Loading...
HomeMy WebLinkAbout10th Change Order 12/22/2025 MONROE COUNTY/ENGWURWG/PROTECT MANAGEMENT CONTRACT CHANGE ORDER PROJECT TITLE: Commercial Apron Expansion and Mitigation CHANGE ORDER NO: 10 INITIATION DATE: 09/12/25 TO CONTRACTOR: Charley Toppino&Sons CONTRACT DATE: 10/11/22 The Contract is changed as follows: The original Contract Sum ......................................................................................$17,166,179.68 Net change by previously authorized Change Order ................................................ ....$ 955,247.70 The Contract Sum prior to this Change order was....................................................._.$18,121,427.38 The Contract Sum is(increased) by this Change Order 9 $ 6,534.00 The Revised 1 Contract Sum including this Change Order w.................. $18,127,961.38 This Change Order No.10 includes replacing bahia sod with seashore pasoalum in the Commercial Apron Expansion drainage swale. The drainage swale will have standing salt water with the tidal fluctuations. The seashore pasoalum is saltwater tolerant and will be able to survive in the tidal fluctuations. The seashore pasoalum will stabilize the ground and reduce the presence of Foreign Object Debris(FOD)adjacent to the newly constructed apron. The total cost to complete the work as noted within this change order is an increase of$6,534.00. See attached price quote from Charley Toppino&Sons, Inc. Net change to contract Change Order 10: $6,634.00 The construction commencement was June 19, 2024. This Change Order 10 does not increase contract time. Contractor agrees to accept the increase/decrease in monetary compensation and hereby waives and releases any and all claims for any additional compensation related to these bid items. This Change Order 10 represents 0.0003 %of the original contract price. Not valid until aporoved bv Owner.Architect if applicable), and Contractor ARCHITECT/ENGINE &I9/12/2025 Date CONTRACTOR_ Dat AIRPORTS DIRECTOR "o° 12.17.2025 Christine Digitally signed by Date Christine Hurley COUNTY/ASSISTANT ADMINISTRATOR Hurley Date:2025.12.22 Date NFIOE COUNTY ATTonNEY A ;101/E T FORM PE TJ.A' SI'STlJ Afflmrmy Date 12/19/25 Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ® No ❑ If Yes, explanation: The seashore pasoalum is used on a case by case basis and during construction it was determined that this material would be the best for this situation. • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds$25,000 or 5%of contract price(whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project engineer/architect approves the change order. Yes ® No ❑ If No, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: Attachment 1:Contractor Proposal EChange Order Attention: Jacobs DATE: 9111125 200 W.Forsyth St Suite 1520 Jacksonville,FL 32202 tTEMIZED QUANTMES Locatlow 3491 S Roosevelt Blvd.Key West FL 33040 Scope; RFI#45 Landsw a RevIsjon-Seashore �n iue or Bahia Sod .............. fteaft Dtl4fxa Oon Ouwfli U101A K2Gustl "I U,51 4.unajlam Cost Notes 1 Bahia sod�.@!Lq subconliNG apowsaD 1.0 LS S 9�465 00 1.0 LS S 946.50 946.SO Saaahniff Pasonium 1540500 migsop j OH&P(10%) IS W945.50 .......... ...Alublolal 6,534.00 ........j_Perfo—ce/Paymant Bon Mobilization/Dernobilization 10 LS General Conditions 1 0 LS Total: $ 6,534.00 Notes., Exclusions: Prepared by: Estimator Charley__EqppinqL&Sons,Inc. ............... .... Sheet: I of Date: 9111125 ITITITITIT Signature: Date: Blue Native of the Florida Keys fir"'th"I4"p tW IKvy' Customer Charley Toppino&Sons 9/11/2025 Job Name Commercial Apron Expansion&Mitigation Estimate 2 Job Address Key West International Airport Scope Summary Price Landscape Lump Sum $ 9,465.00 Tree Disposition $ Irrigation $ Total $ 9,465.00 Scope Details Quantity Landscape Bahia SOD Per SF 4500 Transportation 1 Notes:Soil,watering,Disposal and grading by other Blue Native of the Florida Keys Blue "Ifll-ri�,� Customer Charley Toppino&Sons 9/11/2025 Job Name Commercial Apron Expansion&Mitigation Estimate 2 Job Address Key West International Airport Scope Summary Price Landscape Lump Sum $ 15,405.00 Tree Disposition $ Irrigaliun $ Total $ 1S,40S.00 Scope Details Quantity Landscape Seashore Pasoalum(Paspalum Vaginatum)Per SF 4500 Transportation 1 Notes:Soil,watering,Disposal and grading by other