HomeMy WebLinkAbout4th Change Order 12/15/2025 MONROE COUNTY/DEPARTMENT or AiRrom CONTRACT CHANGE ORDER PROJECT TITLE: CHANGE ORDER NO: 4 CUSTOMS AND BORDER PROTECTION FACILITY, PHASE 3( KWIA) INITIATION DATE: 12/10/2025 TO CONTRACTOR: MARINO CONSTRUCTION GROUP, INC. CONTRACT DATE:JULY 17, 2O24 The Contract is changed as follows: The original (Contract SLIM) (Guaranteed Maximum Price).... . ........ ............. $ 5,102,839.10 Net change by previously authorized Change Orders.......................__............. ....._ $ 18,704,91 The (Contract SLIM) (Guaranteed Maximum Price) prior to this Change order was... ......... 5,121,544.01 The (Contract Sum,) (Guaranteed Maximum Price)will be increased (decreased) (unchanged) by this Change Order,., 22,205.74) The new(Contract Sum)_(Gularanteed Maximum Price) including this Change Or-der is......... $ 5,099,338.27 The Contract Time will be, increased (decreased) (unchanged)by............................... 0 days The date of Substantial Completion as of the date of this Change Order .......... May 25, 2026 Detailed description of change order and justification: SEE ATTACHMENT A This change Order is -0.44!/2 of the original contract price. Not valid until signed by Owner',Architect if apglicable), and Contractor ARCHITECT: 12/11/2025 Date 2, CONTRACTOR: 1 1 Richard Digitally signed Date Richard Strickland Date:205.12.1 DIRECTOR OF AIRPORTS Strickland 16:46:54 2-05'00'1 Digitally signed by Date Christine Christine Hurley Hurley Date:2025.12.15 MONROE COUNTY: 16:39:15-05'00' Asst./County Administrator Date ,tN ROE COuNTY ATmnNEY ANf P 11OVEQA FORM .iPE 1 0 J. ERCA ASSIST PAZ NITY ATMRNSY e Date 1_2L12J_25 Change Order Attachment per Monroe County Code Section 2-58(b) - Change Order was not included in the original contract specifications. Yes ( ) No (X) If Yes, explanation - Change Order was included in the original specifications. Yes ( ) No (X ) If Yes, explanation of increase in price: - Change Order exceeds$100,000 or 5%of contract price(whichever is greater).Yes( ) No(X) If Yes, explanation as to why it is not subject for a calling for bids: - Project architect approves the change order. Yes( ) No ( ) If no,explanation of why: - Change Order is correcting an error or omission in design document. Yes ( ) No (X ) Should a claim under the applicable professional liability policy be made? Yes ( ) No (X) Explain: The net deduction of$22,205.74 for Marino Construction Change Order NoA can be summarized based on several factors: CBP requests for additional ballistic systems, CBP requests for additional surveillance cameras/ devices, unforeseen site conditions, and various avenues of value engineering. CBP requested two exterior ballistic windows located within the Phase 2 Port Director and Supervisor offices, which drove the lion's share of cost increases seen in the change order. CBP also requested additional surveillance cameras/devices which resulted in the second-most driving factor for overall contract cost increases. Per Change Order NoA, unforeseen site conditions resulted in numerous factors causing cost fluctuations. A reduction in main entrance ballistic glass (credit) was directly associated with Change Order No.1,utility conflicts. Several wall systems, outside of the contracted scope of work were found to contain black mold and rust due to water infiltration,resulting in overall demolition &replacement. Due to the growing cost increases driven by both CBP requests and unforeseen conditions,value engineering concepts were explored by the design team. A reduction in flooring requirements (VCT) was noted to be the leading credit,per Change Order No.4. The second leading factor for VE credits to the overall contract was a reduction in exterior sitework and concrete apron construction. Demolition and re-installation were re-allocated to the neighboring contract, resulting in one installing contractor performing said scope of work. Further modifications to the SOW included adjustments to the existing bathroom doors/walls and removal of the CMU baggage house. Lastly, several north exterior wall architectural features were modified to accommodate the new Gate 8 bridge installation. From: brady bennett<bradybennett@orlandocommercialstorefront.com> Sent: Friday, October 3, 2025 9:51 AM To:John White <jwhite@marino-construction.com> Subject: Deduction Good afternoon John. This job was bid on over a year ago.The front door side Lite when this job was bid on would have cost 491 a square foot.The side Lite opening is approximately 21 sq ft and would have been $10311. Because of an increase in material over the last 6 months.The change order to add two new storefront openings with ballistic glass is more expensive per square foot. The square foot price has jumped to 587.33.The square foot for these openings is 48 total feet. Putting it at$28192 without hotel,Trip charge, and per diem due to the subs having to make an unattended additional trip for the additional two openings with storefront and ballistic glass. If you have any questions please advise.Thanks ii'lMaui°ii1c) °uaui°ua ui° .lii ai. ui° 'ui° ui°u : pil.ass III°a lii ` Illlllllll s :lii ui°ua a : ui IIIIII ui°°a: y IIIIII ui°a ui°a : : q "to NJ. G:nUam m'l iIO,lld SIdLe II 0ii-llIn do Fk 3280''7ll°fflps // PCO#3 COST to Remove CMU from openings and install Bullent Resistant Windows Item Discription Cost Hour totals Furnish and install 2 ea 49"x 64"balistic 1 external windows,Sub Contractor $ 33,610.37 General Conditions @$1325.82 a day, 2 Dumpster $ 1,325.82 0.12 $ 159.10 3 Project Manager,an Hour $ 125.00 0 $ - 4 Superntendant,an Hour $ 110.00 0 $ - 5 Project Administrator,an Hour $ 85.00 0 $ - 6 Foreman,an Hour $ 105.00 0 $ - SubContractor quote to Demo CMU 7 window openings $ 3,080.00 1 $ 3,080.00 8 Carpenter,an Hour $ 95.00 0 $ - Carpenter Helper/Painter prepare 9 openings for wndows $ 85.00 0 $ - 10 Laborer,an Hour CMU Demo $ 65.00 0 $ - 11 Rental concrete saw CUM Demo $ 110.00 0 $ - 12 sub total $ 36,849.47 13 Bond&Insurance 2.5% $ 921.24 14 Overhead&Fee 13% $ 4,790.43 15 TOTAL $ 42,561.14 lllFIIIII IIII A Local Glass Experts Inc. localglassexperts@yahoo.com 1360 N Goldenrod Rd Ste 11, FL +1 (407) 799-7398 L 0 CAA JL 32807 https:/Aocalglassexperts.com ("Y'LASS EXPERTS RESIDLN UL&COMMERCIAL (407)799-7398 Bill to Ship to marino marino marino construction marino construction Estimate details Estimate no.:2284 Estimate date:05/14/2025 Date Product or service Description QtY Rate Amount 1. Services Key West Customs(change order) 2 $5,372.53 $10,745.06 -exterior storefront YKK YHS 50FI clear anodized additional two openings -1 5/16" insulated impact glazing clear over solarban 60A 2. Materials -ballistics level 3 mounted to interior of 2 $7,561.00 $15,122.00 the storefront frame 3. Hours -3 techs 5 hours each 15 $155.00 $2,325.00 4. Services -hotel,trip fee, per diem 1 $5,418.31 $5,418.31 Total $33,610.37 Accepted date Accepted by /,/2r!/ f-, %//"// if%//,//,//C %/ i//////%%�,//,///�%il//i// / "/', /////,//, flfJif,✓Z/// ////,//a C O N 5 T R U C T 1 0 N G R O U P Potentlal Change,Order SPCO) OWNER: PROJECT: 9/29/2025 KEY WEST INTERNATIONAL AIRPORT CBP FACILITY PHASE 3 C/O TYLER BETHEL 3491 S.ROOSEVELT BLVD. PCO Number:4 3491 S.ROOSEVELT BLVD. KEY WEST,FL 33040 KEY WEST,FL 33040 This proposed change order is for: RFI NO.17 EXISTING BATHROOM WALLS WERE REMOVED FROM SCOPE OF WORK. Please see attached breakdown. Is additional time needed to perform scope changes? ❑YES �X NO Time Extension 0 Days Changes to Contract Sum: Subtotal: (6, 6`,00) Contractor's Bond 0.00% $ Subtotal: 6`,00) GC Fee: 13.00% (8' t d E 5) Subtotal: General Liability: 0.00% $ Total Proposed Amount: Reason for Changes: X1 Changes in scope given by architect or owner for aesthetic and/or design reasons ❑ Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions ❑ Approved by: Date: ❑ Declined by: Date: Comments: CGCO21647 1 305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.marino-construction.com RFI NO.17 EXISTING BATHROOM WALLS,NOT BEING DONE, THIS ISA C.R/—,,PIT COST Units 1 doors and hardware $ 2,500.00 2 ea ,'.S 5.000,00 framing,drywall, insulation 2 8.5'x 9' =76.5'x$5= $ 382.50 2 ea ,S '7�,)5,00 3 Paint $ 200.00 2 ea ,'.S 4M0,00 4 14VAC $ 150.00 5 Electrical $ 200.00 6 Sub Total ,'.S d)5 00 8 Overhead&Fee 13% ,'.S '80wu � 4�5 TOTAL E aiiiiiiiiiiiiiimiv alai °�aaaaaaaiai iaaammm1ffffffffffffffffffN aaaaatm �rnnnnnnnnna �avaaa C O N S T R U C T I O N G R O U P July 14,2025 Project: EYW Border Patrol and Customs Project—Key West, FL Credit for replacing VCT2 with VCT 1 in the following rooms - 124, 126, 127, 128, 130, 131, 132 and 226. The existing VCT in room 137 to remain. Mr. Petzack, We are pleased to offer our Estimate proposal for a Credit for the above reference VCT. For all flooring and tile, we are utilizing a Subcontractor named Real Floors Commercial Inc. Their quote is attached and is $143,625.28. This quote was received after the deduction was made in the amount of VCT2 being installed on the project. For all flooring and tiles installed prior to the change in the amount Of VCT2 tile, there is a quote from Custom Flooring that is attached, for$169,800.00. Proposal Amount: • .$ 4'3,1.66 0101 (Forty T hree Th ous acid Otic: l lutidred S�xly S x DoqW-s atid "I eer:a Cetil.$) In the event you have any questions regarding the content of this Proposal, please contact me. Kind Regards, John White Construction Project Manager Marino Construction Group, Inc. 3100 Over Seas Highway Key West, FL 33040 O: 305-359-5269 C: 407-721-9020 E: `white�l)an. ano....constructlon.com ......................................................................................................................................................................... CGCO21647 1 305-359-5269 1 PO Box 1706 Key West, FL 33041 www.marino-construction.com C 0 N S T R U C T 1 0 N G R 0 U P John White Construction Project Manager Marino Construction Group, Inc. 3 100 Over Seas Highway Key West, FL 33040 0: 305-359-5269 C: 407-721-9020 P )\ ,R- FN 0-1 2 i E 2 S 1 2 U..............2 E 2 2 E CGCO21647 305-359-5269 1 PO Box 1706 Key West, FL 33041 www.ma(ino-construction.com E �IIIIIIIIIIIII 11VIVIVIVIVIVIVIVN 0- C O N S T R U C T I O N G R O U P Pcrtentiaf Change Order(P O) OWNER: PROJECT: 6/24/2025 KEY WEST INTERNATIONAL AIRPORT CBP FACILITY PHASE 3 C/O TYLER BETHEL 3491 S.ROOSEVELT BLVD. PCO Number:5 3491 S.ROOSEVELT BLVD. KEY WEST,FL 33040 KEY WEST,FL 33040 This proposed change order is for: RFI NO.20-Credit for VCT flooring changes Please see attached description. Is additional time needed to perform scope changes? ❑YES X❑NO Time Extension 0 Days Changes to Contract Sum: Subtotal: ( 38,200 00) Contractor's Bond 0.00% $ Subtotal: $ (38,200.00) GC Fee: 13.00% $ (4,966.00) Subtotal: $ (43,166.00) General Liability: 0.00% $ Total Proposed Amount: n, oo) Reason for Changes: X] Changes in scope given by architect or owner for aesthetic and/or design reasons ❑ Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions ❑ Approved by: Date: ❑ Declined by: Date: Comments: CGCO21647 1 305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.marino-construction.com d;::'uefiit forVCT flooring changes Hours/ Item Discription Cost Days totals Sub Contractor quoted cost difference, 1 most of VCT 2 was replaced with VCT 1 $ (38w24:0.4:0) 2 General Conditions @$1325.82 a day $ - 3 Project Manager,an Hour $ 125.00 0 $ - 4 Superntendant,an Hour $ 110.00 0 $ - 5 Project Administrator,an Hour $ 85.00 0 $ - 6 Foreman,an Hour $ - 7 Materials 8 Carpenter,an Hour $ - 9 Carpenter Helper/Painter,an Hour $ - 10 Laborer,an Hour $ - 11 sub total $ (38,200.00) 0) 12 Overhead&Fee 13% $ (,1,9;i6.4:0) 14 TOTAL "' ('13, l..66.8;1i0) Real Floors Commercial, Inc. R 150 Mirk r rexJrrrJ Wvut.Sm„PM Aompano Seairh,N 3,3064 EYW Customs Border Portal Phase 3 Proposal 6/23/2024 Location: Key West,FL Date: Date of Plans: 10/11/2024 Contractor: Marino Construction Attention: John White Prepared By: Maggie Crowell Email: maggie.crowell@rfcommercial.com Phone: 561-235-4769 'N/A Units Location, Material ati, UdM I Scope Price Amenities Location, Material ati, UbM Scope Price General Office 125.Conferencel33.Port Director CPT-1 Mohawk I Xeric Tile 112BY36-GT406 Mesa 957 12x36 139 SY $7,718.40 Carpet TileAdhesive 1 ea Hall 126&128.Exit Control 131.Primary Processing 132. VCT-1 Armstrong I Imperial Texture Standard Excelon 1 51908 Pewter 12x12 4,095 SF Lactation Rm 176.Storage 175.Waiting 127.Public Secondary Processing 123 VCT-2 Armstrong I Imperial Texture Standard Excelon 1 51953 Pearl White 112x12 1,305 SF TS-Johnsonite/Tarkett 1 48 Grey WG I Ceramic to Existing 12 LF TS-Johnsonite/Tarkett 1 48 Grey WG I Existing to Epoxy Floor 12 LF TS-1 Johnson ite/Tarkett 148 Grey WG I Clot to Vinyl Tile 24 LF $62,632.35 TS-Johnsonite/Tarkett 148 Grey WG I VCT to Existing 35 LF Coved @ hard surfaces.Straight @ Carpet RB-1 Johnson ite/Tarkett I Traditional Vinyl Cove Base 1 48 Grey WG 1 4" 1,080 LF Coved @ hard surfaces.Straight @ Carpet RB-2 Johnson ite/Tarkett I Traditional Vinyl Straight Base 1 48 Grey WG 1 4" 360 LF Floor Prep 1 EA Adhesive 9 EA Base Ad hesive 17 EA Women 146.Men 147.Unisex RR 177 PFT-1 Anatolia I Ceraforge Porcelain Tile I Lithium 69-423 1 12x2410mm 331 SF Restrooms PTB-1 Schluter I Dilex AHK-80 I Brushed Chrome ACGB 1 3/8 112 LF Restrooms PTB-1(ACC)Schluter I Dilex AHK Inside Corners I Brushed Chrome ACGB 14 EA Restrooms PTB-1(ACC)Schluter I Dilex AHK Outside Corners I Brushed Chrome ACGB 3 EA $15,178.60 Grout 4 EA Thinset 8 EA Spacers/Levelers 2 EA Field Tile in Restrooms PWT-1 Garden State Tile I Design Postive 2.0 Porcelain Tile I Blanc Satin 14x20 8mm 724 SF Accent Tile Restrooms PWT-2 Garden State Tile I Design Postive 2.0 Porcelain Tile I Bleu Industrial 14x20 65 SF PWT-3 Garden State Tile I Design Postive 2.0 Porcelain Tile I Gris Dore 06 1 4x20 Accent Tile Restrooms 46 SF 8mm $18,439.14 Grout 9 EA Thinset 18 EA Spacers/Levelers 3 EA General Conditions Freight,Storage,OSHA Silica Controls,Equipment Rental,Travel,Etc. $20,180.99 Project Total: $143,625.28 qualifications Proposal based on 10/11/24 drawings The above prices include materials,labor,taxes and freight.This bid is based on material pricing as of today's date and is subject to industry price fluctuations.This bid excludes protective coverings,caulking,vacuuming,waterproofing,crack-iso membrane,towel bars,niches,floor sealer,epoxy grout,sealing tile or grout,quarter round,attic stock and moving furniture or appliances.All pool,courtyard and exterior scopes of work(if any)by others/excluded.(unless otherwise noted above). Allowances are for budget purposes only. Final price to be determined upon owner/architect material selections. Page 1 of 2 Substrate is assumed to be ready for finishes.Proposal includes light floor prep up to 1/8".Any major floor preparation,such as self-leveling and concrete grinding is excluded. Please Note:Attic stock is not included.Pricing can be provided upon request. Certified payroll,Davis Bacon or prevailing wages excluded. Unless otherwise noted,proposals are valid for 90 days. Unit Notes Floors Installation under cabinetry excluded. Amianity Notes " Stained or polished concrete excluded/by others. Page 2 of 2 oM F1.009s Prepared For z Ile� Marino Construction Group . � a 3100 Overseas Hwy rb a Key West , FI 33040 �b1.000nnodaa Custom Floors, LLC Estimate # 639 2000 Coco Plum Drive, Apt. 304 Date 03/21/2025 Marathon, FI 33050 Expiration Date 04/21/2025 Phone: (305) 395-1646 Email: jestaten@gmail.com Description Total Customs Facility/Key West Airport $0.00 Floor Covering Install (Labor & Materials) Materials (Including Shipping and Handling) $60,300.00 Finish Code: PTB-1 (Schluter Cove Base: 170 Ift.)-$1,200.00 Finish Code: RB(Johnsonite Vinyl Base: 1,300 Ift.)-$2,000.00 Finish Code: CPT(Mohawk Carpet: 138 sq.yards) -$10,500.00 Finish Code: PTF-1 (Anatolia Tile: 340 sgft.)-$2,200.00 Finish Code: PTW-1 (GST Tile: 1,200 sgft.)-$9,000.00 Finish Code: PTW-2(GST Tile: 300 sgft.)-$2,500.00 Finish Code: PTW-3(GST Tile: 110 sgft.)-$1,200.00 Finish Code:VCT-1 &VCT-2(Armstrong Tile: 5,062 sgft.)- $24,000 Rubber Transitions-$900.00 Setting Materials (Thinset, Glue, Grout, Floor Prep)- $6,800.00 Labor $93,500.00 VCT Install/Floor Prep -$51,300.00 Carpet Install - $6,000.00 Tile Wall/Floor Install - $31,000.00 Wall Base Install - $5,200.00 Subtotal $153,800.00 Total $153,800.00 Notes: Marino Construction Group agrees to pay for materials as ordered. Payment Schedule (Negotiable): - 25% deposit of total labor when work begins. - Additional 25% of total labor when VCT is complete. - Additional 35% of total labor when all floor and base are complete. - Final 15% upon completion. ......... ......... ......... ......... ......... ......... ......... ................. Marino Construction Group Prepared For Marino Construction Group 3100 Overseas Hwy Key West , FI 33040 Custom Floors, LLC Estimate # 640 2000 Coco Plum Drive, Apt. 304 Date 03/21/2025 Marathon, FI 33050 Phone: (305) 395-1646 Email: jestaten@gmail.com Description Total Key West Airport/Customs Facility $16,000.00 Queing Room (Material & Labor) Material: VCT-2-$10,500.00 Labor: Floor Prep & Install - $5,500.00 Subtotal $16,000.00 Total $16,000.00 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Notes: Custom Floors, LLC will not be responsible for demo. ......... ......... ......... ......... ......... ......... ......... ................. Marino Construction Group /,/2r!/ f-, %//"// if%//,//,//C %/ i//////%%�,//,///�%il//i// / "/', /////,//, flfJif,✓Z/// ////,//a C O N 5 T R U C T 1 0 N G R O U P Potential Change,Order SPCO) OWNER: PROJECT: 9/29/2025 KEY WEST INTERNATIONAL AIRPORT CBP FACILITY PHASE 3 C/O TYLER BETHEL 3491 S.ROOSEVELT BLVD. PCO Number:6 3491 S.ROOSEVELT BLVD. KEY WEST,FL 33040 KEY WEST,FL 33040 This proposed change order is for: MOLD AND RUST LOCATED-DRYWALL COLD FORM STEEL FRAMING DEMO.INSTALL DRYWALL AND COLD FORM STEEL FRAMING. Please see attached breakdown. Is additional time needed to perform scope changes? ❑YES �X NO Time Extension 0 Days Changes to Contract Sum: Subtotal: $ 6,693.73 Contractor's Bond 2.50% $ 167.34 Subtotal: $ 6,861.07 GC Fee: 13.00% $ 870.18 Subtotal: $ 7,731.26 General Liability: 0.00% $ Total Proposed Amount: $ 7,731.26 Reason for Changes: XI Changes in scope given by architect or owner for aesthetic and/or design reasons ❑ Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions ❑ Approved by: Date: ❑ Declined by: Date: Comments: CGCO21647 1 305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.marino-construction.com PCO 6 DRYWALL AND COLD FORM STEEL FRAMING DEMO - MOLD AND R1. INSTALL DRYWALL AND COLD FORM STEEL FRAMING Hours / Days/ Item Description Cost amount totals Furnish and install framing, drywall and 1 finishing, insulation$7.50 SQ FT 5.50 526 $ 2,893.00 2 Demo of framing,insulation, and Drywall 2.50 526 $ 1,315.00 3 General Conditions @ $1325.82 a day Dumpster $ 1,325.82 0.125 $ 165.73 4 Project Manager, an Hour $ 125.00 0 $ - 5 Superintendent, an Hour $ 110.00 0 $ - 6 Project Administrator, an Hour $ 85.00 0 $ - 7 Foreman, an Hour $ 105.00 0 $ - 8 Materials 9 Carpenter, an Hour $ 95.00 0 $ - 10 Carpenter Helper/Painter, an Hour $ 85.00 16 $ 1,360.00 11 Laborer, an Hour $ 40.00 24 $ 960.00 12 Sub Total $ 6,693.73 13 Bond&Insurance 2.5% $ 167.34 14 Overhead&Fee 13% $ 870.18 15 TOTAL $ 7,731.26 /,/2r!/ f-, %//"// if%//,//,//C %/ i//////%%�,//,///�%il//i// / "/', /////,//, flfJif,✓Z/// ////,//a C O N 5 T R U C T 1 0 N G R O U P Potential Change,Order SPCO) OWNER: PROJECT: 7/15/2025 KEY WEST INTERNATIONAL AIRPORT CBP FACILITY PHASE 3 C/O TYLER BETHEL 3491 S.ROOSEVELT BLVD. PCO Number:7 3491 S.ROOSEVELT BLVD. KEY WEST,FL 33040 KEY WEST,FL 33040 This proposed change order is for: COST TO REMOVE EYEBROW FROM EXTERIOR NE WALL TO SUPPORT BRIDGE INSTALLATION. Please see attached description. Is additional time needed to perform scope changes? ❑YES �X NO Time Extension 0 Days Changes to Contract Sum: Subtotal: $ 2,875.00 Contractor's Bond 2.50% $ 71.88 Subtotal: $ 2,946.88 GC Fee: 13.00% $ 373.75 Subtotal: $ 3,320.63 General Liability: 0.00% $ Total Proposed Amount: $ 3,320.63 Reason for Changes: X1 Changes in scope given by architect or owner for aesthetic and/or design reasons ❑ Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions ❑ Approved by: Date: ❑ Declined by: Date: Comments: CGCO21647 1 305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.marino-construction.com C 0 N S T R U C T 1 0 N G R 0 U P July 14,2025 Joe Petzack, McFarland Johnson Project: Border Patrol and Customs Project Key West, FI 33041 Cost of Eyebrow Removal Exterior North Side Mr. Petzack, We are pleased to offer our Estimate proposal for the Cost of Eyebrow Removal Exterior North Side Project at Key West International Project. These were requested as a change to the original drawings in support of the Bridge Installation. Marino Construction Group has intent to negotiate the terms of a Change Order for this contract. Exclusions: N/A Proposal Amount: $ 3320.63 Cost of Eyebrow Removal Exterior North Side In the event you have any questions regarding the content of this Proposal, please contact me. Kind Regards, John White Construction Project Manager Marino Construction Group, Inc. 3 100 Over Seas Highway Key West, FL 33040 0: 305-359-5269 C: 407-721-9020 R.........I/...N 0-1 S 2 1 2 U C T 1 0 N................2 2 2 E CGCO21647 1 305-359-5269 1 PO Box 1706 Key West, FL 33041 1 www.ma(ino-construction.com PCO 7 COST to Remove Eyebrow from exterior northeast wall,in support of Bridge instalation Item Discription Cost Hours/Days totals 1 Concrete worker $ 95.00 20 $ 1,900.00 2 rental equipment $ 120.00 1 $ 120.00 General Conditions @$1200 3 dumpster $ 1,200.00 0.125 $ 150.00 4 Project Manager,an Hour $ 125.00 2 $ 250.00 5 Superntendant, an Hour $ 110.00 2 $ 220.00 6 Project Administrator,an Hour $ 85.00 2 $ 170.00 7 Foreman,an Hour $ 105.00 0 $ - 8 Materials $ - 9 Carpenter, an Hour $ 95.00 0 $ - Carpenter Helper/Painter,an 10 Hour $ 85.00 0 $ - 11 Laborer, an Hour $ 65.00 1 $ 65.00 12 sub total $ 2,875.00 13 Bond&Insurance 2.5% $ 71.88 14 Overhead&Fee 13% $ 373.75 15 TOTAL $ 3,320.63 /,/2r!/ f-, %//"// if%//,//,//C %/ i//////%%�,//,///�%il//i// / "/', /////,//, flfJif,✓Z/// ////,//a C O N 5 T R U C T 1 0 N G R O U P Potentlal Change,Order SPCO) OWNER: PROJECT: 7/16/2025 KEY WEST INTERNATIONAL AIRPORT CBP FACILITY PHASE 3 C/O TYLER BETHEL 3491 S.ROOSEVELT BLVD. PCO Number:8 3491 S.ROOSEVELT BLVD. KEY WEST,FL 33040 KEY WEST,FL 33040 This proposed change order is for: CREDIT INFILL EXISTING CONCRETE EYEBROW AND BITUMEN ROOFING SYSTEM PER DWG A151 Please see attached description. Is additional time needed to perform scope changes? ❑YES �X NO Time Extension 0 Days Changes to Contract Sum: Subtotal: (4 8,70,00) Contractor's Bond 0.00% Subtotal: (4 8,70,00) GC Fee: 13.00% (5I3 o) Subtotal: 037 N I t i General Liability: 0.00% Total Proposed Amount: E"4/1,'10 h Reason for Changes: X1 Changes in scope given by architect or owner for aesthetic and/or design reasons ❑ Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions ❑ Approved by: Date: ❑ Declined by: Date: Comments: CGCO21647 1 305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.marino-construction.com C 0 N S T R U C T 1 0 N G R 0 U P July 15,2025 Joe Petzack, McFarland Johnson Project: Border Patrol and Customs Project Key West, FI 33041 Credit INFILL EXISTING CONCRETE EYEBROW & BITUMEN ROOFING SYSTEM PER DWGA151 Mr. Petzack, We are pleased to offer our Estimate proposal for a Credit for the removal of E\IFH-L EXISTING CONCRETE EYEBROW & BITUMEN ROOFING SYSTEM PER DWG Al 51 at the Border Patrols and Customs Project at Key West International Project. These were requested as a change to the original drawings. Marino Construction Group has intent to negotiate the terms of a Change Order for this contract. Exclusions: . N/A Proposal Amount: °°S 4,371,101 INFILL EXISTING CONCRETE EYEBROW & BITUMEN ROOFING SYSTEM PER DWG A151 In the event you have any questions regarding the content of this Proposal, please contact me. Kind Regards, John White Construction Project Manager Marino Construction Group, Inc. 3 100 Over Seas Highway Key West, FL 33040 0: 305-359-5269 C: 407-721-9020 E:iLA�hite(�I �.,I.J.n o.....:.c.2.n s tf..0 c1i oD c o m. LY I,,,,,,,,,,, ,,, ,,,,,,,,,,,R 1-N 0-1 2 i E 2 S 1 2 U..............2 E 2 2 E CGCO21647 1 305-359-5269 1 PO Box 1706 Key West, FL 33041 1 www.ma(ino-construction.com INFILL EXISTING CONCRETE EYEBROW & BITUMEN ROOFING SYSTEM PER DV1 this is a C'3CDf.'t Item Discription Cost Hours / Days totals 1 Concrete worker $ 95.00 16 u' °1,,1:120.00 General Conditions @ 3 $1325.82 a day $ 1,325.82 0 u 5 Project Manager, an Hour $ 125.00 1 u' 1251 00 7 Superntendant, an Hour $ 110.00 2 u' 220 00 7 Project Administrator, an Hour $ 85.00 1 1:''51 Clilio Foreman, an Hour $ 105.00 0 u' 8 Materials, Roof u' 4.510 00 Materials, eyebrow u' 4.510 00 Carpenter, an Hour, for 6 Bitumen roof labor $ 95.00 8 u 71,610 00 Carpenter Helper/ Painter, an Hour $ 85.00 0 u' 4 Laborer, an Hour, clean up $ 65.00 4 u' 2610 00 9 sub total 3 8"""0 00 11 Overhead & Fee 13% u' 51(13."1 0 12 TOTAL S11111 3 10 /,/2r!/M-' if%//,//,//C %/ i//////%%�,//,///�%il//i// / "/', /////,//, flfJif,✓Z/// ////,//a C O N 5 T R U C T 1 0 N G R O U P Potential Change,Order SPCO) OWNER: PROJECT: 7/16/2025 KEY WEST INTERNATIONAL AIRPORT CBP FACILITY PHASE 3 C/O TYLER BETHEL 3491 S.ROOSEVELT BLVD. PCO Number:9 3491 S.ROOSEVELT BLVD. KEY WEST,FL 33040 KEY WEST,FL 33040 This proposed change order is for: CREDIT FOR CONCRETE APRON INSTALLATION Please see attached description. Is additional time needed to perform scope changes? ❑YES �X NO Time Extension 0 Days Changes to Contract Sum: Subtotal: (2 J 0,p~,00) Contractor's Bond 0.00% Subtotal: (22 0,p~,00) GC Fee: 13.00% o r 082,871 Subtotal: (25,02`2 7,8,5) General Liability: 0.00% Total Proposed Amount: (25,02 0"/7,7,5) Reason for Changes: XI Changes in scope given by architect or owner for aesthetic and/or design reasons ❑ Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions ❑ Approved by: Date: ❑ Declined by: Date: Comments: CGCO21647 1 305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.marino-construction.com C 0 N S T R U C T 1 0 N G R 0 U P July 15,2025 Joe Petzack, McFarland Johnson Project: Border Patrol and Customs Project Key West, FI 33041 Concrete Apron Installation Mr. Petzack, We are pleased to offer our Estimate proposal for a credit on the Concrete Apron Installation at the Border Patrols and Customs Project at Key West International Project. These were requested as a change to the original drawings. Marino Construction Group has intent to negotiate the terms of a Change Order for this contract. Exclusions: N/A Proposal Amount: 9 ��S 25,927,85 Credit for Installation of Concrete Apron In the event you have any questions regarding the content of this Proposal, please contact me. Kind Regards, John White Construction Project Manager Marino Construction Group, Inc. 3 100 Over Seas Highway Key West, FL 33040 0: 305-359-5269 C: 407-721-9020 R.........I/...N 0-1 2 2 1 B U C T 1 0 N................2 2 2 E CGCO21647 1 305-359-5269 1 PO Box 1706 Key West, FL 33041 1 www.ma(ino-construction.com REINFORCED 12"SOG PER STRUCTURAL DRAWING S1.02 this is a CRED17 Item Discription Cost Hours/Days totals 1 Concrete Sub credit quote $ 95.00 64 $ 6 '5 I;A0 General Conditions @$1325.82 a 3 day $ 1,325.82 0 ': 4 Project Manager,an Hour $ 125.00 1 $ 1.25,iI:;A0 5 Superntendant,an Hour $ 110.00 1 $ :i.:11.¢;;i.u;:;d0, 6 Project Administrator, an Hour $ 85.00 1 $ 8 5.D 7 Foreman,an Hour $ 105.00 0 8 Materials w 9 Carpenter,an Hour $ 95.00 0 ?' 10 Carpenter Helper/Painter,an Hour $ 85.00 0 ' 11 Laborer,an Hour $ 65.00 0 $ 12 sub total $ �2.2,9,.45.010 13 Overhead &Fee 13% I! ,9 8 14 TOTAL $ �25,92"'' 8 6/17/25,4:08 PM Change Order Print Printed:Jun 17, 2025 14113 Northwest 8th Street, Sunrise, FL 33325 Phone:954-451-8479 E 111"1 IE lid II111II S 15 Change Order Client Info Job Info 3491 S Roosevelt Blvd Change Order ID Marino Construction Group Inc Key West, FL 33040 3100 Overseas Highway CO-CF - 001 Key West, FL 33040 Phone:305-797-5223 Customs Facility Concrete - Marino Construction CO ID Created/Approved Date Price CO-CF - 001 Created: Jun 17, 2025 -$22,625.00 Description Apron Slab Credit TERMS AND CONDITIONS Upon execution of this Change Order by Client and Contractor,the above-referenced change shall become a valid and binding part of the original Agreement without exception or qualification, unless noted in this Change Order. Except as modified by this and any previously issued Change Orders, all other terms and conditions of the Agreement shall remain in full force and effect. This Change Order is executed by each of the Client Authorized Representative and Contractor's Authorized Representative. Change order's are due upon receipt in full. Items Cost Types Description Qty/Unit Unit Price Price Apron Slab On Grade - 905 SF Apron Slab 905 -$25.00 -$22,625.00 03-0000 Concrete - As detailed in plans - Change order credit @ $25.00 per SF Status Signature Date Approved by: Approval Comments Please Note.A signature of Approval OR Electronic Acceptance is required before change order is effective.This change orde r er becomes part of the existing contract. https://builderLrend.net/app/ChatigeOrder/Print?ids=8315176 1/2 6/17/25,4:08 PM Change Order Print TOTAL AMOUNT OF CHANGE ORDER -$22,625.00 https://buildertrend.net/app/ChangeOrder/Print?ids=8315176 2/2 '((RRRII( D 06 d AR ....////////1fffffffffffffffffN- s/ C O N S T R U C T I O N G R O U P Potential Change Order(PCO), OWNER: PROJECT: 10/9/2025 KEY WEST INTERNATIONAL AIRPORT CBP FACILITY PHASE 3 C/O TYLER BETHEL 3491 S.ROOSEVELT BLVD. PCO Number: 10 3491 S.ROOSEVELT BLVD. KEY WEST,FL 33040 KEY WEST,FL 33040 This proposed change order is for: RFI No.6 REMOVE ONCE STOREFRONT SIDE LIGHT FROM STOREFRONT 1 Please see attached breakdown. Is additional time needed to perform scope changes? ❑YES X❑NO Time Extension 0 Days Changes to Contract Sum: Subtotal: o,:?N N oo) Contractor's Bond 0.00% $ Subtotal: o,:?N N oo) GC Fee: 13.00% w n) Subtotal: General Liability: 0.00% $ Total Proposed Amount: N n) Reason for Changes: X❑ Changes in scope given by architect or owner for aesthetic and/or design reasons ❑ Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions ❑ Approved by: Date: ❑ Declined by: Date: Comments: CGCO21647 1 305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.marino-construction.com REMOVE ONE STOREFRONT SIDE LITE FROM SF1 this is a (:µREDIT Item Discription Cost Hours/Days totals 1 Side Lite Insatll Sub Quote 8361.82 $ 10,311.00 2 Concrete worker $ 95.00 0 ^ General Conditions @$1325.82 3 a day $ 1,325.82 0 ^ 4 Project Manager,an Hour $ 125.00 0 ^ 5 Superntendant,an Hour $ 110.00 0 ^ 6 Project Administrator,an Hour $ 85.00 0 ^ 7 Foreman,an Hour $ 105.00 0 ^ 8 Materials ^ 9 Carpenter,an Hour $ - 0 ^ Carpenter Helper/Painter,an 10 Hour $ 85.00 0 ^ 11 Laborer,an Hour $ 65.00 0 ^ 12 sub total $ 1.II)„,31.1.11l)11l) 13 Overhead&Fee 13% $ 1.,340.,13 14 TOTAL i' km'µ'".. aPlm lllFIIIII IIII A Local Glass Experts Inc. localglassexperts@yahoo.com 1360 N Goldenrod Rd Ste 11, FL +1 (407) 799-7398 L 0 CAA JL 32807 https:/Aocalglassexperts.com ("Y'LASS EXPERTS RESIDLN UL&COMMERCIAL (407)799-7398 Bill to Ship to marino marino marino construction marino construction Estimate details Estimate no.:2341 Estimate date:07/17/2025 Date Product or service Description QtY Rate Amount 1. Services Key West Customs Airport 1 $3,103.37 $3,103.37 -exterior storefront YKK YHS 50FI clear anodized additional one side lite -1 5/16" insulated impact glazing clear over solarban 60A 2. Materials -ballistics level 3 mounted to interior of 1 $4,483.31 $4,483.31 the storefront frame 3. Hours -two teGhs 6 hours each 6 $155.00 $930.00 Total $8,516.68 Accepted date Accepted by /,/2r!/M-' if%//,//,//C %/ i//////%%�,//,///�%il//i// / "/', /////,//, flfJif,✓Z/// ////,//a C O N 5 T R U C T 1 0 N G R O U P Potential Change,Order SPCO) OWNER: PROJECT: 9/29/2025 KEY WEST INTERNATIONAL AIRPORT CBP FACILITY PHASE 3 C/O TYLER BETHEL 3491 S.ROOSEVELT BLVD. PCO Number: 11 3491 S.ROOSEVELT BLVD. KEY WEST,FL 33040 KEY WEST,FL 33040 This proposed change order is for: CMU WALL LOCATED BY THE BHS DOOR Please see attached breakdown. Is additional time needed to perform scope changes? ❑YES �X NO Time Extension 0 Days Changes to Contract Sum: Subtotal: i 8,75 0 i i Contractor's Bond 0.00% $ Subtotal: i 8,75 0 i i GC Fee: 13.00% (/63 7 5) Subtotal: (6,638, 75) General Liability: 0.00% $ Total Proposed Amount: (6,638,,"7 5) Reason for Changes: XI Changes in scope given by architect or owner for aesthetic and/or design reasons ❑ Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions ❑ Approved by: Date: ❑ Declined by: Date: Comments: CGCO21647 1 305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.marino-construction.com CMU Wall Area By BHS Door and Minor Prep Work for header in Wood Wall this is a RhYXIT Item Description Cost Hours totals Concrete subcontractor quote 1 for CMU $ 4,640.00 1 ,'.S 4tl 64 0 00 General Conditions 3 $1325.82 a day $ 1,325.82 0 fi 5 Project Manager, an Hour $ 125.00 0 fi 7 Superntendant, an Hour $ 110.00 0 7 Project Administrator, an Hour $ 85.00 0 Foreman, an Hour $ 105.00 0 8 Materials for concrete header $ 500.00 1 ,'.S 500,00 6 Carpenter, an Hour $ 95.00 3 ,S '''.rw�,dwudwu Carpenter Helper/Painter, an Hour $ 85.00 3 ,S �w�,dwudwu 4 Laborer, an Hour $ 65.00 3 ,'.S 05,dw 0 9 sub total 5,875 (au(au 11 Overhead&Fee 13% S '7d w ,"7w 12 1 TOTAL 1 ,' 6,N638 75 /,/2r!/M-' if%//,//,//C %/ i//////%%�,//,///�%il//i// / "/', /////,//, flfJif,✓Z/// ////,//a C O N 5 T R U C T 1 0 N G R O U P Potentlal Change,Order SPCO) OWNER: PROJECT: 7/16/2025 KEY WEST INTERNATIONAL AIRPORT CBP FACILITY PHASE 3 C/O TYLER BETHEL 3491 S.ROOSEVELT BLVD. PCO Number: 13 3491 S.ROOSEVELT BLVD. KEY WEST,FL 33040 KEY WEST,FL 33040 This proposed change order is for: Queuing Area Soffit Drywall,Framing per RFI 10 Please see attached description. Is additional time needed to perform scope changes? ❑YES �X NO Time Extension 0 Days Changes to Contract Sum: Subtotal: $ 4,361.00 Contractor's Bond 2.50% $ 109.03 Subtotal: $ 4,470.03 GC Fee: 13.00% $ 566.93 Subtotal: $ 5,036.96 General Liability: 0.00% $ Total Proposed Amount: $ 5,036.96 Reason for Changes: XI Changes in scope given by architect or owner for aesthetic and/or design reasons ❑ Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions ❑ Approved by: Date: ❑ Declined by: Date: Comments: CGCO21647 1 305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.marino-construction.com C 0 N S T R U C T 1 0 N G R 0 U P July 16,2025 Joe Petzack, McFarland Johnson Project: Border Patrol and Customs Project Key West, FI 33041 Queuing Area Sofit Drywall, framing for RF1 10 Mr. Petzack, We are pleased to offer our Estimate proposal for a Queuing Area Sofit Drywall, framing for RF1 10 at the Border Patrols and Customs Project at Key West International Project. These were requested as a change to the original drawings. Marino Construction Group has intent to negotiate the terms of a Change Order for this contract. Exclusions: N/A Proposal Amount: 9 $ 5,036.96 Sofit, Drywall, framing for RF1 10 In the event you have any questions regarding the content of this Proposal, please contact me. Kind Regards, John White Construction Project Manager Marino Construction Group, Inc. 3 100 Over Seas Highway Key West, FL 33040 0: 305-359-5269 C: 407-721-9020 R.........I/...N 0-1 2 2 1 B U C T 1 0 N................2 2 2 E CGCO21647 1 305-359-5269 1 PO Box 1706 Key West, FL 33041 1 www.ma(ino-construction.com PCO 13 Queing area sofit drywall&Framing Hours/ Days/ Item Discription Cost amount totals 1 Sub Contractor quote framing $3,501 1 $ 3,501.00 2 General Conditions @$800 dumpster,a day $800.00 0 $ - 3 Project Manager, an Hour $ 125.00 2 $ 250.00 4 Superntendant,an Hour $ 110.00 4 $ 440.00 5 Project Administrator,an Hour $ 85.00 2 $ 170.00 6 Foreman,an Hour $ 105.00 0 $ - 7 Materials 8 Carpenter,an Hour $ 95.00 0 $ - 9 Carpenter Helper/Painter, an Hour $ 85.00 0 $ - 10 Laborer,an Hour $ 40.00 0 $ - 11 sub total $ 4,361.00 12 Bond&Insurance 2.5% $ 109.03 13 Overhead&Fee 13% $ 566.93 14 TOTAL $ 5,036.96 Dorado Drywall &Stucco Specialties: 1126 S. Federal HWY#521 Stucco/Plaster/EIFS Fort Lauderdale, FL ON Drywall Construction Voice: (954) 675-4867 l'11s Metal Framing/Trusses Acoustical Ceilings DDRYWALL & T CC Proj ect Name: KIA- Customs -Phase 3 Date: June 12, 2025 Location: KIA Architect: Key West , FL General Contractor: Marino Construction Plans Dated: CO#2 - Finish Other Drywall Contractors Scope SCOPE: Per our Contract, the original Drywall company was suppose to finish all the Framing(Walls & Ceilings) They were suppose to install the Drywall -Hanging&Finish at the Ceilings & Soffits Per Roland's walkthrough with Steve on June 1 lth, the following locations and scope were discussed. Areas not listed below are excluded and will be an additional change order if required. 1. Office#125 - Frame the Chase Wall Missed $1,570.00 Materials-$440 (20) Studs, (6)Tracks+Screws/Pins Labor Cost-$1,130 Framing Labor- 2 Workers-6 Hours Each- 12 hours A$85/hour Supervision- 1 Hour A$110/Hour 2. Baggage Claim #130- Fur out Perimeter Walls Missed $1,982.00 Materials-$512 (15)Pieces od 1 x 4 PT,20 1-5/8" Studs,6 Track+Pins/Screws Labor Cost-$1,470 Framing Labor- 2 Workers-8Hours Each- 16 hours A$85/hour � u ��• i�n��...f 14�„ $11. „1 � „� ... � � � � „� � � „. 3. Queuing Area Soffit/Header Framing/Drywall $3,501.00 Materials-$391 � (10)Metal Studs,(6)Tracks,(5) Sheets of Drywall,2Buckets of Compound+Tape, Cornerbeads, Screws,Etc. � Labor Cost-$3,110 � Framing Labor- 2 Workers-5 Hours Each- 10hours A$85/hour Hanging Labor- 2 Workers-4Hours Each-8 hours A$85/hour ° Finishing Labor- 1 Workers- 16Hours Each- 16hours A$85/hour '" Supervision-2 Hour A$110/Hour "„ )„ �� �s % V Ili, Ili, X I I 1 11„ 11 1� 1„„ 1 I 9, 1 1„ ) )1„ � � � mu„ � ) � "M„ �m � �„ ..4"."F"ramie" id (;id""°° e"�ilirigs��_���1 �����,�4., �J������3; 1'" ' � ������#'°°1� ;������ os""ets""�at" �f°ice""�411' ..� �„ ������ �„ �� ..�..�� � '�;966:i) .... �� Materials-$4,200 (160)Metal Studs, (60)Tracks, (40) Sheets of Drywall, 10 Buckets of Compound+Tape, Cornerbeads, Screws,Etc. Labor Cost-$11,760 Framing Labor- 2 Workers-2 Days-8 Hours/Day Each-32 hours A$85/hour Hanging Labor 2 Workers-2 Days-8 Hours/Day Each-32 hours A$85/hour Finishing Labor 2 Workers-4 Days-8 Hours/Day Each-64 hours A$85/hour Supervision-8 Hour A$110/Hour 5. Miscellaneous Framing Repairs $2,045.00 Materials-$125 Misc Metal Studs Labor Cost-$1,920 Framing Labor- 2 Workers - 10 Hours Each-20hours @$85/hour Supervision-2 Hour @$110/Hour 6. Install (6) Metal Door Frames $2,000.00 Materials-$80 Misc Metal Studs Labor Cost-$1,920 Framing Labor- 2 Workers 10 Hours Each-20hours @$85/hour Supervision-2 Hour @$110/Hour 7. Stocking & Delivery Fees for Materials Above $950.00 SUBTOTAL - LABOR+ MATERIALS $28,008.00 INSURANCE - 2% $560.16 SUBCONTRACTOR MARK UP-15% $4,201.20 TOTAL CO#2 $32,769 /,/2r!/M-' if%//,//,//C %/ i//////%%�,//,///�%il//i// / "/', /////,//, flfJif,✓Z/// ////,//a C O N 5 T R U C T 1 0 N G R O U P Potentlal Change,Order SPCO) OWNER: PROJECT: 8/15/2025 KEY WEST INTERNATIONAL AIRPORT CBP FACILITY PHASE 3 C/O TYLER BETHEL 3491 S.ROOSEVELT BLVD. PCO Number: 15 3491 S.ROOSEVELT BLVD. KEY WEST,FL 33040 KEY WEST,FL 33040 This proposed change order is for: Installation of(5)Additional Cameras. Please see attached description. Is additional time needed to perform scope changes? ❑YES �X NO Time Extension 0 Days Changes to Contract Sum: Subtotal: $ 15,470.00 Contractor's Bond 2.50% $ 386.75 Subtotal: $ 15,856.75 GC Fee: 13.00% $ 2,011.10 Subtotal: $ 17,867.85 General Liability: 0.00% $ Total Proposed Amount: $ 17,867.85 Reason for Changes: XI Changes in scope given by architect or owner for aesthetic and/or design reasons ❑ Changes resulting from events or circumstances:defective design,owner caused delays,differing site conditions ❑ Approved by: Date: ❑ Declined by: Date: Comments: CGCO21647 1 305-359-5269 1 PO Box 1706 Key West,FL 33041 1 www.marino-construction.com PCO 15 Additional CAMERAS Hours/ Days/ Item Discription Cost amount totals 1 Sub Contractor quote $15,025 1 $ 15,025.00 2 General Conditions @$800 dumpster,a day $800.00 0 $ - 3 Project Manager,an Hour $ 125.00 2 $ 250.00 4 Superntendant,an Hour $ 110.00 1 $ 110.00 5 Project Administrator,an Hour $ 85.00 1 $ 85.00 6 Foreman, an Hour $ 105.00 0 $ - 7 Materials 8 Carpenter,an Hour $ 95.00 0 $ - 9 Carpenter Helper/Painter,an Hour $ 85.00 0 $ - 10 Laborer,an Hour $ 40.00 0 $ - 11 sub total $ 15,470.00 12 Bond &Insurance 2.5% $ 386.75 13 Overhead&Fee 13% $ 2,011.10 14 TOTAL $ 17,867.85 qIJI Iisat III 4211111 507 August 12, M02 AW Ea= SUBMITTED TO, WORK TO,BE PERFORMED AT Marino Construction Group, Inc. Clh,' NV 1!31E UR1 [ 1''.II dl!fi kainal airrol^wµ John White Terminal Annex Repairs-Custom and Border Protection Facility J ite(e'x7marino-construction.com Key West International Airport 407-721-9020 Key West, FL 33040 IIII e OIIIII"delllr' Provide and install additional cameras per drawings provided. 1. Provide and install (1) additional A-CF camera for public reception hallway. 2. Provide and install (1) additional outdoor vandal proof dome camera, infront of the door 139. (AXIS P3267-LVE P32) 3. Provide and install (3) additional outdoor vandal proof bullet cameras, for walkway between CBP and new terminal per drawings. (AXIS P1467-LE P14) 4. Provide and install (5) cat.6 circuits for additional cameras. 5. Provide and install conduits underneath of the building for walkway cameras. 6. Provide and install (4) surge protectors for outdoor cameras. 7. Provide (5)Vigil licenses for additional cameras. 8. Programming, testing, aiming. I Illmlll...11II0II'11S 1. Premium time, overtime,weekend work. 2. Engineering&CAD drawings/fees. 3. Any work not mentioned in the above change order scope of work. ( I I°..I lll''I IIII,I gli rl („ IIII-illl 1 4li r.1 IIII" c ocst('� � 15 O4 QI'1I")I III lh.s 1111 I is S I IIAA11 I IIS PYAI IIII.) ()11R�30) II II'S Tariff Clause: Pricing is based on current material costs and market conditions as of the date of this proposal. In the event of any new or increased tariffs, duties,taxes,or government-imposed fees affecting the cost of materials or equipment after the proposal date, Check Electric reserves the right to adjust the contract price accordingly.Any such adjustments will be documented and discussed with the client prior to implementation. 3255 Flagler Ave.#303, Key West,FL 33040 1 305-292-3369 1 EC13004515 Naples Office:28731 S.Cargo Ct.#2,Bonita Springs, FL 34135