Loading...
HomeMy WebLinkAbout13th Work Order 03/11/2026 DATE: March 12, 2026 TO: Judith Clarke, PE, Director Engineering/Roads & Bridges ATTN: Samantha Yeoman Executive Assistant FROM: Brynn Morey, Deputy Clerk SUBJECT: March 11, 2026 BOCC Meeting The following item has been executed and added to the record: C10 Approval of Amendment No. 2 to the engineering design and permitting services contract between Monroe County and McFarland Johnson, Inc. for the Crane Blvd Shared Use Path Project for time extension of the original contract until 60 days after construction is complete for post design services at no additional cost C15 Approval of task order 13 under the continuing services contract with AECOM Technical Services, Inc. for Transportation Planning Services to conduct a speed limit evaluation study on four roads in the Baypoint community in Saddlebunch Keys. The task order fee of $25,669.16 will be funded by gas tax funds. Should you have any questions please feel free to contact me at (305) 292-3550. cc: County Attorney Finance File KEY WEST MARATHON PLANTATION KEY 500 Whitehead Street 3117 Overseas Highway 88770 Overseas Highway Key West, Florida 33040 Marathon, Florida 33050 Plantation Key, Florida 33070 Speed Limit Evaluation Study SCOPE OF SERVICES FOR WORK ORDER NO. 13 Speed Limit Evaluation Study Bay Point Community Monroe County, Florida A. INTRODUCTION The Monroe County Engineering Services Department has requested AECOM to conduct a Speed Limit Evaluation Study to determine the feasibility of lowering the speed limit from 25 mph to 15 mph in the Bay Point Community, located in Saddlebunch Keys, Florida. Specific roadways to be evaluated for this study include Beach Drive, Coral Drive, Palm Drive and Shore Drive (see location map below). This study will be conducted based on the guidelines and procedures as outlined in the FDOT Manuals: i) Speed Zoning for Highways, Roads and Streets In Florida, and ii) Manual on Uniform Traffic Studies. The following is a list of tasks included in the scope of services. Any task that is not listed below will be considered out of scope. B. SCOPE OF SERVICES Task 1: Crash Data Analysis and Collision Diagrams Download crash data and crash reports for the 5-year period (2021-2025) from Signal Four Analytics. Also, contact the Monroe County SheriffÓs Office for crash data. Identify and correct mislocated and miscoded crashes based on crash reports. Prepare crash summary tables and develop collision diagrams based on the 5-year crash data (2021-2025). Review collision diagrams and crash reports to identify crash patterns, probable causes, and any speeding-related crashes. Page 1 of 3 Speed Limit Evaluation Study Task 2: Project Progress Meetings AECOM staff will attend one virtual progress meeting with the Monroe County Project Manager (PM) to discuss the study findings/recommendations. Task 3: Speed Data Collection AECOMÓs subconsultant, CHA, will collect speed data for both directions of travel by means of detection and relay devices, or a radar gun, or cameras, or tubes, or other methods. Based on the roadway characteristics of Bay Point, there may be limitations to acquire speed data to meet typical sample size requirements, especially along Beach Drive, Coral Drive and Shore Drive. Data will be collected at two locations on Palm Drive for four days. Task 4: Field Reviews A field review will be conducted to identify existing conditions, examine the physical features, and traffic control devices. Photographs will be taken to document the findings. Task 5: Speed Data and Field Review Technical Memorandum Speed data collected in Task 3 will be analyzed and the following speed parameters will th be determined: 85 percentile speed, average speed, speed variance, and pace. Additionally, a technical memorandum will be prepared to summarize field observations and speed data analysis results. Task 6: Draft Deliverable Prepare a draft report summarizing the study findings and recommendations and submit it to Monroe County PM for review. The following items will be included in the draft report: Crash Data Analysis/Summaries Collision Diagrams Findings of Field Reviews Speed Data Summaries Recommendations Task 7: Final Deliverable Revise the draft report based on comments received from Monroe County Submit a PDF of the Final Report C. PROJECT MANAGEMENT Purpose The purpose of this task is to perform all project management related activities that are required as part of this study. Activities Project Management will include the overall management of this study, including project Page 2 of 3 6.001.003.003.00 41.00 TOTAL $9,111.91 Total Fee$25,669.16 Clerical AECOM Fee$9,111.91 Subconsultant Fee$16,557.25 5.05.00 CADD Technician GIS Specialist 4.04.005.05.00 Engineer Transportation Senior Planner Engineer/ Transportation 6.01.02.04.08.014.001.02.03.0 13.006.0017.000.005.000.00 Project $350.18$259.90$142.41$178.38$115.84$99.19 $4,552.34$1,559.40$2,420.97$0.00$579.20$0.00 Manager EXHIBIT A Monroe County TOTAL HOURS Consultant: AECOM Speed Limit Evaluation Study Estimate of Work Effort for Task Work Order No. 13 Cost by Classification STUDY TYPE: Speed Limit Evaluation StudyBay Point Community Project ManagementTask 2: Project Progress MeetingsTask 1a: Crash Data CollectionTask 1b: Crash AnalysisTask 1c: Collision Diagrams Task 6: Draft DeliverableTask 7: Final DeliverableQuality Control Review $2,247.44$4,836.00$3,066.93$4,232.28$1,304.76 TOTAL DOLLARS TOTAL HOURS Rate Hourly TECHNICIAN T E CADD/GRAPHIC E Hour Man- H S E E F G N I T 069.2352$5,239.00116$16,557.25 L Hourly U S O C ENGINEER A H TRANSPORTATION C Hour Man- Hourly SR. ENGINEER TRANSPORTATION Hour Man- Rate Hourly $280.93$217.46$123.3148$100.7548$280.939$217.469$123.31$100.7518$280.934$217.4624$123.314$100.7532$280.936$217.46$123.31$100.756$280.934$217.46$123.31$100.754$869.84 8$280.93$217.46$123.31$100.7588$2,247.4423$5,001.5833$4, PROJECT MANAGER Hour Man- TOTALS ACTIVITY Project ManagementTask 3: Speed Data Collection (4 days)Task 4: Field ReviewTask 5: Speed Data Analysis/Summary Technical MemorandumProject QA/QCComments/Revisions