HomeMy WebLinkAbout2022-98 Inline Checked Baggage Inspection System MASTER AGREEMENT FOR PROFESSIONAL SERVICES TASK ORDER FORM Effective Date Task Order No. 2022 - 98 Client Project No. 404-630231-530310-sC 00038 Engineer Project No. _EGXM7998 This Task Order is entered into on the effective date noted above pursuant to the "Master Agreement for Professional Services" between Monroe County, Florida ("Client") and JACOBS PROJECT MANAGEMENT CO. ("Consultant"), dated February 16, 2022 ("Agreement"). The Agreement is incorporated herein and forms an integral part of this Task Order. Services Authorized - Inline Checked Baggage Inspection System (OBIS) - Schematic and 30% Deisgn Phases Client authorizes Consultant to perform the Services described in Exhibit A attached hereto and incorporated herein, which Exhibit A is marked with the above noted Task Order No. and consists of 2 page(s). Pricing N/A Time and Expense per Agreement and Appendix B to the Agreement. X Firm Fixed Price of$ 95,002.00 N/A Other(Describe): NFIOE COUNTYATTOnNEY 1 FOB Schedule a „ ^ 7�1 ' Services may commence on Execution J D J - - Services will cease by 547 days Date 12/1/25 Other Recommended: Approved: Christine Digitally signed by ° l� Christine Hurley ., `" d Date:2025.12.03 By ^ _, � By: Hurley 07:46:15-05'00' Executive Director of Airports Date:11.19.2025 County Administrator Date: CONSULTANT: JACOBS PROJECT MANAGEMENT CO Shawn 19 av o,Shawn ev sna=9 ede k By r oN. hl k,tale wad,o,lacobs eemeene, �naw wameh�d pla remte11 d1 to m ev me °`w'9- °°th,, Witness Director of Operations Waldeck n�rv�,n�Pzlmn1nan Title File: MSTRAPSMonroe County Page 1 of 1 Exhibit A—Scope of Work(2022 - 98) Monroe County Key West International Airport Inline Checked Baggage Inspection System (CBIS)—Schematic and 30% Design Phases Scope of Work This scope of services will provide the Key West International Airport with the 30%TSA required design documentation for the fully inline Checked Baggage Inspection System (CBIS). The following phases are required by the Latest TSA Planning Guidelines and Design Standards(PGDS) document. ARTICLE A—SCHEMATIC AND 30% DESIGN PHASES During the Schematic Design Phase, the TSA approved Pre-Design document is used to further develop and refine the Preferred Alternative, including initial development of concept-Level design drawings and a program schedule, as well as more detailed ROM construction cost estimates. The following will be produced for submittal to the TSA for approval to proceed to the 30% design phase: • Further refinement of the preferred alternative • Develop a more detailed rough order magnitude (ROM) cost estimate and updated life cycle costs (LCC)to also include construction costs. • Further develop a program schedule and phasing plan • Develop a Basis of Design Report(BDR) to contain: o Detailed project requirements o EDS make and model that will be provided by the TSA o Confirm and update the analysis requirements o Preliminary description of CBIS operations o List of EDS devices to be decommissioned • Develop preliminary Layout drawings • EDS maintenance and environmental assessment The required tasks to be included for the TSA 30% Design Phase submittal and approval are outlined as follows: • Updated Basis of Design report • Preliminary mechanical, electrical, plumbing,fire protection and IT systems drawings Page 1 of 2 0 Updated phasing plan • Updated project schedule • 30% current working cost and LCC estimates • Preliminary Contingency Plan • Baggage and Data flow charts • Conveyor manifest • Outline of reporting capabilities Stakeholder notification documentation ASSUMPTIONS & CLARIFICATIONS In providing opinions of cost, financial analyses, economic feasibility projections, for the project, Consultant has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions;time or quality of performance by operating personnel or third parties; and other economic and operational factors that may materially affect the ultimate project cost or schedule. Therefore, Consultant makes no warranty that Client's actual project costs,financial aspects, economic feasibility, will not vary from Jacobs' opinions, analyses, projections, or estimates and Jacobs' shall have no Liability for such variances. Page 2 of 2 JACOBS ENGINEERING GROUP JOB HOUR AND FEE ESTIMATE Monroe County Airports Airport: Key West International Airport Project: Inline Checked Baggage Inspection System(CBIS)-Schematic and 30%Design Phases(2022-98) FEE SUMMARY BASIC SERVICES Hours Fee DBE AMOUNT Article A:Schematic and 30%Design Phases 750 $ 95,002 Total Basic Services Lump Sum Fee 750 $ 95,002 $ SPECIAL SERVICES Hours Fee Total Special Services Lump Sum Fee $ - $ TOTAL LUMP SUM PROJECT FEE 750 $ 95,002 $ DBE Percentage 0.00% 1 J:Airports\_MONROE COUNTV\PSO's\_2025 PSO's\PSO 98-EVW In-Line CBIS-Schematic Design\PSO#98-CBIS-Schematic&30%Design Phases_Feexlsx