1st Change Order 06/13/2024 BOARD OF COUNTY COMMISSIONERS County of Monroe � � .� Mayor Holly Merrill Raschein,District 5 The Florida Keys Mayor Pro Tem James K.Scholl,District 3 Craig Cates,District 1 Michelle Lincoln,District 2 David Rice,District 4 Memorandum DATE: 06/12/2024 TO: BOCC Digitally signed by Kevin G.Wilson,P.E. FROM: Kevin G. Wilson, P.E. ` .. Date:2024.06.12 16:38:26-04'00' SUBJECT: Proposed Change Order to be Approved Attached is proposed Change Order Memo #1 for the Seaview Drive Bridge (#904606) Replacement project. This change order increases the final contract sum by$21,534.39. The substantial completion date is increased 57 days to September 4, 2024. Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the Administrator to approve change orders within specified limits after providing Board of County Commissioners with at least 24 hours to review them and pose any questions or objections that they may have. It is the Administrator's intent to approve the attached change order under that authority after the 24- hour BOCC notification time. MONROE COUNTY/ENGINEERING/ PROJECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Seaview Drive Bridge (#904606) Replacement Project CHANGE ORDER NO: 1 INITIATION DATE: 5/23/24 CONTRACT DATE: 11/15/22 REVISED SUBSTANTIAL COMPLETION DATE AS OF THIS CHANGE ORDER#1: 9/4/24 TO CONTRACTOR: American Empire Builders, Inc. The Contract is changed as follows: The original Contract Sum ........................................................................................$5,260,000.00 Net change by previously authorized Change Orders ................................................................ $0.00 The Contract Sum prior to this Change order was...........................................................$5,260,000.00 The Contract Sum is(changed)by this Change Order........................................................$21,534.39 The Contract Sum including this Change Order.............................................................$5,281,534.39 Additional time, labor and equipment was necessary for the contractor to construct a temporary guardrail system to replace a concrete guardrail system that was specified in the contract documents. This work added 12 Contract Days and an increase of$3,933.75 to the original contract. As a result of delays of behalf of utility companies to remove and relocate their utility service lines to new poles, the contractor needed to adjust their construction sequences resulting in an increase of 31 Contract Days at no additional cost to the original contract. The contractor needed to remove large concrete pads that were constructed to support the original bridge structures and were not shown on the Contract Plans. The concrete pads were not discovered until entire lane demolition was complete and removal was necessary to complete the sheet pile and end bent installations as a part of this contract. This additional work added 14 Contract Days and an increase of$17,600.64 to the original contract amount. The total amount of this change order is$21,534.39 and adds 57 days to the original contract. This change order no. 1 revises the substantial completion date to September 4, 2024. CONTRACTOR 06/10/2024 7 Digitally signed by J�dith Clarke, Date ENGINEERING SERVICES DIREC I"'OR Judith Clarke,P.E. Date:2024.06.11 00:4359-04'00' D'g tally signed by Kevin G. Date COUNTY ADMINISTRATOR rr� DateVdls PE 7 Date zoza os zo issass-oa'oa Date Change Order Attachment per Ordinance No. 004-1999 • Change Order was included in the original contract specifications. Yes ❑ No If Yes, explanation: • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5%of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project engineer/architect approves the change order. Yes ® No ❑ • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: 5/15/24 Mr. Clark Briggs Seaview Dr Bridge Replacement Project Duck Key,Monroe County,Florida Subject: Change Order#001 A. Installation of Temporary Guardrail in lieu of Barrier Wall B. Existing Utility Pole Conflict C. End Bent#1&#2 Unforeseen Conditions Dear Mr. Briggs: WSP has received American Empire Builders, Inc(AEB) request for additional compensation due to Installation of the Temporary Guardrail in lieu of Barrier Wall, Existing Utility Pole Conflict, and End Bents 91 & 92 unforeseen conditions. A. AEB needed to use existing material from the previous bridge strengthening project to construct the Temporary Guardrail for Phase 2 of the Construction Sequence. The sequence of construction events was affected, and additional time, labor and equipment was necessary. AEB is requesting 12 Contract Days and a$3,933.75 payment. This requested Time and Cost also includes a credit from the proposed construction in the Bid documents and Contract. B. AEB needed to adjust their construction sequence due to an existing Utility Pole removal date delay. This Utility Pole conflict was initially brought up during the preconstruction meeting and removed at a later date. AEB is requesting 31 Contract Days and a $0 payment. This amount of Time and Cost was the negotiated and agreed upon amount of impact on the critical path witness by the Utility Pole conflict delay. C. AEB encountered large amounts of concrete that had been placed to support the existing bridge.This concrete impacted the contractor's ability to remove the existing foundations and drive the permanent sheet pile per plan in the phase two construction of the bridge. AEB is requesting 14 Contract Days and a $17,600.64 payment for labor and equipment to complete this task. The total amount of the work order is $21,534.39 and 57 Additional Contract Days. WSP concurs with this additional compensation for the three requests as supported by provided documentation. Should you have any questions,please contact me 305-393-2185. Sincerely, WSP James Rhyne,P.E. Project Engineer/Project Administrator cc: Pornsit Chakkaphak P.E. (Enclosure) SEAVIEW DRIVE BRIDGE REPLACEMENT Installation of Traffic Guardrail Detail Cost per 3 Days: Item lUnit lUnitCost lQty lTotal I I Extended Total 1.0 Installation of Traffic Guardrail 1.1 NO1 #1 AEB Personal to work installing the Traffic Guardrail (1) Superintendent/Foreman (base rate $32.50/hr DAY $ 415.35 3 $1,246.05 $1,246.05 +Burden 42%) (1)Welder(base rate$22/hr+Burden 42%) DAY $ 281.16 3 $843.48 $843.48 (2) Operator(base rate$21.5/hr+Burden 42%) DAY $ 549.54 3 $1,648.62 $1,648.62 (2) Carpenter(base rate$21.5/hr+Burden 42%) DAY $ 536.76 3 $1,610.28 $1,610.28 (2) Laborer(base rate$21.00/hr+Burden 42%) DAY $ 536.76 3 $1,610.28 $1,610.28 Rented Equipment Owned Equipment Operated Crane Link-Belt HTC-8670 DAY $ 2,070.24 0 $0.00 $0.00 Wheel Loader Volvo L30GS DAY $ 190.96 3 $572.88 $572.88 Owned Equipment Standby Total $7,531.59 1.2 Subcontractor Barrier, Anchored LF $73.50 -66 ($4,801 '.t.00) ($4,851'.00) ($0.,851.00) 1.3 Materials Miscellaneous (Acetylene, Welding Rods) LS $500.00 1 $500.00 $500.00 Welding Rods $500.00 1.4 Indirect Cost, Markup Markup 10.0 on Labor, Equipment and Material $7,531.59 10.0% $753.16 (item 1.1) Tota I: $753.16 Total: $3,933.75 SEAVIEW DRIVE BRIDGE REPLACEMENT Detail Cost per 4 days: Unforeseen conditions at end bents Item Unit Unit Cost I Qty Total Extended Total 1.0 Unforeseen conditions at end bents 1.1 AEB Personal (1)Superintendent/Foreman(base rate$32.50/hr DAY $ 415.35 4 $1,661.40 $1,661.40 +Burden 42%) (1)Welder(base rate$22/hr+Burden 42%) DAY $ 281.16 4 $1,124.64 $1,124.64 (3)Operator(base rate$21.5/hr+Burden 42%) DAY $ 824.31 4 $3,297.24 $3,297.24 (2)Carpenter(base rate$21.5/hr+Burden 42%) DAY $ 536.76 4 $2,147.04 $2,147.04 (1)Laborer(base rate$21.00/hr+Burden 42%) DAY $ 268.38 4 $1,073.52 $1,073.52 Rented Equipment Owned Equipment Operated Excavator Volvo ECR145 DAY $ 958.08 4 $3,832.32 $3,832.32 Wheel Loader L30GS DAY $ 190.96 4 $763.84 $763.84 Skidsteer Takeuchi TS70VR20 DAY $ 320.60 4 $1,282.40 $1,282.40 Owned Equipment Standby Crane Link-Belt HTC-8670 DAY $ 1,035.12 0 $0.00 $0.00 Vibro Hammer&Power Pack ICE 28C-350E DAY $ 486.96 0 $0.00 $0.00 Total $15,182.40 1.2 Subcontractor Disposal of materials removed LOAD $150.00 6 $900.00 $900.00 $900.00 1.3 Materials LS $0.00 0 $0.00 $0.00 $0.00 1.4 Indirect Cost,Markup Markup 10.0 on Labor,Equipment and Material(item $15,182.40 10.0% $1,518.24 1.1) Total: $1,518.24 Total: $17,600.64 Item Description Unit Qty Unit Price Total Installation of temp.traffic guardrail over 1 existing wood deck LS 1 $3,933.75 $3,933.75 4 Unforeseen Conditions - Removal of existing foundations I LS I 1 1 $17,600.64 1 $17,600.64 Total associated costs 1 $21,534.39 Equipment Description Standy Markup Extended Rate/Hour (O/P) 10% Rate/Hour Hydraulic Crane Link-Belt HTC-8670 $129.39 17.50% $142.33 Vibro Hammer & Power Pack ICE 28C-350E $60.87 17.50% $66.95 Crawler Compact Excavator jVolvo ECR58D 1 $21.551 17.50%1 $23.70 Boom Truck IGIVIC K1500+ BB160 1 $19.761 17.50%1 $21.73 Labor Quantity Unit Rate/Hour Laborer 1.00 HRS $ 21.00 $ 21.00 Laborer 1.00 HRS $ 21.50 $ 21.50 Welder 1.00 HRS $ 22.00 $ 22.00 Operator-Crane 1.00 HRS $ - Foreman - Pile Driving 1.00 HRS $ 32.50 $ 32.50 Superintendent 1.00 HRS $ - Sub Total $ 76.00 Labor Burden 42% Percent $ 76.00 $ 31.92 Total Labor for Pile Preforming $ 107.92