HomeMy WebLinkAbout2nd Change Order 10/16/2025 MONROE COUNTY/ENGINEERING/PROTECT'MANAGEMENT CONTRACT'CHANGE ORDER PROJECT TITLE: Relocate Runway 7-25 CHANGE ORDER NO: 2 INITIATION DATE: 09/24/2025 TO CONTRACTOR: General Asphalt Co. LLC CONTRACT DATE: 12/18/2024 The Contract is changed as follows: The original Contract Sum .......................................................................................$30,152,480.18 Net change by previously authorized Change Order .....................................................$0.00 The Contract Sum prior to this Change order was.........................................................$30,152,480.18 The Contract Sum is (decreased) by this Change Order 2...............................................($11,317.04) The Revised 1 Contract Sum including this Change Order .............................................$30,141,163.14 This Change Order No. 2 includes revisions to quantities of the contract bid item as noted below. Updated sheets were issued with ESI#2. See attached documentation from Hypower summarizing the changes. The total cost to complete the work as noted within this change order is -$11,317.04. Net change to contract Change Order 2: -$11,317.04 The construction commencement was May 13, 2025. This Change Order 2 does not increase contract time. Contractor agrees to accept the increase/decrease in monetary compensation and hereby waives and releases any and all claims for any additional compensation related to these bid items. This Change Order 2 represents a reduction of 0.0375 % of the original contract price. Not valid until approved by Owner,Architect (if applicable),and Contractor Digitally signed by Robert B. Robert B. Aydin Aydin,P.E. ' DN:cn=Robert B.Aydin,P.E., ARCHITECT/ENGINEER P.E. -US Date:2025.10.09 16:42:28-04'00' Digitally signed by Emilio J Zamor ate CONTRACTOR Emilio J Zamora Date:2025.10.09 11:46:34-04'00' Richard Digitally signed by Date Richard Strickland Strickland Date:2025.10.14 AIRPORTS DIRECTOR 11:36:56-04'00' Christine Digitally signed by Christine Date Hurley Date COUNTY/ASSISTANT ADMINISTRATOR Hurley 04'00?025.10.1611:00:26 Date Af PECM O J. 'S4a( 4 U ATMRNEY Date, 10/14/25 Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ❑ No If Yes, explanation: • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $25,000 or 5% of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project engineer/architect approves the change order. Yes ® No ❑ If No, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: 200',A/cs� Fo�syfl-, Mi .Jacobs, SUBMITTAL REVIEW TRANSMITTAL Attention: Emilio Zamora Date Returned: 09/07/2025 To: General Asphalt Co, LLC Project No: EGXM7960 4850 NW 72nd Ave Project Name: Relocate Runway 7-25 Miami, FL 33166 We are sending you these items via: Email REVISE SUBMIT COPIES TYPE OF SUBMITTAL FURNISH AS AND SPECIFIED SUBMITTED CORRECTED RESUBMIT ITEM Submittal #44 Change Order x 1 related to ESI #2 Remarks: For information only submittal. No comments. Reviewed By: Robert B. Aydin, P.E. Date: 09/07/2025 Corrections and Comments made on the shop drawings during this review do not relieve contractor from compliance with requirements of the drawings and specifications. This check is only for review of general conformance with the design concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for: confirming and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating his work with that of all other trades; and performing his work in a safe and satisfactory manner. ��i III ..III 'YIPIRM,"I17 III III VAII COI�I�IC::I101"4S114O111 .. FYI I I M,'1 1 i AS 114011 1 III III RI:4l iINV,I I III ..III11401 A 1 I MP"'I 1) III III 170 11401 1�l SHl'i91V,1.1. III ..III uw"01'l+;MAY IIIi00 11 III III HINV,11 11114AI CI RI1111 ) III III 1 IO 1140 1 111ROCI Iliil Owl I I 1 Wo RI' III.. III RIIiiV"11 u"w"I1401 RI((I lml 1)P.I:9Y" ('01141RACI OOC IIV,I 1141S SI I I 1 'YI"d IVI I I Al I OR AI)I i11101"4AI 11141 OVCIV A 1101"d AS AI 1 I MAN Ilii CI101"d SI OWN AIBMp,"I IS 01141Y IOR("01141'ORIVI'INCIlii WI I I I III 01 SIUN CONCI I l 01'1111uw"ORl<",I"dI)WII I11111141'ORIVAI101"411"d1111 (:OI"d11 CI1.7OCHIV,II"414„ BY YI IMP"' l YI"dl) 9HIJV,1 1101"d, ("011411'ACION RIII11R1 I NIS III AI III HAS )llflINIV,IINIl7 'NI) �Y"IIRIIIII) Vl",III IAI , 1111 ) V,I SHIMV,1lNIS 'YI"W �:01"d I I�IIt"I101"d �"III I I'l1Y, I I�"II"III I I I I I�I01"�IVI'YI"d�"I:i IYI"dl I III 1�31"d �"III I I'llY, 'YI"dl.? dl p,'I'Y1101NS MOM (::01"d11R'CI )OCHIMINIS YIRI 11401 RI�;IIWII.:I l.11"d11 !:4 I CH ICA1..L...Y NI 011l 11 1) 1 d WIRI I IINd , BY CONI I ACIOIRC Rl�;IIY°w'" 0114 I�I !4lIIJVII 4101"du"w"III �:0�;11�01"dL.Y"I:il I� I"d",Illiili�"II'YI"d�llli 01"d IIII!4 IIIJVIIIf'YI 'YI"dl7 OfIIII��"II'YI"d�31 �"II 'YI'L..Yll�ll"dlll'III�I"Y�:01"dll�'Y�"I�YI'`�"w"IIII'YI"dlliil"d�"IIJ"IIIiiIVll.l"df. 1�lliiV"11 Wl 1)1i9Y" Robert Aydin, PE 1)AI I: 09/07/2025 ,oacobs TRANSMITTAL Page 1 DATE:08/13/2025 MARATHON INTERNATIONAL AIRPORT TRANSMITTAL# General Asphalt co.,LLc. RELOCATE RUNWAY 7-25 #44 CO Related to ESI#2 To: Christopher W. Bowker, P.E. From: Emilio Zamora Jacobs Engineering Group, INC Phone: (904)327-4313 Phone: 786-514-0491 Fax: Fax: Email: Clhiriisto Iheir,I3owkeir "acolbs,com Email: IE:irniilliio eneirallas Ihaltcoirn ATTACHED AND/OR ENCLOSED ARE THE FOLLOWING DOCUMENTS Doc TYPE SPEC.SECT.#: DESCRIPTION COPIES STATUS REMARKS Electronic Submital 1 Additional Notes: COPIES DATE NO. DESCRIPTION CODE 1 9/3/2025 Change Order Related to ESI #2 Emilio Zamora RCO 100349-02 August 28,, 2025 Page 1 of 2 v Nib o 7dr,,�,P 4 11 WIN One Company. Powerful Solutions. General Asphalt Co, Inc AWFIELD 4850 Northwest 72nd Avenue SERVICES --G.R-0.U P.. Miami, Florida 33166 Attention: Emilio Zamora, Project Manager DISASTER SERV9CrS G R 0 U P Project: MTH Airport - Relocation of Runway 7-25 Project No. MTH IM ELECTRICAL SERVMES G R 0 UP Subject: RCO #02 - Modification @ Electric Vault. Mr. Zamora, P 0 W E R SERVS G R 0 U ICE P We hereby submit our revised proposal for an equitable adjustment to our P �f�,a subcontract in the deductive amount of eleven thousand three hundred seventeen dollars and four cents for the changes at the vault as per ESI #1 A.NFWABLF and #2. ENERGY G R 0 LI P Changes in Drawings • Delete 2 new constant current regulators (7.5KW and 15kw) SECURITY SERVICES Replace deleted regulators with existing regulators G R 0 U P Add ACE/IRMS metering package to new regulators. Changes do not require any additional labor. M TELEC O SERVICES STIPULATIONS: 0 R 0 1)11 This proposal is based solely on the usual cost elements of the additional work. This proposal does not include any amount for additional changes including, but not limited to, changes in the sequence of work, delays, disruptions, rescheduling, extended overhead, acceleration and/or impact costs and the right is expressly reserved to request an equitable adjustment to our subcontract for any and all of these related items prior to final settlement of the Contract. Hypower LLC has proceeded with this added scope of work and is requesting an executed change order in the above amount. If you have any questions, or if we may be of further assistance, please do not hesitate to contact the undersigned at the office at (954) 917-1430. hypo weri In c . com tel 1954.978.9300 fax 1954.978.8666 5913 NORTHWEST 31 ST AVENUE FORT LAUDERDALE, FL 33309 P RCO 100349-02 August 28, 2025 Page 2 of 2 One Company. Powerful Solutions. 14"'N"s. AIRFIELD SERVICES G R 0 U P WSASTER SERVICES G R 0 U P lob ELECTRICAL SERVICES G-R-0 U.P. Sincerely, I/ Hypow P 0 W E R SERVICES le 11 G R 0 U P Se'ri r'Project Manager CC: Pierre Francoeur, Hypower rt NFWARLE ENERGY G R 0 U P SECURITY SERVICES G R 0 U P aM TELECOM SERVICES G R 0(1 P h y p o w e r n c c o rn tel 1954.978.9300 fax 1 954.978.8666 5913 NORTHWEST 31ST AVENUE FORT LAUDERDALE, FL 33309 100349-02 AFL Vault Mods Itemized Breakdown Vaula Modifications Description Qty Net Price U Total at. Labor Total Hrs. Delete Original Purchase oe 5 Constant Current Regulatorc -1 45,956.25 E -45,956.25 0.00 E -0.00 Purchase 1 -4kw CCR, 1 -7,5kw CCR, and 1- 15kw CCR 1 33,961.58 E 33,961.58 0.00 E 0.00 CCR Rack(Art-Tim Deco) 1 1,418.00 E 1,418.00 0.00 E 0.00 Add ACE/IRMS Controls to New CCR 1 0.00 E 0.00 0.00 E 0.00 Totals 2 -10,576.67 0.00 SlBrnllla General Materials -10,576,67 Material Tax (@ 7,000%) -74037 Total Material -11,317.04 Subtotal -11,317.04 Final Amount $-11,317.04 ORIGINAL Proposed Job # 100349 Purchase UECTMCAL& Order 5913 NW 31 st Avenue P0#j 78097 Fort Lauderdale, FL 33309 Phone: (954) 978-9300 Fax: (954) 978-8666 The following number must appear on all related correspondence, shipping papers, and invoices: Vendor: 10016 Ship To: ADB SAFEGATE AMERICAS MTH Marathon RW 07-25 Rel P.O.BOX 24343 9400 OVERSEAS HWY NEW YORK,NY 10087-4343 MARATHON, FL 33050 (614)552-2482 P.O.Date: 05128125- -------------------------------------------- -------------------------------------------------------- Ordered By: Mario Avin Ship Via: YOUR TRUCK Confirm By: Mario Avin FOB Location: For Resale: No Payment Terms: NET 60 DAYS Remarks: Thyristor Regulators Instructions: Jorge Ferret 954-658-9569 Quantity Description U/M Unit Cost Total 1.0000 CCR Thyristor 4kw 5S 240v EA 6,630.9600 6,630.96 2.0000 CCR Thyristor 7.5kw 5S 240v EA 7,291.5600 14,583.12 2.0000 CCR Thyristor 15kw 3S 240v EA 10,565,2100 21,130.42 2,0000 24"CRX Frame Stacking Kit w/baff EA 202.7500 405.50 1.0000 Sales Tax for FL 6% LS 2,565.0000 2,565.00 1.0000 Sales Tax Marathon 1.5% LS 641.2500 641.25 1 P.O.78097 continued on next page. Print Date:05/28/25 Page 1 P.0.78097 continued from previous page... Notes: NOTES Trucker to call to give 24 hours advance notice so that Hypower can provide proper help to unload regulators, Constant Current Regulator#1 7.5kw,5 steps,240v.(Runway 7-25) Constant Current Regulator#2 15kw,3 steps,240v.(Taxiway East-West) Constant Current Regulator#3 7.5kw,5 steps,240v.(Runway spare) Constant Current Regulator#4 15kw,3 steps,240v.(Taxiway Spare) Constant Current Regulator#5 4kw,5 steps,240v, (7 PAPI&25 PAPI) All materials shall be per plans,specs,and approved shop drawings.A delivery sequence will be arranged,and materials will be released in accordance with a separate release of materials. Shop drawing approval will not constitute release of any material.Hypower written release will follow. Material to be released upon written approval of shop drawings by the Owner/Engineer and Hypower. In the case of discrepancy between the Contract Documents and this purchase order,the Contract Documents shall take precedence. In the case of discrepancy between the Contract Documents and approved shop drawings,the Contract Documents shall take precedence. Quantities are subject to change. The cost and schedule information reflected in this proposal does take into consideration any price escalations,delays,shortages or disruptions to the availability,quantity or pricing of materials,equipment,labor or services to the (Collectively the"Impacts")that may occur due to a global pandemic including, without limitation,the COVD-1 9 virus or actions taken related thereto by businesses,local,state,and national authorities,or ADB Safegate intended to protect the health and safety of its workers or the general population.Accordingly, ADB Safegate shall not be entitled to an extension to the time and an adjustment in the price on account of such impacts. 1. Enter this order in accordance with the prices,terms,delivery Subtotal: 45,956.25 method,and specifications listed above. Tax: 0.00 Please notify us immediately if you are unable to ship as specified. Total: 45,956.25 Z. Send all correspondence to mavin@hypoweii wc,cwn P.O.78097 continued on next page.. Print Date:05/28/25 Page 2 Purchase � ase H W, W.0:1, Job # 100349 Order ELECTRICAL& !!"� ��0# F�ev���o� #1 5813NVV�1at/��nue Fort Lauderdale, FL333OS Phone: (Q54) g78'Q3QD Fax: (Q54) Q78'B66G The following number must appear nn all related cuneopondenoo, shipping papers, and invoices: Vendor� 10016 Ship To: Ordered By: Mario Avin Ship Via: YOURTRUCK Confirm By: Mario Avin FOB Location: For Resale: No Payment Terms: NET 60 DAYS Remarks: Thyristor Regulators Instructions: Jorge Ferret 954-658-9569 Quantity Description Ulm Unit Cost Total Trucker to call to give 24 hours advance notice so that Hypower can provide proper help to unload regulators. All materials shall be per plans,specs,and approved shop drawings.A delivery sequence will be arranged,and materials will be released in accordance with a separate release of materials. Shop drawing approval will not constitute release of any material.Hypower written release will follow, Material to be released upon written approval of shop drawings by the Owner/Engineer and Hypower. In the case of discrepancy between the Contract Documents and this purchase order,the Contract Documents shall take precedence. In the case of discrepancy between the Contract Documents and approved shop drawings,the Contract Documents shall take precedence. Quantities are subject to change. The cost and schedule information reflected in this proposal does take into consideration any price escalations,delays,shortages or disruptions to the availability,quantity or pricing of materials,equipment,labor or services to the (Collectively the"Impacts")that may occur due to a global pandemic including, without limitation,the COVD-1 9 virus or actions taken related thereto by businesses,local,state,and national authorities,or ADB Safegate intended to protect the health and safety of its workers or the general population.Accordingly, ADI3 Safegate shall not be entitled to an extension to the time and an adjustment in the price on account of such impacts. 1. Enter this order in accordance with the prices,terms,delivery Subtotal: 31,592.17 method,and specifications listed above. Tax: 2,369.41 Please notify us immediately if you are unable to ship as specified. Total: 33,961.58 z. Send all correspondence mmmvm@hynowennc.cmm por000rnonunuwdpn next page...