Loading...
HomeMy WebLinkAbout2022-82 Aircraft Overflow Apron Construction Support MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date Upon Execution 5/9/2025 Task Order No. 2022-82 Client Project No. 404-630215-SC_00038 Engineer Project No. E9Y379D9 This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS PROJECT MANAGEMENT CO. ("Consultant"), dated February 16, 2022 ("Agreement"). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized—EYW Aircraft Overflow Apron Construction Support and RPR Services—Supplemental 4 Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 2 page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price of$ 96,741.00 N/A Other(Describe): NF110E COUNTY ATT0nNEY Schedule ' `77 Services may commence on Execution ASSIST N AT7O6EY Services will cease by 600 da s taunt 5/8/25 Recommended by: Approved by: A Digitally signed by Christine Christine Hurley 117 Hurley Date:2025.05.09 09:13:21-04'00' Director of Airports Date: 5/8/25 Asst./County Adminstrator Date: CONSULTANT: JACOBS PROJECT MANAGEMENT CO of a ae dao imaoss BJ g¢a vsiee v s, Jacqueline oN Ro==o-aooes. IIIh,m aooesoom aIso1:i ae��I ro me oms ev me Witness Ross -P01M,S19^t��-thI_d..,m,,� V. P. Operations oae:zozs.o o 1oo.00 Title File: MSTR APES Monroe County Page 1 of 1 Exhibit A—Scope of Work (04/22/2025) Monroe County Key West International Airport Aircraft Overflow Apron Construction Support and RPR Services—Supplemental 4 Scope of Work Under Task Order No. 12/1 S-D9, Jacobs Project Management Co. (Jacobs) provided construction support and resident project representative (RPR) services for the "Aircraft Overflow Apron" project at Key West International Airport (EYW). The project includes the construction of the aircraft overflow apron and the associated mitigation areas on airport property (ONS-1, ONS-2, and ONS-3) and off airport property at Summerland Key(OFS-1) The original design for the EYW Aircraft Overflow Apron and Mitigation Areas project was advertised in September 2021. For the proposed work on Summerland Key, the original design utilized an existing haul route to access the mitigation area. Due to the USACE and SFWMD permitting delays, the construction did not start until April 2024. Between September 2021 and April 2024, the existing haul route to access the mitigation area overgrew with mangroves. An SFWMD permit modification was required due to the change in site conditions and presence of mangroves. Additionally, to meet permit requirements it is necessary to complete a Time Zero Monitoring Report. The Time Zero Monitoring Report includes evaluating the site post construction and developing a report on the site and plant conditions at the mitigation areas. This proposal includes the survey and design required for the Summerland Key (OFS-1) Haul Route.Additionally, it includes the drainage design permitting efforts required for the SFWMD,the SFWMD permitting fee, and the Time Zero Monitoring Report. Assumptions Jacobs will invoice on a percent complete, including expenses, to compensate the level of effort required for each assignment. The scope of services and pricing is provided based upon and shall be performed under base agreement"Master Agreement for Professional Services".The Master Agreement for Professional Services is between Monroe County Florida and Jacobs Project Management Co. with an execution date of December 14, 2021 (together the base agreement Master Agreement for Professional Services and any amendments thereto are defined as the "Agreement"). Notwithstanding anything to the contrary contained or referenced in this Scope of Services, the terms and conditions of the Agreement shall govern all staff augmentation under this Scope of Services. 1 ARTICLE B— DESIGN, SPECIFICATIONS,AND MEETINGS 1. Develop the following sheets for the SFWMD permit plans: Sheet Name Number of Sheets Title Sheet 1 Existing Conditions 2 Demolition Plans 2 Geometry Plans 2 Typical Sections 1 Total Sheet 8 2. Prepare for and attend virtual pre-application meeting with SFWMD. 3. Prepare for and attend virtual pre-application meeting with FDEP to discuss the haul route on TIFF lands. 4. Submit permit package to SFWMD on-line portal. 5. Respond to Requests for Additional Information (RAIs) from SFWMD. Assume 2 RAIs. 6. The proposal includes the additional funds needed to complete a detailed as-built survey of the mitigation sites boundaries for the conservation easements. Services for Article B will be provided under a lump sum basis. ARTICLE D —CONSTRUCTION PHASE SERVICES 1. Inspect mitigation sites ONS-1, ONS-2, ONS-3, and OFS-1 (Summerland Key) post construction and evaluate the post construction site and plant conditions. Develop a Time Zero Monitoring Report of the mitigation areas for the permitting agencies. This task will be completed by Birkitt Environmental Services, Inc. Services for Article D will be provided under a lump sum basis. 2 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Key West International Airport Project: Aircraft Overflow Apron Construction Support and RPR Services-Supplemental 4 FEE SUMMARY BASIC SERVICES Hours Fee DBE AMOUNT Article B: Design,Specifications and Meetings 436 $ 58,188 S Article D: Construction Phase Services 0 $ - $ Total Basic Services Lump Sum Fee 436 $ 68,188 $ SPECIAL SERVICES Hours Fee DBE AMOUNT Article B: Design,Specifications,and Meetings O'Neal Surveying and Mapping $ 20,053 $ 20,053 Article D: Construction Phase Services Birkitt Environmental Services $ 18,500 $ 18,500 Total Special Services Lump Sum Fee 0 $ 389553 $ 389553 SUBTOTAL LUMP SUM PROJECT FEE 436 $ 969741 $ 389553 TOTAL LUMP SUM PROJECT FEE $ 969741 Pagel of 3 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Key West International Airport Project: Aircraft Overflow Apron Construction Support and RPR Services-Supplemental Article B:Desian,Specifications and Meetings Sr.Proj. Pro Senior Sr.Ca" ORKITEM Project Director Manager Sr.Engineer Engineer- Engineer Designer Tech Clerkal TOTAL I Develop permit set 12 200 212 2 Prepare for and attend virtual pre-application 12 16 28 meeting with SFWMD 3 Prepare for and attend virtual pre-application 12 16 28 meeting with DEP 4 Submit permit package to SF WMD online portal 8 8 5 Respond to RAIs from SFWMD.Assume 2 RAIs. 40 120 160 6 As-built Survey TOTAL HOURS 0 84 0 352 0 0 0 0 436 RATE $ 235.00 $ 190.00 $ 155.00 $ 114.00 $ 90.00 $ 135.00 $ 121.00 $ 59.00 PAYROLL ESTIMATE $ - $ 15.960 $ - $ 40.123 $ - $ - $ - $ - $ 56,088 TOTAL PAYROLL $ 56,088 Subconsultants $20,053 Task Expenses: Expenses $ 2,100 Pennitting Fee $ 2,100.00 Lump Sum Fee Total $ 78,241 Subconsultants: 6 O'Neal Surveying and Mapping $ 20,053.00 Total $ 20,053.00 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airport: Key West International Airport Project: Aircraft Overflow Apron Construction Support and RPR Services-Supplemental 4 #REF! Sr,Prof: Sr; Project, Senior I Sr.Cadd WORK ITEM Project Director Manager Engineer Engineer Engineer Designer Tech Clerical 'TOTAL" 1 Inspect mitigation sites and complete time zero report. TOTAL HOURS 0 0 0 0 0 0 0 0 0 RATE $ 235.00 $ 190.00 $ 155.00 $ 114.00 $ 90.00 $ 135.00 $ 121.00 $ 59.00 PAYROLL ESTIMATE $ - $ - $ -1$ - $ - $ -1$ - $ - $ TOTALPAYROLL $ - Subcomi&ants $18,500 Task Expenses: Expenses $ Lump Sum Fee Total $ 18,500 TOTAL FEE S 18,500 Subconsultants: 1 Birkitt Environmental Services $ 18,500.00 Total $ 18,500.00 Page 2 of 3 254E. 0m/4vo, Suite 1O2 m Tallahassee, Flohda323O3 04OO Manatee Ave.VK. Suite L,113 m Bradenton, Florida 342OQ ACeii ified VVomanOvned %inority/DioadvantagedBuoineoo May 7. 2O25 Ms. Lasa Ennis, PE Project Manager—Aviation Jacobs RE: EYVV Aircraft Overflow Apron and Mitigation Sites As-built Survey Proposal O'Neal Surveying and Mapping, Inc. (]8K8) is pleased to provide you with a scope nfservices and proposal for the above- referenced project in Key West, Florida. This proposal is to supplement the original proposal(dated October 27, 2021, for $25,000). Portions of the original proposal were allocated for 2 tasks that were not included: ° Sketch and Legal Descriptions for Mitigation Areas ONS-1. O/VS-2. ONS-3 and Summorland Key-$&66600 ° OF3-1 Haul Route Survey-$f,00800 For a total of$14,665.00 used for scope of services outside the original contract. The total funds remaining un the original contract is$10,335. This proposal covers the remaining fee needed to backfill the original contract. SCOPE OF SERVICES—NEW CONTRACT HORIZONTAL&VERTICAL CONTROL O8K8 team will verify positions on published Primary and Secondary Airport Control points and on control points which were previously established by O8K8 and others. O8K8 will establish new control as may be required for this survey. All survey control will be referenced to North American Datum 1083 (NAO83) (2011 Adjustment) and North American Vertical Datum 1088 (NAVO88). ° Locate and verify existing site control as previously established and/or establish new control as necessary for this project. TOPOGRAPHIC SURVEY The O8K8 team will provide a TnpngnophicAs'Bui|t Survey for(5) sites including the Aircraft Overflow Apron as shown nn the attached Exhibit Plan Sheet C'GO2and (4) sepanote Mitigation Sites asshown on attached Exhibit Plan Sheets C'502thru C'505 (provided by the client). The attached Exhibit Sheets depict dashed "Limits of Disturbance" lines which will be the limits of the areas to surveyed. Any additions to these limits may require additional fees, to be determined. Tasks for this proposal include: ° Pavement elevations measured nna25'Grid. ° Concrete pavement elevations measured at4 corners at each joint. ° Ground elevations measured nna5O'ghd. ° Provide edge nfpavement. ° Survey significant grade break lines within limits of survey. NOTE: This includes as-built location of the various proposed grade breaks depicted within the Mitigation Site area on Plan Sheet C-505. If significant grade breaks are discovered during the as-bult survey in Mitigation Sites on Plan sheets C-502 thru C-504 they will be located, otherwise, as-built grade contours within Mitigation Sites on Plan sheets C-502 thru C-504 will be determined from the 50'grid. • Vegetation and tree lines within limits of survey. NOTE: This location is for overall vegetation outlines of existing or planted areas and does not include individual plant or line location of various species such as those noted in the Planting Schedule on Sheet C-502. • Fence lines • Provide locations of visible major structures such as manholes, taxiway edge lights, drainage structures, taxiway signs/foundations, concrete duct markers, pavement markings, aircraft tie downs. • Elevations for light fixtures to be measured at top of foundations • Elevation of sign foundations shall be measured at four corners • Elevations of structures shall be measured at the center • Provide drainage structure invert elevations and bottom of structure elevations PLEASE NOTE: • This project is scheduled as daytime operations with pull backwhen required.Jacobs will provide badged Airport escort or arrange for Airport Operations Escort for OSM survey crews. • This As-Built survey is scheduled to follow construction completion on the (5) project sites. This As-built survey for the (5) sites is to be scheduled together as one continuous survey operation/deployment. • This proposal excludes deployment of survey crews within a week of any Federal holiday and during Lobster season. • This proposal is valid only for Notice To Proceed with within one year of acceptance. Remaining Lump Survey Fee needed to cover the original contract $ 20,053.00 WORK ZONE SAFETY: All work zone and Airport safety, rules and procedures as required by the Key West Airport will be observed and strictly adhered to by OSM.All survey activity will be coordinated with Jacobs staff prior to and during commencement. Any and all vehicles to be utilized in said survey activities will be authorized by and registered as may be required. Said vehicles to have current decal, display company name/identification and maintain proper lighting requirements. QUALITY CONTROL/QUALITY ASSURANCE AND FIELD REVIEW: Verification of the field conditions as related to the collected survey data prior to any topographic survey data submittal. All activities required to supervise and coordinate the survey project will be performed by the OSM project supervisor, a Florida P.S.M. or their delegate. OSM will implement their QA/QC plan to include review, response to comments and any resolution meetings if required, preparation of submittals for reviews, etc. Deliverables will include the ACAD Civil 3D digital files of the topographic survey, Signed and sealed copies of survey as required. Thank you for this opportunity and please do not hesitate to contact if you have any questions or need anything else. Sincerely, Michael O'Neal, PSM, VP O'Neal Surveying &Mapping, Inc. NOiion iSNOO 2OV lON 0102 oO 03nssi oisgO:)e NV�d SNOIiVnd�d CD lOdS 1NIOf 00d ��U v NoIiVeliiw�ONV N 021dV MOB 21 AO 1VV23 IV ----------------------------------------- Lu o} Z Q Y o x� \\ 2, I / I 0 I I � o 0 i >' - > O d d 1 Q S w ,> 9 d 9 W > > u i O aIQ a 4 Z / O o d D° w11 � I F 000 Iil -�oo� ., oo a \ oo+e O - � - 3 3NI13Stle d ouana Noo U 4 � U U 10 s i i 0 i i i 11 d d 9 d 9 / 9 d 9 mo d� ow '- dw I I I � � I ' I / I d / 19 >/ S+ o o < < Z . 1 w i 1 W ❑ U Q NOiion iSNOO 2OV lON 0102 oO o3nssi oiSgOw,o d„ NV�d o ONI(JE)W-SNO U m NOliVel IN GNV N021 VMO/V AOiVV OdV (Mg O i33HS 33s sn0n NI1NOO)3NOHOIVW N r v a G } o Z II Q N i w r r o -� u w m y oI 1 x � � z w r w x x x w rm b, o� mo � e n o m e a J F m F o m a s o o� zuoo a o 0 �LL om zwoo w^ �s am �xwz � m � w oa �z mzxa a iil o a zW LLo�> x 0 aTw _ �m O 0o w- of o �o �o 00 s a - q Q v z om oomQ a w �LL o a o > o �' w o x i Z o w r m s W m 00 omu Jmo - o <¢m l a ° mQ< - 0 � owwa Z z m m X � w o� z o > d� mS O d > ud O Z W O x mOG Od FZ W¢ �O O o OOX r�Q ZQ WJ �- ¢ m O O Z H W m QOD 'rLLi 'O Do d� ......... W Z <XD xi Ow OIL W~ w F W W Q. m W x W QZ ¢W WZ O dLL O d0 d o OJ H OV G -x I BO8 U 1J a I �� 0 8 oWo a o Z ow t oa w > m 1.8m �o rdm mmoN U �LL J 0 o � o J� J 0 o O Z88 8 8 x ss �r o mo a a a ��z a� m<ax �JomW w�oz za wawo am wu� IN �uizx ax 0 Z u u W �u< wQ w w amp �a iad< a x x I lu I r I II o K a� W r„f a Z ry m o W Z W Lu z 0 0 r Z F A t � v v v v v v v m m m m m m m a y y y d �r d d a d > >a w w W zo m — z _c z W a LL o m a 3 3 g 8 0 z — < O w 0 W z m d o w W g 0 0 z� E = ee et a m m m 0 m m m 0 o Z Z Z z m m o O O m 8 8 8 E v a O O O O O m � W o x x x 8 o, �e r oz LU w ❑ U Q N0110f12iSNO 2O110N 0102 o0 o0 f1SS1 o=sgo�e NM�d co ysar IlMOIlIW 4NM E �NO °No1ivsiiiw"aNv ' `E)MC M JE)Z-SNO ��C) N 021dV MM12 0011V23 IV I i 0 on aQ � r a � c a " Z o" a„ I � 2 a o w a a < w as o „a o a= o 0 0 0 0 0 0 :A Q.W \ of I a wI - oI � m m m m m m m ON o o I ' o� a I z ��I o �m x x - E _� II . o � E Ma oom 0. >d o< 2E m 0J ao m m ,0 z <xo o� o=, w maw go �wiil mm o Jz -o o �I 02 z 0 mLL oaoo z z� >a 0 o �m mmww z LLK �g� o <� mw mQOo wr0 u�0 15 15 w m p m 3 w < 0 _ m u w x N} w 0 m z ry so \LL f c J z 0 a I ao < > w 0 o > > 1 > < 0 w 0 `o 0 0 z z � 0 � � z x x wu m <o 0 m -m z 0 0 < m 0 < m o o m u o o 0 u < 0 z > 0 0 w < < z w 0 w ao o m < m m w o m 0 0 u 0 0 0 0 > w 0 d � m, d d d 0 0 m x 0 0 0 m m m 0 x � 0 0 0 x x � o / Z o w i w J (ZOS'J i33HS 33s snort NUNOO)3M0HO1VW ❑ U Q NOiion iSNO 2OV lON 0102 oO 03f1SS1 m o=sgo�e NM�d o ysar IlMOIlIW 4NM E �NO °No1ivsiiiw"aNv ' `JNIC M JE)£-SNO ��C) N 021dV MO/V 21 AO 1VV23 IV 1p1� y9p�p,lllllllll RIS N90 JI,'Id�OIN YNMai J b�WWf�I0111V YNrch➢u'No IWWII Gd'RA�'@ V Z Z � �I > Lx _ 1 � 1 1 i 1 1 f 0 < o o10 wo Po w mmoQaw o��LL0 oU�l - I 0—< moon m ii m3mW JQQY s z� J�mzom�m �u m m— u m��o <ommmm �� <U< <m�m m m wmz <mmm�Y z wJouom wwo uu w<m Jz =awm � m>mmw< mom w�z� < i I z m �z o m u K < 0 \ lu O, u < ° z w m w m m z W o < J < Z a I w c jl lu 0zmowma mza z o o o a 0 z u z< amaow zou wc>°zmu� mzmu mo z ° 0 mo < p 800u ° o z o m i o o o o x x x ozm ux z qq LU W \ \J ❑ U < NOiion iSNO 2OV lON 0102 o003f1SS1 o=sgo:)e NV�d LO o ysa r NOUVEDUIW4NV 2E L�) No1ivsiiiwaNv `JNIGV2JED l-SRO �z(_j N021 VMMV AO 1VV2OdV m Q J Y i r o ,. o a � o w� 0 Q�goo �a� «< zw xwawa uuao Jo owJLL gz=o o 0 o mo�� w0 m m�U�Mw z<LLzK J� �0, J ow< �� �z m� m o<aQao,w�o� z�ogow » <=� ��<»ow=�zoz� < m 3:xmo Wz0<oo mo � �wo < am Lu wzo 1<o mmw1 <U< o<�fmz 1 0, mew lu /-� j ow �� x( �I o 0,2. 0,2. 0,2. w a� zo <� m m a a A � i i o o �: o x zPz z w I o 0 0 z < mQ 1 w <A _ < LL .. o o k � � o o w � � r Q z w w w z � c� c� � Q o w w u 0 o u > w w c� c� c� �'w z � z z z v w w w w a w w o �E + o "> ff � m � I o N $� w o Nw w v w J ❑ U Q LITT r NVIRONMENTAL SERVICES, INC. www.birl4itt.com February 24, 2025 Chris Bowker Jr., P.E. Lasa Ennis, P.E. Jacobs Engineering 200 W. Forsyth St., Suite 1520 Jacksonville, FL 32202 Project Name/Location: Key West International Airport Aircraft Overflow Apron (Jacobs Contract 148043760 — Project E9Y379139) Time Zero Report for SFWMD Dear Mr. Bowker and Ms. Ennis, Birkitt Environmental Services, Inc. (Birkitt) is providing this scope of services and charges to perform environmental services for conducting the time zero monitoring and preparing the report to regulatory agencies as required by permits.) at on-site and off- site mitigation areas. pursuant to SFWMD permit. 4.4 Agency Time Zero Mitigation Monitoring and Report — Completion (Additional Services Required.......... e Task) Birkitt will conduct the Time Zero monitoring upon completion of the mitigation areas and restoration of Haul Road. We will prepare a Time Zero Report for agency compliance for each mitigation site (ONS-1, ONS-2, and ONS-3; and OFS-1 and the Haul Road Restoration) as required by SFWMD permit conditions. 126 31d Ave North,Suite 101 Safety Harbor,FL 34695 Tel:(813)259-1085 AOA Construction Support and Permitting Time Zero Monitoring for Agencies February 24, 2025 Time Zero Monitoring No Agency More Extensive Monitoring per and Report Monitoring and Permits and Agency Report Preparation for Report in Original Preparation Agency Compliance Scope Total Additional Task 4.4 Agency $18,500 Mitigation Monitoring and Report Year 1 We appreciate the opportunity to provide environmental services for this project. Please feel free to call us at 813-259-1085 or email at iritt birkittecom or rtothCabbirkitt.com if you have additional questions regarding this proposal or other services. Sincerely, Beverly F. Birkitt Robert Toth President Vice President BIRKITT ENVIRONMENTAL SERVICES, INC. 2