16th Change Order 01/22/2024 DocuSign Envelope ID:E84243BE-A3A9-4EAB-87A7-B77643BESAB8 M.C.A.INSTR.8800.2 Enclosure(1) 3/28/2017 Page 3 MONROE COUNTY/DEPARTMENT OF AIRPORTS CONTRACT CHANGE ORDER PROJECT TITLE: KWIA Concourse A&Terminal Improvements CHANGE ORDER NO.: 016 INITIATION DATE: 12/20/2023 TO CONTRACTOR: NV2A/Gulf Keystar JV CONTRACT DATE: 8/17/2022 The Contract is changed as follows: The Original(Contract Sum)(Guaranteed Maxium Price) $ 101,461,771.00 Net change by previously authozied Change Order $ 13,126,496.31 The(Contract Sum)(Guaranteed Mxium Price)prior to this Chage order was $ 114,588,267.31 The(Contract Sum)(Guaranteed Mxium Price)will be gIii:ir:riiii:!&!sied by this Change Order $ 495,000.00 The new(Contract Sum)(Guaranteed Mxium Price) including this Change Order is $ 115,083,267.31 The Contract Time will be quni:haaged by 0 days The date of Substantial Completion as of the date of this Change Order is 3/9/2026 Detailed Description of change order and justification: Per the Owner's request,Passenger Boarding Bridges will be stored at Thyssen Krupp Airport Solutions Factory in Fort Worth,Texas until delivery to the KW IA project.(20-2039-01) This change order includes the cost of Storage of 7 Passenger Boarding Bridges.2 Walkways,and Components as agreed in the FAT meeting on 08/16/2023.Invoice,meeting minutes,and location plan are attached. POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO p I Title Schedule Impact Amount 017 ITKAS-PBB Storage 0 $ 495,000.00 Total: $ 495,000.00 This change order is 0.49%of the original contract price. Not valid until signed by Owner,Architect(if applicable),and Contractor D—Siignetl by: I Jtsfbj,� �. 6rtt 1/3/2024 1 05:44:34 PST ARCHITECT: oe2EiER4233R487 DocuSig tl by' DocuSlgncd by DATE: { - _ 12/22/2023 1 08:03:26 PST CONTRACTORS: EC1go9827A75487 e3DD4B4Rr7E74D4 D sgnedby: DATE: 1/16/2024 1 04:37:41 PST EXECUTIVE DIRECTOR OF AIRPORTS eEs sr4czFaua. DATE: COUNTY/DEPUTY ADMINISTRATOR ,,,' - 01.22.2024 DATE: NROE/0 �RtJ1/E UI"dTY/4,,,7, O1NEY Ds Ds [A P'ED JY. A ._. ASSI TAs LINTY ATTORNEY Date 1/1 LA DocuSign Envelope ID: E84243BE-A3A9-4EAB-87A7-B776438E8AB8 NV K � GULF ST PCCO #016 NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami, Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West, Florida 33040 Prime Contract Change Order #016: TKAS - PBB Storage TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West, Florida 33040 Miami, Florida 33156 DATE CREATED: 12/20/2023 CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) CONTRACT STATUS: Approved REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: 12/20/2023 INVOICED DATE: PAID DATE: SCHEDULE IMPACT: 0 days EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER 10/25/2023 COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 20-2039-01:Key West International Airport TOTAL AMOUNT: $495,000.00 Concourse A DESCRIPTION: TKAS-PBB Storage Per the Owner's request, Passenger Boarding Bridges will be stored at Thyssen Krupp Airport Solutions Factory in Fort Worth,Texas until delivery to the KWIA project.(20-2039-01) This change order includes the cost of Storage of 7 Passenger Boarding Bridges.2 Walkways,and Components as agreed in the FAT meeting on 08/16/2023. Invoice,meeting minutes,and location plan are attached. Location: TK Airport Solution, Inc. 3201 N.Sylvania Ave.,Suite 117 Fort Worth,TX 76111 ATTACHMENTS: NV2A PCO#017 TKAS PBB Storage.pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# I Title Schedule Impact Amount 017 1 TKAS-PBB Storage $495,000.00 Total: $495,000.00 The original(Contract Sum) $101,461,771.00 Net change by previously authorized Change Orders $13,126,496.31 The contract sum prior to this Change Order was $114,588,267.31 The contract sum will be increased by this Change Order in the amount of $495,000.00 The new contract sum including this Change Order will be $115,083,267.31 The contract time will not be changed by this Change Order. DS DS DS _ A� Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street, Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton, New York 13901 Key West, Florida 33040 Miami, Florida 33156 DocuSigned by: DocuSigned by: DocuSigned by: LE E 062E1E842336487_. 8F65F52F4C2F4D3_. 019093827A75487... SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE 1/3/2024 05:44:34 PST 1/16/2024 1 04:37:41 PST 12/22/2023 1 08:03:26 PST NV2A/Gulf Keystar JV Page 1 of 1 Printed On: 12/20/2023 11:26 AM DocuSign Envelope ID: E84243BE-A3A9-4EAB-87A7-B776438E8AB8 GULF BUILDING PCO #017 NV K=YST R NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami,Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West,Florida 33040 Prime Contract Potential Change Order #017: TKAS - PBB Storage TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West,Florida 33040 Miami,Florida 33156 PCO NUMBER/REVISION: 017/0 CONTRACT 20-2039-01-Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY: Mansour Sodagan(NV2AlGulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 9/26/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGES No LOCATION, ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT $495,000.00 POTENTIAL CHANGE ORDER TITLE:TKAS-PBB Storage CHANGE REASON:No Change Reason POTENTIAL CHANGE ORDER DESCRIPTION:(The Contract Is Changed As Follows) Per the Owners request,Passenger Boarding Bridges will be stored at Thyssen Krupp Airport Solutions Factory in Fort Worth,Texas until delivery to the KWIA project.(20-2039-01) This change order includes the cost of Storage of 7 Passenger Boarding Bridges.2 Walkways,and Components as agreed in the FAT meeting on 08/1012023,Invoice,meeting minutes,and location plan are attached. Description Total Cost Storage of 7 PBB's,2 Walkways,and Components $450,000.00 I ocRon: TK Airport Solution,Inc. 3201 N.Sylvania Ave.,Suite 117 Fort Worth,TX 76111 ATTACHMENTS: t.00 it1 � It If # _ Budget Code Description _Amount " 1 34-.77.13.10.S MovingWalks.Subcontractor PBB Storage $450,000.00 . _,-_.,,........ .......-.....,... ....- ,..,,,,,,,,,,,,,,,,,,,,,�,_._,. .��.....,,,,,.. 2 99.99.66.0 Procore OH&P.Other Markup $45,000.00 Grand Total: _ $495,000.00 oltn.Mafer (McFarland Johnson,Inc.) Key West International Airport NV2AIGulf Keystar JV 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton,New York 13901 Key West,Florida 33040 Miami,Florida 33156 Christopher Digitally signed by plel Date:�04 023.10.2016:07:50 � KopecI I SIGNATURE DATE IIGN�ATURE DA" E SIGN PURE DATE 4 NV2A/Gulf Keystar JV Page 1 of 1 Printed On:9/26/2023 04:41 PM DocuSign Envelope ID: E84243BE-A3A9-4EAB-87A7-B776438E8AB8 TK Airport Solutions,Inc. 3201 N.Sylvania Ave.,Suite 117 Fort Worth,TX 76111 Initiated on:06/30/2023 m C am"iftrli of ,"n CrdPr Storage of 7 PBBs+Components and 2 walkways TK Self Porforrn"Costs Unit, QTY Unit Hours TOW Project Manager Hrs 1 $ 160,00 0 $ - Engineering Hrs 1 $ 140,00 0 $ TK Travel Costs Unit Unit Cost QTY Total $ TK Material Costs Uri" Unit Cost QV Toni Monthly Storage Month $ 4.554,00 96,3 $ 438.550 Truck Unit $ 935,00 9 $ 8.415 TK Manufacturing Costs Unit Unit Cost QTY Total Labor hours Hrs $ 135,58 216 $ 29.285 Subcontractor and Supplier Cost$ Unit 'Unit Cost qry, Total Ma"WIP post Magi uo Total TK Self Perform Costs $ $ TK Travel Costs $ $ TK Material Costs $ 446,965 $ 6T045 $ 514.010 TK Manufacturing Costs $ 29.285 $ 4.393 $ 33.678 Spare parts credit $ (50.000) i'I poaal OITA$ Agree to during FAT eating U716/2 460.000 By: By: ACCEPTED:TK EMPLOYEE DATE APPROVED: DATE CO2_FOR_04E,Rev 0 01/17/2022 Page 1of 1 DocuSign Envelope ID: E84243BE-A3A9-4EAB-87A7-B776438E8AB8 PROJECT RELEASE AUTHORIZATION CHECKLIST - (Glass Bridge) Document Number. Revision Latest Revision By: Approved By: Page: C06_FOR_07 6 J.Salinas J.Salinas 1 of 6 This document is a final inspection report of project specific Passenger Boarding Bridges (PBB). Refer to C06_PF_01, Project Release Authorization Workflow for guidance. Airport 755000091-01 Key West Gate Number Sales Order Number 02 Sales Order Item Number PBB Model Number PBB Serial Number Factory Fort Worth Date 8/16/2023 *Please sign forAuthorization for Product Release from Test Stand Quality Representative Engineering Representative Signature„ Signature: Date: Date: Project Management Representative Manufacturing Representative Signature: Signature: Date: Date: *Once completed and signed,QC will file with Quality's Project Documentation. DocuSign Envelope ID: E84243BE-A3A9-4EAB-87A7-B776438E8AB8 ............... ..................-.,. ........ Sales Order # 760000090 PROJECT RELEASE AUTHORIZATION CHECKLIST Item # 02 Status Component to be Inspected Comments SECTION 1-�/►susl lnsp�ctio�„c�R�itu�d,�:;M;�}or Ass�mbl� ; ;, 6K/NC/NA 1 Rotunda Assembly Completed per engineering Spec. NA 2 Exterior/Interior Painted per engineering Spec. NA 3 Curtain Assembly Properly installed NA 4 Exterior/Interior Free from rust,dents,and blemishes. NA 'SECTIaN'2 Visual Inspection of PBB;Ceb Extarlor Assembly „ OK/NC/NA 5 Cab assemblyCompleted per engineering ineerin,g Spec. OK 6 Exterior Painted per engineering Spec. OK 7 Articulating Floor Properly installed.. OK 8 Curtain/Covers Properly installed„ OK 9 Canopy Assembly Properly installed„ OK 10 Drive chain Properly installed„ OK 11 Exterior Free from rust,dents,and blemishes. OK SECTION 3 1/isua1-1 n pect sion of~PBB Tunnels Exterior Asse OK/NC/NA 12 Tunnels exterior assembly Completed per engineering Spec. OK 13 Tunnel weather seals Properly installed. OK 14 Rollers Are greased and free from rust. OK 15 Tunnels Fit without problem OK 16 Exterior paint Painted per engineering Spec. OK 17 Bridge exterior Free from rust,dents,and blemishes OK SECTION 4;-VliOal"Ib l #cr of Elevation Assernl l OK/NC/NA 18 Elevation Is mounted at the proper P-Position„ OK Hydraulic power unit,cylinders,and N/A 1g There is no oil leakage or damaged hoses. connections. 20 Wheel bogie FRONT and REAR signs Are clearly identified. N/A Warning"CRUSH HAZARD-KEEP FEET N/A 21 GEAR„ Mounted each side of wheel bogie crass tube. SECTION 6-1/isual Inopl of Elec#ricaf General Wirirl""Exteplor C)K/NC/NA Various Junction boxes-properly installed and labeled. OK All wires are neatly routed and secured. OK 22 Wiring/Cables Wires labeled and are terminated in correct terminal. OK Electrical conduit is straight,without damage and OK secure. Trolley moves smoothly with no binding. OK Electrical cable is properly supported and labeled. OK 23 Side trolley system Correct side of cord grips attached at the end of each OK cable. SEC ION 6'-VISWI 11140ictis n of PBB TUneels Interior l , I `,, OK/MC/NA 24 Wail,ceiling,and corner trims Properly installed OK 25 Carpet flooring Properly installed,no bubbles are visible. OK 26 Floor Gutter Properly installed,no bubbles are visible OK 27 Transition ramp Ramp is secure and not a trip hazard, OK 28 "WAT N i YOU III S i V'.Il"signs Installed at above the Transition Ramp. N/A 29 Handrails Rails are properly secured with no sharp edges. OK C06_FOR_07,Rev 6 02/10/2023 Page 2 of 6 DocuSign Envelope ID: E84243BE-A3A9-4EAB-87A7-B776438E8AB8 �.._ _..._. ......... Sales Order # 760000090 PROJECT RELEASE AUTHORIZATION CHECKLIST Item # 02 EComponent be Inspected Comments � Status 30 Tunnels interior Free from rust,dents,and blemishes SECT!ON 7 WWI Inspection of PBS Cab Inferior Assembly �01K/NCI NA 31 Cab curtains Properly installed,free from dents and blemishes OK Brushes and seals are properly installed. OK 32 Cab flooring Properly installed,no bubbles are visible. OK Installed properly. OK 33 Service door assembly Caulking and weather sealed properly installed OK Lock is mounted and operate properly. OK 34 Weather Door assembly Properly installed;and operates properly. OK 35 Cab interior Free from rust,dents,and blemishes OK SECTION e-VWil lnspectlolnof Electrical Assembly`InteNor QK/,Nf~/NA 36 Light fixtures Light fixtures operate correctly. OK 37 Light bulbs Installed per engineering Spec. OK 38 Diffusers Placed inside TA with fully wrap. OK 39 GFI plug(receptacle) Operates correctly OK 40 Telephone preparations for connection and Installed in the left wall of the cabin. Not Installed assembly of a telephone 41 CCTV camera monitor Installed on left wall of cabin above CC1 OK 42 Operating Instruction placard/UL labels Installed on left wall of the cabin. Not Installed 3ECTI0N,9, Yiws inspection the of Primalry Power; P'1),#nd CQn#rol Console 'OK/NC/NA 43 Control Console desktop and faceplate The functions are clearly labeled on the control panel OK All wires are neatly routed and secured. OK Wires are identified with approved labels. OK 44 PP1 and CC1 wiring Labels are visible and match the wiring diagram. OK Spare wires shall be numbered and labelled as SPARE. OK 45 PP1 Door Properly installed,open and close without issue. OK 46 llG:AH VOII....TAGIB f Ihalectii IiccaV V'Varn�ny signs Installed per engineering Spec. OK SEC�'1C3N,70-;Functional°lospeckion oK/NC/NA 47 Operation and Functional Inspection Completed per Engineering Inspection Protocol OK 48 Control console cabinet(CCII) Is secured.Interlocks are functional. OK 49 Primary power cabinet(PP1) Is secured.Interlocks are functional. OK 50 Press LAMP TEST Button All the panel lights are ON and the buzzer and siren OK sound audibly. Press and reset"EMERGENCY STOP"button All output should be off,and no movements allowed. OK 51 on CC1 Auto lever Alarm Buzzer and CC1 Buzzer should be on. 52 Tunnel lighting-three-way switches Operates correctly OK 53 Emergency fighting Illuminates only when Main power is shut off. OK 54 Red battery light for emergency lighting Illuminates only when switch is off. OK 55 HMI push button for Exterior Cab lights Outside front of rotating cab light is on. OK 56 HMI push button for Interior Cab Lights Light above CC1 in on. OK Extends/retracts fully;and stops on the limit OK 57 Canopy Operation Canopy extended bridge will not move forward. OK 58 1 Articulating Floor Operation Raises and lowers;and maintains a level position. OK 5 i Auto leveler Operate correctly, OK C06_FOR_07,Rev 6 02/10/2023 Page 3 of 6 DocuSign Envelope ID: E84243BE-A3A9-4EAB-87A7-B776438E8AB8 Sales Order# rs00o0090 PROJECT RELEASE AUTHORIZATION CHECKLIST mm Item # 02 mm 7Co7mp7on7ent7tobe Inspected Comments Status Cab rotates and stops on the limit with no issues. OK Drive chain runs properly and has enough clearance from OK 60 Cab rotations the nearby components. Curtain is tight on both sides when cab is moved in both OK directions. The bridge raises up and lowers smoothly OK 61 Vertical Operation Check for bounce or shudder. OK The door stays closed with the bridge at the lowest OK 62 Service door(check in various positions) height. The door opens easily at the highest height. OK Wheel rotates properly and stops on the limit. OK r63 Wheel Bogie Rotations Wheel guard system fully encompasses both wheels,and OK it stops movement of the PBB when it is contacted/activated by a person or obstruction. The tunnel extends and retract without noise. OK The tunnel Rollers support evenly. OK The exterior of the inner tunnel does not rub the inner OK wall panels of the exterior tunnel. 64 Tunnel extends and retract The antismoke sealing seals well. OK The gap on the left and the right side has the same OK width. The ramp moves freely. OK SECT[QN 11 Cr[tical %C otifica#lan,Incomplete Vl/oFK , ort Parts n App[icable Speciflctian Descr[ption Colmmerrts,[)slivery El'A,etc QTY C06_FOR_07,Rev 6 02/10/2023 Page 4 of 6 DocuSign Envelope ID: E84243BE-A3A9-4EAB-87A7-B776438E8AB8 ......... ........ Soles Order# MO 0090 PROJECT RELEASE AUTHORIZATION CHECKLIST amm Item# 02 Component to be Inspected , Comments Status If yes,create QOD/FPR for the parts identified in Section QOD Applicable? 13. YES❑ NO❑ Email to the QOD-FPR Notification group at NCR# Discrepancy Reason Description of Issue C06_FOR_07,Rev 6 02/10/2023 Page 5 of 6 DocuSign Envelope ID: E84243BE-A3A9-4EAB-87A7-B776438E8AB8 . - ....._.... _Ww....._ Sale, Order# PROJECT RELEASE AUTHORIZATION CHECKLIST Wmw �mmmmmm Item # 02 rvry WwwPo � mrv, ,,,ww PoPoPo ww wwwwmmm Component to be Inspected Comments Status FAT Meeting status • FAT documents to be provided by end of business tomorrow • Submittals Pending calculations will be submitted with revised information by end of business today o Action items to follow up on • The interior lighting RFI appears to be accurate • Customer approves lighting as reviewed during FAT • HPU e HPU mounting must be under the PBB not side mounted Engineering to confirm the under mounting is on all PBB's if that is not the case we will discuss adjusting gate 1 fleet mix • Under skins Customer does not accept the finish as is • MFG to rework with caulking and paint to • MFG confirms the structural integrity of the PBB is not affected by the skin installation • Warranty To be verified by TK and provide by end of business tomorrow • AUX equipment installation e TK to provide the AUX equipment layout • TK to provide the commissioning checklist • Rotunda Rotunda is to be painted a Provide pictures to support upon completion C06_FOR_07,Rev 6 02/10/2023 Page 6 of 6 000 signsnvelope0: E84243 Ex*au From:Gonzalez, Lorena Semt:jueves, 17 de agostm de 2023 11:35 To:Amanda Pfeiffer<AmandaP@gulfbuilding.com>;strickland-richard@monroecounty-fl.gov; Beckham,Tyler <ty|er.beckham@tke|evator.mom>; Bobadi||a,A|onsm<a|onsm.bobadi||a@tke|e«ator,com>; Hoover, Brant <brant.hoover@tke|evator.com>| McCage,Carla<car|m.mccege@1ke|evator.com>; Blanco,Jaime *jaime,b|anco@tke|evator.com>;Antonio Pinto<apinLo@nv2aBroup.00m>;Martinez Chapa,Adrian <adhan.msrtinezchapa@the|evator.cmm> Cc: Moran, Eduardo«eduando.mmran@tke|evotor.com> Subject:7ES/90 Key West FACTORY ACCEPTANCE TEST K4OK8 All, Please find below the minutes from yesterday's FAT. BR Lorena �, West �/\�T���J\� 8/~�—�[�T�K��~� T��'� m6z�� xx ���� FACTORY ACCEPTANCE TEST x mi6pco|es,16deagostode2023 15:S4 Notes Pre FAT follow upnotes • Storage � TK submitted change order for$5ODk for storage inhouse • SOkin spares credit was granted ° Agreed to$450k change order total to be revised and resubmitted by Friday of this week • Confirm in writing that insurance coverage will support any acts ofGod ° Training ° TK to follow up and provide proposal for additional training and exact training being offered ° Provide by Friday Aug ZSth * Maintenance � TKLo have an internal meeting on August 17th for review 0 Proposal to be submitted by no later than Aug 25th ~ Spares and Auto Docking w TKto provide the spares parts list and costing directly with Richard • Tobe provided by Aug 18Lh • Auto Docking tube reviewed as well tomorrow • Pay App#1 � Receipt of payment to site yesterday � TK10 receive payment in the next week 1 000 signsnvelope0: E84243 Ex*au 0 Pay App#2 � Reviewed during meeting 1obe submitted today prior Lo end ofbusiness * Value of2.9&q 0 Bird FhtApproval � Original sample was lost byUPS a New samples were ordered and follow up with delivery date by next week FAT Meeting status • FAT documents tobe provided by end of business tomorrow • Submittals 0 Pending calculations will be submitted with revised information by end of business today ° Action items to follow upon 0 The interior lighting RF| appears tmbeaccurate 0 Customer approves lighting aa reviewed during FAT • HPU � HPU mounting must be under the PBB not side mounted w Engineering to confirm the under mounting is on all PBB's if that is not the case we will discuss adjusting gate 1 fleet mix * Under skins ° Customer does not accept the finish ayis w MFGto rework with caulking and paint to w MFG confirms the structural integrity of the PBB is not affected by the skin installation • Warranty 0 Tbbe verified byTK and provide by end ofbusiness tomorrow • AUX equipment installation • TK10 provide the AUX equipment layout • TKto provide the commissioning check list • Rotunda 0 Rotunda isto6epainted 0 Provide pictures to support upon completion 2 DocuSign Envelope ID: E84243BE-A3A9-4EAB-87A7-B776438E8AB8 y IA , „ e ; m� r i I wN/ l I � o r/ .a �9 r % ) " / ' r %r% l p DocuSign Envelope ID: E84243BE-A3A9-4EAB-87A7-B776438E8ABB TK AIRPORT SOLUTIONS, FORT WORTH, TX, PBB:Pre-Assy Main:Assembly PBB:Testing&Shipping 1.Insulation 1.Interiors 4.Test stand area 2.Canopy 2.Rotating Cab 2.Wrapping 3.Electrical 3.Shipping / 111 � � ia� oij / r rehouse Capacity: 53 PBB perj/rr' / C / Tot 1