Loading...
15th Change Order 01/22/2024 DocuSign Envelope ID:E9406C08-5D93-42DE-9EB4-84B46B54F3BF M.C.A.INSTR.8800.2 Enclosure(1) 3/28/2017 Page 3 MONROE COUNTY/DEPARTMENT OF AIRPORTS CONTRACT CHANGE ORDER PROJECT TITLE: KWIA Concourse A&Terminal Improvements CHANGE ORDER NO.: 015 INITIATION DATE: 12/14/2023 TO CONTRACTOR: NV2A/Gulf Keystar JV CONTRACT DATE: 8/17/2022 The Contract is changed as follows: The Original(Contract Sum)(Guaranteed Maxium Price) $ 101,461,771.00 Net change by previously authozied Change Order $ 13,010,643.48 The(Contract Sum)(Guaranteed Mxium Price)prior to this Chage order was $ 114,472,414.48 The(Contract Sum)(Guaranteed Mxium Price)will be gIiinirriiii:!&!siad by this Change Order $ 115,852.83 The new(Contract Sum)(Guaranteed Mxium Price) including this Change Order is $ 114,588,267.31 The Contract Time will be qn:haagad by TBD days The date of Substantial Completion as of the date of this Change Order is 3/9/2026 Detailed Description of change order and justification: FAs per the attached approved PCO 036,this Change Order includes the costs associated with the scope changes for permeation grouting work in the Conformed Design Drawings compared to the 90%Contract Documents for the KW IA project.(20-2039-01) POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO p I Title Schedule Impact Amount 036 Keller-Permeation Grouting Scope Changes in Conformed Set TBD $ 115,852.83 Total: $ 115,852.83 This change order is 0.11%of the original contract price. Not valid until signed by Owner,Architect(if applicable),and Contractor tD—Signed by: E ib�Atr S- 1/3/2024 1 05:11:04 PST ARCHITECT: o�esF�IER4233s487 D .-Sig ed by ED—sig"Id by DATE: 12/22/2023 1 08:04:21 PST CONTRACTORS: "'04BaevE74Da //r—Docuftned by: DATE: � � 1/18/2024 1 04:01:13 PST EXECUTIVE DIRECTOR OF AIRPORTS sEssrszraczFaoa DATE: COUNTY/DEPUTY ADMINISTRATOR .y :4.. 01.22.2024 DATE: NROE CC)UNTY ArmnNEY DS DS A F10V FORM Ap J. —.. ASSfSTA UNITY ATTORNEY Dat1 1/18/24 DocuSign Envelope ID: E9406C08-6D93-42DE-9E84-84B46B54F3BF NV K � GULF ST PCCO #015 NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami, Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West, Florida 33040 Prime Contract Change Order #015: Keller- Permeation Grouting Scope Changes in Conformed Set TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West, Florida 33040 Miami, Florida 33156 DATE CREATED: 12/14/2023 CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) CONTRACT STATUS: Approved REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: 12/14/2023 INVOICED DATE: PAID DATE: SCHEDULE IMPACT: EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER 12/12/2023 COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 20-2039-01:Key West International Airport TOTAL AMOUNT: $115,852.83 Concourse A DESCRIPTION: Keller-Permeation Grouting Scope Changes in Conformed Set Compared to 90%Contract Documents As per the attached approved PCO#036,this Change Order includes the costs associated with the scope changes for permeation grouting work in the Conformed Design Drawings compared to the 90%Contract Documents for the KWIA project.(20-2039-01) Drawing changes,cost breakdown, and supplier invoices are attached. ATTACHMENTS: PCO 036-Keller 90%Compared to Conformed Set.cdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# I Title Schedule Impact Amount 036 1 Keller-Permeation Grouting Scope Changes in Conformed Set 0 days $115,852.83 Total: $115,852.83 The original(Contract Sum) $101,461,771.00 Net change by previously authorized Change Orders $13,010,643.48 The contract sum prior to this Change Order was $114,472,414.48 The contract sum will be increased by this Change Order in the amount of $115,852.83 The new contract sum including this Change Order will be $114,588,267.31 The contract time will not be changed by this Change Order. DS DS DS AP 1 / Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street, Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton, New York 13901 Key West, Florida 33040 Miami, Florida 33156 EDocuSigned by: DocuSigned by: DocuSigned by: c062E1EB4233B487..I�,visfbr(k � 5. 6rctE. ESE65F52F4C2F4D3... 019093827A75467... SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE 1/3/2024 1 05:11:04 PST 1/18/2024 1 04:01:13 PST 12/22/2023 1 08:04:21 PST NV2A/Gulf Keystar JV Page 1 of 1 Printed On: 12/14/2023 04:38 PM DocuSign Envelope ID: E9406C08-6D93-42DE-9E84-84B46B54F3BF N m = " ' ' K GULF BUILDING P(",(� #(13', V L"M K�YST R NV2AIGulf Keystar JV Project:20-2039-01-KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami,Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West,Florida 33040 Prime Contract Potential Change Order #036: Keller- Permeation Grouting Scope Changes in Conformed Set TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West,Florida 33040 Miami,Florida 33156 PCO NUMBERIREVISION: 036/0 CONTRACT: 20-2039-01-Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY- Mansour Sodagari(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 11/9I2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: Na LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 0 days PAID IN FULL; _ Na EXECUTED: No _ SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $115,852.83 POTENTIAL CHANGE ORDER TITLE:Keller-Permeation Grouting Scope Changes in Conformed Set CHANGE REASON:A/E Design Changes POTENTIAL CHANGE ORDER DESCRIPTION:(The Contract Is Changed As Follows) jell r- et` Rf? !trtiat c<s cgs 1-tt_ oreforrru �f.. o re t 900 +2rL...gf_Q^� rJca� n4 This Change Order includes the costs associated with the scope changes for permeation grouting work in the Conformed Design Drawings compared to the 90%Contract Documents for the KWIA project.(20-2039-01) Drawing changes,cost breakdown,and supplier invoices are attached. ATTACHMENTS: gkZL-LJ-QZ It r I P°qhlqp fife DA Qy.gt jggLpl r p , Of. # Budget Cade Description _ Amount 1 31-.40.10.10.S Shoring and Permeation Grouting $105,320.75 UnderpinnIng.Subcontractor _ 2 99-.99.99.66.0 Procore OH&P.Other 10%Markup $10,532.08 Grand Total: $115,852.83 Christopher Kopec(McFarland Johnson, Key West International Airport NV2AIGulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton,New York 13901 Key West,Florida 33040 Miami,Florida 33156 040,10y signed by Christopher Christopher Kopec x , Date,2023,12,07 13:19:26-05'00' SIGNATURE DATE SIGNATURE 12.11.2025 DATE TURF DATE NV2A/Gulf Keystar JV Page 1 of 1 Printed On:11/9/2023 10:55 AM DocuSign Envelope ID: E9406C08-6D93-42DE-9E84-84B46B54F3BF Keller-NA.com KELLER November 7, 2023 NV2A & Gulf Building JV 5450 MacDonald Ave Key West, FL. 33040 ATTENTION: Antonio Pinto REFERENCE: RCO No.1a—Permeation Grout Scope Changes Key West IACA 3491 S. Roosevelt Blvd Key West, FL. 33040 Keller Project No. 13121088 Mr. Pinto Keller was subcontracted last year on 9/20/2022 for permeation grouting work at the above- mentioned project. The permeation grouting work is an engineered temporary shoring system for the existing foundations for protection to allow for adjacent excavation of the new foundations. Contractual grouting scope was based on the addendum 1 structural drawings dated 4/22/2022. New conformed structural drawing set has been released dated 5/5/2023 and the grouting scope has increased based on structural changes, material escalation and logistical challenges. This narrative is to describe the permeation grout scope increases and change order request. Two areas have been identified via dashed black lines along the proposed foundations by the FOR which would require temporary shoring, see figures 1 and 3 for 4/22/2022 set. Proposed pile caps were designed requiring excavation elevations noted on the figures. Latest 5/5/2023 set for construction was released and pile caps were redesigned to shallow foundations, see figures 2 and 4 for details. New shallow foundations increased the overall footprint and excavation depths. See below for summary of drawing changes. Keller North America, Inc. ' THINK SAFE 1000 NW 65th St., Suite 300B , Fort Lauderdale, FL. 33309 P [954]977-8117 Equal Opportunity Employer—Minorities/Females/DisabledNeterans DocuSign Envelope ID: E9406C08-6D93-42DE-9E84-84B46B54F3BF Drawing Summary Changes drawing drawing drawing drawing date date date date Gridline Foundation 4/5/2022 4/5/2022 5/5/23 5/5/23 location changes Grouting grouting Bottom of required Bottom of required footing (feet) footing (feet) 3.3 to 3.7 PC1 to shallow -3'-0„ 30 -3w-611 40 foundation 3.3 to 3.7 PC1 to shallow -T-V 13 -31-6" at A.0 foundation 3.7 to EJ.3 Deeper and at A.0 larger elevator -T-01' 45 -81-61v 55 I pit I I For additional change order backup, Keller has included shop drawing comparisons in figures 5 through 8. This details differences between contract and revised permeation grouting scopes. Please note injection pipe increases and injection volume increases. Scope increases impact installation durations, spoils handling and material increases. Summary of scope changes • An additional 6,850 gallons of drilling and injection required. • Additional work will require a 6-day increase to our current schedule. • Contract work duration of 1.5 weeks plus 5 day cure time • New work duration will be 2.5 weeks plus 5 day cure time. • Night work required. • Material escalation increase from 2022 contract date to anticipated mob date of October 2023. o See exhibits A and B for material quotes. • Drill access required from south entrance, requiring additional cable length for electric drill. o See exhibit C for cable quote. Keller is requesting a change order in the amount of$106,320.76 for additional drilling and grouting required based on the structural drawing updates for conformed structural set dated 61612023. If we can be of any assistance in clarifying any points in this letter, please contact us at (954) 977-8117. Sincerely, KELLER NORTH AMERICA,INC. Carlos P. Rosand Accepted by: Project Manager Date: DocuSign Envelope ID: E9406C08-6D93-42DE-9E84-84B46B54F3BF Figure 1: Perm grout scope at gridline A.1-415122 set 4 B ttam of, o a Illf"°i ation u _ 0 b �� ' . �.... ,r . � ... ... .ro ,...... I 1 _.--... . a. ....... .....e. I ---— .�_ � m " IN4 TEMPORARY SHORING OF EXISTING GRADE y4' OU LOCAI ON BEAM ALONG EXCAVATIONS;BOTTOM OF FOUNDATIONS AT(4 4") P 11y 1 ill " NAVIII Ill uu , o aim uuuw u " Figure 2: Perm grout scope at gridline A.1-515123 Conformed Doc Set Slab on Grade: '- DRAWINGS ARE CHANGING TO NGVD92 r) W TOP OF MAT(-1'-0") BOLLARD,SEE 1IC-311 1 ' S 301, � B n " Ii Gess :• " +L92 NGVD, T) � u v C P .� _ - � TEMPORARY SHORING OF EXISTING GRADE . ��. . I � IC�3 d d7 BEAM ALONG EXCAVATIONS;BOTTOM OF FOUNDATIONS AT(-1'-4") DocuSign Envelope ID: E9406C08-6D93-42DE-9E84-84B46B54F3BF I figure 3: Perm grout scope at gridline 3.7-415122 set . .�w....�...M :.._.. _.....�"�_ . .."..._.... _ Bott r�n f F iiq�jIlrrg� yyyq'afl 4'FWd1,00AA1W44WDPV0GOFFXISVNGGRAPE 1"' ,�N'"a• �::'':.vf ", t ""d.,.'L. '+M W""F PoN �+ 00AwMMAKU)NO pMCAVAC k'4 IM PN'L'WAW `9 k �'.'.'• on 'IRV F031Y fi&4 Rah' k&�' p ...........uNu1P��l� N �wi tl 7.— , Ana"'A ; �. N s °' � � -0--Z''30UAR2 x 2.6 TALL SUMP PIT I aav� U � NIII IW TONA'K Mut3 pA7mM"U PILES r Y � � �»_J ,V A.... . ■■ q� y, ,J �u p d� ����.'�R" 5. u •———e�.tvnroR u �'�-� ,..., a W'."". Bottpp A PII I TTEMPORARY OF EXISTING G EMPORARY SHORING TONS,BOTTOM OE ,1 ��i N II EXISTING STRIP FOOTING AT{14) Wf u '��1 i... � -, -- ... . cie 0' 0"° +4 Z I II Ikll3otto n of14.: 11 u u u �-2..79` NI NE:) P gure 4:Perm grout scope at gridline,3.7-515123 Conformed Doc Set 1 tl119I19n98LIIII I1II�, AMALONG ,w,..,.....,.», N 10.. PI PD: 114w1 R (M"1 111 1`C19 NG\/f.7 IN'G STRIP ' 9Wtl" u. m"m h h'..._._. _ .., . 6 A o ' ' 5 MN3P �", ••-.2'0'SQUARE X 2'I'TALL SUMP PV TI'7u1411U'l.: .ny G f .� .p O" ^^--30'CONCRETE MAT(-5'-0-) s a o � 4" XISTING d / ''""3✓✓0 "`' BEAM ALONG EXCAIVAT ONS;BOTTOM OFDE f^•f•^^^ -^ / '^ry f \ EXISTING STRIP FOOTING AT(-l'-4") u l __jI DocuSign Envelope ID: E9406C08-6D93-42DE-9E84-84B46B54F3BF Figure 5: Keller Shop Drawing at gridline A.1 based on structural 415122 set with injection cross section L J J ...�.. n _'O___ Figure 6:Keller Shop Drawing at gridline A.1 based on structural conformed 515123 set with injection cross section Al 1 70P OF MkA,r(W-9) _.�.... �.... .. _ �; .,..... .............� �� � p r �pr 4 9� to wCY P� �' ? cn k v a""-61 DocuSign Envelope ID: E9406C08-6D93-42DE-9E84-84B46B54F3BF Figure 7:Keller Shop Drawing at gridline 3.7 based on structural 415122 set rv. =v -—_.._..... -—_.___,.— ... -� i EV i y �� ..... � m. ._. .. .7 �u3.9V p q„ 7— � 6 am i lI Ill 1 "(I 3�..—w. 4 � �aP KIT l'.. T Figure 8:Keller chop Drawing at gridline 3.7 based on structural conformed 515123 set - C15 B16 A16-10. FOUNDATION CONTRACTOR TO 111011�1;S"E AND CONSTRUCT BOTH B15. ,�,+ MATS SIMULTANEOUSLY, A15 C13 � Bta � A'4wuouu p , t 30'CONCRETE MAT FRW F.F,E.ELEVATION A Y r � q I ELEVATOR 2 PIT p V d 47— p { 9 J ,,AB33' tee, C12 ( V 812.A72 I. 11 f ' I 1 B A A �,.. •• QR T9. + tl r� �., I, DocuSign Envelope ID: E9406C08-6D93-42DE-9E84-84B46B54F3BF Project: Key West 1ACA Airport ELLER Subcontract No. Keller Job No,13121088 To:NV2A/Gulf JV Permeation Grouting RCO NO,1-Additional Drilling and Injection Work,new drawings 2 .2 .2 0 0 La V 0 0 V r- •off 2 :E 2 :E 2 2 2 :E 2 :E 2 Item Rate Unit Q. 0) CL (n IL 0 M En IL 0 D_.'W Total Labor(includes per diem and hotels) General Superintendent $122.12 /HR 8 $ 976.96 Superintendent $112.35 /HR 8 8 8 8 8 8 $ 5,392.80 Driller Operator $89.23 /HR 10 10 10 10 10 10 $ 5,353.80 Operator $78.32 /HR 10 10 10 10 10 10 $ 4,699.20 Operator $78.32 1HR 10 10 10 10 10 10 $ 4,699.20 Skilled Labor $59.74 /HR 10 10 10 10 10 10 $ 3,584.40 Skilled Labor $59.74 /HR 10 10 10 10 10 10 $ 3,584.40 Subtotal Labor $ 28,290.76 Equipment Crew Truck $150.00/SHIFT I I I I 1 1 $ 900.00 Crew Truck $150.00/SHIFT 1 1 1 1 1 1 $ 900.00 Drill Rig,powerpack and rotary head $1,050.00/SHIFT i 1 1 1 1 1 $ 6,300.00 88.9mm Drill casing and starter(6 sections) $15.00/SHIFT 1 1 1 1 1 1 $ 90.00 10/10 Colloidial Cement Mixer $225.00/SHIFT 1 1 1 1 1 1 $ 1,350.00 ChemGrout Double Mixing Tub $325.00/SHIFT I 1 1 1 1 1 $ 1,950.00 tri-flowmeter Manifolds $115.00/SHIFT I 1 1 1 1 1 $ 690.00 Superintendent Job Container $50.00/SHIFT 1 1 1 1 1 1 $ 300.00 Olympian Gen Set $85.00/SHIFT I I I 1 1 1 $ 510.00 Mini-Excavator 15-20k $195.00/SHIFT 1 1 1 1 1 1 $ 1,170.00 Telescopic Forklift $275.00/SHIFT 1 1 1 1 1 i $ 1,650.00 Additional electric cable(300 If)and tri-plug connectors $7,113.32 /LS 1 $ 7,113.32 Subtotal Equipment $ 22,923.32 Materials Stucco Bagged cement(60 lb) $9.73 /BAG 300 $ 2,919.00 Sodium Silicate(lbs) $0.25 /LB 50074 $ 12,518.50 Sodium Silicate(lbs)escalation from 2022 $0.05 /LB 79306 S 3,965.30 Sodium Silicate Freight $3,010.00 /EA 1.00 $ 3,010.00 PVC ported Injection Pipe $4.50 /LF 3190 $ 14,355.00 PVC ported Injection Pipe escalation(no change) /LF Dibasic Ester $1.78 /LB 2408.2 4,286.62 Dibasic Ester escalation(no change since 2022) /LB Subtotal Materials $ 41,064.42 Fuel Surcharge 9.0% % $ 2,063.10 Small tools and Supplies 5.0% % $ 1,414.54 TOTAL(Labor,Equipment,Materials,&Subcontractors) $ 95,74 13 Overhead Profit(L,MES) (10%) $ 0,574,61 GRAND TOTAL $ 105,320.75 Notes:Cost Breakdown for additional drilling and grouting for updated scope. DocuSign Envelope ID: E9406C08-6D93-42DE-9E84-84B46B54F3BF PQCorporahion Corporate Headquarters P.O.Box 840 Valley Forge,PA, 19482-0840 USA 610-651-4200 800-756-1456 March 22,2022 EX H I B I Keller-NA Carlos Rosand -Project Manager 5461 Waters Avenue Suite 900 Tampa,FL 33634 Dear Carlos, I appreciate the opportunity to present this proposal for 0 Sodium Silicate. I have received management approval to respond and offer you the following. Product: NO Sodium Silicate Package: Bulk Tank Truck Customer: Keller—NA/ Key West Airport Volume: 80 k pounds Shipments: Full Bulk Tank Truck shipments of approximately 46,000 lbs. Price: $0.187/lb.,No Discounts Apply, FCA Chester, PA Freight: Prepaid& Add Payment Terms:Net 30 days from date of invoice Quotation is subject to any market price increases that occur during the life of the project. This pricing is subject to PQ LLC standard terms and conditions, contingent upon availability. Carlos, Thank you for the confidence Keller-NA has placed in PQ LLC as a key supplier. We greatly appreciate the business you place with PQ LLC, and look forward to an expanded relationship. Do not hesitate to contact me if you need any additional information. Respectfully Submitted, Tim Yanavage Western Regional Account Manager (m) 951.404,4606 DocuSign Envelope ID: E9406C08-6D93-42DE-9E84-84B46B54F3BF PQCorporatlion Corporate Headquarters P.O.Box 840 Valley Forge,PA, 19482-0840 USA 610-651-4200 800-756-1456 March 22,2022 Keller-NA EXHIBIT Carlos Rosand-Project Manager 5461 Waters Avenue Suite 900 Tampa,FL 33634 Dear Carlos, I appreciate the opportunity to present this proposal for N 0 Sodium Silicate. I have received management approval to respond and offer you the following: Product: N 0 Sodium Silicate Package: Bulk Tank Truck Customer: Keller—NA/ Key West Airport Volume: 130 k pounds Shipments: Full Bulk Tank Truck shipments of approximately 46,000 lbs. Price: $0.243/lb., No Discounts Apply, FCA Chester, PA Freight: Prepaid& Add Payment Terms: Net 30 days from date of invoice Quotation is subject to any market price increases that occur during the life of the project. This pricing is subject to PQ LLC standard terms and conditions, contingent upon availability. Carlos, Thank you for the confidence Keller-NA has placed in PQ LLC as a key supplier. We greatly appreciate the business you place with PQ LLC, and look forward to an expanded relationship. Do not hesitate to contact me if you need any additional information. Respectfully Submitted, Tim Yanavage Western Regional Account Manager (in) 951.404.4606