Change Order to Owner - Summary of Costs
No.ContractorItemCostGC FeeExtended Cost
Gary's Plumbing & Fire, Inc. $ 5,868.17 14.50%$ 6,719.05
MEP Relocation
Check Electric LLC.$ 4,650.00 14.50%$ 5,324.25
Electrical Rm Work
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
SUB-TOTAL$ 12,043.30
CREDITS$ -
CO TOTAL$ 12,043.30
3464
3255 Flagler Ave. #303
Proposal #24-0507
Key West, FL 33040
Office: 305-292-3369
OriginalDate: March 17, 2025
License # EC13004515
Revision Date: June 11, 2025
SUBMITTED TOWORK TO BE PERFORMED AT
CHANGE ORDER
Marino Construction Group, Inc.
Terminal Annex Repairs - Custom and Border Protection Facility
John White
Key West International Airport
JWhite@marino-construction.com
Key West, FL 33040
407-721-9020
REVISED CHANGE ORDER
Item #1:Rooms 124, 125, 127, 133, 134, and 135.
SOW#1:Change lighting control from low voltage wall switch to (1) 120V dimmer, in each room.
Certified Labor Cost: $800.00
Material Cost: $1,500.00
Item #2:Room 125.
SOW#2:Replace (1) single duplex receptacle with (1) double duplex receptacle. Provide and install (1) new data drop with (3) CAT6
homeruns.
Certified Labor Cost: $550.00
Material Cost: $100.00
RevisedRevisedItem #3:Item #3:Room 137.Room 137.
SOWSOW#3#3::Remove and relocate existing lighting in the soffit to accommodate new wall Remove and relocate existing lighting in the soffit to accommodate new wall (see attached drawing).(see
attached drawing).Provide and install single Provide and install single
pole switch for closet light, omitted from plans.pole switch for closet light, omitted from plans.
Certified Labor Cost: $Certified Labor Cost: $2,400.002,400.00
Item #4:Rooms 136, 140, 178, and 179.
SOW#4: Relocate (2) lights and re-work switching. Remove (2) receptacles to accommodate new doors (Demo plans E2.101 does not show
any lighting in this area to be removed or relocated, however, to build the walls per plans the additional SOW is required).
Certified Labor Cost: $800.00
Material Cost: $900.00
EXCLUSIONS
1.Weekends, after-hours, night work.
2.Any worknot mentioned in the above CO scopesof work.
REVISED TOTAL COST: $7,TOTAL COST: $7,050.00050.00
$4650.00
Certified Labor Cost: $4,550.00Certified Labor Cost: $4,550.00
$2,150.00
Material Cost: $2,500.00
Respectfully Submitted by,
Check Electric LLC
Price of this proposal is based on following insurance limits: Commercial General Liability $1,000,000 Each Occurrence / $2,000,000 Annual Aggregate; Automobile Liability: $1,000,000
Each Accident; Workers Compensation and Employers Liability: $1,000,000 EachAccident for Bodily Injury by Accident and $1,000,000 Each Employee for Injury by Disease. Any
alteration or deviation from above specifications involving extra costs will be executed only upon written order and will become an extra charge over and above the estimate. All work
is to
be completed during normal work hours of Monday through Fridayfrom 8:00 AM till 5:00 PM. Any work requested to be completed outside normal work hours will be an additional cost.
This proposal may be withdrawn, and supplier quotes voidif not accepted within thirtydays from date of submission.
3465
3466
3467
3468
3469
346:
AVCON, INC.
Engineers & Planners
5555 E. Michigan St., Suite 200/ Orlando, Florida 32822
Phone: (407) 599-1122 / Fax: (407) 599-1133 / www.avconinc.com
REQUEST FOR INFORMATION (RFI) RESPONSE
RFI Response Not Valid without this AVCON Cover Sheet
OWNER RFI #
17
LFZXFTUJOUFSOBUJPOBMBJSQPSU
DVTUPNTGBDJMJUZ.UFSNJOBMBOOFY
PROJECT AVCON #
3134/1377/12
SFQBJST-SFOPWBUJPO'FRVJQ.QIBTF4
FDOT FM # AVCON FILE CODE
DQ44
CONTRACTOR
NBSJOPDPOTUSVDUJPOHSPVQ-JOD/
SUBJECT
NFQSfmpdbujpot
SHEET #
CONTRACTOR’S QUESTION DATE
203:03136
Qmvncjohnjttjohgspnesbxjohefnpboe2tugmppsesbxjoh
Fmfdusjdbmdpoevju-xbufsmjof-sppgwfouboeGjsftvqqsfttjposjtfsoputipxopoesbxjohB212Gmppsqmbopspo
esbxjohB121EfnpGmppsQmbo/
UiftfoffeupcfsfmpdbufeuptvqqpsuuifmpdbujpopgofxTupsfGspou$2buesbxjohjoejdbupstE.2/Xftvhhftuuibu
bobeejujpobm21/6cfbeefeupfyjtujohqmbofefyufsjpsxbmm/Uifouifjoufsobmufmmfsxbmmcfnpwfepwfs21/6/
Qmfbtftffbuubdifeesbxjoht/
DESIGN CONSULTANT’S RESPONSE
BY DATE
\[fnqQfqqfs30803136
UifgjsfnbjomjoftibmmcfsfmpdbufebucbtfnfoumfwfmboespvufeuispvhigmppspqfojohofbsdpmvnoE/
Uifmjoftibmmfyufoewfsujdbmmzbcpwfuifdfjmjohmjofuifopggtfuboesfdpoofduupuiffyjtujohpwfsifbegjsf
nbjopouif2tumfwfm/Uifgjsfnbjobmtpgffetuifnf{{bojofmfwfmboexjmmsfdpoofduupuifwfsujdbmmjof
gffejohuijtbsfbbcpwfuif2tugmppsdfjmjoh/Uifbsdijufduvsbmdibtfxjmmcffombshfeupbddpnnpebufuif
gjsfnbjoboepuifsfyjtujohvujmjujftjoSn235QvcmjdSfdfqujpo/Uifhmbttmjhiuupuifmfgupgepps235xjmm
cfsfwjtfeupnbtposzjogjmm/
SfgfsupbuubdifeQmboTiffutB212-B612-G4/211-boeG4/212/
3471
3472
3473
3474
3477
3478
3479
347:
3481
3482
3483
3484
3485
3486
3487
3488
3489
348:
3491
3492
3493
3494
3495
3496
3497
3498
3499
349:
34:1
34:2
34:3
34:4
34:5
34:6
34:7
34:8
34:9
34::
3511
3512
3513
3514
3515
3516
3517
3518
3519
351:
3521
3522
3523
3524
3525
3526
3527
3528
3529
352:
3531
3532
3533
3534
3535
3536
3537
3538
3539
353:
3541
3542
3543
3544
3545
3546
3547
3548
3549
354:
3551
3552
3553
3554