Memorandum
DATE: 02/09/2026
TO: BOCC
FROM: Kevin G. Wilson, P.E., Assistant County Administrator ` ita2o2 geed bYo; 9 5-5ilson,P.E.
Digitally signed by Christine Hurley
THRU: Christine Hurley, County Administrator Christine Hurley Date:2026.02.0911:52:39-05'00'
SUBJECT: Proposed Change Order to be Approved
Attached is proposed Change Order#1 for the Harvey Government Center Building Spalling Repairs
Project. Sufficient funds are available in the current budget to cover this change order. This change
order increases the final contract sum by$11,125.00. The substantial completion date is unchanged.
Monroe County Ordinance 027-1998 and subsequent amendments provide authority for the
Administrator to approve change orders within specified limits after providing Board of County
Commissioners with at least 24 hours to review them and pose any questions or objections that they
may have.
It is the Administrator's intent to approve the attached change order under that authority after the 24-
hour BOCC notification time.
MONROE COUNTY/ENGMERING/FAciLMES DEVELOPMENT
CONTRACT CHANGE ORDER
PROJECT TITLE: CHANGE ORDER NO: 01
Harvey Government Center Building INITIATION DATE: 02103/2026
Spalling Repairs CONTRACT DATE: 1212312025
TO CONTRACTOR:
Kings Enterprises of the Keys, Inc.
P.O. Box 500849
Marathon, Florida 33050
The Contract is changed as follows:
The original (Contract Sum) (Guaranteed Maximum Price)................................. ..........$ 12,000.00
Net change by previously authorized Change Orders...................................................$ 0.00
The(Contract Sum)(Guaranteed Maximum Price) prior to this Change order was....... $ 12,000.00
The(Contract Sum) (Guaranteed Maximum Price)will be (increased)(decreased)
(unchanged)by this Change Order....._$ 11,125.00
The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order is........$ 23,125.00
The Contract Time will be(increased)(decreased)(unchanged)by.................................. 0 days
The date of Substantial Completion as of the date of this Change Order is........................ 04/14/2026
Detailed description of change order and justification:
The original scope of work included only the spallino--airs to the drive-through portion of the l larvey
Government Center Build The
Gocrnty has asked the Contractor to perforrn additional spallinp repairs on the stairwell floor and wall as
identified in the Structural Report(photos 11,12 13 ,
This chancre Order is 92.7Zo of the original contract price.
Not valid upiff sing v ner Architect/E (if aglicable).and Contracto 02/04/2026
ARCHITECT/ENGINEER: Date
IVf Desigr If
CONTRACTOR:
L,
Kings Enterprises of the Keys, Inc. Date
/U,, �_-A, t1&,e 1A17de,1"
William DeSantis
DEPARTMENT DIRECTOR
William Desantis Date
Facilities Development
Digitally signed by Christine
Christine Hurley Hurley
COUNTY ADMINISTRATO Date:2026.02.12 12:29:07-05'00'
R:
Christine Hurley Date
Change Order Attachment per Ordinance No. 005-2023
• Change Order was not included in the original contract specifications. Yes ® No ❑
If Yes, explanation: Additional spalling damage was identified in the Structural Repair Report which
was not part of the original Scope of Work. This change order covers the spalling damage found in
the stairwell(photo 11, photo 12, &photo 13 of the structural report).
• Change Order was included in the original specifications. Yes ❑ No
If Yes, explanation of increase in price:
• Change Order exceeds $100,000 or 5% of contract price (whichever is greater). Yes ❑ No
If Yes, explanation as to why it is not subject for a calling for bids:
• Project architect approves the change order. Yes ® No ❑
If no, explanation of why:
• Change Order is correcting an error or omission in design document. Yes ❑No
Should a claim under the applicable professional liability policy be made? Yes ❑ No
Explain:
The King's Enterprises of the Keys,Inc.CBC059852 Proposal
PO BOX 500849
MARATHON, FL 330500849 US
+13055226567
kingsenterprisesoffice@gmail.com
www.thekingsenterprises.com
Aliall tll I'll SS Sil flilll o III O
Monroe County Florida Harvey Government Center
Monroe County Department of Facilities and Monroe County Florida
Project Management 1200 Truman Ave
1100 Simonton St Room 2-216 Key West,FL 33040
Key West,FL 33040
III'101 n0SAll # 11 to II II Ili XII1II I113A '110114 DA III e
CO1 -4039 01/09/2026 01/23/2026
AA II L A(:11 IVI II Y ALA(:I3111..,II IAIV II` I dA II L AIIA0U.DI"gl 11
"CHANGE ORDER 1 FOR ADDITIONAL 0.00 0.00
REPAIRS"
LABOR AND MATERIALS ARE INCLUDED IN 0.00 0.00
THE FOLLOWING SCOPE OF WORK:
This change order reflects the specifications
referenced in the original contract
Labor/Mat Included REPAIR 1 -Photo 13,Stairwell Wall Level 1 1 5,500.00 5,500.00
Column 2.5ft x 5ft
5 LF repair
Labor/Mat Included REPAIR 2-Photo 12,Stairwell Floor 1 2,250.00 2,250.00
2ft x 5ft slab
Labor/Mat Included REPAIR 3-Photo 11,Stairwell Floor 1 3,375.00 3,375.00
3ft x 5ft slab
NOTE:
--Only the work noted above is included in
proposed scope and price
PLEASE SIGN BELOW AS ACCEPTANCE OF TERMS AND CONDITIONS: SUBTOTAL 11,125.00
--All Agreements are contingent upon strikes,subcontractors,accidents,
TAX 0.00
weather,or any delays beyond our control.
--Any other work is invoiced at$75.00 per man hour with materials/ TOTAL $1 1 1 25.00
subcontractors invoiced at cost plus 20%contractor overhead.
--Deposits and/or progress payments may be requested. Deposits are applied
to final invoice. Invoices are due upon receipt.
--A convenience fee of 3%will be added to all credit/debit card transactions.
--Overdue accounts will be subject to 18%annual interest and any legal fees
incurred for collection.CONTACTS:Nick Wielander 305-522-6567, Barbra
Brettman,Office:305-360-4730
Accepted By Accepted Date
Harvey Government Building July 28", 2025
Reinforced Concrete Spalling
Structural Observation Report 1111l.M 0
Photo no.11 Potential Grade C Spalling—Cracks and
Stairwell Floor shallow flaking of concrete surface.
u
i
u �
Ih i%
i r rdJJ� �j''rj�i I✓ �oi� � o!N
V �I�r�l`�/rv��✓r/���riln� !` / �,,�rN /I r�/4�`
f- r�%� �r�ir' ;�lif����/Y����i�s t�t/ri�D��h�r���la��%��(1✓%�/��/��/r/�,f�;/ir
� 9r F✓��yr✓ 1/�i � /rlr// /1/
r/✓✓��1/%���%" �'�1,1`��fl/fi'flir///,/t�p li�l+� ��>r "/�/' /i��p�/��jf%��%/1'
i/ J f/✓�l if�ll��'�i/ r ✓/� lr f/t✓r/I�,'r 4 .f/�� �✓� �r�l���
r/, /,✓/ r,r fl��✓RUo�r Ysrf/�/� rj /J/r �/l1?/! t � ���1/
✓ .r / r/� r rOr { rl / l�� r /
r/ / Yi��r/r�y�iy/�lr/y���'�,�ry� ✓r r�rifd�,�� ���l f�l%
rf✓a r � '/�e ��� �i� r r r. ✓y�i,rr�%tl��� Gr l�e,� /�f'Di
� l /
% r u f rl✓ % � � r✓r ,i/ �r rfi/ �rl���;��t��✓ ��'
r✓r X r tr r✓� '/✓i�y! Y /i/iq�lr
1� �I�firi l,l 1 ✓r/�r
✓Jf ✓lip r1 r/ r �! ri,F fr ✓✓ I� �/rrrr
r��{�/f�r✓��0��i%�i/'/� ��
r� I✓.11,✓'� r ifr/%��i th1,�iJ;lk ,/r IJ r✓ i�� rlpi//r`/rvr r 11.
dr � °yTr/P{ 1 � r�J✓ ,r1'✓t r rrry�,/{r,7 off// ;��,a
Photo no.12 Potential Grade C Spalling—Cracks and
Stairwell Floor shallow flaking of concrete surface.
I t
r
r/
f v rN
4 �
r
a
Harvey Government Building July 28", 2025
Reinforced Concrete Spalling
Structural Observation Report 1111l.M 0
Photo no.13 Grade A Spalling—Cracks and
Stairwell Wall delamination in concrete surface with
Level 1 hollow areas that expose rebar once
removed.Hole drilled into wall ilidllullp J ,,,,OJ
indicates potential water intrusion.
Color of water stain indicates possible
steel corrosion.
Photo no.14 Appears to be cosmetic—Small cracks
S„„� MEL
��,
"air�vell Wall in concrete surface likely due to
%i
LeveP,�,,, shrinkage or vibrations.
f
J10 I �� ry� Y iµ tli„�',"