07th Change Order 01/08/2024 BOARD OF COUNTY COMMISSIONERS County of Monroe � � .� Mayor Holly Merrill Raschein,District 5 The Florida Keys Mayor Pro Tem James K.Scholl,District 3 Craig Cates,District 1 Michelle Lincoln,District 2 David Rice,District 4 Memorandum DATE: 01/02/2024 TO: BOCC Digitally signed by Kevin V_, c._._ G.Wilson,P.E. FROM: Kevin G. Wilson P.E. Date:2024.01.02 17:53:23-05'00' SUBJECT: Proposed Change Order to be Approved Attached is proposed Change Order Memo #7 for the Higgs Beach Restrooms Replacement project. This change order decreases the final contract sum by$3,586.41. The substantial completion date is unchanged. Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the Administrator to approve change orders within specified limits after providing Board of County Commissioners with at least 24 hours to review them and pose any questions or objections that they may have. It is the Administrator's intent to approve the attached change order under that authority after the 24- hour BOCC notification time. MO E CouNTY/ENGiNEERiNG/ PROJECT! MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: HI BEACH RESTRO�OMS REPLACEMENT CHANGE ORDER NO: O7 INITIATION DATE: 12�/29/2023 CONTRACT DATE: 04119/2023 TO CONTRACTOR: Barracuda Builders of Key West, Inc. 5601 3rd Avenue Key West, FIL 33040 The Contract is changed as follows,,- The original (Contract Sum)(Guaranteed Maximum Price).................. $1,265,39000 Net change by previously authorized Change Orders.... ....... ........ $ 36,331.92 The (Contract Sum(Guaranteed Maximum Price) prior to this Change order was.,... $1,301,721.,92 The (Contract Sum) (Guaranteed Maximum Price)will be (increased) (decreased) (unchanged) by this Change Order,_..___ $ (3,586.41) The new (Contract Sum)_(Guaranteed Maximum Price) including this Change Order is. $1,298,135,51 The Contract Time will be (increased) (decreased) (unchanged) by..__.......___...... 0 days The date of Substantial Completion as of the date of this Change Order is ................. 06/17/2024 Detailed description of change order and justification: Per Facilities and Parks & Beaches request, simphfied SLOAN fixtures will be installed instead of the ICON fixtures called out in the plans, Change order is -0.3% of original contract price, Not valid until signed by Owner, Archiitect (if,appli cable), and Contractor AW97141' ARCHITECT: Davkd Saiay 6 Bender &Associates Archite , A. Date CONTRACTOR: BarrAuda Builders of Key West, Inc. Date D1111,1111ugned by WeMy Aquir Wendy Aguirre D,,,70240102 1045A9 DEPARTMENT DIRECTOR: 0()' On behalf of Date Project Management Digitally signed by Kevin G.Wilson, P.E. CO;UNTY/ASS I STAN T ADMINISTRATOR: Date:2024.01.08 12:39:06-05'00' Roman Gastesi Date Kevin Wilson Change Order Attachment per Ordinance No. 024-2015 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: Original design called for I-CON auto fixtures (as used in the Jail), Facilities and Parks & Beaches Dept have requested to use simple, self-metering faucets and simple push-button flushometers. The models listed in the CO have been agreed on by Facilities and Parks Departments. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $50,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project architect approves the change order. Yes ® No ❑ If no, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: DEDUCTIVE CHANGE ORDER PROPOSAL To: Monroe County Project Management Date: December 22, 2023 Attn: Wendy Aguirre IB #: 3 Email: Aguirre-Wendy@monroecounty-fl.gov Project: Higgs Beach Restroom Phone: 305-292-4416 Credit for Plumbing Fixtures ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................ Bcurrac uda Bufldeirs of 111K y West, ][inc': is pleased to quote the credit of $3,586 41 to provide all supervision, labor, materials, tools, equipment, and cleanup for the above referenced project. As per the Informational Bulletin number 3 regarding the alternate Plumbing Fixtures; the following is a breakdown of the scope of work included in this proposal: Credit for Plumbing Fixtures Change ALL Toilet Fixtures to Sloan WETS-2460.1000 Water Closets & Flushometer Combos Change ALL Urinal Fixtures to Sloan WEUS-1010.1011 Urinal & Flushometer Combos Change ALL Faucets to American Standard Metering Faucet 1340.105 Original Toilet, Urnial and Faucet Bid Costs............................................................. $8,714.44 Revised Toilet, Urnial and Faucet Costs.................................................................. $5,146.03 TOTAL CREDIT FOR PLUMBING FIXTURES................................................ -$3,5 .41(3,586,41) Contract Time Extension: Above Scope of Work Will Not Effect Contract Time. Acce ted b Authorized SI ner) Bryan Wofsey Pi esiiufeird. sF/il I 1 II I L/1D"EI R/S OF KFY W"T,INC. Date Date Barracuda Builders of Key West, Inc. Proposal page 2 of 2 Higgs Beach Restroom Replacement-Credit for Plumbing Fixtures F , R SHAWN HUDGINS PLUMBING p CREDIT 5607 3rdAVE M KEY WEST,FL 33040 HIGGS 305 294 6276 FAX 2947399 BEACH lic#CFC057497 shawn@shawnhudginsplumbing.com FIXTURE CHANGE DATE 12/20/23 PROPOSAL SUBMITTED TO: NAME BARRACUDA BUILDERS JOB HIGGS BEACH STREET STREET CITY CITY KEY WEST STATE FL STATE PHONE CREDIT FIXTURE CHANGE FIXTURE CHANGE FROM ICON FLUSHOMETERS ,LAVATORY FAUCETS AND AMERICAN STANDARD FIXTURES TO SLOAN TOILET-FLUSHOMETER COMBOS AND AMERICAN STANDARD METERED FAUCETS. ORIGINAL FIXTURE BID$8714.44 CHANGED FIXTURES $5146.03 CREDIT $3586.41 All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders,and will become an extra charge over and above the estimate.All agreements contingent upon strikes,accident or delays beyond our control.This proposal subject to acceptance within 10 days and it is void thereafter at the option of the undersigned. Authorized Signature ACCEPTANCE OF PROPOSAL The above prices,specifications and conditions are hereby accepted.You are authorized to do the work as specified.Payment will be made as outlined above. ACCEPTED: Signature DATE Signature