEV SHAFT 'Tl6. .it 300 $ 150 $ 300 (1 ) 24" X 24" X 8" WALL OPENING ON ROOF $ 500 $ 500 (2) 48" X 36" X 8" WALL OPENINGS ON ROOF $ 650 $ 1300 (1 ) 48" X 48" X 8" WALL OPENING ON ROOF $ 700 $ 700 (1 ) 24" X 12" X 8" WALL OPENING ON ROOF $ 450 $ 450 (2) 10" X 10" X 8" WALL OPENING 9' AFF ON GROUND FL $ 325 $ 650 4t 52)" tj j~O .CUSTOMER TO PROVIDE LIFT, DUMPSTER AND SUPERVISION OF COMPLETED WORK. *"""'*"NO OVERCUT ALLOWED--- I Z. 0' 1f# )C. *f.RICE BASED ON ONE MOBILIZA TION WITH A $ 500.00 I ,,~~ TRAVEL CHARGE. $ 250.00 HOTEL CHARGE PER NIGHT::: z-oZ' 7 b AND $ 45.00 PERDIEM PER DAY. (4) DAYS TO COMPLETE *ALL LAY OUT PRIOR TO SCHEDULED ARRIVAL, ACCESS T'rr.j727-7' FOR TRUCK, EQUIPMENT, OPERATOR. REMOVAL, DISPOSAL AND FINAL CLEAN UP BY OTHERS. ACCEPTED BY $ 500 $ 1000 $ 180 1'10 $6,030.00 PERQUOTE $ 500 $ 1 000 $ 180 DATE WE ASSUME NO RESPONSIBILITY FOR LAVOUT OR DAMAGE TO BURIED UTILITIES PRICES SUBJECT TO CHANGE IF CONDITIONS ON JOB VARY FROM THIS QUOT ATtoN NO YIS NO YES I ACCESSI8II.lTY WATE'UVAUBLE 0 t8J 100 ClST INSIDE WORK t8J 0 I 0 STAllts 0 LADDER 0 BUCK 0 ELEV 0 "LANK! ..OWEJIl AVAILABLE 0 t8J 1Q2 ClST OvsmME NECESSAJIlY t8J 0 I OUJll SCAFFOLDING 12) 0 _ HEIGHT VACUUMJIl&QUlJll&D 12) 0 I SPECIAL EQUIPMENT REQUIRED HEIGHT OF WOR!< i: fEET PLASTIC & TAI'l 12) 0 ICHAIN SAW TJIlUCK TO WORK AREA 50' DlST EXTRA MAN JIl&QUlRED 0 0 112" & 16" DIA BITS STANDBY TIME WILL BE CHARGED AT $125.00 PER HOUR PER MAN I Thursdn. November t. 200612:45:52 PM EST 18"3384158 PalM 2 of 2 ,/-1.. ...ILT . aJIUft'~ 065 Page: 1 Salesman: 01905 SANCHEZ, JESUS ( 3701 N.W. 120TH AVENUE CORAL SPRINGS, FL 33065-253 954-753-7556 Typed By: KHURTGEN -RESERVATION 11111111111111111111111111 ~te: FREEMAN JUSTICE CENTER 302 FLAMING RD KEY WEST, FL 33040 C#: 954-476-3200 J#: 305-986-4163 Contract #.. 7451055 Contract dt. 9/26/06 Date out.... 9/28/06 12:00 PM Est return.. 10/26/06 12:00 PM Job Lac. . . .. 302 FLAMING RD, KEY WEST Job No. . . . .. 1 - FREEMAN JUSTICE P.O. #...... 0417 Ordered By.. CLARK, TIM NET DUE UPON RECEIPT CUstomer: 26338 THE TOWER GROUP INC. **NO RENTAL W/O JOB NAME** 405 S. W. 148TH AVENUE, SUITE DAVIE, FL 33325 QT"l EQUI PMENT # Min Day Week 4 Week Amount 1 60' MANLIFT 4WD DSL 504.00 504.00 1349.00 3790.00 3790.00 0590624 SALES ITEMS: Qty Item number Unit Price DIESEL 145.50 2141.XX.X0 0 0 1 ENVIRONMENTAL EA 29.350 29.35 ENVIRONMENTAL DELIVERY CHARGE 350 . 00 PICKUP C #~IIIIIIIIIIII 1111111I11I1111111111 1111 1111111111111 11111111111 III 1/1111 II 350.00 Job tr'i1~ III nos 2.",jij I II 11111111/1111 I III Tim cellI ~ II ~~Iillliln~ II IIIII1II II I1IIIIII1 1111 1/11111' Sub-totalflllll 1111111 4653.95 Tax: 296. 54 Total: 4950.39 /a1gf}:~,_ljykrd u___ I ACORQM CERTIFICATE OF LIABILITY INSURANCE DATE (MMIDDIYYYY) 10/03/2006 PRODUCER (305)822-7800 FAX THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION 'foliinsworth, Alter, Fowler,:;~.' ...~ ft r "-\Vr'O '~I'-Y AND CONFERS NO RIGHTS UPON THE CERTIFICATE HO DER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR [P. t-. Box 9315 Rl.....l). c.L AL ER THE COVERAGE AFFORDED BY THE POLICIES BELOW. iMiami Lakes, FL 33014-9315 -- INSlJ RERS AFFORDING COVERAGE NAIC# INSURED The Tower Group Inc. OCT 1 J .-." - INSUR RA: Amerisure Insurance Co 09088 405 S,W, 148th Aveue INSUR R B: Fireman's Fund Ins Co Suite 1 INSUR RC: Davie, FL 33325 MONROE COUNTY INSUR RD: R1SK MANAGEME~T ,..vun n E: THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, I,N~: ~~'?;~ TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS GENERAL LIABILITY GL2024292 10/05/2006 10/05/2007 EACH OCCURRENCE $ 1,000,000 I-- ~ COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED $ 300,000 I CLAIMS MADE 00 OCCUR MED EXP (Anyone person) $ 10 , 000 A PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS - COMP/OP AGG $ 2,000,000 h nPRO- n POLICY JECT LOC AUTOMOBILE LIABILITY CA2025189 10/05/2006 10/05/2007 COMBINED SINGLE LIMIT I-- (Ea accident) $ 1,000,000 ~ ANY AUTO ALL OWNED AUTOS BODILY INJURY I-- ( ~\ ~'~ (Per person) $ SCHEDULED AUTOS I OJ! n,' ) A I-- ~0, X HIRED AUTOS BODILY INJURY I-- ~ $ X NON-OWNED AUTOS I O.\~oD (Per accident) I-- PROPERTY DAMAGE $ (Per accident) - -- --'-~ GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ R ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: AGG $ EXCESSlUMBRELLA LIABILITY CU2025190 10/05/2006 10/05/2007 EACH OCCURRENCE $ 5,000,00e tKJ OCCUR 0 CLAIMS MADE AGGREGATE $ 5,000,OOC A $ ~ DEDUCTIBLE $ X RETENTION $ 10,00e $ WORKERS COMPENSATION AND WC2025930 01/01/2006 01/01/2007 I T~g$IfiJgs I IO.;r~- EMPLOYERS' LIABILITY 100,000 A ANY PROPRIETOR/PARTNER/EXECUTIVE E.L EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? EL DISEASE - EA EMPLOYEE $ 100.000 ~ yes, describe under E.L DISEASE - POLICY LIMIT $ 500,000 SPECIAL PROVISIONS below OTHER MXI97506677 10/05/2006 10/05/2007 $250,000 Per Occurrence Leased and Rented B ~quipment $100,000 Per Item $10,000 Deductible DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS ~EF: FREEMAN JUSTICE CENTER, JACKSON SQUARE COMPLEX 500 WHITEHEAD STREET :EY WEST, FL 33 040 :ertificate holder is named as additional insured on the above captioned insurance lolicies for operations being performed by insured. Monroe County Board of County Commisioners 500 Whitehead Street Key West, FL 33040 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL ~ DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE '-/// /, / I / ~.'..' P d,',A Richard French ROSIEG I'~ ~/~~~ ~CORD 25 (2001/08) @ACORDCORPORATION 1988