Loading...
HomeMy WebLinkAboutMC Detention Center Fire Pump Replacement Project State Plumbing License# I State Fire Marshall License# CFC 1425735 FPC21-000111 2026 BUDGET REVISED PROPOSAL October 9,2025 Monroe County Public Works 123 Overseas Highway Key West,FL 33040 Attn: William DeSantis, Director of Maintenance Ref: Monroe County Detention Center Sub:Fire Pump Replacement Gary's Plumbing and Fire is pleased to present our proposed budget that will provide all labor, material and equipment to replace existing diesel driven fire suppression pump. Existing system is at its term life usage and is in need of replacement. New fire pump and enclosure shall be fully enclosed in a factory provided enclosure that shall fit on existing pump house foot print. System shall be elevated to comply with 100 flood plan. Enclosure shall comply with the 180mph wind rating. New system shall connect to existing water and electrical supply. Concrete base shall be augured and poured in place to provide a stable housekeeping pad and designed to support new pump enclosure. This shall be a turnkey project from shut down to start up. Project shall be 30 day duration with 4-8 month lead time for pump delivery. Temporary fire pump shall be installed to eliminate fire watch requirement. Buildings being serviced by existing fire pump shall not go unprotected for duration of replacement. BUDGET PROPOSAL AMOUNT: $474,000.00 Respect ly Submitted, Gary nton President Gary's lumbi g and Fire,Inc. 6409 2"'Terrace,Suite 1 * Key West,FI.33040 Phone(305)296-6013 * Fax(305)292-4978 * garysplumbingl@aol.com F9 BOARD OF COUNTY COMMISSIONERS COUNTY of MONROE Mayor James K.Scholl,District 3 The Florida Keys Mayor Pro Tern Michelle Lincoln,District 2 Craig Cates,District 1 David Rice,District 4 Holly Merrill Raschein,District 5 Board of County Commissioners Meeting November 12, 2025 Agenda Item Number: F9 2023-4729 BULK ITEM: Yes DEPARTMENT: Facilities Maintenance TIME APPROXIMATE: STAFF CONTACT: Willie DeSantis N/A AGENDA ITEM WORDING: Approval of a Proposed Project in the anticipated amount of $474,000.00 with Gary's Plumbing and Fire to perform under its current contract to provide all labor, material, and equipment needed to replace the existing diesel driven fire suppression pump at the Stock Island Detention Center. This is an urgent life/safety replacement. $274,000.00 will be covered under the current contract utilizing Fund 101 - Fine& Forfeiture, and the remaining $200,000.00 will be reallocated from Fund 304 - One Cent Infrastructure Sales Surtax. This is a one-time job and an increase in allotted annual funds going forward is not needed. ITEM BACKGROUND: The existing fire pump system at the Stock Island Detention Cetner is at the end of its useful life and it is in need of replacement. A new fire pump and enclosure will be placed on the existing pump house footprint. The system shall be elevated to comply with 100-year flood plain map, and enclosure shall comply with the 180-mph wind rating. The new system shall connect to existing water and electrical supply. A concrete base shall be augured and poured in place to provide a stable housekeeping pad and to support a new pump enclosure. PREVIOUS RELEVANT BOCC ACTION: N/A INSURANCE REQUIRED: Yes CONTRACT/AGREEMENT CHANGES: N/A STAFF RECOMMENDATION: Approval DOCUMENTATION: 1 MCDC Fire Pump Replacement Proposal 2455_001.pdf 2026.08.13 EXPIRE COI-08-2026-Garys-Exec.pdf FINANCIAL IMPACT: Effective Date: November 12, 2025 Expiration Date: N/A Total Dollar Value of Contract: $474,000.00 Total Cost to County: $474,000.00 Current Year Portion: $474,000.00 Budgeted: No Source of Funds: 101 and 304. $274,000.00 will be covered under the current contract with Gary's, and $200,000.00 will be reallocated from Gato HVAC Project(Fund 304 - One Cent Infrastructure Sales Surtax) by delaying the project until FY27. CPI: No Indirect Costs: N/A Estimated Ongoing Costs Not Included in above dollar amounts: minimal routine maintenance costs: N/A Revenue Producing:No If yes, amount: N/A Grant: N/A County Match: N/A Insurance Required: Yes 2