HomeMy WebLinkAbout37th Change Order 12/12/2024 Docusign Envelope ID:B8B17D01-850D-4CBO-AD10-CD83C91B4821 M.C.A.INSTR.8800.2 Enclosure(1) 3/28/2017 Page 3 MONROE COUNTY/DEPARTMENT OF AIRPORTS CONTRACT CHANGE ORDER PROJECTTITLE: KWIA Concourse A&Terminal Improvements CHANGE ORDER NO.: 037 INITIATION DATE: 8/19/2024 TO CONTRACTOR: NV2A/Gulf Keystar JV CONTRACT DATE: 8/17/2022 The Contract is changed as follows: The Original(Contract Sum)(Guaranteed Maxium Price) $ 101,461,771.00 Net change by previously authozied Change Order $ 13,109,243.51 The(Contract Sum)(Guaranteed Mxium Price)prior to this Chage order was $ 114,571,014.51 The(Contract Sum)(Guaranteed Mxium Price)will be by this Change Order $ 80,332.05 The new(Contract Sum)(Guaranteed Mxium Price) including this Change Order is $ 114,651,346.56 The Contract Time will be(ro:+ngod by TBD days The date of Substantial Completion as of the date of this Change Order is 4/8/2025 Detailed Description of change order and justification: As per the attached PCO's#078 and#088,this change order includes the cost of MC 12 x 14.3 at Low Roof in response to RFI#314 and the cost of Miscellaneous Steel for Gate 8 PBB Tie-Downs in accordance with Submittal 34 7713-004 Revision 3 for KWIA project(20-2039-01). POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# Title Schedule Impact Amount 078 Steel Fab-MC 12x14.3 at Low Roof $ 70,707.05 088 1 Steel Fab-Miscellaneous Steel for Gate 8 PBB Tie-Downs $ 9,625.00 Total: $ 80,332.05 This change order is 0.08%of the original contract price. Not valid until signed by Owner,Architect(if applicable),and Contractor Signed by: E062E1EB4233B487__ kV'tSfOpU, r S 6F(t 11/25/2024 1 10:00:02 PST ARCHITECT: DocuSigned by: DocuSigned by: DATE: (,,, s 9 J.1. �b�� sd tr y� 11/24/2024 1 18:03:52 PST CONTRACTORS: Un QQcVIR97A7�;AR7 A A DATE: Signed by: SM&6JAJ 12/2/2024 1 10:48:03 PST EXECUTIVE DIRECTOR OF AIRPORTS Digitally signed by DATE: Christine Christine Hurley H u rl e Date:2024.12.12 Y 18:10:35-05'00' COUNTY/DEPUTY ADMINISTRATOR DATE: NRCIE COUNTY [�IAA ROVE ATTOPINEY W IDS . , PED JJ4MCADO------ F ASS( T� LINTY ATTORNEY Date 12/5/24 Docusign Envelope ID: B8B17D01-850D-4CB0-AD10-CD83C91B4821 K C K ��T° NV IG PCCO #037 NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami, Florida 33156 3941 South Roosevelt Blvd. Phone: (786)233-5060 Key West, Florida 33040 Prime Contract Change Order #037: Steel Fab - Low Roof Channels & Gate 8 Tie-Downs Steel TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West, Florida 33040 Miami, Florida 33156 DATE CREATED: 11/18/2024 CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) CONTRACT STATUS: Approved REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: 11/18/2024 INVOICED DATE: PAID DATE: SCHEDULEIMPACT: EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 20-2039-01:Key West International Airport TOTAL AMOUNT: $80,332.05 Concourse A DESCRIPTION: As per the attached PCO's#078 and#088,this change order includes the cost of MC 12 x 14.3 at Low Roof in response to RFI#314 and the cost of Miscellaneous Steel for Gate 8 PBB Tie-Downs in accordance with Submittal#34 7713-004 Revision 3 for KWIA project(20-2039-01). ATTACHMENTS: PCO 088®Steel Fab-Miscellaneous Steel for Gate 8.pdf,NV2A PCO#078(Steel Fab Low Roof$70 707.05).pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# Title Schedule Impact Amount 078 Steel Fab-MC 12x14.3 at Low Roof $70,707.05 088 Steel Fab-Miscellaneous Steel for Gate 8 PBB Tie-Downs $9,625.00 Total: $80,332.05 The original(Contract Sum) $101,461,771.00 Net change by previously authorized Change Orders $13,109,243.51 The contract sum prior to this Change Order was $114,571,014.51 The contract sum will be increased by this Change Order in the amount of $80,332.05 The new contract sum including this Change Order will be $114,651,346.56 The contract time will not be changed by this Change Order. LDS DS Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton, New York 13901 Key West, Florida 33040 Miami, Florida 33156 Signed by: Signed by: DocuSigned by: DocuSigned by: (,(�risfapl� r S. opc c � Sfv�i&L4. J (,uis Qrhf i E,eiLt S�,L+.�,vti,v� 062E 1E842336487... SE65F52F4C2F4D3... D19093827A75487... 8 F59717D29E34A5... SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE 11/25/2024 1 10:00:02 PST 12/2/2024 1 10:48:03 PST 11/24/2024 1 18:03:52 PST NV2A/Gulf Keystar JV Page 1 of 1 Printed On: 11/18/2024 05:58 PM Docusign Envelope ID: B81317D01-850D-4CB0-AD10-CD83C91B4821 N 0 " GULF BUILDING PCO #078 off W amn7 KEYST R NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami,Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West,Florida 33040 Prime Contract Potential Change Order#078: Steel Fab - MC 12x14.3 at Low Roof TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West,Florida 33040 Miami,Florida 33156 PCO NUMBER/REVISION: 07810 CONTRACT: 20-2039-01 -Key West International Airport Concourse A REQUEST RECEIVED FROM: - CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 7/24/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $70,707.05 POTENTIAL CHANGE ORDER TITLE:Steel Fab-MC 12x14.3 at Low Roof CHANGE REASON:A/E Design Changes POTENTIAL CHANGE ORDER DESCRIPTION:(The Contract/s Changed As Follows) This change order includes the costs associated with furnishing and installation of 550 LF of prime painted MC 12x14.3 at Low Roof per RFI#314 for KWIA project(20-2039-01). RFI#314,cost breakdown,and additional backups are attached. ATTACHMENTS: ......... ............. # Budget Code Description Amount [05-1.2.10.00.S ist-. Structural Steel Framing MC 12x14.3 at Low Roof $64,279.14 Subcontractor 2 99-.99.99.66.0 Procore OH&P.Olher Prime Contract Markup $6.427.91 ....� ........ ............. ........._. ......... Grand Total;; $70,707.05 Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton,New York 13901 Key West,Florida 33040 Miami,Florida 33156 K peally signed by Christopher Christopher Date:2024.10.17 11:50:05 M Kopec 0400 , 40.22.2024 " SIGNATURE DATE IGNATURE DATE RE DATE. NV2A/Gulf Keystar JV Page 1 of 1 Printed On:8/19/2024 09:02 AM EDT Docusign Envelope ID: B8B17D01-850D-4CB0-AD10-CD83C91B4821 REQUEST FOR CHANGE ORDER 721 N.E. 44th Street NUMBER: 005.0 0 Fort Lauderdale, FL 33334 Phone: 954-772-0440 Fax: 954-938-7527 TITLE: RCO#005.0, Channel @ Low Roof DATE: 05/13/24 PROJECT: 22596 Key West IACA&Terminal JOB: 22596 TO: Antonio Pinto NV2A REASON: Price and Procced Dir CIC REFERENCE: Phone: Fax: ciated with FURNISH AND INSTALL 550 Lit of MC 12x14.3 Low Roof. Steel to . _DESCRIPTION OF CHANGE Cyst asso _ to be Prime Painted. 001T Detailing (standard s...................... _ 154.00 -_� 2 00 Hour _ 77.00 Net Amount Item Descri tion Quanti Units Unit Pnce - 002T Materials Add 8,008.00 Lb 1.92 15,396.98 003T Shop labor standard add 40.00 Hour 70.00 2,800.00 004T ShiDoin 1.00 Lot 1 ..... 005 Foreman„standard 84.00 Hour 82.99 6,971.16 ..._- _ _._ 006 Ironworker standard ._...._. 168.00 Hour 84.25 142154.00 007 Housin -Add 16 00 Da 1,004 34 16,069.44 ................ _. .. 008T Sales Tax at 0.07 1,390 00 1,390.00 009 Overhead at 0.1 5,843 56 5,843.56 ....._. _ By my signature below, I attest that I am authorized by my firm to enter into an agreement to purchase goods and/or services.As the Buyer,. I! hereby authorize Steel Fabricators, L.L.C.to proceed with the additional work described herein and do guarantee compensation on the basis noted above. If schedule impact listed below is zero or not listed, additional contract time required will be determined by Steel Fabricators at the time of implementation due to changes described above. - - .... The Contract Sum Will be Increased 64,279.14 The Contract Time Will Not be Chan ed TBD ACCEPTED: NV2A BY: Antonio Pinto BY: DATE: DATE: PAGE 1 OF 1 FORM:F CO 01 RTF SF Docusign Envelope ID: B8B1 7DOI-850D-4CBO-ADI O-CD83C91 B4821 LLLL-M9OS:2NOHd WOO'ONItl33NION30065 -ONI),NVdV400 H013dSiOl WOJ U�Md�d ONIN33NIEWIff c? Ofts LL U) SINWOAMWINI IVNIAM31 V V 3sunOONOO 9904C VO NWIMA@,F� 1HOdUIV IVNOIIVN831NI ISAMk3N i? n oat ............. PH Z �s1 61 ............................ 0� z Docusign Envelope ID: 1381317D01-850D-4CBO-AD10-CD83C91B4821 Eduardo Dominguez From: Ryan Donnelly <ryand@gulfbuilding.com> Sent: Thursday, May 9, 2024 11:14 AM To: Eduardo Dominguez;Andres Delgado;Vibin Koshy Cc: Tim Bergeron;Aaron Elston;Sergio Sandoval;apinto@nv2agroup.com; Mansour Sodagari; Claudio Santos; Kellen Donnelly Subject: KWIA Continuous Channel Pricing Attachments: 24003-01 Drawings-CFS-3.0.pdf Caution!This message was sent from outside your organization. Block ock sender Good Morning Eduardo, Could you please provide me with pricing for the 550 LF of continuous MC12x14.3 channel to be installed on the low roof. Please let me know if you have any questions. Thank you, Ryan Donnelly, PMP, LEED Green Associate Assistant Project Manager �Ilf �l I�� iCe� Cell: (954) 465-8749 NV K h{EYST i GULF IL R i Docusign Envelope ID: B8B17D01-850D-4CB0-AD10-CD83C91B4821 ,�, e� outr a �� NV2A] ulf KeystarJV Project:20-2039-01 KWIA Concourse A and amnKeYST*R 9100 South Dadeland Blvd,Suite 600 Terminal Improvements Program Miami,Florida 33156 3941 South Roosevelt Blvd. P:(786)233-5060 Key West,Florida 33040 RFI #314: Light Gauge Framing Clarifications Status Closed on 04/30/24 To Christopher Kopec(McFarland Johnson,Inc.) From Ryan Donnelly(NV2A/Gulf Keystar JV) Oren Guttmann(McFarland Johnson,Inc.) 9100 South Dadeland Blvd,Suite 600 Miami,Florida 33156 Date Initiated Apr 30,2024 Due Date May 7,2024 Location Project Stage Cost Impact Schedule Impact Spec Section Cost Code Drawing Number Reference Linked Drawings Received From Aaron Elston(Lotspeich Company,Inc.) Copies To Tim Bergeron(NV2A/Gulf Keystar JV),Kellen Donnelly(NV2A/Gulf Keystar JV),Ryan Donnelly (NV2A/Gulf Keystar JV),Gregg Gaston(NV2A/Gulf Keystar JV),Alex Hyppolite(NV2A/Gulf Keystar JV) ,Gustavo Lazaro(NV2A/Gulf Keystar JV),Jose McSherry(NV2A/Gulf Keystar JV),Antonio Pinto (NV2A/Gulf Keystar JV),Claudio Santos(NV2A/Gulf Keystar JV),Mansour Sodagari(NV2A/Gulf Keystar JV) Trade Structural Steel,Finishes NV2A/Gulf Keystar JV Page 1 of 2 Printed On:Aug 27,2024 01:30 PM EDT Docusign Envelope ID: 1381317D01-850D-4CB0-AD10-CD83C91B4821 RFI#314-Light Gauge Framing Clarifications Project:20-2039-01 KWIA Concourse A and Terminal Improvements Program Activity Question Question from Ryan Donnelly NV2A/Gulf Keystar JV on Tuesday,Apr 30,2024 at 08:56 AM EDT Please see the draft version of engineered light gauge framing shop drawings in the attached file. There are two items of concern that need to be addressed for the light gauge framing scopes to be possible: 1. See Sheet CFS-3.0, Section 5. There are issues with attachment of the bottom track to the 18ga metal roof decking due to substantial uplift. The vertical stud (directly under glazing) must be securely attached to the track below, however that track cannot be adequately secured to the substrate(metal roof deck)that is being provided. Please advise if we may weld a structural C channel to the metal roof deck so that our bottom track has a secure substrate for attachment. 1. See Sheet CFS-3.0, Section 5. The engineering of the interior vertical stud has reached severe limitations due to the 5' spacing of the horizontal steel supports. In lieu of providing a light gauge box beard spanning between the supports, we would like to see more structural steel added in either the form of 5"x 5"tab plates welded to the top of the beams, or a continuous steel angle welded to the beams to provide more opportunities for clip attachment and bracing of the vertical stud. This will not only increase the strength of the overall assembly, but also significantly reduce installation time, in turn advancing the construction schedule. Attachments KWIA RFI 314 Attachment.pdf Official Response Response from Oren Guttmann McFarland Johnson,Inc.on Tuesday,Apr 30,2024 at 09:43 AM EDT 1.Channel is acceptable with attachment at rafters,±5'-0"o/c.Similar to angle noted in question 2. 2.Either is acceptable.Continuous steel angle is preferred. All Replies Response from Oren Guttmann McFarland Johnson,Inc.on Tuesday,Apr 30,2024 at 09:43 AM EDT 1.Channel is acceptable with attachment at rafters,±5'-0"o/c.Similar to angle noted in question 2. 2.Either is acceptable.Continuous steel angle is preferred. NV2A/Gulf Keystar JV Page 2 of 2 Printed On:Aug 27,2024 01:30 PM EDT Docusign Envelope ID: B8B17D01-850D-4CB0-AD10-CD83C91B4821 K GULF BU„ILD , NG PCO #088 V =0" KIEYST`*'R NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami, Florida 33156 3941 South Roosevelt Blvd. Phone: (786)233-5060 Key West, Florida 33040 Prime Contract Potential Change Order #088: Steel Fab - Miscellaneous Steel for Gate 8 PBB Tie-Downs TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West, Florida 33040 Miami, Florida 33156 PCO NUMBER/REVISION: 088/0 CONTRACT: 20-2039-01 -Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 8/21/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $9,625.00 POTENTIAL CHANGE ORDER TITLE:Steel Fab-Miscellaneous Steel for Gate 8 PBB Tie-Downs CHANGE REASON:A/E Design Changes POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) Steel Fab-Miscellaneous Steel for Gate 8 PBB Tie-Downs This Change Order includes the costs associated with furnish,fabrication,galvanizing and shipping 2 sets of Tie-Down cover plates,secondary plates, embeds, bars,and specified reinforcement for 2 Gate 8 Passenger Boarding Bridge Tie-Downs in accordance with Submittal#34 7713-004 Revision 3 for the KWIA project.(20-2039-01) ATTACHMENTS: Structural Drawings-Gate 8 Revision-Revised.pdf # Budget Code Description Amount 1 05-.12.10.00.S Structural Steel Framing I Gate 8 PBB Tie-Down $8,750.00 Joist.Subcontractor 2 99-.99.99.66.0 Procore OH&P.Other Prime Contract Markup $875.00 Grand Total: $9,625.00 Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton, New York 13901 Key West, Florida 33040 Miami, Florida 33156 Signed by: signed by: DocuSigned by: 062E 1EB4233B487... ERF65F59F4C9F4D3 rAnFrP9PgiQGAP? SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE 9/11/2024 1 06:36:39 PDT 9/16/2024 1 06:02:38 PDT 8/25/2024 1 19:32:23 PDT NV2A/Gulf Keystar JV Page 1 of 1 Printed On:8/25/2024 10:16 PM EDT Docusign Envelope ID: 1381317D01-850D-4CBO-AD10-CD83C91B4821 "Pon,W@p REQUEST FOR CHANGE ORDER TVxa 721 N.E. 44th Street NUMBER: 003.0 Fort Lauderdale, FL 33334 Phone: 954-772-0440 ° Fax: 954-938-7527 TITLE: RCO#003.0 DATE: 1/23/2024 PROJECT: 22596 Key West IACA&Terminal JOB: 22596 TO: Antonio Pinto NV2A REASON: Price Only CIC REFERENCE: Phone: (954)599-0009 Fax: DESCRIPTION OF CHANGE Cost associated with FURNISH MATERIALS, FABRICATE, GALVANIZE AND SHIP to the jobsite (14)sets of tie downs, as per information provided by GC Item Description Quantity Units Unit Price Net Amount 001T Detailing standard 8.00 /Hour 77.00 616.00 007T Materials Add 14310.00 /Lb 1.52 21,692.49 014T Shop labor(standard)add 250.00 /Hour 70.00 17,500.00 024T Shipping 1.00 /Lot 1,500.00 1,500.00 027T Galvanization 14310.00 /Lb 0.75 10,732.50 062T Sales Tax at 0.07 3,642.87 3,642.87 063 Overhead at 0.1 5,568.39 5,568.39 By my signature below, I attest that I am authorized by my firm to enter into an agreement to purchase goods and/or services.As the Buyer, I hereby authorize Steel Fabricators, L.L.C.to proceed with the additional work described herein and do guarantee compensation on the basis noted above. If schedule impact listed below is zero or not listed, additional contract time required will be determined by Steel Fabricators at the time of implementation due to changes described above. The Contract Sum Will be Increased 61,252.25 The Contract Time Will Not be Changed TBD ." addfi,Dii4� sells III" II ael own II` i, 1:d ` 6H 1 51 "/T 8,750 ACCEPTED: N V2A BY: Antonio Pinto BY: DATE: DATE: PAGE 1 OF 1 F