MONROE COUNTY/DEPARTMENT OF AIRPORTS
CONTRACT CHANGE ORDER
PROJECT TITLE: KWIA Concourse A&Terminal Improvements CHANGE ORDER NO.: 043
INITIATION DATE: 10/29/2024
TO CONTRACTOR: NV2A/Gulf Keystar JV CONTRACT DATE: 8/17/2022
The Contract is changed as follows:
The Original(Contract Sum)(Guaranteed Maxium Price) $ 101,461,771.00
Net change by previously authozied Change Order $ 15,009,524.12
The(Contract Sum)(Guaranteed Mxium Price)prior to this Chage order was $ 116,471,295.12
The(Contract Sum)(Guaranteed Mxium Price)will be O ncireased)by this Change Order $ 111,805.47
The new(Contract Sum)(Guaranteed Mxium Price) including this Change Order is $ 116,583,100.59
The Contract Time will be(changed)by TBD days
The date of Substantial Completion as of the date of this Change Order is 4/8/2025
Detailed Description of change order and Justification:
This PCCO authorizes the scope changes as outlined in the approved PCOs:101 and 106R2,detailed below:
PCO#101:Wildlife Management-Racoon Trapping and Removal at the KWIA project(20-2039-01)
PCO#106R2:This PCO includes the costs associated with the changes in Mark Product's scope of work depicted in the 100%Conformed Set of
Design Drawings and Shop Drawings review comments received on December 5th,2024,compared to the 90%Contract Documents for the KWIA
project(20-2039-01).
POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER:
PLO# Title Schedule Impact Amount
101 Wildlife Management-Racoon Trapping and Removal at KWIA $ 8,800.00
106112 Mark Products-100%CS„Shop 0wgs Chauuges&Gate 8 1$ 103,005.47
Total: $ 111,805.47
This change order is 0.11%of the original contract price.
Not valid until signed by Owner,Architect(if applicable),and Contractor
Signed by,
I �I 2/17/2025 1 12.48.11 PST
ARCHITECT: p
DATE:
Sacu Ifkned by Docuftned by
2/11/2025 1 15:43:04 PST
CONTRACTORS:
L
DATE:
s'Po
EXECUTIVE DIRECTOR OF AIRPORTS "' � 02.26.2025
DATE:
Digitally signed,,
Christine
Christine Hurley
Hurley Date:2025.02.27
COUNTY/DEPUTY ADMINISTRATOR 16:29:31-05'00'
DATE„
Ds DS
D �3 R
x��NROE TY A C)SNC
t
PAD O J.,9NIrl� ulwd
ASSIST T 60UNT' TT .
Date
Docusign Envelope ID: D6C97EFD-A575-4538-A938-E018A03379F6
K C � . T�
NV
PCCO #043
NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements
9100 South Dadeland Blvd,Suite 600 Program
Miami, Florida 33156 3941 South Roosevelt Blvd.
Phone: (786)233-5060 Key West, Florida 33040
Prime Contract Change Order #043: PCO's: 101 & 106
TO: Key West International Airport FROM: NV2A/Gulf Keystar JV
3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600
Key West, Florida 33040 Miami, Florida 33156
DATE CREATED: 2/05/2025 CREATED BY: Rebecca Vieira(NV2A/Gulf Keystar JV)
CONTRACT STATUS: Approved REVISION: 0
DESIGNATED REVIEWER: REVIEWED BY:
DUE DATE: REVIEW DATE: 02/05/2025
INVOICED DATE: PAID DATE:
SCHEDULE IMPACT: EXECUTED: No
REVISED SUBSTANTIAL SIGNED CHANGE ORDER
COMPLETION DATE: RECEIVED DATE:
CONTRACT FOR: 20-2039-01:Key West International Airport TOTAL AMOUNT: $111,805.47
Concourse A
DESCRIPTION:
This PCCO authorizes the scope changes as outlined in the approved PCOs: 101 and 106R2,detailed below:
•PCO#101:Wildlife Management-Racoon Trapping and Removal at KWIA
Recently,several wildlife encounters, particularly involving racoons, have been reported within the KWIA Concourse A project(20-2039-01).These
encounters have disrupted construction activities and posed potential health and safety risks to both workers and animals.A possible cause of this
issue could be the removal of wetlands and the disruption of natural habitats due to the Commercial Apron Expansion project.JV has engaged a local
wildlife control company to assess the removal and relocation of the racoons from the Concourse A construction area.The wildlife management plan
includes daily monitoring,baiting,and euthanasia, if necessary,over a 16-week period,as detailed in the attached document.
•PCO#106R2:This PCO includes the costs associated with the changes in Mark Product's scope of work depicted in the 100%Conformed Set of
Design Drawings and Shop Drawings review comments received on December 5th,2024,compared to the 90%Contract Documents for the KWIA
project(20-2039-01).Description of changes and cost breakdown are attached.
This PCO also includes one additional gate counter added with the Gate 8 changes. Note: PCO has been revised to replace the SS-1
Corian countertops in ATO Rooms with PLAM-2 countertops in accordance with comments provided by the AE on December 3th,2024 during the
review of PCO 106R1.
ATTACHMENTS:
PCO#101 Wildlife Manage ment,pdf,KWIA®PCO®106 - Rev®02 - Millworks®Changes.pdf
POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER:
PCO# Title Schedule Impact Amount
101 Wildlife Management-Racoon Trapping and Removal at KWIA $8,800.00
106R2 Mark Products-100%CS,Shop Dwgs Changes&Gate 8 $103,005.47
Total: $111,805.47
NV2A/Gulf Keystar JV Page 1 of 2 Printed On:2/5/2025 02:52 PM
Docusign Envelope ID:D6C97EFD-A575-4538-A938-E018A03379F6
N V K GULF ST
PCCO #043
CHANGE ORDER LINE ITEMS:
PCO#101:Wildlife Management-Racoon Trapping and Removal at KWIA
# Budget Code Description Amount
1 01-.54.09.60.0 Safety Expenses I Safety Railings Wildlife Management Control $8,000.00
Nets.Other
2 99-.99.99.66.0 Procore OH&P.Other Prime Contract Markup $800.00
Grand Total: $8,800.00
PCO#106R2: Mark Products-100%CS,Shop Dwgs Changes&Gate 8
# Budget Code Description Amount
1 06-.22.10.10.S Millwork.Subcontractor Conformed Set Millworks Changes $93,641.34
2 99-.99.99.66.0 Procore OH&P.Other Prime Contract Markup $9,364.13
Grand Total: $103,005.47
The original(Contract Sum) $101,461,771.00
Net change by previously authorized Change Orders $15,009,524.12
The contract sum prior to this Change Order was $116,471,295.12
The contract sum will be increased by this Change Order in the amount of $111,805.47
The new contract sum including this Change Order will be $116,583,100.59
The contract time will not be changed by this Change Order.
Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV
Inc.)
49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600
Binghamton, New York 13901 Key West, Florida 33040 Miami, Florida 33156
Signed by: Signed by: L-�
ocuSigned by: DocuSigned by:
�� . 2/13/2025 1 05:4 :A � �fVj&Lt,1/20/2025 07:4 ,sfj � D �l/2025 08
.E ... F5PF4 ... F6 6a@9 ... @B&I+ISB@4®4�i4•B
SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE
DS DS
NV2A/Gulf Keystar JV Page 2 of 2 A Printed On:2/5/2025 02:52 PM
Docusign Envelope ID: D6C97EFD-A575-4538-A938-E018A03379F6
Docusign Envelope ID:7274E51C-01AB-43C6-BED3-80F18AC4DB59
MM
Air " GULF BUILDING PCO #101
N I
EAr
KEYST R W C"7
NV2A/Gulf Keystar JV Project:20-2039-01-KWIA Concourse A and Terminal Improvements
9100 South Dadeland Blvd,Suite 600 Program
Miami,Florida 33156 3941 South Roosevelt Blvd.
Phone:(786)233-5060 y
Ke West,Florida 33040
Prime Contract Potential Change Order #101 : Wildlife Management -
Racoon Trapping and Removal at KWIA
TO: Key West International Airport FROM: NV2A/Gulf Keystar JV
3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600
Key West,Florida 33040 Miami,Florida 33156
PCO NUMBER/REVISION: 101/0 CONTRACT,, 20-2039-01-Key West International
Airport Concourse A
REQUEST RECEIVED FROM: CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar
JV)
STATUS: Pending-In Review CREATED DATE: 10/29/2024
REFERENCE: PRIME CONTRACT None
CHANGE ORDER:
FIELD CHANGE: No
LOCATION, ACCOUNTING METHOD: Amount Based
SCHEDULE IMPACT: PAID IN FULL: No
EXECUTED: No SIGNED CHANGE ORDER
RECEIVED DATE:
TOTAL AMOUNT: $8,800.00
POTENTIAL CHANGE ORDER TITLE:Wildlife Management-Racoon Trapping and Removal at KWIA
CHANGE REASON:A/E Design Changes
POTENTIAL CHANGE ORDER DESCRIPTION:(The Contract Is Changed As Follows)
Ii dl((e hN'OP2r7Bp Tit, agport,TroP'p(u19 And,RATn—,rwA(at i "w✓)N.(.A
Recen0y„several wildlife encounters,particularly Involving raccoons,have been reported within the KWIA Concourse A project(20-2039.01).These
erwouunters have disrupted construction activities and,posed potential health and safety Asks to both wwkers and animals.A possible cause of this issue
could be the removal of wetlands and fhe disruption of natural habitats due to the Commercial Apron Expansion project,JV ties engaged a local wildlife
control company to assess the removal and relocation of the raccoons from the Concourse A construction area,The wildlife marlagernent plain includes
daily monitoring,baiting,and euthanasia,if necessary,over a 16-week period,as detailed in the attached document.
ATTACHMENTS:
# Budget Code Description
Amount
Wildlife Management Control
Nets.Ot0he60.0 Safety Expenses Safety � -1 y p � ty Railings� 9 $8,000.00
2 99 99 99 66.0 Procore OH&P.Other Prime Contract Markup $800 w 00
W w�
Grand Total: $8,800.00
Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV
Inc.)
49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600
Binghamton,New York 13901 Key West,Florida 33040 Miami,Florida 33156
Digitally red yChristO her IOstophs Kotcr:Kopec 050 025,01,3112:04:23
SIGNATURE DATE NGNATUR 62.03.202 DATE UR�E DATE
NV2A/Gulf Keystar JV Page 1 of 1 Printed On:10/29/2024 12:02 PM EDT
Docusign Envelope ID: D6C97EFD-A575-4538-A938-E018A03379F6
Docusign Envelope ID:7274E51C-01AB-43C6-BED3-80F18AC4DB59
OPVD
N
BANDIT Wildlife Management Date: October 27, 2024
561-306-2846
BAND ITWildlife aol.COM
BAND ITWildlifemanagement.com
Prepared for:
NV2A Group
CIO Antonio Pinto and Kyoky M ontalvo
Owner/Wildlife
Reference:
Raccoon Trapping and removal at KWIA
- BANDIT Wildlife Management will set traps in the four stairwells that the raccoons are using
to access the new airport terminal that is under construction. The raccoons have been
coming into the construction area looking for food left in trash cans and defecating in the new
passenger ramps becoming a nuisance.
- The traps will be checked and baited daily Monday - Friday.
-The raccoons will be relocated if found to be healthy as determined by BANDIT Wildlife
Management, if a nursing female raccoon is caught, BANDIT Wildlife Management will have to
locate the babies in order to be able to legally remove all of them, if the young are not able to
be located or removed the female raccoon will have to be released on property per Florida
anti-cruelty laws.
-The estimated cost to humanely remove and relocate the raccoons is....
- $500:40:0er week. 1,6
The tra in fee covers..
- Daily monitoring Monday-Friday r r
- Bait
- Fuel
- Euthanasia If needed
Thank you for choosing BANDIT Wildlife Management to help with the Raccoon issue at the
Key West International Airport.
Docusign Envelope ID: D6C97EFD-A575-4538-A938-E018A03379F6
K
GULF BUILDING PCO #106R2 V Um" K(=--YST*R
NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements
9100 South Dadeland Blvd,Suite 600 Program
Miami, Florida 33156 3941 South Roosevelt Blvd.
Phone: (786)233-5060 Key West, Florida 33040
Prime Contract Potential Change Order #106R2: Mark Products - 100% CS,
Shop Dwgs Changes & Gate 8
TO: Key West International Airport FROM: NV2A/Gulf Keystar JV
3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600
Key West, Florida 33040 Miami, Florida 33156
PCO NUMBER/REVISION: 106R2/2 CONTRACT: 20-2039-01 -Key West International
Airport Concourse A
REQUEST RECEIVED FROM: CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar
JV)
STATUS: Pending-In Review CREATED DATE: 11/20/2024
REFERENCE: PRIME CONTRACT None
CHANGE ORDER:
FIELD CHANGE: No
LOCATION: ACCOUNTING METHOD: Amount Based
SCHEDULE IMPACT: PAID IN FULL: No
EXECUTED: No SIGNED CHANGE ORDER
RECEIVED DATE:
TOTAL AMOUNT: $103,005.47
POTENTIAL CHANGE ORDER TITLE:Mark Products-100%CS,Shop Dwgs Changes&Gate 8
CHANGE REASON:A/E Design Changes
POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows)
Mark Products -Conformed Set Changes
This PCO includes the costs associated with the changes in Mark Product's scope of work depicted in the 100%
Conformed Set of Design Drawings and Shop Drawings review comments received on December 5th, 2024, compared to
the 90% Contract Documents for the KWIA project(20-2039-01). Description of changes and cost breakdown are
attached.
This PCO also includes one additional gate counter added with the Gate 8 changes.
Note: PCO has been revised to replace the SS-1 Corian countertops in ATO Rooms with PLAM-2 countertops in
accordance with comments provided by the AE on December 13th, 2024 during the review of PCO 106R1.
Duration:
The following activities have been added to the overall project schedule to track the progress. Any time impact associated
with this change will be addressed separately.
PCO 106 Mark Products�100%,C6,Shop Dwgs&Gete0 67 2614-Nov,24A 17•Me,25 1TMat-25,PC0 I OF.Mack Pradur.tx 100i C5,S hap Dwgs&Sete 8
PC0106 PCO 106 hletk R.du,t,. Cu V,,ed„et&8D Granges 10 8 20Nav 24 A. (12 D 24 A 1 IPCO 106 Mark Products Cu harried Set&SD Chatiger
PCO1 D6-1 Review uprcmert.to Shop Dwga with added sappy 5t,ttw R&R 10 1214-Nw-24A G'2-Dec 24A AI Sts-R&R
PC01062 PC0106R1Mack Products-Confo,,ed Jot&SDChange.a 10 406-0ao-24A 13-D-24A I..PCO 106R1 Had,Rndaets Crnfprm d So&SD Changan
FC0106,3 Reui cynu girls to Shop Dwgs with added s_cpe-pendng P/Cs app—el 5 22 20-N-24A 20 Dec24 131 He—cumrrents to Shop Dwgswth added&-pe-pending A,tE's approval
PCO1064 PCO106R2Marlc Product. Gofiomd6et&SDChange.. R,.rw<w&Apprpval 5 0213 Do,24 A. ADa..24 1 PC0106R2 Mark Prndacts Confomw_d SSet&SD Changes Review&AK—al
PC0106.5 PCCO Mark Rodact,.-Conformed Set&SO Changer-Revew&Appro aal 20 0271)--24 2fJar 25 0 PCCOMark Products�Cpntarr.dSet&SDChange. Review&Approval
PC'OI O60 Change.Order te.Mark P dauts Conformed Set&.SD Changes Fleriene&App e1 2 0 24Jan25 27Jan 25 1 GYiange 0rdal to Matk ProdupCs-Conformed Sst&SD Clrangd,�Review&Approval
PCO106.1 Fobrinet'on and Defvery of Gale Cuoantera 30 0.%8 jJ 25 10 Mar 25 0= Fa6ricatian and Dafvees al taata Cpuntacz
PCO106-6 Gale Caurtarr installation 5 011-Me,25 17.Me,25 0 Gate Counters lrztallatom
NV2A/Gulf Keystar JV Page 1 of 2 Printed On: 12/23/2024 02:00 PM EST
Docusign Envelope ID: D6C97EFD-A575-4538-A938-E018A03379F6
NV
k
GULF BUILDING PCO #106R2"�nKeYST'*"R
REFERENCE:
Mark Product dated 12.19.2024
Submittal#06 4100-1-0 and exchange of email dated 12.05.2024 and 12.13.2024.
ATTACHMENTS:
23-04®corlb®120624.Ddf, 23-04®corla®101124,pdf
# Budget Code Description Amount
1 06-.22.10.10.S Millwork.Subcontractor Conformed Set Millworks Changes $93,641.34
2 99-.99.99.66.0 Procore OH&P.Other Prime Contract Markup $9,364.13
Grand Total: $103,005.47
Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV
Inc.)
49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600
Binghamton, New York 13901 Key West, Florida 33040 Miami, Florida 33156
Signed by: Signed by: DocuSigned by:
isf ep(�c v S. epw Sfvi&L1UJ ECADFCF2F31994F2
P.�
062E1EB4233B487... 8E65F52F4C2F4D3... .
SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE
1/9/2025 108:03:28 PST 1/20/2025 110:01:16 PST 12/23/2024 114:10:00 PST
NV2A/Gulf Keystar JV Page 2 of 2 Printed On: 12/23/2024 02:00 PM EST
Docusign Envelope ID: D6C97EFD-A575-4538-A938-E018A03379F6
Mark Products Uv�
110NxA10 C u "1 C
Institutional&Lab Casework Specialists
1900 Coral Way, Ste 303 DATE: 12/19/2024
Miami, FL 33145 PROJECT: 23-04
p 305 232-4461
f 305 232-7901
��i i iu llu n i iii i i
NV2A Group Key West International Airport
Attn: Antonio Pinto Terminal Improvements Program Et Concourse A
5450 MacDonald Av, suite 3 3491 S. Roosevelt Blvd
Key West, FL 33040 Key West, FL 33040
305 202-0610
wwapinto@nv2aarouD.com
Design changes as per latest 100%Conformed Design drawings
PHASE 1
1. Design change Gate Counters (8)one additional counter added - material $ 18,069.00
(s.surface replaced w/ quartz, added removable quartz panels, st. steel toekick, interior plam finish)
2. Design change on Gate Counters (install aluminum edge profiles-clear anodized finish) $ 1,200.00
3. Design change on Gate Counters-installation/ labor $ 9,600.00
( 2 people for 8 days) 128H @ $75/h
4. Additional back of Gate Counter cabinets- material $ 46,100.00
5. Additional back of Gate Counter cabinets- installation/ labor $ 19,200.00
(4 people for 8 days) 256H @ $75/h
6. Design change on Gate Counters (install st. steel trims on removable quartz panels) $ 1,200.00
7. Design change on Gate Counters (instal[steel brackets under front counter overhang) $ 1,350.00
8. Nursing room quartz vanity additional scope (material+install) $ 1,750.00
9. Nursing room plam cabinets (material+install) $ 1,400.00
10. Rest rooms quartz wall caps 9"and 6"deep (supply and install) $ 10,780.00
11. Design change from Quartz Stellar white by Cosentino to Niagara by Daltile $ (8,900.00)
subtotal PH1 $ 101,749.00
PHASE 2
1. Design changes TSA Rm 232 cabinets Et Sheriff Breakrm 246 added - material $ 4,200.00
2. Design changes TSA Rm 232 cabinets Et Sheriff Breakrm 246 added - installation/ labor $ 1,800.00
( 2 people for 2 days) 24H @ $75/h
3. Design changes Lost Baggage Counters- material $ 3,500.00
(knee wall structure, transaction top and st. steel toekick added)
4. Design changes Lost Baggage Counters- installation/ labor $ 5,025.00
( 2 people for 3.5 days) 67H @ $75/h
5. Additional plam finished counter tops w/ steel brackets in ATO rms- material $ 12,740.00
(PL-2 finish WA 5044-60 Beachwalk w/ 3mil matching pvc edgebanding)
6. Additional s.surface counter tops w/ steel brackets in ATO rms- installation/ labor $ 12,000.00
(4 people for 5 days) 160H @ $75/h
7. Remove casework in ATO's Rms 146D, 147D, 148D, 149D, 150C and 151D $ (21,809.00)
8. Remove Rental Car counters (5) (38,737.00)
subtotal PH2 (21,281.00)
Profit margin for COR as per contract (10%) 8,046.80
Subtotal $ 88,514.80
Tax rate 6%
Tax due $ 5,076.54
Other $ 50.00
TOTAL $ 93,641.34