HomeMy WebLinkAbout7th Change Order 06/05/2025 MoNRor CouNTYIENGINFYRINGINOTECT MANAGmwr CONTR cr CHANGF ORDER PROJECT TITLE: Commercial Apron Expansion and Mitigation CHANGE ORDER NO: 7 INITIATION DATE: 06/27/2026 TO CONTRACTOR: Charley Toppino&Sons CONTRACT DATE: 10/11122 The Contract is changed as follows: The original Contract Sum ......................................................................................$17,166,179.68 Net change by previously authorized Change Order .....................................................$ 594,770,27 The Contract Sum prior to this Change order was....__..__............. ......__..............__$17,760,949.95 The Contract Sum is (increased) by this Change Order 7 $ 219,223.35 The Revised 1 Contract Sum including this Change Order ............................................ $17,980,173.30 This Change Order No.7 includes the relocation of the injection well platform at Key West International Airport as part of the Commercial Apron Expansion and Mitigation project to accommodate Gate 8 for Concourse A. Scope of work includes demolition and removal of existing concrete pavement, installation of new concrete platform pads„ and relocation of associated electrical infrastructure. Construction activities will include installation of new underground conduit and wiring, relocation of the existing service pole and meter, installation of new junction boxes, and a new equipment rack. Additional work includes coordination with Keys Energy for service disconnection and reconnection, trenching, and installation of a new ground ring. All work to be completed under this change order must meet Commercial Apron Expansion and Migration Technical Specifications. The total cost to complete the work as noted within this change order is an increase of$219,223.36. See attached price quotation from Charley Toppino & Sons, Inc. Net change to contract Change Order 7: $219,223.36 The construction commencement was June 19, 2024, This Change Order 7 does not increase contract time. Contractor agrees to accept the increase/decrease in monetary compensation and hereby waives and releases any and all claims for any additional compensation related to these bid items. This Change Order 7 represents 1.28 % of the original contract price. Not valid until aeproved by Owner Architect if applicable), and Contractor ' , 4A'1%�'�' 05/29/2025 ARCHITECT/ENGIN E �'. .�� '�'�' � i°r �1 ,�' i D7e CONTRACTOR or to AIRPORTS DIRECTOR 05/30/2025 Digitally signed by Chris IQLate COUNTY/ASSISTANT ADMINISTRATOR Christine Hurley Hurley Date IF OE COUNTY IINEY AICiI'E FORM "lW 7 m" L PEO J, DG----- AS°SISTA UNTY ATTORNEY Date _ 5/30/25 Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes E No El If Yes, explanation: 1. As the Concourse project progressed, it was determined that the pumped injection platform had to be relocated to accommodate the expansion. The platform relocation was not anticipated during the original design. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds$25,000 or 5% of contract price (whichever is greater). Yes ❑ No Z If Yes, explanation as to why it is not subject for a calling for bids: • Project engineer/architect approves the change order. Yes Z No ❑ If No, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No M, Should a claim under the applicable professional liability policy be made? Yes El No Z Explain: Attachment 1:Contractor Proposal Chan a Order Attention'. Jacobs DATr 5/1 W.5 200 W Forsyth St Suite 1520 Jacksonville,FL 32202 ITEMIZED QUANTITIES Location: 3491 S Roosevelt Blvd,Key WaM Ft,.33040 Scope: Ir12cl6on Wall Platform Revision „„ ......._._._ _. ROM Deauri ion UrNln LMt ar Un1t Line Item Cant Notes _.._................... ....._..... _W.. ...._............_ _....... __._ _...... .._.._�,„.....................F'crrenxan 27.0 MiRS 96.2q .. ......... .......__........,........_._._.......__......._...._.___...___ ._......_. ,._........._....,..._�__.........___.___. �_......_....2,567;4Q,__"__.._..»»............ _._.. ....,._.... 2'7,q HRG,.... $ 84.60 22281 5t� 3 Laharer 27.0 ,LL HRS $ 54.60 $ I474,2.0 4 Laborer 2'7,p FIRS_ $ 54,60 �..�...'�rl„4/4,2tl _...... .... 2'7,0 MR9 $ S4,60 �. �.. 1474,20 6 LaNdar _ 27o Has $ 15600 4212.gU Gxcavatar� _ 2T.V7 MRS S 162.50 $ 4 mm„387,5Q,p _ ..... ................... .. ....._.._,..........,. ..,...._._.._,,..,....... ..,.... ........_ ........�______....,..,. ____....,..__....._____.... _ .,.,,., _.. m 8 PCC Sudauo Coulrue Nan-raintroraad °I..NS � _._ Sq g eY $ . 233 16 $ 11,656.pt7 ___ i6,U SY $ .......... ...72.8f1.,_S, 364q.gq _....................._...,...., ._._...... .......�s.0 .................._1 7g Pavarnant Remirval Cronc;rata ....,.... °w ., .._. SY $ 72.66 ffi116b,8g „,__....._... 11 Nn,57 Rark Baddin Matenal.. �~,��. 2fl.p TONS $ 'Y6,22 $ 1 524.40 2.p„„,„„ EA $ ;A 33U.gp $ ._W 2 660,00 _ 13 Marc,6,ypslssµFtental 1Manih .._ _.._.._.._ .. 1.p ...........,t.S $ 7916.45 S 7916.45 14 GPF2 Sea_._ .__...._.__ ..... _..._ ....._ ,t.0 l.S, $ 22Uq.tlq 2200.021 _...__. B0 0 h114,"s $ t14.50 $ 6 76g,U4 _... ,,,,,,,_M16,._ mm. Puxdrq t"att orr ecr 3uburntracor 4uate i.0 LS $ 128r,55g,,Og $........_ .12P9,S5g.gp .._ .... ..._ _______,.,...._._......._..,...)_.........._'_'_____.„,._.....__._.,.,„. ...._� ............ ........ .__,.,,., .. ........... _....... 17 _ Ganarata Platform Pads See Surrorttracor Cluote 1.0 WW4 LS`�..._._$_�W�14 8g._0 00 ,5 1 817q.O .... .... Subtotal $ 188,774.8b ,,,_„ i 8 CWa wad&F+ralGt L.irva it n 1 16 15'Yr Y.0 l.S 8 3'33_ '7U $8 113.70 16 Gvedread&Pratit an SukrcAantracvr 1p%h� 0 LS $'14,135,CY6_,........._�$141135,017 2g Prxft>rrnanu>/P�ay,nent F3andv S2p.ggffhnusmard i.p t.S 21 Mobll(aatlen/C7enx>ksdNxafrorr 22 General Caizditions .ww. ° 1A LS Total: ,. .. w...._._ _.._._ $ 216,223.36 _N_atus; Prepared by: ,seeaoa r Estimator Chana 'ia ino&Sena Ina. ._.�!..L.�.____. __........_ .._...�__._w_........_....._ _...........................___,__._.__.._._._ _w_w...__.._...._..._____„,,._........_.......... Shank 1 of 1 Data: 5112/25 -----__.__...�.__...e.______._......_._........___,. ............._..._._. Signature. Data: