HomeMy WebLinkAbout10th Change Order 12/22/2025 MONROE COUNTY/ENGWURWG/PROTECT MANAGEMENT
CONTRACT CHANGE ORDER
PROJECT TITLE: Commercial Apron Expansion and Mitigation CHANGE ORDER NO: 10
INITIATION DATE: 09/12/25
TO CONTRACTOR: Charley Toppino&Sons CONTRACT DATE: 10/11/22
The Contract is changed as follows:
The original Contract Sum ......................................................................................$17,166,179.68
Net change by previously authorized Change Order ................................................ ....$ 955,247.70
The Contract Sum prior to this Change order was....................................................._.$18,121,427.38
The Contract Sum is(increased) by this Change Order 9 $ 6,534.00
The Revised 1 Contract Sum including this Change Order w.................. $18,127,961.38
This Change Order No.10 includes replacing bahia sod with seashore pasoalum in the Commercial Apron Expansion
drainage swale. The drainage swale will have standing salt water with the tidal fluctuations. The seashore pasoalum is
saltwater tolerant and will be able to survive in the tidal fluctuations. The seashore pasoalum will stabilize the ground and
reduce the presence of Foreign Object Debris(FOD)adjacent to the newly constructed apron.
The total cost to complete the work as noted within this change order is an increase of$6,534.00. See attached price
quote from Charley Toppino&Sons, Inc.
Net change to contract Change Order 10: $6,634.00
The construction commencement was June 19, 2024.
This Change Order 10 does not increase contract time.
Contractor agrees to accept the increase/decrease in monetary compensation and hereby waives and releases any and all
claims for any additional compensation related to these bid items.
This Change Order 10 represents 0.0003 %of the original contract price.
Not valid until aporoved bv Owner.Architect if applicable), and Contractor
ARCHITECT/ENGINE &I9/12/2025
Date
CONTRACTOR_
Dat
AIRPORTS DIRECTOR "o° 12.17.2025
Christine Digitally signed by Date
Christine Hurley
COUNTY/ASSISTANT ADMINISTRATOR Hurley Date:2025.12.22
Date
NFIOE COUNTY ATTonNEY
A ;101/E T FORM
PE TJ.A' SI'STlJ Afflmrmy
Date 12/19/25
Change Order Attachment per Ordinance No. 004-1999
• Change Order was not included in the original contract specifications. Yes ® No ❑
If Yes, explanation:
The seashore pasoalum is used on a case by case basis and during construction it was determined that this material
would be the best for this situation.
• Change Order was included in the original specifications. Yes ❑ No
If Yes, explanation of increase in price:
• Change Order exceeds$25,000 or 5%of contract price(whichever is greater). Yes ❑ No
If Yes, explanation as to why it is not subject for a calling for bids:
• Project engineer/architect approves the change order. Yes ® No ❑
If No, explanation of why:
• Change Order is correcting an error or omission in design document. Yes ❑No
Should a claim under the applicable professional liability policy be made? Yes ❑ No
Explain:
Attachment 1:Contractor Proposal
EChange Order
Attention: Jacobs DATE: 9111125
200 W.Forsyth St
Suite 1520
Jacksonville,FL 32202
tTEMIZED QUANTMES
Locatlow 3491 S Roosevelt Blvd.Key West FL 33040
Scope; RFI#45 Landsw a RevIsjon-Seashore �n iue or Bahia Sod
..............
fteaft Dtl4fxa Oon Ouwfli U101A K2Gustl "I U,51 4.unajlam Cost Notes
1 Bahia sod�.@!Lq subconliNG apowsaD 1.0 LS S 9�465 00
1.0 LS S 946.50 946.SO
Saaahniff Pasonium 1540500 migsop j
OH&P(10%)
IS W945.50
..........
...Alublolal 6,534.00
........j_Perfo—ce/Paymant Bon
Mobilization/Dernobilization 10 LS
General Conditions 1 0 LS
Total: $ 6,534.00
Notes.,
Exclusions:
Prepared by:
Estimator
Charley__EqppinqL&Sons,Inc.
............... ....
Sheet: I of
Date: 9111125 ITITITITIT
Signature: Date:
Blue Native of the Florida Keys
fir"'th"I4"p tW IKvy'
Customer Charley Toppino&Sons 9/11/2025
Job Name Commercial Apron Expansion&Mitigation Estimate 2
Job Address Key West International Airport
Scope Summary Price
Landscape Lump Sum $ 9,465.00
Tree Disposition $
Irrigation $
Total $ 9,465.00
Scope Details Quantity
Landscape Bahia SOD Per SF 4500
Transportation 1
Notes:Soil,watering,Disposal and grading by other
Blue Native of the Florida Keys
Blue
"Ifll-ri�,�
Customer Charley Toppino&Sons 9/11/2025
Job Name Commercial Apron Expansion&Mitigation Estimate 2
Job Address Key West International Airport
Scope Summary Price
Landscape Lump Sum $ 15,405.00
Tree Disposition $
Irrigaliun $
Total $ 1S,40S.00
Scope Details Quantity
Landscape Seashore Pasoalum(Paspalum Vaginatum)Per SF 4500
Transportation 1
Notes:Soil,watering,Disposal and grading by other