HomeMy WebLinkAbout36th Change Order 12/12/2024 Docusign Envelope ID:B9783D3E-24BB-4931-871A-8D49937FCA00 M.C.A.INSTR.8800.2 Enclosure(1) 3/28/2017 Page 3 MONROE COUNTY/DEPARTMENT OF AIRPORTS CONTRACT CHANGE ORDER PROJECTTITLE: KWIA Concourse A&Terminal Improvements CHANGE ORDER NO.: 036 INITIATION DATE: 8/10/2023 TO CONTRACTOR: NV2A/Gulf Keystar JV CONTRACT DATE: 8/17/2022 The Contract is changed as follows: The Original(Contract Sum)(Guaranteed Maxium Price) $ 101,461,771.00 Net change by previously authozied Change Order $ 13,041,792.67 The(Contract Sum)(Guaranteed Mxium Price)prior to this Chage order was $ 114,503,563.67 The(Contract Sum)(Guaranteed Mxium Price)will be by this Change Order $ 67,450.84 The new(Contract Sum)(Guaranteed Mxium Price) including this Change Order is $ 114,571,014.51 The Contract Time will be(uni:h ngod by days The date of Substantial Completion as of the date of this Change Order is 4/8/2025 Detailed Description of change order and justification: As per the attached PCO's 14,30,71,and 86,this change order includes the costs associated with changes in the Mechanical Enigineering items per the RFI's#156,#157,#317,#318,#321,and#367.1 as listed below for KW IA project (20-2039-01). POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# Title Schedule Impact Amount 014 Add AFSM to AHU's EA and OA Ducts,RFI#156 $ 41,993.91 030 Modifying Existing Ductbank in Conflict with New Elevator Hoistway,RFI#157 $ 9,374.48 071 Balancing Valves/Dampers,Insulations on RTU Curbs,RFI's#317,318,321 $ 14,679.87 086 Trash Room Fire&Radiation Dampers,RFI#367.1 $ 1,402.58 Total: $ 67,450.84 This change order is 0.07%of the original contract price. Not valid until signed by Owner,Architect(if applicable),and Contractor Signed by: E664r S, 11/22/2024 1 10:49:29 PST ARCHITECT: nF�F Faa�3�aaa� DATE: DocuSigned by: DocuSigned by: LQJ9QQ3A9,76Z5-4,R7 BP5@z c' V 11/18/2024 1 09:45:58 EST CONTRACTORS: J J Signed by: DATE: E8F65F59E4C2E4F)3 &A4 Sfv&LI J 12/2/2024 1 10:46:56 PST EXECUTIVE DIRECTOR OF AIRPORTS DATE: Christine Digitally signed by Christine Hurley H u rl e Date:2024.12.12 COUNTY/DEPUTY ADMINISTRATOR Y 18:09:17-05'00' DATE: ��"."'IROVE E Cf7UNTY ATTORNEY r A ^T FO DS DS .er � F" Q 0 J. ADD---....-� ASS ST UNITY ATTORNEY Date 12L52-4 Docusign Envelope ID:B9783D3E-24BB-4931-871A-8D49937FCA00 KC NV PCCO #036 NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami, Florida 33156 3941 South Roosevelt Blvd. Phone: (786)233-5060 Key West, Florida 33040 Prime Contract Change Order #036: Turnkey-Ductwork Re-route; Added AFMS, Dampers & Insulation TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West, Florida 33040 Miami, Florida 33156 DATE CREATED: 11/14/2024 CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) CONTRACT STATUS: Approved REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: 11/14/2024 INVOICED DATE: PAID DATE: SCHEDULEIMPACT: EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 20-2039-01:Key West International Airport TOTAL AMOUNT: $67,450.84 Concourse A DESCRIPTION: As per the attached PCO's 14,30,71,and 86,this change order includes the costs associated with the following scopes: • PCO#014:Add AFSM to AHU's EA and OA Ducts • PCO#030:Modifying Existing Ductbank in Conflict with New Elevator Hoistway • PCO#071: Balancing Valves/Dampers,Insulations on RTU Curbs • PCO#086:Trash Room Fire&Radiation Dampers ATTACHMENTS: NV2A PCO 071-TKI-Balancing Valves and Dampers Insulations.odf,NV2A PCO#014(TKI Add AFMS to AHUs$41 993,91).pdf,KWIA PCO 086- TKI-Trash®Room®Fire®and®Radian 2),pdf,NV2A PCO#030($9374.48 TKI-Ductwork in Existing Terminal),pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# Title Schedule Impact Amount 014 TKI-RFI#156/Item#7-Add AFMS to AHUs'EA and OA Ducts $41,993.91 030 TKI-Existing Ductwork in Conflict with New Elevator Hoistway 0 days $9,374.48 071 TKI-Balancing Valves/Dampers,Insulation on RTU Curbs $14,679.87 086 TKI-Trash Room Fire&Radiation Dampers $1,402.58 Total: $67,450.84 The original(Contract Sum) $101,461,771.00 Net change by previously authorized Change Orders $13,041,792.67 The contract sum prior to this Change Order was $114,503,563.67 The contract sum will be increased by this Change Order in the amount of $67,450.84 The new contract sum including this Change Order will be $114,571,014.51 The contract time will not be changed by this Change Order. Initial Initial DS E E S DS � k _4 NV2A/Gulf Keystar JV Page 1 of 2 Printed On: 11/14/2024 07:59 PM Docusign Envelope ID:B9783D3E-24BB-4931-871A-8D49937FCA00 GULF BUILING NV KCK 'YTuR PCCO #036 LDS DS �S Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton, New York 13901 Key West, Florida 33040 Miami, Florida 33156 Signed by: Signed by: E cuSigned by: DocuSigned by: isfbp(Ur S. 6rtt Er"� Stv'iG LMA _� ��s�� �661- ScLt,�,vV 8E65F52F4C2F4F)'4 9093827A75487._ 8F59717D29E34A5... SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE 11/22/2024 1 10:49:29 PST 12/2/2024 1 10:46:56 PST 11/18/2024 09:45:58 EST NV2A/Gulf Keystar JV Page 2 of 2 Printed On: 11/14/2024 07:59 PM Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 TM GULF BUILDING PCO #014 V =�IME.ST*R NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd, Suite 600 Program Miami, Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West, Florida 33040 Prime Contract Potential Change Order 14: T I ® RFI#1 56 / Item 7 AFIVIS to AHUs' EA and OA Ducts TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West,Florida 33040 Miami, Florida 33156 PCO NUMBER/REVISION: 014/1 CONTRACT: 20-2039-01 -Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 8/10/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: _ ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: _ PAID IN FULL. No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $41,993 91 POTENTIAL CHANGE ORDER TITLE:TKI-RFI#156/Item#7-Add AFMS to AHUs'EA and OA Ducts CHANGE REASON:A/E Design Changes POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) This Change Order includes the additional cost related to mechanical scope of work incurred by RFI#156/Item#7 for the KWIA project.(20-2039-01) All costs for services are included in this Change Order to perform the work as described herein.This Change Order does not address any other costs affected by this scope of work. Description This document addresses the cost impacts of adding AFMS to AHUs'EA and CA ducts in accordance with the RFI#156. See attached back-up for additinoal information to substantiate this request. ATTACHMENTS: IGWIA TKI COf#(74:1 RFQ 5fi RFly adE , [CFI#156 AHU's sequence_ of operations,pdf # Budget Code Description Amount 1 23-.00.10.10.S HVAC.Subcontractor Add AFMS to AHUs'EA and OA ducts-RFI#156 $38,176.28 2 99-.99.99.66.0 Procore OH&P.Other Prime Contract Markup $3,817.63 Grand Total: $41,993.91 Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton,New York 13901 Key West,Florida 33040 Miami, Florida 33156 Christopher DigUally signed by Christopher Kopec ��� ^,p G ""t'"^"'" �a Kopec Date:2024.06.13102333-04'00' °� � SIGNATURE DATE SIGNATURE 06.14.2024 DATE ATURE DATE NV2A/Gulf Keystar JV Page 1 of 1 Printed On:5/15/2024 09:19 PM Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 ��� Tum C.O.R.Date Thursday,May 9,2024 m��� rnke KEY WEST INTERNATIONAL AIRPORT Project Name CONCOURSE A&TERMINAL From concept to completion IMPROVEMENTS Turnkey International, Inc. Project Number 2-23-101 Mechanical Contractors CMC 1249679 CHANGE ORDER REQUEST # 004 Rev. 01 TO: Attn. Mansour Sodagari City Key West Company NV2A + Gulf Building State/Province FL Zip/Postal Code 33040 Address 5450 MacDonald Ave.,Suite 3 Country USA Description of Change Order Request: Ref. RFI 156 AHU's Sequence of Operations Response Per the referenced RFI, item 7, this proposal is to add AFMS to AHUs' EA and OA ducts. Please refer to the attached REVISED proposal from JCI with additions and exclusions. NOTE:Due to the continued supply chain and material escalation cost, this COR is valid for(30)days. We reserve the right to adjust cost if COR/Submittals are not approved prior to any price escalation. Items, Amount Per the attached breakdown $34,705.71 Cost $34,705.71 OH+Profit+Bond 10 % $3,470.57 Sub-Total $38,176.28 % $0.00 Sub-Total $38,176.28 % $0.00 Total $38,176.28 Accepted By: Date: Submitted by: Jorge Porro Date: May 9,2024 Company: Turnkey International,Inc. THIS PROPOSAL IS ONLY FOR THE COST OF PERFORMING THE CHANGE WORK ITSELF. THIS PROPOSAL DOES NOT INCLUDE ANY ADDITIONAL COST STEMMING FROM IMPACT,DELAY OR ACCELERATION OF OUR SUBCONTRACT WORK REQUIRED BY THIS CHANGE.OUR COMPANY RESERVES ALL RIGHTS WITH RESPECT TO SAID ADDITIONAL COSTS AND/OR TIME EXTENSIONS ARE FULLY RESERVED. 1315 NW 98th Ct Unit 15, Doral, FL 33172 P (305) 591 0261 F (305) 591 2676 Docusign Envelope ID:B9783D3E-24BB-4931-871A-8D49937FCA00 TURNEY INTERNATIONAL,INC. PROJECT: IKEY WEST INTERNATIONAL AIRPORT PAGE:1 of 1 CONSTRUCTION COST ESTIMATE IV.2) TKI DOC.No: COR 4.1 DATE:5/9/2024 DESCRIPTION: RFI 156 AFMS LINE COST ITEM QTY. MATERIAL COST COST LABOR COST OTHER DIRECT LINE TOTAL NO. CODE UNIT TOTAL cane MH'S JAVG.RATE TOTAL COSTS 1 Sheet metal- labor 2 man x 4hrs x 4 4 $25.00 $ 100.00 32 $85.00 $ 2,720.00 $ 2,820.00 AFMS 2 3 SUBTOTALS $ 100.00 32 $ 2,720.00 4 TAX 7%FOR MATERIALS $ 7.00 $ 7.00 5 6 Foreman(20%Total Labor) 7 $9S.00 $ 665.00 $ 665.00 7 800 RFI Review/Integration 8 $105.00 $ 840.00 1 1$ 840.00 8 806 JBIM Coordination/Shop Drawings 1 4 1 $85.001$ 340.00 1 1$ 340.00 9 10 SUBCONTRACTORS 11 504 Controls Subcontract-Refer to the 11 attached proposal from JCI 12 504 Anticipated escalation cost within next $ 990.47 $ 990.47 120 days for Johnson Controls Products $1,799.93+Vendor Products $18,009.40 13 14 OTHER COSTS 15 900 Additional Permit I$ 2,22S.001$ 2,225.00 16 17 TOTAL Is 34,705.71 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 Johnson Controls, Inc. �� 15901 SW 29 the Street, Johnson Suite#801 Controls Miramar, Florida 33027 u N ti u B>itir L)!!a.il Y W'V, PA L Office: 786-918-3240 KWIA Concourse A - Change Order (AFMS Add) To : Turnkey Mechanical Contractor Date : 5/8/2024 *(4)AFMS of type and Model EBTRON GOLD SERIES 42x42 *(2)New 1/0 expansion modules to accommodate extra points * 4 Installation of transmitter,Wiring,24VAC powering,Programming,Commissionin ,Engineering,Project Mana ment *(4)Extended warranty. *(1)Travel expenses and prevailing wages included. Clarifications & Exclusions 120v Power is by others. -(7)Transducer per AFMS aka probes to be installed by others inside ductwork -Programming includes modulation of OA Damper and EF VFD for each unit. Billina Material $18,680.56 Subcontractor $4,237.37 JCI Labor $3,900.31 Total $26,818.24 This proposal is valid Through. Change Order#: 10/8/2024 Turnkey Mechanical Johnson Controls Version 4.0 KWIA Conc A-Change Order (AFMS Add) Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 Project Name: Key West Airport Course A Terminal Project Number:3N920047 Johnson n ro Confidential Change Rates Breakout AFMS OA&EA ADD Johnson Controls Products Subtotal HVAC Controls Product $2,975.10 -50.0 $1,487.55 Mission Critical Air Handling Products $0.00 0.0 $0.00 Johnson Controls Product Warranty $119.00 Johnson Controls Product Tax $119.00 Johnson Controls Freight $74.38 Johnson Controls Product Total Price $1,799.93 Vendor Products Vendor Product JCI systems $0.00 Vendor Product local purchase $12,682.68 BWSI Purchase Orders $0.00 Vendor Product Warranty 8.0 $1,014.61 Vendor Product Tax 8.0 $1,014.61 Vendor Product Freight 5.0 $634.13 Vendor Product Overhead and Profit 10.0 10.0 $1,534.60 Vendor Product Total Price $16,880.63 Direct Labor Project Management Hours 12.0 $110.45 $1,325.45 Controls Engineering Hours 11.1 $87.54 $971.68 Commissioning Hours 10.5 $84.30 $885.11 Project Support Hours 2.7 $72.19 $194.91 Electrical and Mechanical Install Hours 0.0 $0.00 $0.00 Travel Expenses Total $475.00 JCI Labor Overhead and Profit 10.0 10.0 $385.22 JCI Labor Total Price $4,237.37 External Costs Subcontract Electrical Install $3,545.74 Subcontract Engineer&Commission $0.00 Subcontract Construction $0.00 Subcontract Security&Fire $0.00 Subcontract Mechanical $0.00 Other Subcontract plus BWSI $0.00 Facilities Tools and Miscellaneous $0.00 Subcontract Overhead and Profit 10.0 10.0 $354.57 Subcontract Total Price $3,900.31 Total $26,818.24 IN CONSIDERATION OF THE RECEIPT OF THIS DOCUMENT,THE RECIPIENT AGREES NOT TO REPRODUCE,COPY,USE OR TRANSMIT THIS DOCUMENT AND/OR THE INFORMATION THERIN CONTAINED,IN WHOLE OR IN PART,OR TO SUFFER SUCH ACTION BY OTHERS,FOR ANY PURPOSE,EXCEPT WITH THE CONSENT OF JOHNSON CONTROLS Location: Key West Airport Course A Terminal/AFMS OAA ADD AFMS OA EA ADD-Change Order Request Finall Page 1 of 2 Created on 5/9/2024 Docusign Envelope ID:B9783D3E-24BB-4931-871A-8D49937FCA00 LINE p ITEM QTY. MATERIAL COST LABOR COST OTHER DIRECT COST LINE TOTAL UNIT TOTAL N MAN MH's TOTAL HOURS AVG RATE TOTAL 1 AHU-1&2 additional Control devices Installation 2 $ 200.00 2 4 16 $ 141.43 $ 2,262.98 $ 2,462.88 2 Supervision 1 $ - 1 2 2 $ 141.43 $ 282.86 $ 282.86 $ - 0 $ 141.43 - $ - 0 $ 141.43 - $ - 0 $ 141.43 - 0 $ 125.00 10 Traveling Rate/hour Technician 0 $ 95.00 - 11 In livilsa,n"'i 0 $ 95.00 1$ - 1 1$ - 12 Traveling Rate/hour(Supervisor) 0 $ 125.00 - 13 Traveling Cost(350 Miles per round trip @ 1$a mile) 0 - 14 Lodging($350 per night) 2 0 $ - $ 700.00 $ 700.00 15 D 10 Bwin f:mI i4°mri 0 $ - $ - $ - 16 Per Dim 650 per day) 2 0 $ - $ 100.00 $ 100.00 17 D 1 0;volt,fm P,i Dim 0 - 18 Scissor lift rent cost(one week) 0 - 0 $ $ 0 $ $ 0 $ $ 0 $ $ 0 $ $ TOTAL $ 3,545.74 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 GULF IUILDIII NV2A/Gulf Keystar JV Project: 20-2039-01 KWIA Concourse A and NV KwST R 9100 South Dadeland Blvd,Suite 600 Terminal Improvements Program Miami, Florida 33156 3941 South Roosevelt Blvd. P: (786)233-5060 Key West, Florida 33040 RFI #156: AHU's Sequence of Operations Status Closed on 06/09/23 To Devin Shapley(McFarland Johnson, Inc.) From Alex Hyppolite(NV2A/Gulf Keystar JV) Frederick Mock(McFarland Johnson, Inc.) 9100 South Dadeland Blvd,Suite 600 Christopher Kopec(McFarland Johnson,Inc.) Miami, Florida 33156 Michael Martin(McFarland Johnson, Inc.) Date Initiated May 19,2023 Due Date May 26,2023 Location Project Stage Cost Impact Schedule Impact Spec Section Cost Code Drawing Number MS404 Reference Diagram 4/MS404(RFI 76) Linked Drawings Received From Leonel Son(Turnkey International, Inc.) Copies To Gustavo Lazaro(NV2A/Gulf Keystar JV),Jonathan Pena(NV2A/Gulf Keystar JV),Antonio Pinto(NV2A/Gulf Keystar JV), Mansour Sodagari(NV2A/Gulf Keystar JV) Activity/ Question Question from Alex Hyppolite NV2A/Gulf Keystar JV on Friday, May 19, 2023 at 11:00 AM EDT Please refer to MS404 dated Nov.30,2022, received in response to NV2A RFI 76. A.Diagram 4/MS404(RFI 76)shows the Controls Diagram for AHU-1 &AHU-2.This diagram appears to be a generic diagram and it does not match the configuration of the specified and approved Trane AHUs.Please see attached marked up diagram with some comments.Please revise the Controls Diagram to match the approved AHU submittal. B.Our Test and Balance agency(GFS Consulting Inc.)has reviewed the AHU-1/-2 sequence of operation shown on drawing MS404(RFI 76)as well as the approved submittal for the Trane AHUs.Please refer to the attached(2)letters with their comments.Please review and revise the sequence as deemed necessary. C.Please refer to the attached Sequence of Operations shown on drawing MS404(RFI 76)with some additional comments. Attachments KWIA TKI RFI017 AHUs SOO,pdf Official Response Response from Michael Martin McFarland Johnson,Inc.on Monday,Jun 5, 2023 at 04:24 PM EDT See attached for Sequence revisions. Attachments KWIA TKI RFI017 AHUs SOO.pdf All Replies Response from Michael Martin McFarland Johnson,Inc.on Monday,Jun 5, 2023 at 04:24 PM EDT See attached for Sequence revisions. Attachments KWIA TKI RFI017 AHUs SOO,pdf NV2A/Gulf Keystar JV Page 1 of 1 Printed On:Aug 10,2023 12:01 PM EDT Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 Mechanical HVAC Control Sequence Review Key West International Airport o Item #1 - The segment of the control sequence of operation referencing the return fan needs to be removed and updated to reflect the relief (exhaust fan) which is shown in the air handler submittal. Change references of the Return fan to Relief fan. o Item #2 — The supply fan is shown modulating capacity to control overall building pressurization. This needs to be reviewed by the engineer of record. It is my opinion the relationship between relief air volume and outside air volume will control the building pressurization. This will also require the use of air flow stations for the relief and outside air streams to control the volume differential. o Item #3 — The control sequence describes controlling the heat wheel speed to maintain heat wheel leaving air temperature. This needs to be reviewed by the engineer of record. It is my opinion that since Key West International airport is located in a sub-tropical climate. The heat wheel will be operating a maximum speed near 100% of the time to provide the greatest reduction of outside air load as possible. o Item #4 — The heat wheel is shown with bypass dampers to be able to utilize economizer operation. The engineer of record needs to review this function. In a sub-tropical climate economizer operation is near zero. These dampers represent a point of heat wheel bypass leakage and should be sealed 100% closed. o Item #5 — The control sequence of operation describes an outside air reheat coil. The control schematic does not show an outside air reheat coil. Also the air handler submittal does not include an outside air reheat. This should be reviewed by the engineer of record and resolved as required. I do not recommend utilizing outside air reheat since this is operating in a sub-tropical climate. o Item #6 — The sequence of operation has supply air temperature reset based on outside air temperature. The engineer of record should review this criteria. It is our opinion due to the fact this is a sub-tropical climate the system will be in dehumidification mode 100% of it's operational hours. o Item #7 — The sequence of operation has reference to CO2 monitoring to control and optimize outside air volume. The system needs to be reviewed to determine the ventilation requirements based on ASHRAE 62.2. The system also needs to be reviewed to determine how much pressurization air is required for the system. Once this criteria is determine there has to be a method to define the minimum and maximum operating points of both the relief (exhaust) fan and the outside air volume. We recommend adding air flow monitoring stations on the outside air duct and relief air duct. The outside air flow station would be an input in the control system to modulate the amount of outside air between its minimum and maximum setpoint. The relief duct air flow monitoring station would track the outside air flow to maintain the proper offset for building GFS Consulting Inc. P.305.492.2277 F.305.273.7097 contact@gfsconsulting.com Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 Mechanical HVAC Control Sequence Review Key West International Airport pressurization. Our experiences with utilizing differential pressure sensor on building envelopes has not been successful. We recommend utilizing a differential between outside and relief air volume. o Item #8 — The sequence of operation describes return air temperature controlling economizer operation. This needs to be review by the engineer of record. Since this is in a sub-tropical climate it is my opinion the economizer function should be eliminated. o Item #9 — The sequence of operation does not describe how zone temperature control is accomplished. This needs to be included in the sequence of operation. The engineer of record needs to review this item. o Item #10 —The control drawing shows electric reheat in the system supply air after the cooling coil. The control sequence describes reheat of the outside air. The control sequence has to be modified so the control diagram agrees with the described sequence of operation. General Comments • It is my opinion modifications have been made to the mechanical systems without overall coordination of the control diagrams and sequences of operation. In general the engineer of record should completely review these items so there is coordination between the final equipment selection and the controls page of the mechanical drawings. • The air distribution system utilizes nozzle diffusers. These nozzles have minimum and maximum operating velocities to obtain the required throw to maintain correct air distribution. This diffuser performance has to be taken into account to insure correct air distribution operation. This will also be an influencing factor in the minimum and maximum capacity operation of the supply fan. It is my opinion some type of supply air volume measurement will be required to maintain air handler operation within the supply air distribution nozzle limits. The engineer of record should review this item. • Consideration has to be given to component selection of outside air ductwork and associated dampers. This facility is near the ocean and significant salt corrosion is present. Not selecting corrosion proof components will result in early component failure. These requirements relate to the following. o O/A dampers —TAMCO SW1500 — corrosion proof dampers o O/A ductwork— Stainless steel o Roof mounted exhaust fans —Aluminum • We suggest chilled water control valves serving the units utilize a Belimo EPIV type valve. This valve accomplishes the function of both the control valve and the balancing valve. Presently no control valve description has been provided. GFS Consulting Inc. P.305.492.2277 F.305.273.7097 contact@gfsconsulting.com Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 TM GULF BUILDING PCO #030 KEYSTR NV2A/Gulf Keystar JV Project:20-2039-01-KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami, Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West, Florida 33040 Prime Contract Potential Change Order #030: TKI-Existing Ductwork in Conflict with New Elevator Hoistway TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West,Florida 33040 Miami,Florida 33156 PCO NUMBER/REVISION: 030/1 CONTRACT: 20-2039-01-Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY Mansour Sodagari(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 10/23/2023 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 0 days PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT $9.374.48 POTENTIAL CHANGE ORDER TITLE:TKI-Existing Ductwork in Conflict with New Elevator Hoistway CHANGE REASON:A/E Design Changes POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) TKI=existing a tvwork L Conflit�t v+a- Near Elevator Hoist a To address RFI #157, Turnkey International was directed to proceed with the changes on a T&M basis as noted in the RFI response. This change order includes the costs associated with temporary modification to the ductwork around the new elevator hoistway due to unforeseen conditions. This change order does not include any temporary AC or any other relocation of ductwork due to temporary works. ATTACHMENTS: K IA TKI CORMS .:.� Ck RFI 157 E,levalgr Ff§t&1? - 1-KWIA Con,c urn arL�rva[rc venaerro fro rar-1� - Exlslin a_I. rk In # Budget Code Description Amount 1 23-.00.10.10.S HVAC.Subcontractor Existing Ductwork in Conflict with New Elevator Hoistway $8,522.25 2 99-.99.99.66.0 Procore OH&P.Other 10%Markup _ $852.23 Grand Total: $9,374.48 Christopher Kopec(McFarland Johnson, Key West International Airport NV2AIGulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton,New York 13901 Key West,Florida 33040 Miami,Florida 33156 Digitally signed by Christopher Christopher Kopec Kopec 0400,z4.o6.,3,5:30:2° � SIGNATURE DATE SfGZNATURE 06.18.2024 DATE NATU'00 DATE NV2A/Gulf Keystar JV Page 1 of 1 Printed On:6/13/2024 11:34 AM EDT Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 11 1Jissm Y,April 3,2024 C.O.R.Date Wednesday, � �y a� W lurnkemm KEY WEST INTERNATIONAL AIRPORT Project Name CONCOURSE A&TERMINAL From concept to completion IMPROVEMENTS Project Number 2-23-101 Turnkey International, Inc. Mechanical Contractors CMC 1249679 CHA►N�E ORDER RE ES'T # 007 Rev. 02 TO: Attn. Mansour Sodagari City Key West Company NV2A+ Gulf Building State/Province FL Zip/Postal Code 33040 Address 5450 MacDonald Ave.,Suite 3 Country USA Description of Change Order Request: Ref. RFI 157 Response Per the referenced RFI,this COR is for the temporary modification to the ductwork around the new elevator hoistway due to unforeseen conditions. This proposal does not include any temporary AC or any other relocation of ductwork due to temporary works. NOTE.Due to the continued supply chain and material escalation cost, this COR is valid for(30)days. We reserve the right to adjust cost if COR/Submittals are not approved prior to any price escalation. Items Amount Per attached breakdown. � s �--� - $7,747.50 Cost $7,747.50 OH+Profit+Bond 10 % $774.75 Sub-Total $8,522.25 % $0.00 Sub-Total $8,522.25 % $0.00 Total $8,522.25 Accepted By: Date: Submitted by: Leonel Son Date: Apr 3,2024 Company: Turnkey International, Inc. THIS PROPOSAL IS ONLY FOR THE COST OF PERFORMING THE CHANGE WORK ITSELF. THIS PROPOSAL DOES NOT INCLUDE ANY ADDITIONAL COST STEMMING FROM IMPACT,DELAY OR ACCELERATION OF OUR SUBCONTRACT WORK REQUIRED BY THIS CHANGE.OUR COMPANY RESERVES ALL RIGHTS WITH RESPECT TO SAID ADDITIONAL COSTS AND/OR TIME EXTENSIONS ARE FULLY RESERVED. 1315 NW 98th Ct Unit 15, Doral,FL 33172 P (305) 591 0261 F(305) 591 2676 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 - r- n a 00 o o m o IP o Ln J o 0 0 o 00 � r a \ N N N N N T 1� N I� C7 O a ' ' E F LL Q Z J U K N Ln O w U 2 O 0 0 J m rn re N 0 O Ln U O o 0 coa N z O o m � ni vA > v� O Q m C Q F w y+ O O f0 C L IVN N �'.. N N N LA N ^ u 7 ^ Ln J w ci Q .�. O CL: lL Q � Lin o m O 00 F" 0 O O N O rl p Z H z O u a U _ O O u 00 00 O O c-I rl r-I c-I Y w Cf M m a F- ca •3 � v c a�i " v a, = = o 2 _ > E E >m a N i N > Ol N ++ lJ j (1) a Q- x v Z v C c m LL O f0 -0 � N C J Q F N J 7 0 7 Q O 0 O u cz N - 0 H Q O O N x O LU O l0 C Q ' Ln E Q f0 Z O O O v1 O LO N E 00 C U O., , +' O O 'pp Q W Z C C �+ �O w Y > L O Z O F F H J '00 Z d U O U '^ 0 N N N O O H H O Z N Ov Ol Ol 01 m m Ol 1, 00 Q Z O c-I N M N a-LOO Q1 H u M Z Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 0 0 0 0 0 0 O O O O O O O O 0 0 0 0 0 0 0 O Ln O in O O O r cv1 O I— O O O O V M l^Y1 2 N a` V1. +n +n O O c`a Ln Sri L r, n � � 00 :T 00 ICT 00 00 O L ( 0 O N 0 N N V N d It O •L Z � C � � G > O 2 O O O 4� 0 +- N > > E v E N > Q H O N O N H M M M M 'M M NNNNNN II L\n 1D fV N N N N N n n n n C) n � O O O O O O Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 47Turnkey TIME AND MATERIAL FIELD ORDER Project: Key West International Airport Date: July 24,2023 Contractor. Contract No, Location: Existing Terminal - 1st Floor Project No: 2-23-101 Description: Modification to existing ductwork feeding the terminal areas *RFI 157: Removal of existing ductwork+grills and relocation of diffusers to hold room QTYu MATERIALS USED PO's HOURS EQUIPMENT USED NAME REGULAR PREMIUM CLASSIFICATION Narjol Gonzalez 2 Demolition Samuel Garcia 2 Demolition Narjol Gonzalez 4 Sheet Metal Samuel Garcia 4 Sheet Metal We jointly certify that the above completed work is not part of the base contract and the quantities listed are correct. By signing this form, Contractor agrees to pay Turnkey International for the Labor(rates per Contract) and Materials included whithin this T&M Ticket.This is a binding agreement and not predicated on any payment between Owner and Contractor. Turnkey's Representative: Leonel Son Date: 11/7/23 e p Contractor's Re resentative: Date: Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 iVTurnkUe%y TIME AND MATERIAL FIELD ORDER Project: Key West International Airport Date: July 25,2023 Contractor: Contract No: Location: Existing Terminal -1st Floor Project No: 2-23-101 Description: Modification to existing ductwork feeding the terminal areas *RFI 157: Removal of existing ductwork+grills and relocation of diffusers to hold room QTY. MATERIALS USED PO's HOURS EQUIPMENT USED NAME REGULAR PREMIUM CLASSIFICATION Narjol Gonzalez 2 Demolition Samuel Garcia 2 Demolition Narjol Gonzalez 4 Sheet Metal Samuel Garcia 4 Sheet Metal We jointly certify that the above completed work is not part of the base contract and the quantities listed are correct. By signing this form, Contractor agrees to pay Turnkey International for the Labor(rates per Contract) and Materials included whithin this T&M Ticket.This is a binding agreement and not predicated on any payment between Owner and Contractor. Turnkey's Representative: Leonel Son Date: 11/7/23 t jW=4 w —D-Owe G t Contractor's Representative; ate _mITIT_, ,, mm Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 E]= Doral Kendall 2650 N.W. 89 Court 13405 SW 131 Street Doral, FL 33172 SUPPLY Miami, FL 33186 Tel: 305-471-4788 Air Conditioning&Refrigeration Tel: 305-506-1980 Fax: 305-471-4780 Fax: 305-506-1987 Invoice: IN000515168 Entered by: MGARCIA Date:Jul 20,2023 12:15:49PM TURNKEY INTERNATIONAL, INC. TURNKEY INTERNATIONAL,INC. 1315 NW 98TH CT#15 1315 NW 98TH CT#15 NPO NPO MIAMI,FL 33172 MIAMI,FL 33172 APCF-004311-2017/2018(CERT)-NR APCF-004311-2017/2018(CERT)-NR Contact;JORGE PORRO.DILMAR Order No. Customer No. Salesperson PO Number Terms ORD0366653 12031 1 KWIA-11709 15P Item Number Description Qty. City. Unit Price UOM Extended Price Ord. Shp. C-FCL12 12"WIDE TAB COLLAR/(20/BX) 5 5 3.03 ea 15.15 1280 DUCT,12"R6 SILVER 25'BAG 2 2 73.00 EA 146.00 C-FCL10 10"WIDE TAB COLLAR/(25/BX) 1 1 2.08 EA 2.08 1080C DUCT,10"R6 SILVER 25'BAG 1 1 55.25 EA 55.25 L48 TIE STRAP 48" 50 50 0.47 EA 23.50 PC009 BLACK CLOTH TAPE 48MMX55M(24/CS/8E 2 2 7,15 EA 14.30 589390 FASSON 1000S SPRAY ADHESIVE(12 per 1 1 7.59 EA 7.59 Received b Print Name): Subtotal 263.87 Comments: Total sales tax 18.47 Total amount 282.34 Type of Payment : ALL'SAL S AR "'INAL ON SPECIAL ORDERS-NO CANCELLATIONS RFTURNS OR RE,FUNDS Our Goal.. Your Satisfaction Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 Booking Confirmatione =MMENREEMOOMMID CONFIRMATION NUMBER 3846 835.718 PIN CODE:8795 The Laureate Key West CHECK-IN CHECK-OUT ROOMS NIGHTS Address:3444 North Roosevelt Boulevard,Key West,FL 33040,United States of America 24 26 1 / 2 Star Rating r �- JULY JULY Phone:+1 305 295 7509 Monday Wednesday GPS Coordinates:N 024°34.289,W 81°45.622 ©16:00-00:00 p 06:00-11:00 PRICE 16 1 roo $63.m $ 52 12.50%TAX $6$5 US$25 Resort fee per night $50 Price $571.68 (for 2 guests) The final price shown is the amount you'll pay to the property. Booking.com doesn't charge guests any reservation,administration,or other fees. Your card issuer may charge you a foreign transaction fee,. Payment Info The property will charge you: $521,68 At the property you'll pay $50 This property accepts the following forms of payment:American Express,Visa,Mastercard,Diners Club,Discover Additional Info Note that additional supplements(e.g.an extra bed)aren't added in this total. If you don't show up or cancel,applicable taxes may still be charged by the property. Remember to read the Important info below—it could contain important details not mentioned here, 0 l y West ���rt ok a 7tl anF ropi of 0nrest 6 i "•�,°i >�II����I W 1 1 �������Ir� Botanicalo��o 'Garden �� GD°abr sgir¢gr�roun�ri V M _ - m r Y 1DPjr `r!!I/i// r'l ro and lti„Pi Yflc � 204 ,r,i Rd �t s „61t 6LI Av Stock Island' I p7th Ave Map date@2023 C Ccg9n 1KOV King Suite with Ocean View Prepayment: You'll be charged a prepayment of the total Guest name:Narjol Gonzalez/for4 Adults,1 child(up to 12 years of age) price at anytime. Room Size:500 fta Cancellation policy: Meal plan:No meal is included in this room rate, Total cost to cancel Private Bathroom•Balcony•Ocean view•Pool view•Free tarretrles•Air conditioning•Safe•Toilet•Sofa•Bathtub or shower•Towels•Linens•Socket near the bed• Cancellation cost: Tile/Marble floor•Desk•Sitting area•TV•Slippers•Refrigerator«Telephone•Satellite channels•Coffee machine•Tea/Coffee maker•Iron•Radio•Microwave• from July 20,2023 2:09 PM[EDT]:$521.69 Heating•Flat-screen TV•Hairdryer•Kitchenware•Kitchenette•Fan•Wake-up service/Alarm clock•Dishwasher•Wake-up service•Alarm clock•Wardrobe or closet This reservation cannot be canceled free of •Stovetop•Toaster•Dining area•Upper floors accessible by elevator•Toilet paper•Sofa bed charge. OImportant Information Hotel Policies Please note dogs under 30 Ibs(13..6kg)are permitted. Guest parking e Private parking is possible on site(reservation is not possible)and charges may apply. Resort fee includes the following: a WIN is available in all areas and charges apply. -In-room coffee and bottled water -Wireless internet -Daily newspaper delivery(Monday-Friday) -Business tenter for computing and printing needs -Pool towel service -Unlimited local calls and toll-free number access Guests are required to show a phoko,ID and credit card upon check-in.Please note that all Special Requests are subject to availability and additional charges may apply. PSpecial Requests "I'm traysrling for business and I might arse a business credit card. Approximate time 0 ardvat between 1400 and 15:00" You can always view,change or cancel your booking online at:y,9W,.fag9k4,... n�u For any questions related to the property,you can contact The Laureate Key West directly at: +1 305 295 7509 Or contact us by phone-were available 24 hours a day: Support in English:1(888)850 3958 Support in Spanish:1(866)938 1297 When abroad or from United States of America:+44 20 3320 2609 Looking for info about traveling safely?The safety resource center can help you prepare for your trip and enjoy a safe,relaxing stay. soo snl'aa raasetiurue een4'en We've gathered the most important local phone numbers to help give you complete peace of mind during your stay in USA.. Soo loch I—er ennc o os§nEaelo R ID: masmw24B&421a2&amGyFC AOB B ) | 2 , In � \ o rr \ § § \ m a w $ § k k q § m k � G � U. CN U. ° ° § / q \ B § ) , q co f | ] ) ( § k G § 3 § ( B \ k LLI k \ ) / \ / % \ § � > ° U ) 0 § [ � a cn a)} 2 52 q 9 , q kK ) LLc) I t e � c 2 § 0 § ) § i k m co Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 GULF BUILDING NV2A/Gulf Keystar JV Project:20-2039-01 KWIA Concourse A and Im on KevsT R 9100 South Dadeland Blvd,Suite 600 Terminal Improvements Program Miami,Florida 33156 3941 South Roosevelt Blvd. P:(786)233-5060 Key West,Florida 33040 RFI #157: Existing Ductwork in Conflict with New Elevator Hoistway Status Closed on 06/07/23 To Christopher Kopec(McFarland Johnson,Inc.) From Alex Hyppolite(NV2A/Gulf Keystar JV) Devin Shapley(McFarland Johnson,Inc.) 9100 South Dadeland Blvd,Suite 600 Frederick Mock(McFarland Johnson,Inc.) Miami,Florida 33156 Michael Martin(McFarland Johnson,Inc.) Date Initiated May 23,2023 Due Date May 30,2023 Location Departures Terminal Project Stage Cost Impact Schedule Impact Spec Section Cost Code Drawing Number Reference Linked Drawings Received From Leonel Son(Turnkey International,Inc.) Copies To Gustavo Lazaro(NV2A/Gulf Keystar JV),Jonathan Pena(NV2A/Gulf Keystar JV),Antonio Pinto(NV2A/Gulf Keystar JV), Mansour Sodagari(NV2A/Gulf Keystar JV) Trade Activity Question Question from Alex Hyppolite NV2A/Gulf Keystar JV on Tuesday,May 23,2023 at 05:02 PM EDT Attached drawing MD111 D shows existing ductwork to be demolished in 1st Floor,Area D,which is scheduled to be completed during renovation of the departures terminal.Renovation of this area is scheduled after the new bridge and new concourse are completed. Based on coordination with CM and survey of the existing ductwork in this area,it has been determined that some of the existing air distribution is in conflict with the construction of the new elevator and new columns for the new bridge.Air distribution in conflict will need to be reconfigured so that ductwork and diffusers are relocated outside the temporary construction walls.This early work will need to be completed trefore renovation of the departure terminal. 1.Please refer to the attached Sketch No 1 showing the proposed air distribution changes required to allow the construction of elevator hoistway and new columns.The concept is to remove ductwork and grilles within the temporary construction partitions and relocate the diffusers to occupied areas of the hold room.Please review and advise if this acceptable. Attachments KWIA TKI RFI018 Exst Dctwrk in Conflict W New Elev.Hstw.pdf Official Response Response from Michael Martin McFarland Johnson,Inc.on Monday,Jun 5,2023 at 02:14 PM EDT See attached sketch,for diffuser quantity and re-location. Attachments KWIA TKI RFI 018 Exst Dctwrk in Conflict W New Elev.Hstw REV.pdf NV2A/Gulf Keystar JV Page 1 of 1 Printed On:Oct 23,2023 11:45 AM EDT Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 TM GULF BUILDING PCO #071 V C"7 KE=-YST*R NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami,Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West, Florida 33040 Prime Contract Potential Change Order 71 a TKI ® Balancing Valves/Dampers, Insulation on RTU Curbs TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West,Florida 33040 Miami,Florida 33156 PCO NUMBER/REVISION: 071 /0 CONTRACT: 20-2039-01 -Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 6/12/2024 REFERENCE. PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: " No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT., PAID IN FULL: No EXECUTED: Na SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $14,679.87 POTENTIAL CHANGE ORDER TITLE:TKI-Balancing Valves/Dampers, Insulation on RTU Curbs CHANGE REASON:A/E Design Changes POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) TKI-Balancing Valves(RFI#321), Insulation on RTU Curbs(RFI#317) Balancing Dampers(RFI#318) This change order includes the costs associated with the following items: • RFI#321:Balancing valves at AHU-1 and AHU-2 coil connections. • RFI#317: Internal 1.5"thick insulation on 7 RTU Curbs. • RFI#318:5 additional manual balancing dampers and removal of 2 supply air grilles. Cost breakdown and backup documents for each item are attached. ATTACHMENTS: KV\nA TKI COR#12 RFI 321 Balancing Valves. dfdf, _KWIA TKI COR 13 RFI 317 Roof Curbs Insulation.pdf _KWIA TKI COR 14 RFI 318 MVDs on Concours Main Ducts.pdf # Budget Code Description Amount 1 23-.00.10.10.S HVAC.Subcontractor Balancing Valves $5,328.33 2 23-.00.10.10.5 HVAC.Subcontractor Insulation on 7 RTU Curbs $4,604.42 3 23-.00.10.10.5 HVAC.Subcontractor Balancing Dampers $3,412.59 4 99-.99.99.66.0 Procore OH&P.Other Prime Contract Markup $1,334.53 Grand Total: $14,679.87 NV2A/Gulf Keystar JV Page 1 of 2 Printed On:6/12/2024 08:54 AM EDT Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 NV, " ". K KEYST N G CO #071 GULF BUILDI L"57 R Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton,New York 13901 Key West,Florida 33 40 Miami,Florida 33156 Digitally signed by Christopher Christopher Dat Kopec 04'00'024.07.1116:02:19 � r SIGNATURE DATE SIG NAT R DAT NATU DATE NV2A/Gulf Keystar JV Page 2 of 2 Printed On:6/12/2024 08:54 AM EDT Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 C.O.R.Date Friday,May 24,2024� KEY WEST INTERNATIONAL AIRPORTjwTurnke Project Name CONCOURSE A&TERMINAL From concept to completion IMPROVEMENTS Turnkey International, Inc. Project Number 2-23-101 Mechanical Contractors CMC 1249679 CHANGE ORDER REQUEST # 012 TO: Attn. Mansour Sodagari City Key West Company NV2A + Gulf Building State/Province FL Zip/Postal Code 330A0 Address 5450 MacDonald Ave.,Suite 3 Country USA Description of Change Order Request: COR is per RFI 321 response that calls to provide balancing valves at AHU-1 and AHU-2 coil connections. Exclusions: Quickship NOTE:Due to the continued supply chain and material escalation cost, this COR is valid for(30)days. We reserve the right to adjust cost if COR/Submittals are not approved prior to any price escalation. If ems Amount Please see attached breakdown $4,843.94 Cost $4,843.94 OH+Profit+Bond 10 % $484.39 Sub-Total $5,328.33 % $0.00 Sub-Total $5,328.33 % $0.00 Total $5,328.33 Accepted By: Date: Submitted by: Date: May 24,2024 Company: Turnkey International,Inc. THIS PROPOSAL IS ONLY FOR THE COST OF PERFORMING THE CHANGE WORK ITSELF. THIS PROPOSAL DOES NOT INCLUDE ANY ADDITIONAL COST STEMMING FROM IMPACT,DELAY OR ACCELERATION OF OUR SUBCONTRACT WORK REQUIRED BY THIS CHANGE.OUR COMPANY RESERVES ALL RIGHTS WITH RESPECT TO SAID ADDITIONAL COSTS AND/OR TIME EXTENSIONS ARE FULLY RESERVED. 1315 NW 98th Ct Unit 15, Doral, FL 33172 P (305) 591 0261 F (305)591 2676 Docusign Envelope ID:B9783D3E-24BB-4931-871A-8D49937FCA00 TURNEY INTERNATIONAL,INC. PROJECT: Key West International Airport PAGE:1 of 1 CONSTRUCTION COST ESTIMATE(V.2) TKI DOC.No: COR#12 DATE:5/24/2024 DESCRIPTION: RFI 321-Balancing Valves for AHU MATERIAL COST LABOR COST LINE COST ITEM CITY COST OTHER DIRECT LINE TOTAL NO. Cooe UNIT TOTAL CODE MH'S AVG.RATE TOTAL COSTS 1 Furnish and install(2)Balancing Valves 2 $769.00 $1S38.00 11 $85.00 $935.00 $2473.00 (see attachment#1) 2 Furnish and install(4)additional 4" 4 $241.38 202 14 $85.00 $1190 $1431.38 weld neck flanges required for balancing valve installation(see attachment#2) 3 4 5 SUBTOTALS $1779.38 25 $2125 6 TAX 7%FOR MATERIALS $124.56 $4250.00 $124.56 7 8 Foreman(20%Total Labor) 5 $95.00 $475.001 1 $475.00 9 806 Shop Drawings 4 1 $85.001 $340.001 1 $340.00 10 11 12 TOTAL $4843.94 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 G U L F 8 U I L U 1 N G NV2A/Gulf Keystar JV Project: 20-2039-01 KWIA Concourse A and NV KE-Y T" R 9100 South Dadeland Blvd,Suite 600 Terminal Improvements Program Miami, Florida 33156 3941 South Roosevelt Blvd. P: (786)233-5060 Key West, Florida 33040 RFI #321 : Balancing Valves Required at AHU's Status Open To Christopher Kopec(McFarland Johnson,Inc.) From Ryan Donnelly(NV2A/Gulf Keystar JV) Dan Torres(McFarland Johnson,Inc.) 9100 South Dadeland Blvd,Suite 600 Michael Martin(McFarland Johnson, Inc.) Miami, Florida 33156 Date Initiated May 15,2024 Due Date May 22,2024 Location Project Stage Cost Impact Schedule Impact Spec Section Cost Code Drawing Number Reference Linked Drawings Received From Emmanuel Flores(Turnkey International, Inc.) Copies To Tim Bergeron(NV2A/Gulf Keystar JV), Kellen Donnelly(NV2A/Gulf Keystar JV), Ryan Donnelly (NV2A/Gulf Keystar JV),Gregg Gaston(NV2A/Gulf Keystar JV),Alex Hyppolite(NV2A/Gulf Keystar JV) ,Gustavo Lazaro(NV2A/Gulf Keystar JV),Jose McSherry(NV2A/Gulf Keystar JV),Antonio Pinto (NV2A/Gulf Keystar JV),Jasmine Sander (NV2A/Gulf Keystar JV),Claudio Santos(NV2A/Gulf Keystar JV),Mansour Sodagari(NV2A/Gulf Keystar JV),Gabriel Valladares(NV2A/Gulf Keystar JV) Trade Mechanical Activity Question Question from Ryan Donnelly NV2A/Gulf Keystar JV on Wednesday, May 15, 2024 at 02:25 PM EDT Coil piping detail#3 on mechanical drawing MS402 does not show any balancing valves.These balancing valves are anticipated to be required at AHU-1 and AHU-2 to properly balance the flow. Please review and confirm if balancing valves are required at AHU coil connections. Attachments KWIA RFI 321 Attachment,pdf ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Official Response Response from Michael Martin McFarland Johnson,Inc.on Tuesday, May 21, 2024 at 04:34 PM EDT Provide balance valves at the AHU coils. NV2A/Gulf Keystar JV Page 1 of 1 Printed On: May 22,2024 08:47 AM EDT F .......... 5L Mead lunt ILI, ATKINS NOTE INSTALLATION NOTES 2 ui LD Cc:3 0 LLI 0-> Cc 0 < 0 N LL N.HF'INT1111.1-1—11 �N._1.-lUlll—11L &—IF-----AL < Z < 5 Z o Ir LLI z o o < 0 U)LLI w n LLI co 0 OE z 0 UJ 0 z 14 c)0 —11N.TTLI DETAILS 32 "1 Attll'E,1(;,11111,��vi MS402 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 ................................................................................................. Emmanuel Flores From: Steve Hutkowski <steve@diversifiedfluidcontrols.com> Sent: Thursday, May 23, 2024 7:SS PM To: Emmanuel Flores Cc: Jorge Porro Subject: RE: IMI Balancing Valves 2)AF0400,4"flanged manual balancing valves, ...$ 769.00 ea Delivered to your shop Will need flow required to provide correct valve 2-4 weeks thanks Thank you, Steve i Sr. Sales Representative --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- T: 954-492-1166 M:954-629-8539 steve@diversifiedfluidcontrols.com I www.diversifiedfluidcontrols.com 5401 NW 10th Terrace, Fort Lauderdale, FL.33309 II N,81Y STOCi! Variable Frequency Drives Full I"M r1 o 1 (IndicW0r) l46013160 k W Phase Lass & Motor Gverload! Protection t , From: Emmanuel Flores<emmanuel@turnkeymechanical.com> Sent:Thursday, May 23, 2024 11:31 AM To: Steve Hutkowski<steve@diversifiedfluidcontrols.com> Cc:Jorge Porro<Jorge@turnkeymechanical.com> Subject: IMI Balancing Valves 1 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 t: l��11O11�:This message is from an external sender. Steve, Can you please provide quote for(2)AF0400 balancing valves. Thanks, Project Manager emmanuelCCturnkeymechanical.com 305.305.8975 (Mobile) VTurnkey Office 1 1315 NW 98th Court,Suite 15 1 Doral, FL 33172 1 305.591.0261 (Office) 1 305.591.2676 (Fax) Warehouse 1 1345 NW 98th Court,Unit 10 1 Doral,FL 33172 fur c is l.co 2 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 LEHMAN PIPE & SUPPLY, INC 1111111111111111111111111111111111 Jill Quotation 3575 NW 36 STREET MIAMI FL 33142 _ -r_ -__ ,r ,r. ,r ,r 305 576-3054 Fax 305 576-3066 -:° °T: :`° r `_=_`_::"_=_<__ °r ` "_=_`_=_: 05/23/24 Q-S2002184 REMIT TO: AN PIPE � SUPPLY, INC W ..................... LEHM ..d�ll'•p�.���!':&�d .......�� i•��. p.....,�...�. .'I����...............� 3575 NW 35 STREET Im n MIAMI FL 33112 1 of 1 305 576-3054 Fax 305 576-3066 QUOTE TO: SHIP TO: TURNKEY INTERNATIONAL, INC TURNKEY INTERNATIONAL, INC 1315 NW 98th COURT 1315 NW 98th COURT UNIT 15 UNIT 15 MIAMI, FL 33172 MIAMI, FL 33172 ..... .. TOht..:::.:.... ::.:.ht r.. :.....� T9:WE&:NVM6:�R: :::::::::::::::CVS....ER.4&W.�R.N.� .6E.R:::............ .....................Nk......&EQ. .................. ...................S?L:� 6E:RS4N: 8927 KWIA COLLIN ALTMAN `... Fr ........ `... a�RiFER: ..RIP...I... .............. .... .................ARM ......... ......... ........RIP..RATE: ..... .....&E.iGt...AkL...EW...:: JORGE MO RAN JLM 20 10th Net Due 05/23/24 No r ,.r ..r..,.r -OUR--TRUCK,.r . ,.r�...rT,.rTtr ... tr ,.r ,.r ,.r ,.r ,.r ,.r ,.r ..r ,.r.....--------. .`. .`..•. .r ....................................... 4RRE&:.QF...:.:.:.:.::.:.:.:.:.:.:.:6E:RF N......... ......... ......... ................OE.SG&3..F39.R ......... ......... ......... ......... ........N.�F........ ..... ........... . ........... ...................... ........................ ......................................................................................... ........................................................... ......................................................................................................................................................................... ........................... ------------ -------------- ----------------------------------------------------- ------------------- --------------- 4ea 1250 4 RF WELD NECK FLG 150# 44 . 005/ea 176 . 02 GREEN (8/PKY) DOMESTIC 4ea 377585 4" 1504 FLANGE BOLT PACK FOR STEEL 16 . 340/ea 65 . 36 FLANGES WITH 1/8 FULL FACE RED RUBBER GASKET (FLANGE TO FLANGE) BUPSO400FRRG13Z ----------------- ------------------- ----------------------------------------------------------------------- ----------- - - - - --- --------------------- Subtotal 241.38 *Prices based on quantities quoted* Sales Tax 0 . 00 *Stock subject to prior sale* Freight 0 . 00 *Price subject to change without notice* Handlin-g 0 . 00 -*Local sales tax not included* ------------------- -- --------------------- ORIGINAL REMIT TO: 3575 NW 36th Street[ Total Due 241.38 WWW.L E HMAN P I P E.COM MIAMI, FL 33142 U.S.A. ------------------------- --------------------- Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 LEHMAN PIPE & SUPPLY, INC 1111111111111111111111111111111111 Jill Quotation 3575 NW 36 STREET MIAMI FL 33142 _ ,r_ ,__ ,r ,r. ,r ,r 305 576-3054 Fax 305 576-3066 Q qT: :_P 7 ______::________ 07F_......:R_________: 05/23/24 Q—S20.... . REMIT TO: :.:.:: Ali :No<:::::: ..................... LEHMAN PIPE & SUPPLY, INC 3575 NW 36 STREET MIAMI FL 33142 2 o f 1 305 576-3054 Fax 305 576-3066 QUOTE TO: SHIP TO: TURNKEY INTERNATIONAL, INC TURNKEY INTERNATIONAL, INC 1315 NW 98th COURT 1315 NW 98th COURT UNIT 15 UNIT 15 MIAMI, FL 33172 MIAMI, FL 33172 ..... .. TOht..:::.:.... ::.:.ht r.. :.....� T9:WE&:NVM6:�R: :::::::::::::::CVS....ER.4&W.�R.N.� .6E.R:::............ .....................Nk......&EQ. .................. ...................S?L:� 6E:RS4N: 8927 KWIA COLLIN ALTMAN `... Fr ........ `... a�RiFER: ..RIP...I... .............. .... .................ARM ......... ......... ........RIP..RATE: ..... .....&E.iGt...AkL...EW...:: JORGE MORAN JLM OUR TRUCK 20 10th Net Due 05/23/24 No r ,.r ..r..,.r ,.rT,.rTtr .. ..r .`..•. .r ....................................... 4RRE&:QFY: :: 6E:RF N......... ......... ......... ................OE.SG&3..F39.R ......... ......... ......... ......... ........N.�F........ ..... ...........E.kF ........... ...................... ........................ ......................................................................................... ........................................................... ......................................................................................................................................................................... ........................... All returns are subject to a restocking charge of 30%. Nonstock or special-order items are non-refundable. However, if Seller is able to return nonstock or special-order items to the manufacturer, then a credit shall be given to Customer in the same amount given by the manufacturer to Seller less a 30% processing fee to Seller and less all charges incurred by Customer under the Agreement or as a result of the return, including but not limited to, service charges and freight costs. Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 C.O.R.Date Tuesday,May 28,2024 KEY WEST INTERNATIONAL AIRPORT wTurnke Project Name CONCOURSE A&TERMINAL From concept to completion IMPROVEMENTS Turnkey International, Inc. Project Number 2-23-101 Mechanical Contractors CMC 1249679 CHANGE ORDER REQUEST # 013 TO: Attn. Mansour Sodagari City Key West Company NV2A + Gulf Building State/Province FL Zip/Postal Code 330A0 Address 5450 MacDonald Ave.,Suite 3 Country USA Description of Change Order Request: This COR is to include internal 1.5" thick insulation on (7) RTU Curbs per RFI 317. NOTE:Due to the continued supply chain and material escalation cost, this COR is valid for(30)days. We reserve the right to adjust cost if COR/Submittals are not approved prior to any price escalation. If ems Amount Per attached Trane's email (05/25/2024) $3,912.00 Tax $273.84 Cost $A,185.84 OH+Profit+Bond 10 % $A 18.58 Sub-Total $4,604.42 % $0.00 Sub-Total $4,604.42 % $0.00 Total $4,604.42 Accepted By: Date: Submitted by: Jorge Porro Date: May 28,2024 Company: Turnkey International,Inc. THIS PROPOSAL IS ONLY FOR THE COST OF PERFORMING THE CHANGE WORK ITSELF. THIS PROPOSAL DOES NOT INCLUDE ANY ADDITIONAL COST STEMMING FROM IMPACT,DELAY OR ACCELERATION OF OUR SUBCONTRACT WORK REQUIRED BY THIS CHANGE.OUR COMPANY RESERVES ALL RIGHTS WITH RESPECT TO SAID ADDITIONAL COSTS AND/OR TIME EXTENSIONS ARE FULLY RESERVED. 1315 NW 98th Ct Unit 15, Doral, FL 33172 P (305) 591 0261 F (305)591 2676 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 Jorge Porro From: Ponce, Odette <OPonce@trane.com> Sent: Saturday, May 25, 2024 8:41 AM To: Jorge Porro Cc: Emmanuel Flores; Frankcys Salas Subject: RE: KWIA RFI #317: Roof Curbs Insulation Hello Jorge,the ADD for 1 1/2" Insulation is$3,912. For all 7 curbs. Please let me know if you have any questions, Thanks 01c'iette II:°:me ice 4cccHW.nt V ana er I ua:ile Ccin,mi rbeal Sys :uis South Il:l]oricll2 r,8.. l eu .Homte VVay VNsmmar, 3,3025 are Ail: pponce trane.com V'Vebs� e ................................................................................ Connect with us on: I1,-a we r onskJer ffie ew,Aronment @aefm',:,u 2rant�ng tlw¢, m u'qN From:Jorge Porro<Jorge@turnkeymechanical.com> Sent: Friday, May 24, 2024 4:37 PM To: Ponce, Odette <OPonce@trane.com> Cc: Emmanuel Flores<emmanuel@turnkeymechanical.com>; Frankcys Salas<frankcys@turnkeymechanical.com> Subject: FW: KWIA RFI #317: Roof Curbs Insulation Odette, Please respond to this email with the ADD to include insulation on the (7) RTU's curbs so we can issue our COR. thanks Principal k. .:.na.ec,l,].gr].,%cc.l.....cor ... 1305.772.7536 (Mobile) iWTurnkey 1 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 Turnkey International Inc. Office 1 1315 NW 98th Court,Suite 15 1 Doral, FL 33172 1 305.591.2676 (Fax) Warehouse 1 1345 NW 98th Court,Unit 10 1 Doral,FL 33172 W. &W lujlriiake.y. ..!� Collin ........................................ . ........................................................... From:Jasmine Sander(NV2A/Gulf Keystar JV) <NV2AGulf Stream JV notifications@ us02.procoretec com> Sent:Tuesday, May 21, 2024 10:30 AM To:Jorge Porro<Jorge@turnkeymechanical.com> Subject: KWIA RFI #317: Roof Curbs Insulation NE K G.V S T AR E111 "" """ Viraw online jobView IP iDIF From: Jasmine Sander(NV2A/Gulf Keystar JV) Date: Tuesday, May 21,2024 at 10:29 am EDT Sent To: Sergio Sandoval(Lotspelch Company, Inc.) Jessica Trammell (image Resource Group, Inc.) Daniella Arce(Professional Plastering Designs Inc.) Frank Tomsey(David Allen Company,Inc.) Angle Garcia(Fire Stop Systems,Ill Michael Harnish (Florida Keys Electric Inc.) Robert DelPrete(David Allen Company, Inc.) Frankcys Salas(Turnkey International, Inc.) Roman Orofino(Charley Toppino&Sons, Inc.) Bill Hemberger(Gary's Plumbing and Fire) Shawn Las her(Florida Keys Electric Inc.) Erika Price Ron Gage(Charley Toppino&Sons,Inc.) Michael La Bounty(Bella Construction of Key West, Inc.) Jordan Collins(Florida Keys Electric Inc.) Dustin Cr ley(G and S Mechanical USA, Inc.) Daniela Cuadrado(Gary's Plumbing and Fire) Leigh Young(David Allen Company, Inc.) Erica King(David Allen Company, Inc.) Tanner Fogle(Cladding Systems, Inc.) Muriel Aguilar(Gary's Plumbing and Fire) Edward Ledesma (Crawford-Tracey Corp) Carl!Bernard (Charley Toppino&Sons, Inc.) Loreta Alvarez® raga(Charley Toppino&Sons, Inc.) Faith Vazquez(Florida Keys Electric Inc.) Jim Spears(Florida Keys Electric Inc.) Samuel Rodriguez (TK Elevator Corporation) Jackson Smith (David Allen Company, Inc.) Cristian Gonzalez(Turnkey International, Inc.) Paul Harvey(Gary's Plumbing and Fire) Gilbert Gonzalez(Steel Fabricators, LUC) 2 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 Alan Clark(Turnkey International,Inc.) Doug Holmes(Florida eys Electric Inc.) Christopher Vazquez(Florida eys Electric Inc.) Emmanuel ores(Turnkey International, Inc.) Jonathan Garcia(Fire Stop Systems, ) Aaron Gentiluccl(Bridge rot ers, Inc.) Carla McCage(TK Airport Solutions, Inc.) Joe Baumb(Crawford-Tracey Corp) Rey Martinez(Charley Toppino&Sons, Inc.) Vi in Koshy(Steel Fabricators, ) Edward a of (David Allen Company, Inc.) Aaron Elston(Lotspelch Company, Inc.) David Pickers(Record A, Inc.) Douglas Clark(Turnkey International, Inc.) Tom Hilgner(Decktight RoofingServices, Inc.) Robert u re (David Allen Company,Inc.) Ron Pearson (Pegasus Painting& a er roofing, ) Eddie Braswell(Bella Construction of Key West,Inc.) Andres Delgado(Steel Fabricators, ) Jorge Porro(Turnkey International, Inc.) Eduardo Dominguez(Steel Fabricators, ) Richard reen(Decktight RoofingServices, Inc.) Troy Chung(Decktight RoofingServices, Inc.) iliv Rosen(Crawford-Tracey Corp) Heather Sexton ( ar ale Specialties Direct, Inc.) Tim Marshall( a °s Plumbing and Fire) CC. Gabriel Vaa arcs(NV2A/Gulf Keystar V) Kellen Donnelly(NV2A/Gulf Keystar V) anso r Socagarl(NV2A/Gulf Keystar V) Claudio Santos(NV2A/Gulf Keystar V) Greggas on (NV2A/Gulf Keystar V) Jose McSherry(NV2A/Gulf Keystar V) Alex Hyppolite(NV2A/Gulf KeystarJV) Antonio Pinto(NV2A/Gulf Keystar V) Tim Bergeron(NV2A/Gulf KeystarJV) Ryan Donnelly(NV2A/Gulf Keystar V) Gustavo Lazaro(NV2A/Gulf Keystar V) Jasmine Sander(NV2A/Gulf Keystar V) Attachments: None The official resa j.)oina:e for (RIf::1 #w: 17: Roof CUrll.) IlnSLfllatir in) is availlaII.fle for y()Lfir' u~ua,e iin l::)irocr:it This RIf::] has Il)eein closed and added into the I1.)irojectls IIatest co instruction n diravvings.AIIII <:ire to review all IRII::'s and a auull)irnittals and inforim OMAIR of any I1.)ossill.fle chainges to their aacorj.)e of work. <:ire to inotify OMAIR of these chainfses in accordaince with ai ticle w.1.4 f iroirn the cointr<ctv RFI 3 7 was due on Friday, May 10, 2024. QUESTION 1 Asked y: Ryan Donnelly(NV2A/Gulf Keystar V) Date: Fri May 3,2024 a m4 am EDT 3 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 Question: The mechanical specifications and mec icadrawings do of make reference whether the mechanical roof curbs should e provided withinsulation or not. Please note we currently ave the following: m Trane Roof Top Units curbs ( s)currently o of have internal insulation. 2m Greenheck RoofVentilators ( Vs) do not have an option for internal insulation. 3m Greenheck generalExhaust Fans ( s)were submitted roved with internal insulation. m Ca tive ire Make Up Air Unit curbs ( s) have internal insulation. 5m Ca tive ire Kitchen Exhaust Fans curbs ( s) do of have internal insulation, fact e does not recommend internal insulation. Please confirm that we do not need internal insulation curbs for RTUs, RVs,and KEFs. Attachments: None Official Answered y: Michael Martin (McFarland Jo nson, Inc.) Gate: T e May 2 ,2 24 at 10:20 am EDT Response: m Provide T °s with insulated curbs. 2m Provide insulation between the duct and the RV curbs as noted in section 233700.2.07.D. 3m No comment 4m No comment 5m internal insulation is not required fort e Attachments: None All Replies Answered y: Michael Martin (McFarland Jo nson, Inc.) Date: T e May 2 ,2 24 at 10:20 am EDT Response: 1. Provide T °s with insulated curbs. 2m Provide insulation between the duct and the RV curbs as noted in section 233700.2.07.D. 3m No comment 4 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 4. No comment 5m internal insulation is not required fort KEF. Attachments: one ADDITIONAL DETAILS Project: KWIA Concourse A and Terminal Improvements Program Subject: Roof Curbs Insulation Date Initiated: 05/03/24 Created By: Ryan Donnelly(NV2A/Gulf Keys tar JV) Assigned To: Kopec,Christopher(McFarland Johnson, Inc.) Torres, an (McFarland Johnson, Inc.) Martin, Michael(McFarland Johnson, Inc.) Responsible Contractor: Turnkey International, Inc. Received From: Frankcys Salas(Turnkey International, Inc.) Distribution List: Bergeron,Tim(NV2A/Gulf Keystar JV) Donnelly,Kellen (NV2A/Gulf Keystar JV) Donnelly, Ryan (NV2A/Gulf KeystarJV) Gaston, Gregg(NV2A/Gulf Keystar JV) Hyppolite,Alex(NV2A/Gulf Keystar JV) Lazard,Gustavo(NV2A/Gulf KeystarJV) McSherry,Jose(NV2A/Gulf Keystar JV) Pinto,Antonio(NV2A/Gulf Keys tar JV) Santos,Claudio(NV2A/Gulf Keystar JV) Sodagarl,Mansour(NV2A/Gulf Keys tar JV) i Ei ii ii Tmi"i 81 1 iii ('i�i 2i ii ii 1"Iii i 1'�'i i M,,"Im pi-milli 9 i"i"iiii, i i i i 1"i i 0000000 i � 0000000 5 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 C.O.R.Date Tuesday,May 28,2024 KEY WEST INTERNATIONAL AIRPORT wTurnke Project Name CONCOURSE A&TERMINAL From concept to completion IMPROVEMENTS Turnkey International, Inc. Project Number 2-23-101 Mechanical Contractors CMC 1249679 CHANGE ORDER REQUEST # 014 TO: Attn. Mansour Sodagari City Key West Company NV2A + Gulf Building State/Province FL Zip/Postal Code 330A0 Address 5450 MacDonald Ave.,Suite 3 Country USA Description of Change Order Request: COR is per RFI 318 response that calls for(5) additional manual balancing dampers and removal of(2) supply air grilles. Exclusions: Quickship NOTE:Due to the continued supply chain and material escalation cost, this COR is valid for(30)days. We reserve the right to adjust cost if COR/Submittals are not approved prior to any price escalation. If ems Amount Please refer to attached breakdown $3,102.35 Cost $3,102.35 OH+Profit+Bond 10 % $310.24 Sub-Total $3,412.59 % $0.00 Sub-Total $3,412.59 % $0.00 Total $3,412.59 Accepted By: Date: Submitted by: Jorge Porro Date: May 28,2024 Company: Turnkey International,Inc. THIS PROPOSAL IS ONLY FOR THE COST OF PERFORMING THE CHANGE WORK ITSELF. THIS PROPOSAL DOES NOT INCLUDE ANY ADDITIONAL COST STEMMING FROM IMPACT,DELAY OR ACCELERATION OF OUR SUBCONTRACT WORK REQUIRED BY THIS CHANGE.OUR COMPANY RESERVES ALL RIGHTS WITH RESPECT TO SAID ADDITIONAL COSTS AND/OR TIME EXTENSIONS ARE FULLY RESERVED. 1315 NW 98th Ct Unit 15, Doral, FL 33172 P (305) 591 0261 F (305)591 2676 Docusign Envelope ID:B9783D3E-24BB-4931-871A-8D49937FCA00 TURNEY INTERNATIONAL,INC. PROJECT: Key West International Airport PAGE:1 of 1 CONSTRUCTION COST ESTIMATE(V.2) TKI DOC.No: COR#14 DATE:S/28/2024 DESCRIPTION: RFI 318-MVD's on Concourse Main Ducts MATERIAL COST LABOR COST LINE COST ITEM CITY COST OTHER DIRECT LINE TOTAL NO. Cooe UNIT TOTAL Cooe MH'S AVG.RATE TOTAL COSTS 1 300 Furnish and install(5)Manual Volume 5 $1395.00 304 20 $75.00 $1500.D0 $289S.00 Dampers(see attachment#1) 2 300 Deduct for(2)S/A diffusers(see 2 $ (790.00) 304 -4 $75.00 $ (300.00) $ (1,090.00) attachment#1) 3 308 Furnish(5)Access doors for accessing 5 $100.00 $500.00 $500.00 MVD's in the soffit(installation by others). 4 5 SUBTOTALS 1 $1105.00 16 1 $1200 6 TAX 7%FOR MATERIALS 1 $77.35 1 $2400.001 1 $77.35 7 8 Foreman(20%Total Labor) 1 4 $95.00 $380.001 1 $380.00 9 806 Shop Drawings 1 4 $85.001 $340.001 1 $340.00 10 11 12 1 ITOTAL $3102.35 Docusi n Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 L t a II rill I'u ll'i STR'PJ 'VVER�VER QUOTE CUSTOMER: TURNKEY MECHANICAL DATE: MAY 28, 2024 ATTENTION: JORGE PORRO PAGES: 1 FAX: SALES ENGINEER: CARLOS SABATER EMAIL: SUBMITTED BY: CARLOS SABATER PROJECT: KWIA CONCOURSE A & TERMINAL IMPROVEMENTS RFI-318 QTY DESCRIPTION TOT.DELETE I TOT.ADD MVD'S ON CONCOURSE MAIN DUCTS DELETED 2 GRILLES D-A -$790.00 ADDED 5 VOLUME DAMPERS $1,395.00 THANK YOU FOR YOUR BUSINESS! SUB-TOTAL -$790.00 $1,395.00 TOTAL $605.00 Exceptions:Any items not specifically expressed in this bid/quotation. "Unless otherwise indicated this quotation is a based on a customer take off.Purchaser has reviewed all pages for accuracy for the materials to be ordered,especially models,accessories,sizes,quantities,widths,heights and voltages. Louvers as quoted do not meet Miami-Dade County product approval unless otherwise stated. Prices,specifications and conditions are accepted by Purchaser. The Undersigned Purchaser,as the authorized agent for the above customer has read the"Terms and Conditions"located at www.stanweaver.com and hereby agrees to purchase and pay for the above described items. Purchaser has reviewed all pages contained and materials to be ordered,especially sizes,quantities, widths,heights and voltages,including those of louvers and heaters and all other products. The above prices,specifications and conditions are accepted by Purchaser. Payment must be made according to terms. This Quote most be signed and returned with deposit if applicable prior to Stan Weaver and Company ordering product on your company's behalf. Prices are subject to all applicable taxes. DATE PRINTED NAME/TITLE Miami)4D P'allm Beach, 2601 SW 32 Avenue 1511 Prosperity Farms Road,#300 Pembroke Park,FL 33023 take bark, FL 33403 WUVW.STAire1'UU AV i .COI Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 GULF 8 U I L U 1 N G NV2A/Gulf Keystar JV Project: 20-2039-01 KWIA Concourse A and NV KE-Y T" R 9100 South Dadeland Blvd,Suite 600 Terminal Improvements Program Miami, Florida 33156 3941 South Roosevelt Blvd. P: (786)233-5060 Key West, Florida 33040 RFI #318: MVDs on Concourse Main Ducts Status Open To Christopher Kopec(McFarland Johnson,Inc.) From Ryan Donnelly(NV2A/Gulf Keystar JV) Dan Torres(McFarland Johnson,Inc.) 9100 South Dadeland Blvd,Suite 600 Michael Martin(McFarland Johnson, Inc.) Miami, Florida 33156 Date Initiated May 3,2024 Due Date May 10,2024 Location Project Stage Cost Impact Schedule Impact Spec Section Cost Code Drawing Number Reference Linked Drawings Received From Frankcys Salas(Turnkey International, Inc.) Copies To Tim Bergeron(NV2A/Gulf Keystar JV), Kellen Donnelly(NV2A/Gulf Keystar JV), Ryan Donnelly (NV2A/Gulf Keystar JV),Gregg Gaston(NV2A/Gulf Keystar JV),Alex Hyppolite(NV2A/Gulf Keystar JV) ,Gustavo Lazaro(NV2A/Gulf Keystar JV),Jose McSherry(NV2A/Gulf Keystar JV),Antonio Pinto (NV2A/Gulf Keystar JV),Claudio Santos(NV2A/Gulf Keystar JV),Mansour Sodagari(NV2A/Gulf Keystar JV) Trade Mechanical NV2A/Gulf Keystar JV Page 1 of 2 Printed On: May 22,2024 08:44 AM EDT Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 RFI#318-MVDs on Concourse Main Ducts Project: 20-2039-01 KWIA Concourse A and Terminal Improvements Program Activity Question Question from Ryan Donnelly NV2A/Gulf Keystar JV on Friday, May 3, 2024 at 11:38 AM EDT Item#1.Refer to the attached marked-up drawings M121A,M122B&M123C.These drawings show the supply air ducts fed by AHU-1 &AHU-2.Please note that there are(4)MVD's located in the main supply air ducts. Question#1: Please review and advise if these balancing dampers are required. Usually, in a long duct run such as what we have in the Concourse,the balancing will be on the diffusers to make sure that the air will reach the end of the duct run. Item#2.Marked-up Drawing M121A shows a R/A branch serving only one grille.This grille is very close to the duct riser,and noise could potentially be an issue. Question#2: Design Team may want to consider adding a MVD on this branch as shown on Marked up Drawing M121A.This may help to control noise as the air to the R/A grille will be controlled by this damper and not the damper on the grille.Please review and advise. Item#3.Mechanical floor plan M121A shows an S/A diffuser on grid line 1.This diffuser is close to the S/A riser. Question#3: Please review and confirm the location of this S/A diffuser.Diffuser noise could potentially be an issue by being close to the riser. Item#4.Marked up Drawing M122B shows a S/A diffuser on the supply air riser,close to the discharge of AHU-2.Also please refer to the attached marked-up shop drawing SM2.4.The shop drawing shows the actual diffuser location within the riser. Diffuser noise could potentially be an issue since the diffuser is on the riser. Question#4: Please review and confirm the location of this S/A diffuser. Item#5.Please refer to attached marked-up shop drawing SM2.4. AHU-2 S/A and R/A risers within the soffit branch out into east and west branches. Question#5: Design Team may want to consider adding MVD's at these branches as shown on marked up drawing.Please review and advise. Attachments KWIA RFI 318 Attachment.pdf Awaiting an Official Response NV2A/Gulf Keystar JV Page 2 of 2 Printed On: May 22,2024 08:44 AM EDT KEYED NOTES: C) Mead ............................... ............"I ............... ............................................ ---- -- --I— hunt ATKINS ........... Of"111-13, :V L J" II mmmA. Ll I L I I Ill E] � z LD Cc 0 z cc LD -I—-—---I--4-— ------ 0 i�............................. z W fh < rill < < z 0�-, 1E, 41 z z 0 ea Leo IEN 6 1 61 6 6T I 0 Z u o w LLI c) 0 z 0 LLI 14 —'11N.TTL1 Jr,""'s, LEVEL 2 AREA B IR M122B KEYED NOTES: Eli ............ ................... 0-4—---- ---- Mead lunt .......... ATKINS ........... I .......... ----------- 1:1 1:1 ED 0— (D-- D z LLI 2 2 Cc:3 E 0 0 LU > OLL .......................... ......., M. z ZE a 2< iE —-—-—-—-—-—-—-—-—-—-— Eli F Z < Z, z < (�EE �El ��El, �EJ (�El EL 0 u ¢ to UJ w v LU to 0 z 0 LLI 0 z C) 0 C) 14 J, rer .......... LL ............. ....... .......:1--1 LEVEL2 AREA A M121A III III III II'II. 0111 At L, ledr'l K , T T T M—e .d h. - i i_ �® Mead o- :— — �plunt liTlCl NS Zi 0 0 o 0 0 a, c� AldR G� y S '-i3 a' z w cc:3 EB fEG (E� EE EF 'E� L,2 ili o ,a w m Lu wLu ii ii z a z.l l l o a �a U (n W w In W!n U ?j OC a �. z > n p o Yz p 14 rer ,,,, f ii .. ........ ............... .....xd,,,,,,,,,, ......... ......... ........ ......... ....... .....�.w� J LEVEL 2-AREA A M121A III III IIIII'III III A K e , (� (� KEYED NOTES Q `T' N F lavd J h I I I I I I I Mead lunt :,-- - �, AT i i I Ii i i i i i Ii i i KI S o O �C o- - - w --- Z �I .� M a (p2 EM EN EP" EQ ,- 'DER (ES ET (Eu E\' Z JH _ F N Z d a ZW o m � O e rye w a � o [npu w LLIQ z a } :z n Y 14 6 L., LEVEL 2 AREA B M122B K wevr i��. ...III4' I 6 ... ... 14 irl ledl",lt . n—mm aoxo.00 Mead Q s1 lunt i i i i i o-- ATKINS � . r Z '„I ❑ o. o cc O W ¢O 0 M N_b w LL a IL o IL � a a� a p� zz o¢ Y H Z a a� �� d > Z Ir H z ❑ Q oU ¢ (n w w n w co o ?j of a o } o wa Yz 6 Q LEVEL 2-AREA c M123C r; IIIIIIIII III IIIII'III III ° III IIII iii III iiiI NOTES , h o.w. i 1 Il llu",P DROM Il lla`SAa900 ' N•r.om ULDROINN .,wM. IaIIII �� i a " TTT M o • o= 03 " O s M" J IY IMuNi y� O• r fI NMNVNI 1;... ... MrR _ ..• a w "� INN-R"X4 v.uV N r� r a I ,�,� II��.�., '•,i 1 � T � Rev sions "a 21 22 2.3 2.4 2.5 .fi 27 28 2 : „, 1 IIIQ.WPx"w""VMuA.IFa"M PNELM:A'IMM M I HYAC DUCT PLAN k LEVEL z rw=r-o N, 2, 8N2.4 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 K GULF BU� ILDING PCO #086 V =0" KIEYST`*'R NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami, Florida 33156 3941 South Roosevelt Blvd. Phone: (786)233-5060 Key West, Florida 33040 Prime Contract Potential Change Order #086: TKI - Trash Room Fire & Radiation Dampers TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West, Florida 33040 Miami, Florida 33156 PCO NUMBER/REVISION: 086/1 CONTRACT: 20-2039-01 -Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 8/20/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $1,402.58 POTENTIAL CHANGE ORDER TITLE:TKI-Trash Room Fire&Radiation Dampers CHANGE REASON:A/E Design Changes POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) TKI-Trash Room Fire&Radiation Dampers This change order authorizes furnish and install of 1 fire damper and 1 radiation damper per RFI#367.1 response for KWIA project(20-2039-01). Additional details are provided in the attached documents. ATTACHMENTS: RFI 367.1®Trash Room 317 Fire Damper.pdf _KWIA TKI COR 016.1 RFI 367.1 Trash Room 317 FD.pdf # Budget Code Description Amount 1 23-.00.10.10.S HVAC.Subcontractor TKI-Trash Room Dampers $1,275.07 2 99-.99.99.66.0 Procore OH&P.Other Prime Contract Markup $127.51 Grand Total: $1,402.58 Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton, New York 13901 Key West, Florida 33040 Miami, Florida 33156 Signed by: Signed by: DocuSigned by: sfep(�c v S. Wrtt ��4 Sfvu�LAII,�, EQADEJ;E2E3129AE? f.x�.►.;.a P� 062E 1EB4233B487... SE65F52F4C2F4D3._ SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE 11/4/2024 1 13:17:58 PST 11/5/2024 1 08:04:39 PST 10/25/2024 1 06:43:45 PDT NV2A/Gulf Keystar JV Page 1 of 1 Printed On: 10/25/2024 09:16 AM EDT Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 C.O.R.Date Monday,August 5,2024 �n �i �w� KEY WEST INTERNATIONAL AIRPORT G Turnke Project Name CONCOURSE A&TERMINAL From concept to completion IMPROVEMENTS Turnkey International, Inc. Project Number 2-23-101 Mechanical Contractors CMC 1249679 CHANGE ORDER REQUEST # 016 Rev. 01 TO: Attn. Mansour Sodagari City Key West Company NV2A + Gulf Building State/Province FL Zip/Postal Code 330A0 Address 5450 MacDonald Ave.,Suite 3 Country USA Description of Change Order Request: Per RFI #367.1 response, furnish and install (1)fire damper and (1) radiation damper with thermal blanket. Exclusions: Cutting/patching of walls,quickship,overtime. NOTE:Due to the continued supply chain and material escalation cost, this COR is valid for(30)days. We reserve the right to adjust cost if COR/Submittals are not approved prior to any price escalation. If ems Amount Please see attached breakdown $1,159.15 Cost $1,159.15 OH+Profit+Bond 10 % $1 15.92 Sub-Total $1,275.07 % $0.00 Sub-Total $1,275.07 % $0.00 Total $1,275.07 Accepted By: Date: Submitted by: Date: Aug 5,2024 Company: Turnkey International,Inc. THIS PROPOSAL IS ONLY FOR THE COST OF PERFORMING THE CHANGE WORK ITSELF. THIS PROPOSAL DOES NOT INCLUDE ANY ADDITIONAL COST STEMMING FROM IMPACT,DELAY OR ACCELERATION OF OUR SUBCONTRACT WORK REQUIRED BY THIS CHANGE.OUR COMPANY RESERVES ALL RIGHTS WITH RESPECT TO SAID ADDITIONAL COSTS AND/OR TIME EXTENSIONS ARE FULLY RESERVED. 1315 NW 98th Ct Unit 15, Doral, FL 33172 P (305) 591 0261 F (305)591 2676 Docusign Envelope ID:B9783D3E-24BB-4931-871A-8D49937FCA00 TURNEY INTERNATIONAL,INC. PROJECT: Key West International Airport PAGE:1 of 1 CONSTRUCTION COST ESTIMATE(V.2) TKI DOC.No: COR#016 DATE:9/30/2024 DESCRIPTION: RFI 367.1-Trash Room 317 FD MATERIAL COST LABOR COST LINE COST ITEM CITY COST OTHER DIRECT LINE TOTAL NO. Cooe UNIT TOTAL CODE MH'S AVG.RATE TOTAL COSTS 1 300 Furnish and install(1)FD(see 1 $1S0.00 $150.00 304 4 $75.00 $300.D0 $450.00 attachment#1) 2 300 Furnish and install(1)Radiation 1 $195.00 $195.00 304 4 $75.00 $300.00 $495.00 Damper with thermal blanket(see attachment#1) 3 4 5 SUBTOTALS 1 $345.00 8 1 $600.00 6 TAX 7%FOR MATERIALS 1 $24.15 1 $1200.001 1 $24.15 7 8 Foreman(201/Total Labor) 2 1 $95.001 $190.001 1 $190.00 9 10 11 ITOTAL $1159.15 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 Emmanuel Flores From: Carlos Sabater <carlos@stanweaver.com> Sent: Tuesday, July 30, 2024 3:34 PM To: Frankcys Salas;Tina Jurado Cc: Emmanuel Flores;Jorge Porro Subject: RE: KWIA- Quote for Fire Dampers Frankcys, The RFI is asking if a FD or FSD is needed, For what you are saying that is a fire rated ceiling then a radiation is needed. The ceiling radiation damper is $ 150.00/ea +tax The fire damper is $ 19S.00/ea +tax Here are both price in case, Don't think you a FSD Regards, 63 954-456-4300 Carlos Sabater E3 carlos(cDstanweaver.com Sales E, www.stanweaver.com E3 2601 SW 32nd Avenue, Pembroke Park, FL, 33023 ���� uoi uu uuu uuuuuuuuu uydi�lflu �� i p � �ro w� III From: Frankcys Salas<frankcys@turnkeymechanical.com> Sent:Tuesday,July 30, 2024 8:17 AM To: Carlos Sabater<carlos@stanweaver.com>; Tina Jurado<tina@stanweaver.com> Cc: Emmanuel Flores<emmanuel@turnkeymechanical.com>;Jorge Porro<Jorge@turnkeymechanical.com> Subject: RE: KWIA-Quote for Fire Dampers 1 Docusign Envelope ID: B9783D3E-24BB-4931-871A-8D49937FCA00 G U L F 8 U I L U 1 N G NV2A/Gulf Keystar JV Project: 20-2039-01 KWIA Concourse A and NV KE-Y T" R 9100 South Dadeland Blvd,Suite 600 Terminal Improvements Program Miami, Florida 33156 3941 South Roosevelt Blvd. P: (786)233-5060 Key West, Florida 33040 RFI #367.1 : Trash Room 317 Fire Damper Status Closed on 07/25/24 To Christopher Kopec(McFarland Johnson,Inc.) From Ryan Donnelly(NV2A/Gulf Keystar JV) Dan Torres(McFarland Johnson,Inc.) 9100 South Dadeland Blvd,Suite 600 Michael Martin(McFarland Johnson, Inc.) Miami, Florida 33156 Date Initiated Jul 24,2024 Due Date Jul 31,2024 Location Project Stage Cost Impact Schedule Impact Spec Section Cost Code Drawing Number Reference Linked Drawings M122B Received From Emmanuel Flores(Turnkey International, Inc.) Copies To Tim Bergeron(NV2A/Gulf Keystar JV), Kirk Boothroyd(McFarland Johnson,Inc.), Kellen Donnelly(NV2A/Gulf Keystar JV), Ryan Donnelly (NV2A/Gulf Keystar JV),Gregg Gaston(NV2A/Gulf Keystar JV),Alex Hyppolite(NV2A/Gulf Keystar JV) ,Gustavo Lazaro(NV2A/Gulf Keystar JV),Joseph L.Petzack(McFarland Johnson, Inc.),Antonio Pinto (NV2A/Gulf Keystar JV),Jasmine Sander (NV2A/Gulf Keystar JV),Claudio Santos(NV2A/Gulf Keystar JV),Mansour Sodagari(NV2A/Gulf Keystar JV),Gabriel Valladares(NV2A/Gulf Keystar JV) Trade Mechanical Activity Question Question from Ryan Donnelly NV2A/Gulf Keystar JV on Wednesday,Jul 24, 2024 at 02:58 PM EDT The response to KWIA RFI 367 confirmed trash room 317 has a one hour fire rating.Please note mechanical drawing M122B shows a 10"general exhaust duct serving trash room 317 with no fire damper(see attached marked drawing). Please review and advise if a damper is required and confirm if it should be a fire damper or fire smoke damper for 10"GE duct serving trash room 317. Attachments KWIA RFI 367.1 Attachment,pdf Official Response Response from Michael Martin McFarland Johnson,Inc.on Thursday,Jul 25, 2024 at 02:20 PM EDT Provide 45 min.fire damper in the duct at the wall penetration. Provide thermal blanket and radiation damper at the exhaust grille in the rated ceiling. All Replies Response from Michael Martin McFarland Johnson,Inc.on Thursday,Jul 25, 2024 at 02:20 PM EDT Provide 45 min.fire damper in the duct at the wall penetration. Provide thermal blanket and radiation damper at the exhaust grille in the rated ceiling. NV2A/Gulf Keystar JV Page 1 of 1 Printed On:Aug 19,2024 08:58 PM EDT