Loading...
HomeMy WebLinkAbout7th Change Order 06/10/2025 MONROE COUNTY/ENGTNEERTNG/PRO Et r MANAGEmENT CONTRACT'CHANGE ORDER PROJECT TITLE: Aircraft Overflow Apron and Mitigation CHANGE ORDER NO: 7 INITIATION DATE: 05/30/2025 TO CONTRACTOR: Charley Toppino&Sons CONTRACT DATE: 02/16/2022 The Contract is changed as follows: The original Contract Sum ............................................. $ 5,416,177.15 Net change by previously authorized Change Order ..........�......................a.,,,.,.,r.,,...,...$ 1,335,684.55 The Contract Sum prior to this Change order was.................... $ 6,751,861.70 The Contract Sum is(increased) by this Change Order 7............................... 27,898.06 The Revised 1 Contract Sum including this Change Order..................... $ 6,779,759.76 During the punchlist inspection for the EYW Aircraft Overflow Apron project on Wednesday, May 14th, 2025, miscellaneous electrical repairs were noted. The EYW Aircraft Overflow Apron project was originally designed in 2021. Since 2021, existing electrical features, including junction boxes, overhead lights, etc., that the proposed design tied into, changed conditions. Some of the existing features were removed and some features degraded over time. The miscellaneous electrical repairs noted during the punchlist inspection include improving the conditions of the electrical features to increase longevity. Net change to contract Change Order 7$27,898.06 This Change Order 7 does not increase the contract calendar day count. Contractor agrees to accept the increase in monetary compensation and hereby waives and releases any and all claims for any additional compensation related to this change order. This Change Order 7 represents 0.515% increase of the original contract price. Not valid until approved by Owner Architect Jlf applicable), and Contractor 05/30/2025 ARCHITECT/ENGIJ R 0 to CONTRACTOR' De AIRPORTS DIRECTOR f 06.03.2025 Christine Christine Hurley Date H u rl e Date:2025.06.10 COUNTY/ASSISTANT ADMINISTRATOR Y 12:35:29-04'00' Date NROE COUNTY ATMnN79 AOVE1 EC PE�' 0 J. CA ASSIST ATTORNEY Date 6/5/25 Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The original project was designed in 2021. Since 2021, the existing electrical conditions changed. Some elements were removed and some elements degraded. The proposed change order accounts for the changes in existing conditions. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds$25,000 or 5% of contract price(whichever is greater). Yes❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project engineer/architect approves the change order. Yes ® No ❑ If No, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: Change 0 der Attention: Jacobs DATE: 5/29125 200 W..Forsyth St Suite 1520 Jacksonville,FL 32202 ITEMIZED QUANTITIES hocallolru 3491 S Roosevelt Blvd,Ke"y West FL 33040 Scope: Punchltst Modt0oabon Miac Electrical Repairs hero Deabn lbaft u'embC U." 4;am ¢und ww dent 4Ldak w e's .. _... _..... 1 IPunchYist Ntodnccetron: N 0�..... I,S $ 24,25918 $ 24 2aa..'V8 vrraarrvud axnn7wap Ake .worn Jlsw�.JMR corerhreJartu '�. d2ovaaovunl'ar na�.wlnpt�Npyauaaw�lluamrJaaaVwwa �.ar.rt ue 2'raandwut er,r.M1ia;.�u rod ui,revaarwi euarvaPNaWvs ................�_.......... ...,., ........"...................�.., ... ...... _...._�..� M........ ._Wi �°daVP n�uev ea wrYuz Pro woo ddK ao&9 rvuiwwad uear;lara'.ry laerxrwsn edl�drxrad aN ...Vem I .,_.......�.. .._,........ __.,.................................... .. ........ '_...._........ W Subtotal $ 24,269.18 L. 2 Overhead 6 Profit 159h _. 1 A..... LS $3 636 66 ].976,66 3 PedormancelPa ment Bonds 20.00/Thousand 1,0 LS 4 obilizefion/Demobilization 10 LS 5 On"rar cone i"s, 1,6 LS Total: S 27,898.08 Exclusions:....... usians: .,_..�.�.�.�.�.�...................... �............._....... .�.. ......................_ �.�....m.�....m......�.,,.�.�.�.�.�..�...�..... Frtol Prepared by: Estimator i"� Rharley Toppino li Sons,Inc. Sheaf 1 011..... Data,: SP,T9I26 �' Signature: Date: