HomeMy WebLinkAbout7th Change Order 06/10/2025 MONROE COUNTY/ENGTNEERTNG/PRO Et r MANAGEmENT
CONTRACT'CHANGE ORDER
PROJECT TITLE: Aircraft Overflow Apron and Mitigation CHANGE ORDER NO: 7
INITIATION DATE: 05/30/2025
TO CONTRACTOR: Charley Toppino&Sons CONTRACT DATE: 02/16/2022
The Contract is changed as follows:
The original Contract Sum ............................................. $ 5,416,177.15
Net change by previously authorized Change Order ..........�......................a.,,,.,.,r.,,...,...$ 1,335,684.55
The Contract Sum prior to this Change order was.................... $ 6,751,861.70
The Contract Sum is(increased) by this Change Order 7............................... 27,898.06
The Revised 1 Contract Sum including this Change Order..................... $ 6,779,759.76
During the punchlist inspection for the EYW Aircraft Overflow Apron project on Wednesday, May 14th, 2025, miscellaneous
electrical repairs were noted. The EYW Aircraft Overflow Apron project was originally designed in 2021. Since 2021, existing
electrical features, including junction boxes, overhead lights, etc., that the proposed design tied into, changed conditions.
Some of the existing features were removed and some features degraded over time. The miscellaneous electrical repairs
noted during the punchlist inspection include improving the conditions of the electrical features to increase longevity.
Net change to contract Change Order 7$27,898.06
This Change Order 7 does not increase the contract calendar day count.
Contractor agrees to accept the increase in monetary compensation and hereby waives and releases any and all claims for
any additional compensation related to this change order.
This Change Order 7 represents 0.515% increase of the original contract price.
Not valid until approved by Owner Architect Jlf applicable), and Contractor
05/30/2025
ARCHITECT/ENGIJ R
0 to
CONTRACTOR'
De
AIRPORTS DIRECTOR f 06.03.2025
Christine Christine Hurley Date
H u rl e Date:2025.06.10
COUNTY/ASSISTANT ADMINISTRATOR Y 12:35:29-04'00'
Date
NROE COUNTY ATMnN79
AOVE1 EC
PE�' 0 J. CA
ASSIST ATTORNEY
Date 6/5/25
Change Order Attachment per Ordinance No. 004-1999
• Change Order was not included in the original contract specifications. Yes ® No ❑
If Yes, explanation:
The original project was designed in 2021. Since 2021, the existing electrical conditions changed. Some elements
were removed and some elements degraded. The proposed change order accounts for the changes in existing
conditions.
• Change Order was included in the original specifications. Yes ❑ No
If Yes, explanation of increase in price:
• Change Order exceeds$25,000 or 5% of contract price(whichever is greater). Yes❑ No
If Yes, explanation as to why it is not subject for a calling for bids:
• Project engineer/architect approves the change order. Yes ® No ❑
If No, explanation of why:
• Change Order is correcting an error or omission in design document. Yes ❑No
Should a claim under the applicable professional liability policy be made? Yes ❑ No
Explain:
Change 0 der
Attention: Jacobs DATE: 5/29125
200 W..Forsyth St
Suite 1520
Jacksonville,FL 32202
ITEMIZED QUANTITIES
hocallolru 3491 S Roosevelt Blvd,Ke"y West FL 33040
Scope: Punchltst Modt0oabon Miac Electrical Repairs
hero Deabn lbaft u'embC U." 4;am ¢und ww dent 4Ldak w e's
.. _... _.....
1 IPunchYist Ntodnccetron: N 0�..... I,S $ 24,25918 $ 24 2aa..'V8
vrraarrvud axnn7wap Ake .worn Jlsw�.JMR corerhreJartu '�.
d2ovaaovunl'ar na�.wlnpt�Npyauaaw�lluamrJaaaVwwa
�.ar.rt ue 2'raandwut er,r.M1ia;.�u rod ui,revaarwi euarvaPNaWvs ................�_.......... ...,., ........"...................�.., ... ...... _...._�..�
M........ ._Wi
�°daVP n�uev ea wrYuz
Pro woo ddK ao&9 rvuiwwad uear;lara'.ry laerxrwsn edl�drxrad aN ...Vem
I
.,_.......�.. .._,........ __.,.................................... .. ........ '_...._........
W
Subtotal $ 24,269.18 L.
2 Overhead 6 Profit 159h _. 1 A..... LS $3 636 66 ].976,66
3 PedormancelPa ment Bonds 20.00/Thousand 1,0 LS
4 obilizefion/Demobilization 10 LS
5 On"rar cone i"s, 1,6 LS
Total: S 27,898.08
Exclusions:....... usians: .,_..�.�.�.�.�.�...................... �............._....... .�.. ......................_ �.�....m.�....m......�.,,.�.�.�.�.�..�...�.....
Frtol
Prepared by:
Estimator i"�
Rharley Toppino li Sons,Inc.
Sheaf 1 011.....
Data,: SP,T9I26 �'
Signature: Date: