Loading...
HomeMy WebLinkAboutItem I11 3459 345: 3462 3463 Change Order to Owner - Summary of Costs No.ContractorItemCostGC FeeExtended Cost Gary's Plumbing & Fire, Inc. $ 5,868.17 14.50%$ 6,719.05 MEP Relocation Check Electric LLC.$ 4,650.00 14.50%$ 5,324.25 Electrical Rm Work $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - SUB-TOTAL$ 12,043.30 CREDITS$ - CO TOTAL$ 12,043.30 3464 3255 Flagler Ave. #303 Proposal #24-0507 Key West, FL 33040 Office: 305-292-3369 OriginalDate: March 17, 2025 License # EC13004515 Revision Date: June 11, 2025 SUBMITTED TOWORK TO BE PERFORMED AT CHANGE ORDER Marino Construction Group, Inc. Terminal Annex Repairs - Custom and Border Protection Facility John White Key West International Airport JWhite@marino-construction.com Key West, FL 33040 407-721-9020 REVISED CHANGE ORDER Item #1:Rooms 124, 125, 127, 133, 134, and 135. SOW#1:Change lighting control from low voltage wall switch to (1) 120V dimmer, in each room. Certified Labor Cost: $800.00 Material Cost: $1,500.00 Item #2:Room 125. SOW#2:Replace (1) single duplex receptacle with (1) double duplex receptacle. Provide and install (1) new data drop with (3) CAT6 homeruns. Certified Labor Cost: $550.00 Material Cost: $100.00 RevisedRevisedItem #3:Item #3:Room 137.Room 137. SOWSOW#3#3::Remove and relocate existing lighting in the soffit to accommodate new wall Remove and relocate existing lighting in the soffit to accommodate new wall (see attached drawing).(see attached drawing).Provide and install single Provide and install single pole switch for closet light, omitted from plans.pole switch for closet light, omitted from plans. Certified Labor Cost: $Certified Labor Cost: $2,400.002,400.00 Item #4:Rooms 136, 140, 178, and 179. SOW#4: Relocate (2) lights and re-work switching. Remove (2) receptacles to accommodate new doors (Demo plans E2.101 does not show any lighting in this area to be removed or relocated, however, to build the walls per plans the additional SOW is required). Certified Labor Cost: $800.00 Material Cost: $900.00 EXCLUSIONS 1.Weekends, after-hours, night work. 2.Any worknot mentioned in the above CO scopesof work. REVISED TOTAL COST: $7,TOTAL COST: $7,050.00050.00 $4650.00 Certified Labor Cost: $4,550.00Certified Labor Cost: $4,550.00 $2,150.00 Material Cost: $2,500.00 Respectfully Submitted by, Check Electric LLC Price of this proposal is based on following insurance limits: Commercial General Liability $1,000,000 Each Occurrence / $2,000,000 Annual Aggregate; Automobile Liability: $1,000,000 Each Accident; Workers Compensation and Employers Liability: $1,000,000 EachAccident for Bodily Injury by Accident and $1,000,000 Each Employee for Injury by Disease. Any alteration or deviation from above specifications involving extra costs will be executed only upon written order and will become an extra charge over and above the estimate. All work is to be completed during normal work hours of Monday through Fridayfrom 8:00 AM till 5:00 PM. Any work requested to be completed outside normal work hours will be an additional cost. This proposal may be withdrawn, and supplier quotes voidif not accepted within thirtydays from date of submission. 3465 3466 3467 3468 3469 346: AVCON, INC. Engineers & Planners 5555 E. Michigan St., Suite 200/ Orlando, Florida 32822 Phone: (407) 599-1122 / Fax: (407) 599-1133 / www.avconinc.com REQUEST FOR INFORMATION (RFI) RESPONSE RFI Response Not Valid without this AVCON Cover Sheet OWNER RFI # 17 LFZXFTUJOUFSOBUJPOBMBJSQPSU DVTUPNTGBDJMJUZ.UFSNJOBMBOOFY PROJECT AVCON # 3134/1377/12 SFQBJST-SFOPWBUJPO'FRVJQ.QIBTF4 FDOT FM # AVCON FILE CODE DQ44 CONTRACTOR NBSJOPDPOTUSVDUJPOHSPVQ-JOD/ SUBJECT NFQSfmpdbujpot SHEET # CONTRACTOR’S QUESTION DATE 203:03136 Qmvncjohnjttjohgspnesbxjohefnpboe2tugmppsesbxjoh Fmfdusjdbmdpoevju-xbufsmjof-sppgwfouboeGjsftvqqsfttjposjtfsoputipxopoesbxjohB212Gmppsqmbopspo esbxjohB121EfnpGmppsQmbo/ UiftfoffeupcfsfmpdbufeuptvqqpsuuifmpdbujpopgofxTupsfGspou$2buesbxjohjoejdbupstE.2/Xftvhhftuuibu bobeejujpobm21/6Žcfbeefeupfyjtujohqmbofefyufsjpsxbmm/Uifouifjoufsobmufmmfsxbmmcfnpwfepwfs21/6Ž/ Qmfbtftffbuubdifeesbxjoht/ DESIGN CONSULTANT’S RESPONSE BY DATE \[fnqQfqqfs30803136 UifgjsfnbjomjoftibmmcfsfmpdbufebucbtfnfoumfwfmboespvufeuispvhigmppspqfojohofbsdpmvnoE/ Uifmjoftibmmfyufoewfsujdbmmzbcpwfuifdfjmjohmjofuifopggtfuboesfdpoofduupuiffyjtujohpwfsifbegjsf nbjopouif2tumfwfm/Uifgjsfnbjobmtpgffetuifnf{{bojofmfwfmboexjmmsfdpoofduupuifwfsujdbmmjof gffejohuijtbsfbbcpwfuif2tugmppsdfjmjoh/Uifbsdijufduvsbmdibtfxjmmcffombshfeupbddpnnpebufuif gjsfnbjoboepuifsfyjtujohvujmjujftjoSn235QvcmjdSfdfqujpo/Uifhmbttmjhiuupuifmfgupgepps235xjmm cfsfwjtfeupnbtposzjogjmm/ SfgfsupbuubdifeQmboTiffutB212-B612-G4/211-boeG4/212/ 3471 3472 3473 3474 3477 3478 3479 347: 3481 3482 3483 3484 3485 3486 3487 3488 3489 348: 3491 3492 3493 3494 3495 3496 3497 3498 3499 349: 34:1 34:2 34:3 34:4 34:5 34:6 34:7 34:8 34:9 34:: 3511 3512 3513 3514 3515 3516 3517 3518 3519 351: 3521 3522 3523 3524 3525 3526 3527 3528 3529 352: 3531 3532 3533 3534 3535 3536 3537 3538 3539 353: 3541 3542 3543 3544 3545 3546 3547 3548 3549 354: 3551 3552 3553 3554