Loading...
HomeMy WebLinkAboutItem C09 6:6 6:7 6:8 Presented to: Monroe County Florida William DeSantis Director Facilities Maintenance Prepared by: Siemens Industry, Inc. Bradley Ayres Account Executive Proposal #: 7e75ce8d-012e-43ed-bccc-7e6849a95455 Siemens Industry, Inc. 6:9 Monroe County Florida Controls Upgrade Proposal AHUs and VAV Boxes Harvey Government Center September 8, 2025 Contents Scope Summary .......................................................................................................................................... 2 Equipment Controlled: ................................................................................................................................ 2 Proposed Sequences: ................................................................................................................................... 2 Labor Summary .......................................................................................................................................... 3 Control Points List ...................................................................................................................................... 4 Pricing Breakout: ........................................................................................................................................ 5 Clarifications ............................................................................................................................................... 7 Exclusions ................................................................................................................................................... 7 Agreement ................................................................................................................................................... 8 Siemens Industry, Inc. 6:: Scope Summary Siemens Industry, Inc. is pleased to provide the following turnkey proposal to upgrade the controls for the AHUs and the VAV Boxes in the Harvey Government Center. The existing control system was installed in 1996 and is obsolete with no available repair parts. The following is a summary of the proposed controls upgrade: a) New APOGEE Controllers for the AHUs and the VAVs. b) Like-for-like control points replacement. c) Existing analog sensors, actuators, and end-devices shall be replaced with new. d) The mechanical room outside air control dampers shall be replaced. New actuators shall be supplied and installed by Siemens and connected to the new controls system. e) New supply air fan VFDs and invert-duty motors shall be supplied and installed for the AHUs. f) The existing AHU chilled water control valves were recently retrofitted and shall be reused. g) Includes setting up critical alarms for 24/7/365 System Performance Monitoring service. h) Includes updating the existing Fault Detection and Diagnostics service with new point names. i)Includes travel and per diem. Equipment Controlled: AHUs (4) VAVs (19) Mechanical Room Outside Air Control Dampers (2) Exhaust Fan (1) Note: Only those exhaust fans that are currently connected to existing EMS shall be controlled. Other exhaust fans can be added for extra cost if identified during the project. Proposed Sequences: AHUs: o Control of chilled water control valve to maintain supply air setpoint of 55 degrees (user definable). o Supply air temperature reset up to 58 degrees on cooler days if outside air is below 60 degrees (user adjustable). o Control of speed of VFD to maintain duct static pressure setpoint (user definable). o Setup of occupied and unoccupied building time of day schedules. During unoccupied times outside air dampers shall be closed and exhaust fan shall be commanded off. VAVs: o Box damper position shall be modulated between minimum and maximum CFM setpoints to maintain room temperature setpoint (adjustable at thermostat). Humidity sensors are for monitoring only. Siemens Industry, Inc. Page 2 of 8 711 Labor Summary 1. Labor to provide Siemens standard submittals / record documents: o System architecture (Siemens BACnet/IP & MS/TP) o Network address schedule o System flow diagrams o Control installation / wiring diagrams o Control & Component Panel layouts o Equipment / Instrumentation datasheets o Point database o Sequences 2. Labor to provide controls installation o Work during normal business hours. o Programming o Map new controllers and points to existing Desigo CC EBMS. o Includes updates to existing Desigo CC EBMS graphics o Work during normal business hours. 3. Labor to provide Siemens standard startup & checkout: o Point database verification o Point-to-point o Sequence verification 4. Labor to provide Siemens project management, to include the following: o BMS project scope only and associated meetings and coordination as required by project schedule (not full-time on-site superintendent or project manager) o Project meetings attendance o Project documentation requirements o Coordination with installation team o Subcontractor management (if required) o Material ordering and delivery coordination o Project turnover documentation support 5. Labr to install VFDs and motors 6. Labor to install outside air dampers 7. Labor to provide 8 hours of owner training 8. One-year parts and labor warranty on new controls upon beneficial use of systems. Siemens Industry, Inc. Page 3 of 8 712 Control Points List AHUs 1, 2, 4, 5 with new VFDs and Motors VAVs (Qty 19) Siemens Industry, Inc. Page 4 of 8 713 Pricing Breakout: Siemens Material Part NumberDescriptionQuantity List Price Per Sell Price PerExtended Sell 141-0574Air Flow Switch8 $ 266.04 $ 106.42 $ 851.33 269-062PR269 ACCESSORY, SENSING TUBE8 $ 72.55 $ 29.02 $ 232.16 544-339-18DCT PT TEMP, PT 1K OHM (375), 18" RIGID4 $ 121.33 $ 48.53 $ 194.13 544-342-16DUCT AV. TMP, 1K OHM, PT(375), 16', FLEX4 $ 354.83 $ 141.93 $ 567.73 QAM2030.010DUCT POINT TEMP, 10K OHM TYPE 2, 4"19 $ 309.89 $ 123.96 $ 2,355.16 A7F30048853Xfrmr 120/24 100VA W/CB w/ 20" Leads8 $ 103.90 $ 41.56 $ 332.48 DXR2.M12P-1028DXR2.M12P Room Automation Station19 $ 1,057.75 $ 423.10 $ 8,038.90 GCA126.1U2 PT SR,24V,MED/S2 $ 952.46 $ 380.98 $ 761.97 GDE131.1PACT NSR PLENUM 24/108L 5NM19 $ 254.76 $ 101.90 $ 1,936.18 P55802-Y157-A412CCA-100-BA CC ADD 100 BA DP2 $ 1,829.28 $ 731.71 $ 1,463.42 PXC4.E16.APXC4.E16.A COMPACT 16PT, BACNET4 $ 3,577.60 $ 1,431.04 $ 5,724.16 RIBU1CRIB 120VAC 24VAC/DC SPDT7 $ 33.40 $ 13.36 $ 93.52 S55624-H143-AQMX3.P44 T/rH-sensor and room unit19 $ 605.48 $ 242.19 $ 4,601.65 S55720-S526QBM3230U5D Pressure Sensor4 $ 416.03 $ 166.41 $ 665.65 Sub-Total $27,818.43 Outside Material Part NumberDescriptionQuantity Cost Per Sell Price PerExtended Sell AHU Motor 5 HP5 HP Inverter Duty Ready1 $ 536.00 $ 884.40 $ 1,459.26 AHU VFD 5 HP5 HP 460/3 NEMA 1 Bypass1 $ 2,080.00 $ 3,432.00 $ 5,662.80 AHU Motor 7.5 HP7.5 HP Inverter Duty Ready3 $ 803.00 $ 1,324.95 $ 2,186.17 AHU VFD 7.5 HP7.5 HP 460/3 NEMA 1 Bypass3 $ 2,155.00 $ 3,555.75 $ 5,866.99 Ruskin CD 50 DamperAluminum 24" x 72"2 $ 675.00 $ 1,113.75 $ 1,837.69 R-9999Misc. Mechanical Material1 $ 400.00 $ 660.00 $ 1,089.00 R-9999Misc. Electrical Material1 $ 2,050.00 $ 3,382.50 $ 5,581.13 Sub-Total $23,683.03 Siemens Labor Company NameService ProvidedExtended Sell SiemensSee Attached Labor Detail Sheets$136,542.40 Sub-Total $136,542.40 Sell Price$188,043.86 Siemens Industry, Inc. Page 5 of 8 714 Siemens Labor Detail Quantity Hourly Off-Extended Job TitleRate Type HoursSite Sell Building Automation Monday-Friday (Normal Business Hours) 28 $ 182.40 $5,107.20 Technician Monday-Friday (Outside Normal Business 0 $ 273.60 $0.00 Hours) Saturdays0 $ 273.60 $0.00 Sundays & Holidays0 $ 364.80 $0.00 Project Manager Monday-Friday (Normal Business Hours)48 $ 230.40 $11,059.20 Monday-Friday (Outside Normal Business 0 $ 345.60 $0.00 Hours) Saturdays0 $ 345.60 $0.00 Sundays & Holidays0 $ 460.80 $0.00 Application/General Monday-Friday (Normal Business Hours): 85 $ 225.60 $19,176.00 Engineer Design, Graphics, Programming Monday-Friday (Outside Normal Business 0 $ 338.40 $0.00 Hours) Saturdays0 $ 338.40 $0.00 Sundays & Holidays0 $ 451.20 $0.00 Labor Sub-Total $35,342.40 Siemens Labor Detail (On- Quantity Extended Job TitleRate Type Daily On-Site DaysSell Building Automation Monday-Friday (Normal Business Hours) 14 $ 2,200.00 $30,800.00 Technician Service Mechanic Monday-Friday (Normal Business Hours)8 $ 2,200.00 $17,600.00 Electrical Installer Monday-Friday (Normal Business Hours)22 $ 2,200.00 $48,400.00 Project Manager Monday-Friday (Normal Business Hours)2 $ 2,200.00 $4,400.00 Application/General Monday-Friday (Normal Business Hours) 0 $ 2,200.00 $0.00 Engineer Labor Sub-Total $101,200.00 Siemens Industry, Inc. Page 6 of 8 715 Clarifications It is assumed that VAV boxes are accessible above the ceiling. Existing thermostat locations shall be reused. Work during normal business hours. Existing AHU control wiring is assumed to be in good condition and shall be reused. Existing control enclosures shall be reused. AHU chilled water control valves and actuators are assumed to be in good working condition. Space Humidity sensors are for monitoring only. AHU-3, Board Room VAV Boxes, and Chiller Plant were completed in previous projects. Exclusions The following are the exclusions to the Controls Upgrade Proposal: Relocation of furniture, computers, etc. for access to VAVs in ceiling. Repairs to existing control wiring. Repairs to AHU mechanical and electrical equipment. Repairs to VAV boxes. Test and balance. Third-party commissioning. Overtime labor. Ethernet drops and configuration. Personal computer hardware and operating system software. Patching and painting (if required). Fire alarm system testing and/or shutdown modifications. Changes to system required by Inspector to meet current codes. Asbestos abatement, and work within asbestos areas. Bond. Permit. Per project aggregate insurance. Siemens Industry, Inc. Page 7 of 8 716 Agreement Controls UpgradeProposal AHUs and VAV Boxes Harvey Government Center By and Between: Monroe County FloridaSiemens Industry, Inc. 1100 Simonton Street3021 N. Commerce Parkway Key West, FL 33040Miramar, FL 33025 Siemens Industry, Inc. shall provide the services as outlined in the attached proposal dated 09/08/25. Services shall be provided at the Harvey Government Center in Key West,Florida. Controls UpgradeInvestment:$188,043.86 Prices quoted are firm for 30days. 25% mobilization due upon receipt of order. Progress payments thereafter. Net 30payment terms. TheTerms and Conditions of thisproposal are those in the Master Agreement between Monroe County, Florida and Siemens Industry, Inc., and are considered part of the proposal. Siemens reserves the right to adjust prices to reflect the impact of any new or modified taxes, duties, tariffs, or equivalent measures, whether direct or indirect, imposed by any U.S. or foreign governmental authority that are applicable to our offering, including any hardware, software, or service components contained therein. Proposal accepted by:Proposalsubmitted by: Name:William DeSantisName:Bradley L. Ayres Title:DirectorFacilities MainenanceTitle:Account Executive Monroe County FloridaSiemens Industry, Inc. Purchase Order #: _________________ __________________________________________________________________ SignatureSignature Date:___________________________Date:09/08/25 Siemens Industry, Inc.Page 8of8 717 718 719 71: 721 722 723 724 725