Loading...
HomeMy WebLinkAbout49th Change Order 09/22/2025 Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 KCA,INSTR.8800.2 Enclosure(1) 3/28/2017 Page 3 MONROE COUNTY/DEPARTMENT OF AIRPORTS CONTRACT CHANGE ORDER PROJECTTITLE: KWIA Concourse A&Terminal Improvements CHANGE ORDER NO 049 INITIATION DATE: 4/26/2024 TO CONTRACTOR: NV2A/Gulf KeystarJV CONTRACT DATE: 8/17/2022 The Contract is changed as follows: The Original(Contract Sum)(Guaranteed Maxium Price) $ 101,461,771.00 Net change by previously authozied Change Order $ 16,876,025.31 The(Contract Sum)(Guaranteed Mxium Price)prior to this Chage order was $ 118,337,796.31 The(Contract Sum)(Guaranteed Mxium Price)will be(incu"eased)by this Change Order $ 74,791.35 The new(Contract Sum)(Guaranteed Mxium Price) including this Change Order is $ 118,412,587.66 The Contract Time will be Qchanged)by TBD days The date of Substantial Completion as of the date of this Change Order is S P22/2026 Detailed Description of change order and)ustulJcatiow Rhiis PCCO authorizes the scope changes as outlined in the approved PCOs 064,123,124,135,and 149 detailed below: PCO#064:the costs associated with placing two 1.5 MVA transformers at designated locations at KW IA PCO#123:Furnish and install 5/8"fire-treated plywood on walls and ceilings to allow for installation the MP-3 and MP-4 wall panel PCO#124:furnish and install(15)fifteen MCP-1 ceiling tiles and 54 SF of grid system for MCP-1 tiles at the new Gate#8 entry vestibule PCO#135:Furnish and install approximately 875 linear feet of walkway pad in accordance with drawing A130 revision 2 dated 02.15.2024 PCO#149:Removal of Artwork and Concrete Arch at Gift Shop in the Existing Departure Hold Room POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: 2C0# Title Schedule Impact Amount 064 Bella-Transformers installation $9,304,64 123 Lotspeich FIR5/8"Plywood for MP-3&MP-4.... $11,157.30 124 Lotspeich Gate 8 Vestibule MCP-1(RCP 1321C Rev 3) $4,979.70 135 Deck-tight-Walkway Pads $36,124.50 149 Concrete Arch Demolition&Artwork Removal $13,225.21 Total: $74,791.35 This change order is 0.07%of the original contract price. Not valid until signed by Owner,Architect(if applicable),and Contractor Signed by: �1�� S 9/12/2025 i 11:57:16 PDT ARCHITECT: 6. Dac.uSigned by: DATE: Signed by: �(IA LVL,V' 9/12/2025 i 04:44:11 PDT CONTRACTORS: DATE: EXECUTIVE DIRECTOR OF AIRPORTS 09.15.2025 DATE: Christine Digitally signed y Christine Hurley H u rl e Date:2025.09.22 COUNTY/DEPUTY ADMINISTRATOR Y 09:01:45-04'00' DATE: NROE COUNTY r Fi A� PINEY ndPtlak �Ds rPIIOVE;�A§PED ,J" a�lEr STA CC LINTY ATMRNEY Date 9/16/25 Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 NV GULF 601LCIIA� KEYST"P'R PCCO #049 NV2A/Gulf Keystar JV Project:20-2039-01-KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami,Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West,Florida 33040 Prime Contract Change Order #049: PCO's 064, 123, 124, 135, 149 TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West,Florida 33040 Miami, Florida 33156 DATE CREATED: 9/03/2025 CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) CONTRACT STATUS: Pending-In Review REVISION: 0 DESIGNATED REVIEWER: REVIEWED BY: DUE DATE: REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT: EXECUTED: No REVISED SUBSTANTIAL SIGNED CHANGE ORDER COMPLETION DATE: RECEIVED DATE: CONTRACT FOR: 20-2039-01:Key West International Airport TOTAL AMOUNT: $74,791.35 Concourse A DESCRIPTION: This PCCO authorizes the scope changes as outlined in the approved PCOs 064, 123, 124, 135,and 149 detailed below: • PCO#064:the costs associated with placing two 1,5 MVA transformers at designated locations at KWIA • PCO#123:Furnish and install 5J'8°fire-treated plywood on walls and ceilings to allow fear instaltatlon the M'P 3 and MP 4 wall par el • PCO#124:fu.arnish and install(15)fifteen MCP-1 ceiling tiles and 54 SF of grid system for MCP-1 Ides at the new Gate#8 entry v • PCO#135:Furnish and install approximately 875 linear feet of walkway pad in accordance with drawing A130 revWon 2 dated 02,15.2024 • PCO#149:Removal of Artwork and Concrete Arch at Gift Shop in the Existing Departure Hold Room ATTACHMENTS KllIA DelrnpnrtAr(wp pelf KWIA_Qp �gh1 PC 135 Rpfrof �Nkwr tnl�.pdf KWI,A Pf1C)6*l 204. a. Transforron,pa (nt9lpclf l4vl Ptt_14 FI_Lotsppph_ t V .Cika�lppa)t aA_PttR1,�G,4�fstpur �_ ird tar tN? )pol POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# Title Schedule Impact Amount .-... ....... _...._ __ _ .._... ..�.. 064 Bella-Transformers installation $9,304.64 123R1 Lotspeich-FR 5/8"Plywood for MP-3&MP-4 $11,157.30 _ .._._.,.,., _ _..... _ _........ _ _. 124R1 Lotspeich-Gate 8 Vestibule MCP-1 (RCP 1321 C Rev 3) $4 979.70 .._........._.. ...... j4:9:±oncrete 5ecktight-Walkway Pads $36 124.50 .... _.,..._ _......_ _......_ .._Arch Demolition&Artwork Removal $1225.21...,__ _ ........ _ Total: $74,791.35 The original(Contract Sum) $101,461,771.00 Net change by previously authorized Change Orders $16,876,025.31 The contract sum prior to this Change Order was $118,337,796.31 The contract sum would be changed by this Change Order in the amount of $74,791.35 The new contract sum including this Change Order will be $118,412,587.66 The contract time will not be changed by this Change Order. NV2A/Gulf Keystar JV Page 1 of 2 Printed On:9/4/2025 07:49 PM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 GULF GGB�GuN5 CCO #09 rnr�r�r os Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton,New York 13901 Key West,Florida 33040 Miami,Florida 33156 Signed by. Stgned by: DocuSig ned by: 09.15.2025 .4'OL ,. R SIGNATURE DATE SIGNATURE' DATE SIGNATURE DATE 9/12/2025 1 11:57:16 PDT 9/12/2025 1 04:44:11 PDT NV2A/Gulf Keystar JV Page 2 of 2 Printed On:9/4/2025 07:49 PM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 NV K GULF BU„ILD , NG PCO #064 W" KC=-YST`*`R NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami, Florida 33156 3941 South Roosevelt Blvd. Phone: (786)233-5060 Key West, Florida 33040 Prime Contract Potential Change Order #064: Bella - Transformers installation TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West, Florida 33040 Miami, Florida 33156 PCO NUMBER/REVISION: 064/2 CONTRACT: 20-2039-01 -Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 4/26/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $9,304.64 POTENTIAL CHANGE ORDER TITLE: Bella-Transformers installation CHANGE REASON:Client Request POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) Bella-Transformers installation Rev2 This change order includes the costs associated with placing two 1.5 MVA transformers at designated locations for the KWIA project(20-2039-01). Originally,the transformers were to be installed by KWIA and Florida Keys Energy,and this was not included in the JV's contract. However,at the Owner's request,the JV installed the transformers.The cost breakdown and qualifications are attached.This change order supersedes all other proposals for the same scope,thereby voiding PCO#107. ATTACHMENTS: 120424 NV2A.pdf # Budget Code Description Amount 1 01-.54.10.40.0 Support Equipment.Other Transformers Installation $8,458.76 2 99-.99.99.66.0 Procore OH&P.Other Prime Contract Markup $845.88 Grand Total: $9,304.64 Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton, New York 13901 Key West, Florida 33040 Miami, Florida 33156 ^^^Signed by: Signed by: Signed by: (,(�isfepl�v S 6F(t 062E1 EB4233B487... .®,nGaSFs�Far.�Fana ...�ngng�n�7o7taa7 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE 6/25/2025 1 04:49:12 PDT 6/30/2025 1 05:19:05 PDT 6/21/2025 06:32:42 PDT NV2A/Gulf Keystar JV Page 1 of 1 Printed On:2/20/2025 10:33 AM EST Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Bella Holdings of Key West, LLC Invoice 35 Diamond Drive Date...............................................Invoice..�#................. Key West, FL 33040 12/4/2024 120424 Bill To NV2A Gulf Keystar,a Joint Venture LLC 5450 Macdonald Ave,#3 Key West,FL 33040 ................................................................................................................................................................................................................................................................................................................. P.O. No. Terms Project ................................................................................................................................................................................................................................................................................................................. Due on receipt Quantity Description Rate Amount ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. KWIA-Offload and set Transformers 40&90 Ton Crane Service 1 10/29/24 Offload Transformers-6 Hour Minimum,90 Ton Crane(credit 4.5 hours) 1,025.63 1,025.63 1 11/27/24-3 Hour Minimum,40 Ton Crane-Job Canceled 1,050.00 1,050.00 3 Signaler/Rigger and Truck/Trailer 300.00 900.00 7.5%Fuel Surcharge 146.25 146.25 1 12/4/24-3 Hour Minimum,40 Ton Crane 1,050.00 1,050.00 2.5 Hourly Rate,40 Ton Crane 350.00 875.00 3 Signaler/Rigger and Truck/Trailer 300.00 900.00 7.5%Fuel Surcharge 211.88 211.88 1 Extraordinary Set Up 1,500.00 1,500.00 1 Lift Plan 500.00 500.00 1 Rigging/Straps 300.00 300.00 Total $8,458.76 Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 III _ FLORIDA je a SHORT TERM Date SERVIC ew. ....qg.�ry.......^°yy _ ........ .._yg_..._._...._ ........,.._..._.............. .... ........ .. 4,O,# Customer Name: Customer Address: Job Name: Job Address: Customer Representative Name: Bda a loklirq,]s of Key West, I I t By ..............m.. _ ......... A.ruaPra r¢d 5 atures Aulho od,xi+gnaa we ., k rt h)M,I Bi savell I �mr�nga�tr ........,_..,..._...... .._......_..,._ _.... ----- a(Print) rlame arrtc ride LOS mer veruhes signal personEsE and riggers are qual�tled as detrnt d andrequred Regulations,29 CFR 1926,t425 142-8, Documentation is avatlalala era site tlrnitiL) THE TERMS AND CONDITIONS GOVERNING THIS AGREEMENT AS DESCRIBED ON THE FRONT ANDBACK SIDES AREUNDERSTOOD,,AGREED TO AND ARE INCORPORATED BY REFERENCE. CUSTOMER IS ENLACED ON NOTICE THAT THE TERMS AND CONDITIONS ON THE REVERSE SIDE CONTAIN PROVISIONS THAT,AMONG OTHER THINGS, REQUIRE CUSTOMER TO INDEMNIFY OTHERS, INCLUDING MAXIM, FROM CUSTOMER'S AND BELLA'S NEGLIGENCE;WAIVE ALL JURY TRIALS;AND ELIMINATE WARRANTIES. Operator: l Iler er Equipment# : � Boom Length Jib Length: Accessarial E q.: Laud Weught(s): WORK F'El"E'I Oi"t VIE"::IL7 ECC i I I.A14 p S) .._,.,,.�. .__...�w_..._.. .......,____.,_.,. ..__..._,. __....,_..__.._....__ _._....,......_......,._,...,_____. ._..... __......_..._.�..____ __ ....................... .__. ITEM......................... ._._..........._......._.�_ ......._.._.......,..._..._.,...,._............,,... r"4E,._.__.......__.m......_.._.... ........_._.,.....__.___....a_....._.__w_....___._._....._.._.____.___..,__.,...._,.,..___.. .... ._....®....._......,._ ._.........._.__. _ ___ .., Equipment Crew Straight Time _ _ dkAC � �� � _ ._..._ ....._ .... _... Crew Overtime Doulble Time _.......... ..._.m_.._ __ _ __._ __._... Subsistence m,.".._. _....___...._ ___.. ___._ Freight Accessary HaultPuckup _........__....... _ ............................®.._..___......_------- _....._.................. Permits ..Other__._._. -- --. _ DATE DAY FROM T TRAVEL HOURS .. _-- _............ ...___._.._.. ..._.._ _... .m._...... _..-.._...______._...__.m........ .. .... Monday Tuesday. A ru b...._._ Wednesday hardy Friday Satu_. ....__ ry ._......_.....------- .......... _ -----Sunday....._ _ _.........w. ...., ___ __. _ ......_._.___._.._._ _..____ .....,_.............. ...... REMARKS TOTAL NET HOURS I M. aus7onler Relpreseaa9ative N am uBy __ __..e._... Aura iAbOVe Min are verified d:,Ue carrect Auitivarieed Sepnalure CRI NA1, (,AhOo)• P,d'V'O r Qye(luwp CUSTOMER rl,hx)),°PArR01 I.(gold) Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 s Terms and Conditions ' Bella Holdings of Key West,LLC.('Bella')agrees to perform the lifting operation,requested by Customer,subject to the following: 1. Compliance with Laws and Standards:Customer shall comply with and conform to all applicable laws,regulations,ordinances,rules and orders of any governmental entity including,but not limited to OSHA and MSHA laws and regulations and shall comply with all applicable ANSI Standards.Bella agrees to provide lifting services as further described in this Service Agreement. Customer is responsible for providing overall job site safety. Customer is responsible for providing a competent and experienced site supervisor and lift director to oversee job site and lifting operations as set forth in ASME/ANSI 30.6-3.1.3,at seq.(as amended 2007). Customer is responsible for providing Bella accurate load weights and accepts all liability resulting from its failure to do so.Customer assumes responsibility,control of,and supervision for rigging,hooking and unhooking loads.Customer agrees to provide competent and qualified signal persons to direct Bella's equipment operators,Bella's work does not include rigging,signaling, hooking or unhooking the loads(except where and to the extent Bella's employees or designated subcontractors are used as agreed in writing by the parties hereto). 2.Title:Any equipment used to perform the lifting operation shall remain the property of Bella at all times.Customer shall keep the equipment free from any and all liens, encumbrances and claims whatsoever,and shall not perform or permit any act that may encumber or impair Bella's title or rights in the equipment.Upon Bella's request, Customer shall promptly execute and/or deliver to Bella all documentation(such as estoppel certificates or a landlord waiver),as Maxim deems necessary or appropriate for the preservation,perfection or enforcement of Bella's interests in the Equipment and Bella's rights under this Service Agreement,and if Customer fails to do so,Bella may execute such documents on Customer's behalf and in Customer's name. 3.Indemnification:TO THE FULLEST EXTENT ALLOWED BY APPLICABLE LAW,CUSTOMER SHALL DEFEND,INDEMNIFY,AND HOLD HARMLESS BELLA,ITS OFFICERS,DIRECTORS, PARTNERS, MANAGERS, EMPLOYEES,AFFILIATES, REPRESENTATIVES AND AGENTS(THE"INDEMNITEES")FROM ANY AND ALL ACTIONS,CAUSES OF ACTION,CLAIMS,SUITS,DEMANDS,INVESTIGATIONS,OBLIGATIONS,JUDGMENTS,LOSSES,COSTS,LIABILITIES,DAMAGES, FINES,PENALTIES AND EXPENSES INCLUDING ATTORNEY FEES WHICH ARE INCURRED BY ACCRUED ASSERTED OR MADE AGAINST OR RECOVERABLE FROM ANY OF THE INDEMNITEES ARISING FROM OR RELATING TO,DIRECTLY OR INDIRECTLY,THE CUSTOMER'S NEGLIGENCE,WILLFUL OR INTENTIONAL ACT OR ANY OTHER ACT OR OMISSION,WHETHER OR NOT THE SAME ARISES FROM DAMAGE TO PROPERTY(REAL OR PERSONAL) INJURY OR DEATH TO PERSONS INCLUDING BUT NOT LIMITED TO CUSTOMER'S EMPLOYEES AGENTS AND REPRESENTATIVES.CUSTOMER EXPRESSLY AGREES TO WAIVE ANY WORKERS'COMPENSATION IMMUNITY IT MAY OTHERWISE HAVE,THE DUTY TO DEFEND,INDEMNIFY AND HOLD HARMLESS INDEMNITIEES EXISTS WHETHER BASED IN WHOLE OR IN PART UPON THE ACTIVE PASSIVE OR CONCURRENT NEGLIGENCE OF INDEMNITEES IN JURISDICTIONS IN WHICH THE INDEMNIFICATION PROVIDED FOR IN THIS SECTION IS BROADER THAN THAT ALLOWED BY APPLICABLE LAW THIS SECTION SHALL BE INTERPRETED AS PROVIDING THE BROADEST INDEMNIFICATION PERMITTED AND SHALL BE LIMITED ONLY TO THE EXTENT NECESSARY TO COMPLY WITH SAID LAW.CUSTOMER'S OBLIGATION TO INDEMNIFY AND AND HOLD HARMLESS AND THE DUTY TO DEFEND THE INDEMNITEES SHALL SURVIVE THE TERMINATION OF THIS AGREEMENT.IT IS EXPESSLYAGREED THAT THIS INDEMNIFICATION CLAUSE APPLIES TO BOTH THIRD PARTY CLAIMS AND TO ALL CLAIMS BETWEEN BELLA AND CUSTOMER. 4. Payment Adjustments:Payments under this Service Agreement shall be subject to adjustment for excess hours of operator and/or crew time and/or excess hours of usage of the equipment in accordance with the rates agreed to at the lime of the order,custom in the area where the lifting operation occurs,or by any applicable collective bargaining agreement,as the case may be.The Customer shall not be entitled to any abatement,deduction,reduction,set-off,counterclaim,reooupment or defense against payment for any reason.BELLA SHALL NOT BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES RELATING TO THIS SERVICE AGREEMENT. 5.Payment:All payments required hereunder shall be due in full upon billing. In addition to the rates shown on the face of this Service Agreement,Customer shall pay the following arising in connection with this Service Agreement: (a)All demurrage,storage,switching,and drayage. (b)All taxes,levies,assessment,fees and other public charges assessed as a result of this Service Agreement,including tangible personal property taxes if applicable. (c)All judgments,awards,fines,penalties,forfeitures,court costs,expenses,attorneys'fees(unless prohibited by law)incurred by Bella in accordance with Item 3 above. (d) Bella's costs and expenses including reasonable attorney's fees(unless prohibited by law)incurred in enforcing this Service Agreement and/or collecting any amounts due hereunder. (e) In the event of an accident resulting in damage to the equipment arising from the acts,omissions,misfeasance or malfeasance of Customer,including,but not limited to Customer's employees,agents,representatives,subcontractors or independent contractors,Customer shall be responsible for costs of repairs and related expenses,all consequential losses including,but not limited to loss of use of equipment,loss of profits and all reasonable attomey fees incurred in recovering such damages. Any payments more than 30 days past due hereunder shall bear interest at the rate of 1.5%per month(or the maximum amount allowed by law whichever is higher). 6.Default:If Customer fails to pay when due any payment or other amount required herein to be paid by Customer,or if Customer makes an assignment for the benefit of creditors,whether voluntary or involuntary,or if a petition is filed by or against Customer under the bankruptcy laws of the United States,in addition to other remedies Bella may exercise to protect its interest,CUSTOMER AGREES THAT BELLA MAY TAKE POSSESSION OF ANY OR ALL ITEMS OF EQUIPMENT WHEREVER THESE ITEMS MAY BE LOCATED WITHOUT DEMAND OR NOTICE WITHOUT ANY COURT ORDER OR OTHER PROCESS OF LAW AND WITHOUT LIABILITY TO CUSTOMER FOR ANY DAMAGES OCCASIONED BY SUCH TAKINGS OR POSSESSION. 7.Notice:Customer shall immediately notify Bella of any event or occurrence involving personal injury and/or property damage of any kind relating to Bella personnel or equipment.Customer shall immediately deliver to Bella any summons,pleading,notice or paper of any kind involving any claim,suit or proceeding relating to any event or occurrence involving Bella personnel or equipment.Customer shall not aid or abet the assertion of any such claim,suit or proceeding,and shall fully cooperate with Bella in investigating and defending the same. 8.Access&Site Conditions:Customer shall provide Bella with proper ingress to and egress from the job site and provide protection of all paving, curbs, real estate, structures and/or improvements and Customer shall be responsible for all damage to any paving,curbs,real estate,structures and/or improvements caused by Customer's failure to provide proper ingress and egress.Customer is responsible for providing an operating area that is suitable for operation of the crane with respect to levelness,surface conditions,support capability,proximity to pawerlines,excavations,slopes,underground utilities,subsurface conditions,and obstructions to crane operations.Bella shall have immediate access to and the light to retrieve and repair any equipment used in the lifting operation and shall be entitled to enter upon Customer's property at any time for those purposes even in the event of a strike affecting Customer's facility or property.Customer shall perform or have performed all necessary inspections or testing to determine the nature of the ground or soil and its ability to support the crane while in operation or otherwise.If the ground or soil condition is such that it cannot support the crane,Customer shall take all necessary measures to insure that these conditions are remedied prior to the crane being placed on that ground or soil.These measures include,but are not limited to,the provision of proper shoring or cribbing or other measures. 9. Jury Waiver:UNLESS PROHIBITED BYLAW,BELLA AND CUSTOMER EACH KNOWINGLY UNCONDITIONALLY AND IRREVOCABLY WAIVE TRIAL BY JURY WITH RESPECT TO ANY ACTION CLAIM SUIT OR PROCEEDING WHETHER SOUNDING IN CONTRACT TORT OR OTHERWISE IN RESPECT OF ARISING OUT OF, RELATED TO,OR INCIDENTAL TO THE RELATIONSHIP ESTABLISHED BETWEEN THEM(OR AS TO ANY THIRD PARTIES)IN CONNECTION WITH THIS AGREE- MENT,ANY OTHER DOCUMENT OR AGREEMENT EXECUTED OR DELIVERED IN CONNECTION HEREWITH,OR THE PARTIES'CONDUCT. 10. Assignment or Transfer:This is a personal services agreement that neither Bella nor Customer may assign or transfer to a third party without the combined prior written consent of both parties hereto(which consent may be withheld for any reason).Any such consent shall not release Customer from any obligations under this Service Agreement. 11. Lifting,Lugs,Rigging and Apparatus:Customer assumes all responsibility and liability to ensure the adequacy of the design and strength of any lifting lug or device embedded in or attached to any object,and of any and all rigging or lifting apparatus failures or defects(even if such rigging or lifting apparatus is supplied by Bella tD Customer). 12. MSDS Requirements:Customer shall provide Bella,upon delivery of the equipment to the job location,copies of material safety data sheets(MSDS)for all hazardous chemicals in use at said job location.or make such MSDS available at a central location at the job site,in order that Bella may comply with the requirements of all applicable local,state and Federal laws and regulations,including but not limited to OSHA regulations,regarding hazardous materials.Furthermore,Customer shall inform Bella of all precautionary measures that need to be taken to protect the operators and/or crew or other personnel during normal operating conditions and in foreseeable emergencies. 13. Full Agreement;Governing Law-,Waiver,Severability:This Service Agreement constitutes the full agreement between Bella and Customer.Any changes to this Service Agreement must be in writing signed by Bella and Customer.No conduct by either party to this Service Agreement shall be deemed a modification of this Service Agreement.This Service Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and permissible assigns.The laws of the state of the job site location shall govern this Service Agreement.Headings are provided for convenience only,and not for Interpretation of this Service Agreement.Bella and Customer are independent contractors of each other and Customer shall not be deemed to be the agent,servant or employee of Bella for any reason or purpose.No failure of Bella to enforce performance of any terms or covenants,or failure to exercise or delay in exercising any right under this Service Agreement shall operate as a waiver thereof,nor shall any single or partial exercise of any right hereunder preclude any other or further exercise thereof or the exercise of any other right If any provision of this Service Agreement is held to be invalid or illegal by a court of competent jurisdiction,the Invalid or illegal term will be deemed excluded from this Service Agreement and will not invalidate the remaining terns of this Service Agreement. Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 DAILY[WEEKLY FLORIDA tv SHORT TER SERVICE AGREEMENT Proposal RO, Customer NarTte: Customer Address: '` , awo-1 Job Name: Job Address: Al)t, I Customer Representative Name: Bella Holdings of Key West, LLC AUTHORIZATION By: TO Authorized Signature Auffiorized&gnature SIART WORK Rachel Braswell, Manager Name iPrAQ Narne and Turtle Customer verifies signal person(s)and riggers are qualified as defined and required by OSHA Regulations,29 CFR 1926,1425& 1426. Documentation is available on site: (Initial) THE TERMS AND CONDITIONS GOVERNING THIS AGREEMENT AS DESCRIBED ON THE FRONT AND BACK SIDES ARE UNDERSTOOD,AGREED TO AND ARE INCORPORATED BY REFERENCE. CUSTOMER IS PLACED ON NOTICE THAT THE TERMS AND CONDITIONS ON THE REVERSE SIDE CONTAIN PROVISIONS THAT,AMONG OTHER THINGS, REQUIRE CUSTOMER TO INDEMNIFY OTHERS, INCLUDING MAXIM, FROM CUSTOMER'S AND BELLA'S NEGLIGENCE,WAIVE ALL JURY TRIALS;AND ELIMINATE WARRANTIES. Operator: taw" r._. Oder: � I Equipment# : Boom Length Jib Length`. Accessorial Eq.: Load Weights) WORK PERFORMED (COMMENTS) d .,. " .C ITEM RATE 7 Equipment M Crew Straight Time t 2 Crew Overtime Double Time i°i Subsistence ,.mow Freight � Accessory Haul/Pickup Permits Other DATE DAY FROM TO TRAVEL HOURS Monday Tuesday Wednesday Thursday Friday Saturday .. ..�..� Sunday REMARKS TOTAL NET HOURS HAVE SIGNED tn�`Customer s V � . R �r'" tPrntp � By . The above hour's care venfred to be current. Authonzed Signatures ORIGINAL iwv is w.INVOICE gyrnllo y•CUSTOMER(blue) PAYRO(Lr ig old)i Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 O t.,onuitiorIS Bella Holdings of Key West,LLC.("Bejla)agrees to perform the lifting operation,requested by Customer,subject to the following: 1. Compliance with Laws and Standards:Customer shall comply with and conform to all applicable laws,regulations,ordinances,rules and orders of any governmental entity including,but not limited to OSHA and MSHA laws and regulations and shall comply with all applicable ANSI Standards. Bella agrees to provide lifting services as further described in this Service Agreement.Customer is responsible for providing overall job site safety. Customer is responsible for providing a competent and experienced site supervisor and lift director to oversee job site and lifting operations as set forth in ASMEIANSI 30.5-3.1.3,at.seq.(as amended 2007). Customer is responsible for providing Bella accurate load weights and accepts all liability resulting from its failure to do so.Customer assumes responsibility,control of,and supervision for rigging,hooking and unhooking loads.Customer agrees to provide competent and qualified signal persons to direct Bella's equipment operators:Bella's work does not include rigging,signaling, hooking or unhooking the loads(except where and to the extent Bella's employees or designated subcontractors are used as agreed in.writing by the parties hereto). 2.Title:Any equipment used to perform the lifting operation shall remain the property of Bella at all times.Customer shall keep the equipment free from any and all liens, encumbrances and claims whatsoever,and shall not perform or permit any act that may encumber or impair Bella's title or rights in the equipment.Upon Bella's request, Customer shall promptly execute and/or deliver to Bella all documentation(such as estoppel certificates or a landlord waiver),as Maxim deems necessary or appropriate for the preservation,perfection or enforcement of Bella's interests in the Equipment and Bella's rights under this Service Agreement,and if Customer fails to do so,Bella may execute such documents on Customer's behalf and in Customer's name. 3.Indemnification:TO THE FULLEST EXTENT ALLOWED BY APPLICABLE LAW,CUSTOMER SHALL DEFEND,INDEMNIFY,AND HOLD HARMLESS BELLA ITS OFFICERS, DIRECTORS, PARTNERS, MANAGERS, EMPLOYEES,AFFILIATES, REPRESENTATIVES AND AGENTS (THE"INDEMNITEES") FROM ANY AND ALL ACTIONS,CAUSES OF ACTION,CLAIMS,SUITS, DEMANDS,INVESTIGATIONS,OBLIGATIONS JUDGMENTS LOSSES COSTS LIABILITIES DAMAGES FINES,PENALTIES AND EXPENSES,INCLUDING ATTORNEY FEES,WHICH ARE INCURRED BY,ACCRUED ASSERTED OR MADE AGAINST OR RECOVERABLE FROM ANY OF THE INDEMNITEES ARISING FROM OR RELATING TO,DIRECTLY OR INDIRECTLY,THE CUSTOMER'S NEGLIGENCE WILLFUL OR INTENTIONAL ACT OR ANY OTHER ACT OR OMISSION,WHETHER OR NOT THE SAME ARISES FROM DAMAGE TO PROPERTY(REAL OR PERSONAL) INJURY OR DEATH TO PERSONS INCLUDING BUT NOT LIMITED TO CUSTOMER'S EMPLOYEES,AGENTS AND REPRESENTATIVES.CUSTOMER EXPRESSLY AGREES TO WAIVE ANY WORKERS'COMPENSATION IMMUNITY IT MAY OTHERWISE HAVE.THE DUTY TO DEFEND,INDEMNIFY AND HOLD HARMLESS INDEMNITIEES EXISTS WHETHER BASED IN WHOLE OR IN PART UPON THE ACTIVE, PASSIVE,OR CONCURRENT NEGLIGENCE OF INDEMNITEES.IN JURISDICTIONS IN WHICH THE INDEMNIFICATION PROVIDED FOR IN THIS SECTION IS BROADER THAN THAT ALLOWED BY APPLICABLE LAW,THIS SECTION SHALL BE INTERPRETED AS PROVIDING THE BROADEST INDEMNIFICATION PERMITTED AND SHALL BE LIMITED ONLY TO THE EXTENT NECESSARY TO COMPLY WITH SAID LAW.CUSTOMER'S OBLIGATION TO INDEMNIFY AND AND HOLD HARMLESS AND THE DUTY TO DEFEND THE INDEMNITEES SHALL SURVIVE THE TERMINATION OF THIS AGREEMENT.IT IS EXPESSLYAGREED THAT THIS INDEMNIFICATION CLAUSE APPLIES TO BOTH THIRD PARTY CLAIMS AND TO ALL CLAIMS BETWEEN BELLA AND CUSTOMER. 4. Payment Adjustments:Payments under this Service Agreement shall be subject to adjustment for excess hours of operator and/or crew time and/or excess hours of usage of the equipment In accordance with the rates agreed to at the lime of the order,custom in the area where the lifting operation occurs,or by any applicable collective bargaining agreement,as the case may be.The Customer shall not be entitled to any abatement,deduction,reduction,set-off,counterclaim,recoupment or defense against payment for any reason.BELLA SHALL NOT BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES RELATING TO THIS SERVICE AGREEMENT. 5.Payment:All payments required hereunder shall be due in full upon billing. In addition to the rates shown on the face of this Service Agreement,Customer shall pay the following arising In connection with this Service Agreement: (a)All demurrage,storage,switching,and drayage. (b)All taxes,levies,assessment,fees and other public charges assessed as a result of this Service Agreement,including tangible personal property taxes if applicable. (c)All judgments,awards,fines,penalties,forfeitures,court costs,expenses,attomeys'fees(unless prohibited by law)incurred by Bella in accordance with Item 3 above. (d) Bella's costs and expenses including reasonable attorney's fees(unless prohibited by law)incurred in enforcing this Service Agreement and/or collecting any amounts due hereunder. (e) In the event of an accident resulting in damage to the equipment arising from the acts,omissions,misfeasance or malfeasance of Customer,including,but not limited to Customer's employees,agents,representatives,subcontractors or independent contractors,Customer shall be responsible for costs of repairs and related expenses,all consequential losses Including,but not limited to loss of use of equipment,loss of profits and all reasonable attorney fees incurred in recovering such damages. Any payments more than 30 days past due hereunder shall bear interest at the rate of 1.5%per month(or the maximum amount allowed by law whichever is higher). S.Default:If Customer fails to pay when due any payment or other amount required herein to be paid by Customer,or if Customer makes an assignment for the benefit of creditors,whether voluntary or involuntary,or if a petition is filed by or against Customer under the bankruptcy laws of the United States,in addition to other remedies Bella may exercise to protect Its interest,CUSTOMER AGREES THAT BELLA MAY TAKE POSSESSION OF ANY OR ALL ITEMS OF EQUIPMENT,WHEREVER THESE ITEMS MAY BE LOCATED,WITHOUT DEMAND OR NOTICE,WITHOUT ANY COURT ORDER OR OTHER PROCESS OF LAW AND WITHOUT LIABILITY TO CUSTOMER FOR ANY DAMAGES OCCASIONED BY SUCH TAKINGS OR POSSESSION. 7.Notice:Customer shall immediately notify Bella of any event or occurrence involving personal Injury and/or property damage of any kind relating to Bella personnel or equipment.Customer shall immediately deliver to Bella any summons,pleading,notice or paper of any kind involving any claim,suit or proceeding relating to any event or occurrence involving Bella personnel or equipment Customer shall not aid or abet the assertion of any such claim,suit or proceeding,and shall fully cooperate with Bella in investigating and defending the same. 8.Access&Site Conditions: Customer shall provide Bella with proper ingress to and egress from the job site and provide protection of all paving,curbs,real estate, structures and/or improvements and Customer shall be responsible for all damage to any paving,curbs,real estate,structures and/or improvements caused by Customer's failure to provide proper ingress and egress.Customer is responsible for providing an operating area that is suitable for operation of the crane with respect to levelness,surface conditions,support capability,proximity to powerlines,excavations,slopes,underground utilities,subsurface conditions,and obstructions to crane operations.Bella shall have immediate access to and the right to retrieve and repair any equipment used in the lifting operation and shall be entitled to enter upon Customer's property at any time for those purposes even in the event of a strike affecting Customer's facility or property.Customer shall perform or have performed all necessary inspections or testing to determine the nature of the ground or soil and its ability to support the crane while in operation or otherwise.If the ground or soil condition is such that It cannot support the crane,Customer shall take all necessary measures to insure that these conditions are remedied prior to the crane being placed on that ground or soil.These measures include,but are not limited to,the provision of proper shoring or cribbing or other measures. 8. Jury Waiver:UNLESS PROHIBITED BYLAW,BELLA AND CUSTOMER EACH KNOWINGLY,UNCONDITIONALLY AND IRREVOCABLY WAIVE TRIAL BY JURY WITI RESPECT TO ANY ACTION, CLAIM,SUIT OR PROCEEDING,WHETHER SOUNDING IN CONTRACT TORT OR OTHERWISE IN RESPECT OF ARISING OUT OF, RELATED TO,OR INCIDENTAL TO THE RELATIONSHIP ESTABLISHED BETWEEN THEM(OR AS TO ANY THIRD PARTIES)IN CONNECTION WITH THIS AGREE MENT,ANY OTHER DOCUMENT OR AGREEMENT EXECUTED OR DELIVERED IN CONNECTION HEREWITH OR THE PARTIES'CONDUCT 10. Assignment or Transfer.This is a personal services agreement that neither Bella nor Customer may assign or transfer to a third party without the combined prior written consent of both parties hereto(which consent may be withheld for any reason).Any such consent shall not release Customer from any obligations under this Service Agreement. 11. Lifting,Lugs,Rigging and Apparatus:Customer assumes all responsibility and liability to ensure the adequacy of the design and strength of any lifting lug or device embedde in or attached to any object,and of any and all rigging or lifting apparatus failures or defects(even if such rigging or lifting apparatus is supplied by Bella to Customer). 12. MSDS Requirements:Customer shall provide Bella,upon delivery of the equipment to the job location,copies of material safety data sheets(MSDS)for all hazardous chemicals i use at said job location.or make such MSDS available at a central location at the job site,In order that Bella may comply with the requirements of all applicable local,state and Federal law; and regulations.Including but not limited to OSHA regulations,regarding hazardous materials.Furthermore,Customer shall inform Bella of all precautionary measures that need to be take to protect the operators and/or crew or other personnel during normal operating conditions and in foreseeable emergencies. 13. Full Agreement;Governing Law;Waiver,Severability:This Service Agreement constitutes the full agreement between Bella and Customer.Any changes to this Service Agreement must be In writing signed by Bella and Customer.No conduct by either party to this Service Agreement shall be deemed a modification of this Service Agreement This Servic Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and permissible assigns.The laws of the state of the job site location shall govern this Service Agreement.Headings are provided for convenience only,and not for Interpretation of this Service Agreement.Bella and Customer are Independent contractors of each other and Customer shall not be deemed to be the agent,servant or employee of Bella for any reason or purpose.No failure of Bella to enforce performance of any terms or covenants,or failure to exercise or delay in exercising any right under this Service Agreement shall operate as a waiver thereof;nor shall any single or partial exercise of any right hereunder preclude any other or further exercise thereof or the exercise of any other right.If any provision of this Service Agreement is held to be invalid or Illegal by a court of competent jurisdiction,the invalid or illegal term will be deemed excluded from this Service Agreement and will not invalidate the remaining terms of this Service Agreement. Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 DAILY[WEEKLY FLORIDA SH�ORT TERM Date 'a a SERVICE AGREEMENT Proposal P.O.# 2 Customer Name: Customer Address Job Name: ,Job Address: 77 Customer Representative Name: Bella Holdings of Key West, LLC AUTHORIZATION, 8y� TO ALAhodzed SIonature AuMorized signature START WORK Rachel Braswell, Manager ......... Name(Pant) Name and Me Customer verifies signal person(s)and riggers are qualified as defined and required by OSHA Regulations„ 29 CFR 1926,1425& 1428. Documentation is available on site; (Initial) THE TERMS AND CONDITIONS GOVERNING THIS AGREEMENT AS DESCRIBED ON THE FRONT AND BACK SIDES ARE UNDERSTOOD,AGREED TO AND ARE INCORPORATED BY REFERENCE. CUSTOMER IS PLACED ON NOTICE THAT THE TERMS AND CONDITIONS ON THE REVERSE SIDE CONTAIN PROVISIONS THAT,AMONG OTHER THINGS, REQUIRE CUSTOMER TO INDEMNIFY OTHERS, INCLUDING MAXIM, FROM CUSTOMER'S AND BELLA'S NEGLIGENCE;WAIVE ALL JURY TRIALS;AND ELIMINATE WARRANTIES. Operator: Oiler: Equipment# '. Boom Length Jibl-ength: Accessorial Eq.: Load WeIght(s): WORK PERFORMED (COMMENTS) ITEM RATE Equipment el A L,2L Crew Straight Time Crew Overtime Double Tyre Subsistence Freight Accessory Haul/P,ickup Permits ......................................................... Other DATE DAY FROM TO -TRAVEL HOURS Mo�nday Tuesday Il. 30 Wednesday 7, Thursday Friday Saturday Sunday REMARKS TOTAL NET HOUR Customer Representative Narne� S ................ HAVE SIGNED JCIA (-,I'�6�' �0 c'), AT ® OF (print) q"EEK B,y� The above hours are verified to be correct At uffiorrzed Signmure ORICINAL(whw)-INVOICE(yeflow)-CUSTOMER II)4x �PAYROLL(ga1d"p Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 O%,Oflt]IUOf15 Bella Holdings of Key West,LLC.("Bella")agrees to perform the lifting operation,requested by Customer,subject to the following: 1. Compliance with Laws and Standards:Customer shall comply with and conform to all applicable laws,regulations,ordinances,rules and orders of any governmental entity including,but not limited to OSHA and MSHA laws and regulations and shall comply with all applicable ANSI Standards.Bella agrees to provide lifting services as further described in this Service Agreement.Customer is responsible for providing overall job site safety. Customer is responsible for providing a competent and experienced site supervisor and lift director to oversee job site and lifting operations as set forth in ASME/ANSI 30.6-3.1.3,at seq.(as amended 2007). Customer Is responsible for providing Bella accurate load weights and accepts all liability resulting from its failure to do so.Customer assumes responsibility,control of,and supervision for rigging,hooking and unhooking loads.Customer agrees to provide competent and qualified signal persons to direct Bella's equipment operators_Bella's work does not include rigging,signaling, hooking or unhooking the loads(except where and to the extent Bella's employees or designated subcontractors are used'as agreed in writing by the parties hereto). 2.Title:Any equipment used to perform the lifting operation shall remain the property of Bella at all times.Customer shall keep the equipment free from any and all liens, encumbrances and claims whatsoever,and shall not perform or permit any act that may encumber or impair Bella's title or rights in the equipment.Upon Bella's request, Customer shall promptly execute and/or deliver to Bella all documentation(such as estoppel certificates or a landlord waiver),as Maxim deems necessary or appropriate for the preservation,perfection or enforcement of Bella's Interests in the Equipment and Bella's rights under this Service Agreement,and if Customer fails to do so,Bella may execute such documents on Customer's behalf and in Customer's name. 3.Indemnification:TO THE FULLEST EXTENT ALLOWED BY APPLICABLE LAW,CUSTOMER SHALL DEFEND,INDEMNIFY.AND HOLD HARMLESS BELLA,ITS OFFICERS, DIRECTORS, PARTNERS, MANAGERS, EMPLOYEES,AFFILIATES, REPRESENTATIVES AND AGENTS(THE"INDEMNITEES") FROM ANY AND ALL ACTIONS,CAUSES OF ACTION,CLAIMS,SUITS,DEMANDS,INVESTIGATIONS,OBLIGATIONS,JUDGMENTS,LOSSES,COSTS,LIABILITIES,DAMAGES FINES,PENALTIES AND EXPENSES,INCLUDING ATTORNEY FEES,WHICH ARE INCURRED BY,ACCRUED,ASSERTED,OR MADE AGAINST,OR RECOVERABLE FROM ANY OF THE INDEMNITEES ARISING FROM OR RELATING TO,DIRECTLY OR INDIRECTLY,THE CUSTOMER'S NEGLIGENCE,WILLFUL OR INTENTIONAL ACT OR ANY OTHER ACT OR OMISSION,WHETHER OR NOT THE SAME ARISES FROM DAMAGE TO PROPERTY(REAL OR PERSONAL).INJURY OR DEATH TO PERSONS INCLUDING BUT NOT LIMITED TO CUSTOMER'S EMPLOYEES,AGENTS AND REPRESENTATIVES.CUSTOMER EXPRESSLY AGREES TO WAIVE ANY WORKERS'COMPENSATION IMMUNITY IT MAY OTHERWISE HAVE.THE DUTY TO DEFEND,INDEMNIFY AND HOLD HARMLESS INDEMNITIEES EXISTS WHETHER BASED IN WHOLE OR IN PART UPON THE ACTIVE, PASSIVE,OR CONCURRENT NEGLIGENCE OF INDEMNITEES. IN JURISDICTIONS IN WHICH THE INDEMNIFICATION PROVIDED FOR IN THIS SECTION IS BROADER THAN THAT ALLOWED BY APPLICABLE LAW,THIS SECTION SHALL BE INTERPRETED AS PROVIDING THE BROADEST INDEMNIFICATION PERMITTED AND SHALL BE LIMITED ONLY TO THE EXTENT NECESSARY TO COMPLY WITH SAID LAW.CUSTOMER'S OBLIGATION TO INDEMNIFY AND AND HOLD HARMLESS AND THE DUTY TO DEFEND THE INDEMNITEES SHALL SURVIVE THE TERMINATION OF THIS AGREEMENT.IT IS EXPESSLY AGREED THAT THIS INDEMNIFICATION CLAUSE APPLIES TO BOTH THIRD PARTY CLAIMS AND TO ALL CLAIMS BETWEEN BELLA AND CUSTOMER. 4. Payment Adjustments:Payments under this Service Agreement shall be subject to adjustment for excess hours of operator and/or crew time and/or excess hours of usage of the equipment in accordance with the rates agreed to at the Ilme of the order,custom in the area where the lifting operation occurs,or by any applicable collective bargaining agreement,as the case may be.The Customer shall not be entitled to any abatement,deduction,reduction,set-off,counterclaim,recoupment or defense against payment for any reason.BELLA SHALL NOT BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES RELATING TO THIS SERVICE AGREEMENT. S.Payment:All payments required hereunder shall be due in full upon billing.In addition to the rates shown on the face of this Service Agreement,Customer shall pay the following arising in connection with this Service Agreement: (a)All demurrage,storage,switching,and drayage. (b)All taxes,levies,assessment,fees and other public charges assessed as a result of this Service Agreement,including tangible personal property taxes if applicable. (c)All judgments,awards,fines,penalties,forfeitures,court costs,expenses,attomeys'fees(unless prohibited by law)incurred by Bella in accordance with Item 3 above. (d) Bella's costs and expenses including reasonable attorney's fees(unless prohibited by law)incurred in enforcing this Service Agreement and/or collecting any amounts due hereunder. (e) In the event of an accident resulting in damage to the equipment arising from the acts,omissions,misfeasance or malfeasance of Customer,including,but not limited to Customer's employees,agents,representatives,subcontractors or independent contractors,Customer shall be responsible for costs of repairs and related expenses,all consequential losses including,but not limited to loss of use of equipment,loss of profits and all reasonable attorney fees Incurred In recovering such damages. Any payments more than 30 days past due hereunder shall bear interest at the rate of 1.5%per month(or the maximum amount allowed by law whichever is higher). 6.Default:If Customer fails to pay when due any payment or other amount required herein to be paid by Customer,or if Customer makes an assignment for the benefit of creditors,whether voluntary or Involuntary,or If a petition is filed by or against Customer under the bankruptcy laws of the United States,in addition to other remedies Bella may exercise to protect its interest,CUSTOMER AGREES THAT BELLA MAY TAKE POSSESSION OF ANY OR ALL ITEMS OF EQUIPMENT,WHEREVER THESE ITEMS MAY BE LOCATED,WITHOUT DEMAND OR NOTICE,WITHOUT ANY COURT ORDER OR OTHER PROCESS OF LAW AND WITHOUT LIABILITY TO CUSTOMER FOR ANY DAMAGES OCCASIONED BY SUCH TAKINGS OR POSSESSION. 7.Notice:Customer shall immediately notify Bella of any event or occurrence involving personal Injury and/or property damage of any kind relating to Bella personnel or equipment.Customer shall immediately deliver to Bella any summons,pleading,notice or paper of any kind Involving any claim,suit or proceeding relating to any event or occurrence involving Bella personnel or equipment.Customer shall not aid or abet the assertion of any such claim,suit or proceeding,and shall fully cooperate with Bella In investigating and defending the same. 8.Access&Site Conditions: Customer shall provide Bella with proper ingress to and egress from the job site and provide protection of all paving,curbs, real estate, structures and/or improvements and Customer shall be responsible for all damage to any paving,curbs,real estate,structures and/or improvements caused by Customer's failure to provide proper ingress and egress.Customer is responsible for providing an operating area that is suitable for operation of the crane with respect to levelness,surface conditions,support capability,proximity to powerlines,excavations,slopes,underground utilities,subsurface conditions,and obstructions to crane operations.Bella shall have immediate access to and the right to retrieve and repair any equipment used in the lifting operation and shall be entitled to enter upon Customer's property at any time for those purposes even in the event of a strike affecting Customer's facility or property.Customer shall perform or have performed all necessary inspections or testing to determine the nature of the ground or soil and its ability to support the crane while in operation or otherwise. If the ground or soil condition is such that it cannot support the crane,Customer shall take all necessary measures to insure that these conditions are remedied prior to the crane being placed on that ground or soil.These measures include,but are not limited to,the provision of proper shoring or cribbing or other measures. 9. Jury Waiver:UNLESS PROHIBITED BYLAW,BELLA AND CUSTOMER EACH KNOWINGLY,UNCONDITIONALLY AND IRREVOCABLY WAIVE TRIAL BY JURY WITI RESPECT TO ANY ACTION, CLAIM,SUIT OR PROCEEDING,WHETHER SOUNDING IN CONTRACT TORT OR OTHERWISE IN RESPECT OF ARISING OUT OF RELATED TO,OR INCIDENTAL TO THE RELATIONSHIP ESTABLISHED BETWEEN THEM(OR AS TO ANY THIRD PARTIES)IN CONNECTION WITH THIS AGREE. MENT,ANY OTHER DOCUMENT OR AGREEMENT EXECUTED OR DELIVERED IN CONNECTION HEREWITH OR THE PARTIES'CONDUCT 10. Assignment or Transfer.This is a personal services agreement that neither Bella nor Customer may assign or transfer to a third party without the combined prior written consent of both parties hereto(which consent may be withheld for any reason).Any such consent shall not release Customer from any obligations under this Service Agreement. . 11. Lifting,Lugs,Rigging and Apparatus:Customer assumes all responsibility and liability to ensure the adequacy of the design and strength of any lifting lug or device embedde in or attached to any object,and of any and all rigging or lifting apparatus failures or defects(even if such rigging or lifting apparatus is supplied by Bella to Customer). 12. MSDS Requirements:Customer shall provide Bella,upon delivery of the equipment to the job location,copies of material safety data sheets(MSDS)for all hazardous chemicals ti use at said job location.or make such MSDS available at a central location at the job site,In order that Bella may comply with the requirements of all applicable local,state and Federal laws and regulations,Including but not limited to OSHA regulations,regarding hazardous materials.Furthermore,Customer shall Inform Bella of all precautionary measures that need to be take to protect the operators and/or crew or other personnel during normal operating conditions and In foreseeable emergencies. 13. Full Agreement;Governing Law;Waiver, Severability:This Service Agreement constitutes the full agreement between Bella and Customer.Any changes to this Service Agreement must be in writing signed by Bella and Customer.No conduct by either party to this Service Agreement shall be deemed a modification of this Service Agreement This Servic Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and permissible assigns.The laws of the state of the job site location shall govern this Service Agreement.Headings are provided for convenience only,and not for interpretation of this Service Agreement.Bella and Customer are independent contractors of each other and Customer shall not be deemed to be the agent,servant or employee of Bella for any reason or purpose.No failure of Bella to enforce performance of any terms or covenants,or failure to exercise or delay in exercising any right under this Service Agreement shall operate as a waiver thereof;nor shall any single or partial exercise of any right hereunder preclude any other or further exercise thereof or the exercise of any other right.If any provision of this Service Agreement is held to be invalid or illegal by a court of competent jurisdiction,the invalid or illegal term will be deemed excluded from this Service Agreement and will not invalidate the remaining terms of this Service Agreement Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Bella Holdings of Key West, LLC Invoice 35 Diamond Drive Date...............................................Invoice..�#................. Key West, FL 33040 12/4/2024 120424 Bill To NV2A Gulf Keystar,a Joint Venture LLC 5450 Macdonald Ave,#3 Key West,FL 33040 ................................................................................................................................................................................................................................................................................................................. P.O. No. Terms Project ................................................................................................................................................................................................................................................................................................................. Due on receipt Quantity Description Rate Amount ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. KWIA-Offload and set Transformers 40&90 Ton Crane Service 1 10/29/24 Offload Transformers-6 Hour Minimum,90 Ton Crane(credit 4.5 hours) 1,025.63 1,025.63 1 11/27/24-3 Hour Minimum,40 Ton Crane-Job Canceled 1,050.00 1,050.00 3 Signaler/Rigger and Truck/Trailer 300.00 900.00 7.5%Fuel Surcharge 146.25 146.25 1 12/4/24-3 Hour Minimum,40 Ton Crane 1,050.00 1,050.00 2.5 Hourly Rate,40 Ton Crane 350.00 875.00 3 Signaler/Rigger and Truck/Trailer 300.00 900.00 7.5%Fuel Surcharge 211.88 211.88 1 Extraordinary Set Up 1,500.00 1,500.00 1 Lift Plan 500.00 500.00 1 Rigging/Straps 300.00 300.00 Total $8,458.76 Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 III _ FLORIDA je a SHORT TERM Date SERVIC ew. ....qg.�ry.......^°yy _ ........ .._yg_..._._...._ ........,.._..._.............. .... ........ .. 4,O,# Customer Name: Customer Address: Job Name: Job Address: Customer Representative Name: Bda a loklirq,]s of Key West, I I t By ..............m.. _ ......... A.ruaPra r¢d 5 atures Aulho od,xi+gnaa we ., k rt h)M,I Bi savell I �mr�nga�tr ........,_..,..._...... .._......_..,._ _.... ----- a(Print) rlame arrtc ride LOS mer veruhes signal personEsE and riggers are qual�tled as detrnt d andrequred Regulations,29 CFR 1926,t425 142-8, Documentation is avatlalala era site tlrnitiL) THE TERMS AND CONDITIONS GOVERNING THIS AGREEMENT AS DESCRIBED ON THE FRONT ANDBACK SIDES AREUNDERSTOOD,,AGREED TO AND ARE INCORPORATED BY REFERENCE. CUSTOMER IS ENLACED ON NOTICE THAT THE TERMS AND CONDITIONS ON THE REVERSE SIDE CONTAIN PROVISIONS THAT,AMONG OTHER THINGS, REQUIRE CUSTOMER TO INDEMNIFY OTHERS, INCLUDING MAXIM, FROM CUSTOMER'S AND BELLA'S NEGLIGENCE;WAIVE ALL JURY TRIALS;AND ELIMINATE WARRANTIES. Operator: l Iler er Equipment# : � Boom Length Jib Length: Accessarial E q.: Laud Weught(s): WORK F'El"E'I Oi"t VIE"::IL7 ECC i I I.A14 p S) .._,.,,.�. .__...�w_..._.. .......,____.,_.,. ..__..._,. __....,_..__.._....__ _._....,......_......,._,...,_____. ._..... __......_..._.�..____ __ ....................... .__. ITEM......................... ._._..........._......._.�_ ......._.._.......,..._..._.,...,._............,,... r"4E,._.__.......__.m......_.._.... ........_._.,.....__.___....a_....._.__w_....___._._....._.._.____.___..,__.,...._,.,..___.. .... ._....®....._......,._ ._.........._.__. _ ___ .., Equipment Crew Straight Time _ _ dkAC � �� � _ ._..._ ....._ .... _... Crew Overtime Doulble Time _.......... ..._.m_.._ __ _ __._ __._... Subsistence m,.".._. _....___...._ ___.. ___._ Freight Accessary HaultPuckup _........__....... _ ............................®.._..___......_------- _....._.................. Permits ..Other__._._. -- --. _ DATE DAY FROM T TRAVEL HOURS .. _-- _............ ...___._.._.. ..._.._ _... .m._...... _..-.._...______._...__.m........ .. .... Monday Tuesday. A ru b...._._ Wednesday hardy Friday Satu_. ....__ ry ._......_.....------- .......... _ -----Sunday....._ _ _.........w. ...., ___ __. _ ......_._.___._.._._ _..____ .....,_.............. ...... REMARKS TOTAL NET HOURS I M. aus7onler Relpreseaa9ative N am uBy __ __..e._... Aura iAbOVe Min are verified d:,Ue carrect Auitivarieed Sepnalure CRI NA1, (,AhOo)• P,d'V'O r Qye(luwp CUSTOMER rl,hx)),°PArR01 I.(gold) Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 s Terms and Conditions ' Bella Holdings of Key West,LLC.('Bella')agrees to perform the lifting operation,requested by Customer,subject to the following: 1. Compliance with Laws and Standards:Customer shall comply with and conform to all applicable laws,regulations,ordinances,rules and orders of any governmental entity including,but not limited to OSHA and MSHA laws and regulations and shall comply with all applicable ANSI Standards.Bella agrees to provide lifting services as further described in this Service Agreement. Customer is responsible for providing overall job site safety. Customer is responsible for providing a competent and experienced site supervisor and lift director to oversee job site and lifting operations as set forth in ASME/ANSI 30.6-3.1.3,at seq.(as amended 2007). Customer is responsible for providing Bella accurate load weights and accepts all liability resulting from its failure to do so.Customer assumes responsibility,control of,and supervision for rigging,hooking and unhooking loads.Customer agrees to provide competent and qualified signal persons to direct Bella's equipment operators,Bella's work does not include rigging,signaling, hooking or unhooking the loads(except where and to the extent Bella's employees or designated subcontractors are used as agreed in writing by the parties hereto). 2.Title:Any equipment used to perform the lifting operation shall remain the property of Bella at all times.Customer shall keep the equipment free from any and all liens, encumbrances and claims whatsoever,and shall not perform or permit any act that may encumber or impair Bella's title or rights in the equipment.Upon Bella's request, Customer shall promptly execute and/or deliver to Bella all documentation(such as estoppel certificates or a landlord waiver),as Maxim deems necessary or appropriate for the preservation,perfection or enforcement of Bella's interests in the Equipment and Bella's rights under this Service Agreement,and if Customer fails to do so,Bella may execute such documents on Customer's behalf and in Customer's name. 3.Indemnification:TO THE FULLEST EXTENT ALLOWED BY APPLICABLE LAW,CUSTOMER SHALL DEFEND,INDEMNIFY,AND HOLD HARMLESS BELLA,ITS OFFICERS,DIRECTORS, PARTNERS, MANAGERS, EMPLOYEES,AFFILIATES, REPRESENTATIVES AND AGENTS(THE"INDEMNITEES")FROM ANY AND ALL ACTIONS,CAUSES OF ACTION,CLAIMS,SUITS,DEMANDS,INVESTIGATIONS,OBLIGATIONS,JUDGMENTS,LOSSES,COSTS,LIABILITIES,DAMAGES, FINES,PENALTIES AND EXPENSES INCLUDING ATTORNEY FEES WHICH ARE INCURRED BY ACCRUED ASSERTED OR MADE AGAINST OR RECOVERABLE FROM ANY OF THE INDEMNITEES ARISING FROM OR RELATING TO,DIRECTLY OR INDIRECTLY,THE CUSTOMER'S NEGLIGENCE,WILLFUL OR INTENTIONAL ACT OR ANY OTHER ACT OR OMISSION,WHETHER OR NOT THE SAME ARISES FROM DAMAGE TO PROPERTY(REAL OR PERSONAL) INJURY OR DEATH TO PERSONS INCLUDING BUT NOT LIMITED TO CUSTOMER'S EMPLOYEES AGENTS AND REPRESENTATIVES.CUSTOMER EXPRESSLY AGREES TO WAIVE ANY WORKERS'COMPENSATION IMMUNITY IT MAY OTHERWISE HAVE,THE DUTY TO DEFEND,INDEMNIFY AND HOLD HARMLESS INDEMNITIEES EXISTS WHETHER BASED IN WHOLE OR IN PART UPON THE ACTIVE PASSIVE OR CONCURRENT NEGLIGENCE OF INDEMNITEES IN JURISDICTIONS IN WHICH THE INDEMNIFICATION PROVIDED FOR IN THIS SECTION IS BROADER THAN THAT ALLOWED BY APPLICABLE LAW THIS SECTION SHALL BE INTERPRETED AS PROVIDING THE BROADEST INDEMNIFICATION PERMITTED AND SHALL BE LIMITED ONLY TO THE EXTENT NECESSARY TO COMPLY WITH SAID LAW.CUSTOMER'S OBLIGATION TO INDEMNIFY AND AND HOLD HARMLESS AND THE DUTY TO DEFEND THE INDEMNITEES SHALL SURVIVE THE TERMINATION OF THIS AGREEMENT.IT IS EXPESSLYAGREED THAT THIS INDEMNIFICATION CLAUSE APPLIES TO BOTH THIRD PARTY CLAIMS AND TO ALL CLAIMS BETWEEN BELLA AND CUSTOMER. 4. Payment Adjustments:Payments under this Service Agreement shall be subject to adjustment for excess hours of operator and/or crew time and/or excess hours of usage of the equipment in accordance with the rates agreed to at the lime of the order,custom in the area where the lifting operation occurs,or by any applicable collective bargaining agreement,as the case may be.The Customer shall not be entitled to any abatement,deduction,reduction,set-off,counterclaim,reooupment or defense against payment for any reason.BELLA SHALL NOT BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES RELATING TO THIS SERVICE AGREEMENT. 5.Payment:All payments required hereunder shall be due in full upon billing. In addition to the rates shown on the face of this Service Agreement,Customer shall pay the following arising in connection with this Service Agreement: (a)All demurrage,storage,switching,and drayage. (b)All taxes,levies,assessment,fees and other public charges assessed as a result of this Service Agreement,including tangible personal property taxes if applicable. (c)All judgments,awards,fines,penalties,forfeitures,court costs,expenses,attorneys'fees(unless prohibited by law)incurred by Bella in accordance with Item 3 above. (d) Bella's costs and expenses including reasonable attorney's fees(unless prohibited by law)incurred in enforcing this Service Agreement and/or collecting any amounts due hereunder. (e) In the event of an accident resulting in damage to the equipment arising from the acts,omissions,misfeasance or malfeasance of Customer,including,but not limited to Customer's employees,agents,representatives,subcontractors or independent contractors,Customer shall be responsible for costs of repairs and related expenses,all consequential losses including,but not limited to loss of use of equipment,loss of profits and all reasonable attomey fees incurred in recovering such damages. Any payments more than 30 days past due hereunder shall bear interest at the rate of 1.5%per month(or the maximum amount allowed by law whichever is higher). 6.Default:If Customer fails to pay when due any payment or other amount required herein to be paid by Customer,or if Customer makes an assignment for the benefit of creditors,whether voluntary or involuntary,or if a petition is filed by or against Customer under the bankruptcy laws of the United States,in addition to other remedies Bella may exercise to protect its interest,CUSTOMER AGREES THAT BELLA MAY TAKE POSSESSION OF ANY OR ALL ITEMS OF EQUIPMENT WHEREVER THESE ITEMS MAY BE LOCATED WITHOUT DEMAND OR NOTICE WITHOUT ANY COURT ORDER OR OTHER PROCESS OF LAW AND WITHOUT LIABILITY TO CUSTOMER FOR ANY DAMAGES OCCASIONED BY SUCH TAKINGS OR POSSESSION. 7.Notice:Customer shall immediately notify Bella of any event or occurrence involving personal injury and/or property damage of any kind relating to Bella personnel or equipment.Customer shall immediately deliver to Bella any summons,pleading,notice or paper of any kind involving any claim,suit or proceeding relating to any event or occurrence involving Bella personnel or equipment.Customer shall not aid or abet the assertion of any such claim,suit or proceeding,and shall fully cooperate with Bella in investigating and defending the same. 8.Access&Site Conditions:Customer shall provide Bella with proper ingress to and egress from the job site and provide protection of all paving, curbs, real estate, structures and/or improvements and Customer shall be responsible for all damage to any paving,curbs,real estate,structures and/or improvements caused by Customer's failure to provide proper ingress and egress.Customer is responsible for providing an operating area that is suitable for operation of the crane with respect to levelness,surface conditions,support capability,proximity to pawerlines,excavations,slopes,underground utilities,subsurface conditions,and obstructions to crane operations.Bella shall have immediate access to and the light to retrieve and repair any equipment used in the lifting operation and shall be entitled to enter upon Customer's property at any time for those purposes even in the event of a strike affecting Customer's facility or property.Customer shall perform or have performed all necessary inspections or testing to determine the nature of the ground or soil and its ability to support the crane while in operation or otherwise.If the ground or soil condition is such that it cannot support the crane,Customer shall take all necessary measures to insure that these conditions are remedied prior to the crane being placed on that ground or soil.These measures include,but are not limited to,the provision of proper shoring or cribbing or other measures. 9. Jury Waiver:UNLESS PROHIBITED BYLAW,BELLA AND CUSTOMER EACH KNOWINGLY UNCONDITIONALLY AND IRREVOCABLY WAIVE TRIAL BY JURY WITH RESPECT TO ANY ACTION CLAIM SUIT OR PROCEEDING WHETHER SOUNDING IN CONTRACT TORT OR OTHERWISE IN RESPECT OF ARISING OUT OF, RELATED TO,OR INCIDENTAL TO THE RELATIONSHIP ESTABLISHED BETWEEN THEM(OR AS TO ANY THIRD PARTIES)IN CONNECTION WITH THIS AGREE- MENT,ANY OTHER DOCUMENT OR AGREEMENT EXECUTED OR DELIVERED IN CONNECTION HEREWITH,OR THE PARTIES'CONDUCT. 10. Assignment or Transfer:This is a personal services agreement that neither Bella nor Customer may assign or transfer to a third party without the combined prior written consent of both parties hereto(which consent may be withheld for any reason).Any such consent shall not release Customer from any obligations under this Service Agreement. 11. Lifting,Lugs,Rigging and Apparatus:Customer assumes all responsibility and liability to ensure the adequacy of the design and strength of any lifting lug or device embedded in or attached to any object,and of any and all rigging or lifting apparatus failures or defects(even if such rigging or lifting apparatus is supplied by Bella tD Customer). 12. MSDS Requirements:Customer shall provide Bella,upon delivery of the equipment to the job location,copies of material safety data sheets(MSDS)for all hazardous chemicals in use at said job location.or make such MSDS available at a central location at the job site,in order that Bella may comply with the requirements of all applicable local,state and Federal laws and regulations,including but not limited to OSHA regulations,regarding hazardous materials.Furthermore,Customer shall inform Bella of all precautionary measures that need to be taken to protect the operators and/or crew or other personnel during normal operating conditions and in foreseeable emergencies. 13. Full Agreement;Governing Law-,Waiver,Severability:This Service Agreement constitutes the full agreement between Bella and Customer.Any changes to this Service Agreement must be in writing signed by Bella and Customer.No conduct by either party to this Service Agreement shall be deemed a modification of this Service Agreement.This Service Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and permissible assigns.The laws of the state of the job site location shall govern this Service Agreement.Headings are provided for convenience only,and not for Interpretation of this Service Agreement.Bella and Customer are independent contractors of each other and Customer shall not be deemed to be the agent,servant or employee of Bella for any reason or purpose.No failure of Bella to enforce performance of any terms or covenants,or failure to exercise or delay in exercising any right under this Service Agreement shall operate as a waiver thereof,nor shall any single or partial exercise of any right hereunder preclude any other or further exercise thereof or the exercise of any other right If any provision of this Service Agreement is held to be invalid or illegal by a court of competent jurisdiction,the Invalid or illegal term will be deemed excluded from this Service Agreement and will not invalidate the remaining terns of this Service Agreement. Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 DAILY[WEEKLY FLORIDA tv SHORT TER SERVICE AGREEMENT Proposal RO, Customer NarTte: Customer Address: '` , awo-1 Job Name: Job Address: Al)t, I Customer Representative Name: Bella Holdings of Key West, LLC AUTHORIZATION By: TO Authorized Signature Auffiorized&gnature SIART WORK Rachel Braswell, Manager Name iPrAQ Narne and Turtle Customer verifies signal person(s)and riggers are qualified as defined and required by OSHA Regulations,29 CFR 1926,1425& 1426. Documentation is available on site: (Initial) THE TERMS AND CONDITIONS GOVERNING THIS AGREEMENT AS DESCRIBED ON THE FRONT AND BACK SIDES ARE UNDERSTOOD,AGREED TO AND ARE INCORPORATED BY REFERENCE. CUSTOMER IS PLACED ON NOTICE THAT THE TERMS AND CONDITIONS ON THE REVERSE SIDE CONTAIN PROVISIONS THAT,AMONG OTHER THINGS, REQUIRE CUSTOMER TO INDEMNIFY OTHERS, INCLUDING MAXIM, FROM CUSTOMER'S AND BELLA'S NEGLIGENCE,WAIVE ALL JURY TRIALS;AND ELIMINATE WARRANTIES. Operator: taw" r._. Oder: � I Equipment# : Boom Length Jib Length`. Accessorial Eq.: Load Weights) WORK PERFORMED (COMMENTS) d .,. " .C ITEM RATE 7 Equipment M Crew Straight Time t 2 Crew Overtime Double Time i°i Subsistence ,.mow Freight � Accessory Haul/Pickup Permits Other DATE DAY FROM TO TRAVEL HOURS Monday Tuesday Wednesday Thursday Friday Saturday .. ..�..� Sunday REMARKS TOTAL NET HOURS HAVE SIGNED tn�`Customer s V � . R �r'" tPrntp � By . The above hour's care venfred to be current. Authonzed Signatures ORIGINAL iwv is w.INVOICE gyrnllo y•CUSTOMER(blue) PAYRO(Lr ig old)i Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 O t.,onuitiorIS Bella Holdings of Key West,LLC.("Bejla)agrees to perform the lifting operation,requested by Customer,subject to the following: 1. Compliance with Laws and Standards:Customer shall comply with and conform to all applicable laws,regulations,ordinances,rules and orders of any governmental entity including,but not limited to OSHA and MSHA laws and regulations and shall comply with all applicable ANSI Standards. Bella agrees to provide lifting services as further described in this Service Agreement.Customer is responsible for providing overall job site safety. Customer is responsible for providing a competent and experienced site supervisor and lift director to oversee job site and lifting operations as set forth in ASMEIANSI 30.5-3.1.3,at.seq.(as amended 2007). Customer is responsible for providing Bella accurate load weights and accepts all liability resulting from its failure to do so.Customer assumes responsibility,control of,and supervision for rigging,hooking and unhooking loads.Customer agrees to provide competent and qualified signal persons to direct Bella's equipment operators:Bella's work does not include rigging,signaling, hooking or unhooking the loads(except where and to the extent Bella's employees or designated subcontractors are used as agreed in.writing by the parties hereto). 2.Title:Any equipment used to perform the lifting operation shall remain the property of Bella at all times.Customer shall keep the equipment free from any and all liens, encumbrances and claims whatsoever,and shall not perform or permit any act that may encumber or impair Bella's title or rights in the equipment.Upon Bella's request, Customer shall promptly execute and/or deliver to Bella all documentation(such as estoppel certificates or a landlord waiver),as Maxim deems necessary or appropriate for the preservation,perfection or enforcement of Bella's interests in the Equipment and Bella's rights under this Service Agreement,and if Customer fails to do so,Bella may execute such documents on Customer's behalf and in Customer's name. 3.Indemnification:TO THE FULLEST EXTENT ALLOWED BY APPLICABLE LAW,CUSTOMER SHALL DEFEND,INDEMNIFY,AND HOLD HARMLESS BELLA ITS OFFICERS, DIRECTORS, PARTNERS, MANAGERS, EMPLOYEES,AFFILIATES, REPRESENTATIVES AND AGENTS (THE"INDEMNITEES") FROM ANY AND ALL ACTIONS,CAUSES OF ACTION,CLAIMS,SUITS, DEMANDS,INVESTIGATIONS,OBLIGATIONS JUDGMENTS LOSSES COSTS LIABILITIES DAMAGES FINES,PENALTIES AND EXPENSES,INCLUDING ATTORNEY FEES,WHICH ARE INCURRED BY,ACCRUED ASSERTED OR MADE AGAINST OR RECOVERABLE FROM ANY OF THE INDEMNITEES ARISING FROM OR RELATING TO,DIRECTLY OR INDIRECTLY,THE CUSTOMER'S NEGLIGENCE WILLFUL OR INTENTIONAL ACT OR ANY OTHER ACT OR OMISSION,WHETHER OR NOT THE SAME ARISES FROM DAMAGE TO PROPERTY(REAL OR PERSONAL) INJURY OR DEATH TO PERSONS INCLUDING BUT NOT LIMITED TO CUSTOMER'S EMPLOYEES,AGENTS AND REPRESENTATIVES.CUSTOMER EXPRESSLY AGREES TO WAIVE ANY WORKERS'COMPENSATION IMMUNITY IT MAY OTHERWISE HAVE.THE DUTY TO DEFEND,INDEMNIFY AND HOLD HARMLESS INDEMNITIEES EXISTS WHETHER BASED IN WHOLE OR IN PART UPON THE ACTIVE, PASSIVE,OR CONCURRENT NEGLIGENCE OF INDEMNITEES.IN JURISDICTIONS IN WHICH THE INDEMNIFICATION PROVIDED FOR IN THIS SECTION IS BROADER THAN THAT ALLOWED BY APPLICABLE LAW,THIS SECTION SHALL BE INTERPRETED AS PROVIDING THE BROADEST INDEMNIFICATION PERMITTED AND SHALL BE LIMITED ONLY TO THE EXTENT NECESSARY TO COMPLY WITH SAID LAW.CUSTOMER'S OBLIGATION TO INDEMNIFY AND AND HOLD HARMLESS AND THE DUTY TO DEFEND THE INDEMNITEES SHALL SURVIVE THE TERMINATION OF THIS AGREEMENT.IT IS EXPESSLYAGREED THAT THIS INDEMNIFICATION CLAUSE APPLIES TO BOTH THIRD PARTY CLAIMS AND TO ALL CLAIMS BETWEEN BELLA AND CUSTOMER. 4. Payment Adjustments:Payments under this Service Agreement shall be subject to adjustment for excess hours of operator and/or crew time and/or excess hours of usage of the equipment In accordance with the rates agreed to at the lime of the order,custom in the area where the lifting operation occurs,or by any applicable collective bargaining agreement,as the case may be.The Customer shall not be entitled to any abatement,deduction,reduction,set-off,counterclaim,recoupment or defense against payment for any reason.BELLA SHALL NOT BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES RELATING TO THIS SERVICE AGREEMENT. 5.Payment:All payments required hereunder shall be due in full upon billing. In addition to the rates shown on the face of this Service Agreement,Customer shall pay the following arising In connection with this Service Agreement: (a)All demurrage,storage,switching,and drayage. (b)All taxes,levies,assessment,fees and other public charges assessed as a result of this Service Agreement,including tangible personal property taxes if applicable. (c)All judgments,awards,fines,penalties,forfeitures,court costs,expenses,attomeys'fees(unless prohibited by law)incurred by Bella in accordance with Item 3 above. (d) Bella's costs and expenses including reasonable attorney's fees(unless prohibited by law)incurred in enforcing this Service Agreement and/or collecting any amounts due hereunder. (e) In the event of an accident resulting in damage to the equipment arising from the acts,omissions,misfeasance or malfeasance of Customer,including,but not limited to Customer's employees,agents,representatives,subcontractors or independent contractors,Customer shall be responsible for costs of repairs and related expenses,all consequential losses Including,but not limited to loss of use of equipment,loss of profits and all reasonable attorney fees incurred in recovering such damages. Any payments more than 30 days past due hereunder shall bear interest at the rate of 1.5%per month(or the maximum amount allowed by law whichever is higher). S.Default:If Customer fails to pay when due any payment or other amount required herein to be paid by Customer,or if Customer makes an assignment for the benefit of creditors,whether voluntary or involuntary,or if a petition is filed by or against Customer under the bankruptcy laws of the United States,in addition to other remedies Bella may exercise to protect Its interest,CUSTOMER AGREES THAT BELLA MAY TAKE POSSESSION OF ANY OR ALL ITEMS OF EQUIPMENT,WHEREVER THESE ITEMS MAY BE LOCATED,WITHOUT DEMAND OR NOTICE,WITHOUT ANY COURT ORDER OR OTHER PROCESS OF LAW AND WITHOUT LIABILITY TO CUSTOMER FOR ANY DAMAGES OCCASIONED BY SUCH TAKINGS OR POSSESSION. 7.Notice:Customer shall immediately notify Bella of any event or occurrence involving personal Injury and/or property damage of any kind relating to Bella personnel or equipment.Customer shall immediately deliver to Bella any summons,pleading,notice or paper of any kind involving any claim,suit or proceeding relating to any event or occurrence involving Bella personnel or equipment Customer shall not aid or abet the assertion of any such claim,suit or proceeding,and shall fully cooperate with Bella in investigating and defending the same. 8.Access&Site Conditions: Customer shall provide Bella with proper ingress to and egress from the job site and provide protection of all paving,curbs,real estate, structures and/or improvements and Customer shall be responsible for all damage to any paving,curbs,real estate,structures and/or improvements caused by Customer's failure to provide proper ingress and egress.Customer is responsible for providing an operating area that is suitable for operation of the crane with respect to levelness,surface conditions,support capability,proximity to powerlines,excavations,slopes,underground utilities,subsurface conditions,and obstructions to crane operations.Bella shall have immediate access to and the right to retrieve and repair any equipment used in the lifting operation and shall be entitled to enter upon Customer's property at any time for those purposes even in the event of a strike affecting Customer's facility or property.Customer shall perform or have performed all necessary inspections or testing to determine the nature of the ground or soil and its ability to support the crane while in operation or otherwise.If the ground or soil condition is such that It cannot support the crane,Customer shall take all necessary measures to insure that these conditions are remedied prior to the crane being placed on that ground or soil.These measures include,but are not limited to,the provision of proper shoring or cribbing or other measures. 8. Jury Waiver:UNLESS PROHIBITED BYLAW,BELLA AND CUSTOMER EACH KNOWINGLY,UNCONDITIONALLY AND IRREVOCABLY WAIVE TRIAL BY JURY WITI RESPECT TO ANY ACTION, CLAIM,SUIT OR PROCEEDING,WHETHER SOUNDING IN CONTRACT TORT OR OTHERWISE IN RESPECT OF ARISING OUT OF, RELATED TO,OR INCIDENTAL TO THE RELATIONSHIP ESTABLISHED BETWEEN THEM(OR AS TO ANY THIRD PARTIES)IN CONNECTION WITH THIS AGREE MENT,ANY OTHER DOCUMENT OR AGREEMENT EXECUTED OR DELIVERED IN CONNECTION HEREWITH OR THE PARTIES'CONDUCT 10. Assignment or Transfer.This is a personal services agreement that neither Bella nor Customer may assign or transfer to a third party without the combined prior written consent of both parties hereto(which consent may be withheld for any reason).Any such consent shall not release Customer from any obligations under this Service Agreement. 11. Lifting,Lugs,Rigging and Apparatus:Customer assumes all responsibility and liability to ensure the adequacy of the design and strength of any lifting lug or device embedde in or attached to any object,and of any and all rigging or lifting apparatus failures or defects(even if such rigging or lifting apparatus is supplied by Bella to Customer). 12. MSDS Requirements:Customer shall provide Bella,upon delivery of the equipment to the job location,copies of material safety data sheets(MSDS)for all hazardous chemicals i use at said job location.or make such MSDS available at a central location at the job site,In order that Bella may comply with the requirements of all applicable local,state and Federal law; and regulations.Including but not limited to OSHA regulations,regarding hazardous materials.Furthermore,Customer shall inform Bella of all precautionary measures that need to be take to protect the operators and/or crew or other personnel during normal operating conditions and in foreseeable emergencies. 13. Full Agreement;Governing Law;Waiver,Severability:This Service Agreement constitutes the full agreement between Bella and Customer.Any changes to this Service Agreement must be In writing signed by Bella and Customer.No conduct by either party to this Service Agreement shall be deemed a modification of this Service Agreement This Servic Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and permissible assigns.The laws of the state of the job site location shall govern this Service Agreement.Headings are provided for convenience only,and not for Interpretation of this Service Agreement.Bella and Customer are Independent contractors of each other and Customer shall not be deemed to be the agent,servant or employee of Bella for any reason or purpose.No failure of Bella to enforce performance of any terms or covenants,or failure to exercise or delay in exercising any right under this Service Agreement shall operate as a waiver thereof;nor shall any single or partial exercise of any right hereunder preclude any other or further exercise thereof or the exercise of any other right.If any provision of this Service Agreement is held to be invalid or Illegal by a court of competent jurisdiction,the invalid or illegal term will be deemed excluded from this Service Agreement and will not invalidate the remaining terms of this Service Agreement. Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 DAILY[WEEKLY FLORIDA SH�ORT TERM Date 'a a SERVICE AGREEMENT Proposal P.O.# 2 Customer Name: Customer Address Job Name: ,Job Address: 77 Customer Representative Name: Bella Holdings of Key West, LLC AUTHORIZATION, 8y� TO ALAhodzed SIonature AuMorized signature START WORK Rachel Braswell, Manager ......... Name(Pant) Name and Me Customer verifies signal person(s)and riggers are qualified as defined and required by OSHA Regulations„ 29 CFR 1926,1425& 1428. Documentation is available on site; (Initial) THE TERMS AND CONDITIONS GOVERNING THIS AGREEMENT AS DESCRIBED ON THE FRONT AND BACK SIDES ARE UNDERSTOOD,AGREED TO AND ARE INCORPORATED BY REFERENCE. CUSTOMER IS PLACED ON NOTICE THAT THE TERMS AND CONDITIONS ON THE REVERSE SIDE CONTAIN PROVISIONS THAT,AMONG OTHER THINGS, REQUIRE CUSTOMER TO INDEMNIFY OTHERS, INCLUDING MAXIM, FROM CUSTOMER'S AND BELLA'S NEGLIGENCE;WAIVE ALL JURY TRIALS;AND ELIMINATE WARRANTIES. Operator: Oiler: Equipment# '. Boom Length Jibl-ength: Accessorial Eq.: Load WeIght(s): WORK PERFORMED (COMMENTS) ITEM RATE Equipment el A L,2L Crew Straight Time Crew Overtime Double Tyre Subsistence Freight Accessory Haul/P,ickup Permits ......................................................... Other DATE DAY FROM TO -TRAVEL HOURS Mo�nday Tuesday Il. 30 Wednesday 7, Thursday Friday Saturday Sunday REMARKS TOTAL NET HOUR Customer Representative Narne� S ................ HAVE SIGNED JCIA (-,I'�6�' �0 c'), AT ® OF (print) q"EEK B,y� The above hours are verified to be correct At uffiorrzed Signmure ORICINAL(whw)-INVOICE(yeflow)-CUSTOMER II)4x �PAYROLL(ga1d"p Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 O%,Oflt]IUOf15 Bella Holdings of Key West,LLC.("Bella")agrees to perform the lifting operation,requested by Customer,subject to the following: 1. Compliance with Laws and Standards:Customer shall comply with and conform to all applicable laws,regulations,ordinances,rules and orders of any governmental entity including,but not limited to OSHA and MSHA laws and regulations and shall comply with all applicable ANSI Standards.Bella agrees to provide lifting services as further described in this Service Agreement.Customer is responsible for providing overall job site safety. Customer is responsible for providing a competent and experienced site supervisor and lift director to oversee job site and lifting operations as set forth in ASME/ANSI 30.6-3.1.3,at seq.(as amended 2007). Customer Is responsible for providing Bella accurate load weights and accepts all liability resulting from its failure to do so.Customer assumes responsibility,control of,and supervision for rigging,hooking and unhooking loads.Customer agrees to provide competent and qualified signal persons to direct Bella's equipment operators_Bella's work does not include rigging,signaling, hooking or unhooking the loads(except where and to the extent Bella's employees or designated subcontractors are used'as agreed in writing by the parties hereto). 2.Title:Any equipment used to perform the lifting operation shall remain the property of Bella at all times.Customer shall keep the equipment free from any and all liens, encumbrances and claims whatsoever,and shall not perform or permit any act that may encumber or impair Bella's title or rights in the equipment.Upon Bella's request, Customer shall promptly execute and/or deliver to Bella all documentation(such as estoppel certificates or a landlord waiver),as Maxim deems necessary or appropriate for the preservation,perfection or enforcement of Bella's Interests in the Equipment and Bella's rights under this Service Agreement,and if Customer fails to do so,Bella may execute such documents on Customer's behalf and in Customer's name. 3.Indemnification:TO THE FULLEST EXTENT ALLOWED BY APPLICABLE LAW,CUSTOMER SHALL DEFEND,INDEMNIFY.AND HOLD HARMLESS BELLA,ITS OFFICERS, DIRECTORS, PARTNERS, MANAGERS, EMPLOYEES,AFFILIATES, REPRESENTATIVES AND AGENTS(THE"INDEMNITEES") FROM ANY AND ALL ACTIONS,CAUSES OF ACTION,CLAIMS,SUITS,DEMANDS,INVESTIGATIONS,OBLIGATIONS,JUDGMENTS,LOSSES,COSTS,LIABILITIES,DAMAGES FINES,PENALTIES AND EXPENSES,INCLUDING ATTORNEY FEES,WHICH ARE INCURRED BY,ACCRUED,ASSERTED,OR MADE AGAINST,OR RECOVERABLE FROM ANY OF THE INDEMNITEES ARISING FROM OR RELATING TO,DIRECTLY OR INDIRECTLY,THE CUSTOMER'S NEGLIGENCE,WILLFUL OR INTENTIONAL ACT OR ANY OTHER ACT OR OMISSION,WHETHER OR NOT THE SAME ARISES FROM DAMAGE TO PROPERTY(REAL OR PERSONAL).INJURY OR DEATH TO PERSONS INCLUDING BUT NOT LIMITED TO CUSTOMER'S EMPLOYEES,AGENTS AND REPRESENTATIVES.CUSTOMER EXPRESSLY AGREES TO WAIVE ANY WORKERS'COMPENSATION IMMUNITY IT MAY OTHERWISE HAVE.THE DUTY TO DEFEND,INDEMNIFY AND HOLD HARMLESS INDEMNITIEES EXISTS WHETHER BASED IN WHOLE OR IN PART UPON THE ACTIVE, PASSIVE,OR CONCURRENT NEGLIGENCE OF INDEMNITEES. IN JURISDICTIONS IN WHICH THE INDEMNIFICATION PROVIDED FOR IN THIS SECTION IS BROADER THAN THAT ALLOWED BY APPLICABLE LAW,THIS SECTION SHALL BE INTERPRETED AS PROVIDING THE BROADEST INDEMNIFICATION PERMITTED AND SHALL BE LIMITED ONLY TO THE EXTENT NECESSARY TO COMPLY WITH SAID LAW.CUSTOMER'S OBLIGATION TO INDEMNIFY AND AND HOLD HARMLESS AND THE DUTY TO DEFEND THE INDEMNITEES SHALL SURVIVE THE TERMINATION OF THIS AGREEMENT.IT IS EXPESSLY AGREED THAT THIS INDEMNIFICATION CLAUSE APPLIES TO BOTH THIRD PARTY CLAIMS AND TO ALL CLAIMS BETWEEN BELLA AND CUSTOMER. 4. Payment Adjustments:Payments under this Service Agreement shall be subject to adjustment for excess hours of operator and/or crew time and/or excess hours of usage of the equipment in accordance with the rates agreed to at the Ilme of the order,custom in the area where the lifting operation occurs,or by any applicable collective bargaining agreement,as the case may be.The Customer shall not be entitled to any abatement,deduction,reduction,set-off,counterclaim,recoupment or defense against payment for any reason.BELLA SHALL NOT BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES RELATING TO THIS SERVICE AGREEMENT. S.Payment:All payments required hereunder shall be due in full upon billing.In addition to the rates shown on the face of this Service Agreement,Customer shall pay the following arising in connection with this Service Agreement: (a)All demurrage,storage,switching,and drayage. (b)All taxes,levies,assessment,fees and other public charges assessed as a result of this Service Agreement,including tangible personal property taxes if applicable. (c)All judgments,awards,fines,penalties,forfeitures,court costs,expenses,attomeys'fees(unless prohibited by law)incurred by Bella in accordance with Item 3 above. (d) Bella's costs and expenses including reasonable attorney's fees(unless prohibited by law)incurred in enforcing this Service Agreement and/or collecting any amounts due hereunder. (e) In the event of an accident resulting in damage to the equipment arising from the acts,omissions,misfeasance or malfeasance of Customer,including,but not limited to Customer's employees,agents,representatives,subcontractors or independent contractors,Customer shall be responsible for costs of repairs and related expenses,all consequential losses including,but not limited to loss of use of equipment,loss of profits and all reasonable attorney fees Incurred In recovering such damages. Any payments more than 30 days past due hereunder shall bear interest at the rate of 1.5%per month(or the maximum amount allowed by law whichever is higher). 6.Default:If Customer fails to pay when due any payment or other amount required herein to be paid by Customer,or if Customer makes an assignment for the benefit of creditors,whether voluntary or Involuntary,or If a petition is filed by or against Customer under the bankruptcy laws of the United States,in addition to other remedies Bella may exercise to protect its interest,CUSTOMER AGREES THAT BELLA MAY TAKE POSSESSION OF ANY OR ALL ITEMS OF EQUIPMENT,WHEREVER THESE ITEMS MAY BE LOCATED,WITHOUT DEMAND OR NOTICE,WITHOUT ANY COURT ORDER OR OTHER PROCESS OF LAW AND WITHOUT LIABILITY TO CUSTOMER FOR ANY DAMAGES OCCASIONED BY SUCH TAKINGS OR POSSESSION. 7.Notice:Customer shall immediately notify Bella of any event or occurrence involving personal Injury and/or property damage of any kind relating to Bella personnel or equipment.Customer shall immediately deliver to Bella any summons,pleading,notice or paper of any kind Involving any claim,suit or proceeding relating to any event or occurrence involving Bella personnel or equipment.Customer shall not aid or abet the assertion of any such claim,suit or proceeding,and shall fully cooperate with Bella In investigating and defending the same. 8.Access&Site Conditions: Customer shall provide Bella with proper ingress to and egress from the job site and provide protection of all paving,curbs, real estate, structures and/or improvements and Customer shall be responsible for all damage to any paving,curbs,real estate,structures and/or improvements caused by Customer's failure to provide proper ingress and egress.Customer is responsible for providing an operating area that is suitable for operation of the crane with respect to levelness,surface conditions,support capability,proximity to powerlines,excavations,slopes,underground utilities,subsurface conditions,and obstructions to crane operations.Bella shall have immediate access to and the right to retrieve and repair any equipment used in the lifting operation and shall be entitled to enter upon Customer's property at any time for those purposes even in the event of a strike affecting Customer's facility or property.Customer shall perform or have performed all necessary inspections or testing to determine the nature of the ground or soil and its ability to support the crane while in operation or otherwise. If the ground or soil condition is such that it cannot support the crane,Customer shall take all necessary measures to insure that these conditions are remedied prior to the crane being placed on that ground or soil.These measures include,but are not limited to,the provision of proper shoring or cribbing or other measures. 9. Jury Waiver:UNLESS PROHIBITED BYLAW,BELLA AND CUSTOMER EACH KNOWINGLY,UNCONDITIONALLY AND IRREVOCABLY WAIVE TRIAL BY JURY WITI RESPECT TO ANY ACTION, CLAIM,SUIT OR PROCEEDING,WHETHER SOUNDING IN CONTRACT TORT OR OTHERWISE IN RESPECT OF ARISING OUT OF RELATED TO,OR INCIDENTAL TO THE RELATIONSHIP ESTABLISHED BETWEEN THEM(OR AS TO ANY THIRD PARTIES)IN CONNECTION WITH THIS AGREE. MENT,ANY OTHER DOCUMENT OR AGREEMENT EXECUTED OR DELIVERED IN CONNECTION HEREWITH OR THE PARTIES'CONDUCT 10. Assignment or Transfer.This is a personal services agreement that neither Bella nor Customer may assign or transfer to a third party without the combined prior written consent of both parties hereto(which consent may be withheld for any reason).Any such consent shall not release Customer from any obligations under this Service Agreement. . 11. Lifting,Lugs,Rigging and Apparatus:Customer assumes all responsibility and liability to ensure the adequacy of the design and strength of any lifting lug or device embedde in or attached to any object,and of any and all rigging or lifting apparatus failures or defects(even if such rigging or lifting apparatus is supplied by Bella to Customer). 12. MSDS Requirements:Customer shall provide Bella,upon delivery of the equipment to the job location,copies of material safety data sheets(MSDS)for all hazardous chemicals ti use at said job location.or make such MSDS available at a central location at the job site,In order that Bella may comply with the requirements of all applicable local,state and Federal laws and regulations,Including but not limited to OSHA regulations,regarding hazardous materials.Furthermore,Customer shall Inform Bella of all precautionary measures that need to be take to protect the operators and/or crew or other personnel during normal operating conditions and In foreseeable emergencies. 13. Full Agreement;Governing Law;Waiver, Severability:This Service Agreement constitutes the full agreement between Bella and Customer.Any changes to this Service Agreement must be in writing signed by Bella and Customer.No conduct by either party to this Service Agreement shall be deemed a modification of this Service Agreement This Servic Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and permissible assigns.The laws of the state of the job site location shall govern this Service Agreement.Headings are provided for convenience only,and not for interpretation of this Service Agreement.Bella and Customer are independent contractors of each other and Customer shall not be deemed to be the agent,servant or employee of Bella for any reason or purpose.No failure of Bella to enforce performance of any terms or covenants,or failure to exercise or delay in exercising any right under this Service Agreement shall operate as a waiver thereof;nor shall any single or partial exercise of any right hereunder preclude any other or further exercise thereof or the exercise of any other right.If any provision of this Service Agreement is held to be invalid or illegal by a court of competent jurisdiction,the invalid or illegal term will be deemed excluded from this Service Agreement and will not invalidate the remaining terms of this Service Agreement Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 K GULF BU� ILDING PCO #107 V KC=-YST`*'R NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program,,,, Miami, Florida 33156 3941 South Roosevelt Q!4 Phone: (786)233-5060 Key West, Florida,,,33' 040 Prime Contract Potential Change Order #107: Transformers Place!L16nt TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Bled Suite 600 Key West, Florida 33040 Miami, Florida 33156 1,10 PCO NUMBER/REVISION: 107/0 CONTRACT: 20-2039-01 -Key We p „A' st International Airport Concours REQUEST RECEIVED FROM: CREATED BY: Mansour Sod,a'6 gari(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 11/21/2p '4 REFERENCE: PRIME CONTRACT Non FIELD CHANGE: No CHANGE ORDER: LOCATION: ACCOUNTING METHOQ^ Amount Based SCHEDULE IMPACT: PAID IN FULL. No EXECUTED: No 11111111111111111IMNSIGNED CHANGE ORDER ECEIVED DATE. IIIII��III IV�IIIIIIIIIIIIII OTAL AMA6NT: $43,450.00 POTENTIAL CHANGE ORDER TITLE:Transformers Plai IIIIIVnt I) IIIIIIIIIIIIu� CHANGE REASON:Client Request POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Charm'°ed As Follows) Transformers Placement Per the Owner request,JV will hire Pedowitz Machinery Movers to,,,p"Iace two 1.5MVA Transformers at the designated locations for KWIA project(20- 2039-01).This change order includes the labor and equipment c„p" t to rig and lift the transformers up to the concrete platform.Quote is based on work being scheduled any day Monday-Friday normal business hou„r4.Additional costs regarding site preparation for the crane operation are excluded from this change order and will be submitted later.Attached is the°proposal from Pedowitz Machinery Movers. ATTACHMENTS: Proposal 11.19,24,pdf # Budget Code Description Amount 1 01-.54.10.40.0 Support Equipment""Other Transformers Installation $39,500.00 2 99-.99.99.66.0 Procore OH&fRR'bther Prime Contract Markup $3,950.00 Grand Total: $43,450.00 ChristopheF° opec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Bingi a"mton, New York 13901 Key West, Florida 33040 Miami, Florida 33156 Signed by: Signed by: DocuSigned by: 062E1EB4233B487... 8E65F52F4C2F4D3... ECADFCF2F31994F2 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE 12/3/2024 1 12:58:12 PST 12/10/2024 1 08:27:36 PST 11/21/2024 1 12:29:02 PST NV2A/Gulf Keystar JV Page 1 of 1 Printed On: 11/21/2024 11:43 AM EST Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 NV k GULF BUILDINGPCO #135 NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami, Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West, Florida 33040 Prime Contract Potential Change Order #135: Decktight - Walkway Pads TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West, Florida 33040 Miami, Florida 33156 PCO NUMBER/REVISION: 135/0 CONTRACT: 20-2039-01 -Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY: Rebecca Vieira(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 3/25/2025 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $36,124.50 POTENTIAL CHANGE ORDER TITLE: Decktight-Walkway Pads CHANGE REASON:A/E Design Changes POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) Decktight-Walkway Pads SCOPE OF WORK: Furnish and install approximately 875 linear feet of walkway pad in accordance with drawing A130 revision 2 dated 02.15.2024. The walkway strip shown on drawing A130, keyed notes#4.274, was added to the permit set of drawings dated July 29, 2022. The walkway strip configuration was later modified in drawing A130 revision 2 dated 02.15.2024. This PCO considers the latest configuration. REFERENCE: Decktight proposal dated 03.18.2025 Drawings A130 (90% 05.02.2022, Permit Set 7.29.2022 & Rev 2 02.15.2024) Specifications—90% CD ATTACHMENTS: 1 (2),pdf A130 ROOF PLANS Rev.0 markup 90°/®,pdf, A130®ROOF PLANS Rev,2(RFI242,1)markup.odf, Al30 ROOF PLANS Rev,P markup,pdf Spec 07 54 16,pdf NV2A/Gulf Keystar JV Page 1 of 2 Printed On:3/26/2025 06:14 PM EDT Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 NV K GULF BU„ILD , NG PCO #135 W" KC=—YST`*'R # Budget Code Description Amount 1 07-.50.10.10.S Roofing System.Subcontractor Roof Walkway Pads $32,840.50 2 99-.99.99.66.0 Procore OH&P.Other 10%Markup $3,284.00 Grand Total: $36,124.50 Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton, New York 13901 Key West, Florida 33040 Miami, Florida 33156 ^^^Signed by: Signed by: Signed by: �,�cvisfep(ur S. epw LK&A4 SfvY&(,V �,:a �4- . ^�•^--•062E1 EB4233B4S7... 8E65F52F4C2F4D3... r—LQj90q3897A754R7. SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE 6/23/2025 1 09:01:00 PDT 6/30/2025 1 05:17:45 PDT 6/20/2025 1 04:53:43 PDT NV2A/Gulf Keystar JV Page 2 of 2 Printed On:3/26/2025 06:14 PM EDT Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 �-`DECK ICAHT Change Order Lit7oFIIIsG SCRVIC w, II�C Order#: DTCO#01 ompaty q1'C)'q'ftSnmn Order Date: 03/18/2025 License;CC 050447 To: NV2A / Gulf Keystar,JV Project: Job No.221058 9100 South Dadeland Boulevard,Suite 600 Ivey West Airport Term Improvement Miami FL 33156 3491 S. Roosevelt Blvd. Ivey West FL 33040 Description of Work Amount 875 If Walkway Pad x$25.00 $21,875.00 Per Diem 6 men x$ 86.0�0 per day x 5 days $2,580,.0�0 Lodging 4 days x 3 rooms x$450 ea $5,400.00 10% 01-1P $2,985.50 I Notes I, i Approved Aount of Change 32,�40.5Q m Theoriginal Contract Sum was... ............................................................................. . $2,500,484.00 Net change by previous Change Orders......... ................................................................................................................................, .... 0.00 I The Contract Suter prior to this Change Carders..........., ,......... .,,. ...,...................................................................................... 2,500,484.00 The Contract Sum will be changed b this Change Order 32,840.50 g y g .... The new Contract Sum including this Change Order will he. 2,533,324.50 r The Contract Time will be changed by ......... 0 Days i Owner: Date: ` Contractor: Date: Dccktihrht Roofing Se,tvim,Inc.2755 NW 63rd Court,Fort Lauderdale,FI,33309 Tel(954)970-8565 Fax(954)9'70-6881 S1N3W3AOHdWl IVNIWb31 V V 3sHnOONOO N y w a 3 m� iHOdH1V IVNOIIVNH31NI 1S3M A3NYEN s m g M w _ ObOE£-1=1`;saM Aai`pM8;lanasooa S L6b£ r' S NOliVIAH AO 1NINIHV''d30 A1Nnoo 3OHNOW a x �rs a S � a o i 21 o {r ; a 1 �s Z. I W$ z- LL QMill !i I I o-- Ill SIM--� -- o--- --- - - x x I'' o-- I --- ;— .. j Itt W ® = I I --- — z - —_--- o--- i— W w !Bills11 I W I Y 2 m i - .. a � 5 HER a INNER a o- ,i—I LL v - a - — —r —�— — o--- -- �— C------------------------------I = I HIM mommommoT Ia olipR I -- - - I ----------------w® F --------------- L= o- o--- - . Sim j: ------------------------------------------- --------------------------------------------------- I i o-- o--- --- - C x: I I du du IMEMOmI o i i I 777 I �u } Ln S1NIW3A07JdAl IVNIWb31'S v gain00NOO y sp iHOdHIV lVNOliVNa31Nl 1S3M)ON 3 �Jr DbDEE�d`3sam AaN`pnl8 3lanasOO}3 S L617E o Q t NOliVIAH d0 1N3NiHVd30 UNnoO 3OHNOW ro a a S o z > ° 7 // I I � U ':::::::::::::....az.:::::::::::::::::::::::::::.�,.a.:.::::::::::::: 2 — U ° o- w U ° 3q JI Q i i l w�x -- 1 I o--- --- t— °b . o-- ww -- -- ----------- .................................................................. .: 1 J ------------ x x r B o-_ ... i --- ° w w w vl ® Y a �— — -- - C. x w � ; , - . _ I o- YII — -- �m m i `n a u YIII YIII YIII YIII �h ..,s,. i o- -- — — — C W Y a x x o- I � I I a 11 w r z s �_ _ _— _1 w ( l o a ' n 1 4 —_ �. a w _ w .. m Q---------------= — -----------------® o o0 0 x r: ...'. —- - ------------- - )' [ m I� (� I� I (�I�� �I[ Ni'nU { a { ii�i�ii - - o-- .1 .............. .... t b b u (x C DEEMo C u u I .. ----------------- - b b , bb b bbb I Ln SJ_N3W3AOHdWl IVNIW)J3i Q V 3sHnooNOD y o��m�`yp l�lOd�Jlb lbN011bN�131NI1S3M1.3>i o a _ poo g o _�JIOp ObDEE-Id'1saM/sN'pM8 llan ryoop oo Q NOIlHIAH AO 1N3W1FJbd30 AlNf10O 30aNOW n o a a S z z o i ': T N J o-- w U z �y Q wa 1 C y o o i .: 7 o--- --- I wLI , m — ® o _ z F W jL' o-- _ -- o--- --- F: x C _ _ I ---- p o- { --- o- � C z $� £ Y Y " I— - o- 0— Ia z C w V � s w I z o---{ --- LL d a o + I t® 0 NT m � , a a a o- w w — — — o-- --- --� !— — — x �Q o-- r — M d m I r ` I �II�N�l�11 b II�II�I�I�II� _ .. -- fi ®Tb b e j� 0-- CD o--- o-- — — N a � 2 b b b b o � o Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation SECTION 07 5416 KETONE ETHYLENE ESTER(KEE) ROOFING SYSTEM PART 1GENERAL 1.01 SUMMARY A. Section Includes: 1. Adhered ketone ethylene ester(KEE) roofing system. 2. Substrate board. 3. Roof and perimeter wall insulation. 4. Cover board. 5. Walkway pads. 6. Expansion joints. 1.02 DEFINITIONS A. Roofing Terminology: Definitions in ASTM D1079 and glossary in NRCA's"The NRCA Roofing Manual: Membrane Roof Systems" apply to work of this Section. 1.03 PREINSTALLATION MEETINGS A. Preliminary Roofing Conference: Conduct conference at Project site to comply with Division 01 requirements and the following: 1. Meet with Owner, Consultant, Construction Manager, Owner's representative, testing and inspecting agency representative, roofing installer, roofing system manufacturer's representative, deck installer, air barrier installer, and installers whose work interfaces with or affects roofing, including installers of roof accessories and roof-mounted equipment. 2. Review methods and procedures related to roofing installation, including manufacturer's written instructions. 3. Review and finalize construction schedule. 4. Examine deck substrate conditions and finishes for compliance with requirements. 5. Review structural loading limitations of roof deck during and after roofing. 6. Review base flashings, special roofing details, roof drainage, roof penetrations, equipment curbs, and condition of other construction that affects roofing system. 7. Review governing regulations and requirements for insurance and certificates. 8. Review temporary protection requirements for roofing system during and after installation. 9. Review roof observation and repair procedures after roofing installation. 1.04 SUBMITTALS, GENERAL A. See Section 01 3000-Administrative Requirements for submittal procedures. 1.05 ACTION SUBMITTALS A. Product Data: For each type of product. 1. For insulation and roof system component fasteners, include copy of SPRI's Directory of Roof Assemblies listing. 2. Provide Florida Building Code product approvals and additional engineering documentation as required by Authorities Having Jurisdiction. B. Shop Drawings: Include the following: 1. Roof plans indicating wind zones per Structural Drawings and ASCE 7 and fastening and adherence requirements. 2. Manufacturer's standard details for typical conditions. 3. Layout and thickness of insulation. 4. Base flashings and membrane terminations. 5. Flashing details at penetrations; coordinate with Section 07 62 00 "Sheet Metal Flashing and Trim." 6. Tapered insulation, including slopes. 7. Insulation and substrate board fastening patterns for corner, perimeter, and field-of-roof locations. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416- 1 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation C. Wind Uplift Resistance Submittal: For roofing system, indicating compliance with wind uplift performance requirements. 1.06 INFORMATIONAL SUBMITTALS A. Manufacturer Certificates: 1. Performance Requirement Certificate: Signed by roof membrane manufacturer, certifying that roofing system complies with requirements specified in "Performance Requirements"Article. a. Submit evidence of compliance with performance requirements. 2. Special Warranty Certificate: Signed by roof membrane manufacturer, certifying that all materials supplied under this Section are acceptable for special warranty. B. Product Test Reports: For roof membrane and insulation, for tests performed by a qualified testing agency, indicating compliance with specified requirements. C. Research reports. D. Field Test Reports: 1. Concrete internal relative humidity test reports. 2. Fastener-pullout test results and manufacturer's revised requirements for fastener patterns. E. Field quality-control reports. F. Sample warranties. G. Maintenance data. 1.07 QUALITY ASSURANCE A. Manufacturer Qualifications: A qualified manufacturer that is listed in SPRI's Directory of Roof Assemblies for roofing system identical to that used for this Project. B. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty. 1.08 DELIVERY, STORAGE, AND HANDLING A. Deliver materials in manufacturer's original containers, dry and undamaged, with seals and labels intact. B. Store materials in weather protected environment, clear of ground and moisture. C. Ensure storage and staging of materials does not exceed static and dynamic load-bearing capacities of roof decking. D. Protect insulation from direct exposure to sunlight. 1.09 FIELD CONDITIONS A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements. B. Do not expose materials vulnerable to water or sun damage in quantities greater than can be weatherproofed the same day. C. Schedule applications so that no partially completed sections of roof are left exposed at end of workday. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416-2 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation 1.10 WARRANTY A. Manufacturer's System Warranty: Manufacturer agrees to repair or replace, without monetary limitation, components of roofing system that do not remain watertight; that fail in adhesion, cohesion, or general durability; or that deteriorate in manner not clearly specified by submitted roofing-system manufacturer's data as inherent quality of material for application indicated within the specified warranty period. 1. Warranty includes roof membrane, base flashings, roof insulation, fasteners, cover boards, substrate boards, walkway pads, and other components of roofing system. 2. Warranty Period: Stated in Warranty Form at the end of this Section. a. Include a 150 mph windspeed rider. B. Roofing Installer's Warranty: 1. Completed Warranty Form at end of this Section, signed by Roofing Installer. a. Repair or replace components of roofing system that do not comply with requirements; that do not remain watertight; that fail in adhesion, cohesion, or general durability; or that deteriorate in manner not clearly specified by submitted roofing-system manufacturer's data as inherent quality of material for application indicated. Warranty includes defects such as blisters, ridging, and excessive surfacing loss. b. Removal and replacement of base sheets, insulation, cover boards, walkway products, and other components of roofing system. Warranty includes replacing materials and labor as necessary. 2. Warranty Period: Stated in Warranty Form at the end of this Sectio. PART 2 PRODUCTS 2.01 PERFORMANCE REQUIREMENTS A. Accelerated Weathering: Roof membrane shall withstand 2000 hours of exposure when tested according to ASTM G152, ASTM G154, or ASTM G155. B. Impact Resistance: Roof membrane shall resist impact damage when tested according to ASTM D3746 or ASTM D4272/D4272M, or the"Resistance to Foot Traffic Test" in FM Approvals 4470. C. Wind Uplift Resistance: Design roofing system to resist the wind uplift pressures indicated on the Components and Cladding Wind Pressures table in the Drawings, with a 1.67 safety factor, when tested according to UL 580 and UL 1897. D. Solar Reflectance Index (SRI): Three-year-aged SRI not less than 64 or initial SRI not less than 82 when calculated according to ASTM E 1980, based on testing identical products by a qualified testing agency. E. Exterior Fire-Test Exposure: ASTM E108 or UL 790, Class A; for application and roof slopes indicated; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency. 2.02 KETONE ETHYLENE ESTER(KEE)/STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMEN MEMBRANE ROOFING - DRAWING DESIGNATION: MR-1 A. To establish standards of manufacture, operation, performance, and appearance, Drawings and Specifications are based on products of FiberTite (Seaman Corporation) Multi-Ply Roofing System. Provided compliance with Project requirements and prior approval by the Owner and the Architect products of the following manufacturer will also be acceptable: 1. Tremco TremPly Kee FB. B. Roofing System: 1. Base Ply: ASTM D 6164/D66164M SBS modified bitumen sheet, reinforced with a non-woven polyester mat. a. Average Weight: 91 Ibs/100 sq. ft(4.4 kg/m2). b. Polyolefin burn-off film; both faces for torch application. c. Product: FiberTite SBS 190 TG Base. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416- 3 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation 2. Cap Ply: ASTM D6754/D6754M KEE sheet, fabric-reinforced and fleece backed. a. Ketone Ethylene Ester(KEE) Content: Not less than 50 percent by weight of the polymer content of the sheet when tested in accordance with ASTM D8154. b. Thickness: 50 mils (1.2 mm), nominal. C. Exposed Face Color: White. d. Product: FiberTite-XT FB Membrane. 2.03 AUXILIARY ROOFING MATERIALS A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with other roofing components. 1. Adhesives and Sealants: Comply with VOC limits of Authorities Having Jurisdiction. B. Sheet Flashing: Manufacturer's standard sheet flashing of same material, type, reinforcement, thickness, and color as KEE sheet. C. Prefabricated Pipe Flashings: As recommended by roof membrane manufacturer. D. Bonding Adhesive: Manufacturer's standard. E. Slip Sheet: Manufacturer's standard, of thickness required for application. F. Metal Termination Bars: Manufacturer's standard, predrilled stainless steel or aluminum bars, approximately 1 by 1/8 inch (25 by 3 mm) thick; with anchors. G. Fasteners: Manufacturer's standard No. 14-13, heavy duty threaded steel No. 3 Phillips truss, self- tapping corrosion resistant fastener. H. Miscellaneous Accessories: Provide single-component gun-grade polyether, preformed cone and vent sheet flashings, preformed inside and outside corner sheet flashings, T joint covers, lap sealants, termination reglets, and other accessories required for a complete, weather-tight installation. 2.04 SUBSTRATE AND COVER BOARDS A. Substrate Board: ASTM C1177/C1177M, glass-mat, water-resistant gypsum substrate, or ASTM C1278/C1278M, fiber-reinforced gypsum board. 1. Subject to compliance with requirements, provide products by one of the following: a. Georgia-Pacific Gypsum, LLC. b. National Gypsum Company. c. USG Corporation. B. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion- resistance provisions in FM Approvals 4470, designed for fastening substrate board to roof deck. 2.05 ROOF INSULATION A. General: Preformed roof insulation boards manufactured or approved by KEE roof membrane manufacturer B. Polyisocyanurate Board Insulation: ASTM C1289, Type II, Class 1, Grade 3, felt or glass-fiber mat facer on both major surfaces. 1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Carlisle SynTec Incorporated. b. Firestone Building Products. c. Johns Manville. 2. Size: 48 by 48 inches (1219 by 1219 mm). 3. Thickness: a. Base Layer: 2 inches (50. mm). b. Upper Layer: As indicated on Drawings and required to achieve minimum ICC required R- value. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416-4 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation 4. Where more than 4 inches of insulation is required to achieve thermal performance provide mineral wool board insulation; ASTM C726, Type II, Class 1, comprising monolithic fibrous material having 12.5-Ib/cu. ft. (200-kg/cu. m) density. C. All thermal insulation products must meet the VOC general emissions testing criteria of CDPH Standard Method v1.1 or v1.2. D. Tapered Insulation: Provide factory-tapered insulation boards. 1. Material: Match roof insulation. 2. Minimum Thickness: 1/4 inch (6.35 mm). 3. Slope: a. Roof Field: 1/4 inch per foot (1:48) unless otherwise indicated on Drawings. b. Saddles, Sumps, and Crickets: 1/2 inch per foot(1:24) unless otherwise indicated on Drawings. 2.06 INSULATION ACCESSORIES A. General: Roof insulation accessories recommended by insulation manufacturer for intended use and compatibility with other roofing system components B. Insulation Adhesive: Insulation manufacturer's recommended adhesive formulated to attach roof insulation to substrate or to another insulation layer as follows: 1. Full-spread, spray-applied, low-rise, two-component urethane adhesive. C. Cover Board: ASTM C1177/C1177M, glass-mat, water-resistant gypsum board, or ASTM C1278/C1278M fiber-reinforced gypsum board. 1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Georgia-Pacific Gypsum LLC. b. National Gypsum Company. c. USG Corporation. 2. Thickness: 1/2 inch (13 mm). 3. Surface Finish: Factory primed. 2.07 WALKWAY PADS A. Flexible Walk Pads: Factory-formed, nonporous, heavy-duty, slip-resisting, surface-textured walkway pads, approximately 3/16 inch (5 mm) thick and acceptable to roofing system manufacturer. 1. Size: As indicated on Drawings. 2. Color: Contrasting with roof membrane. 2.08 EXPANSION JOINTS A. Manufacturer's standard for specified system. PART 3 EXECUTION 3.01 EXAMINATION A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements and other conditions affecting performance of the Work. 1. Verify that metal roof deck is properly secured and free of damage. 3.02 PREPARATION A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing system installation according to roofing system manufacturer's written instructions. Remove sharp projections. B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416- 5 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation 3.03 INSTALLATION OF ROOFING, GENERAL A. Install roofing system according to roofing system manufacturer's written instructions, SPRI's Directory of Roof Assemblies listed roof assembly requirements, and FM Global Property Loss Prevention Data Sheet 1-29. B. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at the end of workday or when rain is forecast. Remove and discard temporary seals before beginning work on adjoining roofing. 3.04 INSTALLATION OF SUBSTRATE BOARD OVER METAL DECK A. Install substrate board with long joints in continuous straight lines, with end joints staggered not less than 24 inches (610 mm) in adjacent rows. 1. At steel roof decks, install substrate board at right angle to flutes of deck locating joints over crests of roof deck. 2. Tightly butt substrate boards together. 3. Cut substrate board to fit tight around penetrations and projections, and to fit tight to intersecting sloping roof decks. 4. Fasten substrate board to top flanges of steel deck according to recommendations in SPRI's Directory of Roof Assemblies listed roof assembly requirements for specified Wind Uplift Load Capacity and FM Global Property Loss Prevention Data Sheet 1-29. 3.05 INSTALLATION OF INSULATION A. Coordinate installing roofing system components so insulation is not exposed to precipitation or left exposed at the end of the workday. B. Comply with roofing system and insulation manufacturer's written instructions for installing roof insulation. C. Installation Over Metal Decking: 1. Install base layer of insulation with joints staggered not less than 24 inches (610 mm) in adjacent rows. a. Trim insulation neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks. b. Make joints between adjacent insulation boards not more than 1/4 inch (6 mm) in width. c. Fill gaps exceeding 1/4 inch (6 mm)with insulation. d. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and penetrations. e. Adhere base layer of insulation and substrate board using insulation manufacturer's proprietary two-part foam adhesive according to requirements in SPRI's Directory of Roof Assemblies for specified Wind Uplift Load Capacity. 2. Install upper layers of insulation and tapered insulation with joints of each layer offset not less than 12 inches (305 mm) from previous layer of insulation. a. Staggered end joints within each layer not less than 24 inches (610 mm) in adjacent rows. b. Install with long joints continuous and with end joints staggered not less than 12 inches (305 mm) in adjacent rows. c. Trim insulation neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks. d. Make joints between adjacent insulation boards not more than 1/4 inch (6 mm) in width. e. Provide prefabricated sloped insulation at internal roof drains to create a square drain sump with each side equal to the diameter of the drain bowl plus 24 inches (610 mm). 1) Trim insulation so that water flow is unrestricted. f. Fill gaps exceeding 1/4 inch (6 mm)with insulation. g. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and penetrations. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416-6 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation h. Adhere each layer of insulation to substrate using adhesive according to SPRI's Directory of Roof Assemblies listed roof assembly requirements for specified Wind Uplift Load Capacity and FM Global Property Loss Prevention Data Sheet 1-29, as follows: 1) Set each layer of insulation in a uniform coverage of full-spread insulation adhesive, firmly pressing and maintaining insulation in place. 3.06 INSTALLATION OF COVER BOARDS A. Install cover boards over insulation with long joints in continuous straight lines with end joints staggered between rows. Offset joints of insulation below a minimum of 6 inches (150 mm) in each direction. 1. Trim cover board neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks. 2. At internal roof drains, conform to slope of drain sump. a. Trim cover board so that water flow is unrestricted. 3. Cut and fit cover board tight to nailers, projections, and penetrations. 4. Adhere cover board to substrate using adhesive according to SPRI's Directory of Roof Assemblies listed roof assembly requirements for specified Wind Uplift Load Capacity and FM Global Property Loss Prevention Data Sheet 1-29, as follows: a. Set cover board in a uniform coverage of full-spread insulation adhesive, firmly pressing and maintaining insulation in place. 3.07 INSTALLATION OF ADHERED ROOF MEMBRANE A. Adhere roof membrane over area to receive roofing according to roofing system manufacturer's written instructions. Unroll roof membrane and allow to relax before installing. B. Start installation of roofing in presence of roofing system manufacturer's technical personnel and Owner's testing and inspection agency. C. Accurately align roof membrane and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps. D. Fabric-Backed Roof Membrane Adhesive: Apply to roof membrane and substrate at rate required by manufacturer and install fabric-backed roof membrane. E. Apply roof membrane with side laps shingled with slope of roof deck where possible. F. Extend base membrane vertically up parapet walls and projections to a minimum height equal to height of insulation and cover board. G. Seams: Clean seam areas, overlap roofing, and hot-air weld side and end laps of roof membrane and sheet flashings to ensure a watertight seam installation. 1. Test lap edges with probe to verify seam weld continuity. Apply lap sealant to seal cut edges of roof membrane and sheet flashings. 2. Verify field strength of seams a minimum of three times daily or for every 1000 square feet of membrane, and repair seam sample areas. 3. Repair tears, voids, and lapped seams in roof membrane that do not comply with requirements. H. Spread sealant bed over deck-drain flange at roof drains, and securely seal roof membrane in place with clamping ring. 3.08 INSTALLATION OF BASE FLASHING A. Install sheet flashings and preformed flashing accessories and adhere to substrates according to roofing system manufacturer's written instructions. B. Apply bonding adhesive to substrate and underside of sheet flashing at required rate, and allow to partially dry. Do not apply to seam area of flashing. C. Flash penetrations and field-formed inside and outside corners with cured or uncured sheet flashing. D. Clean seam areas, overlap, and firmly roll sheet flashings into the adhesive. Hot-air weld side and end laps to ensure a watertight seam installation. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416-7 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation E. Terminate and seal top of sheet flashings and mechanically anchor to substrate through termination bars. 3.09 INSTALLATION OF WALK PADS A. Flexible Walkways: Install walkway products according to manufacturer's written instructions. 1. Install flexible walk pads as indicated on the Drawings. 2. Provide 6-inch (76-mm) clearance between adjoining pads. 3. Trim walk pads so that valleys along crickets are not obstructed. 4. Adhere walkway products to substrate with compatible adhesive according to roofing system manufacturer's written instructions. 3.10 FIELD QUALITY ASSURANCE A. The Construction Manager will engage a qualified testing agency to perform tests and to inspect substrate conditions, surface preparation, roof membrane application, sheet flashings, protection, and drainage components, and to furnish reports to the Owner and the Architect. B. Low-Voltage Electrical Conductance Testing: The testing agency will survey the entire roof area and flashings to locate discontinuity in the roof membrane using an exposed metal electrical loop to create an electrical field tested with handheld probes or a scanning platform with integral perimeter electrical loops creating a complete electrical field. 1. Testing will be performed before overlying construction is placed. 2. After testing, repair areas of discontinuities, repeat tests, and make further repairs, at no additional cost to the Owner, until roofing and flashing installations are contiguous. 3. The testing agency will prepare survey report indicating locations of initial discontinuities, if any. C. Arrange for the roofing manufacturer's technical representative to inspect roofing system installation during construction at intervals appropriate to progress, but no less than five times for each roofing system type. Include at a minimum start insulation, start of base sheet, start of cap sheet, and completion of cap sheet. D. Final Roof Inspection: Arrange for roofing system manufacturer's technical personnel to inspect roofing installation on completion, in presence of Owner's representative, and to prepare inspection report. E. At Construction 's discretion perform field uplift testing in accordance with FM 1-52 /ASTM E907 to validate uplift performance. F. Repair, or remove and replace with new, components of roofing system where inspections indicate that they do not comply with specified requirements. G. Additional testing and inspecting, at Contractor's expense, will be performed to determine if replaced or additional work complies with specified requirements. 3.11 PROTECTING AND CLEANING A. Protect roofing system from damage discoloration, and wear during remainder of construction period. When remaining construction does not affect or endanger roofing, inspect roofing system for deterioration and damage, describing its nature and extent in a written report, with copies to Architect and Owner. B. Correct deficiencies in or remove roofing system that does not comply with requirements, repair substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements. C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended in writing by manufacturer of affected construction. D. Clean roof membrane as recommended in writing by manufacturer following construction to remove discoloration that may impact SRI rating. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416- 8 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation 3.12 ROOFING INSTALLER'S WARRANTY A. WHEREAS of herein called the "Roofing Installer," has performed roofing and associated work("work") on the following project: 1. Owner: Key West International Airport. 2. Address: 3491 S Roosevelt Blvd., Key West, Florida 33040. 3. Building Name/Type: EYW Concourse A. 4. Address: 3491 S Roosevelt Blvd., Key West, Florida 33040. 5. Area of Work: As indicated on Drawings. 6. Acceptance Date: 7. Warranty Period: Two years from date of Substantial Completion. 8. Expiration Date: B. AND WHEREAS Roofing Installer has contracted (either directly with Owner or indirectly as a subcontractor) to warrant said work against leaks and faulty or defective materials and workmanship for designated Warranty Period, C. NOW THEREFORE Roofing Installer hereby warrants, subject to terms and conditions herein set forth, that during Warranty Period Roofing Installer will, at Roofing Installer's own cost and expense, make or cause to be made such repairs to or replacements of said work as are necessary to correct faulty and defective work and as are necessary to maintain said work in a watertight condition. D. This Warranty is made subject to the following terms and conditions: 1. Specifically excluded from this Warranty are damages to work and other parts of the building, and to building contents, caused by: a. Lightning; b. Peak gust wind speed exceeding mph (include wind speed rider); c. Fire; d. Failure of roofing system substrate, including cracking, settlement, excessive deflection, deterioration, and decomposition; e. Faulty construction of parapet walls, copings, chimneys, skylights, vents, equipment supports, and other edge conditions and penetrations of the Work; f. Vapor condensation on bottom of roofing; and g. Activity on roofing by others, including construction contractors, maintenance personnel, other persons, and animals, whether authorized or unauthorized by Owner. 2. When work has been damaged by any of foregoing causes, Warranty shall be null and void until such damage has been repaired by Roofing Installer and until cost and expense thereof have been paid by Owner or by another responsible party so designated. 3. Roofing Installer is responsible for damage to work covered by this Warranty but is not liable for consequential damages to building or building contents resulting from leaks or faults or defects of work. 4. During Warranty Period, if Owner allows alteration of work by anyone other than Roofing Installer, including cutting, patching, and maintenance in connection with penetrations, attachment of other work, and positioning of anything on roof, this Warranty shall become null and void on date of said alterations, but only to the extent said alterations affect work covered by this Warranty. If Owner engages Roofing Installer to perform said alterations, Warranty shall not become null and void unless Roofing Installer, before starting said work, shall have notified Owner in writing, showing reasonable cause for claim, that said alterations would likely damage or deteriorate work, thereby reasonably justifying a limitation or termination of this Warranty. 5. During Warranty Period, if original use of roof is changed and it becomes used for, but was not originally specified for, a promenade, work deck, spray-cooled surface, flooded basin, or other use or service more severe than originally specified, this Warranty shall become null and void on date of said change, but only to the extent said change affects work covered by this Warranty. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416- 9 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation 6. Owner shall promptly notify Roofing Installer of observed, known, or suspected leaks, defects, or deterioration and shall afford reasonable opportunity for Roofing Installer to inspect work and to examine evidence of such leaks, defects, or deterioration. 7. This Warranty is recognized to be the only warranty of Roofing Installer on said work and shall not operate to restrict or cut off Owner from other remedies and resources lawfully available to Owner in cases of roofing failure. Specifically, this Warranty shall not operate to relieve Roofing Installer of responsibility for performance of original work according to requirements of the Contract Documents, regardless of whether Contract was a contract directly with Owner or a subcontract with Owner's General Contractor. E. IN WITNESS THEREOF, this instrument has been duly executed this day of 1. Authorized Signature: 2. Name: F. Title: END OF SECTION 07 5416 MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416 - 10 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 �-`DECK ICAHT Change Order Lit7oFIIIsG SCRVIC w, II�C Order#: DTCO#01 ompaty q1'C)'q'ftSnmn Order Date: 03/18/2025 License;CC 050447 To: NV2A / Gulf Keystar,JV Project: Job No.221058 9100 South Dadeland Boulevard,Suite 600 Ivey West Airport Term Improvement Miami FL 33156 3491 S. Roosevelt Blvd. Ivey West FL 33040 Description of Work Amount 875 If Walkway Pad x$25.00 $21,875.00 Per Diem 6 men x$ 86.0�0 per day x 5 days $2,580,.0�0 Lodging 4 days x 3 rooms x$450 ea $5,400.00 10% 01-1P $2,985.50 I Notes I, i Approved Aount of Change 32,�40.5Q m Theoriginal Contract Sum was... ............................................................................. . $2,500,484.00 Net change by previous Change Orders......... ................................................................................................................................, .... 0.00 I The Contract Suter prior to this Change Carders..........., ,......... .,,. ...,...................................................................................... 2,500,484.00 The Contract Sum will be changed b this Change Order 32,840.50 g y g .... The new Contract Sum including this Change Order will he. 2,533,324.50 r The Contract Time will be changed by ......... 0 Days i Owner: Date: ` Contractor: Date: Dccktihrht Roofing Se,tvim,Inc.2755 NW 63rd Court,Fort Lauderdale,FI,33309 Tel(954)970-8565 Fax(954)9'70-6881 S1N3W3AOHdWl IVNIWb31 V V 3sHnOONOO N y w a 3 m� iHOdH1V IVNOIIVNH31NI 1S3M A3NYEN s m g M w _ ObOE£-1=1`;saM Aai`pM8;lanasooa S L6b£ r' S NOliVIAH AO 1NINIHV''d30 A1Nnoo 3OHNOW a x �rs a S � a o i 21 o {r ; a 1 �s Z. I W$ z- LL QMill !i I I o-- Ill SIM--� -- o--- --- - - x x I'' o-- I --- ;— .. j Itt W ® = I I --- — z - —_--- o--- i— W w !Bills11 I W I Y 2 m i - .. a � 5 HER a INNER a o- ,i—I LL v - a - — —r —�— — o--- -- �— C------------------------------I = I HIM mommommoT Ia olipR I -- - - I ----------------w® F --------------- L= o- o--- - . Sim j: ------------------------------------------- --------------------------------------------------- I i o-- o--- --- - C x: I I du du IMEMOmI o i i I 777 I �u } Ln S1NIW3A07JdAl IVNIWb31'S v gain00NOO y sp iHOdHIV lVNOliVNa31Nl 1S3M)ON 3 �Jr DbDEE�d`3sam AaN`pnl8 3lanasOO}3 S L617E o Q t NOliVIAH d0 1N3NiHVd30 UNnoO 3OHNOW ro a a S o z > ° 7 // I I � U ':::::::::::::....az.:::::::::::::::::::::::::::.�,.a.:.::::::::::::: 2 — U ° o- w U ° 3q JI Q i i l w�x -- 1 I o--- --- t— °b . o-- ww -- -- ----------- .................................................................. .: 1 J ------------ x x r B o-_ ... i --- ° w w w vl ® Y a �— — -- - C. x w � ; , - . _ I o- YII — -- �m m i `n a u YIII YIII YIII YIII �h ..,s,. i o- -- — — — C W Y a x x o- I � I I a 11 w r z s �_ _ _— _1 w ( l o a ' n 1 4 —_ �. a w _ w .. m Q---------------= — -----------------® o o0 0 x r: ...'. —- - ------------- - )' [ m I� (� I� I (�I�� �I[ Ni'nU { a { ii�i�ii - - o-- .1 .............. .... t b b u (x C DEEMo C u u I .. ----------------- - b b , bb b bbb I Ln SJ_N3W3AOHdWl IVNIW)J3i Q V 3sHnooNOD y o��m�`yp l�lOd�Jlb lbN011bN�131NI1S3M1.3>i o a _ poo g o _�JI O�rypop ObDEE�d'1saM/�s�{'pM8 llanasooa S L6b£ o Q a o o NOIlHIAH AO 1N3W1FJbd30 AlNf10O 30aNOW n o a a S z z o i ': T N J o-- w U _ z �y Q wa zy ..................j o 13 o i . 7 o--- --- I wLI C .. �I — ® O o z F W jL' o-- _ -- o--- --- x a p. m m s i o- z I o- o-- o{ — p G (f a LL o � P . " I— - 0 __ �- =r C � I , 0 y F Ia z C w V 15 W a I z o-. _ __ _ o---tIII --- LL d a o r I ® rc < a a o- w w -- --- o-- --- --� !— -1— I � I — m I I. IINl11 b IIII�II�II� o- o--- --- — _ I 7 �,� C 0-- --- CD o-- — �_ o--- b b b b o � o Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation SECTION 07 5416 KETONE ETHYLENE ESTER(KEE) ROOFING SYSTEM PART 1GENERAL 1.01 SUMMARY A. Section Includes: 1. Adhered ketone ethylene ester(KEE) roofing system. 2. Substrate board. 3. Roof and perimeter wall insulation. 4. Cover board. 5. Walkway pads. 6. Expansion joints. 1.02 DEFINITIONS A. Roofing Terminology: Definitions in ASTM D1079 and glossary in NRCA's"The NRCA Roofing Manual: Membrane Roof Systems" apply to work of this Section. 1.03 PREINSTALLATION MEETINGS A. Preliminary Roofing Conference: Conduct conference at Project site to comply with Division 01 requirements and the following: 1. Meet with Owner, Consultant, Construction Manager, Owner's representative, testing and inspecting agency representative, roofing installer, roofing system manufacturer's representative, deck installer, air barrier installer, and installers whose work interfaces with or affects roofing, including installers of roof accessories and roof-mounted equipment. 2. Review methods and procedures related to roofing installation, including manufacturer's written instructions. 3. Review and finalize construction schedule. 4. Examine deck substrate conditions and finishes for compliance with requirements. 5. Review structural loading limitations of roof deck during and after roofing. 6. Review base flashings, special roofing details, roof drainage, roof penetrations, equipment curbs, and condition of other construction that affects roofing system. 7. Review governing regulations and requirements for insurance and certificates. 8. Review temporary protection requirements for roofing system during and after installation. 9. Review roof observation and repair procedures after roofing installation. 1.04 SUBMITTALS, GENERAL A. See Section 01 3000-Administrative Requirements for submittal procedures. 1.05 ACTION SUBMITTALS A. Product Data: For each type of product. 1. For insulation and roof system component fasteners, include copy of SPRI's Directory of Roof Assemblies listing. 2. Provide Florida Building Code product approvals and additional engineering documentation as required by Authorities Having Jurisdiction. B. Shop Drawings: Include the following: 1. Roof plans indicating wind zones per Structural Drawings and ASCE 7 and fastening and adherence requirements. 2. Manufacturer's standard details for typical conditions. 3. Layout and thickness of insulation. 4. Base flashings and membrane terminations. 5. Flashing details at penetrations; coordinate with Section 07 62 00 "Sheet Metal Flashing and Trim." 6. Tapered insulation, including slopes. 7. Insulation and substrate board fastening patterns for corner, perimeter, and field-of-roof locations. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416- 1 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation C. Wind Uplift Resistance Submittal: For roofing system, indicating compliance with wind uplift performance requirements. 1.06 INFORMATIONAL SUBMITTALS A. Manufacturer Certificates: 1. Performance Requirement Certificate: Signed by roof membrane manufacturer, certifying that roofing system complies with requirements specified in "Performance Requirements"Article. a. Submit evidence of compliance with performance requirements. 2. Special Warranty Certificate: Signed by roof membrane manufacturer, certifying that all materials supplied under this Section are acceptable for special warranty. B. Product Test Reports: For roof membrane and insulation, for tests performed by a qualified testing agency, indicating compliance with specified requirements. C. Research reports. D. Field Test Reports: 1. Concrete internal relative humidity test reports. 2. Fastener-pullout test results and manufacturer's revised requirements for fastener patterns. E. Field quality-control reports. F. Sample warranties. G. Maintenance data. 1.07 QUALITY ASSURANCE A. Manufacturer Qualifications: A qualified manufacturer that is listed in SPRI's Directory of Roof Assemblies for roofing system identical to that used for this Project. B. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty. 1.08 DELIVERY, STORAGE, AND HANDLING A. Deliver materials in manufacturer's original containers, dry and undamaged, with seals and labels intact. B. Store materials in weather protected environment, clear of ground and moisture. C. Ensure storage and staging of materials does not exceed static and dynamic load-bearing capacities of roof decking. D. Protect insulation from direct exposure to sunlight. 1.09 FIELD CONDITIONS A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements. B. Do not expose materials vulnerable to water or sun damage in quantities greater than can be weatherproofed the same day. C. Schedule applications so that no partially completed sections of roof are left exposed at end of workday. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416-2 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation 1.10 WARRANTY A. Manufacturer's System Warranty: Manufacturer agrees to repair or replace, without monetary limitation, components of roofing system that do not remain watertight; that fail in adhesion, cohesion, or general durability; or that deteriorate in manner not clearly specified by submitted roofing-system manufacturer's data as inherent quality of material for application indicated within the specified warranty period. 1. Warranty includes roof membrane, base flashings, roof insulation, fasteners, cover boards, substrate boards, walkway pads, and other components of roofing system. 2. Warranty Period: Stated in Warranty Form at the end of this Section. a. Include a 150 mph windspeed rider. B. Roofing Installer's Warranty: 1. Completed Warranty Form at end of this Section, signed by Roofing Installer. a. Repair or replace components of roofing system that do not comply with requirements; that do not remain watertight; that fail in adhesion, cohesion, or general durability; or that deteriorate in manner not clearly specified by submitted roofing-system manufacturer's data as inherent quality of material for application indicated. Warranty includes defects such as blisters, ridging, and excessive surfacing loss. b. Removal and replacement of base sheets, insulation, cover boards, walkway products, and other components of roofing system. Warranty includes replacing materials and labor as necessary. 2. Warranty Period: Stated in Warranty Form at the end of this Sectio. PART 2 PRODUCTS 2.01 PERFORMANCE REQUIREMENTS A. Accelerated Weathering: Roof membrane shall withstand 2000 hours of exposure when tested according to ASTM G152, ASTM G154, or ASTM G155. B. Impact Resistance: Roof membrane shall resist impact damage when tested according to ASTM D3746 or ASTM D4272/D4272M, or the"Resistance to Foot Traffic Test" in FM Approvals 4470. C. Wind Uplift Resistance: Design roofing system to resist the wind uplift pressures indicated on the Components and Cladding Wind Pressures table in the Drawings, with a 1.67 safety factor, when tested according to UL 580 and UL 1897. D. Solar Reflectance Index (SRI): Three-year-aged SRI not less than 64 or initial SRI not less than 82 when calculated according to ASTM E 1980, based on testing identical products by a qualified testing agency. E. Exterior Fire-Test Exposure: ASTM E108 or UL 790, Class A; for application and roof slopes indicated; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency. 2.02 KETONE ETHYLENE ESTER(KEE)/STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMEN MEMBRANE ROOFING - DRAWING DESIGNATION: MR-1 A. To establish standards of manufacture, operation, performance, and appearance, Drawings and Specifications are based on products of FiberTite (Seaman Corporation) Multi-Ply Roofing System. Provided compliance with Project requirements and prior approval by the Owner and the Architect products of the following manufacturer will also be acceptable: 1. Tremco TremPly Kee FB. B. Roofing System: 1. Base Ply: ASTM D 6164/D66164M SBS modified bitumen sheet, reinforced with a non-woven polyester mat. a. Average Weight: 91 Ibs/100 sq. ft(4.4 kg/m2). b. Polyolefin burn-off film; both faces for torch application. c. Product: FiberTite SBS 190 TG Base. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416- 3 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation 2. Cap Ply: ASTM D6754/D6754M KEE sheet, fabric-reinforced and fleece backed. a. Ketone Ethylene Ester(KEE) Content: Not less than 50 percent by weight of the polymer content of the sheet when tested in accordance with ASTM D8154. b. Thickness: 50 mils (1.2 mm), nominal. C. Exposed Face Color: White. d. Product: FiberTite-XT FB Membrane. 2.03 AUXILIARY ROOFING MATERIALS A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with other roofing components. 1. Adhesives and Sealants: Comply with VOC limits of Authorities Having Jurisdiction. B. Sheet Flashing: Manufacturer's standard sheet flashing of same material, type, reinforcement, thickness, and color as KEE sheet. C. Prefabricated Pipe Flashings: As recommended by roof membrane manufacturer. D. Bonding Adhesive: Manufacturer's standard. E. Slip Sheet: Manufacturer's standard, of thickness required for application. F. Metal Termination Bars: Manufacturer's standard, predrilled stainless steel or aluminum bars, approximately 1 by 1/8 inch (25 by 3 mm) thick; with anchors. G. Fasteners: Manufacturer's standard No. 14-13, heavy duty threaded steel No. 3 Phillips truss, self- tapping corrosion resistant fastener. H. Miscellaneous Accessories: Provide single-component gun-grade polyether, preformed cone and vent sheet flashings, preformed inside and outside corner sheet flashings, T joint covers, lap sealants, termination reglets, and other accessories required for a complete, weather-tight installation. 2.04 SUBSTRATE AND COVER BOARDS A. Substrate Board: ASTM C1177/C1177M, glass-mat, water-resistant gypsum substrate, or ASTM C1278/C1278M, fiber-reinforced gypsum board. 1. Subject to compliance with requirements, provide products by one of the following: a. Georgia-Pacific Gypsum, LLC. b. National Gypsum Company. c. USG Corporation. B. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion- resistance provisions in FM Approvals 4470, designed for fastening substrate board to roof deck. 2.05 ROOF INSULATION A. General: Preformed roof insulation boards manufactured or approved by KEE roof membrane manufacturer B. Polyisocyanurate Board Insulation: ASTM C1289, Type II, Class 1, Grade 3, felt or glass-fiber mat facer on both major surfaces. 1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Carlisle SynTec Incorporated. b. Firestone Building Products. c. Johns Manville. 2. Size: 48 by 48 inches (1219 by 1219 mm). 3. Thickness: a. Base Layer: 2 inches (50. mm). b. Upper Layer: As indicated on Drawings and required to achieve minimum ICC required R- value. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416-4 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation 4. Where more than 4 inches of insulation is required to achieve thermal performance provide mineral wool board insulation; ASTM C726, Type II, Class 1, comprising monolithic fibrous material having 12.5-Ib/cu. ft. (200-kg/cu. m) density. C. All thermal insulation products must meet the VOC general emissions testing criteria of CDPH Standard Method v1.1 or v1.2. D. Tapered Insulation: Provide factory-tapered insulation boards. 1. Material: Match roof insulation. 2. Minimum Thickness: 1/4 inch (6.35 mm). 3. Slope: a. Roof Field: 1/4 inch per foot (1:48) unless otherwise indicated on Drawings. b. Saddles, Sumps, and Crickets: 1/2 inch per foot(1:24) unless otherwise indicated on Drawings. 2.06 INSULATION ACCESSORIES A. General: Roof insulation accessories recommended by insulation manufacturer for intended use and compatibility with other roofing system components B. Insulation Adhesive: Insulation manufacturer's recommended adhesive formulated to attach roof insulation to substrate or to another insulation layer as follows: 1. Full-spread, spray-applied, low-rise, two-component urethane adhesive. C. Cover Board: ASTM C1177/C1177M, glass-mat, water-resistant gypsum board, or ASTM C1278/C1278M fiber-reinforced gypsum board. 1. Manufacturers: Subject to compliance with requirements, provide products by one of the following: a. Georgia-Pacific Gypsum LLC. b. National Gypsum Company. c. USG Corporation. 2. Thickness: 1/2 inch (13 mm). 3. Surface Finish: Factory primed. 2.07 WALKWAY PADS A. Flexible Walk Pads: Factory-formed, nonporous, heavy-duty, slip-resisting, surface-textured walkway pads, approximately 3/16 inch (5 mm) thick and acceptable to roofing system manufacturer. 1. Size: As indicated on Drawings. 2. Color: Contrasting with roof membrane. 2.08 EXPANSION JOINTS A. Manufacturer's standard for specified system. PART 3 EXECUTION 3.01 EXAMINATION A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements and other conditions affecting performance of the Work. 1. Verify that metal roof deck is properly secured and free of damage. 3.02 PREPARATION A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing system installation according to roofing system manufacturer's written instructions. Remove sharp projections. B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416- 5 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation 3.03 INSTALLATION OF ROOFING, GENERAL A. Install roofing system according to roofing system manufacturer's written instructions, SPRI's Directory of Roof Assemblies listed roof assembly requirements, and FM Global Property Loss Prevention Data Sheet 1-29. B. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at the end of workday or when rain is forecast. Remove and discard temporary seals before beginning work on adjoining roofing. 3.04 INSTALLATION OF SUBSTRATE BOARD OVER METAL DECK A. Install substrate board with long joints in continuous straight lines, with end joints staggered not less than 24 inches (610 mm) in adjacent rows. 1. At steel roof decks, install substrate board at right angle to flutes of deck locating joints over crests of roof deck. 2. Tightly butt substrate boards together. 3. Cut substrate board to fit tight around penetrations and projections, and to fit tight to intersecting sloping roof decks. 4. Fasten substrate board to top flanges of steel deck according to recommendations in SPRI's Directory of Roof Assemblies listed roof assembly requirements for specified Wind Uplift Load Capacity and FM Global Property Loss Prevention Data Sheet 1-29. 3.05 INSTALLATION OF INSULATION A. Coordinate installing roofing system components so insulation is not exposed to precipitation or left exposed at the end of the workday. B. Comply with roofing system and insulation manufacturer's written instructions for installing roof insulation. C. Installation Over Metal Decking: 1. Install base layer of insulation with joints staggered not less than 24 inches (610 mm) in adjacent rows. a. Trim insulation neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks. b. Make joints between adjacent insulation boards not more than 1/4 inch (6 mm) in width. c. Fill gaps exceeding 1/4 inch (6 mm)with insulation. d. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and penetrations. e. Adhere base layer of insulation and substrate board using insulation manufacturer's proprietary two-part foam adhesive according to requirements in SPRI's Directory of Roof Assemblies for specified Wind Uplift Load Capacity. 2. Install upper layers of insulation and tapered insulation with joints of each layer offset not less than 12 inches (305 mm) from previous layer of insulation. a. Staggered end joints within each layer not less than 24 inches (610 mm) in adjacent rows. b. Install with long joints continuous and with end joints staggered not less than 12 inches (305 mm) in adjacent rows. c. Trim insulation neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks. d. Make joints between adjacent insulation boards not more than 1/4 inch (6 mm) in width. e. Provide prefabricated sloped insulation at internal roof drains to create a square drain sump with each side equal to the diameter of the drain bowl plus 24 inches (610 mm). 1) Trim insulation so that water flow is unrestricted. f. Fill gaps exceeding 1/4 inch (6 mm)with insulation. g. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and penetrations. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416-6 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation h. Adhere each layer of insulation to substrate using adhesive according to SPRI's Directory of Roof Assemblies listed roof assembly requirements for specified Wind Uplift Load Capacity and FM Global Property Loss Prevention Data Sheet 1-29, as follows: 1) Set each layer of insulation in a uniform coverage of full-spread insulation adhesive, firmly pressing and maintaining insulation in place. 3.06 INSTALLATION OF COVER BOARDS A. Install cover boards over insulation with long joints in continuous straight lines with end joints staggered between rows. Offset joints of insulation below a minimum of 6 inches (150 mm) in each direction. 1. Trim cover board neatly to fit around penetrations and projections, and to fit tight to intersecting sloping roof decks. 2. At internal roof drains, conform to slope of drain sump. a. Trim cover board so that water flow is unrestricted. 3. Cut and fit cover board tight to nailers, projections, and penetrations. 4. Adhere cover board to substrate using adhesive according to SPRI's Directory of Roof Assemblies listed roof assembly requirements for specified Wind Uplift Load Capacity and FM Global Property Loss Prevention Data Sheet 1-29, as follows: a. Set cover board in a uniform coverage of full-spread insulation adhesive, firmly pressing and maintaining insulation in place. 3.07 INSTALLATION OF ADHERED ROOF MEMBRANE A. Adhere roof membrane over area to receive roofing according to roofing system manufacturer's written instructions. Unroll roof membrane and allow to relax before installing. B. Start installation of roofing in presence of roofing system manufacturer's technical personnel and Owner's testing and inspection agency. C. Accurately align roof membrane and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps. D. Fabric-Backed Roof Membrane Adhesive: Apply to roof membrane and substrate at rate required by manufacturer and install fabric-backed roof membrane. E. Apply roof membrane with side laps shingled with slope of roof deck where possible. F. Extend base membrane vertically up parapet walls and projections to a minimum height equal to height of insulation and cover board. G. Seams: Clean seam areas, overlap roofing, and hot-air weld side and end laps of roof membrane and sheet flashings to ensure a watertight seam installation. 1. Test lap edges with probe to verify seam weld continuity. Apply lap sealant to seal cut edges of roof membrane and sheet flashings. 2. Verify field strength of seams a minimum of three times daily or for every 1000 square feet of membrane, and repair seam sample areas. 3. Repair tears, voids, and lapped seams in roof membrane that do not comply with requirements. H. Spread sealant bed over deck-drain flange at roof drains, and securely seal roof membrane in place with clamping ring. 3.08 INSTALLATION OF BASE FLASHING A. Install sheet flashings and preformed flashing accessories and adhere to substrates according to roofing system manufacturer's written instructions. B. Apply bonding adhesive to substrate and underside of sheet flashing at required rate, and allow to partially dry. Do not apply to seam area of flashing. C. Flash penetrations and field-formed inside and outside corners with cured or uncured sheet flashing. D. Clean seam areas, overlap, and firmly roll sheet flashings into the adhesive. Hot-air weld side and end laps to ensure a watertight seam installation. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416-7 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation E. Terminate and seal top of sheet flashings and mechanically anchor to substrate through termination bars. 3.09 INSTALLATION OF WALK PADS A. Flexible Walkways: Install walkway products according to manufacturer's written instructions. 1. Install flexible walk pads as indicated on the Drawings. 2. Provide 6-inch (76-mm) clearance between adjoining pads. 3. Trim walk pads so that valleys along crickets are not obstructed. 4. Adhere walkway products to substrate with compatible adhesive according to roofing system manufacturer's written instructions. 3.10 FIELD QUALITY ASSURANCE A. The Construction Manager will engage a qualified testing agency to perform tests and to inspect substrate conditions, surface preparation, roof membrane application, sheet flashings, protection, and drainage components, and to furnish reports to the Owner and the Architect. B. Low-Voltage Electrical Conductance Testing: The testing agency will survey the entire roof area and flashings to locate discontinuity in the roof membrane using an exposed metal electrical loop to create an electrical field tested with handheld probes or a scanning platform with integral perimeter electrical loops creating a complete electrical field. 1. Testing will be performed before overlying construction is placed. 2. After testing, repair areas of discontinuities, repeat tests, and make further repairs, at no additional cost to the Owner, until roofing and flashing installations are contiguous. 3. The testing agency will prepare survey report indicating locations of initial discontinuities, if any. C. Arrange for the roofing manufacturer's technical representative to inspect roofing system installation during construction at intervals appropriate to progress, but no less than five times for each roofing system type. Include at a minimum start insulation, start of base sheet, start of cap sheet, and completion of cap sheet. D. Final Roof Inspection: Arrange for roofing system manufacturer's technical personnel to inspect roofing installation on completion, in presence of Owner's representative, and to prepare inspection report. E. At Construction 's discretion perform field uplift testing in accordance with FM 1-52 /ASTM E907 to validate uplift performance. F. Repair, or remove and replace with new, components of roofing system where inspections indicate that they do not comply with specified requirements. G. Additional testing and inspecting, at Contractor's expense, will be performed to determine if replaced or additional work complies with specified requirements. 3.11 PROTECTING AND CLEANING A. Protect roofing system from damage discoloration, and wear during remainder of construction period. When remaining construction does not affect or endanger roofing, inspect roofing system for deterioration and damage, describing its nature and extent in a written report, with copies to Architect and Owner. B. Correct deficiencies in or remove roofing system that does not comply with requirements, repair substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements. C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended in writing by manufacturer of affected construction. D. Clean roof membrane as recommended in writing by manufacturer following construction to remove discoloration that may impact SRI rating. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416- 8 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation 3.12 ROOFING INSTALLER'S WARRANTY A. WHEREAS of herein called the "Roofing Installer," has performed roofing and associated work("work") on the following project: 1. Owner: Key West International Airport. 2. Address: 3491 S Roosevelt Blvd., Key West, Florida 33040. 3. Building Name/Type: EYW Concourse A. 4. Address: 3491 S Roosevelt Blvd., Key West, Florida 33040. 5. Area of Work: As indicated on Drawings. 6. Acceptance Date: 7. Warranty Period: Two years from date of Substantial Completion. 8. Expiration Date: B. AND WHEREAS Roofing Installer has contracted (either directly with Owner or indirectly as a subcontractor) to warrant said work against leaks and faulty or defective materials and workmanship for designated Warranty Period, C. NOW THEREFORE Roofing Installer hereby warrants, subject to terms and conditions herein set forth, that during Warranty Period Roofing Installer will, at Roofing Installer's own cost and expense, make or cause to be made such repairs to or replacements of said work as are necessary to correct faulty and defective work and as are necessary to maintain said work in a watertight condition. D. This Warranty is made subject to the following terms and conditions: 1. Specifically excluded from this Warranty are damages to work and other parts of the building, and to building contents, caused by: a. Lightning; b. Peak gust wind speed exceeding mph (include wind speed rider); c. Fire; d. Failure of roofing system substrate, including cracking, settlement, excessive deflection, deterioration, and decomposition; e. Faulty construction of parapet walls, copings, chimneys, skylights, vents, equipment supports, and other edge conditions and penetrations of the Work; f. Vapor condensation on bottom of roofing; and g. Activity on roofing by others, including construction contractors, maintenance personnel, other persons, and animals, whether authorized or unauthorized by Owner. 2. When work has been damaged by any of foregoing causes, Warranty shall be null and void until such damage has been repaired by Roofing Installer and until cost and expense thereof have been paid by Owner or by another responsible party so designated. 3. Roofing Installer is responsible for damage to work covered by this Warranty but is not liable for consequential damages to building or building contents resulting from leaks or faults or defects of work. 4. During Warranty Period, if Owner allows alteration of work by anyone other than Roofing Installer, including cutting, patching, and maintenance in connection with penetrations, attachment of other work, and positioning of anything on roof, this Warranty shall become null and void on date of said alterations, but only to the extent said alterations affect work covered by this Warranty. If Owner engages Roofing Installer to perform said alterations, Warranty shall not become null and void unless Roofing Installer, before starting said work, shall have notified Owner in writing, showing reasonable cause for claim, that said alterations would likely damage or deteriorate work, thereby reasonably justifying a limitation or termination of this Warranty. 5. During Warranty Period, if original use of roof is changed and it becomes used for, but was not originally specified for, a promenade, work deck, spray-cooled surface, flooded basin, or other use or service more severe than originally specified, this Warranty shall become null and void on date of said change, but only to the extent said change affects work covered by this Warranty. MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416- 9 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Concourse A&Terminal Key West International Airport Improvements-04-28-2022 Monroe County Dept. of Aviation 6. Owner shall promptly notify Roofing Installer of observed, known, or suspected leaks, defects, or deterioration and shall afford reasonable opportunity for Roofing Installer to inspect work and to examine evidence of such leaks, defects, or deterioration. 7. This Warranty is recognized to be the only warranty of Roofing Installer on said work and shall not operate to restrict or cut off Owner from other remedies and resources lawfully available to Owner in cases of roofing failure. Specifically, this Warranty shall not operate to relieve Roofing Installer of responsibility for performance of original work according to requirements of the Contract Documents, regardless of whether Contract was a contract directly with Owner or a subcontract with Owner's General Contractor. E. IN WITNESS THEREOF, this instrument has been duly executed this day of 1. Authorized Signature: 2. Name: F. Title: END OF SECTION 07 5416 MJ No. 18811.02 KETONE ETHYLENE ESTER 07 5416 - 10 (KEE) ROOFING SYSTEM Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 NV K GULF BUILDING PCO #123R1 W" KE=-YST`*'R NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami, Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West, Florida 33040 Prime Contract Potential Change Order #123R1 : Lotspeich - FIR 5/8" Plywood for MP-3 & MP-4 TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West, Florida 33040 Miami, Florida 33156 PCO NUMBER/REVISION: 123R1 /1 CONTRACT: 20-2039-01 -Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY: Rebecca Vieira(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 2/7/2025 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $11,157.30 POTENTIAL CHANGE ORDER TITLE: Lotspeich-FR 5/8"Plywood for MP-3&MP-4 CHANGE REASON:A/E Design Changes POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) Fire Rated 5/8"Plywood for MP-3&MP-4 Furnish and install approximately 2,742 square feet of 5/8"fire-treated plywood on walls and ceilings to allow for installation the MP-3 and MP-4 wall panel scopes.Clean plywood and paint with the approved Pure White/Alabaster white paint. Note:This scope of work is included with the added MP-3 and MP-4 finishes included in the conformed set as priced in PCO 112.The plywood has been installed and the balance of the scope will be performed at night in Phase 2. PCO 112 MP-3&MP-4 will be revised to remove the plywood and to reflect current scope of work that will be performed in Phase II. Reference: Lotspeich proposal RCO-015R2 dated March 6th,2025 NV2A/Gulf Keystar JV Page 1 of 2 Printed On:3/12/2025 11:22 AM EDT Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 NV K GULF BUILDING PCO #123R1 W" K(=-YST'*'R ATTACHMENTS: IA Lotsneich RCO 015(Rev 2).Ddf # Budget Code Description Amount 1 09-.29.10.30.S Gypsum Board I Framing FR Plywood $10,143.00 Finish.Subcontractor 2 99-.99.99.66.0 Procore OH&P.Other Markup-10% $1,014.30 Grand Total: $11,157.30 Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton, New York 13901 Key West, Florida 33040 Miami, Florida 33156 Signed by: ---Signed by: DocuSigned by: 062E1 EB4233B4S7... C�6 ronFnFVF't�aan 19 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE 4/10/2025 1 11:21:17 PDT 6/23/2025 1 06:58:45 PDT 3/12/2025 1 11:17:44 PDT NV2A/Gulf Keystar JV Page 2 of 2 Printed On:3/12/2025 11:22 AM EDT Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 LCM&WA" j�j �� ESTABLISHED 19'28 January 31, 2025 : „, °+ n;i iti °:;i II a ri h 6, :O Antonio Pinto NV2A I Gulf Building 3491 S Roosevelt Blvd. Key West, FL 33040 Re: KWIA— F&I FT Plywood for MP-3 and MP-4 Scopes Lotspeich RCO 162542-015r2 Dear Mr. Pinto, We submit this proposal for the above referenced subject. Scope and Price of the Work Furnish and install approx. 2,752 SF of 5/8" fire-treated plywood on walls and ceilings to allow for installation of the MP-3 and MP-4 wall panel scopes. Include DEDUCT of$2,500 for drywall hanging and finishing work at alcove areas. This scope was included as an add previously,which is now being deducted due to the requirement of a plywood substrate for MP-3 and MP-4 panels. The price for the work above is$12,643. DEDUCT$ 2,500. The REVISED price for the work above is$10,143. Please forward a change order to the contract for the total above if you would like to proceed. Proposal Certification and Expiration Lotspeich Company Inc,certifies that this proposal is reasonable and accurately reflects the additional work and cost for this change to the best of our current knowledge. We reserve the right to amend or withdraw this proposal at any time prior to the issuance of a Change Authorization by NV2A I Gulf Building. This proposal is withdrawn if not accepted within thirty days from March 6,2025. Lotspeich Company reserves all rights and remedies to claim and recover compensation for delay,extension,acceleration,disruption, interference, loss of production, inefficiency and other schedule impacts which the cumulative effect of this change and others may cause or should such changes constitute a cardinal change. Very truly yours, LOTSPEICH COMPANY INC. Aaron Elston Project Manager LOTSPEICH COMPANY INC. Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 t5 I IIVIHTE WORKSHEET � n ESTABLISHED 19,28 KWIA LOTS#: 015r2 F&I FT Plywood for MP-3 and MP-4 Scopes JOB#: 16-2542 Material QUANTITY UNIT TOTAL 5/8"FT Plywood(SF) 2,752 1.850 5,091.20 Misc. Screws and Attachments 1 50.91 50.91 TOTAL MATERIAL 5,142.11 SALES TAX 385.66 TOTAL MATERIAL 5,527.77 CATEGORY HOURS RATE TOTAL CARPENTER/MECHANIC(NET) 96 42.60 4,090 LABORER/DRIVER 10 28.40 273 CARPENTER FOREMAN/SUPERINTENDENT 10 56.80 545 PER DIEM($300 PER MAN DAY) 3 300.00 900 TOTAL LABOR 5,819 TOTAL MATERIAL 5,528 SUBTOTAL 11,346 CONTRACTOR'S OHF 1,135 BOND 162 TOTAL 12,643 Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 NV K GULF BU„ILD , NG PCO #124 R1 W" KC=-YST`*'R NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami, Florida 33156 3941 South Roosevelt Blvd. Phone: (786)233-5060 Key West, Florida 33040 Prime Contract Potential Change Order #124 R1 : Lotspeich - Gate 8 Vestibule MCP-1 (RCP 1321 C Rev 3) TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West, Florida 33040 Miami, Florida 33156 PCO NUMBER/REVISION: 124 R1 /1 CONTRACT: 20-2039-01 -Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY: Rebecca Vieira(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 2/13/2025 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $4,979.70 POTENTIAL CHANGE ORDER TITLE: Lotspeich-Gate 8 Vestibule MCP-1 (RCP 1321 C Rev 3) CHANGE REASON:A/E Design Changes POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) Lotspeich Gate 8 Vestibule MCP-1 (RCP 1321C Rev3) This change order includes the costs to furnish and install(15)fifteen MCP-1 ceiling tiles and 54 SF of grid system for MCP-1 tiles at the new Gate#8 entry vestibule for KWIA project(20-2039-01)in accordance with revised RCP drawing 1321C dated January 17,2025. This scope of work will be performed after Phase I TCO. This proposal has been revised to include nightwork. Reference: Lotpeich Proposal RCO 14R1 dated March 5,2025 ATTACHMENTS: IA Lotsoeich RCO 014.pdf, 1321 C®SECOND FLOOR RCP-AREA C Rev3.pdf Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton, New York 13901 Key West, Florida 33040 Miami, Florida 33156 Signed by: Signed by: Signed by: (6sf6p(A,t,v' S. 6rtt �� Sfvic�.(,oun,� �. �.,. ; �4, ,_nA9F1 FRd9ZZRdR� SE65F52F4C 9F4n.-i 9hB SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE 6/23/2025 1 08:54:24 PDT 6/30/2025 1 05:22:22 PDT 6/8/2025 1 20:09:23 PDT NV2A/Gulf Keystar JV Page 1 of 1 Printed On:3/11/2025 02:54 PM EDT Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 LCM&MA" j�j �� ESTABLISHED 19'28 February 3, 2025 5, Antonio Pinto NV2A I Gulf Building 3491 S Roosevelt Blvd. Key West, FL 33040 Re: KWIA—Gate 8 Revision January 2025 Lotspeich RCO 162542-014 Dear Mr. Pinto, We submit this proposal for the above referenced subject. Scope and Price of the Work Furnish and install an additional (15) MCP-1 ceiling tiles and 54 SF of grid system for MCP-1 tiles. This additional work comes from the new RCP 1321 C that shows an additional entry vestibule ceiling at Gate 8. Work to be performed at night. The price for the work above is$4,527. Please forward a change order to the contract for the total above if you would like to proceed. Proposal Certification and Expiration Lotspeich Company Inc,certifies that this proposal is reasonable and accurately reflects the additional work and cost for this change to the best of our current knowledge. We reserve the right to amend or withdraw this proposal at any time prior to the issuance of a Change Authorization by NV2A I Gulf Building. This proposal is withdrawn if not accepted within thirty days from February 3,2025. Lotspeich Company reserves all rights and remedies to claim and recover compensation for delay,extension,acceleration,disruption, interference, loss of production, inefficiency and other schedule impacts which the cumulative effect of this change and others may cause or should such changes constitute a cardinal change. Very truly yours, LOTSPEICH COMPANY INC. Aaron Elston Project Manager LOTSPEICH COMPANY INC. Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 t5 I IIVIHTE WORKSHEET � n ESTABLISHED 19,28 KWIA LOTS#: 014r1 Gate 8 Revision January 2025 JOB#: 16-2542 Material QUANTITY UNIT TOTAL MPC-1 Added Tile 60 13.64 818.40 MPC-1 Molding(12'stick) 36 0.65 23.40 MPC-1 Mains(12'Stick) 24 1.143 27.43 MPC-1 2'Ts 24 0.901 21.62 Misc. Screws and Attachments/Hanger Wire 1 16.37 16.37 LTL(Freight) 1 240.00 240.00 Crate Fee(Freight) 1 300.00 300.00 TOTAL MATERIAL 1,447.22 SALES TAX 101.31 TOTAL MATERIAL 1,548.53 CATEGORY HOURS RATE TOTAL CARPENTER/MECHANIC(NET) 32 48.28 1,545 LABORER/DRIVER 4 28.40 114 CARPENTER FOREMAN/SUPERINTENDENT 4 63.90 256 PER DIEM($300 PER MAN DAY) 2 300.00 600 TOTAL LABOR 2,514 TOTAL MATERIAL 1,549 SUBTOTAL 4,063 CONTRACTOR'S OHF 406 BOND 58 TOTAL 4,527 S1N3W3AOHdWl IVNIWb3i Q V 3sHnooN0D Fasa ra= a 3 o y idOdUIV IVNOIiVNH31NI lS3M A3N a e easy z U o U a � �y o0 ObOEE�d`1saM�aJi`pM8 llanasooa S L6b6 _ z m o a M .0 NOIlHIAH AO 1N]NlHV'd30 J.1Nnoo 3OHNOW rs � - R 'r C V 2 u C,V Z m 0 - _ - z y = w z 7 7rA,3 z s y zCD d F I1+I y 9 y5 939 33 a e s 5 3 u 3 ;; 5 ~ W I I I I I I 2 ------ _____________________________ _____________ __ - a C U t7 r a .,, z i I I i I m li I w I 2 Y o °o Iv o i i I i i �I, I i i i I I I ' I i b I � I e, - I � I0 I I '- I ! a II I I ` z � , � pryry b a d #ri I [ ! I I I El . I Y I I I II I I a , - k I n —;- - - - - =-; - i- --- ---- - - - - -- ------- — I , ----- ---- --------------- ' I I q �� t S1N3W3A0!IdWI lb NIWb31 8 b 3Slif10ONOD a idOdUIV IVNOIiVN�131NI lS3M 1.3>i a _ o a r ¢w �ME �gtio�o Ob0££-1d•1saM AE)N•PM8 llanasoOU S L6b£ y o a M �• " N0IlHIAHdOINIAIIHVd30A1NnoozIOHNOW n o w 0 w 3 a] z 3 w E x Z CD 3 3 k ZO 2 w - v c I I I I U W _____________________________�_______ e U U' I I I I � III I W I Q U rc I x 0 rc 0 0 o j'� o I I o 0 I z z I I o- I I oq I I Uq U, I I Wm W= I N' Nm I I I - I J I I I I I I I I I I I c hI lslff l iLl Jil I I I I I I I ' I I 1 I I I I I I I I I I I 1 m 2 I I 1 a I III' I I I I I I_• xl I I I � I I 1 11 I II I I. I I I I I I � I I I I I oe I e II I I I Ii 5 I I I I I I ICI ❑ e_ (w: o- .'I I I I I I e�ecT 33s—.4_ I.. Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 NV K GULF BUILDING PCO #149 W" KE=-YST`*'R NV2A/Gulf Keystar JV Project:20-2039-01 -KWIA Concourse A and Terminal Improvements 9100 South Dadeland Blvd,Suite 600 Program Miami, Florida 33156 3941 South Roosevelt Blvd. Phone:(786)233-5060 Key West, Florida 33040 Prime Contract Potential Change Order #149: Concrete Arch Demolition & Artwork Removal TO: Key West International Airport FROM: NV2A/Gulf Keystar JV 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Key West, Florida 33040 Miami, Florida 33156 PCO NUMBER/REVISION: 149/0 CONTRACT: 20-2039-01 -Key West International Airport Concourse A REQUEST RECEIVED FROM: CREATED BY: Mansour Sodagari(NV2A/Gulf Keystar JV) STATUS: Pending-In Review CREATED DATE: 6/25/2025 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $13,225.21 POTENTIAL CHANGE ORDER TITLE:Concrete Arch Demolition&Artwork Removal CHANGE REASON:A/E Design Changes POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) Authorization of Additional Demolition Work and Artwork Removal This Change Order is issued in response to RFI#512 and due to unforeseen conditions encountered during Phase 2 demolition activities.The following scopes of work are hereby authorized: Scope of Work: • Removal of Artwork in the Existing Departure Hold Room:The JV will make all reasonable and necessary efforts to remove the existing Artwork without causing damage.Due to the nature of the structure and installation,the JV cannot guarantee successful removal or restoration of the Artwork. Upon removal,the Artwork will be returned to the Owner and stored at the same location within the existing departure hold room. • Demolition and Removal of Concrete Arch at Gift Shop:The concrete arch located within the gift shop area of the existing hold room,which was not previously included in the demolition scope,will be fully demolished and removed as part of this change. The schedule impact of these additional scopes will be assessed and submitted after the works is performed and completed.Cost breakdown, RFI#512 and further details are provided in the attached documents. ATTACHMENTS: 512---MH-Resoonsexdf, Estimate 254.odf, Estimate 252.odf # Budget Code Description Amount 1 02-.41.16.13.0 Building Demolition.Other Additional Demolition Work and Artwork Removal $12,022.92 2 99-.99.99.66.0 Procore OH&P.Other Prime Contract Markup $1,202.29 Grand Total: $13,225.21 NV2A/Gulf Keystar JV Page 1 of 2 Printed On:6/25/2025 05:48 PM EDT Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 NV K GULF BU„ILD , NG PCO #149 W" KC=-YST`*'R Christopher Kopec(McFarland Johnson, Key West International Airport NV2A/Gulf Keystar JV Inc.) 49 Court Street,Suite 240 3491 South Roosevelt Boulevard 9100 South Dadeland Blvd,Suite 600 Binghamton, New York 13901 Key West, Florida 33040 Miami, Florida 33156 Christopher ""'a I ly signed by Signed by: Signed by: p Christopher Kopec Kopec Date:2025.07.01 11:07:07 r- 8E65F52F4C2F4D3 ( ^A r� 5 &��, �p� -v (TY�I�VY,S -04'00' //NF4 t (N V Y - ... v an oaostaF�Fao:t SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE 7/9/2025 1 05:53:28 PDT 7/2/2025 1 14:56:37 PDT NV2A/Gulf Keystar JV Page 2 of 2 Printed On:6/25/2025 05:48 PM EDT Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 MANIFESTED CONCEPTS LLC 3347 Donald Ave Maniffesled Key West, FL 33040 +13056998524 Concepts Ux info@manifestedconcepts.com www.manifestedconcepts.com ti'ii cirri at e ADDRESS SHIP TO ESTIMATE# 252 NV2A/Gulf Building NV2A/Gulf Building DATE 06/22/2025 ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... FLORIDA CONTRACTORS LICENSE CBC-1266900 AC-rivrry DESCRIP-HON AMOUNT 06/22/2025 Disclosure Please be advised: Given the nature of 0.00 Notification the project, contractor can not make any guarantees concerning the work to be performed. Regardless of success or failure to preserve installation, client is responsible for payment of time and materials incurred. Qualifying Agent Qualifying Agent: Cut Wall open to allow 2,882.08 block cores to be poured full of mortar. Build a 4 sided wood crate - 2x4's and 112" plywood -to incase the art work in. The crate will have negative space in the front- use plaster of paris to fill that negative space to stabilize the art piece. Band the create with a minimum of 3 ratchet straps. Use of come alongs to lower the created art work to a horizontal position where it will rest. Moved with pallet jacks or a forklift. Foreman Foreman 2,127.04 Laborer Laborer: 1,714.24 General Materials Concrete, Lumber, Plaster of Paris 765.77 Equipment Rentals Heavy Equipment Rental of: pallet jacks 0.00 or forklift will be provided by prime contractor or rented and bill a cost plus 20%. Manifested Concepts, LLC will provide all other materials and come alongs. Overhead Allocation Allocation of company overhead 2,298.24 incurred during project. Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Thank you for your business. TOTAL $9,787.37 We accept the following forms of payment: `7 Cash,Check or Wire Transfer. We do not accept credit cards,Zelle,Venmo or CashApp. We look forward to being able to serve you again. Accepted By Accepted Date Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 MANIFESTED CONCEPTS LLC 3347 Donald Ave Maniffesled Key West, FL 33040 +13056998524 Concepts Ux info@manifestedconcepts.com www.manifestedconcepts.com ti'ii cirri at e ADDRESS SHIP TO ESTIMATE# 254 NV2A NV2A DATE 06/22/2025 ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... FLORIDA CONTRACTORS LICENSE CBC-1266900 ACTivrry DESCRIP-HON AMOUNT 06/22/2025 Qualifying Agent Qualifying Agent: Demolition of concrete 473.16 arch way. Foreman Foreman 678.96 Laborer Laborer: 596.32 Equipment Rentals Heavy Equipment Rental of: pallet jacks 0.00 or forklift will be provided by prime contractor or rented and bill a cost plus 20%. Overhead Allocation Allocation of company overhead 487.11 incurred during project. Thank you for your business. TOTAL $2,235.55 We accept the following forms of payment: Cash,Check or Wire Transfer. We do not accept credit cards,Zelle,Venmo or CashApp. We look forward to being able to serve you again. Accepted By Accepted Date Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 G U L F B U I L B 1 N G NV2A/Gulf Keystar JV Project: 20-2039-01 KWIA Concourse A and N V K C I -YST*R 9100 South Dadeland Blvd,Suite 600 Terminal Improvements Program Miami, Florida 33156 3941 South Roosevelt Blvd. P: (786)233-5060 Key West, Florida 33040 RFI #512: Existing Conditions at Old Holdroom First Floor Area D/E Status Open To Christopher Kopec(McFarland Johnson,Inc.) From Ryan Donnelly(NV2A/Gulf Keystar JV) Don Koppy(Mead&Hunt) 9100 South Dadeland Blvd,Suite 600 Genae Sweet(Mead&Hunt) Miami, Florida 33156 Tang Fang(Mead&Hunt) Tonya Wood(Mead&Hunt) Tyler Bethel(Key West International Airport) Date Initiated May 20,2025 Due Date May 27,2025 Location Project Stage Cost Impact Schedule Impact Spec Section Cost Code Drawing Number Reference Linked Drawings Received From Copies To Tim Bergeron(NV2A/Gulf Keystar JV), Kirk Boothroyd(McFarland Johnson,Inc.), Kellen Donnelly(NV2A/Gulf Keystar JV), Ryan Donnelly (NV2A/Gulf Keystar JV),Gregg Gaston(NV2A/Gulf Keystar JV),John Govero(NV2A/Gulf Keystar JV), Gustavo Lazaro(NV2A/Gulf Keystar JV), Frank Montalvo(NV2A/Gulf Keystar JV),Joseph L. Petzack(McFarland Johnson, Inc.),Mansour Sodagari(NV2A/Gulf Keystar JV) Trade Finishes NV2A/Gulf Keystar JV Page 1 of 2 Printed On: May 20,2025 10:03 AM EDT Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 RFI#512-Existing Conditions at Old Holdroom First Floor Area D/E Project: 20-2039-01 KWIA Concourse A and Terminal Improvements Program Activity Question Question from Ryan Donnelly NV2A/Gulf Keystar JV on Tuesday, May 20, 2025 at 09:46 AM EDT Please see the KWIA RFI 512 Attachment, indicating the existing conditions in the existing terminal first floor holdroom.The items requiring clarification are listed below: 1. Non-load bearing masonry walls(noted as stud walls,structural columns to remain), please confirm this is to be demolished. 2. Existing Artwork;Please confirm this is to be preserved. 3. Concrete beam at 8'-4"to bottom of beam.(New ceiling to be at 8'-4"AFF)Please advise if ceiling height shall be lowered in this area. 4. LVT behind old gate counters not shown on demo plans,please confirm this is to be demolished. 5. Slab elevation differences at restau rant/hold room where kneewall was,please confirm concrete shall be chipped out as the finished floor is to be flush here. 6. Area has ceramic tile flooring, not shown on demo plan, please confirm this is to be demolished. 7. 2 windows not in field,please confirm no further action required. 8. Right area has tile and LVT not shown on demo plan,please confirm this is to be demolished. 9. LVT not shown on demo plan, please confirm this is to be demolished. 10. Existing column is 4 1/2"thick.Wall is type SA3 to be installed in this area, please confirm if the wall shall be upsized to conceal column in wall. 11. 2-3"Concrete/wood slab not shown on demo plans,please confirm this is to be demolished. 12. Kitchen Hoods&Equipment not shown to be demolished,please confirm this is to be demolished. 13. Note 4.030 indicates walk in freezer to remain.Please confirm if it to stay or be demolished. Attachments KWIA RFI 512 Attachment.pdf 1. Yes, the non-load uubearing walls will need to be demolished. 2. Per Tyler's request, remove artwork tile and keep as intact as possible. 3. III.°xu llfiiu i c uncrctc beam to rernaiin. lNew dccu13un of ceilHng Mll be uss ucn shoo 111 . 4. LVT should be demolished. 90% Specification 09 6500-3 3.02 notes that existing flooring and adhesive should be removed prior to installation of resilient flooring. Demolition Plan General Notes #3 on 90% notes the removal of all items that interfere with final construction'. 5. Concrete finish floor should be flushed with top of concrete slab of surrounding area. 6. Tile should be demolished. 90% Specification 09 6500-3 3.02 notes that existing flooring and adhesive should be removed prior to installation of resilient flooring. 7. As noted in keyed notes, exterior of the windows are covered in plywood, and interior is furred out. 8. Tile and LVT should be demolished. 90% Specification 09 6500-3 3.02 notes that existing flooring and adhesive should be removed prior to installation of resilient flooring. 9. LVT, should be demolished. 90% Specification 09 6500-3 3.02 notes that existing flooring and adhesive should be removed prior to installation of resilient flooring. 10. Will need to dimensions to locate column and in reference to where new wall is installed, so it can be determined whether column can be enclosed within a wall or not. 11. Demolish 2-3 concrete/wood slab. `1 , Yes, exisfing kbchein Ikon' cllluauid Ile ircu oved "13,, Yes, existing fireez r alhoOd be lrcunc cd Design Mtn new furcc cir iinstallllcd live sarn NV2A/Gulf Keystar JV locat11oii III MH 16 c lss ucd ahoftl q e } LnS1N3W3A0lidWllbNIWb31 Sb 3Slif10oN0D _ ay a a iHOdUIV lVNOliVNH31NI lS3M A3N a e= o°z rl �yO�oJQo 0b0££-Id'1SaM AE)N'pMS IIEABSOO S L6b£ d z w g a e � o NOIlHIAH AO lN]IAlHV'd30J.1NnooDOHNOW LL s =a J °°°°°°°°ul o z I 1 luuuuuuuuuuuuuuuuuu uuu uuuuuuuum u F ' a uuuuuuuuuuuuuuuuuuuuuuuuuuuu uuu uuuuuuuum u — • z r FuuuuuuumiiVuuuuuuuuuuuuuuuum uuuuuuuuuuuuuuuuuuuuuuuuuuuuii iii L... w c i i ,�, ❑ E3 o o „ liv I � ..q;,� � � I I OWWI IisOWNO lis OWNOWWIWNO Iis0 � s 0 � 0 t l $ _ °o_. __.__ 1 J LL F t III t� m wry IL +++++++++fit w I. II L w h k ��� t A q� III/1// 1 m r I � m oe a _ I � I w bf w P o I Its I p � i — e w — I a e e a - f L I i w m r I d I a t [II I I I isl CcIN 1�7 w LL p = 0 ., ? Z o � �-'� ,III 4 L, s - s 15 S v 0 F ♦ _ I k mi61Q 1"h. P � m I 1 kit k � .. t� I I I I I"1 I"i 1 J II rrrrrrr / Jr i / III➢ %r rr��/iio � °�"r v� /o, r it Al CL �, grid y u r �1 r / 'n 1, /r iii/a ,,,., ro'„ � U i rIMPINILL I ILL rn CD 00 ILL 0); s� 'r tl p'.li ° G!/I �;Mti i _ 7 / r riiiii Gi Y� a i > tlI v 1 IG % c ui //Giw iii ////// W I;I I r; kr/ ///iiii,//%/ rrrrrrrrrr rrrr / ,, �� r 'fir / puuuuuuuuumm iii a iii!p,VVVV°I' %% o � Lo CD LL CP 00 LL h'Vuuuu uuuuuu III r �i i u t�I1�R��r. II i Y i i rn n„ o,t l i fQ � r LU , _ / /, � r // / � 1�1 III � � �� t�,����iiiir%; � ✓, / w //ter �jir / Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 r r � r r as � 1 f j r�" >!59 �`r���t/✓ � r I u u Vil. fi �V II ff -ai a,' Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 Standard Agreement (SA-KWIA) TM G. LIL F BUILDING Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 IN WITNESS WHEREOF, Contractor and Subcontractor have hereunto set their hands and seals in duplicate below on the day and year first above written. SUBCONTRACTOR: CONTRACTOR: MANIFF,STKD CONCEPTS LLC NV2A qUj F MYSTAR JV By BeF3®fj4@-4-834f ... By F.543-F D2a I... Paul A. Rowe John Scherer Printed Name: Printed Name: Title: Manager Title: CEO CONTRACTOR: NV2A GULF KEYSTAR JV F��� ed by: By: 6 Ivt,s 0D841B904D1B4B1... Printed Name: Gilberto Neves Title: chief Executive officer (CEO) Initial DS Key West Intl.Airport Concourse A and Terminal Improvements Program Manifested Concepts LLC 51 Docusign Envelope ID:3EBA269F-F729-4820-9FFA-51CC90CF5769 ATTACHMENT "2" SUBCONTRACT PRICE AND SCOPE OF WORK 2.1 SUBCONTRACT PRICE The Subcontractor agrees to furnish all labor, materials, equipment, tools, supervision, technical and professional services, transportation, hoisting, submittals, shop drawings, samples, insurance and taxes necessary and incidentally required to fully perform the following work (the "Work") and per the terms of this Agreement. A. SUBCONTRACT PRICE.................................................................. $12,022.92 Price in words: Twelve Thousand Twentv-Two Dollars and 92/100 Subcontract Price Breakdown: Item Cost Code Description of the Work Amount 1 TBD Art Piece Protections and Relocation $ 9,787.37 2 TBD Demolition of Concrete Archway $ 2,235.55 B. PAYMENT TERMS: 50% deposit($6,011.46) due upon executing this Agreement. Balance ($6,011.46) due within 15 days upon receiving Subcontractor's invoice. 2.2 SCOPE OF WORK This scope and description of Scope of Work is intended to be read in conjunction with all other provisions of the Contract. It is not intended to limit, replace, supersede or otherwise amend other descriptive terms of the Contract. It is intended to provide a more succinct, subcontractor-specific summary of the details contained in the drawings, plans and specifications associated with the Scope of Work to be performed under this Contract. The specific performance results intended for the Subcontractor to achieve are those indicated in the Contract. The entire Scope of Work is to be in accordance with the Contract in its entirety and shall include all labor, materials, services, supervision, coordination, support, commissioning, inspections, permits, licenses, fees, engineering, shop drawings, work plans, quality, safety, security, temporary utilities, taxes, insurance, overhead, profit, and any other ancillary or collateral resources and activities necessary to achieve proper performance and strict compliance with the terms of the Contract. The Scope of Work includes, but is not limited to, the following: A. General Scope Items 1. Visited the site and understands the constraints imposed by the logistics of the site. 2. Aware the Work Schedule for this Project is based upon a 5-day 8-hour workweek. Key West Intl.Airport Concourse A and Terminal Improvements Program Manifested Concepts LLC 53