Release of Contingency Funds #101 BOARD OF COUNTY COMMISSIONERS County of Monroe . Mayor Holly Merrill Raschein,District 5 The Florida Keys Mayor Pro Tem James K. Scholl,District 3 h Craig Cates,District 1 Michelle Lincoln,District 2 David Rice,District 4 Memorandum DATE: 02/21/2024 TO: BOCC Digitally signed by Kevin . V�_ c._._ G.Wilson,P.E. FROM: Kevin G. Wilson, P.E. Date:2024.02.21 17:14:20-05'00' SUBJECT: Release of Contingency Funds Included with this memo is the proposed Release of Contingency Funds 4101 for the Fl Keys Marathon Airport Non-Aeronautical Use Building (EOC)project. This does not affect the contract amount, but releases contingency funds already included in the Guaranteed Maximum Price for work that was either not foreseen or for which a price could not be determined at the time of contract execution. The amount requested is $41,500.00. The attached Release of Owner Contingency Request provides the details. This is being provided to ensure the BOCC is aware of this change. Please contact me with any questions. If there are none with the normal 24-hour window, I will approve the request. County of Monroe BOARD OF COUNTY CONIXIISSIONERS Mayor Holly lvlemll Raschein, District 5 The Florida Keys 1�� ~cr"Pro T =Jame K. Scholl,District Craig Cates,District 1 ti Michelle Lincoh%,Di%tact 2 aid Rice,District 4 MEMORANDUM DATE: 2/16/2024 TO: County Administrator FROM: Cary Vick SUBJECT: Release of Contingency for: FL KEYS MARATHON AIRPORT NON- AERONAUTICAL USE BUILDING (EOC) Action Requested: Approval for RELEASE of contingency funds in the amount of $ (41,500.00) as outlined below. Basis for Recommended Action: 1. The requested release does not increase the total cost of the project as approved by the BOCC, and it will have no impact to contract time. 2. The scope for which the release is requested is within the intended project scope. 3. The release is not based upon an error or omission by the designer or the general contractor. Background: This is a cost change to the Contingency related to Submittal 271000-2, dated 01/10/2024, to change the power infrastructure in Server Room 242 and AV Control Room 221 per MC IT request. These changes included increasing the number and size of the PDUs in the racks and the associated power required to feed the PDUs. Reference the sketch in Submittal 271000-2 for more detail. Approved by Marshall Quarles 02/16/2024 3:15:00 PM 02-19-2024 Ajax Building Company Architects Design Group KevinWilson n Digitally signed by Kevin Wilson f evi 1 1 V V i lso 1 Date:2024.03.05 13:01:24 -05,00, By Cary Vick at 9 21 am Feb 21 2d�24 1�1........ ........ ....... ........ .................. On behalf of the Kevin Wilson,Assistant County Administrator Director of Project Management Project: FL Keys Marathon Airport Non-Aeronautical Use Building (EOS) (202011) Subcontractor: PEDRO FALCON ELECTRICAL CONTRACTORS, INC. Change(RFI#,ASI#,etc): COR OS4- Data racks receptacles and PDU's Date: 1/24/2024 Request for Additional Time 5 days.IlMonday II rWay 7AIlM 3.3011PI LABOR Quantity Units Description LtLnit Cost of labor 25 Hour Forman $45.00 $1,125.00 80 Hour Electrician $35.00 $2,800.00 80 Hour Electrician Helper $25.001 $2,000.00 Labor Subtotal $5,925.00 Labor Burden Percentagel 38% 1 $2,251.50 LaborTotall $8,176.50 MA EI IAI.,f$UPPLIE BACK-ITP I E+QUII ED) Quantity Units Description $/unit Cost of Material 5 Each 11/4" EMT LB BOODY $18.00 $90.00 270 Feet 11/4" EMT CONDUIT $2.80 $756.00 40 Each 11/4" EMT Compression COUPLINGS $5.95 $238.00 15 Each 11/4" EMT 90'S $8.90 $133.50 40 Each 11/4" EMT Compression COUPLINGS $5.89 $235.60 27 Each 11/4" EMT SUPPORTS $16.80 $453.60 12 Each VxVxV EMT Box $30.00 $360.00 6 Feet Fire wall penetration $35.00 $210.00 800 Feet #2 AWG TI WN CU WIRE $1.90 $1,520.00 400 Each 1#10 AWG TI WN CU WIRE SOLID $0.351 $140.00 I Each lMisc.material $250.001 $250.00 Material subtotal $4,386.70 Material Sales Taxi 7.50% $329.00 Material Total $4,715.70 Quantity Units Description unit Cost of E/S/U tea.—60A 2P CB at Main Switchboard 1 L.E. lea.-60A 2P CB at EOCUP Panel $1,703.88 $1,703.88 tea.- 60A 2P CB at ITUP Panel 1 L.E. 60A Receptacles $965.40 $965.40 1 L.E. Freigh cost for CB and Receptacles $150.00 $150.00 1 L.E. Automated Port Services $22,015.931 $22,015.93 Labor Total $ 8,176.50 Materlaltotal $ 4,71S,70 Subtotall I $ 37,727.41 Allowable OH&P 10% 1 $ 3,772.74 GRAND TOTAL(no pennies)I I $ 41,500 Gr%4)aR,. 11250 NW 91ST ST MEDLEY FL 33178-1486 Phone:305-520-4869 Fax: 305-520-4950 To: PEDRO FALCON ELE Date: 01/22/2024 31160 AVENUE C Proj Name: BIG PINE KEY FL 33043-4516 GB Quote #: 0245223145 Attn: Ihor Rymaruk Release Nbr: Phone: 305-872-2200 Purchase Order Nbr: Fax: 305-872-2219 Additional Ref# Email: Valid From: 01/22/2024 Valid To: 02/21/2024 Contact: Melvin Robinson Email: melvin.robinson@graybar.com Proposal We Appreciate Your Request and Take Pleasure in Responding As Follows Item Item/Type Quantity Supplier Catalog Nbr Description Price Unit Ext.Price 100 5 EA MENNEKES ME3601116 60A 10 $179.61 1 $898.05 3W 250VAC RECEPTACLE ***Item Note:*** 1 week lead time Total in USD (Tax not included): $898.05 I"'aiic 67 35 I.. :III �,, �'tt� ... .I��� 1110 I This equipment and associated installation charges may be financed for a low monthly payment through Graybar Financial Services(subject to credit approval). For more information call 1-800-241-7408 to speak with a leasing specialist. To learn more about Graybar,visit our website at www.graybar.com 24-Hour Emergency Phone#: 1-800-GRAYBAR Subject to the standard terms and conditions set forth in this document. Unless otherwise noted,freight terms are F.O.B.shipping point prepaid and bill. Unless noted the estimated ship date will be determined at the time of order placement. Page 1 of 2 !!I���'" MENNEKES Electrical Products 277 Fairfield Road Fairfield, NJ 07004 (800)882-7584 RECEPTACLE, PANEL MOUNTING PART NO.: ME 360R6 DESCRIPTION: 60AMP 1 phase 3W 250VAC Receptacle CONSTRUCTION: Splashprooft IEC IP 44 APPROVALS: UL Listed Standards 1682; 1686 CSA Certification to Spec. C22.2 No.182.1 IEC 309- 1; IEC309-2 IEC COLOR CODE: Blue GROUND PIN: 6 Hour Position Mates with Male in 6 Hour Position. u a 4 1/4" O O O Front View of Receptacle 3 15/16" 2 1/8" 3 1/8" fo 1/4" 3 3/8" 0 3 1/2" Panel Cut Out 3" Wire Range: #4-#8 AWG Dimensions in Inches Unless Otherwise Stated. Drawing Not to Scale. Copyright 1999 Mennekes, Inc. Specifications Subject to Change. Rev.99-1 III III111111111111111II11111III 4===E S I Quotation S(J9 P1A1,.,S, INC:. EXPIRATION DATE QUOTE NUMBER Our People Make Me Wfferance. 02/16/2024 S 101267670 ELECTRICAL SUPPLIES INC, HOMESTEAD 229 SOUTH RAILROAD AVE ELECTRICAL SUPPLIES INC, PAGE NO. HOMESTEAD, FL 33030 HOMESTEAD Phone 305-246-2440 229 SOUTH RAILROAD AVE Fax 305-246-2438 HOMESTEAD,FL33030 Phone 305-246-2440 1 of 1 Fax 305-246-2438 QUOTE TO: SHIP TO: PEDRO FALCON ELEC CONTRACTORS PEDRO FALCON ELEC CONTRACTORS 31160 AVENUE C 31160 AVENUE C BIG PINE KEY, FL 33043 BIG PINE KEY, FL 33043 CUSTOMER NUMBER CUSTOMER PO NUMBER JOB NAME/RELEASE NUMBER SALESPERSON 2085 EOC BREAKERS CRAIG COWAN WRITER SHIP VIA TERMS SHIP DATE FREIGHT ALLOWED CRAIG COWAN OT OUR TRUCK PASS-ALONG 01/17/2024 Yes ORDER QTY DESCRIPTION UNIT PRICE EXT PRICE 2ea SQD BGA24060Y1 MOLDED CASE CIRCUIT 545.000/ea 1090.00 PANEL MSB 3ea SQD QOB260VH MINIATURE CIRCUIT 165.000/ea 495.00 PANELS EOCUP & ITUP *** UNLESS OTHERWISE SPECIFIED *** *** COPPER WIRE QUOTES VALID FOR THE QUOTED DATE ONLY*** Subtotal 1585.00 ***ALL OTHER QUOTED PRICES VALID FOR 48 HOURS FROM DATE OF S&H Charges 0.00 QUOTE Sales Tax 118.88 Amount Due 1703.88 Printed By:CRAIG on 1/17/2024 10:24:56AM EST uuuuulllp i„ ] _ \ ) a ) ƒ a a a \ \ „ zz � \ § „ „ § j 4 % \ 0 ) � / � < 22jo £ cu = r 2 222 u 5 Im kn m E r_ § r4 mcu \ � Ln 0 § ƒ m§ — — ± 7 / E > / / /§ - \ \ƒ ) a - - co \<; - \ \ § j � § • # : # j \ j4 . ) ! � bB oo zao k 3 � rongo, % IIIIIIIIIIIINV Quote��� �d�vJI .; -, 1,t,✓loll g Gov,,,e r C i ,,Jp p i el° www.pduwhips.com I www.lockingpowercords.com I www.rackmountpdu.com DATE: 1/23/2024 Quote ID 12324 T2 Iron Box Customer I ...............................A.P.S.............................. 1349 Express Drive Contact Humberto Raleigh, NC 27603 Phone: 1-800-590-8610 Fax: 1-800-477-1381 Email: sales@ironbox.com MOM Adam 12324 T2 TBD Ground Des,tinatio U,SD MN01 D1 RO 10D203 eist..l� C1 etered' pgradeab e,.. f'A, `�, k 2TL5AOH10-S Horizontal, ()0) NEMA 5-20R, 10ft power cord 4 835.20 3,340.80 with L5-20P, Black Powder Coat. >9W1-48Ml18-6PS6B Geist PDU, Metered Upgradeable, 60A, 208V, 9.9kW, 5 3,015.11 15,075.55 Vertical, (42) Locking IEC C13, (6) Locking IEC C19, - 10ft power cord with 2 P+E (IP44), Black Powder Coat ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ SUBTOTAL $18,416.35 Other Comrnents'or Special Instructions TAX RATE 0.000% ....::: .....:: ....... .....::: ....... ......:: ......:: .......:. ......:: Quote is valid for 30 days. TAX $- * Lead time 5-6 weeks to manufacture S Et H $256.37 OTHER $- ................................................................................................................................................................................. * Shipping FEDEX Ground $18,672.72 it� **Custom builds are non-cancellable and non-returnable** 11111""^1111 ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................... If you have any questions, please contact Iron Box Customer Service: 1-800-590-8610 Thank You For Your Business! °��i�llllllll Architects Design Group 3 2 es I Wi n f e r III urnilkF . I. 3 789 +lCu, 6, 4 , 1 SUBMITTAL REVIEW - LETTER OF TRANSMITTAL To: Ajax Building Company Project Name: Marathon Airport NAUB EOC Attention: Marshall Quarles Project/ File no;1001 Date: 1�1 Submittal Name: Structured Cabling System PD PDUs Specification Number: 27 10 00 Submittal Number: 271000-2.0 Architect's review is for general conformance with design intent and contract documents. Comments, notes and markings shall not be construed as relieving the contractor from any requirements and/or compliance with the contract documents. The contractor remains responsible for means and methods including (but not limited to) details and accuracy, for confirming and coordinating all quantities and dimensions, for selecting fabrication processes, for techniques of assembly, manufacturer's recommendations and safety requirements. STATUS: F-1 NO EXCEPTIONS TAKEN Z REVIEWED AS NOTED, RESUBMITTAL NOT REQUIRED 1-1 RESUBMITTAL REQUIRED, REJECTED NON-CONFORMING 1-1 INFORMATIONAL SUBMITTAL NOT REQUIRING ARCHITECT'S ACTION COMMENTS: See notes from TLC SIGNED: COPY TO: Mickey Pruitt Devon Ayers ADG Forms Transmittal Copyright©2011 E N G II lfwl,E N G �3 w 1. U I I `ti S Structured Cabling System PD (PDUs) Sub # 27 10 00-2 1 PM- Juan Perez Received- 12/20/2023 Project- 120825 - MONROE COUNTY EOC Returned- 12/28/2023 Name: SUBMITTAL REVIEW IS LIMITED TO VERIFYING GENERAL CONFORMANCE WITH THE DESIGN CONCEPT AS PRESENTED BY THE CONTRACT DOCUMENTS. DISPOSITION OR NOTATIONS DO NOT CONSTITUTE A CONTRACT MODIFICATION AND DO NOT RELIEVE THE CONTRACTOR FROM COMPLIANCE WITH CONTRACT DOCUMENTS, GOVERNING CODES AND REGULATIONS. NO DETAILED CHECK OF QUANTITIES OR DIMENSIONS WAS MADE. THE GENERAL CONTRACTOR, SUBCONTRACTOR, AND/OR CONSTRUCTION MANAGER IS SOLELY RESPONSIBLE FOR CONFIRMING ALL QUANTITIES, DIMENSIONS, FABRICATION TECHNIQUES, COORDINATING WORK WITH OTHER TRADES AND ENSURING THAT WORK IS PERFORMED IN A SAFE AND SATISFACTORY MANNER. F-1 REVIEWED FOR ENGINEERING RELATED ISSUES ONLY ... NO ACTION TAKEN F] REVIEWED FOR COMMISSIONING RELATED ISSUES ONLY ... NO ACTION TAKEN F-1 UNREVIEWED/NOT APPLICABLE(NO ACTION TAKEN) F] SUBSTANTIALLY CONFORMS TO DESIGN CONCEPT ... ACCEPTED AS SUBMITTED Z SUBSTANTIALLY CONFORMS TO DESIGN CONCEPT ... ACCEPTED AS NOTED F-1 DOES NOT CONFORM TO DESIGN CONCEPT ... REVISE AS NOTED AND RESUBMIT UNRESPONSIVE SUBMITTAL AS NOTED...REJECTED, REVISE AS NOTED AND RESUBMIT Review Comments (SUBMITTED BY Victor Carra ra) 1. The submittal was reviewed for electrical compatibility only. Refer to Technology review comments for additional information. 2. The Contractor shall coordinate receptacle device type for connection to respective 20A and 60A PDUs with the PDU manufacturer and provide for a complete electrical installation accordingly. 3. See attached electrical sketch, ESK 04, for updated circuit information to Server Room equipment rack PDUs per recent coordinate efforts with the County. 4. For A/V Control Room Rack: • Replace existing two (2) quad receptacle devices (connected to EOCUP-43 and EOCUP-45)with two (2) L5-20 receptacle devices at A/V rack for 20A PDU connections. One (1) L5-20 receptacle shall be connected to EOCUP-43 and the second receptacle shall be connected to EOCUP-49. • Provide IP44 (2P+E) 208V, 60A receptacle connected to new 60A/2P circuit breaker at EOCUP-70,72 via (2)#4, (1)#10 GND, in 1.25" conduit for 60A PDU connection. Review Comments (SUBMITTED BY Juan Perez) Accepted as Noted. Please refer to Electrical Response and attached sketch for circuit information. As per OAC meeting on 12/19/2023, only two Power Supply Modules (C9400-PWR-3200AC) can be connected to the 60A PDU on UPS, while the other two modules will be on the Non-UPS PDU (N+ N configuration). This condition applies to both Cisco Catalyst 9400 Series chassis mounted on Racks 2 and 4 of the Server Room. fJ1G'1'�illllll� ir9?!l!�l1ya� C ��,,,,,,,,,,,,' yi rrj Submittal #27 10 00-2.0 `h w"r! I.. i..➢ 'F I f,,D S, 16 Project: 120825- MONROE COUNTY EOC Distribution Distributed on 1212812023 by Denise Saltzman(TLC Engineering Solutions) To: Denise Saltzman (TLC Engineering Solutions) Message: None Additional Attachments: 120825_Sub 27 10 00-2.0 Structured Cabling System PD(PDUsL.Pdf NAME RESPONSE ATTACHMENTS COMMENT Victor Carrasco(TLC Engineering Accepted as ESK 04.W Solutions) Noted 1. The submittal was reviewed for electrical compatibility only. Refer to Technology review comments for additional information. 2. The Contractor shall coordinate receptacle device type for connection to respective 20A and 60A PDUs with the PDU manufacturer and provide for a complete electrical installation accordingly. 3. See attached electrical sketch, ES 04, for updated circuit information to Server Room equipment rack PDUs per recent coordinate efforts with the County. 4. For A/V Control Room Rack: • Replace existing two(2)quad receptacle devices(connected to EOCUP-43 and EOCUP-45)with two(2)1-5-20 receptacle devices at A/V rack for 20A PDU connections. One(1)1-5-20 receptacle shall be connected to EOCUP-43 and the second receptacle shall be connected to EOCUP-49. • Provide IP44(2P+E)208V,60A receptacle connected to new 60A/2P circuit breaker at EOCUP- 70,72 via(2)#4,(1)#10 GND,in 1.25"conduit for 60A PDU connection. Juan Perez(TLC Engineering Accepted as Solutions) Noted Accepted as Noted. Please refer to Electrical Response and attached sketch for circuit information.As per OAC meeting on 12/19/2023,only two Power Supply Modules (C9400-PWR-3200AC) can be connected to the 60A PDU on UPS, while the other two modules will be on the Non-UPS PDU (N+ N configuration). This condition applies to both Cisco Catalyst 9400 Series chassis mounted on Racks 2 and 4 of the Server Room. 16 Page 3 of 4 Printed On: 12/28/2023 07:51 PM Submittal #27 10 00-2.0 F,,F,Nl,5,,IJ�N E E',"R 11 N G S IJ T' � C) S, Structured Cabling System PD (PDUs) SPEC SECTION: SUBMITTAL MANAGER: Denise Saltzman (TLC Engineering Solutions) STATUS: Accepted as Noted DATE CREATED: 12/20/2023 ISSUE DATE: 12/20/2023 REVISION: 0 RESPONSIBLE Ajax Building Company, LLC RECEIVED FROM: CONTRACTOR: RECEIVED DATE: 12/20/2023 SUBMIT BY: 01/3/2024 FINAL DUE DATE: 12/27/2023 LOCATION: SUB JOB: COST CODE: LEAD TIME: TYPE: Shop Drawing APPROVERS: Victor Carrasco (TLC Engineering Solutions),Juan Perez(TLC Engineering Solutions) BALL IN COURT: DISTRIBUTION: Juan Perez (TLC Engineering Solutions) , Erick Gonzalez (TLC Engineering Solutions) DESCRIPTION: Attached is Submittal 27 10 00-2.0 Structured Cabling System PD(PDUs)for your review. ATTACHMENTS: 120825 Sub 27 10 00-2.0 Structured Cabling System PD(PDUsL.Pdf SUBMITTAL WORKFLOW SUBMITTER/ RETURNED NAME APPROVER SENT DATE DUE DATE RESPONSE ATTACHMENTS DATE Victor Carrasco Approver 12/27/2023 12/26/2023 Accepted as ESK 04 pdf Noted Juan Perez Approver 12/20/2023 12/27/2023 12/28/2023 Accepted as Noted BY DATE COPIES TO 16 Page 4 of 4 Printed On: 12/28/2023 07:51 PM ervoo o u a u ............ woo saeaul,0ueo1� l% Yd l%'t '"II p'h t I. 0 oa�1 40 vO MS3 £999 99Z50£d pp ,1 oo9ZI,££-ia`Iwe!w a ^ U11 ��� Oil :u6lsap v axlns D If�l II Bra ".3 Ilr IN o,II 3 :'ON yo}a�S anua wow ants[s[s fiZ/9Z/Z 6 :a}ep S1N :aleoS 9Z90Z6 :'ON qor 0�1 l 0tr-3 :'ON bulnneap o}}uawalddnS OSd V 003.11Nf1OO 3O23NOW :}oafoid O,Z-00 06 LZ#le}}luagnS :uolslnay CL �w��w Ir rn o z o 0 0 ��rroo � � , � ■ w�owo� � n ni a z an r 4p t N a I X a Y I it �µ � u ,�I" w a ti ti I�r�II� ¢d ff mmo }_-? fl7 1 Ir. > t?I1} III II' LL f Ir - I III I" fJ Il. � .B II" I 11. E I I",? m f 7 Ip ilk n � IL rr t � m n }n7 Z Z I. -'r i a �n Irl'j 11 <r 7 Q a �I Ir p; I� n, r r ,p I- "r II. d m r i I I" _ a r> II }�n Ira} I— � O I� CL I� „ (D )IIII ,t S a m ` J > O r if � III In� �l 7. Z W N W (n i J jD1 II %%%/Il ��IIIIII II ����� IIIIIIIIIIIII V I IIIIIIIIIIIII M a1 AaxAjax Building Company,LLC Project:202011 Monroe County FL Keys Marathon 109 Commerce Blvd Airport NAUB EOC Oldsmar, Florida 34677 7280 Overseas Highway P:+18137923900 Marathon, Florida 33050 Submittal #27 10 00-2.0 - 271000-2 Structured Cabling System PD (PDUs) 27 10 00 - STRUCTURED CABLING SYSTEM Revision 0 Submittal Manager Marshall Quarles(Ajax Building Company, LLC) Status Submitted Date Created Aug 30,2022 Issue Date Dec 19,2023 Spec Section 27 10 00-STRUCTURED CABLING SYSTEM Responsible Pedro Falcon Electrical Contractors, Inc. Received From Ihor Rymaruk(Pedro Falcon Electrical Contractors, Contractor Inc.) Received Date Dec 19,2023 Submit By Dec 19,2023 Final Due Date Jan 3,2024 Lead Time Cost Code Location Type Product Data Approvers Devon Ayers(K2M Design), Mickey Pruitt(Architects Design Group) Ball in Court Devon Ayers(K2M Design), Mickey Pruitt(Architects Design Group) Distribution Victor Carrasco(TLC Engineering Solutions(Jax)),Travis Mauldin(Ajax Building Company, LLC),Steven Sanders(Monroe County),Juan Perez(TLC Engineering Solutions(Jax)),Jordan Salinger(Monroe County),Jeffrey Whipple(Ajax Building Company, LLC), Donald Harcrow(Ajax Building Company, LLC), Denise Saltzman(TLC Engineering Solutions(Jax)), Cary Vick (Monroe County) Description Product data for PDUs Submittal Workflow Name Sent Date Due Date Returned Date Response Attachments General Information Attachments Marshall Quarles Dec 20,2023 Dec 19,2023 Submitted 271000-2 Structured Cabling System PD P( DUs}�df(Curra;nll:) Comment Product data for PDUs Devon Ayers Dec 19,2023 Jan 3,2024 Pending Mickey Pruitt Dec 19,2023 Jan 3,2024 Pending Ajax Building Company, LLC Pagel of 1 Printed On: Dec 20,2023 11:54 AM EST Ajax SUBMITTAL AJAX JOB #202011 SPEC SECTION NO. 271000 SUBMITTAL NO. 271000-2 Marathon Airport NAUB EOC AJAX BUILDING COMPANY 109 Commerce Blvd. REVISION NO. Oldsmar, FL 34677 SENT DATE 12/19/2023 Specification Section Title: Ajax Stamp his I)omlitwnl I li s Ik,t'lr Cll'w(flwd'I"or G(,1wrzl Lat��,lylr C,c�trrESlnu Ilr,rrr,`Chet'wrid Structured Cabling Systems C,r nlorlii,lly I o C:of lrtt 11',aa.11iwlils C:onlrtt Mari S Il,l,lwr Sl to vt'rl)y,All 1 iutwn,=sirnr, 0 1p,znlllies wrid CrzJp rllles, Alrlrrovi l )ws Not IdNIev('I It('. C,rnilr:'fclrrr/Submittal Type: �Cil1,7Frlia�r or Ckrr11pliallm,VV1111 C,rnil.riwt )omlltif:Pli'Ils ❑ Product Data NO� ❑ AJ11AX II::WU 1i....11::)l11'2C CCIII III'%19Y Submitting Contractor: gunge: 12/19/2023 g2: Ig/leirw^Neill Quarles lc^:n .................................................................. Pedro Falcon Electrical Cu,.ullbu ni nll: 271000 2 ................................................................................................................................................................................................... Notes: Architect's Stamp �IN a ,�au.�lkxrrnu114wl iis lb61 ng;;g u.tiul zed to II)ir oAide cut sheets on the ulrntre need IISIf::gV,.s in oirdei tro a a aiistr in the 6Ie ctririca d §ig;;glrn 2,lhaing;;ges to the II)owei ne2;q)tac2Ies in the Server roonrn 2d2 and AV221 Illh°°°IIII III"""IIII"""IIIIIIIIIIIIII IIII IIII IIIIIIIIIIIIII III °° III' GII ulll:wi rrtill ttalll IRuuliuw II 1�S"111"CI 11"1111tlD11� II"'AKIII III IV11 V1111 I11:l AS p u 42rIIII'u:�, VII SU1:IMA11111 11"' 11..1140 11 IIVII!tl'� IIIIVII!II:� p uRu SU11:oAuu uAu 1401114•• 0111411 )1110IIAII1IN Arad< f) wvi+^Vv I,to g(,t wl wntnnn,an( ,with cP^.I i) Inl=_r)t and .iilrsw[ dr,„a,uIII=nfo.C:.ulnlnrrnis,mh, s and nrtarlkinga shall not be coiil truud au I,allonq 1ha;tcu tlolu rlwy r rctimmiiiuntra rndror t;onil li,ai co vvi11'r the contrort d[`.nrr n,i s ri'1�ff i i adoi fl.l i ir2ir I s I os Ill IIo1b}uPI'JrIT7(!AI I i a Id InothorlS,➢1 dl)(Ii1'Iq (Curt jlot Ilrrlltu.l ha) dotaIIr wd rain^nloy In ciJrlfiu uu is it'id r;I,rc(dmvling A rtuul f[tt(s rorua dun.mmoim,Inc.rloding f ahnr;ttlrin prra c. .o,far tc.Ihniq{ac.,o raf r.-Lmlbly,I7ranlil c twl,^r a rc o mini Irdah iI, and lml(My wg1111 nnewntllr,. v F\I a f Itta a,t'P.„I:)a.wt(tI GI oti1) 11!!h,Y Rox 121(1 Y . 2tt1I 6*I7"It.I rr47 1706 a2r�ao 1/1 /2 2 I' A(L" � F 407-645 5525 1:)atla^': .................................................................................... FL Keys Marathon Airport Non- Aeronautical Use Building (EOS) Structured Cabling System. PDU's Specification Section 2710 00-1 Paragraph: 271000-1.3 Pedro Falcon Electrical Contractors, Inc. 31160 Ave C Big Pine Key, Florida 33043 Electrical Project Manager Roman Sviridenko Rom an(a,pedrofalcon.com 305-872-2200 (Ext. 27) I I I I I � I _r ¢ m w § N z 0 r S� g W so I 0 0 3w wo e � e s s se e� s s s 3 ss Uu F no 7 U�U ss N o N O _n�e�m_m me n�e�m�m � �Ae� �s�aseseaa ¢ Of Of §K §K §K § - W z� > LLJ = ew eo ¢ U) z O — 0 §¢ §W W s � w Of N Horizontal Metered PDU20A � I Upgradeable Metered rPDUs provide reliable power distribution to critical IT equipment within a rack or cabinet while delivering a view of real-time view of power usage from a local LED display. Benefits Ill With the Geist Upgradeable hot-swap technology,users may easily transform metered rPDUs to monitored rPDUs with the addition of the appropriate Interchangeable qq ppyy ppyy ppy Monitoring Device(IMD). �In��1 ��d11��113 Ill Avoid accidental overloads when Y Y deploying or moving critical server equipment with instant access to Model Number:MN01D1R0-10D203-2TL5A0H10-S power consumption metrics on the Category:Metered ,t11' local digital display. Sub Category:Upgradeable Every unit is 100%tested for Power Configuration:20A,120V,1.9kW reliability and functionality. Physical Configuration:19in/483mm,Horizontal Simple and convenient configuration options for cord lengths and chassis colors. Product Summary: rPDU,Metered Upgradeable,20A,120V,1.9kW,Horizontal,(10)NEMA 5-20R,10ft power cord with L5-20P,Black Powder Coat. Monitoring: Input current monitoring.Local high visibility LED display. Plug Form: Receptacle: ............................................................................................................................... L5-20P NEMA 5-20R l ote irecelf,ta ,lie type (Quantity:10) needed foir tnls Ir:,lkilc o ev�v :ed dIectrk.,d. `:;II"neet Chassis Color Options: ■ ® Im ❑ E 0 ❑ Vertiv.com I Vertiv Headquarters, 1050 Dearborn Drive,Columbus,OH,43085, USA Vertiv Group Corp.All rights reserved.Vertiv'",and the Vertiv logo are trademarks or registered trademarks of Vertiv Group Corp.All other names and logos referred to are trade names,trademarks or registered trademarks oftheir respective owners.While every precaution has been taken to ensure accuracy and completeness here,Vertiv Group Corp.assumes no responsibility,and disclaims all liability,for damages resulting from use ofthls Information or for any errors or omissions.Specifications,rebates and other promotional offers are has to change at Vertiv's sole tllsc ret Ion upon notice. To discuss color options,contact your local sales representative. �a;ut�uiiwan ".elt.a�. aus.a.,�n,:1abunaiiA()llInoam;i"niiia System Features ........... ............ ............. ............. ............ ............. ............. ............ ............. ............. ............ ............. Monitoring Input current monitoring.Local high visibility LED display. Monitoring Level 1 Phase(A)Monitoring(kWh,W,VA,PF,V,A) Power Measurements Compliant with ANSI C12.1 and IEC 62053- 21 at 1%Accuracy Class Requirements Quantity Of Inputs 1 Voltage 100-120V Current 20A VA per Input(Load Capacity) 1.9kW(120V) Frequency 50/6OHz Over Current Protection None Switch No Scrolling/Rotatable Digital Display Yes Power Cable Wire Gauge 12/3 Power Cable Length loft/3m Power Entry Location Left Rear Plug Type NEMA L5-20P Twistlock Receptacle/Socket Type#1 NEMA 5-20R Quantity on Rear 10 Style Duplex Voltage per Receptacle/Socket 120V Internal RMS Voltage Sensor Yes Internal RMS Current Sensor Yes Maximum Operating Temperature 60C/140F Heavy Steel-Powder Coat Finish Black Configuration lU Adjustable Mount Brackets Yes Country of Origin USA,TAA Compliant and Buy American Act COTS Compliant Product Warranty 5-year limited warranty if registered within 120 days of purchase,otherwise warranty defaults to 3 years Certification/Agency Approvals RoHS Compliant Certification/Agency Approvals FCC Part 15 Class A Conformance Certification/Agency Approvals UL&c-UL Listed 62368-1 Chassis Dimensions(HxWxD) 1.72in x 17in x 8.5in Shipped Weight 12lbs(5.44kg) Vertiv.com Vertiv Headquarters, 1050 Dearborn Drive,Columbus,OH,43085, USA Vertiv Group Corp.All rights reserved.Vertiv—,and the Vertiv logo are trademarks or registered trademarks of Vertiv Group Corp.All other names and logos referred to are trade names,trademarks or registered trademarks oft heir respective owners.Whl le every p rec out lon has been taken to ensure accuracy and completeness here,Vertiv Group Corp.assumes no responsibility,and disclaims all liability,for damages resulting from use ofthls Information or for any errors or omissions.Specifications,rebates and other promotional offers are has to change at Vertiv's sole tllsc ret Ion upon notice. Vertical Metered Single Phase P.,1,111111 Yu 60, � I Upgradeable Metered rPDUs provide IN reliable power distribution to critical IT MENEM equipment within a rack or cabinet while delivering a view of real-time view of power usage from a local LED display. 110 M IL,.. Benefits Ill With the Geist Upgradeable hot-swap Model Number:MN01D9W1-48MI18-6PS6B0A10-S technology,users may easily Category:Metered transform metered rPDUs to Sub Category:Upgradeable monitored rPDUs with the addition of power Configuration:60A,208V,9.9kW the appropriate Interchangeable Physical Configuration:72in/1829mm,vertical Monitoring Device(IMD). Avoid accidental overloads when deploying or moving critical server equipment with instant access to Product Summary: rPDU,Metered Upgradeable,60A,208V,9.9kW,Vertical,(42)Locking IEC C13,(6) power consumption metrics on the Locking IEC C19,10ft power cord with 2P+E(I1344),Black Powder Coat. local digital display. �Ir Every unit is 100%tested for Monitoring: Input and Breaker level current monitoring.Local high visibility LED display. reliability and functionality. Simple and convenient configuration options for cord lengths and chassis Plug Form: Receptacle: colors. � II ............. +E(I P44) Locking IEC C13 Locking IEC C19 (Quantity:42) (Quantity:6) 1'Jot n Irecelptac,lle type needed foir tnls Iplkilc o ev"v ��„rr.d....�:.ILe:.c...�.Irlk.,,dL..`:�.h.��.��.t`;,,,,,,,,,,,,,,,,, Chassis Color Options: ■ ® EM ❑ E 0 ❑ To discuss color options,contact your local sales representative. unUlln� I ".elt.�l. a Ils.a.,nl,:ilsbun a iiA()llIIioiiwm;n System Features ........... ............ ............. ............. ............ ............. ............. ............ ............. ............. ............ ............. Monitoring Input and Breaker level current monitoring.Local high visibility LED display. Vertiv.com I Vertiv Headquarters, 1050 Dearborn Drive,Columbus,OH,43085, USA Vertiv Group Corp.All rights reserved.Vertiv'",and the Vertiv logo are trademarks or registered trademarks of Vertiv Group Corp.All other names and logos referred to are trade names,trademarks or registered trademarks oftheir respective owners.While every precaution has been taken to ensure accuracy and completeness here,Vertiv Group Corp.assumes no responsibility,and disclaims all liability,for damages resulting from use ofthls Information or for any errors or omissions.Specifications,rebates and other promotional offers are has to change at Vertiv's sole tllsc ret Ion upon notice. Monitoring Level 1 Phase(A)Monitoring(kWh,W,VA,PF,V,A) Power Measurements Compliant with ANSI C12.1 and IEC 62053- 21 at 1%Accuracy Class Requirements Monitoring Level 2 Circuit/Breaker Monitoring(A) Circuit/Breaker Current Measurements Independently Tested and Verified at 2%Accuracy Quantity Of Inputs 1 Voltage 200-240V Current 60A VA per Input(Load Capacity) 9.9kW(208V) Frequency 50/6OHz Over Current Protection (3)20A Double Pole Magnetic Breakers Switch Breaker/Switch Combination Scrolling/Rotatable Digital Display Yes Power Cable Wire Gauge 6/3 Power Cable Length loft/3m Power Entry Location Bottom Front Plug Type IEC60309 2P+E,60A,Splashproof IP44 Combined Total Receptacle/Socket Quantity 48 Receptacle/Socket Type#1 U-Lock IEC C13 Quantity on Face 42 Quantity per Breaker 14 U-Lock Color ID 3 Circuit=Orange,Green,Blue Style Individual Voltage per Receptacle/Socket 208V Receptacle/Socket Type#2 U-Lock IEC C19 Quantity on Face 6 Quantity per Breaker 2 U-Lock Color ID 3 Circuit=Orange,Green,Blue Style Individual Voltage per Receptacle/Socket 208V Internal RMS Voltage Sensor Yes Internal RMS Current Sensor Yes Maximum Operating Temperature 60C/140F Heavy Steel-Powder Coat Finish Black Configuration 72in/1829mm Vertical Rackmount 7938 Vertical Mounting Bracket Kit Yes Toolless Mounting Hardware-Center to Center 61.25in and 64.75in Spacing Country of Origin USA,TAA Compliant and Buy American Act COTS Compliant Product Warranty 5-year limited warranty if registered within 120 days of purchase,otherwise warranty defaults to 3 years Certification/Agency Approvals RoHS Compliant Vertiv.com Vertiv Headquarters, 1050 Dearborn Drive,Columbus,OH,43085, USA Vertiv Group Corp.All rights reserved.Vertiv—,and the Vertiv logo are trademarks or registered trademarks of Vertiv Group Corp.All other names and logos referred to are trade names,trademarks or registered trademarks oft heir respective owners.Whl le every p rec out lon has been taken to ensure accuracy and completeness here,Vertiv Group Corp.assumes no responsibility,and disclaims all liability,for damages resulting from use ofthls Information or for any errors or omissions.Specifications,rebates and other promotional offers are has to change at Vertiv's sole tllsc ret Ion upon notice. Certification/Agency Approvals FCC Part 15 Class A Conformance Certification/Agency Approvals UL&c-UL Listed 62368-1 Chassis Dimensions(LxWxD) 72in x 3.75in x3.44in Shipped Weight 30lbs(13.61kg) Vertiv.com I Vertiv Headquarters, 1050 Dearborn Drive,Columbus,OH,43085, USA Vertiv Group Corp.All rights reserved.Vertiv—,and the Vertiv logo are trademarks or registered trademarks of Vertiv Group Corp.All other names and logos referred to are trade names,trademarks or registered trademarks oft heir respective owners.Whl le every p rec out lon has been taken to ensure accuracy and completeness here,Vertiv Group Corp.assumes no responsibility,and disclaims all liability,for damages resulting from use ofthls Information or for any errors or omissions.Specifications,rebates and other promotional offers are has to change at Vertiv's sole tllsc ret Ion upon notice. av s N N O O O O N N N N N N N N N N N y N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N > O N 1 1 1 1 N N N N N N N N N N N y N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N p• m N N N N N N O N N N N N W 1V 1V n m m m m m N N m N N N N m m N N N N N M M M M O. N N N N N N N N rl rl rl rl txo a N N N N N M M M M M M M M M m m m M M M M M M M M M M M M M M M M M M M M M M M M M m m m m N N N N N N N N O N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N C �+ O O O O N O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 @ N N N N .�N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N V 0 1 1 1 1\rl rl N rl rl rl rl rl rl 1 1 1 N N M M N N\\rl rl rl rl rl rl rl M 1 1 1 1 1 N N N 1 1 1 1 1`� rl rl C tx tlo p ++ u 8 C = v m m ui j � m O i Q V » 0 4 F `b', ouoioom � o 0o p o0 04000 `a' `a', o `a' `a' `a', uoi, o `a' `a' `a', W p M ui O st M n N O 'i �} ..i O 00 n ui of N O O ��}} N M N O �+f O N N ��}} 01 ci n O pp m of M .-� �G O .-� n W O m W m n > oD N n W n W .-� M .-� �} O �G O st st .-� M �G O ��}} ��}} of W st .-� of N 00 of T W V Q of O O St M O �G �G n W N of Ct of M O M n St n OO M a0 .-� O M 00 St oD M n .-� N O N N 00 �7 .-� O O n M W St of m m m �p N N�p of O 1,z Ve of rl rl W�G rl 06 rl V�rl M rl n O M 06 rl M M V�rl V of W rl n � `•'rl `•'rl rl N rl 1p ....� rl rl � � ....�N��...�...M..� rl n `•'`•'rl rl rl `�'rl rl rl `"rl `�'rl `�' ` W � 5 LL — v LIJ W J O' CO a O N Z co g °a o O w W ° U C. ao Z O N Q } `O Z ° p W `o Q ui y^ W ° }} E M M Z 0 Lu Z N `O rl ryj V F Z O Z O ° a `^ y a ¢ ti 0 0 O 3 ° V Z > x N �, N u = y = 0 v m y c �nl o x ° al Q N EO O d C N p z ¢ E a Q J t m o ' c E c x o N N O�J u MI C E C = N N O ° `p N .ti >'p M N al N D aJ N G fO N w C ♦+ m Q aJ in E O Q' ti0 c E in MI Y L N O c ^ i OI aJ lOp C N V a O�J a C Vf N °. u O u 0 u aJ N c '�' Q 0 LL N V y o u _ = v .N-7 f0 m c - y c� a=i rri m M E '" o• 0 c c 3 E O c °' v .-� _ as ,°, o c as m t ^! . _ ^ v m = •�, m p_d O V 'm c m 4 2 0 3 c v ti -°° u c 3 '°J^ N E O .t u u a o r O en c ,—°� .+ M Q E m o 0 N � v O }`y c 0a V t u m ° ° ° o O as a c y`O_ as Q �°, _ — 0 as a ° d m u E y v N a o OA u V u c ''� C p _ O tO O E O0 y_ o u t o al E aJ a E c o'J •- E c c o u m m" c m '^ m 3 a+ N a = v o E m° s v w 4 m v o MI•o s o «' �' v 'o N co �y,' m'^)�,-.'iG°c°vE3C°cs uv3co3c iN 0oaOo°��3s- cSc vLtcof0 .o-?� oC"'J •p�3c+ v.m3acs `'m�m=c=pu°O> pca3>s -macms _ymvm,�c t0.*`a's Y.m� Q° •�cN�' "vaOvaJ .�c�E� mu umCaaOss s=c>d 0>o' a0amJs pNm-m o`u`.°°+ pp"N,;�' Y°°' p0O`oO° mm�aE's y•.,�-,i� 'muaa3�s a—rv. -FWy WQccOovv+0=wacam's Vmo x•�c°m�J »•c3e- -a'mo $ o m N W$0v 6 *- m o . mow0v O mr O c : EO O E : o o co m a o ° M 3ucOv0,°` LL=Qz4oayN"O O O au= a ° a v o u „° o v a . cv cuo a o o xK o o o a u a° W c , 'E cc = ° O " o> o 60 E a O e > aA M Mti NE p voa°o'JPE 'o ° ° o aO O NiN0 o • o o o > > 0 o° Y N ` NE N . o o o v > > �° N W cm ^ O 0 0 0 0 I O � O`• I w I I I I I I I I °" C la'1 N eM•1 N V�1 3 0 .M-1 .•+ V�1 eN•1 .�-� n «� M . . N m m w m m o o m w o n w m � n � o eM•1 N M e0.1 .�-1 N O N N N .O-1 u •C � ei ei ei ei V ei O ei ei ei ei ei =o ei ei ei ei ei ei Ill ei ei ei N N ei ei ei ei ei ei E ei E N N N N N N N V N N N Il1 N O _ _ _ ^ _ _ p V Q 1 1 1 1 u V O Q 1 1 1 1 1 V 1 . 1 1 1 1 N 1' 1' 1' 1' 1' 1 1 N 1 1 1 V 1 V 1 1 1 1 1 1 1 i 1 1 1 i .. N M V . . 00 m O ei N M V Vf �D i� W m O ei N M V Vf �D i� W m O ei N M V Vf �D i� W ei ei ei ei ei ei ei ei ei ei N N N N N N N N N N M M M M M M M M M M V V V V V V V V V V O V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V # N N ry Z O O 0 0 0 00 O eO eO O ei Om 0 00 eO . eM eO eO . eM eO . . . . . e00 e00 . . . M M W O W �D m O O ei O O O N N O ei ei ei ei ei N ei ei ei N N N N N N N N N N N 1p Q V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V \ a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a N N M M M M M M N N N M M M M M N N N N N N N N N N N N N N N N N N N N N N N N St St '7 N N N N N N O N N N N N N O O O N N N N N O O O O O O O O O O O O O O O O O O O O O O O O N N N O O O O O O N N N N N N N N N N N N N N N 1 N N N 1 1 1 1 1 1 1 1 1 N 1 1 1 1 1 1 1 1 1 1 N N N N N N N N N 1 1 \\\\\\ rI rI rI rI rI rI rI N N N .-� .-� .-� rl rl rl rl rl rl rl rl rl rl rl rl rl rl rl rl rl rl rl rl N N N M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M N N N N N N M M N N N N N N N M N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N rt N N N N N O O O O O O N N O O O O O O O N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O N O O O O O N N N N N N O O N N N N N N N O N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N O N N N N N N N N N N N N —— —————— ——— p— p� p� p� p� p�� p�p p�p p�p p�p p�p � p�p p�p p�p p�p —p —p —p ——p —p —p —p —p p—p ———————p ——p —pp O O O O O O O O O C. O O O O O O O O OV O O O O O N O O O O O n O 0 0 N 0 0 0 0 0 0 .O-� O O O O O ONO O ' 0 0 st 00 .-i O ��}} O ui N O ��}} �+f N oD N .-i w of .-i N M of w 4 �} N .-i pp N O O N tYl N M of .-� of st p O m �G �G O O N N a0 N �G O N p M mp N St M N M w OO w N N N rl N �!f m N OO St w O rl h �/1 m O M ��}} �!f W h m O M W N m h N �!f N m St N � St 8 rl St h m O m M N h M O m N Lff �G N Ct N N rl M L/1 m OD N St m m O m �p rl St �G N h M O m O h �G V� rl .... rl N rl n m V of M of �/1 W m M rl W N rl rl q M V M N rl h rl M V rl V .... W V V rl rl rl rl n rl rl N N rl M 1!1 N St .... ............ .... .... ........ ................ .... .... .... ........................................ ............ .... ............ rl N C O 0 m N f0 O c °• as = p m E u o °I w E " o f p N N C O u" w O ry O O C O O in C o O C C w O C O C O O -p tYi. N Q ) N o v `" 3 " as �' v o ° :° ° ° '' N o = ei G 3 E—ou LJ N ♦+ N w t+E y v a $ x M �No m x °' o —°o o v a O u O in N .N-1 d N N N O O C c_ a O N N Om p C C -p O N C C ',�+ \ "y A O N ` N N V J v Y 3 0 c o o „ .-� — \ E u C ei y N ° ^O mm > C O O N N yl N L ei a+ \ Q C .^-1 M C p m m O N u ^ c.ti E " '" „°, = as c c 3 v •y vVi .°.� o c "°" 3 •� > c en y .°.� m y > of L Q o N m " c •u f0 '"' •u c v o 17 a v° m d c u o u. 3 p u. a N c .-� c y .-� a E v c .f0.� " ..� c •� 3 v '� m N _ N N N .+ c " v t ra °' '^ > ¢ '^ t o N ° C O o V N Q 6 d N M 3 = V C u N — w $ ._ �^ 'O ei N O Q C — C O C `J C C "O m E v o .-� E a v ° °° $o °- s o p o N o m > m m m o .-� o ..� > v ,..� E LL N O OO ei u N M N m 3 m2J C `J " O C Z O O O m E .ti ° ..� „°„ '+ 3 v� a c ° .-� a`+ c E „ v� o ° O'J — `y o- o m' v y '� N }`o o O aal a o° x o E c en x°' a°i •+ u `t �' N O'J 'x n ° v °- F V •' u '° ` ti m as V ? •3 ° a — o: y c m „°; Y°- °o v —T—' c m as M N a a as ,3 N Y- ° u W o o ! .o ° „ o- O " u o a•,u—, O ° x E S y ,°J, `—' o: ,3, c " 0 3 M " w N `° `" °� =O ma c ° v " v "' a p s ° _ u °' Y m o c m o v .-� v `o N _" 3 of c c as " « o c v y a c as •c `o m as w o m as c m = " v v a 17 m = V ° a .-� o — �o u v E o E ra `oo y V y o o c E ra as m N - }`O as y a` u 'G p u N A -° o •E o •� `° N ° p_ E c c t c c v y _ V m E E o: Y a �+ \ en — as x o 'C x c a o E m r� E v_ m m t >, p p 3 c ° o a o m -p �: en m '� ;+ =p as o o "p Q �+ m I O as E en v $ o o p V y 'O '" c u a m O o �a G m ° 3 m `c c -p v p- ° c v o m c y W > a a o v as m 3 o a c v v ..� p t c " v� N c a+ v ° a°i E m ° LL = u v as ° 3 V c v� `m E o �' `o m m O p m > > v E as o J ° 3 � as x a • as �`°R v v em u .°� v a°i i'o '— as u .°� v ° E �+ o- > ° as c p ° 0 .o m as o " m > w m � v ° m ..� m 3 c ._ o Q c.+ as m"O p a o .°. o `° c _° u u u m N m c ° u y `° o c ° c am°, '° y as > y 'u. =O m V `° a v ° Jt p°, y ° E rig a s o :u �' a '� f0 " m ° m = c E N v v c p '° a `0 y`O_ ` m o °- m .o Q u v°i v E E '^ ° o o ..� a u a " '3 °o E — as m a E c E „aa, 4 o �ri m n am �n �n o v > > r m o: o m v� y`O_ x c = 2 ° _o m "p x ° c °- c N v as .-� ° ° c en O N �o �o M N ra Q Q O p o c '� ° ,f0, a °- o: v f0 m y 'G o c\ v w o v O t` > N C V'1 C N N N N OO "O OO OO "O O O N G O ~ O u a d u 3 ~ in d 0 O •..� E F o M y E c c c c v as •,,, ,°, E c v c 'en as m c a c v E E E E o- '.� 3 v �+ m N m ,`o� o y y a+ u+ v c v p c E �o E ...� „v. L 3 0 0 0 0 ° ° -p -p w v o 0 17 v v w ° u+ m e o V N 3 ° em o v o — v vv yv 'c m .-� v c v m o V 'O m v as as v o: _, o 0 0 0 o v v v v t v m ," o- — v 3 t Q o:l l7 0: w m OI ¢ O .-� l a o: o: o: o: o:l c l7 Q Q c QI m m '^I Q v� m N m ¢ v� m cm o O - , Q d u m = O V y w a A o v M v N w �n 'gym w .-� N o v N m n .-� w o a y � � �o N M �n v .-� m N N N N N ei E N N N ei N N — — — N -1 V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V N N ei N N ei N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N M N M M M M N M M N M M M N M N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a - - - - � } ! ! | ! ! ! ! \ \ ! 3 to [ to - 00707077000 07 7 m / / - § - i- }}- - - k - k \ k k \ § § � § § \ \ ; { § } { » 00 Ek ) � 0 - - � ! § §� § £ ) | ] } t� ia ; � Gm - 7 ) 0 >Zu \ kuE \) ; m § ) / / � a / 2G | a § G ; § 2 § i ) 2f2 m 2 } § ) k § 0mm k / ] q3 » ! 7 \ w0 / } k � R ) R } RRRR § § ) ) g. � ) ) ) ) ) ) ) ) ) ) ) ) ) 0 o c c v o o m u u v ° � c s 0 0 Z Z Z a n M N N M M M O N N N N C 1 t0 CLtxo 1 1 1 o v uo a MMNo c� o Y 0 0 0 N t N CO N M V 1 1 N \ Y CL N V M O 111� i s V V1A rl of of F C p G/ pN pN N pN N i/! G C O N •@iy �p 0 0 � 0 M a m p� m i $ n i m O m 0 m Q N N-N N W R i *' a w 0 um o n 00 0 0 0 � � r+i �riv v ppc�' pppp o a m ��p � M o a O M 0 0 M to N N O C N N d. 0 EA s v p H H H H M H H H H » 2 O O a V y w Oq r C 2 a � c V V 2 3 m V 2 3 0 a c v � v a � � o Oq u V � C O C 00 C y O N>M ry Ol L N_ � N O � � C = C Oq C y Vf .a M ` S y E X u N U. aim co M v o as cc cc Z cc cc cc en co co m m m O Q 00 00 as ti w m w 2 N ei ei O Q V V V V a a a a OWNER CONTROLLED CONTINGENCY LEDGER FL KEYS MARATHON AIRPORT NON-AERONAUTICAL USE BUILDING (EOC) Initial Contingency Amount: $955,613.00 Total Debits Total Credits Total Adjustments to Date: ( 591.,877 15) $398,944.83 ( 990,823 985) $ - Current Contingency Balance: $363,733.85 *EO designates PCA as an Error or Omission on Designer ur, s ut f Initial Budget 0.00 € 0.00% € $955,613.00 This is a cost change to the Project Contingency to add a GPR survey of the site prior to underground utilities installation beginning in order to locate potential unknown utilities that are not shown on the contract documents. Contract time is not impacted. 10/05/22 (I ,1rDCDG1) € -0.68% $949,113.00 This is a credit change to Contingency for all work related to RFI 121,dated 10/12/2022,to document the email correspondence with Cardno that the injection well casing is only required to be 60'deep, not 120'deep per C-008. The total depth drilled will remain 120' but the casing is only required for 60'.Also,the material of the casing is acceptable to change to Schedule 80 PVC in lieu of DIP (ductile iron pipe). 12/08/22 12,000.00 1.26% $961,113.00 This is a cost change to Contingency for RFI 113,dated' 09/21/2022,to add window shades at the exterior windows in room 235 and 262 that were not previously calling for shades. Reference sketch included in RFI response, 1111.00 12/08/22 (2,093,50) -0.22% $959,019.50 This is a credit change to Contingency for RFI 124,dated € 10/06/2022 to document the variance between ID-202 and A-131 on the mirror manufacturer and the decision to go with the Bobrick B-165 series mirrors due to the cost savings to the Owner over the Renwil,vered mirrors. Id 12/08/22 16,455.00 € 1.72% $975,474.50 This is a credit change to the Contingency per RFI 151, ated 12/08/2022,for the Owner request to change all countertops in Food Prep room 260 from Quartz to Stainless Steel. 12/16/22 5,330.00 0.56% $980,$04.50 This is a cost change to the Contingency to fund the FKEC fee worksheet for the electrical primary service. 01/10/23 (10,01432) 1.05% $970,790.18 This is a cost change to the Contingency to fund the City of Marathon Utilities Force Main worksheet fees.; 11,1414 01/10/23 (27,663 63) € -2.89%€ $943,126.55 OWNER CONTROLLED CONTINGENCY LEDGER This is a credit change to the Contingency for changes from submittal 084113-1,dated 12/01/2022,to change the 1203 window from an insulgard ballistic window to a standard YKK interior storefront window,and to change door 218 from a double door to a single door with a sidelite due to a conflict between the corridor width and the required width for an insulgard double door. 01/23/23 14,607.00 1 1.53% $957,733.55 WIN HI This is a cost change to the Contingency for ASI 01,dated 11/28/2022,for; -The changes to the primary electrical routing and equipment for the building's power per FKEC requirements,and -The addition of the quick-connect equipment to add the s ability to connect a portable load bank.' 02/14/23 (65,712,00) -6.88% $892,021.55 This is a cost change to the Contingency for RFI 154,dated 02/02/2023,to change doors 202&203 to Ambico ballistic hollow metal (HM)frames since the specified Insulgard HP500 ballistic door system required the doors to be outswing,which conflicted with the hallways. Ambico doors can accomodate an inswing to match the floor plan intent. 02/14/23 (870 00) -0.09%1 $891,151.55 This is a cost change to the Contingency for RFI 115,dated 12/05/22,to expand the chase in room219C and add chases in rooms 254& 251 for the vertical storm piping drops from the roof drains down to underneath the 1st floor slab. Nil MAN 02/14/23 (1,282,00) € -0.13% $889,869.55 This is a cost change to the Contingency for RFI 111,dated 10/03/22,for updates to A-132&A-133 clarifying quantity and locations of bathroom accessories. 02/14/23 (1,503,00) -0.16% $888,366.55Hill HIM This is a cost change to the Contingency for RFI 164,dated 02/14/2023,to increase the depth of the dumpster enclosure per revised sheets A-001 and'A-030 to meet the dumpster size and clearance requirements. Durnpster, enclosure CMU walls that have already been constructed will be removed,foundation will be extended to support the increased depth,and the CMU walls will be re- constructed. (10,495,00)CC( -1.10% $877,871.55 This is a credit change to the Contingency for RFI 173, dated 01/19/2023,to eliminate the Masterseal 581 waterproofing noted in the details for the dumpster enclosure.The dumpster enclosure walls will have a standard stucco finish. 02/14/23 1,581.00 € 0.17% $879,452.55 OWNER CONTROLLED OWNER CONTROLLED CONTINGENCY LEDGER This is a cost change to the Contingency for RFI 194 Stairwell doors hardware and fire rating changes to meet fire and FEMA 361,dated 03/20/2023,to change the door hardware specified for doors S102B and 5103 per manufacturer requirements in order for the doors to meet both a FEMA 361 rating and a 2hr fire rating. Separately,this RFI also updated all other stairwells doors from 1hr to 2hr and all glazing in these stairwell doors from 45min to 90min rating.There is no cost associated with these latter upgrades. 04/18/23 (5,875,00) -0.61% $819,533.55: This is a cost change to the Contingency related to Submittal 280537-1.2 to change the bi-directional antenna from a Yagi antenna(model#B©A-YDA763869-14-1)to a Westell panel antenna (model#CS03-777-999).This change was recommended by the BDA vendor,and reviewed and approved by Monroe County because the panel antenna is tested and rated for a lhigher wind MPH than the yagi antenna. 04/18/23 (1,582,00) 1 -0.17% $817,951.55 This is a cost change to the Contingency related to RFI 188, dated 03/06/2023,to demo part of the retaining wall just northwest of GL 9 to provide more turning radius availability for when trucks or equipment drive up the access ramp and need to turn left IPA 05/09/23 ( ,841.00) -0.40% $814,110.55 This is a cost change to the Contingency related to RFI'199, dated 05/09/2023,to extend multiple P1 and P9 walls to the underside of the roof deck(framing,iso,and drywall extended)that were originally called to terminate at the ceiling.This change enhances sound transfer reduction between corridors, building areas,and offices. 05/09/23 (80,114 CC( -8.38% $733,996.55 This is a cost change to the Contingency related to RFI 198, dated 04/11/2023,to add beacon lights on the top of the building per request from the Monroe County Building Department.This includes eight(8)FAA-approved beacon lights positioned at the building corners and along the roof perimeter. IPA 05/09/23 (18,634,00) -1.95% $715,362.55 OWNER CONTROLLED OWNER CONTROLLED OWNER CONTROLLED OWNER CONTROLLED OWNER CONTROLLED OWNER CONTROLLED OWNER CONTROLLED OWNER CONTROLLED OWNER CONTROLLED OWNER CONTROLLED OWNER CONTROLLED